Method for receiving shield penetrating through diaphragm wall based on steel sleeve to escape from shield body
By digging holes and replacing scrapers in the blocked part of the shield, and opening a working window on the steel sleeve for mortar removal, the problem of the shield being stuck is solved, and the effective escape of the shield and the improvement of the construction progress is achieved.
Patent Information
- Application Number
- CN202411007772.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-26
AI Technical Summary
During the shield construction process, the shield is stuck due to excessive wear of the knife plate when crossing the ground and connecting the wall. The traditional method of escape cannot be effectively solved, which affects the construction progress and safety.
The holes are dug within 120° above the jammed shield and replaced the edge scraper. A second operating hole chamber is opened through the working window of the steel sleeve. The holes are dug in the ground connection wall of the jammed shield, and the soil outside the shield is expanded. The body diameter reduces the pressure on the wall to the shield, allowing the shield to move and escape.
The shield is escaped, the construction efficiency and safety are improved, and the problem of the shield being unable to move forward and backward in traditional methods is avoided.
Smart Images

Figure CN119021701A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield construction, and specifically to a shield escape method based on a steel sleeve receiving a shield through a ground-connected wall. Background Art
[0002] With the continuous advancement of science and technology and the diversification of engineering needs, shield technology, as an efficient, environmentally friendly and economical tunnel construction method, plays an increasingly important role in modern engineering construction. It is widely used in subway, railway, highway, municipal, hydropower and other tunnel projects, and has achieved remarkable results. However, with the widespread use of shield technology, the problems encountered in the construction process are becoming more and more complicated.
[0003] During the shield tunnel construction process, due to factors such as complex and changeable geological conditions, harsh construction environment and the shield machine's own performance, the shield machine and its cutterhead and other components may encounter various difficulties, such as the cutterhead being frozen, shutdown due to excessive torque, and difficulty in excavation due to sudden geological changes. If these difficulties are not solved promptly and effectively, they will seriously affect the construction progress and project safety. When the shield machine passes through the ground-connected wall, if the cutterhead is worn too much, the shield body will be stuck. Traditional shield body escape methods include freezing method, active articulation method, soil-gas replacement method under pressure balance, etc., but the inventors found in the actual implementation process that none of the above traditional methods can achieve effective escape.
[0004] Therefore, a novel shield body escape method is urgently needed to help the shield body escape.
[0005] The information disclosed in this background technology section is only used to deepen the understanding of the background technology of the present disclosure, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention
[0006] In view of at least one of the above technical problems, the present disclosure provides a shield escape method based on a steel sleeve receiving a shield machine passing through a ground-connected wall. By excavating a hole in the soil layer within a 120° range above the stuck shield body and replacing the edge scraper, the pressure on the stuck shield body is reduced, so that the shield body can move and then be escaped, thereby solving the problem that the shield body cannot move forward and backward due to the reduction of the excavation radius when the shield machine passes through the ground-connected wall, and thus cannot be escaped.
[0007] According to one aspect of the present disclosure, a method for escaping a shield body through a ground-connected wall based on receiving a shield through a steel sleeve is provided, comprising: S1: A water-stop ring is installed between the shield shell of the shield machine and the ground-connected wall to block the water flow channel at the rear of the shield; S2: After the water-stop ring hoop is installed, the air bin is connected to the soil bin, and the pressure in the air bin is reduced to 0 Bar. After the liquid level in the air bin is stable, the bin is opened at normal pressure to check the cutter head; S3: excavating a first operating chamber at a position where the face of the cutterhead is opposite to the edge scraper, and then replacing the edge scraper; S4: opening an operating window on the transition ring of the steel sleeve, and excavating the mortar inside the steel sleeve through the operating window as a second operating cavern; S5: drilling a hole on the ground-connected wall at the shield body jamming position through the second operating chamber, wherein the hole is drilled within a range of 115° to 125° on the upper part of the cutter head, and the drilling depth thereof is 340 to 360 mm deep into the ground-connected wall; S6: Close the working window and resume excavation.
[0008] In some embodiments of the present disclosure, in the step S1, polyurethane is injected into the outside of the shield shell through the radial grouting holes of the shield in the shield machine, and the polyurethane forms the water-stop ring after solidification.
[0009] In some embodiments of the present disclosure, the polyurethane is water-based polyurethane.
[0010] In some embodiments of the present disclosure, in step S2, if the liquid level in the gas bin does not increase for at least 2 hours, it is considered that the liquid level in the gas bin is stable.
