Exploration-to-production well pipe string and operation method

By designing the pipe columns and operating methods for exploration and mining wells, the underground well shutdown is achieved without pressing the well, solving the well control operation problem under ultra-deep high-pressure sulfur-containing conditions, and reducing the reservoir The damage and operation cost have achieved rapid re-production of exploration wells.

CN119021648APending Publication Date: 2024-11-26CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310604723.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing technology is difficult to achieve unpressed well shutdown in the exploration and mining well operation, especially in ultra-deep and high-pressure sulfur-containing conditions, which leads to an increased risk of secondary completion capacity, and traditional processes have pollution and harm to the reservoir. .

Method used

A probe-to-machining well pipe column is designed, including the upper plug-in pipe section, the lower seat-to-seal pipe section and the formation isolation valve. The well shutdown is achieved through the completion sealer and the insertion seal, which can quickly switch between testing and production operations. , avoid damage to the reservoir by crushing wells.

Benefits of technology

It realizes well control operations that can be realized without pressing wells downhole, meet ultra-deep high-pressure sulfur-containing conditions, and reduces bridge plugs/cement plugs required for secondary well completion. The sealing operation eliminates the damage caused by well pressing to the reservoir, shortens the operation cycle and saves costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021648A_ABST
    Figure CN119021648A_ABST
Patent Text Reader

Abstract

The invention provides a well exploration-to-production pipe string which comprises a primary well completion pipe string and a secondary well completion pipe string, the primary well completion pipe string comprises an upper inserting pipe section, a lower setting pipe section and a stratum isolation valve, and the lower setting pipe section comprises a second oil pipe and a well completion packer arranged in the second oil pipe; the secondary well completion pipe string comprises a third oil pipe and an insertion seal connected to the downstream end of the third oil pipe; in the first state, the upper portion inserting pipe section is connected with the stratum isolation valve in an inserting mode, and therefore testing operation can be carried out. In the second state, the upper portion inserting pipe section is taken out by rotating and lifting the upper portion inserting pipe section, then a secondary well completion pipe string is put down, and the secondary well completion pipe string is in inserting connection with the stratum isolation valve through inserting sealing and is locked and sealed, so that production operation can be conducted, and the exploring and converting well production pipe string can be switched to the second state from the first state; therefore, the exploratory well is transferred and mined. The invention further provides a well exploration-to-production operation method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas well operation, and particularly relates to an exploration-to-production well pipe string and an operation method. Background Art

[0002] Ultra-deep exploration wells are generally tested using the APR process. After production is achieved, it is generally necessary to kill the well and lift the tubing. The well is temporarily sealed by cement plugging or bridge plugging. The reservoir is then opened for secondary completion and production. A common oil and gas well testing method is the full-bore (Annular Pressure Responsive, APR) test, which means that without moving the tubing, the annulus between the tubing and the casing is pressurized and released, and the test valve of the downhole APR test tool is repeatedly opened and closed to obtain test parameters. The entire process requires operations such as killing the well, lifting the tubing, plugging, lifting and lowering the well control tubing, and sweeping the plug. The process is complex and costly, and killing the well will pollute the reservoir, affecting the secondary completion capacity.

[0003] In recent years, research on downhole isolation valves and other devices has been carried out at home and abroad for exploration-to-production wells. Formation isolation valves are set in conventional APR strings for temporary well sealing. However, existing formation isolation valve tools need to be lifted up and lowered to open and close the well. Since well pressure must be performed when the string is moved during high-pressure sulfur-containing gas well operations, reservoir protection cannot be achieved, increasing the production capacity risk of secondary completion. Summary of the invention

[0004] In response to the technical problems mentioned above, the present invention aims to propose an exploration-to-production well string and operation method, which can achieve downhole well shut-in without well pressure while meeting the requirements of exploratory well testing, data acquisition, etc., meet the well control operation requirements of ultra-deep, high-pressure, sulfur-containing and other working conditions, and realize the rapid conversion of exploratory wells to production.

