Statistical method of structure template quantity based on BIM (Building Information Modeling) technology
Through the combination of BIM technology and Dynamo software, the rapid and accurate calculation of the amount of structural templates is achieved, and the problems of low efficiency and poor accuracy in the existing technology are solved, flexible statistical methods are provided, cost reduction and construction efficiency are improved.
Patent Information
- Application Number
- CN202411145588.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, the calculation efficiency of the formwork project volume is low, the accuracy is poor, and the flexibility is lacking, resulting in large errors in the construction stage, long time and high cost.
Using the structural template quantity statistics method based on BIM technology, volume model processing, Boolean operation and surface splitting are performed through Dynamo software, template area is quickly calculated, and the results are exported to Excel table, supporting statistics in projects, stages, and floors. .
It improves the efficiency and accuracy of formwork quantity statistics, reduces manpower and material costs, provides accurate data reference, is suitable for different concrete structures, and shortens the construction cycle.
Smart Images

Figure CN119026360A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of structural template quantity calculation methods, and in particular to a statistical method for structural template quantity based on BIM technology. Background Art
[0002] The calculation of formwork quantity is a very important task in the construction industry. It has a vital impact on the project budget, construction progress and quality control. Cost estimators calculate the formwork quantity through two-dimensional CAD drawings. The calculation results have large deviations due to the experience and level of the cost estimators, and cannot provide a more accurate data basis for the formwork quantity in the construction phase.
[0003] At present, the statistical methods of structural template quantity of waste incineration power plants in China mainly have the following problems: 1) Low efficiency Manual calculation of structural templates consumes a lot of time and human resources. Usually, calculating the amount of structural templates for one layer requires cost estimators to count the CAD drawings and accumulate the calculation results, which is not only time-consuming but also requires review of the results, resulting in low overall efficiency. 2) Poor accuracy Manual calculations are often limited by human computing ability and experience. When dealing with complex structural templates, even experienced engineers may make calculation errors due to negligence or fatigue. In addition, manual calculations may also be limited by tools such as calculators, resulting in reduced accuracy; 3) Lack of flexibility Manual calculation structure templates usually follow fixed calculation processes and steps and lack flexibility. Once encountering special situations or complex problems, manual calculations may be difficult to cope with. Summary of the invention
[0004] The purpose of the present invention is to provide a statistical method for the quantity of structural formwork based on BIM technology, which can provide accurate structural formwork quantity and avoid large errors on site; provide relevant data reference for cost estimators, save manpower and material costs, and be flexibly applicable to different concrete structures.
[0005] The above technical objectives of the present invention are achieved through the following technical solutions: A statistical method for structural template quantity based on BIM technology includes the following steps: Step S10, selecting the mass model and components respectively; Step S20, flattening the structural components to merge entities, including obtaining a geometric information list of related structural components from the imported structural component model, and flattening the list of geometric information of the structural components; Step S30, materializing the volume model, including obtaining a list of relevant volume geometry information from the volume model, and generating a volume entity from the geometry information list of the volume model; Step S40, integrating the structural entity and performing Boolean operation with the volume entity, including performing Boolean operation on the integrated structural entity and the volume entity to obtain geometric information required for calculating the template; Step S60, distinguishing the horizontal template and the vertical template and summing up the values, including distinguishing the horizontal and vertical templates on the template surface, counting the areas of each horizontal and vertical template, and summing up the areas to obtain the total area.
[0006] Furthermore, step S10 includes establishing a relevant mass model in the structural model, the mass model covers the structural components that need to be calculated by template, the components are selected and loaded into the Dynamo software, and then the established mass model is loaded into the Dynamo software.
[0007] Furthermore, in step S20, after the list of geometric information of the structural component is flattened, the original nested list is converted and merged into a first-level list, and the structural entities generated by the first-level list are integrated into the entire structural entity.
[0008] Furthermore, in step S40, the Boolean operation is performed by the Geometry.Intersect command.
[0009] Furthermore, the method further comprises step S50, splitting the acquired entity into surfaces and acquiring the direction of the surface space vector.
