Underground water diversion method suitable for tunnel lining high-pressure leakage treatment

By setting up radial drainage holes at the edge of the tunnel wall and setting up a step-shaped longitudinal drainage structure, combined with the drainage structure, the problem of high-pressure leakage of the tunnel lining is solved, and efficient and safe water flow is achieved The drainage and drainage improves the safety and durability of the tunnel structure.

CN119021749APending Publication Date: 2024-11-26GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411464249.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing tunnel lining water leakage treatment methods are difficult to effectively deal with strand leakage of high-pressure groundwater, which poses structural safety risks, and conventional measures do not handle large flow leakage conditions well.

Method used

By setting up radial drainage holes at the edge of the tunnel, and combining the step-shaped longitudinal drainage structure and the drainage pressure structure, the effective reduction of groundwater and diversion and drainage to the drainage ditches in the center of the tunnel are achieved, avoiding the potential harm of high-pressure water impact on the structure .

Benefits of technology

It significantly improves the groundwater drainage and discharge capacity in the tunnel, avoids structural safety hazards caused by high-pressure water impact, and improves the safety and durability of the tunnel groundwater drainage and discharge structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021749A_ABST
    Figure CN119021749A_ABST
Patent Text Reader

Abstract

The invention discloses an underground water diversion method suitable for high-pressure leakage treatment of a tunnel lining, which comprises the following steps of: punching a radial drainage hole at the arch foot position of a side wall of a water accumulation section at the back of the tunnel lining, and arranging a stepped longitudinal drainage structure at the water outlet end of the radial drainage hole along the side wall of the tunnel; a drainage and pressure release structure is arranged in at least one stage of longitudinal drainage structure close to one side of the radial drainage hole; and the stepped longitudinal drainage structure is communicated with the transverse drainage ditches and the central drainage ditch of the tunnel. According to the method, damage to an existing tunnel structure is small, construction is convenient and efficient, water gushing out of the radial drainage holes can be effectively slowed down, the water is guided and drained to a tunnel center drainage ditch in a sheetflood mode, the sudden underground water gushing situation of an operating tunnel can be effectively handled, potential structural potential safety hazards caused by high-pressure water impact are avoided, and the service life of the tunnel is prolonged. And the safety and durability of the tunnel underground water drainage structure are greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a groundwater diversion method suitable for tunnel lining high-pressure leakage treatment, belonging to the technical field of tunnel leakage treatment construction. Background Art

[0002] Tunnel lining water leakage is the most common disease in tunnel engineering. The causes of its occurrence are diverse and the treatment construction is extremely difficult. If it is not properly treated, it may induce accidents such as traffic safety and structural safety. The potential hazards should not be underestimated. Especially in karst development areas or surrounding rock broken and water-rich sections, a large amount of groundwater often gathers behind the tunnel lining, and often leaks into the tunnel in a pressurized form, seriously affecting the normal operation of the tunnel. In response to the above-mentioned concentrated pressurized water discharge, the conventional treatment solutions of drilling grooves inside the lining to bury pipes for drainage or installing diversion grooves on the lining surface for drainage have certain structural safety hazards. The long-term impact of large water pressure is very likely to cause the drainage pipe covered only by a thin layer of concrete to be squeezed into the tunnel, or cause the diversion groove anchored on the lining surface to loosen and fall off.

[0003] It can be seen that the existing tunnel leakage diversion measures are mainly suitable for conventional leakage diseases. If there is a situation of pressurized water in the form of strands, there are certain defects. In view of the above situation, it is of great practical significance to study a groundwater diversion method suitable for high-pressure leakage treatment of tunnel lining. Summary of the invention

[0004] In view of this, an object of the present invention is to provide a groundwater diversion method suitable for treating high-pressure leakage of tunnel linings, so as to at least solve the problems mentioned in the background technology.

[0005] The objective of the present invention is achieved through the following technical solutions: A groundwater diversion method suitable for treating high-pressure leakage of tunnel linings comprises the following steps: s1. Determine the groundwater-rich section behind the tunnel lining through surface observation, equipment detection and other means; s2. Drill radial drainage holes at the arch foot of the side wall of the water-logged section behind the tunnel lining and plug them with drainage pipes; s3. A stepped longitudinal drainage structure is set up at the outlet of the radial drainage hole and along the side wall of the tunnel; s4. A drainage and pressure relief structure is provided in at least one longitudinal drainage structure close to one side of the radial drainage hole; s5. According to the setting range of the drainage and pressure relief structure, a transverse drainage ditch is excavated under the tunnel invert, and the stepped longitudinal drainage structure, the transverse drainage ditch and the central drainage ditch of the tunnel are interconnected.

