Quantitative management and control system and method for safety risk of high-sulfur production gas well based on shaft barrier

By real-time monitoring and analysis of key safety production parameters at high sulfur production gas wells, using the wellbore barrier system to conduct risk quantitative control, the problem of inability to early warning in the existing technology is solved, and the timely identification and control of hydrogen sulfide leakage risks is achieved. , improving the level of production safety.

CN119021671APending Publication Date: 2024-11-26CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310601694.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing technology cannot be in advance warning and provide targeted risk control measures at the site of high-sulfur production gas wells, resulting in the inability to take timely prevention and control measures before the hydrogen sulfide leakage accident, affecting production safety.

Method used

The high-sulfur-containing gas well safety risk quantitative management and control system is adopted based on the wellbore barrier. The monitoring data acquisition unit obtains key safety production parameters in real time, combines the data analysis and early warning information generation unit of the central processor to determine the risk level and push the rectification suggestions. Realize real-time monitoring and early warning of hydrogen sulfide leakage risks.

Benefits of technology

It has achieved risk classification warning and rapid analysis of high-sulfur-containing gas wells, provided targeted rectification suggestions, improved the safety of oilfield enterprises in high-sulfur-containing gas wells, and ensured timely prevention and treatment of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021671A_ABST
    Figure CN119021671A_ABST
Patent Text Reader

Abstract

The invention discloses a high-sulfur-content production gas well safety risk quantitative management and control system and method based on a shaft barrier. According to the method, shaft barrier integrity evaluation is conducted on the high-sulfur-content production gas well, the shaft barrier integrity score of the high-sulfur-content production gas well is obtained, and after the inherent risk level of the high-sulfur-content production gas well is determined, safety production key parameters of the high-sulfur-content production gas well are selected; the method comprises the following steps: establishing a real-time early warning evaluation system and a production gas well risk early warning model, calculating a safety production risk early warning index by using the production gas well risk early warning model, determining a risk early warning level of a high-sulfur-content production gas well in real time, and calling risk early warning prevention and control measures from a pre-established risk suggestion measure library according to the risk early warning level, and a rectification suggestion scheme for the high-sulfur-content production gas well is formed. According to the method, the safety risk of the high-sulfur-content production gas well is quantified, so that the safety production risk of the high-sulfur-content production gas well is found in time and effectively managed and controlled, and the safety management and control capability of a well site is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of industrial control technology, and in particular to a system and method for quantitatively controlling safety risks of high-sulfur production gas wells based on a wellbore barrier. Background Art

[0002] At present, safety issues have become the top priority in the development and generation process of natural gas fields, and run through the entire life cycle of gas field development. At present, some gas fields have achieved more than 10 years of stable and high-yield development, but with the aging of equipment and the increase in water content, hydrogen sulfide leakage accidents have been increasing year by year, and safety issues have become increasingly prominent.

[0003] In order to prevent large-scale hydrogen sulfide leakage accidents from causing serious consequences, high-sulfur oil and gas field companies usually use toxic gas monitoring, combustible gas monitoring, flame detection, wellhead and casing pressure monitoring methods at the gas well production site to determine whether hydrogen sulfide is leaking on the ground or leaking inside the wellbore.

[0004] Among them, toxic gas monitoring is to deploy hydrogen sulfide gas alarms around the well, and combustible gas monitoring is to deploy combustible gas alarms around the well. Both hydrogen sulfide gas alarms and combustible gas alarms monitor gas leaks by measuring the gas concentration around the well. When the gas concentration exceeds the preset alarm threshold of the alarm, the alarm will sound and light alarms to prevent further expansion of the accident. However, the toxic gas monitoring method, as a post-alarm method, cannot provide leakage warning in the early stage of hydrogen sulfide leakage.

[0005] Flame monitoring is achieved by deploying flame monitors around the well. When leaking gas encounters a fire source and catches fire, or when combustible materials around the well catch fire, the flame monitor will issue an audible and visual alarm to further prevent the accident from expanding. However, the flame monitor will only alarm after a fire occurs, and the alarm response delay is long, which often misses the best time to deal with hydrogen sulfide leaks.

[0006] Wellhead and casing pressure monitoring (SCS system) monitors the pressure fluctuations in the wellhead and the casing annulus, technical casing annulus, and surface casing annulus by installing an online pressure gauge at the wellhead. When the wellhead pressure is lower than the preset pressure value or the casing pressure exceeds the preset pressure value, it indicates that the wellbore has leaked. Although the wellhead and casing pressure monitoring method can preliminarily identify the occurrence of wellbore leakage, it can only provide alarm information to the on-site station control room personnel, and cannot deeply mine the wellbore leakage data, and cannot achieve graded warning of wellbore leakage risks and give targeted warning measures, which is not conducive to the on-site staff to take relevant risk control measures in a timely manner.

[0007] However, the above-mentioned monitoring methods are all aimed at surface leakage or wellbore leakage of hydrogen sulfide at high-sulfur production gas wells, and all provide leakage warning after hydrogen sulfide occurs at high-sulfur production gas wells. They cannot provide early warning of the risk of hydrogen sulfide leakage, and cannot quickly provide risk control recommendations for hydrogen sulfide leakage, which is not conducive to timely control of hydrogen sulfide leakage risks.

[0008] At the same time, at this stage, the research focus of technical personnel in this field on safety risk classification warning of high-sulfur production gas wells is concentrated on integrating the existing on-site monitoring information and realizing early warning by using the method of preset thresholds. Its main goal is to realize the real-time integrated display of on-site monitoring data, but it does not conduct in-depth analysis of the on-site monitoring data of high-sulfur production gas wells. It can neither issue safety reminders to on-site operators and managers before a leakage accident occurs, nor provide targeted risk control measures based on the on-site monitoring data of high-sulfur production gas wells.

[0009] Therefore, there is an urgent need to propose a safety risk quantification management system and method for high-sulfur production gas wells, which can promptly issue safety reminders to on-site workers before a hydrogen sulfide leakage accident occurs, and provide operational guidance for on-site workers to take control measures in a timely manner. Summary of the invention

[0010] In view of the current situation that it is impossible to use the on-site monitoring data of high-sulfur production gas wells to provide timely safety warnings before a hydrogen sulfide leakage accident occurs, the present invention proposes a high-sulfur production gas well safety risk quantification management and control system and method based on a wellbore barrier, which realizes real-time monitoring and early warning of the production status of high-sulfur production gas wells, and effectively improves the oilfield enterprises' ability to control the safety of high-sulfur production gas wells.

