Temporary plugging diversion fracturing method and system
By simulating the erosion process of perforated eyelets and determining the parameters of fiber knots, the fiber knot temporary plugging technology is used to solve the problem of no fluid inlet perforation in porous and multi-cluster transformation, the fracturing effect and transformation volume are improved, and the fracturing volume is reduced. Casing deformation risk.
Patent Information
- Application Number
- CN202310609189.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
The existing joint opening temporary blocking and steering fracturing technology. In the reconstruction construction of porous and multi-clusters, nearly one-third of the perforation clusters have no liquid inlet, resulting in poor fracturing effect and difficult to ensure the fracturing effect and the transformation volume.
Using fiber rope knot temporary plugging technology, the optimal temporary plugging time and knot size and shape are determined by simulating the erosion process of sand carrying liquid on perforated holes, calculating the strength and quantity of knots, and using fiber ropes for temporary plugging to ensure that Even sealing and effective transformation of perforation eyelets.
Improve the fluid inlet efficiency of perforation eyelets, increase the complexity of cracks and effective transformation volume, reduce the risk of casing deformation, realize the fracturing transformation of perforation clusters without inlet, and improve the development level of oil and gas fields and benefit.
Smart Images

Figure CN119021658A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and natural gas exploitation, and in particular to a temporary plugging and diverting fracturing method and system. Background Art
[0002] With the continuous promotion of volume fracturing technology, the target layer of fracturing is becoming more and more complex. How to further increase the complexity of fractures and improve the fracturing effect is the primary problem to be solved by fracturing transformation technology. As a special layered fracturing process technology, fracture temporary plugging and diversion technology is increasingly showing its superiority in oilfield development and production.
[0003] The existing fracture temporary plugging and diversion fracturing technologies include temporary plugging with balls, temporary plugging with rubber plugs, and temporary plugging with temporary plugging agents, each of which has corresponding advantages and disadvantages.
[0004] (1) Liquid rubber plug temporary plugging technology
[0005] Liquid rubber plug temporary plugging is to inject non-ton plant rubber fluid with sufficient viscosity and toughness into the wellbore to form a temporary jelly-like plug at the artificial cracks of the original production layer of the wellbore, effectively preventing foreign fluid from entering the original production layer while balancing the formation pressure by the liquid pressure of the rubber plug. According to the requirements of reservoir conditions (reservoir depth, well temperature, formation pressure), stability, low damage (optimizing the amount of liquid rubber plug, timely breaking the gel) for the performance of liquid rubber plugs, the liquid rubber plug formula is optimized to screen out the best liquid rubber plug.
[0006] (2) Temporary blocking technique by pitching
[0007] The temporary plugging and diversion fracturing technology of throwing balls is to select suitable materials to make rigid temporary plugging balls, plug the blastholes or high permeability zones of fractures, increase the wellbore pressure, and allow the fracturing fluid to enter the high stress area or new fracture layer, thereby generating new fractures around the wellbore to achieve the purpose of layered (segmented) transformation. Since the temporary plugging ball is made of rigid material with low plasticity, the size difference or irregular shape of the blasthole will affect the plugging efficiency. In addition, before throwing the ball, the two perforation sections are open and absorb liquid to varying degrees. The continuous flow of the rigid temporary plugging ball in the wellbore also affects the precise plugging of the blasthole by the ball. In comparison, the plugging effect of the liquid plug is better than that of the throwing ball.
[0008] In addition to the above, for gas wells with multiple low-yield layers, ball-throwing temporary plugging and stratified fracturing are used. The temporary plugging balls dropped from the ground lack human control, and the distribution of the temporary plugging balls underground is unclear. Due to process limitations, the geological characteristics of each layer cannot be modified, and it is difficult to ensure the fracturing effect.
[0009] (3) Temporary plugging technology with high-strength temporary plugging agent
[0010] High-strength temporary plugging agent is composed of paraffin, reinforcing agent, plasticizer and solubilizer and other organic substances. Compared with temporary plugging balls, it has the following advantages: ① high plugging strength; ② good solubility; ③ small dosage and convenient use. However, due to material limitations, it is easy to solidify into blocks in the well and difficult to be discharged from the wellbore, resulting in wellbore blockage.