[0011] In some embodiments of the present disclosure, in step S3, the first operating chamber is located at the 3 o'clock position of the cutter head face, and its portion close to the outer edge of the cutter head circumference is excavated to be flush with the inner wall of the steel sleeve.
[0012] In some embodiments of the present disclosure, in step S4, there are two operating windows, which are relatively arranged above the waistline on both sides of the transition ring, and an external convex flange is welded correspondingly to the outer side of the operating window, and a sealing door corresponding to the external convex flange is provided at the outer end of the external convex flange.
[0013] In some embodiments of the present disclosure, in step S4, the second operating chamber is excavated in steps, and three steps are reserved at the center of the transition ring, and the step height is 490-510 mm.
[0014] In some embodiments of the present disclosure, in step S5, the hole position exceeds the outer edge of the blade disc by 50 mm, and the distance between adjacent holes is 10 to 20 mm.
[0015] One or more technical solutions provided in the embodiments of the present application have at least any of the following technical effects or advantages: 1. Drilling holes within a range of 120° on the ground-connected wall where the shield is stuck can reduce the pressure of the ground-connected wall on the shield, allowing the shield to move forward and backward, thereby achieving escape.
[0016] 2. Use water-based polyurethane to make a water-stop ring between the shield shell and the ground-connected wall. The water-based polyurethane has a large penetration radius and can effectively block the water from the rear of the shield to achieve normal pressure opening and tool changing.
[0017] 3. Opening an operating window on the steel sleeve allows the operator to chisel out the mortar inside the steel sleeve from the transition ring without excavating from the end of the mortar inside the steel sleeve, greatly reducing the construction workload and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a flow chart of a method for escaping a shield body based on a steel sleeve receiving a shield machine passing through a ground-connected wall in one embodiment of the present application.
[0019] Figure 2 This is a schematic diagram of the trapped position of the shield in one embodiment of the present application.
[0020] Figure 3 It is a schematic cross-sectional diagram of the embedded steel ring in one embodiment of the present application.
[0021] In the above figures, 1 is the shield machine, 2 is the reinforcement layer, 3 is the radial grouting hole, 4 is the hole, 5 is the ground-connected wall, 6 is the transition ring, 7 is the working window, 8 is the steel sleeve, 9 is the embedded steel ring, 10 is the mortar, and 11 is the second operating chamber. DETAILED DESCRIPTION
[0022] In order to better understand the technical solution of the present application, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0023] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "vertical", "horizontal", "clockwise", "counterclockwise", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first", "second", etc. involved in the present application are used to distinguish the objects described and do not have any order or technical meaning. The terms "connection" and "connection" involved in the present application, unless otherwise specified, include direct and indirect connections (connections).
[0024] Unless otherwise specified, the components, structures, and mechanisms involved in the following embodiments are conventional commercially available products.
[0025] The embodiment of the present application solves the problem that the existing shield escape method cannot effectively help the shield body stuck when passing through the ground-connected wall to escape by providing a shield escape method based on a steel sleeve to receive the shield body passing through the ground-connected wall. Holes are drilled in the ground-connected wall at the stuck part of the shield body to expand the diameter of the soil outside the shield body so as to achieve the shield escape.
[0026] This example discloses a shield escape method based on a steel sleeve receiving shield through a ground-connected wall. Figures 1 to 3 Taking the construction of a certain section as an example, the section adopts slurry balance shield construction, and the shield reception adopts high-pressure rotary spraying and compaction grouting to apply the reinforcement layer 2, and constructs dewatering wells to assist dewatering, and installs steel sleeves 8 for shield reception; the axial length of the high-pressure rotary spraying pile reinforcement is 6m, and the reinforcement width is 3m above and below and left and right of the shield tunnel structure.
[0027] In order to ensure that the shield arrives at the receiving end smoothly, a closed receiving device is adopted, that is, outside the expected port of the tunnel, a special steel sleeve is welded to the pre-buried steel ring 9 of the tunnel port. The inner diameter of the pre-buried steel ring is the same as the inner diameter of the steel sleeve and exceeds the outer diameter of the shield machine by about 25 cm. After the installation of the steel sleeve, mortar is backfilled in the steel sleeve to form a closed space; the mortar strength is less than 1MPa, which is used to ensure that the steel sleeve has the same pressure as the shield soil bin cutout, to prevent water and sand gushing caused by unbalanced internal and external water and soil pressure during the shield receiving process, so that the shield machine can safely and smoothly excavate into the steel sleeve to complete the shield receiving.
