Temperature control system and method for preheating sizing material

Through the preheating temperature control system of the rubber material, the temperature control analysis model and simulation optimization of the temperature control strategy is solved, and the problem of poor thermoplastic refining of extruder materials is improved, and the stability and reliability of the rubber material treatment are improved, ensuring that Product quality and process control.

CN119024898APending Publication Date: 2024-11-26SHANDONG LINGLONG TIRE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411120774.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing extruders have poor thermoplastic refining of rubber materials, resulting in quality problems in the extrusion of half parts, which affects product quality stability and subsequent operation control.

Method used

The temperature control system of preheating of rubber materials is used to obtain the quality information of rubber materials, determine the real-time rubber types and standard characteristic factors, calculate the temperature difference, generate a preliminary temperature control strategy based on the preset temperature control analysis model, conduct simulation and simulation Correct the strategy and set the optimal temperature control strategy to control the temperature control device to achieve the best preheating effect.

Benefits of technology

It improves the processing performance of the extruder on the rubber, ensures the plasticization stability and reliability of the subsequent extruder on the rubber, and improves product quality and process operation control efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119024898A_ABST
    Figure CN119024898A_ABST
Patent Text Reader

Abstract

The invention discloses a sizing material preheating temperature control system and method, and the system comprises an obtaining module which is used for determining a standard characteristic factor corresponding to a real-time sizing material type, and the standard characteristic factor comprises a standard temperature interval and a standard speed value; the calculation module is used for calculating a first temperature difference quantity between the first temperature and a standard temperature interval; the first temperature control module is used for inputting the first temperature difference quantity into a preset temperature control analysis model to obtain a first temperature control strategy; the second temperature control module is used for calculating a second temperature difference quantity and correcting the first temperature control strategy based on a preset correction model to obtain a second temperature control strategy; and the simulation module is used for carrying out analog simulation on the plurality of second temperature control strategies, generating application evaluation values of the second temperature control strategies, and setting the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy, so that the optimal preheating treatment effect is achieved, and the stability and reliability of a subsequent extruder on rubber plasticizing are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field, and in particular to a temperature control system and method for preheating a rubber material. Background Art

[0002] The action process of the extruder on the rubber material: the rubber material (original rubber sheet) is originally in a highly elastic state. The feeding mechanism transports the rubber material into the barrel. The screw shears, heats and plasticizes the rubber material, and keeps it at a certain temperature through the heating system of the extruder barrel. As the screw rotates, it is gradually transformed into a molten state.

[0003] The prior art directly uses an extruder to process the rubber material without a pre-treatment device. In production, the extruder may not heat and plasticize the original rubber sheet well, resulting in quality problems in the extrusion of semi-components, which affects the stability of product quality and the process operation control of subsequent processes. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides a temperature control system and method for preheating of rubber materials, by obtaining a first temperature control strategy based on a first temperature difference of the rubber material that has not been preheated and a corresponding preset temperature control analysis model, controlling the temperature control device according to the first temperature control strategy, obtaining a second temperature difference during the first preheating, obtaining multiple second temperature control strategies based on the second temperature difference and the preset correction model, simulating the multiple second temperature control strategies and calculating application evaluation values, and setting the optimal temperature control strategy based on the maximum application evaluation value to achieve the best preheating treatment effect, improve the subsequent extruder's processing performance on the rubber material, and ensure the stability and reliability of the subsequent extruder's plasticization of the rubber material.

[0005] In some embodiments of the present application, a temperature control system and method for preheating a rubber material are provided, comprising:

[0006] An acquisition module is used to acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value;

[0007] A calculation module, used for obtaining in real time a first temperature of the rubber material without preheating, and calculating a difference between the first temperature of the rubber material and a first temperature in a standard temperature range;

[0008] A first temperature control module, configured to select a corresponding preset temperature control analysis model according to the real-time rubber material type, input the first temperature difference into the preset temperature control analysis model, and obtain a first temperature control strategy;

[0009] The second temperature control module is used to control the operation of the temperature control device and the feeding conveyor belt according to the first temperature control strategy and the standard speed value, obtain the second temperature of the rubber material during the first preheating in real time, and calculate the second temperature difference. Based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies;

[0010] The simulation module is used to simulate multiple second temperature control strategies, generate application evaluation values ​​of the second temperature control strategies according to the simulation results, set the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy, and control the temperature control device according to the optimal temperature control strategy.

