Experimental device and method for exploiting geothermal heat in high-temperature waste gas reservoir through carbon dioxide

By designing a geothermal experimental device for carbon dioxide mining high-temperature waste gas reservoirs containing a multi-measuring point temperature pressure acquisition system and variable inclination gas reservoir simulation tube, the problem of carbon dioxide dynamic behavior in traditional devices is solved, and high efficiency and environmental protection are achieved The geothermal experiment of high-temperature waste gas reservoir for carbon dioxide mining provides scientific support and environmental protection effects.

CN119023732APending Publication Date: 2024-11-26SHANDONG ZHONGSHI YITONG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411151927.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Traditional geothermal mining experimental devices are difficult to accurately reflect the dynamic behavior of carbon dioxide in the circulating state in high-temperature waste gas reservoirs, and the one-way displacement mode leads to greenhouse gas emissions and measurement errors.

Method used

An experimental device including a liquid reservoir, a high-pressure double-column plunger pump, a controller, a pulse damper, a flowmeter, a DC preheater, a variable inclination gas reservoir simulation tube and a multi-measuring point temperature and pressure acquisition system was designed. Analyze the thermal carrying capacity of carbon dioxide in the circulating state of high-temperature waste gas reservoirs, capture dynamic parameter changes in real time through the multi-measuring point temperature and pressure acquisition system, and simulate the influence of inclination angles of different formations using variable inclination angles.

Benefits of technology

It realizes accurate and rapid measurement of the geothermal dynamic behavior of high-temperature waste gas reservoir for carbon dioxide mining, provides scientific support, high measurement accuracy, reliable device, and no carbon dioxide or waste liquid discharge during the experimental process, which is beneficial to environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119023732A_ABST
    Figure CN119023732A_ABST
Patent Text Reader

Abstract

The invention relates to a geothermal experiment device and method for a high-temperature waste gas reservoir in carbon dioxide exploitation. The geothermal experiment device comprises a liquid storage tank, a high-pressure double-column-head plunger pump, a controller, a pulse damper, a flow meter, a direct-current preheater, a first mixing filter, a variable-dip-angle gas reservoir simulation pipe, a multi-measuring-point temperature and pressure collection system and a precooler. The measuring method comprises the following steps: injecting a carbon dioxide working medium into the variable dip angle gas reservoir sand-filled pipe through the high-pressure double-column-head plunger pump, controlling the flow through the controller, adjusting the back-pressure valve and the heating device, reproducing the conditions of the high-temperature waste gas reservoir, and measuring the temperature and pressure of the high-temperature waste gas reservoir by using the multi-measuring-point temperature and pressure acquisition system and the temperature and pressure controller. The dynamic change of parameters in the geothermal exploitation process is monitored, collected and stored; the method can realize closed-loop circulation of the geothermal process of the carbon dioxide exploitation high-temperature waste gas reservoir, is simple in operation method and high in measurement precision, does not discharge carbon dioxide and waste liquid, and is beneficial to environmental protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of carbon dioxide enhanced geothermal exploitation, and specifically, relates to a carbon dioxide exploitation high-temperature abandoned gas reservoir geothermal experimental device and method, which are used to study the geothermal exploitation capacity of carbon dioxide in high-temperature abandoned gas reservoirs with different properties. Background Art

[0002] The use of carbon dioxide to exploit geothermal energy is not only economically beneficial, but also can reduce the emission of carbon dioxide into the atmosphere. It has both economic and environmental benefits and has received increasing attention. Under most gas reservoir conditions, carbon dioxide is in a supercritical state. The density of supercritical carbon dioxide is close to that of liquid and the viscosity is close to that of gas. The use of carbon dioxide to enhance geothermal exploitation is considered to be a technology with commercial potential. High-temperature abandoned gas reservoirs refer to natural gas reservoirs with underground temperatures exceeding 100°C. They have high formation temperatures and complete data, and are ideal potential resources for geothermal development. The natural gas recovery rate of gas reservoirs is high, generally reaching 70-90%, but the effective production cycle is short, and the well network and ground pipeline facilities of the abandoned gas field have good integrity and availability. Making full use of the original well network and ground pipeline facilities, giving full play to the unique technical advantages of oil and gas development, and exploiting geothermal resources in high-temperature abandoned gas reservoirs will help extend the life of gas reservoirs and reduce capital investment and development costs. Supercritical carbon dioxide has a high permeability and good thermal properties, that is, its heat capacity changes greatly with temperature and pressure, which is conducive to heat exchange. Compared with water, although the mass heat capacity of carbon dioxide under high pressure conditions is about 50-70% of that of water, its mass flow rate can be 2-5 times that of water, and its comprehensive heat carrying capacity may be equivalent to or higher than that of water. Therefore, the use of carbon dioxide to exploit geothermal resources in high-temperature abandoned gas reservoirs can significantly reduce the initial investment in well network construction, and has the dual functions of geothermal development and carbon sequestration.