[0005] To this end, according to a first aspect of the present invention, there is provided an exploration-to-production tubular string, comprising: a primary completion string, comprising an upper plug-in pipe section, a lower sealing pipe section, and a formation isolation valve arranged between the upper plug-in pipe section and the lower sealing pipe section, the lower sealing pipe section comprising a second oil pipe and a completion packer arranged in the second oil pipe; a secondary completion string, comprising a third oil pipe and an inserted seal connected to the lower end of the third oil pipe; wherein the lower sealing pipe section can be sealed in the wellbore casing through the completion packer On the inner wall; in the first state, the upper plug-in pipe section is plug-in connected with the formation isolation valve, so that testing operations can be carried out; in the second state, the upper plug-in pipe section is taken out by rotating and lifting the upper plug-in pipe section, and then the secondary completion pipe string is lowered, and the secondary completion pipe string is plug-in connected with the formation isolation valve through the insertion seal and locked, so that production operations can be carried out, and the exploration-to-production well string can be switched from the first state to the second state, thereby realizing the conversion of the exploration well to production.

[0006] In one embodiment, the upper plug-in pipe section includes a first oil pipe and an RDS valve connected in the first oil pipe, and the RDS valve is used to provide a flow channel for the fluid to be tested in an open state.

[0007] In one embodiment, the RDS valve includes a circulation hole and a ball valve. When in the wellbore state, the circulation hole of the RDS valve is closed and the ball valve of the RDS valve is opened. After the test operation is completed, the circulation hole of the RDS valve is opened and the ball valve of the RDS valve is closed.

[0008] In one embodiment, the upper plug-in pipe section further comprises a pressure gauge holder connected to the first oil pipe for installing a pressure gauge to test downhole pressure, and the pressure gauge holder is located at the downstream end of the RDS valve.

[0009] In one embodiment, the formation isolation valve comprises: an outer cylinder, the upper end of which is fixedly connected to a connecting nipple; a switch sleeve arranged in the outer cylinder, the upper end of which is fixedly connected to an elastic claw; a switch valve arranged at the lower end of the switch sleeve, the switch sleeve being configured to be able to close or open the switch valve by moving upward or downward; an insertion joint, the lower end of which is provided with external teeth that can be matched with the elastic claw;

[0010] Among them, the switch valve is open in the initial state; the insertion joint can form a plug-in seal with the connecting short section, and can drive the elastic claw and the switch sleeve to move upward by rotating and lifting to close the switch valve, and continued lifting can separate the insertion joint from the elastic claw; the inner wall of the switch sleeve is provided with a sealing step extending radially inward, and a ball is dropped from the wellhead to adapt to the sealing step to form a pressure-holding, so that the switch sleeve moves downward to open the switch valve.

[0011] In one embodiment, the switch valve includes a ball cage, a rotatable isolation ball valve disposed in the ball cage, and a connecting rod connected to the switch sleeve.

[0012] The isolation ball valve is connected to the connecting rod via an operating pin, and the switch sleeve can drive the isolation ball valve to rotate via the connecting rod and the operating pin, thereby controlling the switch valve to open or close.

[0013] In one embodiment, the completion packer adopts a bidirectional slip, which is sealed by pressurizing the oil pipe. After the completion packer is expanded and sealed, it can seal the second oil pipe and the annular space between the second oil pipe and the wellbore casing.

[0014] In one embodiment, a ball seat unit is provided at the downstream end of the completion packer, which includes an outer shell connected to the second oil pipe and a ball seat core arranged in the outer shell, wherein the ball seat core is connected to the outer shell by a pin.

[0015] Among them, after the ball is dropped into the wellhead and fits with the ball seat core, the completion packer can be pressurized and sealed, and the pressure can be continued to shear off the pin, so that the ball and the ball seat core move downward, thereby establishing a flow channel.

[0016] In one embodiment, the lower sealing pipe section also includes a perforating gun for perforating operations, and a screen pipe and a ball catching short joint connected to the lower end of the screen pipe are provided between the ball seat unit and the perforating gun. The screen pipe is used for pressure transmission during perforating, and the lower part of the ball catching short joint is configured to intercept falling balls.

[0017] In one embodiment, the secondary completion pipe string further comprises a downhole safety valve connected to the third oil pipe, and the insert seal is connected to the lower end of the safety valve through a connecting oil pipe.