[0011] In some embodiments of the present application, the rubber type-standard characteristic factor mapping table includes:

[0012] Obtain historical quality information of rubber materials and historical preheating logs;

[0013] The rubber material is divided into multiple rubber material types according to the historical quality information of the rubber material, and the historical operation parameters of preheating of different rubber material types at different historical time nodes are obtained according to the historical preheating log of the rubber material;

[0014] Screen out standard characteristic factors according to the historical operating parameters of preheating of different types of rubber at different historical time nodes and the corresponding historical product quality evaluation values ​​after preheating, wherein the standard characteristic factors include standard temperature range and standard speed value;

[0015] According to the mapping relationship between the rubber type and the corresponding standard characteristic factor, a rubber type-standard characteristic factor mapping table is constructed.

[0016] In some embodiments of the present application, obtaining a first temperature control strategy includes:

[0017] Determine a corresponding preset temperature control analysis model according to the real-time rubber type, wherein the preset temperature control analysis model includes a plurality of preset temperature difference quantities of the same rubber type, and each preset temperature difference quantity is associated with a corresponding preset temperature control strategy;

[0018] Performing similarity analysis on the first temperature difference and a plurality of preset temperature difference, screening out preset temperature control strategies with similarity greater than a preset similarity threshold, and obtaining rubber material performance parameters and cost-related parameters corresponding to the screened preset temperature control strategies;

[0019] The rubber performance parameters and cost-related parameters are compared with the corresponding preset optimal rubber performance parameters and preset minimum cost-related parameters respectively, and the temperature control evaluation value of the corresponding screened preset temperature control strategy is generated according to the comparison results, and the preset temperature control strategy with the largest temperature control evaluation value is set as the first temperature control strategy.

[0020] In some embodiments of the present application, calculating the second temperature difference includes:

[0021] Determining the controllable time of the first temperature control strategy based on the standard speed value of the feeding conveyor belt;

[0022] According to the detection accuracy requirement, the controllable time is divided into a plurality of analysis periods, and based on the first temperature difference, a preset standard temperature sub-interval of each analysis period is set;

[0023] The second temperature in each analysis period is acquired in real time, and the second temperature difference in each analysis period is obtained by comparing the second temperature with the preset standard temperature sub-interval of the corresponding analysis period, and a second temperature difference sequence T, T (t1, t2, ... tn) is constructed according to the time sequence of the analysis periods.

[0024] In some embodiments of the present application, based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies, including:

[0025] Determine multiple preset correction coefficient intervals for each analysis period according to the historical temperature difference amount in each analysis period in the historical temperature control strategy, the historical control data, and the standard control data corresponding to the preset standard temperature sub-interval;

[0026] Based on the historical temperature difference and historical control data of each analysis period as input data and the corresponding preset correction coefficient interval as output data, neural network training is performed to obtain the preset correction model of the corresponding analysis period;

[0027] Inputting the second temperature difference amount and the real-time control data of each analysis period into a preset correction model to obtain a correction coefficient interval of each analysis period;

[0028] Based on the correction coefficient interval, the control data of the corresponding analysis period in the first temperature control strategy is corrected to generate multiple correction schemes, and the first temperature control strategy is corrected according to the multiple correction schemes to obtain multiple second temperature control strategies.

[0029] In some embodiments of the present application, multiple second temperature control strategies are simulated, including:

[0030] Determine the device location information and connection structure information involved in the preheating process, and lock the position of the preset panoramic map to obtain a static simulation scene of rubber preheating;

[0031] Obtain multiple historical temperature control strategies of the real-time rubber type, divide each historical temperature control strategy into multiple temperature control sub-processes according to the analysis period, and determine the control data in each temperature control sub-process and the correlation between the control data;

[0032] The control data in each temperature control sub-process is set as a unit node, and according to the degree of association in the association relationship of the control data in the same temperature control sub-process, a unit node structure diagram of the corresponding temperature control sub-process is constructed, wherein the unit node structure diagram includes the connection relationship of the unit nodes and the influence weight of each unit node;

[0033] Generate the independent variable influencing factor of the corresponding temperature control sub-process according to the unit node structure diagram of each temperature control sub-process, and generate the dependent variable influencing factor according to the corresponding historical temperature related data;

[0034] According to the time sequence of the temperature control sub-processes of the same historical temperature control strategy, the independent variable influencing factors and the dependent variable influencing factors are simulated in a static simulation scenario to generate a simulation model corresponding to the historical temperature control strategy;

[0035] The simulation models of multiple historical temperature control strategies are combined to obtain a rubber preheating temperature control simulation model;

[0036] Based on the rubber preheating temperature control simulation model, multiple second temperature control strategies are simulated to obtain simulation results of each second temperature control strategy.