[0003] However, the seepage characteristics, heat carrying capacity, phase change and dynamic exploitation behavior of carbon dioxide in high-temperature abandoned gas reservoirs are relatively complex. The geological conditions of abandoned gas reservoirs are changeable, the formations are heterogeneous, the supercritical carbon dioxide mobility is relatively high, and the displacement front is unstable. Through effective and reliable experimental devices and methods, the dynamic behavior of carbon dioxide exploitation of geothermal energy in high-temperature abandoned gas reservoirs and the analysis of influencing factors can provide key scientific basis for the practical application of carbon dioxide exploitation of geothermal energy in high-temperature abandoned gas reservoirs.

[0004] Traditional geothermal mining experimental devices use a one-way displacement mode, which is not easy to reflect the dynamics of geothermal mining under a cyclic state. On the other hand, during the one-way displacement process, the carbon dioxide at the back end of the experiment needs to be emptied, resulting in greenhouse gas emissions. The existence of the coke soup effect will also cause violent fluctuations in the flow process, making it difficult to collect experimental data and causing measurement errors. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to propose a carbon dioxide geothermal experimental device and method for exploiting high-temperature waste gas reservoirs, which are used to accurately and quickly measure the heat extraction dynamics of carbon dioxide in simulated high-temperature waste gas reservoirs, and to analyze the heat carrying capacity of carbon dioxide in simulated high-temperature waste gas reservoirs under a directly circulated state, so as to provide scientific support for strengthening the exploitation of geothermal energy from high-temperature waste gas reservoirs with carbon dioxide.

[0006] The technical solution of the present invention is:

[0007] A geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide, comprising:

[0008] Liquid storage tank, high-pressure double-column plunger pump, controller, pulse damper, flow meter, direct current preheater, first mixing filter, variable inclination gas reservoir simulation tube, multi-measurement point temperature and pressure acquisition system, precooler;

[0009] The liquid storage tank, high-pressure double-column plunger pump, controller, pulse damper, flow meter, direct current preheater, first mixing filter, variable-angle gas reservoir simulation tube, multi-measurement point temperature and pressure acquisition system, and precooler are connected in a front-to-back loop in sequence;

[0010] The liquid storage tank is used to store liquid carbon dioxide working fluid;

[0011] The high-pressure double-column plunger pump extracts liquid carbon dioxide from the liquid storage tank and pushes it into the multi-measurement point temperature and pressure acquisition system under pressure;

[0012] The controller is used to control the reciprocating frequency of the high-pressure double-column plunger pump, thereby realizing the control of the pumping flow rate;

[0013] After the pulse damper offsets most of the flow and pressure pulsations, the liquid carbon dioxide working fluid enters the flow meter for mass flow measurement;

[0014] The direct current preheater preheats the incoming working fluid. The first mixing filter mixes the fluid temperature in the tube evenly and then enters the variable inclination gas reservoir simulation tube. The temperature and pressure controller controls and stores the dynamic changes of temperature and pressure during the cycle. The multi-point temperature and pressure acquisition system captures the geothermal dynamic data of high-temperature abandoned gas reservoirs for carbon dioxide exploitation. The geothermal dynamic data of high-temperature abandoned gas reservoirs include temperature changes, pressure changes, temperature migration fronts, and pressure migration fronts. The second mixing filter mixes the heat-carrying fluid evenly to reduce temperature and pressure pulse fluctuations. Then the working fluid flows through the precooler and the back pressure valve in turn, and finally returns to the liquid storage tank to complete the cycle.

[0015] Further preferably, the multi-measurement point temperature and pressure acquisition system includes a plurality of temperature sensors and a plurality of pressure sensors, which are arranged in the axial direction of the variable inclination gas reservoir simulation pipe to obtain temperature change and pressure change data.