[0006] Furthermore, in step s2, after the radial drainage holes are constructed, the water discharge from the lining surface of the water-logged section behind the tunnel lining is observed again, and measures are taken according to the situation: s2.1. If there are still strand-shaped water outlets in the area from the upper part of the tunnel side wall to the arch, the drainage holes on the side wall should be further increased until the water flow at the outlet is reduced to seepage or dripping, and then an annular drainage trough should be added at the above-mentioned location for drainage; s2.2. If there are only seepage or dripping water outlets on the lining surface, an annular drainage ditch should be added at the corresponding position for drainage; s2.3. If there is no obvious water on the lining surface, it is only necessary to apply new tunnel paint to the corresponding position.

[0007] Furthermore, in step s3, the construction area of ​​the stepped longitudinal drainage structure is determined according to the drilling range of the radial drainage holes; the stepped longitudinal drainage structure is at least two levels arranged in sequence from top to bottom along the water outlet of the radial drainage holes, and at least one level of the longitudinal drainage structure close to the radial drainage holes is a drainage and pressure relief groove structure, and the other level is an existing cable trench modification structure.

[0008] Furthermore, the specific construction steps of the stepped longitudinal drainage structure are: s3.1. Use the method of sleeve-connecting temporary drainage pipes to temporarily drain the water outflow from the radial drainage holes, and determine the longitudinal transformation area H of the cable trench according to the range of the radial drainage holes, and carry out the construction of the cable trench transformation structure; s3.2. Construction of drainage and pressure relief trench structure: a water retaining plate is set up along the outer side of the arch foot of the tunnel side wall, the upper part of the water retaining plate is anchored to the tunnel side wall lining, and the lower part is suspended and anchored to the inner side of the cable trench; if an annular drainage trough is installed on the tunnel side wall, the lower drainage outlet of the annular drainage trough is connected to the water retaining plate to ensure that the water in the annular drainage trough flows into the water retaining plate; s3.3. Remove the temporary drainage pipe that is connected to the radial drainage hole.

[0009] Furthermore, in step s3.1, the longitudinal reconstruction area H of the cable trench should exceed the radial drainage pipe installation range by more than 2m in the upstream direction of the longitudinal slope, and exceed the radial drainage pipe installation range by more than 4m in the downstream direction of the longitudinal slope to ensure that all the gushing water can be collected; the reconstruction of the cable trench includes the replacement of the inward-inclined drainage cover plate, the setting of the drainage trough at the bottom of the cable trench, and the adjustment of the cable layout position; in step s3.2, an inspection port is opened on the outside of the water retaining plate, and an inspection door that can be opened and closed is installed on the inspection port to facilitate subsequent maintenance.

[0010] Furthermore, the specific construction steps of the cable trench reconstruction structure are: s3.1.1. Half of the cable trench bottom within the confirmed cable trench reconstruction range shall be excavated on the road side to form a drainage ditch at the bottom of the cable trench. The excavation depth shall be controlled at 30-40cm, and the longitudinal slope of the drainage ditch shall be basically flush with the longitudinal slope of the tunnel. During the expansion and excavation process, attention shall be paid to protecting the cables inside the cable trench. If necessary, the cables in the adjacent sections shall be moved outside the cable trench for protection. s3.1.2. Add transverse drainage ditches connected to the tunnel center drainage ditch at a spacing of 20-25 meters on the downslope direction of the drainage trough at the bottom of the cable trench; s3.1.3. After the construction of the cable trench bottom drainage ditch and the transverse drainage ditch is completed, the garbage in the ditch shall be cleaned up, and then the road surface structure near the transverse drainage ditch shall be restored in time, and the top surface of the cable trench bottom drainage ditch shall be covered with a water grate; s3.1.4. Change the cable layout within the scope of cable trench reconstruction to an overall hanging layout close to the road surface, and check the waterproofness of the cable. If necessary, measures such as adding cable waterproof sheaths can be adopted to improve the waterproofness of the cables in the relevant sections; s3.1, 5. Use inward-inclined drainage cover plates to replace the original cable trench cover plates in the cable trench reconstruction area H; The inwardly inclined drainage cover plate is arranged downwardly with respect to the water outlet end of the radial drainage hole; wherein, The inward-inclined drainage cover plate comprises an inward-inclined plate body, a transverse drainage groove, and a vertical transport lever groove, wherein the transverse drainage groove is arranged at the top of the inward-inclined plate body and close to the side of the side wall arch foot, and the vertical transport lever groove is arranged at the center of both sides of the inward-inclined plate body; Alternatively, the inward-inclined drainage cover plate includes an inward-inclined cover plate body, a groove is provided at the bottom of the thin side of the inward-inclined cover plate body, and a plurality of pads higher than the groove are provided in the groove, so that the inward-inclined cover plate body is lifted by the pads to form a drainage gap.