[0037] In some embodiments of the present application, generating an application evaluation value of the second temperature control strategy according to the simulation result includes:

[0038] The simulation results include the simulated temperature of each second temperature control strategy in multiple analysis periods, and the simulated temperature difference of the corresponding second temperature control strategy in each analysis period is obtained by comparing the simulated temperature with the corresponding preset temperature sub-interval;

[0039] Generate an application evaluation value corresponding to the second temperature control strategy according to the simulated temperature difference amounts of the multiple analysis periods and the weight coefficients of the corresponding analysis periods;

[0040] The application evaluation value of the second temperature control strategy is:

[0041]

[0042] Where W is the application evaluation value, w0 is the application evaluation conversion coefficient, △di is the simulation temperature difference of the i-th analysis period, n is the number of analysis periods, and ei is the weight coefficient of the i-th analysis period.

[0043] In some embodiments of the present application, the system further comprises:

[0044] Control the temperature control device according to the optimal temperature control strategy and obtain the real-time temperature value of the rubber material within a preset period of time;

[0045] According to the real-time temperature value of the rubber material within the preset period, the temperature change amount and change rate within the preset period are generated;

[0046] Comparing the temperature variation within the preset time period with the preset temperature standard sub-interval within the analysis period corresponding to the optimal temperature control strategy to obtain a first temperature deviation degree;

[0047] Predicting the predicted temperature of the optimal temperature control strategy after the controllable time according to the temperature change amount and change rate within the preset time period, comparing the predicted temperature with the standard temperature range, and obtaining a second temperature deviation degree;

[0048] Generate a comprehensive deviation degree between a simulation result of an optimal temperature control strategy and an actual application result according to a first temperature deviation degree and a second temperature deviation degree;

[0049] If the comprehensive deviation degree is between the first preset deviation degree threshold and the second preset deviation degree threshold, fine-tuning the control parameters in the corresponding analysis period of the optimal temperature control strategy;

[0050] If the comprehensive deviation degree is greater than the second preset deviation degree threshold, the optimal temperature control strategy is reset.

[0051] In some embodiments of the present application, a temperature control method for preheating the rubber material is also included:

[0052] Acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value;

[0053] Real-time acquisition of a first temperature of the rubber material without preheating, and calculation of a difference between the first temperature of the rubber material and a first temperature in a standard temperature range;

[0054] Selecting a corresponding preset temperature control analysis model according to the real-time rubber material type, inputting the first temperature difference into the preset temperature control analysis model, and obtaining a first temperature control strategy;

[0055] According to the first temperature control strategy and the standard speed value, the temperature control device and the feeding conveyor belt are controlled to operate, the second temperature of the rubber material during the first preheating is obtained in real time, and the second temperature difference is calculated, and the first temperature control strategy is corrected based on the second temperature difference and the preset correction model to obtain multiple second temperature control strategies;

[0056] Simulate the multiple second temperature control strategies, generate application evaluation values ​​of the second temperature control strategies according to the simulation results, and set the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy.

[0057] Compared with the prior art, the temperature control system and method for preheating a rubber material in the embodiment of the present application have the following beneficial effects:

[0058] A first temperature control strategy is obtained based on the first temperature difference of the rubber material without preheating and the corresponding preset temperature control analysis model. The temperature control device is controlled according to the first temperature control strategy to obtain the second temperature difference during the first preheating. According to the second temperature difference and the preset correction model, multiple second temperature control strategies are obtained. The multiple second temperature control strategies are simulated and application evaluation values ​​are calculated. The optimal temperature control strategy is set according to the maximum application evaluation value to achieve the best preheating treatment effect, improve the processing performance of the subsequent extruder on the rubber material, and ensure the stability and reliability of the subsequent extruder in plasticizing the rubber material. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 is a schematic diagram of a temperature control system for preheating a rubber material in a preferred embodiment of the present application;

[0060] Figure 2 It is a flow chart of a temperature control method for preheating a rubber material in a preferred embodiment of the present application. DETAILED DESCRIPTION

[0061] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0062] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0063] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0064] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0065] like Figure 1 As shown, a temperature control system for preheating a rubber material in a preferred embodiment of the present application includes:

[0066] An acquisition module is used to acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value;

[0067] A calculation module, used for obtaining in real time a first temperature of the rubber material without preheating, and calculating a difference between the first temperature of the rubber material and a first temperature in a standard temperature range;

[0068] A first temperature control module, configured to select a corresponding preset temperature control analysis model according to the real-time rubber material type, input the first temperature difference into the preset temperature control analysis model, and obtain a first temperature control strategy;

[0069] The second temperature control module is used to control the operation of the temperature control device and the feeding conveyor belt according to the first temperature control strategy and the standard speed value, obtain the second temperature of the rubber material during the first preheating in real time, and calculate the second temperature difference. Based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies;

[0070] The simulation module is used to simulate multiple second temperature control strategies, generate application evaluation values ​​of the second temperature control strategies according to the simulation results, set the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy, and control the temperature control device according to the optimal temperature control strategy.