[0028] Step 1: Analysis of the cause of the shield machine being trapped and the escape plan (1) Analysis of the cause of the shield machine being trapped: Based on the excavation conditions of the shield machine 1 in the reinforcement layer 2 and the analysis of similar shield machine excavation conditions in the past, it was determined that the shield machine was trapped because the edge scraper and the over-excavation cutter were severely worn, resulting in a smaller excavation radius. When the cutterhead passed through the ground-connected wall 5, the front shield of the shield machine had difficulty passing through, which led to the shield machine being trapped. In addition, since the shield body was pushed by an auxiliary cylinder when it was trapped, the shield shell became more and more stuck when the cutterhead of the shield machine was separated from the ground-connected wall, until the shield machine was completely trapped.
[0029] (2) Analysis of the shield machine's escape plan: During the period when the shield machine was trapped, various measures were taken to escape, such as articulated mode advancement, loading of auxiliary oil cylinders, and injection of bentonite lubrication on the outside of the middle shield, but none of them had any obvious effect, and the shield machine could not move backward at this time; the pressure on the top of the shield soil bin was actively adjusted, and the pressure in the bin rose to a maximum of 2.9 Bar and dropped to a minimum of 0 Bar. At this time, the liquid level in the shield gas bin remained stable and unchanged. It was judged that when the cutterhead was excavating through the ground-connected wall, the excavation diameter of the cutterhead was smaller than the diameter of the front shield. When the auxiliary oil cylinder was added to assist in the advancement, the shield main machine was squeezed forward, which further caused the ground-connected wall and the front shield shell to fit tightly. At this time, the soil bin had formed a closed space.
[0030] See also Figure 2 There are 6 radial grouting holes 3 on the circumference of the middle shield of the shield machine 1. The radial grouting holes 3 are opened for inspection. There is no sand gushing phenomenon, but there is flowing water and no pressure. Based on the above situation, it can be judged that under the condition of taking external water sealing measures for the middle shield, the shield machine is in a state that meets the conditions for opening the chamber at normal pressure.
[0031] Step 2: The original cutterhead tool is severely worn, and its excavation diameter is smaller than the shield diameter. Therefore, the edge scraper needs to be replaced to achieve normal excavation and meet subsequent excavation requirements. (1) Installation of water-stop rings: At present, the earth bunker of the shield machine has formed a closed space. However, in order to ensure the safety of bunker opening and subsequent construction, a water-stop ring is installed between the shield shell and the ground-connected wall of the shield machine to block the water flow channel at the rear of the shield body and prevent the water flow from the rear from rushing to the front shield. Polyurethane is injected into the outside of the shield shell through the radial grouting holes 3 of the shield middle shield of the shield machine. After the polyurethane solidifies, a good water-stop ring can be formed between the ground-connected wall and the shield machine shell, which can effectively block the water from the rear. The polyurethane is a water-based polyurethane with a large penetration radius and is suitable for dynamic water strata, with good water-blocking and waterproofing effects.
[0032] (2) Open the chamber at normal pressure to check the cutter head and tool: After the water-stop ring is installed, perform internal circulation of the soil bin and the air bin, empty the soil in the soil bin, and reduce the liquid level in the bin to the minimum; close the inlet and outlet slurry pipelines, connect the soil bin and the air bin, and gradually reduce the pressure in the bin to 0 bar. Observe the changes in the liquid level in the bin. Under the condition of 0 bin pressure, if the liquid level in the air bin does not change within 2 hours, it can be seen that the water-stop ring has a good water-stopping effect and the conditions for opening the chamber at normal pressure are met.
[0033] Before opening the gas warehouse door, use a portable gas detector to detect the gas in the warehouse through the connecting valve of the gas warehouse. If the detected gas is abnormal, replace the gas in the warehouse until the gas in the warehouse is tested and qualified before opening the warehouse; after opening the gas warehouse, continue to ventilate the warehouse, place a portable gas detector in the warehouse, and continuously monitor the air in the warehouse.
[0034] After opening the warehouse, first check the stability of the palm face. Only after determining that the palm face is in a safe state can subsequent cutter disc tool inspection work be carried out; after inspection, it is confirmed that the edge scraper of the cutter disc is severely worn and needs to be replaced; the tool inspection must be recorded and video data must be kept, and a dedicated person must be arranged to continuously monitor the liquid level changes and the stability of the palm face while personnel enter the warehouse. Before leaving the warehouse, it is necessary to check the items left in the warehouse, and the warehouse door can only be closed after confirmation.