[0011] In the multi-hole and multi-cluster transformation construction, it has been monitored that nearly one-third of the perforation clusters have no production capacity contribution due to no fluid inflow. Therefore, the prior art requires a technical solution that can adjust the temporary plugging agent of the seam opening so that the perforation clusters without fluid inflow can also be subjected to fracturing transformation. Summary of the invention
[0012] In order to solve the above technical problems, the present invention provides a temporary plugging and diverting fracturing method, comprising: determining the position of the cracks to be plugged in the target layer to be transformed; simulating the transformation construction parameters required for the cracks to be plugged to reach the optimal transformation volume according to the engineering geological parameters, so as to obtain the optimal temporary plugging timing; simulating the erosion process of the sand-carrying fluid on each perforation in the target layer, and obtaining the size and shape of each perforation corresponding to the erosion process reaching the optimal temporary plugging timing, so as to determine the size and shape of the temporary plugging knot used for temporary plugging of the cracks, and further calculating the knot strength and the required number; calculating the displacement required for pumping the temporary plugging knot so that the current knot is delivered to each perforation position and maintains an effective plugging state; according to the pumping displacement and the design parameters of the temporary plugging knot, using the fiber knot temporary plugging technology, implement temporary plugging and diverting fracturing construction at the optimal temporary plugging timing.
[0013] Preferably, the process of designing the knotting parameters includes: using a preset erosion rate model to analyze the flow field around the perforations, the movement trajectory of the particles and the erosion law of the holes under different displacements and sand contents, and obtaining the size and shape of each perforation; based on the size and shape of each perforation, determining the size and shape of the perforations involved in the cracks to be plugged, and further determining the size and shape of the temporary plugging knot.
[0014] Preferably, the process of designing the knotting parameters includes: determining the pump-off pressure and the corresponding formation fracture pressure for generating cracks at different perforations according to the rock mechanical parameters of the target layer to be transformed; and determining the strength of the temporary plugging knot for sealing the current perforation according to the difference between the pump-off pressure and the formation fracture pressure.
[0015] Preferably, the number of fiber knots is calculated based on the size and shape of each perforation and the total number of perforations to be plugged in the target layer to be transformed.
[0016] Preferably, the step of determining the locations of fractures to be plugged in the target layer to be transformed includes: calculating the pressure difference between the perforation clusters in the target layer to be transformed, determining the fracture opening sequence and fracture permeability, and thus determining the fractures to be plugged.
[0017] Preferably, the displacement generation process includes: based on the construction displacement required for the fracturing reconstruction construction, through indoor experiments, using preset fiber knotting conditions, calculating the knotting pumping displacement required for the size and shape of each perforation.
[0018] Preferably, the knot-in-place conditions include: when the temporary plugging knot sits on the perforation hole, the sum of the drag force generated by the flow of the fracturing fluid and the knot's weight is greater than the inertia force of the fluid flow; and when the temporary plugging knot is sealed on the perforation hole and maintained, the sum of the adhesion force and the knot's weight is greater than the driving force of the fluid flow.
[0019] On the other hand, the present invention also proposes a temporary plugging and diverting fracturing system, which utilizes the temporary plugging and diverting fracturing method as described above to perform fracturing transformation construction on the target layer, wherein the temporary plugging and diverting fracturing system comprises: a temporary plugging position generation module, which is used to determine the position of the cracks to be plugged in the target layer to be transformed; a temporary plugging timing generation module, which is used to simulate the transformation construction parameters required for the cracks to be plugged to reach the optimal transformation volume according to the engineering geological parameters, so as to obtain the optimal temporary plugging timing; a knotting parameter design module, which is used to simulate the erosion process of the sand-carrying fluid on each perforation in the target layer, and obtain the size and shape of each perforation corresponding to the erosion process when the optimal temporary plugging timing is reached, so as to determine the size and shape of the temporary plugging knot used for temporary plugging of the cracks, and further calculate the knot strength and the required number; a displacement generation module, which is used to calculate the displacement required for pumping the temporary plugging knot, so that the current knot is delivered to each perforation position and maintains an effective plugging state; a fracturing construction module, which is used to implement temporary plugging and diverting fracturing construction at the optimal temporary plugging timing using the fiber knotting temporary plugging technology according to the pumping displacement and the design parameters of the temporary plugging knot.