[0071] In this embodiment, the rubber preheating treatment process includes a PLC system, a water pump, a heating tube, a temperature detection probe, an electromagnetic proportional valve, a heating roller, a motor for driving the heating roller to rotate, a gear, a temperature control device, etc. The rubber runs along the feeding conveyor belt, and the temperature control device conveys circulating heating water along the pipeline and conveys it to the heating roller. The heating roller heats up and exchanges heat with the rubber, thereby realizing the heating pretreatment process of the rubber. The temperature detection probe detects the real-time temperature of the rubber, and the detected real-time temperature is conveyed as an input signal to the first temperature control module and the second temperature control module to determine whether it is within the standard temperature range. If it is not within the standard temperature range, the first temperature control module generates a first temperature control strategy. For example, if it is lower than the standard temperature range, The first temperature strategy specifically includes the control parameters of the heating tube controller of the temperature control device. The heating tube controller controls the operation of the heating tube according to the corresponding control parameters to carry out the heating process of the circulating heating water. The temperature of the circulating heating water increases, which drives the heating effect of the heating roller to increase, thereby achieving the effect of increasing the temperature of the rubber. When the real-time temperature is detected to be higher than the standard temperature range, the first temperature control strategy specifically includes the control parameters of the cooling water electromagnetic valve controller of the temperature control device. The electromagnetic valve opens, and the servo water pump receives the signal and works to provide power to the cooling water. The cooling water enters, which drives the temperature of the circulating cooling water to decrease, and drives the heating effect of the heating roller to decrease, thereby achieving the effect of lowering the temperature of the rubber.

[0072] In this embodiment, a first temperature control strategy is obtained based on the first temperature difference of the rubber material without preheating and the corresponding preset temperature control analysis model, and the temperature control device is controlled according to the first temperature control strategy to obtain the second temperature difference during the first preheating. According to the second temperature difference and the preset correction model, multiple second temperature control strategies are obtained, and the multiple second temperature control strategies are simulated and the application evaluation values ​​are calculated. The optimal temperature control strategy is set according to the maximum application evaluation value to achieve the best preheating treatment effect, improve the processing performance of the subsequent extruder on the rubber material, and ensure the stability and reliability of the subsequent extruder in plasticizing the rubber material.

[0073] In some embodiments of the present application, the rubber type-standard characteristic factor mapping table includes:

[0074] Obtain historical quality information of rubber materials and historical preheating logs;

[0075] The rubber material is divided into multiple rubber material types according to the historical quality information of the rubber material, and the historical operation parameters of preheating of different rubber material types at different historical time nodes are obtained according to the historical preheating log of the rubber material;

[0076] Screen out standard characteristic factors according to the historical operating parameters of preheating of different types of rubber at different historical time nodes and the corresponding historical product quality evaluation values ​​after preheating, wherein the standard characteristic factors include standard temperature range and standard speed value;

[0077] According to the mapping relationship between the rubber type and the corresponding standard characteristic factor, a rubber type-standard characteristic factor mapping table is constructed.

[0078] In this embodiment, the standard characteristic factors are parameters that affect the quality of subsequent semi-component extrusion during the preheating process, including a standard temperature range for preheating and a standard speed value of the feed conveyor belt.

[0079] In this embodiment, a plurality of rubber types are divided according to the quality information of the rubber. For example, the type of rubber in the first quality information interval is the first rubber type, and the type of rubber in the second quality information interval is the second rubber type. A plurality of rubber types are divided according to the quality information, and the standard characteristic factor corresponding to each rubber type is determined according to the historical preheating log, and a rubber type-standard characteristic factor mapping table is constructed to obtain the standard temperature range and standard speed value corresponding to the real-time rubber type, thereby improving the temperature control accuracy of the preheating of the rubber, thereby improving the process operation control efficiency and product quality stability of the subsequent process, and improving the quality of semi-component extrusion.

[0080] In some embodiments of the present application, obtaining a first temperature control strategy includes:

[0081] Determine a corresponding preset temperature control analysis model according to the real-time rubber type, wherein the preset temperature control analysis model includes a plurality of preset temperature difference quantities of the same rubber type, and each preset temperature difference quantity is associated with a corresponding preset temperature control strategy;

[0082] Performing similarity analysis on the first temperature difference and a plurality of preset temperature difference, screening out preset temperature control strategies with similarity greater than a preset similarity threshold, and obtaining rubber material performance parameters and cost-related parameters corresponding to the screened preset temperature control strategies;

[0083] The rubber performance parameters and cost-related parameters are compared with the corresponding preset optimal rubber performance parameters and preset minimum cost-related parameters respectively, and the temperature control evaluation value of the corresponding screened preset temperature control strategy is generated according to the comparison results, and the preset temperature control strategy with the largest temperature control evaluation value is set as the first temperature control strategy.

