Integrated bathroom overall chassis capable of draining water under door and mounting method thereof
By designing an integrated chassis that can drain under the door in the integrated bathroom, using a waterproof tray made of fiberglass and leveling support frame, the height difference and water seepage problems in wet and dry areas are solved, and barrier-free design and aesthetic improvement are achieved.
Patent Information
- Application Number
- CN202411234798.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-26
AI Technical Summary
There is a structural height difference between the wet and dry areas of the existing integrated bathroom, which affects the aesthetics and barrier-free design, and the structure of the door and the ground is not closed, causing water to seep into the dry areas at the bottom of the door.
A integrated bathroom chassis with drainable water under the door is designed, using a waterproof tray made of fiberglass and leveling support frame. The waterproof tray is equipped with a U-shaped wall card slot and water guide port, combined with high-strength XPS material filling and glass coating. Achieve no height difference installation and waterproofing effect.
It solves the need for barrier-free design, avoids water seepage at the bottom of the door, improves the aesthetics and waterproof safety of the overall bathroom, and effectively separates the wet and dry areas through the water guide.
Smart Images

Figure CN119021518A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to an integrated bathroom chassis capable of draining water under a door and an installation method thereof. Background Art
[0002] At present, the chassis structure used in the integrated bathroom is mostly flanged around the chassis, and the wall panels are on the chassis, but this kind of chassis will expose the corners around, affecting the appearance; in the prior art, the wet area and the dry area of the integrated bathroom are structurally waterproof, and the height difference between the inside and the outside is about 3 cm, which cannot achieve no height difference between the inside and the outside, and does not meet the requirements of barrier-free design; in the prior art, when water is directly sprayed to the integrated bathroom door, because the structure of the door and the ground is not closed, water will seep into the dry area from the bottom of the door. Summary of the invention
[0003] The purpose of the present invention is to provide an integrated bathroom chassis with drainage under the door and an installation method thereof, so as to solve the problem that there is a height difference between the inside and outside of the existing integrated bathroom, which cannot meet the requirements of barrier-free entry and exit and is inconvenient to enter and exit; and to solve the problem that the structure of the existing integrated bathroom door and the ground is not closed, causing water to seep into the dry area from the bottom of the door.
[0004] To achieve the above object, the present invention adopts the following technical solution: The utility model discloses an integrated bathroom overall chassis capable of draining water under a door, comprising a leveling support frame supported on the ground and a waterproof plate bonded to the top surface of the leveling support frame.
[0005] The waterproof plate is a rectangular integrated structure made of fiberglass, including a rectangular plate surface, which is arranged around the plate surface and bent downward in a U shape along the edge of the plate surface to form a U-shaped wall panel groove, wherein the outer edge of the U-shaped wall panel groove located on the front side is bent outward in an L shape to form a bathroom door mounting surface; the top edge height of the U-shaped wall panel groove located on the rear side and the left and right sides is flush with the top edge height of the outer side surface of the bathroom door mounting surface.
[0006] An inner corner of the disk surface is pressed down along the disk surface to form a rectangular pressing groove, and the middle of the rectangular pressing groove is pressed down to form a circular pressing groove, and a circular drainage port is opened in the center of the circular pressing groove.
[0007] The entire disk surface is tilted toward the drain outlet, with a drainage slope of 1.2%.
[0008] A further preferred technical solution is as follows: a water guide port is provided in the U-shaped wall panel slot and on one side close to the drain port.
[0009] The water inlet and the drain outlet are connected through a water pipe, which is arranged below the waterproof plate. The water inlet of the water pipe is connected to the water inlet, and the water outlet of the water pipe is connected to the floor drain.
[0010] A further preferred technical solution: a wall panel is clamped in the U-shaped wall panel slot.
[0011] A further preferred technical solution: the leveling support frame includes a bracket, a nut welded to the bottom surface of the bracket, and a bolt passing through the nut from top to bottom.
[0012] A further preferred technical solution is that the bracket is a rectangular plate frame structure, including three transverse bars arranged at intervals and five longitudinal bars welded vertically at intervals between the three transverse bars; the lower surfaces of the transverse bars and the longitudinal bars are located in the same plane.
[0013] A further preferred technical solution is as follows: a round hole is provided on the bottom surface of the transverse rod, corresponding to the connection position of the longitudinal rod.
[0014] A further preferred technical solution is that the nut is welded to the circular hole on the bottom surface of the transverse rod.
[0015] A further preferred technical solution is that the bolt passes through the circular hole on the bottom surface of the transverse rod from top to bottom and is threadedly connected to the nut.