[0016] Further preferably, the variable inclination gas reservoir simulation pipe has an inner diameter of 3.5 cm and a length of 1 m.

[0017] Further preferably, the pumping control accuracy is enhanced by a controller, the pumping flow range is 0-200 ml / min, the accuracy is 0.01 ml / min, and the pumping pressure is 20 MPa.

[0018] Further preferably, the experimental device also includes a vacuum pump, and the vacuum pump is connected to the liquid storage tank.

[0019] Further preferably, the experimental device also includes a safety valve, and an insulating joint is installed at the rear end of the DC preheater.

[0020] Preferably according to the present invention, the liquid storage tank is completely immersed in ethylene glycol antifreeze liquid at 0.5-1.5° C. and has its own refrigeration cycle.

[0021] Further preferably, the liquid storage tank is completely immersed in ethylene glycol antifreeze at 1°C.

[0022] Preferably, according to the present invention, the high-pressure double-column-head plunger pump has a built-in semiconductor refrigeration sheet to cool the pump head.

[0023] Preferably according to the present invention, the experimental device further comprises a circulating refrigerator, and the circulating refrigerator is connected to the precooler.

[0024] Preferably, according to the present invention, the experimental device further comprises a plurality of needle valves, specifically comprising a first needle valve, a second needle valve, a third needle valve, a fourth needle valve, a fifth needle valve, a sixth needle valve, a seventh needle valve, an eighth needle valve, and a ninth needle valve;

[0025] The first needle valve is arranged between the vacuum pump and the liquid storage tank; the liquid storage tank, the second needle valve, the third needle valve and the high-pressure double-column plunger pump are connected in sequence; the fourth needle valve is arranged between the liquid storage tank and the high-pressure double-column plunger pump; the fifth needle valve, the Coriolis flowmeter, the sixth needle valve and the direct current preheater are connected in sequence; the seventh needle valve is arranged between the first mixing filter and the variable inclination gas reservoir simulation tube; the eighth needle valve is arranged between the heating device and the second mixing filter.

[0026] A geothermal experimental method for exploiting high-temperature waste gas reservoirs using carbon dioxide is implemented by the above experimental device, comprising:

[0027] (1) Adjust the quartz sand particle size of the variable-angle gas reservoir simulation tube and perform corresponding compaction according to the permeability requirements;

[0028] (2) High-pressure carbon dioxide is introduced into the experimental device and the pressure is maintained in a constant temperature chamber;

[0029] (3) Pumping out the gas in the experimental device;

[0030] (4) Turn on the circulating refrigeration machine and control the temperature of the liquid storage tank at 1-2°C;

[0031] (5) Filling the storage tank with liquid carbon dioxide;

[0032] (6) Turn on the high-pressure double-column plunger pump, adjust the controller, and adjust the mass flow rate from a low flow rate to the required range; after the high-pressure double-column plunger pump runs stably, slowly adjust the back pressure valve to the target pressure, fill with carbon dioxide, and maintain the pressure of the high-pressure double-column plunger pump above 5MPa;

[0033] (7) Turn off the high-pressure double-column plunger pump, adjust the direct current preheater, heating device, and back pressure valve to achieve the required abandoned gas reservoir temperature and pressure conditions, turn on the high-pressure double-column plunger pump, adjust the controller to obtain the required carbon dioxide injection flow rate, and at the same time observe the discharge pressure of the high-pressure double-column plunger pump. When the pressure is the same as the pressure in the variable-angle gas reservoir sand filling pipe, turn on the multi-point temperature and pressure acquisition system and the temperature and pressure controller to monitor, capture and store the geothermal dynamic data of carbon dioxide exploitation of high-temperature abandoned gas reservoirs in real time; adjust the temperature of the circulating refrigeration machine so that the precooler can fully play the role of reducing the temperature of heat-carrying carbon dioxide;

[0034] (8) After the experiment, turn off the DC preheater and heating device, release the pressure of the back pressure valve, reduce the flow rate of the high-pressure double-column plunger pump, turn off the high-pressure double-column plunger pump, and turn off the circulating refrigeration machine.

[0035] The beneficial effects of the present invention are:

[0036] 1. The present invention can capture the dynamic parameter changes in the geothermal process of carbon dioxide exploitation of high-temperature abandoned gas reservoirs in real time through a multi-measurement point temperature and pressure acquisition system, and use a variable-angle gas reservoir simulation tube with an angle adjustment function to simulate the influence of different formation inclinations.

