Energy-saving optimization method for industrial circulating water system

By monitoring and analyzing the heat exchanger device in the industrial circulating water system and adjusting the water inlet pressure of the heat exchanger, the problem of water imbalance is solved, and the efficient operation of the system and energy-saving and emission reduction effects are achieved.

CN119022712AInactive Publication Date: 2024-11-26ZHEJIANG JINGGESEN ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411213010.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There is a problem of water imbalance between heat exchangers in industrial circulation water systems, which leads to mismatch between the operating interval of the water circulation system and the efficient interval of the water pump, resulting in waste of power resources.

Method used

By monitoring the water inlet pressure and temperature of the heat exchange device, analyzing the equilibrium coefficient and water distribution coefficient, adjusting the water inlet pressure of the heat exchanger, ensuring that the cooling tower and heat exchanger operate in the efficient range, and setting a pressure regulating valve to balance the layout of the cooling tower Water state.

Benefits of technology

It realizes efficient operation of the water circulation system, reduces unnecessary losses, ensures that the cooling tower, heat exchanger and pump group operate in their own efficient range, and avoids waste of electricity caused by water imbalance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022712A_ABST
    Figure CN119022712A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of circulating water management, and particularly discloses an energy-saving optimization method for an industrial circulating water system, which comprises the following steps: performing data analysis according to monitoring data to obtain a balance coefficient and a water distribution coefficient sum, and setting a first effective interval based on a value range of the balance coefficient, and if the starting number of the heat exchangers changes and any one of the first condition and the second condition is met, the water inlet pressure of each heat exchanger is adjusted based on the balance coefficient and the water distribution coefficient. Therefore, the final equilibrium state is achieved, the cooling tower, the heat exchanger and the pump set can all operate in the efficient intervals of the cooling tower, the heat exchanger and the pump set, and unnecessary loss is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of circulating water management, and in particular to an energy-saving optimization method for an industrial circulating water system. Background Art

[0002] As the most commonly used refrigerant, industrial circulating water is widely used in metallurgy, electricity, oil refining, chemical industry and other industries. According to statistics, cooling water accounts for more than 80% of the total industrial water consumption. Therefore, from an economic point of view, the operating efficiency of the cooling water system is a key factor affecting the energy consumption of the circulating water system, especially the widely used cooling tower, which has high water and electricity consumption. The industrial circulating water system consists of machine pump equipment, pipe network system, heat exchange device, cooling system, bypass filter system water supply system and control system. In the past, energy saving only focused on machine pump equipment, and energy-saving transformation was implemented by replacing high-efficiency water pumps and high-efficiency motors or installing frequency conversion systems.

[0003] The problem with the current industrial circulating water system is that there is water imbalance between the multiple heat exchangers of the heat exchange device. The water imbalance will cause a mismatch between the operating range of the water circulation system and the high-efficiency range of the water pump, thereby causing a waste of electricity resources.

[0004] In view of this, the present invention proposes an energy-saving optimization method for an industrial circulating water system. Starting from the heat exchange device, the required flow rate and pressure of the system heat exchange are accurately analyzed, and then the water inlet pressure of the heat exchanger is adjusted as needed, so as to match the operating range of the water circulation system with the high-efficiency range of the water pump, and finally achieve the purpose of energy saving and emission reduction. Summary of the invention

[0005] The purpose of the present invention is to provide an energy-saving optimization method for an industrial circulating water system to solve the following technical problems:

[0006] How to accurately analyze the system heat exchange flow and pressure starting from the heat exchange device and then adjust the heat exchanger water inlet pressure as needed to match the operating range of the water circulation system with the high-efficiency range of the water pump, and ultimately achieve the goal of energy conservation and emission reduction.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] An energy-saving optimization method for an industrial circulating water system, comprising:

[0009] The operation efficiency of the pump group is set according to the required value of the treated water volume, and the start-up quantity of the heat exchanger and cooling tower of the heat exchange device is set based on the operation efficiency of the pump group;