[0084] In this embodiment, the rubber performance parameter refers to the parameter representing the quality stability of the rubber corresponding to the screened preset temperature control strategy, the cost-related parameter refers to the relevant parameter of the cost generated when the screened preset temperature control strategy is applied, the preset optimal rubber parameter is set in advance and is set according to the maximum quality stability of the extrusion size of the subsequent extrudate, and the preset minimum cost-related parameter is the minimum cost-related parameter when the rubber meets the standard temperature range according to the historical temperature control strategy. The smaller the deviation between the rubber performance parameter and the corresponding preset optimal rubber performance parameter and the smaller the deviation between the cost-related parameter and the corresponding preset minimum cost-related parameter, the greater the temperature control evaluation value.

[0085] In this embodiment, a reasonable preset temperature control strategy is screened out based on the similarity comparison, and the first temperature control strategy corresponding to the real-time rubber type is obtained based on the preset temperature control strategy corresponding to the maximum temperature control evaluation value, thereby saving costs, improving the processing performance of the subsequent extruder on the rubber, and ensuring the stability and reliability of the subsequent extruder in plasticizing the rubber.

[0086] In some embodiments of the present application, calculating the second temperature difference includes:

[0087] Determining the controllable time of the first temperature control strategy based on the standard speed value of the feeding conveyor belt;

[0088] According to the detection accuracy requirement, the controllable time is divided into a plurality of analysis periods, and based on the first temperature difference, a preset standard temperature sub-interval of each analysis period is set;

[0089] The second temperature in each analysis period is acquired in real time, and the second temperature difference in each analysis period is obtained by comparing the second temperature with the preset standard temperature sub-interval of the corresponding analysis period, and a second temperature difference sequence T, T (t1, t2, ... tn) is constructed according to the time sequence of the analysis periods.

[0090] In this embodiment, the transportation time of the rubber on the feed conveyor belt, that is, the controllable time of the first temperature control strategy for preheating, can be obtained according to the standard speed value. The controllable time is divided into multiple analysis periods to improve the accuracy of rubber temperature control, improve the processing performance of the subsequent extruder on the rubber, and ensure the stability and reliability of the subsequent extruder in plasticizing the rubber.

[0091] In some embodiments of the present application, based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies, including:

[0092] Determine multiple preset correction coefficient intervals for each analysis period according to the historical temperature difference amount in each analysis period in the historical temperature control strategy, the historical control data, and the standard control data corresponding to the preset standard temperature sub-interval;

[0093] Based on the historical temperature difference and historical control data of each analysis period as input data and the corresponding preset correction coefficient interval as output data, neural network training is performed to obtain the preset correction model of the corresponding analysis period;

[0094] Inputting the second temperature difference amount and the real-time control data of each analysis period into a preset correction model to obtain a correction coefficient interval of each analysis period;

[0095] Based on the correction coefficient interval, the control data of the corresponding analysis period in the first temperature control strategy is corrected to generate multiple correction schemes, and the first temperature control strategy is corrected according to the multiple correction schemes to obtain multiple second temperature control strategies.

[0096] In this embodiment, the corresponding control data is corrected according to the correction coefficient in the correction coefficient interval, so that the control data in the corresponding analysis period is in the standard control data corresponding to the preset standard temperature sub-interval, thereby ensuring that the temperature of the analysis period is in the standard temperature interval, so as to achieve the best preheating treatment effect, improve the subsequent extruder's processing performance on the rubber material, and ensure the stability and reliability of the subsequent extruder's plasticization of the rubber material.

[0097] In some embodiments of the present application, multiple second temperature control strategies are simulated, including:

[0098] Determine the device location information and connection structure information involved in the preheating process, and lock the position of the preset panoramic map to obtain a static simulation scene of rubber preheating;

[0099] Obtain multiple historical temperature control strategies of the real-time rubber type, divide each historical temperature control strategy into multiple temperature control sub-processes according to the analysis period, and determine the control data in each temperature control sub-process and the correlation between the control data;

[0100] The control data in each temperature control sub-process is set as a unit node, and according to the degree of association in the association relationship of the control data in the same temperature control sub-process, a unit node structure diagram of the corresponding temperature control sub-process is constructed, wherein the unit node structure diagram includes the connection relationship of the unit nodes and the influence weight of each unit node;

[0101] Generate the independent variable influencing factor of the corresponding temperature control sub-process according to the unit node structure diagram of each temperature control sub-process, and generate the dependent variable influencing factor according to the corresponding historical temperature related data;

[0102] According to the time sequence of the temperature control sub-processes of the same historical temperature control strategy, the independent variable influencing factors and the dependent variable influencing factors are simulated in a static simulation scenario to generate a simulation model corresponding to the historical temperature control strategy;

[0103] The simulation models of multiple historical temperature control strategies are combined to obtain a rubber preheating temperature control simulation model;

[0104] Based on the rubber preheating temperature control simulation model, multiple second temperature control strategies are simulated to obtain simulation results of each second temperature control strategy.

