Upper differential pressure floating coupling

By designing impact components and a small number of shear pin fixing structures in the floating joints, the problems of unbreakable sealing discs and difficulty in controlling pins are solved, and the full diameter of the pipe column and construction risks are reduced, which improves the simplicity of the equipment and convenience.

CN119021599APending Publication Date: 2024-11-26CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202310604382.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

During the downstream process of the existing floating coupling, the sealing disc is not completely broken, resulting in the full diameter of the pipe column, which increases the construction risk; another structure requires a large number of shear pins to fix, which is difficult to control and pressure in the well. The pin may cause the pin to be cut in advance, affecting the effect of the pin.

Method used

Design an upper pressure differential floating joint, which impacts the sealing disk under pressure through the impact assembly, and fixes the impact sleeve with a small number of shear pins to achieve the crushing and debris removal of the sealing disk, reduces construction risks, and passes through isolation fluid and soluble dowels reduce the difficulty of pump injection pressure control.

Benefits of technology

The full diameter of the pipe column is realized, which reduces construction risks and pump injection pressure control difficulty, and improves the structural simplicity and construction convenience of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021599A_ABST
    Figure CN119021599A_ABST
Patent Text Reader

Abstract

The invention provides an upper differential pressure floating coupling. The upper differential pressure floating coupling comprises an outer cylinder; the upper joint is arranged at the upper end of the outer cylinder; the lower joint is arranged at the lower end of the outer cylinder; the plugging disc is fixedly arranged in the outer cylinder in a sealing manner; and the impact assembly is arranged in the outer cylinder, the impact assembly is arranged above the plugging disc, and the impact assembly is constructed to be capable of impacting the plugging disc under the action of pressure. The pipe column can achieve full bore after the plugging disc is broken, construction risks can be reduced, and meanwhile the pipe column has the advantages of being simple in structure, convenient to construct and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas drilling and completion and reservoir transformation, and in particular relates to an upper pressure difference floating collar. Background Art

[0002] During the development process of oil and gas wells, as exploration and development deepen, oil and gas wells face problems such as large water-to-vertical ratio and insufficient deadweight of the tubing due to the long horizontal section, which leads to large friction torque in the horizontal section and difficulty in lowering the tubing when the tubing is lowered.

[0003] The floating collar casing technology can effectively solve the problem of running the completion string in extended reach wells and long horizontal wells. This technology uses a floating collar to seal a section of air or low-density drilling fluid at the bottom of the casing string, so that the casing string is in a floating state in the mud of the large well deviated section or horizontal section to reduce the friction between the casing string and the well wall. After the string is run into place, the closed section is opened to achieve unobstructed flow inside the string.

[0004] In the prior art, there is a plugging disc type floating coupling, which uses a plugging disc to seal a section of air or low-density drilling fluid. After the tubing is in place, the plugging disc is broken by direct pressure holding. However, the plugging disc may not be completely broken when the pressure holding method is used, so that the tubing may not yet achieve full diameter. When the plugging disc is not completely broken, on the one hand, it will affect the passing performance of the cementing plug in subsequent work. When the cementing plug passes, it is damaged by the remaining plugging disc and cannot effectively scrape the residual cement in the tubing, thereby increasing the actual opening pressure of tools such as the differential pressure sleeve pre-installed in the tubing, and reducing the passing safety of other tools that need to pass, etc., increasing the construction risk; on the other hand, it may completely destroy the cementing plug, causing the cementing plug to fail in collision pressure and sealing, resulting in cement reflux back into the wellbore, causing complex conditions in the wellbore.