[0011] Furthermore, in step s4, a drainage and pressure relief structure is provided in the drainage and pressure relief groove structure, and the drainage and pressure relief structure is provided at the water outlet position of the radial drainage hole and is connected to the inner side of the water retaining plate.

[0012] Furthermore, the drainage and pressure relief structure includes a connecting rod and a deceleration turntable mounted on the connecting rod and rotatably connected thereto. Anchor plates are symmetrically provided at both ends of the connecting rod. The anchor plates are fixedly connected to the inner side of the water retaining plate. The water gushing out of the radial drainage holes is sprayed onto the deceleration turntable to decelerate the water flow, thereby achieving a shock absorbing effect.

[0013] Furthermore, the drainage and pressure relief structure includes a shock-absorbing ball and connecting springs symmetrically arranged on both sides of the shock-absorbing ball. The shock-absorbing ball is connected to an anchor plate fixed to the inner side of the water retaining guard plate through the connecting spring. The gushing water from the radial drainage hole is sprayed on the shock-absorbing ball, and the impact force of the water flow is consumed by the connecting spring to achieve a shock-absorbing effect.

[0014] Furthermore, the drainage and pressure relief structure is an elastic plate structure, which includes an arc-shaped spring piece, the lower end of which is fixedly connected to the inner wall of the water retaining guard plate, and the upper end is provided with an inclined plate, and the inclined plate is provided with a plurality of guide grooves. The gushing water from the radial drainage hole is sprayed on the inclined plate, and the impact force of the water flow is consumed by the arc-shaped spring piece to achieve a shock-absorbing effect.

[0015] Compared with the prior art, the beneficial effects of the present invention are: (1) The present invention discloses a groundwater diversion method suitable for treating high-pressure leakage of tunnel linings. The method comprises the following steps: drilling radial drainage holes at the foot of the tunnel side wall to centrally drain groundwater; and setting a stepped longitudinal drainage structure at the outlet of the radial drainage holes and along the tunnel side wall. Combined with a drainage and pressure relief structure arranged in the stepped longitudinal drainage structure, the water gushing out of the radial drainage holes is effectively decelerated so that the water is drained to the tunnel center drainage ditch in the form of overflow. Compared with the conventional measure of draining groundwater using drainage pipes, the groundwater drainage capacity is greatly improved, and the situation of large-flow groundwater leakage in the tunnel can be effectively dealt with.

[0016] (2) The groundwater diversion method provided by the present invention has less destructiveness to the existing tunnel structure and is convenient and efficient to construct. It can effectively deal with sudden groundwater inrush in operating tunnels, avoid potential structural safety hazards caused by high-pressure water impact, and greatly improve the safety and durability of the tunnel groundwater diversion and drainage structure.

[0017] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings, in which: Figure 1 It is a front structural schematic diagram of the present invention; Figure 2 It is a partial enlarged cross-sectional view of the tunnel side wall foot; Figure 3 It is a schematic diagram of the top surface structure of the present invention; Figure 4 It is a structural schematic diagram of a water retaining plate; Figure 5 The structure diagram of the inward-inclined drainage cover Figure 1 ; Figure 6 The structure diagram of the inward-inclined drainage cover Figure 2 ; Figure 7 for Figure 6 Schematic diagram of the three-dimensional structure; Figure 8 A schematic diagram of the structure of the drainage and pressure relief structure provided in the first embodiment of the present invention; Fig. 9 A schematic diagram of the structure of the drainage and pressure relief structure provided in the second embodiment of the present invention; Fig.10 A schematic diagram of the structure of the drainage and pressure relief structure provided in the third embodiment of the present invention; Fig.11 for Figure 8 Schematic diagram of the use principle of the central pressure relief structure; Fig.12 It is a structural schematic diagram of an anti-slip drainage pipe.