[0016] A further preferred technical solution is that the gap between the leveling support frame and the waterproof plate is filled with high-strength XPS material.
[0017] The installation method of the integrated bathroom chassis with drainage under the door comprises the following steps: Step 1: The waterproof plate is processed according to the design dimensions and drawing requirements. The fiberglass waterproof plate with an integrated structure is prefabricated in the factory and is guaranteed to be firm after processing.
[0018] Step 2: Make a leveling support frame: Use a rectangular steel pipe to weld a bracket, open a circular hole on the bottom surface of the horizontal rod of the bracket, weld a nut at the position of the circular hole, and pass the bolt through the nut from top to bottom.
[0019] Step three: place the waterproof plate on the leveling support frame according to the positioning size. After fixing it, fill the gap between the leveling support frame and the waterproof plate with high-strength XPS material, and then coat it with glass cloth to complete the drainage chassis.
[0020] Step 4: transport the drainable chassis as a whole to the construction site and place it directly on the ground to be constructed. By adjusting the height of the adjusting bolts, the overall levelness of the drainable chassis can be adjusted.
[0021] Step 5. According to the design, plug and install the wall panels into the U-shaped wall panel slots.
[0022] Step six, install the matching bathroom door on the bathroom door installation surface and fix it to the wall panel.
[0023] Compared with the prior art, the present invention has the following characteristics and beneficial effects: 1. The waterproof plate of the present invention is provided with a water guide port in the U wall plate slot near the installation surface of the bathroom door, which solves the problem of water splashing and overflowing under the door and better ensures the waterproof safety of the overall bathroom.
[0024] 2. The surface of the waterproof plate of the present invention can be composited in various forms, such as composite plate with composite soft floor glue, composite plate with floor tiles, so that the overall bathroom has more style choices.
[0025] 3. The waterproof plate of the present invention is provided with a U-shaped wall panel slot, into which the wall panel can be inserted, so that the junction between the ground and the wall panel is more beautiful, meets people's aesthetic requirements, and the product is more refined.
[0026] 4. The height of the top edges at the rear and both sides of the bathroom door installation surface of the present invention is flush with the top edge height of the outer side of the U-shaped wall panel slot; it solves the requirement of barrier-free design of the overall bathroom with no height difference inside and outside, and can be used in water spaces with barrier-free needs or requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a plan view of the integrated bathroom chassis with drainage under the door of the present invention.
[0028] Figure 2 yes Figure 1 Cross-section view at point I.
[0029] Figure 3 yes Figure 1 Cross-sectional view at point II.
[0030] Figure 4 yes Figure 1 Cross-sectional view at point III.
[0031] Figure 5 yes Figure 1 Cross-sectional view at point IV.
[0032] Figure 6 yes Figure 1 AA section view in.
[0033] Figure 7 yes Figure 1 BB cross-section diagram in.
[0034] Figure 8 yes Figure 6 Enlarged view of point V in the middle.
[0035] Fig. 9 yes Figure 6 Enlarged view of point VI in the middle.
[0036] Fig.10 It is a schematic diagram of the integrated bathroom chassis with drainage under the door of the present invention.
[0037] Figure numerals: 1—leveling support frame, 2—waterproof plate, 1.1—bracket, 1.2—nut, 1.3—bolt, 2.1—plate surface, 2.2—U-shaped wall plate slot, 2.3—bathroom door installation surface, 2.4—rectangular downward pressure surface, 2.5—circular downward pressure surface, 2.6—drain outlet, 2.7—water guide outlet. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] See also Figures 1 to 10 As shown, an integrated bathroom chassis with drainage under the door and an installation method thereof.
[0040] The integrated bathroom chassis with drainage under the door comprises a leveling support frame 1 supported on the ground and a waterproof plate 2 bonded to the top surface of the leveling support frame 1.
[0041] The waterproof plate 2 is a rectangular integrated structure made of glass fiber reinforced plastic, including a rectangular plate surface 2.1, which is arranged around the plate surface 2.1 and bent downward in a U shape along the edge of the plate surface 2.1 to form a U-shaped wall panel slot 2.2, wherein the outer edge of the U-shaped wall panel slot 2.2 located on the front side is bent outward in an L shape to form a bathroom door installation surface 2.3; the top edge height of the U-shaped wall panel slot 2.2 located on the rear side and the left and right sides is flush with the top edge height of the outer side surface of the bathroom door installation surface 2.3.
[0042] A corner of the inner side of the plate surface 2.1 is pressed down along the plate surface 2.1 to form a rectangular pressing groove 2.4, and the middle of the rectangular pressing groove 2.4 is pressed down to form a circular pressing groove 2.5. A circular drainage port 2.6 is opened in the center of the circular pressing groove 2.5.