[0005] In addition, in the prior art, there is another type of floating coupling with a sliding sleeve plugging disc. This floating coupling is provided with a movable plugging disc and a fixed impact sleeve. The crushing disc is arranged above the impact sleeve, and the impact sleeve and the plugging disc are fixed by shear pins. When the plugging disc needs to be crushed, pressure is pumped from above the crushing disc to push the plugging disc to cut off the shear pin and then hit the impact sleeve, thereby completely crushing the plugging disc. Although this technology can achieve full diameter of the pipe column, it must be ensured that the plugging disc will not be relatively displaced with the main pipe column of the floating coupling during the lowering process. In this structure, a large number of shear pins must be used to fix the plugging disc to ensure that the plugging disc works normally during the lowering process. Therefore, this structure requires a large number of shear pins, which is difficult to control, and is mostly distributed in multiple rows. Under the pressure of the mud in the well, the pins may be unevenly stressed and cut off in advance, resulting in process failure, causing the pipe column to fail to be smoothly lowered into place. The provision of multiple shear pins will require extremely high pumping pressure in the process of breaking the sealing disk. Since the sealing disk bears the pressure to shear the shear pins, the sealing disk may break prematurely under such pumping pressure. Once the sealing disk breaks or the seal fails due to an unexpected situation before the shear pins break, the shear pins will not be able to be sheared, resulting in the sealing disk being unable to hit the impact sleeve, which may cause the tubing to fail to achieve full bore, affecting subsequent work and increasing the risk of operations. Summary of the invention

[0006] In view of the technical problems mentioned above, the present invention aims to provide an upper pressure difference floating coupling, which can realize the full diameter of the pipe string and reduce the risk of work accidents.

[0007] According to the present invention, there is provided an upper pressure difference floating coupling, comprising: an outer tube; an upper joint arranged at the upper end of the outer tube; a lower joint arranged at the lower end of the outer tube; a sealing disk sealed and fixedly arranged inside the outer tube; and an impact assembly arranged inside the outer tube, the impact assembly being arranged above the sealing disk, and the impact assembly being configured to impact the sealing disk under the action of pressure.

[0008] In one embodiment, the impact assembly includes an inner sleeve sealed and fixedly connected to the outer sleeve and an impact sleeve fixed to the inner sleeve by shear pins.

[0009] In one embodiment, a C-shaped ring is provided on the outer wall of the inner sleeve, and a groove matching with the C-shaped ring is provided on the inner wall of the outer cylinder.

[0010] In one embodiment, the upper end of the impact sleeve abuts against the upper joint, and the lower end of the inner sleeve abuts against the sealing disk.

[0011] In one embodiment, the impact sleeve includes a convex ring portion and an impact portion arranged at the lower end of the convex ring portion, the wall thickness of the convex ring portion is greater than the wall thickness of the impact portion, the convex ring portion is sealingly connected to the outer tube, and the inner sleeve is sealingly arranged between the impact portion and the outer tube.

[0012] In one embodiment, a positioning protrusion for mounting the sealing disk is provided inside the outer cylinder.

[0013] In one embodiment, the upper end of the lower joint extends to the inside of the outer tube and abuts against the sealing disk, and a step is provided on the inner wall of the upper end of the lower joint, and the diameter of the step surface is greater than or equal to the outer diameter of the impact part.

[0014] In one embodiment, a sealing structure is provided between any contact surface of the inner sleeve, the outer tube and the lower joint with the sealing disk, and the sealing structure is a single-sided seal or a multi-sided seal. The sealing disk is made of a high-pressure resistant and fragile non-metallic material, and the high-pressure resistant and fragile non-metallic material includes glass, ceramic, and resin. The sealing disk is cylindrical or spherical.

[0015] In one embodiment, the shear pins used to secure the impact sleeve to the inner side of the inner sleeve are fusible pins.

[0016] The present invention also provides a floating coupling clearance method, which uses the upper pressure difference floating coupling provided by the present invention, including the following steps: pumping isolation fluid for protecting shear pins into the floating coupling well section; pumping mud into the well, and increasing the pumping pressure to achieve clearance.

[0017] Compared with the prior art, the present application has the following advantages.

[0018] When the pipe string is lowered, the present invention isolates the mud through the plugging disk, seals a section of air or low-density drilling fluid between the floating coupling and the pipe string below, and uses buoyancy to reduce the weight of the pipe string entering the large well inclination section or horizontal section, thereby reducing the friction resistance of the pipe string and helping the pipe string to be smoothly lowered into place. In the present invention, the plugging disk is fixedly arranged in the outer tube. The axial pressure area of ​​the impact sleeve is small, and it can be fixed in the outer tube through the inner sleeve with only a small number of shear pins, reducing the difficulty of pin control. In the process of crushing the plugging disk, the impact sleeve uses the end face pressure difference at its upper and lower ends to achieve displacement, cut off the shear pins, hit the plugging disk, and then take out the plugging disk debris in a circulating manner. Under this setting, even if the plugging disk fails prematurely, the impact sleeve can complete the displacement under the action of pressure and hit the plugging disk. The present invention can not only achieve the full diameter of the pipe string after the plugging disk is crushed, but also reduce the construction risk, and at the same time has the characteristics of simple structure and convenient construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be described below with reference to the accompanying drawings.