[0019] In the figure: 1. radial drainage hole; 2. annular drainage groove; 3. stepped longitudinal drainage structure; 4. transverse drainage groove; 5. central drainage groove; 6. water retaining plate; 6.1. stainless steel plate; 6.2. drainage groove interface; 6.3. bolt hole; 6.1.1. upper anchor edge; 6.1.2. L-shaped steel plate; 6.1.3. lower anchor edge; 7. drainage and pressure relief structure; 7.1. anchor plate; 7.2. connecting rod; 7.3. speed reduction turntable; 7.4, shock-absorbing ball; 7.5, connecting spring; 7.6, arc-shaped spring piece; 7.7, inclined plate; 8, drainage groove at the bottom of cable trench; 9, inward-inclined drainage cover plate; 9.1, inward-inclined plate body; 9.2, horizontal drainage groove; 9.3, vertical handling lever groove; 9.4, inward-inclined cover plate body; 9.5, groove; 9.6, pad; 10, original cable trench cover plate; 11, cable; 12, pipe body; 13, barb structure; 14, flow-blocking structure. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] like Figure 1-Figure 12 As shown, the first embodiment of the present invention provides a groundwater diversion method suitable for high-pressure leakage treatment of tunnel lining, which includes the following steps: A groundwater diversion method suitable for treating high-pressure leakage of tunnel linings comprises the following steps: s1. Determine the groundwater-rich section behind the tunnel lining through surface observation, equipment detection and other means; s2. Drill radial drainage holes 1 at the arch foot of the side wall of the water accumulation section behind the tunnel lining and plug them with drainage pipes; s3, a stepped longitudinal drainage structure 3 is provided at the outlet end of the radial drainage hole 1 and along the side wall of the tunnel; S4, a drainage and pressure relief structure is arranged in at least one longitudinal drainage structure near one side of the radial drainage hole 1; S5. According to the setting range of the drainage and pressure relief structure, a transverse drainage ditch 4 is excavated under the tunnel invert, and the stepped longitudinal drainage structure, the transverse drainage ditch 4 and the central drainage ditch 5 of the tunnel are connected to each other.

[0022] In step s1, the equipment detection method includes geophysical exploration means such as TEM infrared water detection and geological radar method.

[0023] In step s2, the drain pipe can be a conventional steel pipe or an anti-slip drain pipe. The anti-slip drain pipe includes a pipe body 12, and a plurality of deformable barb structures 13 are provided on the outer surface of the pipe body 12. By providing the deformable barb structure 13 outside the pipe body 12, when the pipe body 12 is inserted into the drain hole 1, it can be close to the outer wall of the pipe body 12 to ensure that the pipe body 12 can be smoothly inserted; when the water pressure squeezes the pipe body 12 toward the outer end of the drain hole, the barb structure 13 can effectively prevent the pipe body 12 from moving outward. In addition, there is also a flow-blocking structure 14 in the pipe body 12 for slowing down the flow rate of water. The flow-blocking structure 14 can be a spiral chute, a dot-shaped protrusion or a ring-shaped thread arranged on the inner wall of the pipe body 12. The friction between the inside of the pipe and the water flow is increased by the flow-blocking structure 14, thereby achieving the effect of slowing down the water flow, and thus effectively avoiding the potential structural safety hazards caused by high-pressure water impact.

[0024] After the construction of radial drainage hole 1 is completed, observe the water discharge from the lining surface of the water-logged section behind the tunnel lining again and take measures according to the situation: (2.1) If there are still water outlet points in the area from the upper part of the tunnel side wall to the arch, the drainage holes on the side wall should be further increased until the water flow at the outlet point is reduced to seepage or dripping, and then an annular drainage ditch 2 should be added at the above position for drainage; (2.2) If there are only seepage and dripping water outlets on the lining surface, an annular drainage ditch 2 should be added at the corresponding position for drainage; (2.3) If there is no obvious water leakage on the lining surface, it is only necessary to apply new tunnel paint to the corresponding positions.

[0025] The inclination angle of the radial drainage holes 1 is controlled at 3 to 5 degrees, the longitudinal arrangement spacing is controlled at 0.5 to 1.0 m, and the depth of the radial drainage holes is controlled at 5 to 10 m.

[0026] In step s3, the construction area of ​​the stepped longitudinal drainage structure 3 is determined according to the range of the radial drainage hole 1. The stepped longitudinal drainage structure 3 is arranged in at least two stages from top to bottom along the outlet of the radial drainage hole 1. At least one longitudinal drainage structure near the radial drainage hole 1 is a drainage and pressure relief groove structure 3.1, and the other is an existing cable trench modification structure 3.2.