[0010] Monitoring the water inlet pressure and first water inlet temperature of multiple heat exchanger hot water inlets of the heat exchange device, and monitoring the water flow and first water outlet temperature of the cooling tower;

[0011] Data analysis is performed based on the monitoring data to obtain the balance coefficient and the water distribution coefficient, and a first effective interval is set based on the value range of the balance coefficient, and a second effective interval is set based on the value range of the water distribution coefficient. If any one of the first condition and the second condition is met, the water inlet pressure of each heat exchanger is adjusted based on the balance coefficient and the water distribution coefficient.

[0012] Through the above technical scheme: for an industrial water circulation system using a combination of a cooling tower and a heat exchanger, a process for optimizing the use of the cooling tower based on the water distribution state of the cooling tower and the water imbalance state between the heat exchangers is provided. Specifically, when the demand value of the processed water volume changes, the power of the pump group is adjusted. Correspondingly, in order to maintain the water usage state of each heat exchanger, reducing the number of heat exchangers used is the most convenient and effective method. However, adjusting the number of heat exchangers used will lead to water imbalance between the heat exchangers and subsequent uneven water distribution to the cooling tower, which will affect the use efficiency of the cooling tower. The present invention sets a pressure regulating valve in front of the heat exchanger, and indirectly affects the water distribution state of the cooling tower by adjusting the pressure input, thereby achieving a final equilibrium state, so that the cooling tower, heat exchanger and pump group can all operate within their own high-efficiency range, thereby reducing unnecessary losses.

[0013] As a further technical solution of the present invention: the process of obtaining the balance coefficient includes:

[0014] Based on the water inlet pressure and first water inlet temperature of multiple heat exchanger hot water inlets, formula 1:

[0015]

[0016] Obtain the balance coefficient Bal, where ε1 and ε2 are respectively the preset first weight coefficient and the second weight coefficient, n is the number of heat exchangers started, and i is a non-zero integer not greater than n. represents the water inlet pressure of the ith heat exchanger, is the preset standard value of the inlet water pressure of the ith heat exchanger, is the first inlet water temperature of the ith heat exchanger, is the preset standard value of the inlet water temperature of the i-th heat exchanger.

[0017] As a further technical solution of the present invention: the first condition is that the balance coefficient obtained by data analysis after the quantity changes is outside the first valid interval, and the second condition is that the water distribution coefficient obtained by data analysis after the quantity changes is outside the second valid interval.

[0018] As a further technical solution of the present invention: the process of obtaining the water distribution coefficient includes:

[0019] Based on the water flow rate of the cooling tower and the first outlet water temperature, formula 2 is used:

[0020]

[0021] Where a is the preset compensation parameter, b1 and b2 are the preset model parameters, ln is the natural logarithm, m is the number of cooling towers, j is a non-zero integer not greater than m, Q j is the water flow rate of the jth cooling tower, is the preset standard value of water flow of the jth cooling tower, is the first outlet water temperature of the jth cooling tower, It is the standard value of the outlet water temperature of the jth cooling tower.

[0022] As a further technical solution of the present invention: the process of adjusting the water inlet pressure of each heat exchanger based on the balance coefficient and the water distribution coefficient includes:

[0023] Constructing a first prediction model for predicting the water outlet state of a heat exchanger and a second prediction model for predicting the water outlet state of a cooling tower;

[0024] Setting constraint conditions, and calculating and obtaining a value range of a first adjustment value of the water pressure based on the constraint conditions and the balance coefficient;

[0025] Based on the prediction result of the second prediction model, the value range of formula 2 is calculated with the value range of the first adjustment value as the definition domain, and then the first adjustment value corresponding to the minimum value in the value range is set as the adjustment amount of the water inlet pressure of the heat exchanger.