[0018] According to a second aspect of the present invention, a method for conducting exploration-to-production well operations is provided, comprising the following steps:

[0019] Step 1: providing the exploration-production well string as described above;

[0020] Step 2: Assemble the primary completion pipe string and lower it to the designed position, install the wellhead gas production device, drop a ball from the wellhead into the ball seat unit in the lower sealing pipe section to form an adaptive seal, and pressurize the completion packer;

[0021] Step 3: Continue to pressurize and cut off the pin of the ball seat unit, so that the ball falls downward, so as to achieve pressure communication between the first and second oil pipes, and then perform perforation and subsequent transformation and testing operations by pressurizing;

[0022] Step 4: After the test, the annulus is pressurized to open the circulation hole of the RDS valve connected to the first oil pipe, and the clean water or mud is circulated back, and the RDS valve is used to restore the downhole pressure;

[0023] Step 5: Remove the wellhead gas production device, install the blowout preventer, rotate the ball valve to a closed state by turning it upside down and lifting the pipe string, disconnect the internal connection, and remove the upper pipe string;

[0024] Step 6: Assemble the secondary completion pipe string, start the pump to flush the upper sealing cylinder of the formation isolation valve after the secondary completion pipe string is in place, adjust the length of the pipe string, insert the insert seal at the lower end of the third oil pipe into the formation isolation valve and lock it to form a seal;

[0025] Step 7: Remove the blowout preventer, reinstall the wellhead gas production device, throw a soluble ball into the upper sealing step of the elastic claw of the formation isolation valve, pressurize the oil pipe to push the elastic claw to drive the operating pin downward, so that the ball valve is shifted to achieve upper and lower pressure connection in the oil pipe, and production can be carried out after the well is opened.

[0026] In one embodiment,

[0027] Compared with the prior art, the advantages of this application are:

[0028] According to the exploration-to-production well string and exploration-to-production well operation method of the present invention, under the premise of meeting the requirements of exploration well testing and data collection, it is possible to achieve downhole well shut-in without well pressure reduction, meet the well control operation requirements of ultra-deep, high-pressure, and sulfur-containing working conditions, and realize the rapid conversion of exploration wells to production. Compared with traditional processes and other downhole well shut-in processes, the exploration-to-production well string and exploration-to-production well operation method can not only meet the well control operation requirements of high-pressure, sulfur-containing and other oil and gas wells, but also meet the conditions of testing, downhole pressure recovery, downhole data collection and other conditions required for exploration wells, and can reduce the bridge plug / cement plug sealing operation required for the secondary completion of the traditional process after the exploration well test, eliminate the damage of well pressure reduction to the reservoir, shorten the operation cycle, and save operation costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention will be described below with reference to the accompanying drawings.

[0030] Figure 1The structure of the exploration-production well string according to the present invention is schematically shown.

[0031] Figure 2 Schematically shows Figure 1 The structure of the formation isolation valve in the exploration-production well string is shown.

[0032] In the present application, all drawings are schematic drawings, which are only used to illustrate the principles of the present invention and are not drawn according to the actual scale. DETAILED DESCRIPTION

[0033] The present invention will be described below with reference to the accompanying drawings.

[0034] For ease of understanding, in this application, the end close to the wellhead is defined as the upper end, the upstream end or similar terms, and the end away from the wellhead is defined as the lower end, the downstream end or similar terms. At the same time, the length direction along the exploration and production well string is called the longitudinal direction, the axial direction or similar terms, and the direction perpendicular to it is called the transverse direction, the radial direction or similar terms. It should also be noted that the directional terms or qualifiers "upper", "lower", etc. used in this application are all for the referenced attachments. Figure 1 The above description is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention.

[0035] Figure 1 The structure of the exploration-production well string 100 according to the present invention is schematically shown. Figure 1 As shown, the exploration-production well string 100 includes a primary completion string and a secondary completion string (not shown), the primary completion string is used for transformation and testing operations, and the secondary completion string is used for production operations. The primary completion string includes an upper plug-in pipe section 1, a lower sealing pipe section 2, and a formation isolation valve 3 arranged between the upper plug-in pipe section 1 and the lower sealing pipe section 2, and the lower sealing pipe section 2 includes a second oil pipe 21 and a completion packer 22 arranged in the second oil pipe 21. The secondary completion string includes a third oil pipe and an inserted seal connected to the downstream end of the third oil pipe.