[0020] Preferably, the knotting parameter design module includes: a knotting size generation unit, which is used to use a preset erosion rate model to analyze the flow field around the perforations, the movement trajectory of the particles and the erosion law of the holes under different displacements and sand contents, and obtain the size and shape of each perforation. Based on this, the size and shape of the perforations involved in the cracks to be plugged are determined, and the size and shape of the temporary plugging knot are further determined.
[0021] Preferably, the knotting parameter design module includes: a knotting strength generation unit, which is used to determine the pump-off pressure and the corresponding formation fracture pressure for generating cracks at different perforations according to the rock mechanical parameters of the target layer to be transformed, and based on this, the strength of the temporary plugging knot for sealing the current perforation is determined according to the difference between the pump-off pressure and the formation fracture pressure.
[0022] Compared with the prior art, one or more embodiments of the above scheme may have the following advantages or beneficial effects:
[0023] The present invention discloses a temporary plugging and diverting fracturing method and system. The method and system adopt a fiber knot temporary plugging technology, by selecting fibers that are suitable for the formation temperature and can dissolve automatically, by predicting the difference between the formation fracture pressure and the pump stop pressure to determine the compressive strength of the fiber knot, by establishing a numerical model to simulate the erosion of the perforation holes by sand-carrying fluid to obtain the hole shape after erosion and determine the specifications of the plastic fiber knot, and temporarily plug the perforation holes that have been filled with liquid and sand, thereby improving the efficiency of liquid filling of the perforation holes, achieving uniform volume fracturing transformation of each perforation hole, increasing the complexity of the cracks, increasing the effective transformation volume, while reducing the probability of casing deformation, and remedial transformation of the well section where casing deformation has occurred. In this way, the present invention uses a seam temporary plugging agent for adjustment, so that the perforation clusters that have not been filled with liquid can be fracturing and transformed, so that through a fiber knot with strength and plasticity to temporarily plug and divert the cracks, the utilization efficiency of the perforation holes can be improved, the risk of casing deformation can be reduced, and it is beneficial to improve the overall development level and development benefits of oil and gas fields. In addition, the fracturing method of the present invention is mainly applicable to oil and natural gas wells to improve the complexity of artificial fractures after transformation, increase the effective transformation volume, and thus improve the transformation effect.
[0024] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a step diagram of the temporary plugging and diverting fracturing method according to an embodiment of the present application.
[0027] Figure 2 It is a contour map of fluid velocity at the perforation holes in the simulation of the erosion process in the temporary plugging diversion fracturing method according to the embodiment of the present application.
[0028] Figure 3 It is a schematic diagram of the simulation of the erosion process in the temporary plugging and diverting fracturing method in the embodiment of the present application.
[0029] Figure 4 It is a schematic diagram of the pump stop pressure and the fracture pressure during the fracturing construction process in the temporary plugging and diverting fracturing method in the embodiment of the present application.
[0030] Figure 5 It is a schematic diagram of the principle of the first condition within the knotting-in-place condition in the temporary plugging and diverting fracturing method in an embodiment of the present application.
[0031] Figure 6 It is a schematic diagram of the principle of the second condition within the knotting condition in place in the temporary plugging and diverting fracturing method in an embodiment of the present application.
[0032] Figure 7 It is a schematic diagram of an indoor experimental scene of the pumping displacement generation process in the temporary plugging and diverting fracturing method in an embodiment of the present application.
[0033] Figure 8 It is a module block diagram of the temporary plugging and diverting fracturing system of an embodiment of the present application. DETAILED DESCRIPTION
[0034] The following will describe the implementation methods of the present invention in detail with reference to the accompanying drawings and embodiments, so that the implementation process of how the present invention applies technical means to solve technical problems and achieve technical effects can be fully understood and implemented accordingly. It should be noted that as long as there is no conflict, the various embodiments of the present invention and the various features in the embodiments can be combined with each other, and the technical solutions formed are all within the protection scope of the present invention.
[0035] With the continuous promotion of volume fracturing technology, the target layer of fracturing is becoming more and more complex. How to further increase the complexity of fractures and improve the fracturing effect is the primary problem to be solved by fracturing transformation technology. As a special layered fracturing process technology, fracture temporary plugging and diversion technology is increasingly showing its superiority in oilfield development and production.