[0026] Through the above technical solution: a process for adjusting the water inlet pressure of each heat exchanger is provided, and the adjustment is divided into two parts. The reason is that the heat exchanger after being divided as evenly as possible has only two quantity states, and there are also only two quantity states after the adjustment. The first adjustment value and the second adjustment value adjust the two parts of the heat exchanger respectively. Compared with the sequential adjustment, the adjustment method is more in line with the operating state, making the adjustment process more sensitive and effective.

[0027] As a further technical solution of the present invention: the process of calculating the formula to obtain the value range of the first adjustment value of the water pressure includes:

[0028] By constraints:

[0029]

[0030] Calculate and obtain the value range of ΔP1;

[0031] Wherein, Bal1 and Bal2 are the left endpoint value and the right endpoint value of the first effective interval of the balance coefficient, respectively, ΔP1 is the first adjustment value, ΔP2 is the second adjustment value, n1 is the absolute value of the difference between the remainder of the number of heat exchangers started after the change in the number of heat exchangers divided by the number of cooling towers started and the remainder of the number of heat exchangers divided by the number of cooling towers started before the change in the number of heat exchangers, n1+n2=n, Q x is the demand value of the treated water volume, f(n1, Q x ) is based on n1 and Q x is the transformation function of the independent variable, is the preset compensation value.

[0032] As a further technical solution of the present invention: the process of setting the start-up number of the heat exchanger and the cooling tower of the heat exchange device based on the operating efficiency of the pump group includes:

[0033] Divide the number of started heat exchangers by the number of cooling towers to obtain an integer x and a remainder y;

[0034] If the remainder is zero, all heat exchangers are divided equally based on the number of cooling towers;

[0035] If the remainder is not zero, the remainder is evenly distributed to the first y cooling towers after the integer part is equally divided.

[0036] Through the above technical solution: a process for solving the first adjustment value and the second adjustment value is provided, and the solution is carried out through two constraints. The first constraint is set based on the value range of the balance coefficient, and the second constraint is set based on the demand value of the treated water volume. After the demand value of the treated water volume decreases, the operating efficiency of the pump group needs to be appropriately reduced within the operating range. If the terminal control flow method is adopted, although it is effective, it will limit the water use status of the cooling tower, resulting in inefficient operation of the cooling tower in some cases. The second constraint is a restriction constraint based on the balanced water use of the heat exchanger. When the water use of the heat exchanger is balanced, if the number of heat exchangers corresponding to each cooling tower is close, then the water distribution status of each cooling tower is close and they are all in the efficient operating range, and the processing capacity of the entire system is limited in advance to avoid excessive processing capacity causing the pump group efficiency to fail to keep up or insufficient processing capacity causing excessive accumulation of industrial water to be treated.

[0037] As a further technical solution of the present invention: the first prediction model and the second prediction model are both trained neural network models, the input of the first prediction model is the first inlet water temperature and the inlet water pressure, and the output is the outlet water temperature of the heat exchanger, the input of the second prediction model is the first outlet water temperature and the inlet water pressure, and the output is the outlet water temperature and water flow rate of the cooling tower.

[0038] As a further technical solution of the present invention: recording the adjustment result;

[0039] If the adjustment result cannot be calculated, notify the management personnel to inspect the cooling tower and heat exchanger;

[0040] If the time intervals for multiple consecutive adjustments are all within the preset safety interval, the management personnel will also be notified to inspect the cooling tower and heat exchanger.

[0041] Beneficial effects of the present invention:

[0042] (1) The present invention sets a pressure regulating valve in front of the heat exchanger, and indirectly affects the water distribution state of the cooling tower by adjusting the pressure input, so as to achieve a final equilibrium state, so that the cooling tower, heat exchanger and pump group can all operate in their own high-efficiency range, thereby reducing unnecessary losses.