[0027] Specifically, the construction steps of the stepped longitudinal drainage structure are: s3.1. Use the method of sleeve-connecting temporary drainage pipes to temporarily drain the water outflow from the radial drainage holes 1, and determine the longitudinal transformation area H of the cable trench according to the range of the radial drainage holes 1, and carry out the construction of the cable trench transformation structure 3.2; s3.2, carry out the construction of the drainage and pressure relief groove structure 3.1, and the specific construction steps are: install a water retaining plate 6 on the outside of the radial drainage hole 1 along the range of the drilling, the upper part of the water retaining plate 6 is anchored to the tunnel side wall lining, and the lower part is suspended and anchored to the inner side of the cable trench; if an annular drainage groove 2 is installed on the tunnel side wall, the lower drainage port of the annular drainage groove 2 is connected to the water retaining plate 6 to ensure that the water in the annular drainage groove 2 flows into the water retaining plate 6, and in addition, an inspection port is opened on the outside of the water retaining plate 6, and an inspection door that can be opened and closed is installed on the inspection port to facilitate subsequent maintenance; s3.3. Remove the temporary drainage pipe connected to the opening of the radial drainage hole 1, and let the water sprayed from the radial drainage hole 1 first flush the water retaining plate 6, and then flow through the gap between the bottom of the water retaining plate 6 and the inner side of the cable trench to flow on the inward-inclined drainage cover plate 9, and then flow into the cable trench and gather in the drainage trough 8 at the bottom of the cable trench, and finally flow into the tunnel center drainage ditch 5 through the transverse drainage ditch 4.

[0028] In step s3.1, in principle, the longitudinal reconstruction area H of the cable trench should exceed the radial drainage pipe installation range by more than 2m in the upstream direction of the longitudinal slope, and should exceed the radial drainage pipe 1 installation range by more than 4m in the downstream direction of the longitudinal slope (i.e. the direction of water flow) to ensure that all the gushing water can be collected; the reconstruction of the cable trench includes three aspects: replacement of the inward-inclined drainage cover plate 9, setting of the drainage trough 8 at the bottom of the cable trench, and adjustment of the layout position of the cable 11.

[0029] The specific construction steps are: (3.1) The bottom of the cable trench within the confirmed cable trench reconstruction range shall be half-dug on the road surface side to form a drainage ditch 8 at the bottom of the cable trench, wherein the digging depth shall be controlled at 30-40cm, and the longitudinal slope of the drainage ditch shall be basically flush with the longitudinal slope of the tunnel; during the expansion and excavation process, attention shall be paid to protecting the cables 11 inside the cable trench, and if necessary, the cables 11 in the adjacent sections may be moved outside the cable trench for protection; (3.2) Add transverse drainage ditches 4 connected to the tunnel center drainage ditch 5 at a spacing of 20-25 meters at the downhill direction of the drainage ditch 8 at the bottom of the cable trench. The road surface structure needs to be excavated during the construction of the transverse drainage ditch 4; (3.3) After the construction of the cable trench bottom drainage ditch 8 and the transverse drainage ditch 4 is completed, the garbage in the ditch shall be cleaned up, and then the road surface structure near the transverse drainage ditch shall be restored in time, and a water grate shall be added to the top surface of the cable trench bottom drainage ditch 8; (3.4) Change the layout of cables 11 within the scope of cable trench reconstruction to an overall hanging layout close to the road surface, and check the waterproofness of cables 11. If necessary, measures such as adding waterproof sheaths for cables 11 can be adopted to improve the waterproofness of cables 11 in relevant sections; (3.5) Use the inward-inclined drainage cover plate 9 to replace the original cable trench cover plate 10 within the scope of the cable trench reconstruction.

[0030] The water retaining plate 6 comprises a stainless steel plate 6.1, a drainage groove interface 6.2, and a bolt hole 6.3. The stainless steel plate 6.1 comprises an upper anchoring edge 6.1.1, an L-shaped steel plate 6.1.2, and a lower anchoring edge 6.1.3. The upper anchoring edge 6.1.1 is closely anchored to the tunnel wall by bolts, and the lower anchoring edge 6.1.3 is suspended and anchored to the inner side of the cable trench by bolts, so as to leave a drainage gap, so that the water flow sprayed from the radial drainage hole 1 first flushes the water retaining plate 6, and then passes through the bottom of the water retaining plate 6. The drainage gap flows on the inward-inclined drainage cover plate 9, and then flows into the cable trench and gathers in the drainage trough 8 at the bottom of the cable trench; the drainage trough interface 6.2 is arranged at a certain interval on the upper end of the upper anchor edge 6.1.1, and its setting position matches the position of the annular drainage trough 2 set in the tunnel, so that the surface water of the tunnel lining flows into the annular drainage trough 2, and then flows into the water retaining guard plate 6 through the drainage trough interface 6.2; the bolt holes 6.3 are arranged on the upper anchor edge 6.1.1 and the lower anchor edge 6.1.3 at a certain interval.