[0105] In this embodiment, the influence weight of the unit node refers to the influence of the corresponding control parameter on the rubber temperature in the temperature control sub-process. The connection relationship of the unit nodes is set according to the degree of association. The greater the degree of association, the closer the connection of the unit nodes. The independent variable influence factor generated according to the unit node structure diagram can be understood as the changes and influence degrees of multiple control data corresponding to each temperature control sub-process. The historical temperature-related data includes historical temperature, historical temperature change rate, historical temperature change amount, etc.

[0106] In this embodiment, according to the unit node structure diagram, it is possible to clearly understand the degree of influence of the control data changes in each temperature control sub-process on the temperature and quality of the rubber material. By simulating the independent variable influencing factors and the dependent variable influencing factors of the temperature control sub-process of the historical temperature control strategy in the static simulation scene, a rubber preheating temperature control simulation model is obtained, thereby improving the simulation accuracy of multiple second temperature control strategies, providing a basis for selecting the optimal temperature control strategy, so as to achieve the best preheating treatment effect, improve the subsequent extruder's processing performance on the rubber material, and ensure the stability and reliability of the subsequent extruder's plasticization of the rubber material.

[0107] In some embodiments of the present application, generating an application evaluation value of the second temperature control strategy according to the simulation result includes:

[0108] The simulation results include the simulated temperature of each second temperature control strategy in multiple analysis periods, and the simulated temperature difference of the corresponding second temperature control strategy in each analysis period is obtained by comparing the simulated temperature with the corresponding preset temperature sub-interval;

[0109] Generate an application evaluation value corresponding to the second temperature control strategy according to the simulated temperature difference amounts of the multiple analysis periods and the weight coefficients of the corresponding analysis periods;

[0110] The application evaluation value of the second temperature control strategy is:

[0111]

[0112] Where W is the application evaluation value, w0 is the application evaluation conversion coefficient, △di is the simulation temperature difference of the i-th analysis period, n is the number of analysis periods, and ei is the weight coefficient of the i-th analysis period.

[0113] In some embodiments of the present application, the system further comprises:

[0114] Control the temperature control device according to the optimal temperature control strategy and obtain the real-time temperature value of the rubber material within a preset period of time;

[0115] According to the real-time temperature value of the rubber material within the preset period, the temperature change amount and change rate within the preset period are generated;

[0116] Comparing the temperature variation within the preset time period with the preset temperature standard sub-interval within the analysis period corresponding to the optimal temperature control strategy to obtain a first temperature deviation degree;

[0117] Predicting the predicted temperature of the optimal temperature control strategy after the controllable time according to the temperature change amount and change rate within the preset time period, comparing the predicted temperature with the standard temperature range, and obtaining a second temperature deviation degree;

[0118] Generate a comprehensive deviation degree between a simulation result of an optimal temperature control strategy and an actual application result according to a first temperature deviation degree and a second temperature deviation degree;

[0119] If the comprehensive deviation degree is between the first preset deviation degree threshold and the second preset deviation degree threshold, fine-tuning the control parameters in the corresponding analysis period of the optimal temperature control strategy;

[0120] If the comprehensive deviation degree is greater than the second preset deviation degree threshold, the optimal temperature control strategy is reset.

[0121] In this embodiment, the second temperature control strategy with the largest application evaluation value is set as the optimal temperature control strategy. The temperature control device is controlled according to the optimal temperature control strategy, and the temperature change and change rate within a preset time period are obtained, so as to obtain the comprehensive deviation degree between the simulation results of the optimal temperature control strategy and the actual application results. The optimal temperature control strategy is reset or adjusted according to the comprehensive deviation degree, and the temperature control strategy is continuously optimized through real-time feedback and simulation to achieve the best preheating treatment effect, improve the subsequent extruder's processing performance on the rubber material, and ensure the stability and reliability of the subsequent extruder's plasticization of the rubber material.