[0011] The present invention specifically adopts the following technical solutions:

[0012] A safety risk quantitative management and control system for high-sulfur production gas wells based on a wellbore barrier, comprising a monitoring data acquisition unit, a central processor and a rectification suggestion plan push unit connected in sequence;

[0013] The monitoring data acquisition unit includes all risk monitoring instruments installed in the high-sulfur production gas well field, and is used to monitor and store key production safety parameters of each monitoring point in the high-sulfur production gas well field in real time;

[0014] The central processing unit is provided with a monitoring data receiving unit, a monitoring data processing unit, a monitoring data analyzing unit, and an early warning information generating unit, and the monitoring data receiving unit, the monitoring data processing unit, the monitoring data analyzing unit, and the early warning information generating unit are connected in sequence;

[0015] The monitoring data receiving unit is used to receive and store the key safety production parameters collected by each monitoring point in the monitoring data collection unit; the monitoring data processing unit is used to determine the inherent risk level of the high-sulfur production gas well and calculate the early warning value of the key safety production parameters of the high-sulfur production gas well in real time, and transmit it to the monitoring data analysis unit;

[0016] The monitoring data analysis unit is used to determine the correction coefficient and the key safety parameter warning index value of the high-sulfur production gas well according to the inherent risk level of the high-sulfur production gas well and the warning value of the key safety production parameter, determine the safety production risk warning index of the high-sulfur production gas well and send it to the warning information generation unit; the warning information generation unit generates the risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well, and sends the risk warning level of the high-sulfur production gas well to the rectification suggestion plan pushing unit at the same time as the warning;

[0017] The rectification suggestion plan pushing unit is provided with a risk suggestion measure library and a display terminal, which are used to match risk warning prevention and control measures according to the risk warning level of the high-sulfur production gas well, generate a rectification suggestion plan and push it to the display terminal for display, for reference by on-site technicians of the high-sulfur production gas well.

[0018] Preferably, the monitoring data acquisition unit is used to obtain in real time the oil pressure, casing annulus pressure, surface casing annulus pressure, technical casing annulus pressure, oil temperature, casing annulus temperature, surface casing annulus temperature, technical casing annulus temperature, hydrogen sulfide monitoring value and combustible gas monitoring value of the high-sulfur production gas well, and transmit them to the monitoring data receiving unit.

[0019] A method for quantitatively controlling safety risks of high-sulfur production gas wells based on a wellbore barrier, using the above-mentioned system for quantitatively controlling safety risks of high-sulfur production gas wells based on a wellbore barrier, specifically comprising the following steps:

[0020] Step 1, conducting a wellbore barrier integrity assessment on a high-sulfur production gas well to obtain a wellbore barrier integrity score for the high-sulfur production gas well;

[0021] Step 2, determining the inherent risk level of the high-sulfur production gas well based on the wellbore barrier integrity score of the high-sulfur production gas well;

[0022] Step 3, selecting key safety production parameters of high-sulfur production gas wells, establishing a real-time early warning evaluation system for high-sulfur production gas wells, constructing a risk early warning model for production gas wells, and using the risk early warning model for production gas wells to calculate a safety production risk early warning index for high-sulfur production gas wells;

[0023] Step 4, determining the risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well;

[0024] Step 5: According to the risk warning level of the high-sulfur production gas well, risk warning prevention and control measures are retrieved from the pre-established risk recommendation measure library to form a rectification recommendation plan for the high-sulfur production gas well.

[0025] Preferably, a wellhead device is provided at the wellhead of the high-sulfur production gas well, and an anti-leakage protection device for preventing leakage of fluid in the wellbore is provided in the wellbore. The wellhead device and the anti-leakage protection device are combined to form a wellbore barrier for preventing the fluid in the wellbore from flowing into the freshwater layer and the surface;

[0026] The anti-leakage protection device includes surface casing, technical casing, production casing, oil pipe, oil pipe accessories, packer and safety valve;

[0027] The surface casing, technical casing and oil layer casing are all cemented by cement.

[0028] Preferably, in step 1, the structure and construction process of the wellbore barrier of the high-sulfur production gas well are obtained, and the wellbore barrier integrity score of the high-sulfur production gas well is determined based on the wellbore barrier integrity scoring principle;

[0029] The wellbore barrier integrity scoring principles are:

[0030] The full score of wellbore barrier integrity for high-sulfur production gas wells is set to 100 points;

[0031] When the surface casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points;

[0032] When the surface casing cementing quality test of a high-sulfur production gas well is unqualified, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points;

[0033] When the technical casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points;

[0034] When the technical casing cementing quality test of a high-sulfur production gas well is unqualified, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points;

[0035] When the production casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0036] When the cementing quality test of the production casing of a high-sulfur production gas well fails, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0037] When the packer installed on the production casing of a high-sulfur production gas well fails or is not sealed tightly, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0038] When a bridge plug, cement plug or packer is installed in a high-sulfur production gas well to isolate the completion section, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0039] When the oil pipe and oil pipe accessories of the high-sulfur production gas well are detected to be damaged or perforated, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0040] When the safety valve of a high-sulfur production gas well detects sealing failure, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points;

[0041] When the wellhead device of a high-sulfur production gas well is detected to fail or the control effect is weakened, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 20 points.

[0042] Preferably, in step 2, when the wellbore barrier integrity score of the high-sulfur production gas well is greater than 0 and not more than 25, the inherent risk level of the high-sulfur production gas well is determined to be a significant risk;

[0043] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 25 and less than 50, the inherent risk level of the high-sulfur production gas well is determined to be a high risk;

[0044] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 50 and not more than 75, the inherent risk level of the high-sulfur production gas well is determined to be general risk;

[0045] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 75 and not more than 100, the inherent risk level of the high-sulfur production gas well is determined to be low risk.

[0046] Preferably, the step 3 specifically includes the following steps:

[0047] Step 3.1, based on the Bow-tie model, the key safety production parameters of high-sulfur production gas wells are screened and a real-time early warning evaluation system for high-sulfur production gas wells is established;

[0048] The key production safety parameters are used to reflect the production safety status of high-sulfur production gas wells, including process control indicators and leakage alarm indicators;

[0049] The process control indicators include oil pressure, casing annulus pressure, surface casing annulus pressure, technical casing annulus pressure, oil temperature, casing annulus temperature, surface casing annulus temperature, and technical casing annulus temperature;

[0050] The leakage alarm indicators include hydrogen sulfide monitoring values ​​and combustible gas monitoring values;

[0051] Step 3.2, constructing a key safety parameter early warning model based on the key safety parameters, and determining the key safety parameter early warning value of the high-sulfur production gas well in real time by performing early warning evaluation on the key safety parameters;

[0052] Step 3.3, mapping the key safety parameter warning value of the high sulfur production gas well to the range of the key safety parameter warning index. After mapping, the key safety parameter warning index value T is obtained. R ;

[0053] Step 3.4: According to the inherent risk level of the high-sulfur production gas well determined in step 2, determine the correction coefficients γ corresponding to low risk, general risk, greater risk and major risk respectively. R ;

[0054] Step 3.5, construct a risk warning model for production gas wells, combine the correction coefficient of high-sulfur production gas wells and the warning index value of key parameters for safe production, and calculate the safety production risk warning index of high-sulfur production gas wells.

[0055] Preferably, in step 3.2, the key parameter early warning model for safe production is:

[0056]

[0057] In the formula,

[0058] T Alarm — Early warning values ​​of key parameters for safe production;

[0059] T 1,j — Early warning values ​​of process control indicators;

[0060] T 2,j —Warning value of leakage alarm index;

[0061] α 1 , α 2 —weight coefficient;

[0062] j—The serial number of the subject involved in the evaluation of the warning value of key parameters.

[0063] Preferably, the warning values ​​of the process control index and the leakage alarm index in the key parameter early warning model for safe production are obtained by scoring based on the early warning evaluation principle for high-sulfur production gas wells;

[0064] The subjects involved in the evaluation of the early warning values ​​of key safety parameters for production safety include the average disturbance rate, the number of repeated alarms, the average number of alarms at each point, the average alarm elimination time, and the timely rate of alarm elimination. Multiple monitoring time segments are set in the early warning monitoring cycle. The total duration of the early warning monitoring cycle is set to 24 hours, and the duration of each monitoring time segment is set to 10 minutes.