[0010] Furthermore, step S50 includes converting the geometric information of the template required to be calculated obtained in S40 into an entity, splitting the outer surface of the entity, and obtaining the spatial vector direction of the surface; and removing part of the surface according to the template required to be made to obtain the template surface required to be made.
[0011] Furthermore, in step S60, based on the Z-axis vector, the template surface to be produced obtained in step S50 is screened and output as horizontal and vertical templates respectively.
[0012] Furthermore, the method further includes step S70 of exporting the calculated template area.
[0013] Furthermore, step S70 includes writing and exporting the calculation results into an Excel table according to set parameters, and the set parameters include a file path and a worksheet name.
[0014] In summary, the present invention has the following beneficial effects: Compared with the traditional method of calculating the amount of structural templates based on CAD drawings, which is not only labor-intensive, inefficient, and inaccurate, but also inevitably prone to errors, this application uses Dynamo technology to calculate the amount of structural templates, which can not only quickly, efficiently, and accurately calculate the amount of templates, but also can be counted by project, stage, and floor according to the needs of the construction site, greatly improving the work efficiency and calculation accuracy of cost personnel and reducing the manpower and material costs of enterprises; This application can provide accurate structural formwork quantity to avoid large errors on site; it can provide relevant data reference for cost estimators to save manpower and material costs; it can be flexibly applied to different concrete structures and can quickly derive formwork quantity; This application provides a statistical method for the quantity of structural formwork based on BIM technology, which provides a reliable and efficient design method for waste incineration power plant projects. It can not only greatly improve the efficiency and accuracy of the statistical method of structural formwork, but also facilitate the preliminary budgeting and material feeding of the construction site and shorten the construction period, providing an important reference for the construction site. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a flow chart of a statistical method of structural template quantity based on BIM technology of the present invention; Figure 2 It is an implementation block diagram of a statistical method for structural template quantity based on BIM technology in the present invention. DETAILED DESCRIPTION
[0016] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings, and this embodiment does not constitute a limitation of the present invention. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0017] A statistical method for structural template quantity based on BIM technology, such as Figure 1 and Figure 2 As shown, in this embodiment, it is used for a waste incineration power plant project, which is a set of efficient and reliable structural template statistics method, ensuring the rationality and economy of structural template statistics; specifically, it includes the following steps: Step S10, selecting the mass model and components such as the structural frame, columns, floor slabs, stairs, etc. respectively; Specifically, it includes establishing relevant massing models in the structural model. The massing model covers the structural components that need to be calculated by template. The structural frames, columns, floor slabs, stairs and other components are selected through "Select Model Element" and loaded into the Dynamo software. The established massing model is then loaded into the Dynamo software through "Select Boundary MaS".
[0018] Step S20, flattening the structural components to form a combined entity. Specifically, it includes using the "Element.geometry" command in the Dynamo software to obtain the geometric information list of the relevant structural components of the imported structural component model, flattening the list of geometric information of the structural components through the "list.flatten" command, converting and merging the original nested lists into a first-level list, and integrating the structural entities generated by the first-level list into the entire structural entity through the "Solid.byUnion" command.
[0019] Step S30, materialize the volume model. Specifically, it includes obtaining a list of related volume geometry information through "Element.geometry" of the volume model. The volume model is a single component and does not need to process the geometry list and union. The geometry information list is generated into a volume entity through "ValueAtIndex".
[0020] Step S40, integrating the structural entities and performing Boolean operations with the volume entities, Specifically, it includes performing Boolean operation (intersection) on the integrated structural entity and the volume entity to obtain the geometric information required for calculating the template; wherein, the Boolean operation is performed through the Geometry.Intersect command.