[0020] Figure 1 A schematic diagram showing an initial state of an embodiment of an upper pressure difference floating collar according to the present invention is shown;

[0021] Figure 2 A schematic diagram showing a broken plugging disk of an embodiment of an upper pressure difference floating collar according to the present invention;

[0022] Figure 3 A schematic diagram showing another embodiment of a crushing disk according to the present invention;

[0023] Figure 4 A schematic diagram showing the connection of the inner sleeve and the outer cylinder through pins according to the present invention is shown.

[0024] In the figure: 1. outer cylinder; 11. positioning protrusion; 2. upper joint; 3. lower joint; 31. step; 4. sealing disk; 41. sealing structure; 5. impact assembly; 51. inner sleeve; 511. C-shaped ring; 512. groove; 52. impact sleeve; 521. convex ring part; 522. impact part; 6. shear pin.

[0025] In the present application, all drawings are schematic drawings, which are only used to illustrate the principles of the present invention and are not drawn according to the actual scale. DETAILED DESCRIPTION

[0026] The present invention will be described below with reference to the accompanying drawings.

[0027] In the present application, it should be noted that the direction of the wellhead approaching the well according to the present invention is described as "upstream", "upper end" or similar terms, that is, Figure 1 The direction away from the wellhead is described as "downstream", "lower end" or similar terms, i.e. Figure 1 Underside shown.

[0028] Figure 1 The structure of the upper pressure difference floating collar 100 according to the present invention is shown. Figure 1As shown, the upper pressure difference floating coupling 100 includes an outer tube 1, an upper joint 2, a lower joint 3, a sealing disc 4 and an impact assembly 5. The upper joint 2 and the lower joint 3 are respectively arranged at the upper and lower ends of the outer tube 1 in a sealed manner. In this embodiment, the upper joint 2 and the lower joint 3 are connected to the outer tube 1 by a threaded connection. It is easy to understand that both the upper joint 2 and the lower joint 3 can be connected to other downhole tubulars. The sealing disc 4 and the impact assembly 5 are both arranged in the outer tube 1, wherein the sealing disc 4 is sealed and fixedly arranged in the outer tube 1, and is used to cooperate with other tubulars connected to the upper pressure difference floating coupling 100 to create a closed space. The impact assembly 5 is located above the sealing disc 4. Under a certain pressure, the impact assembly 5 can hit the sealing disc 4, break the sealing disc 4, and achieve full diameter.

[0029] In one embodiment, the impact assembly 5 includes an inner sleeve 51 and an impact sleeve 52. The inner sleeve 51 is fixedly connected to the outer cylinder 1, and is connected to the impact sleeve 52 through a shear pin 6. There are many ways to fix the inner sleeve 51 to the outer cylinder 1, such as by pin connection, such as Figure 4 As shown, sealing is required.

[0030] In a preferred embodiment, the inner sleeve 51 is fixedly connected to the outer cylinder 1 by means of a snap connection. A C-shaped ring 511 is provided on the outer wall of the inner sleeve 51, and a corresponding groove 512 is provided on the inner wall of the outer cylinder 1. The outer diameter of the C-shaped ring 511 in a natural state is larger than the outer diameter of the inner sleeve 51, and the inner diameter is smaller than the outer diameter of the inner sleeve 51. By such an arrangement, it is avoided to directly set a shear pin on the cylinder wall of the outer cylinder 1, thereby enhancing the structural strength of the outer cylinder 1 and enhancing the sealing performance.

[0031] According to an embodiment of the present invention, the impact sleeve 52 includes a convex ring portion 521 and an impact portion 522. The wall thickness of the convex ring portion 521 is greater than the wall thickness of the impact portion 522, and the inner diameters of the two are equal. The convex ring portion 521 contacts the outer tube 1, and a sealing ring is arranged between the two. The impact portion 522 contacts the inner sleeve 51, and a sealing ring is also arranged between the two. And a sealing ring is also arranged between the inner sleeve 51 and the outer tube 1. Through such an arrangement, when the space above the occluding disk 4 is pumped with pressure, the axial direction of the impact sleeve 51 is respectively subjected to forces on the upper end face of the convex ring portion 521 and the lower end face of the impact portion 522. Since the wall thickness of the convex ring portion 521 is greater than the wall thickness of the impact portion 522, the area of ​​the upper end face of the convex ring portion 521 is greater than the area of ​​the lower end face of the impact portion 522. Under the action of the pressure difference caused by the area difference at both ends, the impact sleeve 51 cuts off the shear pin 6 and hits the occluding disk 4.