[0065] When the subject number j of the key parameter early warning value evaluation is 1, it means that the subject involved in the key parameter early warning value evaluation is the average disturbance rate, and the average disturbance rate is the percentage of the number of monitoring points that alarm more than five times during the early warning monitoring period to the total number of monitoring points;

[0066] When the subject number j=2 participating in the key parameter warning value assessment, it means that the subject participating in the key parameter warning value assessment is the number of repeated alarms, and the number of repeated alarms is the number of monitoring points with a cumulative alarm number of not less than 2 during the warning monitoring cycle;

[0067] When the subject number j participating in the key parameter warning value evaluation is 3, it means that the subject participating in the key parameter warning value evaluation is the average number of point alarms, and the average number of point alarms is the percentage of the number of monitoring points that have alarms in the warning monitoring period to the total number of monitoring points;

[0068] When the subject number j=4 participating in the key parameter warning value evaluation, it means that the subject participating in the key parameter warning value evaluation is the average alarm elimination time, and the average alarm elimination time is the ratio between the total alarm time of all current monitoring points and the total number of accumulated alarms of all current monitoring points;

[0069] When the subject number j involved in the key parameter warning value evaluation is 5, it means that the subject involved in the key parameter warning value evaluation is the timely alarm elimination rate. The timely alarm elimination rate is the ratio between the number of alarms eliminated at all monitoring points within the monitoring time segment and the total number of accumulated alarms at all current monitoring points.

[0070] Preferably, based on the early warning evaluation principle for high-sulfur production gas wells, the early warning values ​​of the process control indicators and the leakage alarm indicators in the early warning model for key parameters of safe production are calculated respectively;

[0071] The early warning evaluation principles for high sulfur production gas wells are:

[0072] The total score of the key safety parameter early warning evaluation is set to 100 points, and the total score of each subject involved in the evaluation of the key safety parameter early warning value of production safety is set to 20 points;

[0073] When the average disturbance rate is equal to 0, the evaluation score of the average disturbance rate will not be deducted; when the average disturbance rate is not equal to 0, the evaluation score of the average disturbance rate will be deducted by 5 points for every 10% increase in the average disturbance rate, until a full 20 points are deducted;

[0074] When the number of repeated alarms is equal to 0, the evaluation score of the number of repeated alarms will not be deducted; when the number of repeated alarms is not equal to 0, the evaluation score of the number of repeated alarms will be deducted by 2 points for each additional monitoring point, until the maximum deduction is 20 points;

[0075] When the average number of alarms at a point is equal to 0, the evaluation score of the average number of alarms at a point will not be deducted; when the average number of alarms at a point is not equal to 0, the evaluation score of the average number of alarms at a point will be deducted by 2 points for every 20% increase in the average number of alarms at a point, until a full 20 points are deducted;

[0076] When the average time to extinguish an alarm does not exceed 10 minutes, the evaluation score of the average time to extinguish an alarm will not be deducted; when the average time to extinguish an alarm is greater than 10 minutes, the evaluation score of the average time to extinguish an alarm will be deducted by 5 points for every additional 10 minutes of the average time to extinguish an alarm, until a maximum of 20 points are deducted;

[0077] When the timeliness rate of fire alarm handling is 100%, the evaluation score of the timeliness rate of fire alarm handling will not be deducted; when the timeliness rate of fire alarm handling is not equal to 100%, the evaluation score of the timeliness rate of fire alarm handling will be deducted by 2 points for every 5% decrease in the timeliness rate of fire alarm handling, until a full 20 points are deducted.

[0078] Preferably, in step 3.3, the key parameter warning index for safe production T R The value range is set to 0≤T R ≤5;

[0079] When the key parameter warning value of production safety is T Alarm 0≤T Alarm When ≤20, the range of the key safety parameter warning index is [4,5]. The key safety parameter warning value is mapped to the key safety parameter warning index range to determine the key safety parameter warning index value T. R ;

[0080] When the key parameter warning value of production safety is T Alarm 20<T Alarm When ≤40, the range of the key parameter warning index for safe production is [3,4). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ;

[0081] When the key parameter warning value of production safety is T Alarm 40<T AlarmWhen ≤60, the range of the key parameter warning index for production safety is [2,3). The key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R ;

[0082] When the key parameter warning value of production safety is T Alarm 60<T Alarm When ≤80, the range of the key parameter warning index for safe production is [1,2). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ;

[0083] When the key parameter warning value of production safety is T Alarm 80<T Alarm When ≤100, the range of the key parameter warning index for production safety is [0,1), the key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R .

[0084] Preferably, in step 3.4, the correction coefficient γ R The value range of is (0.4,1], and the correction coefficient values ​​of low risk, general risk, relatively large risk and major risk form an arithmetic progression.

[0085] Preferably, when the inherent risk level of the high-sulfur production gas well is low risk, the correction coefficient γ R Set to 0.43;

[0086] When the inherent risk level of the high-sulfur production gas well is general risk, the correction factor γ R Set to 0.62;

[0087] When the inherent risk level of the high-sulfur production gas well is a relatively high risk, the correction factor γ R Set to 0.81;

[0088] When the inherent risk level of the high-sulfur production gas well is a major risk, the correction factor γ R Set to 1.

[0089] Preferably, in step 3.5, the production gas well risk warning model is:

[0090] R=γR×TR (2)

[0091] In the formula,

[0092] R—safety production risk warning index of high-sulfur production gas wells;

[0093] γR —Correction factor;

[0094] T R —Warning index value of key parameters for safe production.

[0095] Preferably, in step 4, when the safety production risk warning index R of the high-sulfur production gas well is 0≤R≤1, the risk warning level of the high-sulfur production gas well is determined to be low risk;

[0096] When the safety production risk warning index R of the high-sulfur production gas well is 1<R≤2, the risk warning level of the high-sulfur production gas well is determined to be general risk;

[0097] When the safety production risk warning index R of a high-sulfur production gas well is 2<R≤3, the risk warning level of the high-sulfur production gas well is determined to be medium risk;

[0098] When the safety production risk warning index R of a high-sulfur production gas well is 3<R≤4, the risk warning level of the high-sulfur production gas well is determined to be high risk;

[0099] When the safety production risk warning index R of the high-sulfur production gas well is 4<R≤5, the risk warning level of the high-sulfur production gas well is determined to be severely high risk.

[0100] Preferably, in step 5, risk warning and control measures corresponding to each risk warning level of high-sulfur production gas wells are provided in the risk recommendation measures library, and rectification suggestions for high-sulfur production gas wells are generated according to the risk warning levels of high-sulfur production gas wells and changes in key production safety parameters in high-sulfur production gas wells, combined with risk warning and control measures.

[0101] The present invention has the following beneficial effects:

[0102] (1) The present invention comprehensively considers the structure and construction process of the wellbore barrier of a high-sulfur production gas well, obtains the monitoring data of the well site of the high-sulfur production gas well in real time, and determines the monitoring values ​​of various key parameters for safe production. The monitoring values ​​of the key parameters for safe production in the method of the present invention are easy to obtain. By deeply analyzing the characteristics of the inherent risks of high-sulfur production gas wells, the key parameters for safe production are screened to construct a real-time early warning evaluation system for high-sulfur production gas wells, thereby reducing the difficulty of processing the monitoring data of the well site of the high-sulfur production gas well, and realizing in-depth mining of the monitoring data of the well site of the high-sulfur production gas well.