[0036] The existing fracture plugging and diversion fracturing technologies include ball plugging, rubber plugging, and temporary plugging agents, each of which has its own advantages and disadvantages. However, in the multi-porous and multi-cluster transformation construction, it has been monitored that nearly one-third of the perforation clusters have no production capacity contribution due to the lack of fluid inflow.
[0037] Therefore, in order to solve the above technical problems, the present invention proposes a new temporary plugging and diverting fracturing method and system. The method and system first determine the location of the cracks that need to be temporarily plugged in the target layer to be transformed; then, a temporary plugging knot with a size and strength suitable for the perforation holes involved in each crack is designed, so that each temporary plugging knot can be stably maintained in the plugging state of the corresponding perforation; then, the pumping displacement of each knot is calculated to pump each knot to each perforation and maintain the temporary plugging effect; finally, according to the designed pumping displacement and temporary plugging knot design parameters, the fiber knot temporary plugging technology is used to temporarily plug the perforations that need temporary plugging with knots, and after fracturing all perforations in the target layer, the liquid inflow of each perforation reaches a uniform state. In this way, the present invention can adaptively adjust the temporary plugging agent of the seam, so that the perforation clusters without liquid inflow can also be fracturing-transformed, thereby expanding the effective transformation volume range and increasing the recovery.
[0038] Figure 1 This is a step diagram of the temporary plugging and diverting fracturing method of the embodiment of the present application. Figure 1 The temporary plugging and diverting fracturing method of the present invention is described in detail.
[0039] Step S110 determines the location of the fractures that need to be sealed in the target layer to be transformed.
[0040] In the implementation of the present invention, since the target layer to be transformed has undergone multiple fracturing operations to form a porous and multi-cluster area (area to be transformed), among which, some perforation clusters in the current porous and multi-cluster area to be transformed have no contribution to production capacity due to the lack of fluid intake. Therefore, these perforation clusters that do not contribute to production capacity need to be identified as fracture locations that need to be blocked.
[0041] Further, in the temporary plugging position generation step (step S110), the pressure difference between each perforation cluster in the target layer to be transformed is calculated, the crack opening sequence and the crack permeability are determined, and thus one or more crack positions that need to be plugged are determined. That is, in step S110, it is necessary to use numerical simulation software to determine the stress data of different perforation clusters in the target layer to be transformed (including perforation clusters that contribute to production capacity and perforation clusters that do not contribute to production capacity due to no fluid inflow), and calculate the stress difference between different perforation clusters, and further combine the engineering geological parameters of the target layer to be transformed to determine the opening sequence of each perforation cluster in the target layer to be transformed (i.e., the crack opening sequence) and the crack permeability of each perforation cluster, and then determine the crack position that needs to be plugged according to the determined opening sequence parameters and crack permeability parameters, so as to enter step S120. Among them, the engineering geological parameters of the target layer to be transformed include but are not limited to: natural fracture development degree, well depth, formation pressure, formation temperature, porosity and permeability, rock mechanics parameters and other information.
[0042] Step S120 simulates the transformation construction parameters required for achieving the optimal transformation volume of the cracks to be plugged according to the engineering geological parameters of the target layer to be transformed, so as to obtain the optimal temporary plugging time.
[0043] In step S120, first, the engineering geological parameters of the target layer to be transformed are obtained, and according to the current engineering geological parameters and the crack opening sequence determined in step S110, the (optimal) transformation construction parameters required to achieve the optimal transformation volume state at the blocked crack position are determined, and the optimal temporary plugging time is further determined, so as to obtain the optimal transformation volume after determining the optimal transformation parameters and the optimal plugging time.
[0044] Specifically, by analyzing the seepage law of the reservoir to be transformed, the transformation volume corresponding to the optimal production capacity of the reservoir is obtained, and by numerically simulating different transformation construction parameters, the construction parameters that can achieve the optimal transformation volume and the optimal plugging timing are determined.
[0045] Step S130 simulates the erosion process of the sand-carrying fluid on each perforation hole in the target layer to be transformed, and obtains the size and shape of each perforation hole corresponding to the optimal temporary plugging time during the erosion process, thereby determining the size and shape of the temporary plugging knot corresponding to the temporary plugging treatment of the crack to be blocked, and further calculating the knot strength and the required number of knots.