[0036] According to the present invention, in the actual operation process, the lower sealing pipe section 2 can be sealed on the inner wall of the wellbore casing 101 through the completion packer 22. In the first state, the upper plug-in pipe section 1 forms a plug-in sealing connection with the formation isolation valve 3, and transformation and testing operations can be carried out in this state. In the second state, the upper plug-in pipe section 1 is rotated and lifted to remove the upper plug-in pipe section 1, and then the secondary completion pipe string is lowered, and the secondary completion pipe string is plug-in connected with the formation isolation valve 3 through the insertion seal and locked and sealed. In this state, production operations can be carried out. The exploration-to-production well string 100 can be switched from the first state to the second state, thereby realizing the conversion of the exploration well to production.

[0037] According to the present invention, the upper plug-in pipe section 1 comprises a first oil pipe 11 and an RDS valve 12 connected to the first oil pipe 11 , and the RDS valve 12 is used to provide a flow channel for the fluid to be tested in an open state.

[0038] like Figure 1 As shown, the upper plug-in pipe section 1 further includes a pressure gauge holder 13 connected to the first oil pipe 11 for installing a pressure gauge to test downhole pressure. The pressure gauge holder 13 is located at the downstream end of the RDS valve 12 .

[0039] The RDS valve 12 is a common tool in APR testing. The RDS valve 12 includes a circulation hole and a ball valve. When in the well, the circulation hole of the RDS valve 12 is closed and the ball valve of the RDS valve 12 is opened. After the test operation is completed, the circulation hole of the RDS valve 12 is opened and the ball valve of the RDS valve 12 is closed. A rupture disk is provided in the circulation hole. During operation, the rupture disk of the RDS valve 12 connected to the first oil pipe 11 is hit by pressurizing the annulus until the rupture disk ruptures, thereby realizing the opening of the circulation hole of the RDS valve.

[0040] According to the present invention, Figure 2 As shown, the formation isolation valve 3 includes an insertion joint 31, a connecting nipple 32, a switch sleeve 33, an outer tube 34, an elastic claw 35, a switch valve 50, a lower joint 310, and a limit sleeve 311. The upper end of the insertion joint 31 is connected to the first oil pipe 11 through a tapered thread buckle 301. The connecting nipple 32 is fixedly connected to the upper end of the outer tube 34 by thread. The upper end of the connecting nipple 32 can form a plug-in connection with the insertion joint 31 through the thread buckle 302, and a sealing member 303 is provided between the connecting nipple 32 and the insertion joint 31, so that the connecting nipple 32 and the insertion joint 31 form a plug-in seal. As a result, the upper plug-in pipe section 1 is connected to the formation isolation valve 3 by plug-in sealing. The switch sleeve 33 is arranged inside the outer tube 34, and the upper end of the switch sleeve 33 is fixedly connected to the elastic claw 35. The switch valve 50 is disposed in the outer cylinder 34 and at the lower end of the switch sleeve 33 , and the switch sleeve 33 is configured to be able to close or open the switch valve 50 by moving upward or downward.

[0041] The lower joint 310 is sleeved in the outer tube 34, and the lower end extends downward to extend out of the outer tube 34. The limiting sleeve 311 is fixedly sleeved on the lower joint 310, and the lower end surface of the outer tube 34 abuts against the limiting sleeve 311, thereby limiting the outer tube 34.

[0042] When entering the well, the switch valve 50 is in the open state. After the test and the pressure recovery are completed, the isolation ball valve 38 (see below) in the switch valve 50 is rotated to the closed state by turning upside down and lifting the pipe string, so that the internal connection is disconnected, and the upper plug-in pipe section 1 can be taken out.