[0043] The plate surface 2.1 is tilted as a whole toward the drainage outlet 2.6, and the drainage slope is 1.2%.
[0044] The water inlet 2.7 and the drain outlet 2.6 are connected through a water pipe, which is arranged below the waterproof plate 2. A water inlet 2.7 is opened in the U-shaped wall plate slot 2.2 and on one side close to the drain outlet 2.6. The water inlet of the water pipe is connected to the water inlet 2.7, and the water outlet of the water pipe is connected to the floor drain.
[0045] The water inlet 2.7 is adapted to a special small floor drain, and the upper surface of the small floor drain is a stainless steel cover plate. After installation, the stainless steel cover plate must be flush with the bottom of the U-shaped wall plate slot 2.2, so as not to affect the installation of the wall plate. The U-shaped wall plate slot 2.2 is clamped with a wall plate.
[0046] The wall panel fits into the U-shaped wall panel slot 2.2, which avoids the problem that after the traditional waterproof plate 2 and the wall panel are installed, the installation gap is higher than the plate surface 2.1, which leads to poor aesthetics. The wall panel of the present invention is directly combined with the ground, which is more beautiful.
[0047] The leveling support frame 1 comprises a bracket 1.1, a nut 1.2 welded to the bottom surface of the bracket 1.1, and a bolt 1.3 passing through the nut 1.2 from top to bottom.
[0048] The bracket 1.1 is welded from rectangular steel pipes with specifications of 40*20*2mm and is a rectangular plate frame structure, including three transverse bars arranged at intervals and five longitudinal bars welded vertically at intervals between the three transverse bars; the lower surfaces of the transverse bars and the longitudinal bars are located in the same plane; the bottom surface of the transverse bar, corresponding to the connection position of the longitudinal bar, is provided with a circular hole with a diameter of 16mm.
[0049] The nut 1.2 is welded to the circular hole on the bottom surface of the transverse rod; the nut 1.2 is a nut with a specification of M16mm, and the nut 1.2 is ensured to be perpendicular to the welding surface.
[0050] Bolt 1.3 is a bolt with a specification of M16 mm; Bolt 1.3 is used to adjust the level of the entire chassis.
[0051] The bolt 1.3 passes through the circular hole on the bottom surface of the transverse rod from top to bottom and is threadedly connected to the nut 1.2.
[0052] The gap between the leveling support frame 1 and the waterproof plate 2 is filled with high-strength XPS material, and the surface is wrapped with glass cloth, which can play the dual roles of heat preservation and support.
[0053] The present invention provides a waterproof plate with a U-shaped wall panel slot 2.2, so that the wall panel can be directly plugged into the U-shaped wall panel slot 2.2, thereby solving the problem of the connection between the wall panel and the ground and the waterproof structure. The installation gap between the traditional waterproof plate 2 and the wall panel after installation will not be exposed, which is more visually beautiful.
[0054] The present invention ensures that there is no height difference between the inner and outer sides of the waterproof plate at the door installation side through the structural design of the waterproof plate, so that the wheelchair can enter and exit conveniently.
[0055] The waterproof plate of the present invention is provided with a water guide port 2.7 to separate the water area inside the toilet from the dry area outside, so as to prevent the water in the water area from splashing, penetrating and flowing out to the dry area.
[0056] The waterproof plate of the present invention is provided with a composite anti-skid soft floor glue to prevent the elderly from slipping and falling.
[0057] The installation method of the integrated bathroom chassis with drainage under the door of the present invention comprises the following steps: 1. The waterproof plate is processed according to the design size and drawing requirements. The waterproof plate made of fiberglass with an integrated structure is prefabricated in the factory. 2. It is guaranteed to be firm after processing.
[0058] 2. Make a leveling support frame 1: Use a rectangular steel pipe to weld a bracket 1.1, open a circular hole on the bottom surface of the horizontal rod of the bracket 1.1, weld a nut 1.2 at the position of the circular hole, and pass the bolt 1.3 through the nut 1.2 from top to bottom.
[0059] 3. Place the waterproof plate 2 on the leveling support frame 1 according to the positioning size. After fixing it, fill the gap between the leveling support frame 1 and the waterproof plate 2 with high-strength XPS material, and then coat it with glass cloth to complete the production of the drainable chassis.
[0060] 4. Transport the drainable chassis as a whole to the construction site and place it directly on the ground to be constructed. Adjust the height of the adjusting bolts 1.3 to adjust the overall levelness of the drainable chassis.
[0061] 5. According to the design, plug and install the wall panels into the U-shaped wall panel slot 2.2.