[0103] (2) The present invention deeply analyzes the key safety parameters of high-sulfur production gas wells, constructs a risk warning model for production gas wells, and uses the risk warning model to calculate the safety risk warning index of high-sulfur production gas wells, thereby determining the risk warning level of high-sulfur production gas wells. The present invention obtains the monitoring data of key safety parameters in real time, on the one hand, obtains the current risk status of high-sulfur production gas wells based on the key safety parameter monitoring data, and on the other hand, forms a key safety parameter monitoring database, analyzes the changes in key safety parameters within a specific time period, and analyzes the risk status of high-sulfur production gas wells within the warning monitoring period, thereby realizing risk classification warning for high-sulfur production gas wells.

[0104] (3) The method for quantitatively controlling the safety risks of high-sulfur production gas wells based on wellbore barriers proposed in the present invention directly obtains the current production risk situation of high-sulfur production gas wells by acquiring and analyzing key production safety parameters in real time, outputs the risk warning level and rectification suggestion plan of high-sulfur production gas wells, and realizes rapid analysis and judgment of on-site monitoring data of high-sulfur production gas wells, which is conducive to timely understanding the production status of high-sulfur production gas wells and quickly taking risk warning and prevention measures, ensuring the timeliness of the discovery of safety production risks of high-sulfur gas wells and the effectiveness of control, and effectively improving the oilfield enterprises' ability to control the safety of high-sulfur production gas wells. BRIEF DESCRIPTION OF THE DRAWINGS

[0105] Figure 1 It is a structural schematic diagram of the safety risk quantification management and control system of high-sulfur production gas wells based on wellbore barriers of the present invention.

[0106] Figure 2 The present invention is a flow chart of a method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers.

[0107] Figure 3 This is a risk warning classification diagram for high-sulfur production gas wells of the present invention. DETAILED DESCRIPTION

[0108] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0109] Example 1

[0110] The present invention proposes a safety risk quantitative management and control system for high-sulfur production gas wells based on wellbore barriers. Figure 1 As shown, it includes a monitoring data collection unit, a central processing unit and a rectification suggestion plan pushing unit, and the monitoring data collection unit, the central processing unit and the rectification suggestion plan pushing unit are connected in sequence.

[0111] The monitoring data acquisition unit includes all risk monitoring instruments installed in the high-sulfur production gas well field, which are used for real-time monitoring and storing key production safety parameters at each monitoring point in the high-sulfur production gas well field, and can obtain in real time the oil pressure, casing annulus pressure, surface casing annulus pressure, technical casing annulus pressure, oil temperature, casing annulus temperature, surface casing annulus temperature, technical casing annulus temperature, hydrogen sulfide monitoring value and combustible gas monitoring value of the high-sulfur production gas well.

[0112] The central processing unit is provided with a monitoring data receiving unit, a monitoring data processing unit, a monitoring data analyzing unit, and an early warning information generating unit, and the monitoring data receiving unit, the monitoring data processing unit, the monitoring data analyzing unit, and the early warning information generating unit are connected in sequence.

[0113] The monitoring data receiving unit is used to receive and store the key safety production parameters collected by each monitoring point in the monitoring data collection unit; the monitoring data processing unit is used to determine the inherent risk level of the high-sulfur production gas well and calculate the warning value of the key safety production parameters of the high-sulfur production gas well in real time, and transmit it to the monitoring data analysis unit.

[0114] The monitoring data analysis unit is used to determine the correction coefficient and the key parameter warning index value of the high-sulfur production gas well according to the inherent risk level of the high-sulfur production gas well and the key parameter warning value of safe production, determine the safe production risk warning index of the high-sulfur production gas well and send it to the warning information generation unit;

[0115] The warning information generating unit generates a risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well, and sends the risk warning level of the high-sulfur production gas well to the rectification suggestion plan pushing unit while issuing the warning.

[0116] The rectification suggestion plan pushing unit is provided with a risk suggestion measure library and a display terminal, which are used to match risk warning prevention and control measures according to the risk warning level of the high-sulfur production gas well, generate a rectification suggestion plan and push it to the display terminal for display, for reference by on-site technicians of the high-sulfur production gas well.

[0117] In summary, the high-sulfur production gas well safety risk quantification management and control system based on wellbore barrier provided in the technical solution of the present application can use the monitoring data acquisition unit to obtain the key safety production parameters of each monitoring point in the well field of the high-sulfur production gas well in real time, and use the monitoring data processing unit to determine the inherent risk level of the high-sulfur production gas well and calculate the key safety production parameter warning value of the high-sulfur production gas well in real time based on the key safety production parameters collected by the monitoring data acquisition unit, and combine the correction coefficient of the high-sulfur production gas well and the key safety production parameter warning index value obtained by the monitoring data analysis unit to determine the safety production risk warning index of the high-sulfur production gas well, and the warning information generation unit generates the risk warning level of the high-sulfur production gas well according to the safety production risk warning index transmitted by the monitoring data analysis unit, and pushes it to the rectification suggestion plan push unit to generate a rectification suggestion plan and display it through the display terminal, thereby realizing risk warning before the leakage accident of the high-sulfur production gas well occurs. Early warning enables on-site operators to take control measures in time, which is conducive to ensuring the on-site operation safety of the high-sulfur production gas well.

[0118] Example 2

[0119] The present invention proposes a method for quantitatively controlling the safety risks of high-sulfur production gas wells based on wellbore barriers, such as Figure 2 As shown, the specific steps include:

[0120] Step 1: Obtain the structure and construction technology of the wellbore barrier of the high-sulfur production gas well, and based on the wellbore barrier integrity scoring principle, conduct a wellbore barrier integrity assessment on the high-sulfur production gas well to obtain the wellbore barrier integrity score of the high-sulfur production gas well.

[0121] A wellhead device is provided at the wellhead of the high-sulfur production gas well, and an anti-leakage protection device is provided in the wellbore for preventing leakage of fluid in the wellbore. The wellhead device and the anti-leakage protection device are combined to form a wellbore barrier for preventing the fluid in the wellbore from flowing into the freshwater layer and the surface.

[0122] In this embodiment, the anti-leakage protection device includes a surface casing, a technical casing, a production casing, an oil pipe, oil pipe accessories, a packer and a safety valve; the surface casing, the technical casing and the oil layer casing are all cemented by cement.

[0123] The scoring principle of the wellbore barrier integrity adopted in this embodiment is shown in Table 1, and the full score of the wellbore barrier integrity of the high-sulfur production gas well is set to 100 points.

[0124] Table 1 Wellbore barrier integrity score table

[0125]

[0126] It can be seen from Table 1 that when the surface casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points. When the cementing quality test of the surface casing of a high-sulfur production gas well is unqualified, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 5 points.

[0127] When the technical casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well. When the technical casing cementing quality test of a high-sulfur production gas well is unqualified, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well.

[0128] When the production casing of a high-sulfur production gas well is detected to be damaged, misaligned, or reversed, 10 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well. When the cementing quality test of the production casing of a high-sulfur production gas well is unqualified, 10 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well.