[0043] (2) The present invention adjusts the water inlet pressure of each heat exchanger in a process in which the adjustment is divided into two parts. The reason is that the heat exchanger after being divided as evenly as possible has only two quantity states, and after the adjustment, there are also only two quantity states. The first adjustment value and the second adjustment value are used to adjust the two parts of the heat exchanger respectively. Compared with sequential adjustment, the adjustment method is more in line with the operating state, making the adjustment process more sensitive and effective.

[0044] (3) The present invention is based on the restriction of balanced water use in heat exchangers. Under the condition of balanced water use in heat exchangers, if the number of heat exchangers corresponding to each cooling tower is close, the water distribution state of each cooling tower will be close and all will be in the high-efficiency operation range. In addition, the processing capacity of the entire system is limited in advance to avoid excessive processing capacity leading to the inability of the pump group to keep up or insufficient processing capacity leading to excessive accumulation of industrial water to be treated. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] The present invention will be further described below in conjunction with the accompanying drawings.

[0046] Figure 1 It is a schematic diagram of the basic steps of the present invention;

[0047] Figure 2 It is a schematic diagram of the supplementary steps of the present invention. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] See also Figure 1As shown, in one embodiment, a method for energy-saving optimization of an industrial circulating water system is provided, comprising the following steps:

[0050] S1. Setting the operating efficiency of the pump group according to the required value of the treated water volume, and setting the start-up quantity of the heat exchanger and cooling tower of the heat exchange device based on the operating efficiency of the pump group;

[0051] S2, monitoring the water inlet pressure and the first water inlet temperature of the hot water inlets of the multiple heat exchangers of the heat exchange device, and monitoring the water flow and the first water outlet temperature of the cooling tower. The water pressure monitoring is based on the acquisition of the regulating valve controlled by the water pressure. It should be noted that the water inlet pipe conditions of each heat exchanger of the present invention are the same;

[0052] S3. Perform data analysis based on the monitoring data to obtain the balance coefficient and the water distribution coefficient, and set a first effective interval based on the value range of the balance coefficient and a second effective interval based on the value range of the water distribution coefficient. The first effective interval corresponds to the balance coefficient and is set based on the value range of the balance coefficient. For example, by setting normal operating conditions, a set of all balance coefficients under the conditions is obtained, and then the first effective interval is set according to certain conditions based on the obtained set. The condition may be a number covering 90% of the set, etc., and there is no specific limitation. The second effective interval corresponds to the water distribution coefficient and is set based on the value range of the water distribution coefficient.

[0053] S4. If the number of heat exchanger startups changes and any one of the first and second conditions is met, the water inlet pressure of each heat exchanger is adjusted based on the balance coefficient and the water distribution coefficient. The water inlet pressure of each heat exchanger is adjusted by a pressure valve, and the pressure valve is only set in front of the water inlet of the heat exchanger.

[0054] S5. Record the adjustment results;

[0055] S5.1. If the adjustment result cannot be calculated, notify the management personnel to inspect the cooling tower and heat exchanger;

[0056] S5.2. If the time intervals for multiple consecutive adjustments are all within the preset safety interval, the management personnel will also be notified to check the cooling tower and heat exchanger. Through the above technical solution, a certain degree of safety monitoring and safety prediction can be carried out on the entire water circulation system based on the adjustment results. The adjustment results are obtained by extracting the predictions, that is, when the adjustment results cannot be obtained, the failures of the circulation system can be predicted, adding a layer of protection for the safe and stable operation of the system.

[0057] In this embodiment, for an industrial water circulation system using a combination of a cooling tower and a heat exchanger, a process for optimizing the use of the cooling tower based on the water distribution state of the cooling tower and the water imbalance state between heat exchangers is provided. Specifically, when the demand value of the processed water volume changes, the power of the pump group is adjusted. Correspondingly, in order to maintain the water usage state of each heat exchanger, reducing the number of heat exchangers used is the most convenient and effective method. However, adjusting the number of heat exchangers used will lead to water imbalance between the heat exchangers and subsequent uneven water distribution to the cooling tower, which will affect the use efficiency of the cooling tower. The present invention sets a pressure regulating valve in front of the heat exchanger to indirectly affect the water distribution state of the cooling tower by adjusting the pressure input, thereby achieving a final equilibrium state, so that the cooling tower, heat exchanger and pump group can all operate within their own high-efficiency range, thereby reducing unnecessary losses.