[0037] 2. The operation method of the present invention is simple, easy to implement and has good feasibility.

[0038] 3. The measuring device of the present invention has good reliability, adopts a multi-measurement point temperature and pressure acquisition system, and is equipped with a temperature and pressure controller, so the measuring accuracy is high.

[0039] 4. The present invention is designed as a closed-loop cycle, and no carbon dioxide and waste liquid are discharged during the experiment, which is beneficial to environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a schematic diagram of the structure of the geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide according to the present invention;

[0041] Figure 2 This is a schematic diagram of temperature change data obtained by the present invention;

[0042] 1. Circulating refrigeration machine; 2. Vacuum pump; 3. First needle valve; 4. Liquid storage tank; 5. Second needle valve; 6. Third needle valve; 7. Pulse damper; 8. Fourth needle valve; 9. Safety valve; 10. High-pressure double-column plunger pump; 11. Controller; 12. Fifth needle valve; 13. Back pressure valve; 14. Precooler; 15. Coriolis flowmeter; 16. Sixth needle valve; 17. DC preheater; 18. Insulating joint; 19. First mixing filter; 20. Heating device; 21. Variable inclination gas reservoir simulation tube; 22. Multi-point temperature and pressure acquisition system; 23. Seventh needle valve; 24. Eighth needle valve; 25. Second mixing filter; 26. Temperature and pressure controller; 27. Ninth needle valve. DETAILED DESCRIPTION

[0043] The present invention will be further defined below in conjunction with the accompanying drawings and embodiments, but is not limited thereto.

[0044] Example 1

[0045] A geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide, connected by pipes and valves made of 316L material, including:

[0046] Liquid storage tank 4, high-pressure double-column plunger pump 10, controller 11, pulse damper 7, Coriolis flowmeter 15, direct current preheater 17, first mixing filter 19, variable inclination gas reservoir simulation tube 21, multi-measurement point temperature and pressure acquisition system 22, precooler 14;

[0047] The liquid storage tank 4, the high-pressure double-column plunger pump 10, the controller 11, the pulse damper 7, the Coriolis flowmeter 15, the direct current preheater 17, the first mixing filter 19, the variable-angle gas reservoir simulation tube 21, the multi-measurement point temperature and pressure acquisition system 22, and the precooler 14 are connected in a front-to-back loop in sequence;

[0048] The liquid storage tank 4 is used to store liquid carbon dioxide working medium;

[0049] The high-pressure double-column plunger pump 10 extracts liquid carbon dioxide from the liquid storage tank 4 and pushes it under pressure to the multi-measurement point temperature and pressure acquisition system 22;

[0050] The controller 11 is used to control the reciprocating frequency of the high-pressure double-column-head plunger pump 10, thereby realizing the control of the pumping flow rate;

[0051] After the pulse damper 7 offsets most of the flow and pressure pulsations, the liquid carbon dioxide working medium enters the Coriolis flowmeter 15 for mass flow measurement;

[0052] The direct current preheater 17 preheats the incoming working fluid, the first mixing filter 19 mixes the fluid temperature in the tube evenly and then enters the variable inclination gas reservoir simulation tube 21, the temperature and pressure controller 26 controls and stores the dynamic changes of temperature and pressure during the cycle, and the multi-point temperature and pressure acquisition system 22 captures the geothermal dynamic data of high-temperature abandoned gas reservoirs for carbon dioxide exploitation with high precision. The geothermal dynamic data of high-temperature abandoned gas reservoirs include temperature changes, pressure changes, temperature migration fronts, and pressure migration fronts; the second mixing filter 25 mixes the heat-carrying fluid evenly to reduce temperature and pressure pulse fluctuations, and then the working fluid flows through the precooler 14 and the back pressure valve 13 in turn, and finally returns to the liquid storage tank 4 to complete the cycle.

[0053] In the present invention, in order to ensure that the fluid temperature before the inlet of the experimental section is fully mixed, a first mixed filter 19 and a second mixed filter 25 having both filtering and mixing functions are obtained by modifying the finished filter.