[0129] When the packer installed on the production casing of a high-sulfur production gas well fails or is not sealed tightly, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points.

[0130] When a bridge plug, cement plug or packer is installed in a high-sulfur production gas well to isolate the completion section, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points.

[0131] When the oil pipes and oil pipe accessories of a high-sulfur production gas well are detected to be damaged or perforated, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points.

[0132] When the safety valve of a high-sulfur production gas well detects sealing failure, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 10 points.

[0133] When the wellhead device of a high-sulfur production gas well is detected to fail or the control effect is weakened, the wellbore barrier integrity score of the high-sulfur production gas well will be deducted by 20 points.

[0134] Step 2: Determine the inherent risk level of the high-sulfur production gas well based on the wellbore barrier integrity score of the high-sulfur production gas well.

[0135] In this embodiment, the corresponding relationship between the wellbore barrier integrity score and the inherent risk level is:

[0136] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 0 and not more than 25, the inherent risk level of the high-sulfur production gas well is determined to be a significant risk, and the early warning is displayed in red.

[0137] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 25 and not more than 50, the inherent risk level of the high-sulfur production gas well is determined to be a high risk, and the early warning display is orange.

[0138] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 50 and not more than 75, the inherent risk level of the high-sulfur production gas well is determined to be general risk, and the early warning display is yellow.

[0139] When the wellbore barrier integrity score of a high-sulfur production gas well is greater than 75 and not more than 100, the inherent risk level of the high-sulfur production gas well is determined to be low risk, and the early warning is displayed in blue.

[0140] Step 3, selecting key safety production parameters of high-sulfur production gas wells, establishing a real-time early warning evaluation system for high-sulfur production gas wells, constructing a risk early warning model for production gas wells, and using the risk early warning model for production gas wells to calculate the safety production risk early warning index for high-sulfur production gas wells, specifically including the following steps:

[0141] Step 3.1, based on the Bow-tie model, select key safety production parameters that reflect the safety production status of high-sulfur production gas wells, and establish a real-time early warning evaluation system for high-sulfur production gas wells.

[0142] The key production safety parameters are used to reflect the production safety status of high-sulfur production gas wells, including process control indicators and leakage alarm indicators. The process control indicators include pressure control indicators and temperature control indicators. Among them, the pressure control indicators include oil pressure, casing annulus pressure, surface casing annulus pressure and technical casing annulus pressure; the temperature control indicators include oil temperature, casing annulus temperature, surface casing annulus temperature and technical casing annulus temperature; the leakage alarm indicators include hydrogen sulfide monitoring values ​​and combustible gas monitoring values.

[0143] Step 3.2, construct a key safety parameter early warning model based on key safety parameters, use the key safety parameter early warning model combined with the high-sulfur production gas well early warning evaluation principle to conduct early warning evaluation on the key safety parameters, and determine the key safety parameter early warning values ​​of the high-sulfur production gas well in real time.

[0144] The key parameter early warning model for safe production constructed in this embodiment is shown in formula (1):

[0145]

[0146] In the formula,

[0147] T Alarm — Early warning values ​​of key parameters for safe production;

[0148] T 1,j — Early warning values ​​of process control indicators;

[0149] T 2,j —Warning value of leakage alarm index;

[0150] α 1 , α 2 —weight coefficient;

[0151] j—The serial number of the subject involved in the evaluation of the warning value of key parameters.

[0152] In the key parameter early warning model for production safety, the early warning values ​​of process control indicators and leakage alarm indicators are obtained by scoring based on the early warning evaluation principle of high sulfur production gas wells. The subjects involved in the evaluation of the early warning values ​​of key safety parameters for production safety include average disturbance rate, number of repeated alarms, average number of point alarms, average alarm elimination time and timely alarm elimination disposal rate. When the subject number j=1 of the subject involved in the early warning value evaluation of the key parameter is the average disturbance rate, when the subject number j=2 of the subject involved in the early warning value evaluation of the key parameter is the number of repeated alarms, when the subject number j=3 of the subject involved in the early warning value evaluation of the key parameter is the average number of point alarms, when the subject number j=4 of the subject involved in the early warning value evaluation of the key parameter is the average alarm elimination time, when the subject number j=5 of the subject involved in the early warning value evaluation of the key parameter is the timely alarm elimination disposal rate, and multiple monitoring time segments are set in the early warning monitoring cycle. The calculation methods and evaluation criteria for each subject involved in the key parameter warning value assessment are shown in Table 2.

[0153] Table 2 Evaluation table of key safety parameters for production safety

[0154]

[0155]

[0156] As can be seen from Table 2, the early warning evaluation principle for high-sulfur production gas wells adopted in this embodiment is:

[0157] The total score for the early warning evaluation of key production safety parameters is set at 100 points, and the total score for each subject involved in the early warning value assessment of key production safety parameters is set at 20 points.

[0158] When the average disturbance rate is equal to 0, the evaluation score of the average disturbance rate will not be deducted; when the average disturbance rate is not equal to 0, the evaluation score of the average disturbance rate will be deducted by 5 points for every 10% increase in the average disturbance rate, until a full 20 points are deducted;

[0159] When the number of repeated alarms is equal to 0, the evaluation score of the number of repeated alarms will not be deducted; when the number of repeated alarms is not equal to 0, the evaluation score of the number of repeated alarms will be deducted by 2 points for each additional monitoring point, until the maximum deduction is 20 points;

[0160] When the average number of alarms at a point is equal to 0, the evaluation score of the average number of alarms at a point will not be deducted; when the average number of alarms at a point is not equal to 0, the evaluation score of the average number of alarms at a point will be deducted by 2 points for every 20% increase in the average number of alarms at a point, until a full 20 points are deducted;

[0161] When the average time to extinguish an alarm does not exceed 10 minutes, the evaluation score of the average time to extinguish an alarm will not be deducted; when the average time to extinguish an alarm is greater than 10 minutes, the evaluation score of the average time to extinguish an alarm will be deducted by 5 points for every additional 10 minutes of the average time to extinguish an alarm, until a maximum of 20 points are deducted;

[0162] When the timeliness rate of fire alarm handling is 100%, the evaluation score of the timeliness rate of fire alarm handling will not be deducted; when the timeliness rate of fire alarm handling is not equal to 100%, the evaluation score of the timeliness rate of fire alarm handling will be deducted by 2 points for every 5% decrease in the timeliness rate of fire alarm handling, until a full 20 points are deducted.

[0163] Step 3.3, mapping the key safety parameter warning value of the high sulfur production gas well to the interval range [0,5]. After mapping, the key safety parameter warning index value T is obtained. R .

[0164] In this embodiment, the mapping relationship between the key safety production parameter warning value and the key safety production parameter warning index value is:

[0165] When the key parameter warning value of production safety is T Alarm 0≤T Alarm When ≤20, the range of the key safety parameter warning index is [4,5]. The key safety parameter warning value is mapped to the key safety parameter warning index range to determine the key safety parameter warning index value T. R ;

[0166] When the key parameter warning value of production safety is T Alarm 20<T Alarm When ≤40, the range of the key parameter warning index for safe production is [3,4). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ;

[0167] When the key parameter warning value of production safety is T Alarm 40<T AlarmWhen ≤60, the range of the key parameter warning index for production safety is [2,3). The key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R ;

[0168] When the key parameter warning value of production safety is T Alarm 60<T Alarm When ≤80, the range of the key parameter warning index for safe production is [1,2). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ;

[0169] When the key parameter warning value of production safety is T Alarm 80<T Alarm When ≤100, the range of the key parameter warning index for production safety is [0,1), the key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R .