[0021] Step S50, splitting the acquired entity into surfaces, and acquiring the direction of the surface space vector; Specifically, the geometric information of the template to be calculated obtained in S40 is converted into an entity through "ValueAtIndex", and the outer surface of the entity is split through "Geometry.Explode", and the spatial vector direction of the surface is obtained through "Surface,NormalAtParameter"; And according to the template to be made, part of the surface is removed to obtain the template surface to be made. For example, in this embodiment, the top of the template is not closed when it is made, so based on the Z-axis vector, "Vector.Zaxis" is used to remove the top surface to obtain the template surface to be made.
[0022] Step S60, distinguishing the horizontal template and the vertical template and summing up the values, which specifically includes: After obtaining the required template surface by removing the top surface, the template surface required to be produced obtained in step S50 is screened based on the Z-axis vector and output as horizontal and vertical templates respectively; For example, in this embodiment, when the template is made, except for the bottom plane which is a horizontal template, all the others are vertical templates. Using "Vector.Reverse (Zaxis)" as a condition, they can be screened and finally output separately through "ValueATKey". The area of each horizontal and vertical template is counted through Surface.Area, and the area is accumulated using "Math.sum" to get the total area.
[0023] In this embodiment, step S70 is also included, exporting the calculated template area through EXCEL; Specifically, the calculation results are automatically written and exported into an Excel table through the "Data.ExportToExcel" module according to the set parameters, wherein the set parameters include File Path (file path), SheetName (worksheet name), and OverWrite (write overwrite).
[0024] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions should also be deemed to fall within the protection scope of the technical solution of the present invention.
Claims
1. A statistical method for structural template quantity based on BIM technology, characterized by: The following steps are included: Step S10, selecting the mass model and components respectively; Step S20, flattening the structural components to merge entities, including obtaining a geometric information list of related structural components from the imported structural component model, and flattening the list of geometric information of the structural components; Step S30, materializing the volume model, including obtaining a list of relevant volume geometry information from the volume model, and generating a volume entity from the geometry information list of the volume model; Step S40, integrating the structural entity and performing Boolean operation with the volume entity, including performing Boolean operation on the integrated structural entity and the volume entity to obtain geometric information required for calculating the template; Step S60, distinguishing the horizontal template and the vertical template and summing up the values, including distinguishing the horizontal and vertical templates on the template surface, counting the areas of each horizontal and vertical template, and summing up the areas to obtain the total area.
2. According to the statistical method of the structural template quantity based on BIM technology in claim 1, it is characterized by: Step S10 includes establishing a relevant mass model in the structural model, the mass model covers the structural components that need to be calculated by the template, the components are selected and loaded into the Dynamo software, and then the established mass model is loaded into the Dynamo software.
3. The statistical method of structural template quantity based on BIM technology according to claim 1 or 2, characterized in that: In step S20, after the list of geometric information of the structural component is flattened, the original nested list is converted and merged into a first-level list, and the structural entities generated by the first-level list are integrated into the entire structural entity.
4. The method for calculating the amount of structural templates based on BIM technology according to claim 1, characterized in that: In step S40, the Boolean operation is performed by the Geometry.Intersect command.
5. The method for calculating the amount of structural templates based on BIM technology according to claim 1, characterized in that: The method further comprises step S50 of splitting the acquired entity into surfaces and acquiring the direction of the surface space vector.
6. The method for calculating the quantity of structural templates based on BIM technology according to claim 5, characterized in that: Step S50 includes converting the geometric information of the template to be calculated obtained in S40 into a solid, splitting the outer surface of the solid, and obtaining the spatial vector direction of the surface; And according to the template to be made, part of the surface is eliminated to obtain the template surface to be made.
7. The method for calculating the quantity of structural templates based on BIM technology according to claim 6, characterized in that: In step S60, based on the Z-axis vector, the template surface to be produced obtained in step S50 is screened and output as horizontal and vertical templates respectively.
8. The method for calculating the quantity of structural templates based on BIM technology according to claim 1, characterized in that: The method further includes step S70 of exporting the calculated template area.
9. The method for calculating the quantity of structural templates based on BIM technology according to claim 8, characterized in that: Step S70 includes writing and exporting the calculation results into an Excel table according to set parameters, where the set parameters include a file path and a worksheet name.