[0054] Example 2

[0055] According to the geothermal experimental device for exploiting high-temperature waste gas reservoirs of carbon dioxide described in Example 1, in order to simulate the formation inclination, a variable inclination gas reservoir simulation tube 21 is selected, which can be rotated at different angles to simulate the formation inclination. Different permeabilities are obtained by filling quartz sand of different particle sizes and changing the degree of compaction. The inner diameter of the variable inclination gas reservoir simulation tube 21 is 3.5 cm and the length is 1 m.

[0056] In order to simulate the formation temperature, the formation temperature is replicated by setting the temperature of the heating device 20. In particular, the outside of the heating device 20 is wrapped with insulation material and equipped with a high-precision temperature sensor. The temperature control range is from room temperature to 200°C, and the temperature fluctuation is 0.1°C.

[0057] In order to simulate the formation pressure, a highly sensitive back pressure valve 13 is used to simulate gas reservoirs with different depth pressures through pressure setting. The pressure control range is 0-40MPa and the pressure control accuracy is 0.1MPa.

[0058] In order to achieve accurate and continuous pumping of high-pressure carbon dioxide working fluid, a high-pressure double-column plunger pump 10 is used. At the same time, the pumping control accuracy is enhanced through the controller 11. The pumping flow range is 0-200ml / min, the accuracy is 0.01ml / min, and the pumping pressure is 20MPa.

[0059] In order to eliminate the influence of gas impurities, the experimental device also includes a vacuum pump 2, and the vacuum pump 2 is connected to the liquid storage tank 4. The present invention is equipped with a large-displacement vacuum pump 2 for pumping out impurity gases in the system.

[0060] In order to obtain the evolution law of the heat front, the multi-point temperature and pressure acquisition system 22 includes 7 temperature sensors and 7 pressure sensors, which are arranged in the axial direction of the variable-angle gas reservoir simulation pipe 21 to obtain more detailed temperature and pressure evolution data. The variable-angle gas reservoir simulation pipe 21 is also equipped with a high-sensitivity acquisition module, in which the temperature sensor is a four-wire system and the pressure sensor has an accuracy of 0.1%, which can scan and collect temperature and pressure changes at high speed and accurately.

[0061] In order to ensure the safety and reliability of the experimental process, the experimental device also includes a safety valve 9. When the system pressure exceeds the safety upper limit pressure, the experimental system will automatically release the pressure. At the same time, an insulating joint 18 is installed at the rear end of the DC preheater 17 to prevent leakage.

[0062] The liquid storage tank 4 is completely immersed in ethylene glycol antifreeze at 1°C and has its own refrigeration cycle to ensure the tank temperature is stable.

[0063] The high-pressure double-column-head plunger pump 10 has a built-in semiconductor refrigeration sheet to cool the pump head.

[0064] The experimental device further comprises a circulating refrigerator 1 , which is connected to a precooler 14 .

[0065] The experimental device also includes a number of needle valves, specifically including a first needle valve 3, a second needle valve 5, a third needle valve 6, a fourth needle valve 8, a fifth needle valve 12, a sixth needle valve 16, a seventh needle valve 23, an eighth needle valve 24, and a ninth needle valve 27;

[0066] A first needle valve 3 is arranged between the vacuum pump 2 and the liquid storage tank 4; the liquid storage tank 4, the second needle valve 5, the third needle valve 6 and the high-pressure double-column plunger pump 10 are connected in sequence; a fourth needle valve 8 is arranged between the liquid storage tank 4 and the high-pressure double-column plunger pump 10; the fifth needle valve 12, the Coriolis flowmeter 15, the sixth needle valve 16 and the direct current preheater 17 are connected in sequence; a seventh needle valve 23 is arranged between the first mixing filter 19 and the variable inclination gas reservoir simulation pipe 21; and an eighth needle valve 24 is arranged between the heating device 20 and the second mixing filter 25.

[0067] Set the temperature of the heating device 20 to 198°C and the pressure of the back pressure valve 13 to 8.5MPa to make the carbon dioxide in a supercritical state and obtain the temperature change data as follows: Figure 2 shown.