[0122] In some embodiments of the present application, Figure 2 As shown, a temperature control method for preheating the rubber material is also included:

[0123] Step S201: Acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value;

[0124] Step S202: acquiring in real time a first temperature of the rubber material without preheating, and calculating a difference between the first temperature of the rubber material and a first temperature in a standard temperature range;

[0125] Step S203: selecting a corresponding preset temperature control analysis model according to the real-time rubber type, inputting the first temperature difference into the preset temperature control analysis model, and obtaining a first temperature control strategy;

[0126] Step S204: According to the first temperature control strategy and the standard speed value, the temperature control device and the feeding conveyor belt are controlled to operate, the second temperature of the rubber material during the first preheating is obtained in real time, and the second temperature difference is calculated. Based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies;

[0127] Step S205: simulating multiple second temperature control strategies, generating application evaluation values ​​of the second temperature control strategies according to the simulation results, and setting the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy.

[0128] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A temperature control system for preheating rubber materials. It is characterized in that include: An acquisition module is used to acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value; A calculation module, used for obtaining in real time a first temperature of the rubber material without preheating, and calculating a difference between the first temperature of the rubber material and a first temperature in a standard temperature range; A first temperature control module, configured to select a corresponding preset temperature control analysis model according to the real-time rubber material type, input the first temperature difference into the preset temperature control analysis model, and obtain a first temperature control strategy; The second temperature control module is used to control the operation of the temperature control device and the feeding conveyor belt according to the first temperature control strategy and the standard speed value, obtain the second temperature of the rubber material during the first preheating in real time, and calculate the second temperature difference. Based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies; The simulation module is used to simulate multiple second temperature control strategies, generate application evaluation values ​​of the second temperature control strategies according to the simulation results, and set the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy.

2. The temperature control system for preheating the rubber material as claimed in claim 1, It is characterized in that The rubber type-standard characteristic factor mapping table includes: Obtain historical quality information of rubber materials and historical preheating logs; The rubber material is divided into multiple rubber material types according to the historical quality information of the rubber material, and the historical operation parameters of preheating of different rubber material types at different historical time nodes are obtained according to the historical preheating log of the rubber material; Screen out standard characteristic factors according to the historical operating parameters of preheating of different types of rubber at different historical time nodes and the corresponding historical product quality evaluation values ​​after preheating, wherein the standard characteristic factors include standard temperature range and standard speed value; According to the mapping relationship between the rubber type and the corresponding standard characteristic factor, a rubber type-standard characteristic factor mapping table is constructed.

3. The temperature control system for preheating the rubber material as claimed in claim 2, It is characterized in that The first temperature control strategy is obtained, including: Determine a corresponding preset temperature control analysis model according to the real-time rubber type, wherein the preset temperature control analysis model includes a plurality of preset temperature difference quantities of the same rubber type, and each preset temperature difference quantity is associated with a corresponding preset temperature control strategy; Performing similarity analysis on the first temperature difference and a plurality of preset temperature difference, screening out preset temperature control strategies with similarity greater than a preset similarity threshold, and obtaining rubber material performance parameters and cost-related parameters corresponding to the screened preset temperature control strategies; The rubber performance parameters and cost-related parameters are compared with the corresponding preset optimal rubber performance parameters and preset minimum cost-related parameters respectively, and the temperature control evaluation value of the corresponding screened preset temperature control strategy is generated according to the comparison results, and the preset temperature control strategy with the largest temperature control evaluation value is set as the first temperature control strategy.

4. The temperature control system for preheating the rubber material as claimed in claim 3, It is characterized in that Calculating the second temperature difference includes: Determining the controllable time of the first temperature control strategy based on the standard speed value of the feeding conveyor belt; According to the detection accuracy requirement, the controllable time is divided into a plurality of analysis periods, and based on the first temperature difference, a preset standard temperature sub-interval of each analysis period is set; The second temperature in each analysis period is acquired in real time, and the second temperature difference in each analysis period is obtained by comparing the second temperature with the preset standard temperature sub-interval of the corresponding analysis period, and a second temperature difference sequence T, T (t1, t2, ... tn) is constructed according to the time sequence of the analysis periods.

5. The temperature control system for preheating the rubber material as claimed in claim 4, It is characterized in that Based on the second temperature difference and the preset correction model, the first temperature control strategy is corrected to obtain multiple second temperature control strategies, including: Determine multiple preset correction coefficient intervals for each analysis period according to the historical temperature difference amount in each analysis period in the historical temperature control strategy, the historical control data, and the standard control data corresponding to the preset standard temperature sub-interval; Based on the historical temperature difference and historical control data of each analysis period as input data and the corresponding preset correction coefficient interval as output data, neural network training is performed to obtain the preset correction model of the corresponding analysis period; Inputting the second temperature difference amount and the real-time control data of each analysis period into a preset correction model to obtain a correction coefficient interval of each analysis period; Based on the correction coefficient interval, the control data of the corresponding analysis period in the first temperature control strategy is corrected to generate multiple correction schemes, and the first temperature control strategy is corrected according to the multiple correction schemes to obtain multiple second temperature control strategies.