[0031] The inward-inclined drainage cover plate 9 comprises an inward-inclined plate body 9.1, a transverse drainage groove 9.2 and a vertical transport lever groove 9.3, wherein the transverse drainage groove 9.2 is arranged at the top of the inward-inclined plate body 9.1 and close to the arch foot side of the side wall, and the vertical transport lever groove 9.3 is arranged at the center of both sides of the inward-inclined plate body 9.1. The vertical transport lever groove 9.3 facilitates transportation and disassembly, and the transverse drainage groove 9.2 can guide the water flow sprayed from the radial drainage hole 1 to the drainage ditch for drainage.

[0032] Alternatively, the inward-inclined drainage cover plate 9 includes an inward-inclined cover plate body 9.4, a groove 9.5 is provided at the bottom of the thin side of the inward-inclined cover plate body 9.4, and a plurality of pads 9.6 higher than the groove 9.5 are provided in the groove 9.5, so that the inward-inclined cover plate body 9.4 is lifted by the pads 9.6 to form a drainage gap, and the inward-inclined cover plate body 9.4 is tilted downward relative to one side of the drainage gap. This structure adopts a side drainage method, which is not only simple in structure, but also convenient for water flow collection and discharge, and can prevent the cables in the cable trench from getting damp. Specifically, the pads 9.6 are at least two pieces symmetrically arranged on both sides of the groove 9.5, so that the inward-inclined drainage cover plate 9 is firmly supported on the side of the cable trench through the pads 9.6. The inward-inclined cover plate body 9.4 and the pads 9.6 can be an integrally formed structure. Or the pads 9.6 and the inward-inclined cover plate body 9.4 can be detachably connected, such as by bolt connection or anchor connection. Cables are placed in the cable trench, the inward-inclined cover plate body 9.4 is arranged at the top of the cable trench 7 and the groove is close to the buffer platform 6, and a drainage gap is formed between the bottom of the drainage type cable trench cover plate and the trench side close to the buffer platform 6 through the pad. The water flow sprayed from the radial drainage hole 1 can be drained into the drainage ditch through the drainage gap.

[0033] The inwardly inclined drainage cover plate 9 is arranged downwardly and tilted relative to the water outlet end of the radial drainage hole 1 to facilitate water collection and discharge. Specifically, the inwardly inclined drainage cover plate 9 has an inclination angle of 5-10 degrees.

[0034] In step s4, a drainage and pressure relief structure is arranged in the drainage and pressure relief groove structure. The drainage and pressure relief structure 7 is arranged at the outlet of the radial drainage hole 1 and connected to the inner side of the L-shaped steel plate 6.1.2.

[0035] In this embodiment, the drainage and pressure relief structure 7 includes an anchor plate 7.1, a connecting rod 7.2 and a deceleration disc 7.3. The anchor plate 7.1 is composed of two pieces, which are respectively arranged on both sides of the connecting rod 7.2 and fixedly connected to the inner side of the stainless steel plate 6.1; the deceleration disc 7.3 is rotatably nested on the connecting rod 7.2. When in use, the gushing water from the radial drainage hole 1 is sprayed on the deceleration disc 7.3, and the rotation deceleration principle of the deceleration disc 7.3 is used to effectively decelerate the groundwater gushing from the radial drainage hole 1, and finally drain it into the central drainage ditch of the tunnel, which greatly improves the tunnel groundwater drainage capacity and effectively avoids the potential structural safety hazards caused by high-pressure water impact.

[0036] like Figure 7As shown, based on the first embodiment, the second embodiment of the present invention provides a groundwater diversion method suitable for high-pressure leakage treatment of tunnel linings, wherein the drainage and pressure relief structure 7 comprises an anchor plate 7.1, a shock-absorbing ball 7.4 and a connecting spring 7.5, and the shock-absorbing ball 7.4 is elastically connected to the anchor plates 7.1 on both sides through the connecting springs 7.5 on both sides, and the anchor plates 7.1 are fixedly connected to the inner side of the stainless steel plate 6.1. When in use, the gushing water from the radial drainage hole 1 is sprayed on the shock-absorbing ball 7.4, which uses the elastic shock-absorbing principle of the shock-absorbing ball 7.4 to release the pressure of the water gushing from the radial drainage hole 1, and then slowly discharges it into the cable trench, effectively avoiding the potential structural safety hazards caused by the high-pressure water impact.