[0062] 6. Install the matching bathroom door on the bathroom door installation surface and fix it to the wall panel.
[0063] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0064] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. An integrated bathroom chassis with drainage under the door, characterized by: It comprises a leveling support frame (1) supported on the ground and a waterproof plate (2) bonded to the top surface of the leveling support frame (1); The waterproof plate (2) is a rectangular integrated structure made of glass fiber reinforced plastic, comprising a rectangular plate surface (2.1), which is arranged around the plate surface (2.1) and is bent downward in a U-shape along the edge of the plate surface (2.1) to form a U-shaped wall plate slot (2.2), wherein the outer edge of the U-shaped wall plate slot (2.2) located at the front side is bent outward in an L-shape to form a bathroom door installation surface (2.3); the top edge height of the U-shaped wall plate slot (2.2) located at the rear side and the left and right sides is flush with the top edge height of the outer side surface of the bathroom door installation surface (2.3); A corner portion of the inner side of the disk surface (2.1) is pressed down along the disk surface (2.1) to form a rectangular pressing groove (2.4), and the middle portion of the rectangular pressing groove (2.4) is pressed down to form a circular pressing groove (2.5), and a circular drainage port (2.6) is opened at the center of the circular pressing groove (2.5); The disk surface (2.1) is tilted as a whole toward the drainage outlet (2.6), and the drainage slope is 1.2%.
2. The integrated bathroom chassis with drainage under the door according to claim 1 is characterized by: A water guide port (2.7) is provided in the U-shaped wall plate slot (2.2) and on one side close to the drain port (2.6); The water guide port (2.7) and the drain port (2.6) are connected via a water guide pipe, which is arranged below the waterproof plate (2). The water inlet of the water guide pipe is connected to the water guide port (2.7), and the water outlet of the water guide pipe is connected to the floor drain.
3. The integrated bathroom chassis with drainage under the door according to claim 1 is characterized by: A wall panel is clamped in the U-shaped wall panel clamping groove (2.2).
4. The integrated bathroom chassis with drainage under the door according to claim 1 is characterized by: The leveling support frame (1) comprises a bracket (1.1), a nut (1.2) welded to the bottom surface of the bracket (1.1), and a bolt (1.3) passing through the nut (1.2) from top to bottom.
5. The integrated bathroom chassis with drainage under the door according to claim 4 is characterized by: The bracket (1.1) is a rectangular plate frame structure, comprising three transverse bars arranged at intervals and five longitudinal bars welded vertically at intervals between the three transverse bars; the lower surfaces of the transverse bars and the longitudinal bars are located in the same plane.
6. The integrated bathroom chassis with drainage under the door according to claim 5 is characterized by: A round hole is opened on the bottom surface of the transverse rod, corresponding to the connection position of the longitudinal rod.
7. The integrated bathroom chassis with drainage under the door according to claim 6 is characterized by: The nut (1.2) is welded to the circular hole on the bottom surface of the transverse rod.
8. The integrated bathroom chassis with drainage under the door according to claim 7 is characterized by: The bolt (1.3) passes through the circular hole on the bottom surface of the transverse rod from top to bottom and is threadedly connected to the nut (1.2).
9. The integrated bathroom chassis with drainage under the door according to claim 1 is characterized by: The gap between the leveling support frame (1) and the waterproof plate (2) is filled with high-strength XPS material.
10. The method for installing the integrated bathroom chassis with drainage under the door according to any one of claims 1 to 9, characterized in that: The steps are: Step 1: The waterproof plate is processed according to the design dimensions and the requirements of the drawings. The waterproof plate (2) made of glass fiber reinforced plastic with an integrated structure is prefabricated in the factory. After the processing is completed, it is ensured to be firm. Step 2, making a leveling support frame (1): using a rectangular steel pipe to weld a bracket (1.1), opening a circular hole on the bottom surface of the horizontal rod of the bracket (1.1), welding a nut (1.2) at the position of the circular hole, and inserting a bolt (1.3) into the nut (1.2) from top to bottom; Step 3: Place the waterproof plate (2) on the leveling support frame (1) according to the positioning size. After fixing, fill the gap between the leveling support frame (1) and the waterproof plate (2) with high-strength XPS material, and then coat it with glass cloth. The drainage chassis is completed. Step 4: transport the drainable chassis as a whole to the construction site and place it directly on the ground to be constructed. By adjusting the height of the adjusting bolts (1.3), the overall levelness of the drainable chassis is adjusted. Step 5: According to the design, plug and install the wall panel into the U-shaped wall panel slot (2.2); Step six, install the matching bathroom door on the bathroom door installation surface and fix it to the wall panel.