[0043] The switch valve 50 of the formation isolation valve 3 is opened in the initial state, the insertion joint 31 can form a plug-in seal with the connecting short section 32, and can drive the elastic claw 35 and the switch sleeve 33 to move upward by rotating and lifting to close the switch valve 50, and the insertion joint 31 can be separated from the elastic claw 35 by continuing to lift. The inner wall of the switch sleeve 33 is provided with a sealing step extending radially inward, and a pressure can be formed by dropping a ball at the wellhead to fit the sealing step, so that the switch sleeve 33 moves downward to open the switch valve 50. In this way, the control of the switch valve 50 is achieved. After the switch valve 50 is closed, the inner cavity of the outer tube 34 can be closed. In the initial state, the switch valve 50 is in an open state, and the fluid can flow in the switch valve 50 and the switch sleeve 33. After the switch sleeve 33 moves upward, the switch valve 2 can be closed, thereby completing the closure of the outer tube 34.

[0044] According to one embodiment of the present invention, the switch valve 50 includes a ball cage 51, an isolation ball valve 52, an operating pin 53, an upper ball seat 54, a lower ball seat 55, and a connecting rod 56. The isolation ball valve 52 is arranged inside the ball cage 51 through the upper ball seat 54 and the lower ball seat 55 and can rotate. The upper end of the connecting rod 56 is connected to the switch sleeve 33, and the isolation ball valve 52 is connected to the connecting rod 56 through the operating pin 53. The switch sleeve 33 can drive the isolation ball valve 52 to rotate through the connecting rod 56 and the operating pin 53, thereby controlling the switch valve 50 to open or close. For example, in one embodiment, the isolation ball valve 52 is provided with a through hole, and the isolation ball valve 52 is opened when the isolation ball valve 52 is rotated to make the through hole parallel to the central axis of the formation isolation valve 3, and the isolation ball valve 52 is closed when the isolation ball valve 52 is rotated to make the through hole perpendicular to the central axis of the formation isolation valve 3.

[0045] In one embodiment, the inner wall of the upper spring piece of the elastic claw 35 is provided with inner teeth extending radially inward, and the lower spring piece of the insertion joint 31 is provided with outer teeth that can adapt to the inner teeth of the elastic claw 35. A stepped hole is provided in the connecting short section 32, and the lower part of the connecting short section 32 is the small diameter part of the stepped hole, and the upper part is the large diameter part of the stepped hole. Figure 2In the state shown, the insertion joint 31 forms a plug-in seal with the connecting short section 32, and the elastic claw 35 is radially resisted by the outer tube 34, so that the elastic claw 35 cannot expand radially. Therefore, in this state, the insertion joint 34 moves upward and adapts to the inner teeth of the elastic claw 35 through the outer teeth, and then drives the switch sleeve 33 to move upward together through the elastic claw 35, so that the switch sleeve 33 closes the switch valve 50. After the switch valve 2 is closed, the part of the upper end of the elastic claw 35 with the inner teeth has been separated from the small diameter of the connecting short section 32 and moved to the large diameter of the connecting short section 32. In this case, the insertion joint 31 is continued to move upward. Since the part of the elastic claw 35 with the inner teeth has no radial abutment force of the connecting short section 32, the outer teeth of the insertion joint 31 can make the part of the elastic claw 35 with the inner teeth 61 expand radially outward, so that the insertion joint 31 can be separated from the elastic claw 35, and the hand is released. In this way, the upper plug-in pipe section 1 is separated from the formation isolation valve 3. It should be understood here that the insertion joint 31 is provided as a part of the upper splice pipe section 1 together with the upper pipe string and tools.

[0046] In actual operation, after the test production is completed, the RDS valve 12 is used to shut down the well and perform well pressure in the upper formation. At this time, since the completion packer 22 is set, the pressure in the oil pipe and casing is not connected, and the well pressure fluid will not enter the formation below the completion packer 22. After well pressure, the gas tree is dismantled, the blowout preventer is installed, and the insertion joint 31 is turned upside down and the pipe string is lifted. During the lifting process, the lower spring piece of the insertion joint 31 is hung together with the spring piece of the elastic claw 35, and the elastic claw 35 drives the operating pin 53 to move upward, so that the isolation ball valve 52 is turned over to achieve downhole well closing. When it is lifted to the diameter change point of the connecting short section 32, the spring piece of the elastic claw 35 is released, and at the same time, the circulation hole provided on the switch sleeve 33 is aligned with the circulation hole provided on the outer tube 34, and the insertion joint 31 and the upper plug-in pipe section 1 and the tool can be lifted out of the wellbore.