[0032] In this setting, since the blocking disk 4 no longer controls the shear pins 6 to be cut off, even if the blocking disk 4 fails, it will not affect the normal operation of the impact sleeve 52. In addition, the impact sleeve 52 has a small force-bearing area, and under the same pressure, the impact sleeve 52 is subjected to a small pressure, so the number of shear pins 6 required is small, which reduces the difficulty of designing and controlling the shear pins 6 during the design and production process of the device, and also reduces the difficulty of pressure control during the pumping process.

[0033] It is easy to understand that there is no sealed connection between the upper end of the impact sleeve 52 and the upper joint 2, so the upper end and the lower end of the impact sleeve 52 are subjected to equal pressure. The force generated by the compressed air in the closed annular space formed between the impact sleeve 52, the outer tube 1 and the inner sleeve 51 is not enough to affect the movement of the impact sleeve 52.

[0034] In one embodiment, the blocking disk 4 is fixedly arranged in the outer tube 1 by abutting against other parts. Specifically, the upper part of the lower joint 3 extends into the outer tube 1 and abuts against the lower end of the blocking disk 4, and the upper end of the blocking disk 4 abuts against the inner sleeve 51, thereby completing the fixing of the blocking disk 4.

[0035] In order to achieve the effect of sealing the pipe column by the plugging disk 4, a sealing structure 41 is set on any one or more of the contact surfaces of the inner sleeve 51, the outer tube 1 and the lower joint 3 with the plugging disk 4. The sealing structure 41 can be an O-ring set on any of the above surfaces, a semi-wrapped seal set on two adjacent surfaces, or a fully wrapped seal set on three surfaces.

[0036] In a preferred embodiment, a positioning protrusion 11 for installing the blocking disk 4 is provided on the inner wall of the outer tube 1, and a sealing ring is provided between the blocking disk 4 and the positioning protrusion 11. The positioning protrusion 11 can increase the wall thickness of the outer tube 1, and the sealing groove provided on the positioning protrusion 11 can reduce the influence on the strength of the outer tube 1.

[0037] In addition, in order to make the blocking disk 4 able to withstand a certain pressure and be broken by the impact sleeve 52, the blocking disk is made of high-pressure resistant and fragile non-metallic materials, such as glass, ceramics, resin, etc. Figure 1 The cylindrical shape shown in FIG. 1 can also be configured as Figure 3 Other shapes such as spherical shell shown.

[0038] In a preferred embodiment, a step 31 is provided on the inner wall of the upper end of the lower joint 3, and the diameter of the step surface of the step 31 is greater than or equal to the outer diameter of the impact portion 522. Figure 2 As shown, under this arrangement, after the impact sleeve 52 impacts the sealing disk 4 under pressure, the lower end of the impact portion 522 can pass over the sealing disk, thereby breaking the sealing disk 4 more thoroughly.

[0039] The present invention can realize a variety of usage modes by controlling the strength of the shear pin 6. The method of using the sealing disk 4 to block a section of air or low-density drilling fluid to reduce the friction resistance is the same as the prior art. The main difference is that after the sealing disk 4 is lowered into place and pumped with pressure, the specific method is as follows.

[0040] Method 1: When the strength of the shear pin 6 is relatively small, that is, after the pumping pressure is applied, the impact sleeve 52 tends to move downward under the action of pressure, and the shear pin 6 is sheared by the impact sleeve 52. Subsequently, the impact sleeve 52 hits the sealing disk 4. The impact of the impact sleeve 52 causes a weak point to appear on the sealing disk 4 that matches the contour of the impact sleeve 52. After the pumping pressure is increased, the sealing disk 4 breaks along the contour formed by the weak point, thereby achieving full diameter.