[0046] In step S130, the optimal plugging timing determined in step S120 is used to sequentially determine the knot size, shape, strength and number of knots required for the current temporary plugging process, thereby completing the design of the knotting parameters.
[0047] When determining the size and shape of the knotted rope, firstly, the preset erosion rate model is used to analyze the flow field around the perforation, the movement trajectory of the particles and the erosion law of the perforation under different displacement and sand content conditions, and the size and shape of the perforations in each perforation cluster in the target layer to be transformed are obtained. Specifically, a simulation environment for the erosion shape of the perforation holes is built (see Figure 3 , Figure 3 is a schematic diagram of simulating the erosion process in the temporary plugging and diverting fracturing method in an embodiment of the present application); using the erosion rate model constructed by the numerical simulation software, the erosion process of the sand-carrying fluid on the holes of each perforation cluster is simulated, and the erosion characteristics including the velocity field, the movement trajectory of the particles and the erosion law of the holes near the holes of each perforation cluster under the conditions of different displacement and different sand content combinations are analyzed, so as to determine the corresponding erosion characteristics at the optimal temporary plugging time, and further obtain the size and shape of the holes of each perforation cluster at the optimal plugging time after erosion.
[0048] The above erosion rate model is expressed by the following expression:
[0049]
[0050] Where ER is the erosion rate; α is the erosion angle; K is an empirical constant (determined according to the material), usually 2.0×10 -9 ; m1 represents the particle mass, in kg; V1 n represents the velocity function of the medium, m / s, where the value of n is related to the material and is obtained from the erosion test; f(α) represents the particle impact angle function, which generally takes a value between 2 and 3; α m It represents the maximum erosion angle, which is 16.8°. It is an important parameter that determines the corrosion rate and is obtained from the erosion test.
[0051] Figure 2 It is a contour map of fluid velocity at the perforation holes in the simulation of the erosion process in the temporary plugging diversion fracturing method according to the embodiment of the present application. Figure 2 The figure shows the velocity field near the holes of each perforation cluster in the target layer to be transformed under the conditions of different displacement and different sand content combinations.
[0052] After obtaining the size and shape data of each perforation, the size and shape of each perforation cluster hole corresponding to the optimal plugging opportunity are used to determine the size and shape of the perforation cluster hole involved in the current crack to be plugged (to which the crack to be plugged belongs), and further determine the size and shape (including specifications and shape) of the temporary plugging knot required for plugging the perforation cluster hole to which the crack to be plugged belongs.
[0053] Furthermore, when determining the knot strength, first, the pump-off pressure and the corresponding formation fracture pressure for generating cracks at different perforations are determined according to the rock mechanical parameters of the target layer to be transformed, and then, the strength of the temporary plugging knot for sealing the current perforation cluster is determined according to the difference between the pump-off pressure and the formation fracture pressure corresponding to these perforation clusters.
[0054] Figure 4 This is a schematic diagram of the pump-off pressure and the fracture pressure during the fracturing construction process in the temporary plugging and diverting fracturing method of the embodiment of the present application. According to the rock mechanical parameters of the target layer to be transformed, the pump-off pressure corresponding to the generation of fractures at different perforation clusters and the formation fracture pressure corresponding to the pump-off pressure are determined. Then, refer to Figure 4 According to the difference between the pump-off pressure and the formation fracture pressure corresponding to the same perforation cluster, the strength of the temporary plugging knot required to plug the current perforation cluster is determined.
[0055] By analyzing and calculating the rock mechanics parameters of the formation, the pump-off pressure and fracture pressure of different perforation clusters are predicted, and the difference between the two pressures is obtained. Therefore, this difference determines the initial pressure bearing capacity requirement for temporary plugging and thus, the strength of the fiber knot required for plugging each perforation cluster is determined based on this difference.
[0056] Furthermore, when determining the number of knots, the number of fiber knots is calculated according to the size and shape of each perforation cluster in the target layer to be transformed and the total number of holes in the perforation cluster to be plugged in the current target layer to be transformed.
[0057] According to the results of indoor experiments, under regular holes, the temporary plugging rate of fiber knots for holes is 75%, and the number of fiber knots required to plug all holes is 1.33 times the total number of perforations to be plugged. In addition, considering the hole shape after erosion, the number of knots required in the embodiment of the present invention is at least 1.5 times the total number of holes in the perforation cluster to be plugged, so as to maximize the guarantee that as many perforations to be plugged in the current target layer to be transformed as possible have corresponding knots for plugging.