[0047] The completion packer 22 adopts a bidirectional slip, which is sealed by pressurizing the oil pipe. After the completion packer 22 is expanded and sealed, it can seal the second oil pipe 21 and the annular space between the second oil pipe 21 and the wellbore casing 101.

[0048] A ball seat unit 23 is provided at the downstream end of the completion packer 22, which includes an outer shell connected to the second oil pipe 21 and a ball seat core disposed in the outer shell, and the ball seat core is connected to the outer shell through a pin. After a ball is dropped from the wellhead to fit the ball seat core, the completion packer 22 can be pressurized and expanded, and the pin can be continuously pressurized to cut off, so that the ball and the ball seat core move downward, thereby establishing a flow channel.

[0049] The lower sealing pipe section 2 further includes a perforating gun 26 for performing perforating operations.

[0050] A screen tube 24 and a ball-catching short section 25 connected to the lower end of the screen tube 24 are provided between the ball seat unit 23 and the perforating gun 26. The screen tube 24 is used for pressure transmission during perforation, and the lower part of the ball-catching short section 25 is configured to intercept the falling ball. Preferably, the lower part of the ball-catching short section is configured in a "cross" structure to prevent the ball from falling directly into the bottom of the well. Thus, the ball can be prevented from falling into the upper part of the perforating gun and causing accidental detonation.

[0051] According to the present invention, the secondary completion pipe string further comprises a downhole safety valve (not shown) connected to the third oil pipe, and the inserted seal is connected to the lower end of the downhole safety valve through the connecting oil pipe.

[0052] According to the present invention, a method for converting an exploration well into a production well is also proposed, and the method uses the above-mentioned exploration well into a production well string 100. The method for converting an exploration well into a production well is described in detail below.

[0053] First, a well exploration-production tubular string 100 according to the present invention is provided.

[0054] Then, the primary completion pipe string is assembled and lowered to the designed position, a wellhead gas production device (not shown) is installed, and a ball is dropped from the wellhead into the ball seat unit 23 in the lower sealing pipe section 2 and fits and seals with the ball seat core, and then pressurized to seal the completion packer 22. During the well entry process, the circulation hole of the RDS valve 12 is closed, and the ball valve of the RDS valve 12 is opened.

[0055] Afterwards, the pressure is continued to be increased until the pin of the ball seat unit 23 is cut off, so that the ball and the ball seat core fall downward, so as to achieve pressure communication between the first oil pipe 11 and the second oil pipe 21, and then perforation and subsequent transformation and testing operations are carried out by pressurization.

[0056] After the test, the annulus is pressurized to break the rupture disk of the RDS valve 12 connected to the first oil pipe 11, so that the circulation hole of the RDS valve 12 is opened, and the ball valve of the RDS valve 12 is closed, and clean water or mud is circulated back, and the RDS valve 12 is used to restore the downhole pressure.

[0057] Afterwards, remove the wellhead gas production device and install the blowout preventer, turn the forward and reverse button to disengage the insertion joint 34 of the formation isolation valve 50, continue to lift the upper plug-in pipe section 1 so that the insertion joint 34 drives the operating pin 35 in the formation isolation valve 50 to move, so as to drive the isolation ball valve 52 to flip, thereby closing the isolation ball valve 38 and realizing downhole well shut-in. After the isolation ball valve 38 is closed, circulate the liquid in the well and remove the upper tubing.

[0058] After that, assemble the secondary completion pipe string, and after the secondary completion pipe string is in place, start the pump to flush the upper sealing cylinder of the formation isolation valve 3, adjust the length of the pipe string, insert the insert seal into the formation isolation valve 3 and lock it to form a seal.