[0041] It is easy to understand that the high-pressure resistant and fragile non-metallic materials such as glass and ceramics used in this embodiment have the physical property that once a weak point appears, it will break along the contour formed by the weak point when subjected to strong pressure again.

[0042] Method 2: When the strength of the shear pin 6 is greater than that of method 1, that is, after the pump pressure is injected, the impact sleeve 52 has a downward movement trend under the pressure, and the shear pin 6 is sheared by the impact sleeve 52. Subsequently, the impact sleeve 52 hits the blocking plate 4. The impact of the impact sleeve 52 causes a broken through hole on the blocking plate 4 that matches the contour of the impact sleeve 52, and finally presents Figure 2 The effect shown is to achieve full bore. In this way, even if the sealing failure of the crushing disk 22 occurs before the shear pin 6 breaks, it will not have an impact on achieving full bore.

[0043] Method 3: When the strength of the shear pin 6 is greater than that of method 2, that is, after the pump pressure is injected, the impact sleeve 52 tends to move downward under the pressure, but the blocking disk 4 breaks before the shear pin 6. After further pressurization, the shear pin 6 is sheared by the impact sleeve 52, and then the impact sleeve 52 hits the blocking disk 4. The impact of the impact sleeve 52 causes a broken through hole on the blocking disk 4 that matches the contour of the impact sleeve 52, and finally presents Figure 2 In this way, after the plugging disk 4 is broken, only a few fragments on the edge remain, and the impact sleeve 52 only needs a small impact force to achieve full diameter, which can avoid the phenomenon that the edge of the impact sleeve 52 is curled up due to excessive impact force, and better achieve full diameter of the pipe diameter.

[0044] In the third mode provided by the present invention, the shear pin 6 can only be broken by pumping pressure exceeding the bursting pressure of the plugging disk 4. Under such high-pressure pumping, the mud in the wellbore may be squeezed into the formation, polluting the energy reserves of the formation, thereby reducing the mining output. In order to solve this problem, the present invention provides another implementation method, which is specifically described in the fourth mode as follows.

[0045] Method 4: In a preferred embodiment, the shear pin 6 is a soluble pin made of a high-strength soluble material. Before installing the soluble pin, a solid solvent is first introduced into the pin hole where the soluble pin is installed for semi-filling, and then the soluble pin is installed into the pin hole. The floating coupling well section is set at the junction of the horizontal well and the vertical well. After the floating coupling is lowered, during the grouting process, it is necessary to first pump a section of isolation fluid into the floating coupling well section, and then pump in mud, that is, pump the isolation fluid to fill the horizontal well upstream of the floating coupling, and then pump in mud. Thereby, the isolation fluid isolates the mud from the solid solvent and the soluble pin, preventing the solid solvent from being soaked in the mud and causing the soluble pin to dissolve prematurely. The specific working principle of this embodiment is as follows.

[0046] After the pumping pressure, the sealing disk 4 ruptures before the soluble pins. After the sealing disk 4 explodes, the pre-pumped isolation fluid is replaced by the mud above and moves downward along the pipe string, thereby rendering the isolation fluid ineffective, that is, the isolation fluid loses its protective effect on the solid solvent, and the solid solvent comes into contact with the mud. The solid solvent dissolves under the immersion of the mud, causing the soluble pins to dissolve quickly. When the soluble pins lose their strength due to dissolution, there is no need to increase the pumping pressure. The soluble pins can be sheared off by the liquid column pressure or circulating pressure in subsequent work in the well, thereby accelerating the impact sleeve 52 downward and impacting the remaining part of the sealing disk 4 after the explosion, thereby achieving secondary crushing. After the impact sleeve 52 penetrates the sealing disk 4, the full diameter is achieved. In the case of low liquid column pressure or circulating pressure, even if the impact force generated by the impact sleeve 52 cannot completely remove the remaining part of the plugging disk 4, the impact sleeve 52 can also squeeze and crush the remaining part of the plugging disk 4 after the explosion through the pressure difference force that always exists in the pipe column (i.e., in the floating coupling) on ​​the impact sleeve 52. Since the remaining part of the plugging disk 4 after the explosion does not have integrity, the compressive strength is greatly reduced under the action of impact crushing, so that the remaining part can be crushed into fine particles through the extrusion action to achieve full diameter. Under this setting, on the one hand, the required pumping pressure does not need to exceed the explosion pressure of the plugging disk 4, thereby solving the problem that mud may invade the formation under high pressure; on the other hand, the shear pin 6 is a soluble pin, and the strength of the shear pin 6 is reduced by dissolving, which can more reliably complete the impact action of the impact sleeve 52 and avoid the situation where the shear pin 6 cannot be sheared under the pressure operation window.