[0058] In this way, after the design of the size, strength and required number of the temporary blocking knot is completed, the process proceeds to step S140.
[0059] Step S140 calculates the (pumping) displacement required for the current pumping temporary plugging knot, so that the designed temporary plugging knot is delivered to the perforation hole position of each crack to be plugged and continuously maintains an effective temporary plugging state.
[0060] In step S140, based on the construction displacement required for the fracturing construction, the required rope pumping displacement under the size and shape of each perforation is calculated by combining indoor experiments with theoretical calculations and using the preset fiber rope emplacement conditions.
[0061] Specifically, first, a pumping displacement indoor experimental platform is built, and then, based on the pumping displacement indoor experimental platform, according to the construction displacement of normal fracturing reconstruction construction, through theoretical calculation combined with indoor experiments, using the knotting position conditions, the pumping (design) displacement required for pumping knotting under different hole (or knotting) specifications is obtained, thereby entering step S150. The fiber knotting position conditions need to meet the following two position conditions:
[0062] The first condition is that when the temporary plugging knot sits on the perforation hole, the sum of the drag force generated by the flow of the fracturing fluid and the weight of the knot is greater than the inertia force of the fluid flow. Figure 5 It is a schematic diagram of the principle of the first condition within the knotting-in-place condition in the temporary plugging and diverting fracturing method in an embodiment of the present application. Figure 5 The drag force F generated by the fluid velocity when the temporary plugging ball sits on the hole is shown. D +GravityF g >Inertia force F1.
[0063] The second condition is that the sum of the adhesion force generated when the temporary plugging knot is sealed on the perforation hole and continues to maintain an effective plugging state and the knot weight is greater than the fluid flow driving force. Figure 6It is a schematic diagram of the principle of the second condition within the knotting condition in place in the temporary plugging and diverting fracturing method in an embodiment of the present application. Figure 6 Shows the adhesion force F formed when the temporary plugging ball is on the hole H +GravityF g Thrust F u .
[0064] Step S150 uses the fiber knot temporary plugging technology to implement temporary plugging and fracturing at the optimal temporary plugging time according to the pumping displacement and the temporary plugging knot design parameters. Further, based on the pumping displacement corresponding to different knot specifications and shapes obtained in step S140 and the temporary plugging knot design parameters obtained in step S130, the fiber knot temporary plugging technology is used to implement temporary plugging and fracturing when the optimal temporary plugging time obtained in step S120 is reached.
[0065] Figure 7 Schematic diagram of the plugging effect of the temporary plugging technology using fiber knotting in the temporary plugging diversion fracturing method of the embodiment of the present application. Figure 7 As shown in the left figure, the state of uneven expansion of the liquid inflow of multiple perforation clusters before temporary plugging is shown. After the temporary plugging and fracturing operation formed by the above steps S110 to S150 of the present invention, the state of uniform expansion of the liquid inflow of each perforation cluster after temporary plugging is significantly improved (see Figure 7 right).
[0066] On the other hand, based on the temporary plugging and diverting fracturing method, an embodiment of the present invention further provides a temporary plugging and diverting fracturing system. The temporary plugging and diverting fracturing system utilizes the temporary plugging and diverting fracturing method to perform fracturing reconstruction on the target layer. Figure 8 Schematic diagram of the module of the temporary plugging and diverting fracturing system of the embodiment of the present application. Figure 8 As shown, the temporary plugging and diverting fracturing system includes: a temporary plugging position generating module 81, a temporary plugging timing generating module 82, a knotting parameter design module 83, a displacement generating module 84 and a fracturing construction module 85.