[0058] The process of obtaining the balance coefficient includes:

[0059] Based on the water inlet pressure and first water inlet temperature of multiple heat exchanger hot water inlets, formula 1:

[0060]

[0061] Obtain the balance coefficient Bal, where ε1 and ε2 are respectively the preset first weight coefficient and the second weight coefficient, are constants, n is the number of heat exchangers started, and i is a non-zero integer not greater than n. represents the water inlet pressure of the ith heat exchanger, is the preset standard value of the inlet water pressure of the ith heat exchanger, is the first inlet water temperature of the ith heat exchanger, is the preset standard value of the inlet water temperature of the i-th heat exchanger.

[0062] The first condition is that the balance coefficient obtained by data analysis after the quantity changes is outside the first valid interval, and the second condition is that the water distribution coefficient obtained by data analysis after the quantity changes is outside the second valid interval.

[0063] The process of obtaining the water distribution coefficient includes:

[0064] Based on the water flow rate of the cooling tower and the first outlet water temperature, formula 2 is used:

[0065]

[0066] Among them, a is the preset compensation parameter, b1 and b2 are preset model parameters, which are constants. It should be noted that a, b1 and b2 are set according to the operating status of the cooling tower. In the case of unstable operation and long operation time, the final water distribution coefficient will be too large. ln is the natural logarithm, m is the number of cooling towers, j is a non-zero integer not greater than m, and Q jis the water flow rate of the jth cooling tower, is the preset standard value of water flow of the jth cooling tower, is the first outlet water temperature of the jth cooling tower, It is the standard value of the outlet water temperature of the jth cooling tower.

[0067] It should be noted that, since the water flow rate of the cooling tower and the first outlet water temperature of the cooling tower have obvious marginal effects on the operating state of the cooling tower, a logarithmic expression is used to construct the final functional formula more efficiently.

[0068] The process of adjusting the water inlet pressure of each heat exchanger based on the balance coefficient and the water distribution coefficient includes:

[0069] S4.1. Constructing a first prediction model for predicting the outlet water state of a heat exchanger and a second prediction model for predicting the outlet water state of a cooling tower;

[0070] S4.2. Set constraint conditions, and calculate and obtain a value range of the first adjustment value of the water pressure based on the constraint conditions and the balance coefficient;

[0071] S4.3. Based on the prediction result of the second prediction model, the value range of formula 2 is calculated with the value range of the first adjustment value as the definition domain, and then the first adjustment value corresponding to the minimum value in the value range is set as the adjustment amount of the water inlet pressure of the heat exchanger.

[0072] Through the above technical solution: in this embodiment, a process for adjusting the water inlet pressure of each heat exchanger is provided, and the adjustment is divided into two parts. The reason is that the heat exchanger after being divided as evenly as possible has only two quantity states, and there are also only two quantity states after the adjustment. The first adjustment value and the second adjustment value adjust the two parts of the heat exchanger respectively. Compared with the sequential adjustment, the adjustment method is more in line with the operating state, making the adjustment process more sensitive and effective.