[0170] Step 3.4: According to the inherent risk level of the high-sulfur production gas well determined in step 2, determine the correction coefficients γ corresponding to low risk, general risk, greater risk and major risk respectively. R , the correction factor γ corresponding to the inherent risk level of each high-sulfur production gas well R The value range of is (0.4,1], and the correction coefficient values ​​of low risk, general risk, large risk and major risk form an arithmetic progression.

[0171] Step 3.5, construct a risk warning model for production gas wells, as shown in formula (2):

[0172] R=γR×TR (2)

[0173] In the formula,

[0174] R—safety production risk warning index of high-sulfur production gas wells;

[0175] γ R —Correction factor;

[0176] T R —Warning index value of key parameters for safe production.

[0177] The production safety risk warning index of high-sulfur production gas wells is calculated by using the production gas well risk warning model, combined with the correction coefficient of high-sulfur production gas wells and the warning index value of key parameters of safe production.

[0178] Step 4: Determine the risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well.

[0179] When the safety production risk warning index R of high-sulfur production gas wells is 0≤R≤1, the risk warning level of the high-sulfur production gas wells is judged to be low risk; when the safety production risk warning index R of high-sulfur production gas wells is 1<R≤2, the risk warning level of the high-sulfur production gas wells is judged to be general risk; when the safety production risk warning index R of high-sulfur production gas wells is 2<R≤3, the risk warning level of the high-sulfur production gas wells is judged to be medium risk; when the safety production risk warning index R of high-sulfur production gas wells is 3<R≤4, the risk warning level of the high-sulfur production gas wells is judged to be high risk; when the safety production risk warning index R of high-sulfur production gas wells is 4<R≤5, the risk warning level of the high-sulfur production gas wells is judged to be severely high risk.

[0180] Step 5: According to the risk warning level of the high-sulfur production gas well, risk warning prevention and control measures are retrieved from the pre-established risk recommendation measure library to form a rectification recommendation plan for the high-sulfur production gas well.

[0181] The risk recommendation measures database contains risk warning and control measures corresponding to each risk warning level of high-sulfur production gas wells. According to the risk warning levels of high-sulfur production gas wells and the changes in key production safety parameters in high-sulfur production gas wells, combined with risk warning and control measures, rectification suggestions for high-sulfur production gas wells are generated.

[0182] Example 3

[0183] This embodiment adopts the high-sulfur production gas well safety risk quantification management and control system and method based on wellbore barrier proposed in Embodiment 1 and Embodiment 2 to perform safety risk quantification management and control on the high-sulfur production gas well, specifically including the following steps:

[0184] Step 1: Obtain the wellbore barrier structure and construction process of the high-sulfur production gas well A. Based on the wellbore barrier integrity scoring principle, evaluate the wellbore barrier integrity of the high-sulfur production gas well A to obtain the wellbore barrier integrity score of the high-sulfur production gas well A, as shown in Table 3.

[0185] Table 3 Wellbore barrier integrity scoring results

[0186]

[0187]

[0188] It can be seen from Table 3 that the wellbore barrier integrity score of high-sulfur production gas well A is 75 points.

[0189] Step 2: Based on the wellbore barrier integrity score of the high-sulfur production gas well A, it is determined that the inherent risk level of the high-sulfur production gas well A is general risk, and the warning is displayed in yellow.

[0190] Step 3, selecting key safety production parameters of high-sulfur production gas well A, establishing a real-time early warning evaluation system for high-sulfur production gas well A, constructing a risk early warning model for production gas wells, and using the risk early warning model for production gas wells to calculate the safety production risk early warning index for high-sulfur production gas wells, specifically including the following steps:

[0191] Step 3.1, based on the Bow-tie model, select key safety production parameters that reflect the safety production status of high-sulfur production gas wells, and establish a real-time early warning evaluation system for high-sulfur production gas wells.

[0192] The key production safety parameters are used to reflect the production safety status of high-sulfur production gas wells, including process control indicators and leakage alarm indicators. The process control indicators include pressure control indicators and temperature control indicators. Among them, the pressure control indicators include oil pressure, casing annulus pressure, surface casing annulus pressure and technical casing annulus pressure; the temperature control indicators include oil temperature, casing annulus temperature, surface casing annulus temperature and technical casing annulus temperature; the leakage alarm indicators include hydrogen sulfide monitoring values ​​and combustible gas monitoring values.

[0193] Step 3.2: construct a key parameter early warning model for safe production based on key parameters for safe production, and determine the weight coefficient α in the key parameter early warning model for safe production based on the analytic hierarchy process for process indicators and leakage alarm indicators. 1 =0.4, α 2 =0.6. The key parameters of safe production are evaluated by using the early warning model of key parameters of safe production and combining the early warning evaluation principle of high sulfur production gas wells, as shown in Table 4.

[0194] Table 4 Process control index warning value evaluation table

[0195]

[0196]

[0197] As shown in Table 4, the score of the process control index in this embodiment is 84 points, and no toxic and harmful gas and combustible gas alarms occurred during the early warning monitoring period, so the score of the leakage alarm index is 100 points. Therefore, the early warning value T of the key parameter for safe production of high-sulfur production gas well A in this embodiment is Alarm It is 93.6.

[0198] Step 3.3, mapping the key safety parameter warning value of the high sulfur production gas well to the interval range [0,5]. After mapping, the key safety parameter warning index value T is obtained. R It is 0.32.

[0199] Step 3.4: Determine the inherent risk level correction factor γ of high sulfur production gas well A R It is 0.62.

[0200] Step 3.5, construct a risk warning model for production gas wells. Using the risk warning model for production gas wells, combined with the correction coefficient of high-sulfur production gas wells and the warning index value of key parameters for safe production, the safety production risk warning index of high-sulfur production gas well A is calculated to be 0.1984.

[0201] Step 4: According to the safety production risk warning index value of the high-sulfur production gas well, determine that the risk warning level of the high-sulfur production gas well A is low risk, such as Figure 3 shown.

[0202] Step 5: Since the risk warning level of the high-sulfur production gas well A in this embodiment is low risk, no risk control measures are required.

[0203] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms used herein are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0204] In the present invention, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention. They do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.

[0205] In the present invention, terms such as "connected" and "connection" should be understood in a broad sense, indicating that the connection can be fixed, integral or detachable; it can be directly connected or indirectly connected through an intermediate medium. Relevant scientific research or technical personnel in this field can determine the specific meaning of the above terms in the present invention according to specific circumstances, and they should not be understood as limiting the present invention.