[0067] Specifically, the temporary plugging position generation module 81 is implemented according to the method described in the above step S110, and is configured to determine the position of the cracks that need to be plugged in the target layer to be transformed; the temporary plugging timing generation module 82 is implemented according to the method described in the above step S120, and is configured to simulate the transformation construction parameters required for the cracks to be plugged to achieve the optimal transformation volume according to the engineering geological parameters, so as to obtain the optimal temporary plugging timing; the knotting parameter design module 83 is implemented according to the method described in the above step S130, and is configured to simulate the erosion process of the sand-carrying fluid on each perforation in the target layer, and obtain the optimal temporary plugging timing when the erosion process reaches the optimal temporary plugging. The size and shape of each perforation corresponding to the machine time are determined, so as to determine the size and shape of the temporary plugging knot used for temporary plugging of the cracks, and further calculate the knot strength and the required number; the displacement generation module 84 is implemented according to the method described in the above step S140, and is configured to calculate the displacement required for pumping the temporary plugging knot, so that the current knot is delivered to each perforation position and maintains an effective plugging state; the fracturing construction module 85 is implemented according to the method described in the above step S150, and is configured to implement temporary plugging and fracturing construction at the optimal temporary plugging time by using the fiber knot temporary plugging technology according to the pumping displacement and the design parameters of the temporary plugging knot.
[0068] Further, the knotting parameter design module 83 described in the embodiment of the present invention includes: a knotting size generation unit 831, a knotting strength generation unit 832 and a knotting number generation unit 833. Among them, the knotting size generation unit 831 is configured to use a preset erosion rate model to analyze the flow field around the perforation, the movement trajectory of the particles and the erosion law of the perforation under different displacement and sand content conditions, and obtain the size and shape of each perforation. Based on this, the size and shape of the perforation holes involved in the cracks to be plugged are determined, and the size and shape of the temporary plugging knot is further determined. The knotting strength generation unit 832 is used to determine the pump-off pressure and the corresponding formation fracture pressure of the cracks generated at different perforations according to the rock mechanical parameters of the target layer to be transformed. Based on this, according to the difference between the pump-off pressure and the formation fracture pressure, the strength of the temporary plugging knot for plugging the current perforation is determined. The knotting number generation unit 833 is used to calculate the number of fiber knots according to the size and shape of each perforation and the total number of holes to be plugged in the target layer to be transformed.
[0069] The present invention discloses a temporary plugging and diverting fracturing method and system. The method and system adopt a fiber knot temporary plugging technology, by selecting fibers that are suitable for the formation temperature and can dissolve automatically, by predicting the difference between the formation fracture pressure and the pump stop pressure to determine the compressive strength of the fiber knot, by establishing a numerical model to simulate the erosion of the perforation holes by sand-carrying fluid to obtain the hole shape after erosion and determine the specifications of the plastic fiber knot, and temporarily plug the perforation holes that have been filled with liquid and sand, thereby improving the efficiency of liquid filling of the perforation holes, achieving uniform volume fracturing transformation of each perforation hole, increasing the complexity of the cracks, increasing the effective transformation volume, while reducing the probability of casing deformation, and remedial transformation of the well section where casing deformation has occurred. In this way, the present invention uses a seam temporary plugging agent for adjustment, so that the perforation clusters that have not been filled with liquid can be fracturing and transformed, so that through a fiber knot with strength and plasticity to temporarily plug and divert the cracks, the utilization efficiency of the perforation holes can be improved, the risk of casing deformation can be reduced, and it is beneficial to improve the overall development level and development benefits of oil and gas fields. In addition, the fracturing method of the present invention is mainly applicable to oil and natural gas wells to improve the complexity of artificial fractures after transformation, increase the effective transformation volume, and thus improve the transformation effect.
[0070] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any person familiar with the technology within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
[0071] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.
[0072] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.
[0073] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.
Claims
1. A temporary plugging and diverting fracturing method, It is characterized in that include: Determine the location of the cracks that need to be sealed in the target layer to be transformed; According to the engineering geological parameters, the reconstruction construction parameters required to achieve the optimal reconstruction volume of the cracks to be plugged are simulated, so as to obtain the optimal temporary plugging time; Simulate the erosion process of the sand-carrying fluid on each perforation in the target layer, obtain the size and shape of each perforation corresponding to the optimal temporary plugging time during the erosion process, thereby determining the size and shape of the temporary plugging knot used for temporary plugging of the fracture, and further calculate the knot strength and required number; Calculate the displacement required for pumping the temporary plugging knot so that the current knot reaches each perforation position and maintains an effective plugging state; According to the pumping displacement and the design parameters of the temporary plugging knot, the temporary plugging and diverting fracturing construction is carried out at the optimal temporary plugging time by using the fiber knot temporary plugging technology.