[0073] The process of calculating the formula to obtain the value range of the first adjustment value of the water pressure includes:

[0074] By constraints:

[0075]

[0076] Calculate and obtain the value range of ΔP1;

[0077] Wherein, Bal1 and Bal2 are the left endpoint value and the right endpoint value of the first effective interval of the balance coefficient, respectively, ΔP1 is the first adjustment value, ΔP2 is the second adjustment value, n1 is the absolute value of the difference between the remainder of the number of heat exchangers started after the change in the number of heat exchangers divided by the number of cooling towers started and the remainder of the number of heat exchangers divided by the number of cooling towers started before the change in the number of heat exchangers, n1+n2=n, Qx is the demand value of the treated water volume, f(n1, Q x ) is based on n1 and Q x is the transformation function of the independent variable, obtained by iterative neural network model, is the preset compensation value. After obtaining the adjustment amount, the adjustment amount is substituted into the constraint condition as the first adjustment value to inversely solve the second adjustment value. represents the water inlet pressure of the ith heat exchanger, is the preset standard value of the inlet water pressure of the ith heat exchanger, is the first inlet water temperature of the ith heat exchanger, is the preset standard value of the inlet water temperature of the i-th heat exchanger.

[0078] The process of setting the start-up quantity of the heat exchanger and the cooling tower of the heat exchange device based on the operating efficiency of the pump group includes:

[0079] S1.1. Divide the number of started heat exchangers by the number of cooling towers to obtain an integer x and a remainder y;

[0080] S1.2. If the remainder is zero, all heat exchangers are equally divided based on the number of cooling towers. Equal division means that the heat exchanger is connected to the corresponding cooling tower;

[0081] S1.3. If the remainder is not zero, the remainder is evenly distributed to the first y cooling towers after dividing the integer part equally.

[0082] In this embodiment, a process for solving the first adjustment value and the second adjustment value is provided, and the solution is performed through two constraints. The first constraint is set based on the value range of the balance coefficient, and the second constraint is set based on the demand value of the treated water volume. After the demand value of the treated water volume decreases, the operating efficiency of the pump group needs to be appropriately reduced within the operating range. If the terminal control flow method is adopted, although it is effective, it will limit the water use status of the cooling tower, resulting in inefficient operation of the cooling tower in some cases. The second constraint is a restriction constraint based on the balanced water use of the heat exchanger. When the water use of the heat exchanger is balanced, if the number of heat exchangers corresponding to each cooling tower is close, then the water distribution status of each cooling tower is close and they are all in the efficient operating range, and the processing capacity of the entire system is limited in advance to avoid excessive processing capacity causing the pump group efficiency to fail to keep up or insufficient processing capacity causing excessive accumulation of industrial water to be treated.

[0083] The first prediction model and the second prediction model are both trained neural network models. The input of the first prediction model is the first inlet water temperature and the inlet water pressure, and the output is the outlet water temperature of the heat exchanger. The input of the second prediction model is the first outlet water temperature and the inlet water pressure, and the output is the outlet water temperature and water flow rate of the cooling tower.

[0084] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. An energy-saving optimization method for an industrial circulating water system, characterized in that: The steps include: The operation efficiency of the pump group is set according to the required value of the treated water volume, and the start-up quantity of the heat exchanger and cooling tower of the heat exchange device is set based on the operation efficiency of the pump group; Monitoring the water inlet pressure and first water inlet temperature of multiple heat exchanger hot water inlets of the heat exchange device, and monitoring the water flow and first water outlet temperature of the cooling tower; Perform data analysis based on the monitoring data to obtain the balance coefficient and the water distribution coefficient, and set a first effective interval based on the value range of the balance coefficient and a second effective interval based on the value range of the water distribution coefficient; If the number of heat exchangers started changes and any one of the first condition and the second condition is met, the water inlet pressure of each heat exchanger is adjusted based on the balance coefficient and the water distribution coefficient.

2. The energy-saving optimization method for an industrial circulating water system according to claim 1, characterized in that: The process of obtaining the balance coefficient includes: Based on the water inlet pressure and first water inlet temperature of multiple heat exchanger hot water inlets, formula 1: Obtain the balance coefficient Bal, where ε1 and ε2 are respectively the preset first weight coefficient and the second weight coefficient, n is the number of heat exchangers started, and i is a non-zero integer not greater than n. represents the water inlet pressure of the ith heat exchanger, is the preset standard value of the inlet water pressure of the ith heat exchanger, is the first inlet water temperature of the ith heat exchanger, is the preset standard value of the inlet water temperature of the i-th heat exchanger.