[0206] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A safety risk quantitative management and control system for high-sulfur production gas wells based on wellbore barriers. It is characterized in that It includes a monitoring data acquisition unit, a central processing unit and a rectification suggestion plan pushing unit which are connected in sequence; The monitoring data acquisition unit includes all risk monitoring instruments installed in the high-sulfur production gas well field, and is used to monitor and store key production safety parameters of each monitoring point in the high-sulfur production gas well field in real time; The central processing unit is provided with a monitoring data receiving unit, a monitoring data processing unit, a monitoring data analyzing unit, and an early warning information generating unit, and the monitoring data receiving unit, the monitoring data processing unit, the monitoring data analyzing unit, and the early warning information generating unit are connected in sequence; The monitoring data receiving unit is used to receive and store the key safety production parameters collected by each monitoring point in the monitoring data collection unit; the monitoring data processing unit is used to determine the inherent risk level of the high-sulfur production gas well and calculate the early warning value of the key safety production parameters of the high-sulfur production gas well in real time, and transmit it to the monitoring data analysis unit; The monitoring data analysis unit is used to determine the correction coefficient and the key parameter warning index value of the high-sulfur production gas well according to the inherent risk level of the high-sulfur production gas well and the key parameter warning value of safe production, determine the safe production risk warning index of the high-sulfur production gas well and send it to the warning information generation unit; The warning information generating unit generates a risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well, and sends the risk warning level of the high-sulfur production gas well to the rectification suggestion plan pushing unit at the same time as the warning; The rectification suggestion plan pushing unit is provided with a risk suggestion measure library and a display terminal, which are used to match risk warning prevention and control measures according to the risk warning level of the high-sulfur production gas well, generate a rectification suggestion plan and push it to the display terminal for display, for reference by on-site technicians of the high-sulfur production gas well.

2. The safety risk quantification management and control system for high-sulfur production gas wells based on wellbore barriers according to claim 1, It is characterized in that The monitoring data acquisition unit is used to obtain in real time the oil pressure, casing annulus pressure, surface casing annulus pressure, technical casing annulus pressure, oil temperature, casing annulus temperature, surface casing annulus temperature, technical casing annulus temperature, hydrogen sulfide monitoring value and combustible gas monitoring value of the high-sulfur production gas well, and transmit them to the monitoring data receiving unit.

3. A method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers. It is characterized in that The high-sulfur production gas well safety risk quantification management and control system based on the wellbore barrier as claimed in claim 1 specifically comprises the following steps: Step 1, conducting a wellbore barrier integrity assessment on a high-sulfur production gas well to obtain a wellbore barrier integrity score for the high-sulfur production gas well; Step 2, determining the inherent risk level of the high-sulfur production gas well based on the wellbore barrier integrity score of the high-sulfur production gas well; Step 3, selecting key safety production parameters of high-sulfur production gas wells, establishing a real-time early warning evaluation system for high-sulfur production gas wells, constructing a risk early warning model for production gas wells, and using the risk early warning model for production gas wells to calculate a safety production risk early warning index for high-sulfur production gas wells; Step 4, determining the risk warning level of the high-sulfur production gas well according to the safety production risk warning index of the high-sulfur production gas well; Step 5: According to the risk warning level of the high-sulfur production gas well, risk warning prevention and control measures are retrieved from the pre-established risk recommendation measure library to form a rectification recommendation plan for the high-sulfur production gas well.

4. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that The wellhead of the high-sulfur production gas well is provided with a wellhead device, and the wellbore is provided with an anti-leakage protection device for preventing leakage of fluid in the wellbore. The wellhead device and the anti-leakage protection device are combined to form a wellbore barrier for preventing the fluid in the wellbore from flowing into the freshwater layer and the surface; The anti-leakage protection device comprises a surface casing, a technical casing, a production casing, an oil pipe, oil pipe accessories, a packer and a safety valve; the surface casing, the technical casing and the oil layer casing are all cemented by cement.

5. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that In the step 1, the structure and construction process of the wellbore barrier of the high-sulfur production gas well are obtained, and the wellbore barrier integrity score of the high-sulfur production gas well is determined based on the wellbore barrier integrity scoring principle; The scoring principle of the wellbore barrier integrity is as follows: the full score of the wellbore barrier integrity of high-sulfur production gas wells is set to 100 points; when the surface casing of the high-sulfur production gas well is detected to be damaged, misaligned, or reversed, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well; when the cementing quality inspection of the surface casing of the high-sulfur production gas well is unqualified, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well; when the technical casing of the high-sulfur production gas well is detected to be damaged, misaligned, or reversed, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well; when the cementing quality inspection of the technical casing of the high-sulfur production gas well is unqualified, 5 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well; when the production casing of the high-sulfur production gas well is detected to be damaged, misaligned, or reversed, 10 points will be deducted from the wellbore barrier integrity score of the high-sulfur production gas well; When the cementing quality inspection of the production casing is unqualified, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 10 points; when the packer installed on the production casing of the high-sulfur production gas well fails or is not sealed tightly, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 10 points; when a bridge plug, cement plug or packer is installed in the high-sulfur production gas well to isolate the completion section, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 10 points; when the oil pipe and oil pipe accessories of the high-sulfur production gas well are detected to be damaged or perforated, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 10 points; when the safety valve of the high-sulfur production gas well is detected to have sealing failure, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 10 points; when the wellhead device of the high-sulfur production gas well is detected to have failed or the control effect is weakened, the wellbore barrier integrity score of the high-sulfur production gas well shall be deducted by 20 points.

6. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that In the step 2, when the wellbore barrier integrity score of the high-sulfur production gas well is greater than 0 and does not exceed 25, the inherent risk level of the high-sulfur production gas well is determined to be a major risk; when the wellbore barrier integrity score of the high-sulfur production gas well is greater than 25 and does not exceed 50, the inherent risk level of the high-sulfur production gas well is determined to be a relatively high risk; when the wellbore barrier integrity score of the high-sulfur production gas well is greater than 50 and does not exceed 75, the inherent risk level of the high-sulfur production gas well is determined to be a general risk; when the wellbore barrier integrity score of the high-sulfur production gas well is greater than 75 and does not exceed 100, the inherent risk level of the high-sulfur production gas well is determined to be a low risk.

7. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that The step 3 specifically includes the following steps: Step 3.1, based on the Bow-tie model, the key safety production parameters of high-sulfur production gas wells are screened and a real-time early warning evaluation system for high-sulfur production gas wells is established; The key production safety parameters are used to reflect the production safety status of high-sulfur production gas wells, including process control indicators and leakage alarm indicators; the process control indicators include oil pressure, casing annulus pressure, surface casing annulus pressure, technical casing annulus pressure, and oil temperature, casing annulus temperature, surface casing annulus temperature, and technical casing annulus temperature; the leakage alarm indicators include hydrogen sulfide monitoring values ​​and combustible gas monitoring values; Step 3.2, constructing a key safety parameter early warning model based on the key safety parameters, and determining the key safety parameter early warning value of the high-sulfur production gas well in real time by performing early warning evaluation on the key safety parameters; Step 3.3, mapping the key safety parameter warning value of the high sulfur production gas well to the range of the key safety parameter warning index. After mapping, the key safety parameter warning index value T is obtained. R ; Step 3.4: According to the inherent risk level of the high-sulfur production gas well determined in step 2, determine the correction coefficients γ corresponding to low risk, general risk, greater risk and major risk respectively. R ; Step 3.5, construct a risk warning model for production gas wells, combine the correction coefficient of high-sulfur production gas wells and the warning index value of key parameters for safe production, and calculate the safety production risk warning index of high-sulfur production gas wells.

8. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 7, It is characterized in that In step 3.2, the early warning model of key parameters for safe production is: In the formula, T Alarm — Early warning values ​​of key parameters for safe production; T 1,j — Early warning values ​​of process control indicators; T 2,j —Warning value of leakage alarm index; α 1 , α 2 —weight coefficient; j—The serial number of the subject involved in the evaluation of the warning value of key parameters.

9. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 8, It is characterized in that The early warning values ​​of the process control index and the leakage alarm index in the key parameter early warning model for safe production are obtained by scoring based on the early warning evaluation principle for high-sulfur production gas wells; The subjects involved in the evaluation of the early warning values ​​of key safety parameters for production safety include the average disturbance rate, the number of repeated alarms, the average number of alarms at each point, the average alarm elimination time, and the timely rate of alarm elimination. Multiple monitoring time segments are set in the early warning monitoring cycle. The total duration of the early warning monitoring cycle is set to 24 hours, and the duration of each monitoring time segment is set to 10 minutes. When the subject number j of the key parameter early warning value evaluation is 1, it means that the subject involved in the key parameter early warning value evaluation is the average disturbance rate, and the average disturbance rate is the percentage of the number of monitoring points that alarm more than five times during the early warning monitoring period to the total number of monitoring points; When the subject number j=2 participating in the key parameter warning value assessment, it means that the subject participating in the key parameter warning value assessment is the number of repeated alarms, and the number of repeated alarms is the number of monitoring points with a cumulative alarm number of not less than 2 during the warning monitoring cycle; When the subject number j participating in the key parameter warning value evaluation is 3, it means that the subject participating in the key parameter warning value evaluation is the average number of point alarms, and the average number of point alarms is the percentage of the number of monitoring points that have alarms in the warning monitoring period to the total number of monitoring points; When the subject number j=4 participating in the key parameter warning value evaluation, it means that the subject participating in the key parameter warning value evaluation is the average alarm elimination time, and the average alarm elimination time is the ratio between the total alarm time of all current monitoring points and the total number of accumulated alarms of all current monitoring points; When the subject number j involved in the key parameter warning value evaluation is 5, it means that the subject involved in the key parameter warning value evaluation is the timely alarm elimination rate. The timely alarm elimination rate is the ratio between the number of alarms eliminated at all monitoring points within the monitoring time segment and the total number of accumulated alarms at all current monitoring points.

10. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 9, It is characterized in that Based on the early warning evaluation principle of high-sulfur production gas wells, the early warning values ​​of process control indicators and leakage alarm indicators in the early warning model of key parameters for safe production are calculated respectively; The early warning evaluation principles for high sulfur production gas wells are as follows: The total score of the key safety parameter early warning evaluation is set to 100 points, and the total score of each subject involved in the evaluation of the key safety parameter early warning value of production safety is set to 20 points; When the average disturbance rate is equal to 0, the evaluation score of the average disturbance rate will not be deducted; when the average disturbance rate is not equal to 0, the evaluation score of the average disturbance rate will be deducted by 5 points for every 10% increase in the average disturbance rate, until a full 20 points are deducted; When the number of repeated alarms is equal to 0, the evaluation score of the number of repeated alarms will not be deducted; when the number of repeated alarms is not equal to 0, the evaluation score of the number of repeated alarms will be deducted by 2 points for each additional monitoring point, until the maximum deduction is 20 points; When the average number of alarms at a point is equal to 0, the evaluation score of the average number of alarms at a point will not be deducted; when the average number of alarms at a point is not equal to 0, the evaluation score of the average number of alarms at a point will be deducted by 2 points for every 20% increase in the average number of alarms at a point, until a full 20 points are deducted; When the average time to extinguish an alarm does not exceed 10 minutes, the evaluation score for the average time to extinguish an alarm will not be deducted; When the average time to fire an alarm exceeds 10 minutes, 5 points will be deducted from the average time to fire an alarm for every 10 minutes increase in the average time to fire an alarm, until a maximum of 20 points are deducted. When the timeliness rate of fire alarm handling is 100%, the evaluation score of the timeliness rate of fire alarm handling will not be deducted; when the timeliness rate of fire alarm handling is not equal to 100%, the evaluation score of the timeliness rate of fire alarm handling will be deducted by 2 points for every 5% decrease in the timeliness rate of fire alarm handling, until a full 20 points are deducted.

11. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 7, It is characterized in that In step 3.3, the key parameter warning index T for safe production R The value range is set to 0≤T R ≤5; When the key parameter warning value of production safety is T Alarm 0≤T Alarm When ≤20, the range of the key safety parameter warning index is [4,5]. The key safety parameter warning value is mapped to the key safety parameter warning index range to determine the key safety parameter warning index value T. R ; When the key parameter warning value of production safety is T Alarm 20<T Alarm When ≤40, the range of the key parameter warning index for safe production is [3,4). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ; When the key parameter warning value of production safety is T Alarm 40<T Alarm When ≤60, the range of the key parameter warning index for production safety is [2,3). The key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R ; When the key parameter warning value of production safety is T Alarm 60<T Alarm When ≤80, the range of the key parameter warning index for safe production is [1,2). The key parameter warning value for safe production is mapped to the key parameter warning index range for safe production, and the key parameter warning index value T for safe production is determined. R ; When the key parameter warning value of production safety is T Alarm 80<T Alarm When ≤100, the range of the key parameter warning index for production safety is [0,1), the key parameter warning value for production safety is mapped to the key parameter warning index range for production safety, and the key parameter warning index value T for production safety is determined. R .

12. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 7, It is characterized in that In step 3.4, the correction coefficient γ R The value range of is (0.4,1], and the correction coefficient values ​​of low risk, general risk, relatively large risk and major risk form an arithmetic progression.

13. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 8, It is characterized in that When the inherent risk level of the high-sulfur production gas well is low risk, the correction coefficient γ R Set to 0.43; when the inherent risk level of the high-sulfur production gas well is general risk, the correction coefficient γ R Set to 0.62; when the inherent risk level of the high-sulfur production gas well is a relatively high risk, the correction coefficient γ R Set to 0.81; when the inherent risk level of the high-sulfur production gas well is a major risk, the correction coefficient γ R Set to 1.

14. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 7, It is characterized in that In step 3.5, the risk warning model for production gas wells is: R=γR×TR (2) In the formula, R—safety production risk warning index of high-sulfur production gas wells; γ R —Correction factor; T R —Warning index value of key parameters for safe production.

15. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that In the step 4, when the safety production risk warning index R of the high-sulfur production gas well is 0≤R≤1, the risk warning level of the high-sulfur production gas well is determined to be low risk; When the safety production risk warning index R of high-sulfur production gas wells is 1<R≤2, the risk warning level of the high-sulfur production gas wells is determined to be general risk; when the safety production risk warning index R of high-sulfur production gas wells is 2<R≤3, the risk warning level of the high-sulfur production gas wells is determined to be medium risk; when the safety production risk warning index R of high-sulfur production gas wells is 3<R≤4, the risk warning level of the high-sulfur production gas wells is determined to be high risk; when the safety production risk warning index R of high-sulfur production gas wells is 4<R≤5, the risk warning level of the high-sulfur production gas wells is determined to be severely high risk.

16. The method for quantitatively controlling safety risks of high-sulfur production gas wells based on wellbore barriers according to claim 3, It is characterized in that In step 5, risk warning and control measures corresponding to each risk warning level of high-sulfur production gas wells are set in the risk recommendation measures library. According to the risk warning levels of high-sulfur production gas wells and changes in key production safety parameters in high-sulfur production gas wells, combined with risk warning and control measures, rectification suggestions for high-sulfur production gas wells are generated.