[0037] like Figure 8 As shown, on the basis of the first and second embodiments, the third embodiment of the present invention provides a groundwater diversion method suitable for the treatment of high-pressure leakage in tunnel linings, and the drainage and pressure relief structure 7 is an elastic plate structure. The elastic plate structure includes an arc-shaped spring piece 7.6, the lower end of which is fixedly connected to the inner wall of the stainless steel plate 6.1, and the upper end is provided with an inclined plate 7.7, and the inclined plate 7.7 is provided with a number of diversion grooves. When in use, the gushing water from the radial drainage hole 1 is sprayed on the inclined plate 7.7, and the water flows upward along the inclined plate 7.7 under the action of its own inertia, and consumes the impact force of the water flow through the change of potential energy, thereby achieving the effect of reducing pressure. The inclined plate 7.7 is connected by an elastic member, and the impact of high-pressure water on the inclined plate 7.7 can be reduced under the action of elastic buffering, while increasing the service life of the inclined plate. The elastic member can provide a certain elastic buffering force for the inclined plate 7.7, which can further consume the impact force of the water flow and have a better effect on reducing the pressure of the water flow.

[0038] The above description is only a preferred embodiment of the present invention and does not constitute any form of confidentiality restriction on the present invention. Any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the scope of the technical solution of the present invention.

Claims

1. A groundwater diversion method suitable for treating high-pressure leakage of tunnel linings, characterized in that: The following steps are involved: s1. Determine the groundwater-rich section behind the tunnel lining through surface observation, equipment detection and other means; s2. Drill radial drainage holes (1) at the arch foot of the side wall of the water-logged section behind the tunnel lining and plug them with drainage pipes; s3, a stepped longitudinal drainage structure (3) is provided at the outlet end of the radial drainage hole (1) and along the side wall of the tunnel; s4. a drainage and pressure relief structure is provided in at least one longitudinal drainage structure close to one side of the radial drainage hole (1); s5. According to the setting range of the drainage and pressure relief structure, a transverse drainage ditch (4) is excavated below the tunnel invert, and the stepped longitudinal drainage structure is connected to the tunnel central drainage ditch (5) through the transverse drainage ditch (4).

2. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 1 is characterized in that: In step s2, after the radial drainage holes (1) are constructed, the water discharge from the lining surface of the water-logged section behind the tunnel lining is observed again, and measures are taken according to the situation: s2.

1. If there are still water outlet points in the area from the upper part of the tunnel side wall to the arch, the drainage holes in the side wall will be further increased until the water flow at the outlet point is reduced to seepage or dripping, and then an annular drainage trough (2) will be added at the above position for drainage; s2.

2. If there are only seepage or dripping water outlets on the lining surface, an annular drainage ditch (2) should be added at the corresponding position for drainage; s2.

3. If there is no obvious water on the lining surface, it is only necessary to apply new tunnel paint to the corresponding position.

3. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 2 is characterized in that: In step s3, the construction area of ​​the stepped longitudinal drainage structure (3) is determined according to the range of the radial drainage hole (1); the stepped longitudinal drainage structure (3) is at least two levels arranged in sequence from top to bottom along the water outlet of the radial drainage hole (1), and at least one level of the longitudinal drainage structure close to the radial drainage hole (1) is a drainage and pressure relief groove structure ( 3.1), and the other level is the existing cable trench reconstruction structure (3.2).

4. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 3 is characterized in that: The specific construction steps of the stepped longitudinal drainage structure are: s3.

1. Use a temporary drainage pipe to temporarily drain the water from the radial drainage hole (1). According to the range of the radial drainage hole (1), determine the longitudinal modification area H of the cable trench and carry out the construction of the cable trench modification structure (3.2). s3.2, construct the drainage and pressure relief trench structure (3.1): a water retaining plate (6) is arranged along the outer side of the arch foot of the tunnel side wall, the upper part of the water retaining plate (6) is anchored to the tunnel side wall lining, and the lower part is suspended and anchored to the inner side of the cable trench; if an annular drainage groove (2) is installed on the tunnel side wall, the lower drainage outlet of the annular drainage groove (2) is connected to the water retaining plate (6) to ensure that the water in the annular drainage groove (2) flows into the water retaining plate (6); s3.

3. Remove the temporary drainage pipe that is connected to the opening of the radial drainage hole (1).

5. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 4 is characterized in that: In step s3.1, the longitudinal reconstruction area H of the cable trench should exceed the radial drainage pipe installation range by more than 2m in the upstream direction of the longitudinal slope and exceed the radial drainage pipe (1) installation range by more than 4m in the downstream direction of the longitudinal slope to ensure that all the gushing water can be collected; the reconstruction of the cable trench includes the replacement of the inward-inclined drainage cover plate (9), the installation of the drainage trough (8) at the bottom of the cable trench and the adjustment of the layout position of the cable (11); In step s3.2, an inspection opening is opened on the outside of the water retaining plate (6), and an opening and closing inspection door is installed on the inspection opening to facilitate subsequent inspection.

6. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 5 is characterized in that: The specific construction steps of the cable trench reconstruction structure (3.2) are: s3.1.

1. Half of the cable trench bottom within the confirmed cable trench reconstruction range is excavated on the road surface side to form a drainage ditch (8) at the bottom of the cable trench, wherein the excavation depth is controlled to be 30-40 cm, and the longitudinal slope of the drainage ditch is controlled to be basically flush with the longitudinal slope of the tunnel; during the expansion and excavation process, attention is paid to protecting the cables (11) inside the cable trench, and if necessary, the cables (11) in the adjacent sections are moved outside the cable trench for protection; s3.1.2, add transverse drainage ditches (4) connected to the tunnel center drainage ditch (5) at a spacing of 20-25 meters on the downhill direction of the drainage ditch (8) at the bottom of the cable trench; s3.1.

3. After the construction of the cable trench bottom drainage ditch (8) and the transverse drainage ditch (4) is completed, the garbage in the ditch shall be cleaned up, and then the road surface structure near the transverse drainage ditch shall be promptly restored, and a water grate shall be added to the top surface of the cable trench bottom drainage ditch (8); s3.1.

4. Change the cable layout within the scope of cable trench reconstruction to an overall hanging layout close to the road surface, and check the waterproofness of the cable. If necessary, measures such as adding cable waterproof sheaths can be adopted to improve the waterproofness of the cables in the relevant sections; s3.1.5, using an inward-inclined drainage cover plate (9) to replace the original cable trench cover plate (10) in the cable trench reconstruction area H; The inwardly inclined drainage cover plate (9) is arranged to be inclined downward relative to the water outlet end of the radial drainage hole (1); wherein: The inward-inclined drainage cover plate (9) comprises an inward-inclined plate body (9.1), a transverse drainage groove (9.2) and a vertical transport lever groove (9.3), wherein the transverse drainage groove (9.2) is arranged at the top of the inward-inclined plate body (9.1) and close to the arch foot of the side wall, and the vertical transport lever groove (9.3) is arranged at the center of both sides of the inward-inclined plate body (9.1); Alternatively, the inwardly inclined drainage cover plate (9) comprises an inwardly inclined cover plate body (9.4), a groove (9.5) being provided at the bottom of the thinner side of the inwardly inclined cover plate body (9.4), and a plurality of cushion blocks (9.6) being provided in the groove (9.5) and being higher than the groove (9.5), so that the inwardly inclined cover plate body (9.4) is raised by the cushion blocks (9.6) to form a drainage gap.

7. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 4 is characterized in that: In step s4, a drainage and pressure relief structure (7) is arranged in the drainage and pressure relief groove structure (3.1); the drainage and pressure relief structure (7) is arranged at the outlet of the radial drainage hole (1) and is connected to the inner side of the water retaining plate (6).

8. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 7, characterized in that: The drainage and pressure relief structure (7) comprises a connecting rod (7.2) and a deceleration turntable (7.3) sleeved on the connecting rod (7.2) and rotatably connected thereto. Anchor plates (7.1) are symmetrically provided at both ends of the connecting rod (7.2). The anchor plates (7.1) are fixedly connected to the inner side of the water retaining plate (6). Water gushing out of the radial drainage hole (1) is sprayed onto the deceleration turntable (7.3) to decelerate the water flow.

9. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 7, characterized in that: The drainage and pressure relief structure (7) comprises a shock absorbing ball (7.4) and connecting springs (7.5) symmetrically arranged on both sides of the shock absorbing ball (7.4); the shock absorbing ball (7.4) is connected to an anchor plate (7.1) fixed to the inner side of the water retaining plate (6) via the connecting spring (7.5); water gushing out of the radial drainage hole (1) is sprayed onto the shock absorbing ball (7.4), and the impact force of the water flow is consumed via the connecting spring (7.5).

10. The groundwater diversion method for treating high-pressure leakage of tunnel lining according to claim 7, characterized in that: The drainage and pressure relief structure (7) is an elastic plate structure, which includes an arc-shaped spring piece (7.6). The lower end of the arc-shaped spring piece (7.6) is fixedly connected to the inner wall of the water retaining plate (6), and the upper end is provided with an inclined plate (7.7). The inclined plate (7.7) is provided with a plurality of guide grooves. The gushing water from the radial drainage hole (1) is sprayed on the inclined plate (7.7), and the impact force of the water flow is consumed by the arc-shaped spring piece (7.6).