3. The energy-saving optimization method for an industrial circulating water system according to claim 1, characterized in that: The first condition is that the balance coefficient obtained by data analysis after the quantity changes is outside the first valid interval, and the second condition is that the water distribution coefficient obtained by data analysis after the quantity changes is outside the second valid interval.

4. The energy-saving optimization method for an industrial circulating water system according to claim 2, characterized in that: The process of obtaining the water distribution coefficient includes: Based on the water flow rate of the cooling tower and the first outlet water temperature, formula 2 is used: Where a is the preset compensation parameter, b1 and b2 are the preset model parameters, ln is the natural logarithm, m is the number of cooling towers, j is a non-zero integer not greater than m, Q j is the water flow rate of the jth cooling tower, is the preset standard value of water flow of the jth cooling tower, is the first outlet water temperature of the jth cooling tower, It is the standard value of the outlet water temperature of the jth cooling tower.

5. The energy-saving optimization method for an industrial circulating water system according to claim 4, characterized in that: The process of adjusting the water inlet pressure of each heat exchanger based on the balance coefficient and water distribution coefficient includes: Constructing a first prediction model for predicting the water outlet state of a heat exchanger and a second prediction model for predicting the water outlet state of a cooling tower; Setting constraint conditions, and calculating and obtaining a value range of a first adjustment value of the water pressure based on the constraint conditions and the balance coefficient; Based on the prediction result of the second prediction model, the value range of formula 2 is calculated with the value range of the first adjustment value as the definition domain, and then the first adjustment value corresponding to the minimum value in the value range is set as the adjustment amount of the water inlet pressure of the heat exchanger.

6. The energy-saving optimization method for an industrial circulating water system according to claim 5, characterized in that: The process of calculating the formula to obtain the value range of the first adjustment value of the water pressure includes: By constraints: Calculate and obtain the value range of ΔP1; Wherein, Bal1 and Bal2 are the left endpoint value and the right endpoint value of the first effective interval of the balance coefficient, respectively, ΔP1 is the first adjustment value, ΔP2 is the second adjustment value, n1 is the absolute value of the difference between the remainder of the number of heat exchangers started after the change in the number of heat exchangers divided by the number of cooling towers started and the remainder of the number of heat exchangers divided by the number of cooling towers started before the change in the number of heat exchangers, n1+n2=n, Q x is the demand value of the treated water volume, f(n1, Q x ) is based on n1 and Q x is the transformation function of the independent variable, is the preset compensation value.

7. The energy-saving optimization method for an industrial circulating water system according to claim 1, characterized in that: The process of setting the start-up quantity of the heat exchanger and cooling tower of the heat exchange device based on the operating efficiency of the pump group includes: Divide the number of started heat exchangers by the number of cooling towers to obtain an integer x and a remainder y; If the remainder is zero, all heat exchangers are divided equally based on the number of cooling towers; If the remainder is not zero, the remainder is evenly distributed to the first y cooling towers after the integer part is equally divided.

8. The energy-saving optimization method for an industrial circulating water system according to claim 5, characterized in that: The first prediction model and the second prediction model are both trained neural network models. The input of the first prediction model is the first inlet water temperature and the inlet water pressure, and the output is the outlet water temperature of the heat exchanger. The input of the second prediction model is the first outlet water temperature and the inlet water pressure, and the output is the outlet water temperature and water flow rate of the cooling tower.

9. The energy-saving optimization method for an industrial circulating water system according to claim 8, characterized in that: Record the adjustment results; If the adjustment result cannot be calculated, notify the management personnel to inspect the cooling tower and heat exchanger; If the time intervals for multiple consecutive adjustments are all within the preset safety interval, the management personnel will be notified to inspect the cooling tower and heat exchanger.