[0068] Example 3

[0069] A geothermal experimental method for exploiting high-temperature waste gas reservoirs using carbon dioxide is implemented by the experimental device described in Example 1 or 2, comprising:

[0070] (1) Adjust the quartz sand particle size of the variable-angle gas reservoir simulation tube 21 and perform corresponding degree of compaction according to the permeability requirements; the specific operation is: close one end of the variable-angle gas reservoir simulation tube 21, and use a press to apply a pressure of 0.1MPa-40MPa to the other end of the variable-angle gas reservoir simulation tube 21 filled with quartz sand of a certain particle size according to the size of the simulated gas reservoir permeability, thereby obtaining simulated gas reservoir formations with different permeabilities. After the pressure application is completed, close the variable-angle gas reservoir simulation tube 21.

[0071] (2) High-pressure carbon dioxide is introduced into the experimental device and the pressure is maintained in a constant temperature chamber;

[0072] (3) Pumping out the gas in the experimental device;

[0073] (4) Start the circulating refrigerator 1 and control the temperature of the liquid storage tank 4 to be 1-2°C;

[0074] (5) Filling the liquid storage tank 4 with liquid carbon dioxide;

[0075] (6) Turn on the high-pressure double-column-head plunger pump 10, adjust the controller 11, and adjust the mass flow rate from a low flow rate to the required range; after the high-pressure double-column-head plunger pump 10 runs stably, slowly adjust the back pressure valve 13 to the target pressure, fill with carbon dioxide, and maintain the pressure of the high-pressure double-column-head plunger pump 10 above 5 MPa;

[0076] (7) Turn off the high-pressure double-column-head plunger pump 10, adjust the direct current preheater 17, the heating device 20, and the back pressure valve 13 to achieve the required abandoned gas reservoir temperature and pressure conditions, turn on the high-pressure double-column-head plunger pump 10, adjust the controller 11, obtain the required carbon dioxide injection flow rate, and at the same time observe the discharge pressure of the high-pressure double-column-head plunger pump 10. When the pressure is the same as the pressure in the variable-angle gas reservoir sand filling pipe, turn on the multi-point temperature and pressure acquisition system 22 and the temperature and pressure controller 26 to monitor, capture and store the geothermal dynamic data of carbon dioxide exploitation of high-temperature abandoned gas reservoirs in real time; including: temperature changes, pressure changes, temperature migration front, pressure migration front, etc.; implement the temperature adjustment of the circulating refrigeration machine 1 so that the precooler 14 can fully play the role of reducing the temperature of heat-carrying carbon dioxide;

[0077] (8) After the experiment, turn off the DC preheater 17 and the heating device 20, release the pressure of the back pressure valve 13, and after reducing the flow rate of the high-pressure double-column-head plunger pump 10, turn off the high-pressure double-column-head plunger pump 10 and turn off the circulating refrigerator 1.

Claims

1. A geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide, characterized in that: include: Liquid storage tank, high-pressure double-column plunger pump, controller, pulse damper, flow meter, direct current preheater, first mixing filter, variable inclination gas reservoir simulation tube, multi-measurement point temperature and pressure acquisition system, precooler; The liquid storage tank, high-pressure double-column plunger pump, controller, pulse damper, flow meter, direct current preheater, first mixing filter, variable-angle gas reservoir simulation tube, multi-measurement point temperature and pressure acquisition system, and precooler are connected in a front-to-back loop in sequence; The liquid storage tank is used to store liquid carbon dioxide working fluid; The high-pressure double-column plunger pump extracts liquid carbon dioxide from the liquid storage tank and pushes it into the multi-measurement point temperature and pressure acquisition system under pressure; The controller is used to control the reciprocating frequency of the high-pressure double-column plunger pump, thereby realizing the control of the pumping flow rate; After the pulse damper offsets most of the flow and pressure pulsations, the liquid carbon dioxide working fluid enters the flow meter for mass flow measurement; The direct current preheater preheats the incoming working fluid. The first mixing filter mixes the fluid temperature in the tube evenly and then enters the variable inclination gas reservoir simulation tube. The temperature and pressure controller controls and stores the dynamic changes of temperature and pressure during the cycle. The multi-point temperature and pressure acquisition system captures the geothermal dynamic data of high-temperature abandoned gas reservoirs for carbon dioxide exploitation. The geothermal dynamic data of high-temperature abandoned gas reservoirs include temperature changes, pressure changes, temperature migration fronts, and pressure migration fronts. The second mixing filter mixes the heat-carrying fluid evenly to reduce temperature and pressure pulse fluctuations. Then the working fluid flows through the precooler and the back pressure valve in turn, and finally returns to the liquid storage tank to complete the cycle.