[0059] Afterwards, the blowout preventer is removed and the wellhead gas production device is reinstalled. A soluble ball is thrown from the wellhead to the sealing step of the elastic claw 33 of the formation isolation valve 3. The pressure in the oil pipe pushes the elastic claw 33 to drive the operating pin 35 to move downward, so that the isolation ball valve 38 is shifted to achieve the upper and lower pressure connection in the oil pipe, and production can be carried out after the well is opened.

[0060] According to the exploration-to-production well string 100 and the exploration-to-production well operation method of the present invention, under the premise of meeting the requirements of exploration well testing and data collection, it is possible to achieve downhole well shut-in without well pressure reduction, meet the well control operation requirements of ultra-deep, high-pressure, sulfur-containing and other working conditions, and realize the rapid conversion of exploration wells to production. Compared with traditional processes and other downhole well shut-in processes, the exploration-to-production well string 100 and the exploration-to-production well operation method can not only meet the well control operation requirements of high-pressure, sulfur-containing and other oil and gas wells, but also meet the conditions of testing, downhole pressure recovery, downhole data collection and other conditions required for exploration wells, and can reduce the bridge plug / cement plug sealing operation required for the secondary completion of the traditional process after the exploration well test, eliminate the damage of well pressure reduction to the reservoir, shorten the operation cycle, and save operation costs.

[0061] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0062] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0063] In addition, in the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0064] Finally, it should be noted that the above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A drilling well pipe string, include: A primary completion pipe string, comprising an upper plug-in pipe section (1), a lower sealing pipe section (2), and a formation isolation valve (3) arranged between the upper plug-in pipe section (1) and the lower sealing pipe section (2), wherein the lower sealing pipe section (2) comprises a second oil pipe (21) and a completion packer (22) arranged in the second oil pipe (21); A secondary completion string, comprising a third oil pipe and an insert seal connected to a lower end of the third oil pipe; The lower sealing pipe section (2) can be sealed on the inner wall of the wellbore casing (101) through the completion packer (22); In the first state, the upper plug-in pipe section (1) forms a plug-in connection with the formation isolation valve (3), so that a test operation can be performed; In the second state, the upper plug-in pipe section (1) is rotated and lifted to remove the upper plug-in pipe section (1), and then the secondary completion pipe string is lowered, and the secondary completion pipe string is plug-connected with the formation isolation valve (3) through the insertion seal and the seal is locked, so that production operations can be carried out. The exploration-to-production well pipe string can be switched from the first state to the second state, thereby realizing the conversion of the exploration well to production.

2. The exploration-to-production well pipe string according to claim 1, It is characterized in that The upper plug-in pipe section (1) comprises a first oil pipe (11) and an RDS valve (12) connected to the first oil pipe (11), wherein the RDS valve (12) is used to provide a flow channel for the fluid to be tested in an open state.

3. The exploration-to-production well pipe string according to claim 2, It is characterized in that The RDS valve (12) comprises a circulation hole and a ball valve. When in a wellbore state, the circulation hole of the RDS valve (12) is closed and the ball valve of the RDS valve (12) is opened. After the test operation is completed, the circulation hole of the RDS valve (12) is opened and the ball valve of the RDS valve (12) is closed.

4. The exploration-to-production well pipe string according to claim 2 or 3, It is characterized in that The upper plug-in pipe section (1) also includes a pressure gauge holder (13) connected to the first oil pipe (11) for installing a pressure gauge to test downhole pressure. The pressure gauge holder (13) is located at the downstream end of the RDS valve (12).

5. The exploration-to-production well pipe string according to claim 1, It is characterized in that The formation isolation valve (3) comprises: An outer cylinder (34) having a connecting nipple (32) fixedly connected to its upper end; A switch sleeve (33) is arranged in the outer sleeve (34), and an elastic claw (35) is fixedly connected to the upper end of the switch sleeve; a switch valve (50) disposed at the lower end of the switch sleeve (33), wherein the switch sleeve (33) is configured to be able to close or open the switch valve (50) by moving upward or downward; An insert joint (31) having an outer tooth at its lower end adapted to fit the elastic claw (33); Wherein, the switch valve (50) is opened in the initial state; The insertion joint (31) can form a plug-in seal with the connecting short section (32), and can drive the elastic claw (35) and the switch sleeve (33) to move upwards by rotating and lifting to close the switch valve (50), and further lifting can separate the insertion joint (31) from the elastic claw (33); The inner wall of the switch sleeve (33) is provided with a sealing step extending radially inward, and a ball is dropped from the wellhead to fit the sealing step to form a pressure build-up, so that the switch sleeve (33) moves downward to open the switch valve (50).