2. The temporary plugging and diverting fracturing method according to claim 1, It is characterized in that In the process of designing knotting parameters, including: Using the preset erosion rate model, the flow field around the perforation, the movement trajectory of the particles and the erosion law of the perforation are analyzed under different displacement and sand content conditions to obtain the size and shape of each perforation; Based on the size and shape of each perforation, the size and shape of the perforation holes involved in the crack to be plugged are determined, and the size and shape of the temporary plugging knot are further determined.
3. The temporary plugging and diverting fracturing method according to claim 1 or 2, It is characterized in that In the process of designing knotting parameters, including: According to the rock mechanical parameters of the target layer to be transformed, the pump-off pressure for generating cracks at different perforations and the corresponding formation fracture pressure are determined; The strength of the temporary plugging knot for plugging the current perforation is determined according to the difference between the pump stop pressure and the formation fracture pressure.
4. The temporary plugging and diverting fracturing method according to any one of claims 1 to 3, It is characterized in that The number of fiber knots is calculated according to the size and shape of each perforation and the total number of perforations to be plugged in the target layer to be transformed.
5. The temporary plugging and diverting fracturing method according to any one of claims 1 to 4, It is characterized in that The step of determining the location of the fracture that needs to be sealed in the target layer to be transformed includes: The pressure difference between each perforation cluster in the target layer to be transformed is calculated to determine the fracture opening sequence and fracture permeability, thereby determining the fractures that need to be plugged.
6. The temporary plugging and diverting fracturing method according to any one of claims 1 to 5, It is characterized in that The displacement generation process includes: Based on the construction displacement required for the fracturing reconstruction construction, through indoor experiments and using the preset fiber knotting conditions, the knotting pumping displacement required for the size and shape of each perforation is calculated.
7. The temporary plugging and diverting fracturing method according to claim 6, It is characterized in that The conditions for tying the rope in place include: When the temporary plugging knot is seated on the perforation hole, the sum of the drag force generated by the flow of the fracturing fluid and the weight of the knot is greater than the inertial force of the fluid flow; and The sum of the adhesion force generated when the temporary plugging knot is sealed on the perforation hole and maintained and the knot weight is greater than the fluid flow driving force.
8. A temporary plugging and diverting fracturing system, It is characterized in that The system uses the temporary plugging and diverting fracturing method according to any one of claims 1 to 7 to perform fracturing reconstruction construction on the target layer, wherein the temporary plugging and diverting fracturing system includes: A temporary plugging position generation module is used to determine the position of the cracks that need to be plugged in the target layer to be transformed; A temporary plugging timing generation module is used to simulate the transformation construction parameters required to achieve the optimal transformation volume of the cracks to be plugged based on engineering geological parameters, so as to obtain the optimal temporary plugging timing; The knot parameter design module is used to simulate the erosion process of the sand-carrying fluid on each perforation in the target layer, obtain the size and shape of each perforation corresponding to the optimal temporary plugging time in the erosion process, thereby determining the size and shape of the temporary plugging knot used for temporary plugging of the fracture, and further calculate the knot strength and required number; A displacement generation module, which is used to calculate the displacement required for pumping the temporary plugging knot so that the current knot is delivered to each perforation position and maintains an effective plugging state; The fracturing construction module is used to implement temporary plugging and fracturing construction at the optimal temporary plugging time by using fiber knotting temporary plugging technology according to the pumping displacement and the design parameters of the temporary plugging knotting.
9. The temporary plugging and diverting fracturing system according to claim 8, It is characterized in that The knotting parameter design module comprises: The knot size generation unit is used to use a preset erosion rate model to analyze the flow field around the perforation, the movement trajectory of the particles and the erosion law of the perforation under different displacement and sand content conditions, obtain the size and shape of each perforation, and based on this, determine the size and shape of the perforation holes involved in the crack to be plugged, and further determine the size and shape of the temporary plugging knot.
10. The temporary plugging and diverting fracturing system according to claim 8 or 9, It is characterized in that The knotting parameter design module comprises: A knot strength generating unit is used to determine the pump-off pressure and the corresponding formation fracture pressure for generating cracks at different perforations according to the rock mechanical parameters of the target layer to be transformed, and based on this, the strength of the temporary plugging knot for plugging the current perforation is determined according to the difference between the pump-off pressure and the formation fracture pressure.