[0035] (3) Replacing the edge scraper: The shield machine cannot move backward because the outer shell of the shield machine fits too tightly with the ground-connected wall, and the cutterhead tool fits tightly with the tunnel face. There is no space for tool replacement, making tool replacement difficult. Therefore, the first operating chamber is excavated at the 3 o'clock position of the cutterhead tunnel face. The first operating chamber is located in front of the edge scraper to facilitate manual tool replacement operations; the longitudinal depth of the first operating chamber is 1m, the height is 1.5m, and the width is 1m. Since the outer diameter of the cutterhead after replacing the edge scraper is larger than the current outer diameter of the cutterhead, the first operating chamber is excavated near the outer edge of the cutterhead circumference until it is flush with the steel sleeve wall, so that the edge scraper can be replaced smoothly.
[0036] Rotate the cutter disc to move the edge scraper to be replaced to the front of the first operating chamber to facilitate the operator's operation; it is strictly forbidden for personnel to stay in the warehouse when rotating the cutter disc.
[0037] Since the shield has already excavated the stratum at this time, it is only necessary to replace some edge scrapers and increase the excavation diameter to complete the remaining excavation. There are six groups of edge scrapers on the cutterhead, and three groups of edge scrapers are replaced at intervals; when removing the edge scraper, first use oxygen acetylene to cut off the anti-loosening pin sealing block, and then use an Allen wrench to take out the anti-loosening pin, and then use a jack or other tools to push out the tool fixing pin and remove the edge scraper; when installing the edge scraper, place the edge scraper on the tool holder, insert the fixing pin, screw in the anti-loosening pin, and weld the sealing block at the tail of the anti-loosening pin to prevent the anti-loosening pin from falling off; when replacing the tool, one needs to be removed and transported out, and then a new tool is transported in for replacement, and the other tool is removed after the replacement is completed.
[0038] After each batch of cutting tools is replaced, it is necessary to enter the warehouse to check the quality of tool installation and check whether there are any missing or poorly fixed tools. Only after confirming that the operation is correct can subsequent work be continued; after all cutting tools are replaced, turn the cutter disc, re-tighten all tool bolts, clean the used tools and materials, confirm that they are correct or take them all out, close the warehouse door, and the tool change work is completed.
[0039] Step 3: After the cutter head tool is replaced, the shield is freed. Since the shield is stuck and cannot move backward, a second operating chamber needs to be excavated at the portal, and then holes are drilled at the stuck part of the shield to free the shield.
[0040] (1) Opening an operating window on the steel sleeve: see Figure 2 , Figure 3Since the steel sleeve 8 is filled with mortar 10, if you want to excavate the second operating cavern 11 at the tunnel portal, you need to open an operating window 7 on the steel sleeve 8 so that you can excavate the second operating cavern 11 from the inside of the steel sleeve 8; check the waterproof condition of the tunnel portal, and when it is determined that there is no water leakage at the portal, open the steel sleeve transition ring 6; cut two opposite rectangular operating windows 7 above the waistline on both sides of the transition ring 6, and the operating window 7 is 1200mm high and 600mm wide; when cutting the operating window An outward convex flange matching the working window 7 is welded at the position of the working window 7 before opening 7, and a blocking door matching the flange is arranged at the end of the flange. The size of the flange is 1300*700mm, and a snap fastener and a bolt hole are arranged at the corresponding connection between the blocking door and the flange. The blocking door and the flange can be fixedly connected by M8 bolts, and a sealing ring is also arranged at the corresponding connection between the blocking door and the flange to achieve a sealed connection, so as to ensure that the internal pressure of the steel sleeve remains unchanged during the shield receiving operation, and to ensure smooth and safe reception of the shield.
[0041] (2) Backfill mortar in the excavated steel sleeve: see Figure 3 After the operation windows 7 on both sides of the transition ring 6 are opened, the mortar 10 inside the steel sleeve 8 is chiseled out manually through the operation windows 7. The operation windows 7 on both sides are constructed at the same time, and tools such as pneumatic picks can be used for chiseling. The chiseling thickness is 800mm inward from the transition ring, and the volume of chiseled mortar is about 12 cubic meters. The second operation cavern 11 formed by chiseling out the mortar provides an operation space for the subsequent manual chiseling of the ground-connected wall holes.
[0042] The mortar 10 in the steel sleeve 8 is chiseled out and excavated in steps. Three steps are reserved at the center of the transition ring 6. The height of each step is about 500mm to ensure smooth excavation of the ground-connected wall at the stuck part of the subsequent shield.