2. A geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide according to claim 1, characterized in that: The multi-measurement point temperature and pressure acquisition system includes a plurality of temperature sensors and a plurality of pressure sensors, which are arranged in the axial direction of the variable-angle gas reservoir simulation pipe to obtain temperature change and pressure change data.

3. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 1, characterized in that: The variable-inclination gas reservoir simulation tube has an inner diameter of 3.5 cm and a length of 1 m; Further preferably, the pumping control accuracy is enhanced by a controller, the pumping flow range is 0-200 ml / min, the accuracy is 0.01 ml / min, and the pumping pressure is 20 MPa.

4. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 1, characterized in that: The experimental device also includes a vacuum pump, which is connected to the liquid storage tank.

5. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 1, characterized in that: The experimental device also includes a safety valve, and an insulating joint is installed at the rear end of the direct current preheater.

6. The geothermal experimental device for exploiting high-temperature waste gas reservoirs using carbon dioxide according to claim 1, characterized in that: The liquid storage tank is completely immersed in ethylene glycol antifreeze at 0.5-1.5℃ and has its own refrigeration cycle; Further preferably, the liquid storage tank is completely immersed in ethylene glycol antifreeze at 1°C.

7. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 1, characterized in that: The high-pressure double-column plunger pump has a built-in semiconductor refrigeration chip to cool the pump head.

8. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 1, characterized in that: The experimental device also includes a circulating refrigerator, which is connected to the precooler.

9. The geothermal experimental device for exploiting high-temperature waste gas reservoir using carbon dioxide according to claim 4, characterized in that: The experimental device also includes a plurality of needle valves, specifically including a first needle valve, a second needle valve, a third needle valve, a fourth needle valve, a fifth needle valve, a sixth needle valve, a seventh needle valve, an eighth needle valve, and a ninth needle valve; The first needle valve is arranged between the vacuum pump and the liquid storage tank; the liquid storage tank, the second needle valve, the third needle valve and the high-pressure double-column plunger pump are connected in sequence; the fourth needle valve is arranged between the liquid storage tank and the high-pressure double-column plunger pump; the fifth needle valve, the Coriolis flowmeter, the sixth needle valve and the direct current preheater are connected in sequence; the seventh needle valve is arranged between the first mixing filter and the variable inclination gas reservoir simulation tube; the eighth needle valve is arranged between the heating device and the second mixing filter.

10. A geothermal experimental method for exploiting high-temperature waste gas reservoirs using carbon dioxide, implemented by the experimental device of claim 8, characterized in that: include: (1) Adjust the quartz sand particle size of the variable-angle gas reservoir simulation tube and perform corresponding compaction according to the permeability requirements; (2) High-pressure carbon dioxide is introduced into the experimental device and the pressure is maintained in a constant temperature chamber; (3) Pumping out the gas in the experimental device; (4) Turn on the circulating refrigeration machine and control the temperature of the liquid storage tank at 1-2°C; (5) Filling the storage tank with liquid carbon dioxide; (6) Turn on the high-pressure double-column plunger pump, adjust the controller, and adjust the mass flow rate from a low flow rate to the required range; after the high-pressure double-column plunger pump runs stably, slowly adjust the back pressure valve to the target pressure, fill with carbon dioxide, and maintain the pressure of the high-pressure double-column plunger pump above 5MPa; (7) Turn off the high-pressure double-column plunger pump, adjust the direct current preheater, heating device, and back pressure valve to achieve the required abandoned gas reservoir temperature and pressure conditions, turn on the high-pressure double-column plunger pump, adjust the controller to obtain the required carbon dioxide injection flow rate, and at the same time observe the discharge pressure of the high-pressure double-column plunger pump. When the pressure is the same as the pressure in the variable-angle gas reservoir sand filling pipe, turn on the multi-point temperature and pressure acquisition system and the temperature and pressure controller to monitor, capture and store the geothermal dynamic data of carbon dioxide exploitation of high-temperature abandoned gas reservoirs in real time; adjust the temperature of the circulating refrigeration machine so that the precooler can fully play the role of reducing the temperature of heat-carrying carbon dioxide; (8) After the experiment, turn off the DC preheater and heating device, release the pressure of the back pressure valve, reduce the flow rate of the high-pressure double-column plunger pump, turn off the high-pressure double-column plunger pump, and turn off the circulating refrigeration machine.