6. The temperature control system for preheating the rubber material as claimed in claim 5, It is characterized in that Simulate multiple second temperature control strategies, including: Determine the device location information and connection structure information involved in the preheating process, and lock the position of the preset panoramic map to obtain a static simulation scene of rubber preheating; Obtain multiple historical temperature control strategies of the real-time rubber type, divide each historical temperature control strategy into multiple temperature control sub-processes according to the analysis period, and determine the control data in each temperature control sub-process and the correlation between the control data; The control data in each temperature control sub-process is set as a unit node, and according to the degree of association in the association relationship of the control data in the same temperature control sub-process, a unit node structure diagram of the corresponding temperature control sub-process is constructed, wherein the unit node structure diagram includes the connection relationship of the unit nodes and the influence weight of each unit node; Generate the independent variable influencing factor of the corresponding temperature control sub-process according to the unit node structure diagram of each temperature control sub-process, and generate the dependent variable influencing factor according to the corresponding historical temperature related data; According to the time sequence of the temperature control sub-processes of the same historical temperature control strategy, the independent variable influencing factors and the dependent variable influencing factors are simulated in a static simulation scenario to generate a simulation model corresponding to the historical temperature control strategy; The simulation models of multiple historical temperature control strategies are combined to obtain a rubber preheating temperature control simulation model; Based on the rubber preheating temperature control simulation model, multiple second temperature control strategies are simulated to obtain simulation results of each second temperature control strategy.

7. The temperature control system for preheating the rubber material as claimed in claim 6, It is characterized in that Generate an application evaluation value of the second temperature control strategy based on the simulation results, including: The simulation results include the simulated temperature of each second temperature control strategy in multiple analysis periods, and the simulated temperature difference of the corresponding second temperature control strategy in each analysis period is obtained by comparing the simulated temperature with the corresponding preset temperature sub-interval; Generate an application evaluation value corresponding to the second temperature control strategy according to the simulated temperature difference amounts of the multiple analysis periods and the weight coefficients of the corresponding analysis periods; The application evaluation value of the second temperature control strategy is: Where W is the application evaluation value, w0 is the application evaluation conversion coefficient, △di is the simulation temperature difference of the i-th analysis period, n is the number of analysis periods, and ei is the weight coefficient of the i-th analysis period.

8. The temperature control system for preheating the rubber material as claimed in claim 7, It is characterized in that Also includes: Control the temperature control device according to the optimal temperature control strategy and obtain the real-time temperature value of the rubber material within a preset period of time; According to the real-time temperature value of the rubber material within the preset period, the temperature change amount and change rate within the preset period are generated; Compare the temperature variation within the preset time period with the preset temperature standard sub-interval within the analysis period corresponding to the optimal temperature control strategy to obtain a first temperature deviation degree; Predicting the predicted temperature of the optimal temperature control strategy after the controllable time according to the temperature change amount and change rate within the preset time period, comparing the predicted temperature with the standard temperature range, and obtaining a second temperature deviation degree; Generate a comprehensive deviation degree between a simulation result of an optimal temperature control strategy and an actual application result according to a first temperature deviation degree and a second temperature deviation degree; If the comprehensive deviation degree is between the first preset deviation degree threshold and the second preset deviation degree threshold, fine-tuning the control parameters in the corresponding analysis period of the optimal temperature control strategy; If the comprehensive deviation degree is greater than the second preset deviation degree threshold, the optimal temperature control strategy is reset.

9. A temperature control method for preheating a rubber material, applied to the temperature control system for preheating a rubber material as claimed in any one of claims 1 to 8, It is characterized in that include: Acquire quality information of the rubber material, determine the real-time rubber material type according to the quality information, and determine the standard characteristic factor corresponding to the real-time rubber material type based on a rubber material type-standard characteristic factor mapping table, wherein the standard characteristic factor includes a standard temperature range and a standard speed value; Real-time acquisition of a first temperature of the rubber material without preheating, and calculation of a difference between the first temperature of the rubber material and a first temperature in a standard temperature range; Selecting a corresponding preset temperature control analysis model according to the real-time rubber material type, inputting the first temperature difference into the preset temperature control analysis model, and obtaining a first temperature control strategy; According to the first temperature control strategy and the standard speed value, the temperature control device and the feeding conveyor belt are controlled to operate, the second temperature of the rubber material during the first preheating is obtained in real time, and the second temperature difference is calculated, and the first temperature control strategy is corrected based on the second temperature difference and the preset correction model to obtain multiple second temperature control strategies; Simulate the multiple second temperature control strategies, generate application evaluation values ​​of the second temperature control strategies according to the simulation results, and set the second temperature control strategy corresponding to the maximum application evaluation value as the optimal temperature control strategy.