[0043] During the chiseling process of the backfill mortar in the steel sleeve, the stress state of the steel sleeve will change, which may cause the steel sleeve to move. Therefore, the reinforcement of the reaction frame needs to be strictly checked before construction, and the deformation of the steel sleeve and the reaction frame needs to be strictly monitored during the chiseling process of the mortar. A dial indicator monitor is installed at the transition ring position to monitor the deformation of the reaction frame and the displacement of the support at any time, strengthen manual monitoring, and prevent accidents.
[0044] (3) Drilling holes in the ground-connected wall at the shield jamming point: see Figure 2 , Figure 3 The excavation range of hole 4 is the ground wall 5 within 120° range above the cutter head, the axial depth of hole 4 is 350mm, the hole 4 is opened at a position 50mm beyond the outer diameter of the cutter head, and the distance between adjacent holes 4 is 10-20mm; a water drill is used to drill holes within a certain range on the upper part of the shield to expand the diameter of the soil outside the shield body so as to achieve the escape of the shield body.
[0045] During the construction of the holes for the ground-anchored wall, the ground dewatering wells must be kept in operation at all times to prevent the water level in the reinforced area from rising. After each hole is excavated, the chisel must be used to promptly fill and seal the hole with cotton yarn, plugging cement, etc., to ensure the sealing effect is strictly guaranteed to prevent the formation of water channels.
[0046] (4) Shield machine resumes excavation: After drilling holes in the ground-connected wall at the stuck part of the shield body, the pressure of the ground-connected wall on the shield body can be reduced, so that the shield machine can move under the thrust of the hydraulic cylinder and resume advancement; when the shield machine excavates to the steel sleeve, its excavation speed is about 5mm / min, the thrust is within 2500T, the cutter head speed is 1.0rpm / min, the torque is within 1500kn.m, the pressure at the top of the soil bin is maintained within 1.5bar, the pressure is adjusted to not more than 0.2bar per ring, and the grouting volume per ring is guaranteed to be 5 to 8 cubic meters; during the excavation process, the steel sleeve is monitored at all times, and the shield excavation parameters are adjusted in time to prevent the shield machine from damaging the steel sleeve.
[0047] Although some preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present application.
[0048] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the inventive concept. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A shield escape method based on a steel sleeve receiving a shield machine passing through a ground-connected wall, characterized in that: include: S1: A water-stop ring is installed between the shield shell of the shield machine and the ground-connected wall to block the water flow channel at the rear of the shield; S2: After the water-stop ring hoop is installed, the air bin is connected to the soil bin, and the pressure in the air bin is reduced to 0 Bar. After the liquid level in the air bin is stable, the bin is opened at normal pressure to check the cutter head; S3: excavating a first operating chamber at a position where the face of the cutterhead is opposite to the edge scraper, and then replacing the edge scraper; S4: opening an operating window on the transition ring of the steel sleeve, and excavating the mortar inside the steel sleeve through the operating window as a second operating cavern; S5: drilling a hole on the ground-connected wall at the shield body jamming position through the second operating chamber, wherein the hole is drilled within a range of 115° to 125° on the upper part of the cutter head, and the drilling depth thereof is 340 to 360 mm deep into the ground-connected wall; S6: Close the working window and resume excavation.
2. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In the step S1, polyurethane is injected into the outside of the shield shell through the radial grouting holes of the shield in the shield machine, and the polyurethane forms the water-stop ring after solidification.
3. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 2 is characterized in that: The polyurethane is water-based polyurethane.
4. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In the step S2, if the liquid level in the gas bin does not increase for at least 2 hours, it is considered that the liquid level in the gas bin is stable.
5. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In step S3, the first operating cavern is located at the 3 o'clock position of the cutter head face, and the portion thereof close to the outer edge of the cutter head circumference is excavated until it is flush with the inner wall of the steel sleeve.
6. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In step S4, there are two operating windows, which are relatively arranged above the waistline on both sides of the transition ring. An external convex flange is welded on the outer side of the operating window, and a sealing door corresponding to the external convex flange is provided at the outer end of the external convex flange.
7. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In step S4, the second operating cavern is excavated in steps, and three steps are reserved at the center of the transition ring, and the step height is 490-510 mm.
8. The shield escape method based on steel sleeve receiving shield passing through ground-connected wall according to claim 1 is characterized in that: In the step S5, the hole position exceeds the outer edge of the cutter disc by 50 mm, and the distance between adjacent holes is 10 to 20 mm.