6. The exploration-to-production well pipe string according to claim 5, It is characterized in that The switch valve (50) comprises a ball cage (51), an isolating ball valve (52) rotatably disposed in the ball cage (51), and a connecting rod (56) connected to the switch sleeve (33). The isolation ball valve (52) is connected to the connecting rod (56) via an operating pin (53), and the switch sleeve (33) can drive the isolation ball valve (52) to rotate via the connecting rod (56) and the operating pin (53), thereby controlling the switch valve (50) to open or close.

7. The exploration-to-production well pipe string according to claim 1, It is characterized in that The completion packer (22) adopts a bidirectional slip, which is sealed by pressurizing the oil pipe. After the completion packer (22) is expanded and sealed, it can seal the second oil pipe (21) and the annular space between the second oil pipe (21) and the wellbore casing (101).

8. The exploration-to-production well pipe string according to claim 7, It is characterized in that A ball seat unit (23) is provided at the downstream end of the completion packer (22), comprising an outer shell connected to the second oil pipe (21) and a ball seat core arranged in the outer shell, wherein the ball seat core is connected to the outer shell via a pin. After a ball is dropped into the wellhead and fits with the ball seat core, pressure can be applied to seal the completion packer (22), and pressure can be continued to shear off the pin, so that the ball and the ball seat core move downward, thereby establishing a flow channel.

9. The exploration-to-production well pipe string according to claim 8, It is characterized in that The lower sealing pipe section (2) also includes a perforating gun (26) for performing perforating operations. A screen tube (24) and a ball catching short joint (25) connected to the lower end of the screen tube (24) are provided between the ball seat unit (23) and the perforating gun (26). The screen tube (24) is used for pressure transmission during perforating. The lower part of the ball catching short joint (25) is configured to be able to intercept falling balls.

10. The exploration-to-production well pipe string according to claim 1, It is characterized in that The secondary completion pipe string further comprises a downhole safety valve connected to the third oil pipe, and the insert seal is connected to the lower end of the safety valve through a connecting oil pipe.

11. A method for operating an exploration-to-production well, The following steps are involved: Step 1: providing a well exploration-production tubular string according to any one of claims 1 to 10; Step 2: assemble the primary completion pipe string and lower it to the designed position, install the wellhead gas production device, drop a ball from the wellhead into the ball seat unit (23) in the lower sealing pipe section (2) to form an adaptive seal, and pressurize and seal the completion packer (22); Step 3: Continue to pressurize and cut off the pin of the ball seat unit (23), so that the ball falls downward, so as to achieve pressure communication between the first oil pipe and the second oil pipe, and then perform perforation and subsequent transformation and testing operations by pressurizing; Step 4: After the test is completed, the annulus is pressurized to open the circulation hole of the RDS valve (12) connected to the first oil pipe, and clean water or mud is circulated back, and the RDS valve (12) is used to restore the downhole pressure; Step 5: Remove the wellhead gas production device and install a blowout preventer, close the formation isolation valve (3) by turning upside down and lifting the pipe string, circulate the liquid in the well, and separate the insertion joint (31) of the formation isolation valve (3) from the elastic claw (33), so as to disconnect the internal connection of the formation isolation valve (3) and remove the upper pipe string; Step 6: Assemble the secondary completion pipe string, start the pump to flush the upper sealing cylinder of the formation isolation valve after the secondary completion pipe string is in place, adjust the length of the pipe string, insert the insert seal at the lower end of the third oil pipe into the formation isolation valve and lock it to form a seal; Step 7: Remove the blowout preventer, reinstall the wellhead gas production device, and throw a soluble ball at the wellhead until it fits the formation isolation valve to reopen the formation isolation valve to connect the upper and lower pressures in the oil pipe, and start production after opening the well.