[0047] It is easy to understand that the isolation fluid, high-strength soluble material and solid solvent are all existing materials. After the solid solvent comes into contact with the mud, it can promote the dissolution of the high-strength soluble material.

[0048] According to the method of breaking the plugging disk provided by the present invention, the upper pressure difference floating coupling 100 provided by the present invention can achieve full diameter, and the design strength of the shear pin 6 can be within a wide range, thereby reducing the design difficulty of the shear pin 6. And the pumping pressure in the present invention can also be within a wide range, thereby reducing the difficulty of controlling the pumping pressure.

[0049] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0050] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0051] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0052] Finally, it should be noted that the above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An upper pressure difference floating coupling, characterized in that: include: outer cylinder(1); An upper joint (2) arranged at the upper end of the outer cylinder; A lower joint (3) arranged at the lower end of the outer cylinder; A sealing disk (4) fixedly and sealed inside the outer cylinder; And an impact assembly (5) arranged inside the outer cylinder, the impact assembly is arranged above the sealing disk, and the impact assembly is configured to impact the sealing disk under pressure.

2. The upper pressure difference floating coupling according to claim 1, characterized in that: The impact assembly (5) comprises an inner sleeve (51) sealed and fixedly connected to the outer cylinder (1), and an impact sleeve (52) fixed to the inner side of the inner sleeve via shear pins.

3. The upper pressure difference floating coupling according to claim 2, characterized in that: A C-shaped ring (511) is arranged on the outer wall of the inner sleeve (51), and a groove (512) matching with the C-shaped ring is arranged on the inner wall of the outer cylinder (1).

4. The upper pressure difference floating coupling according to claim 3, characterized in that: The upper end of the impact sleeve (52) abuts against the upper joint (2), and the lower end of the inner sleeve (51) abuts against the sealing disk (4).

5. The upper pressure difference floating coupling according to claim 4, characterized in that: The impact sleeve (52) comprises a convex ring portion (521) and an impact portion (522) arranged at the lower end of the convex ring portion, the wall thickness of the convex ring portion is greater than the wall thickness of the impact portion, the convex ring portion is sealingly connected to the outer tube (1), and the inner sleeve (51) is sealingly arranged between the impact portion and the outer tube (1).

6. The upper pressure difference floating coupling according to claim 5, characterized in that: A positioning protrusion (11) for mounting the sealing disk (4) is arranged inside the outer cylinder (1).

7. The upper pressure difference floating coupling according to claim 6, characterized in that: The upper end of the lower joint (3) extends into the interior of the outer tube (1) and abuts against the sealing disk (4). A step (31) is provided on the inner wall of the upper end of the lower joint (3), and the diameter of the step surface is greater than or equal to the outer diameter of the impact portion (522).

8. The upper pressure difference floating coupling according to claim 7, characterized in that: A sealing structure (41) is provided between any contact surface between the inner sleeve (51), the outer tube (1) and the lower joint (3) and the sealing disk (4); the sealing structure is a single-sided seal or a multi-sided seal; the sealing disk (4) is made of a high-pressure resistant and fragile non-metallic material, which includes glass, ceramics and resin; the sealing disk (4) is cylindrical or spherical.

9. The upper pressure difference floating coupling according to any one of claims 2 to 8, characterized in that: The shear pins used to fix the impact sleeve (52) on the inner side of the inner sleeve (51) are soluble pins.

10. A floating collar diameter method, characterized in that: Using the upper pressure difference floating collar according to claim 9 comprises the following steps: Pumping a spacer fluid for protecting the shear pin (33) into the floating coupling well section; Pump mud into the well and increase the pumping pressure to achieve clearance.

Citation Information

Patent Citations

  • High-strength autolysis-type coupling for float casing running

    CN107313727A

  • Floating coupling for casing pipe

    CN108425640A

  • Impact type floating coupling

    CN115853431A

  • Floating coupling

    CN115898285A

  • Drilling -free type floating coupling

    CN204984290U