A method for compiling multi-level reservoir dispatching diagram based on improved long series method
By improving the long series method, combining the long series scheduling line and the reservoir characteristic water level line, the representative annual selection differences and water supply damage problems in the compilation of multi-level scheduling maps of the reservoir are solved, and the accurate drawing of multi-level scheduling maps of the reservoir is achieved and the water supply task is achieved. Effectively ensure, reducing the depth of damage.
Patent Information
- Application Number
- CN202110960003.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-20
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-08-20
AI Technical Summary
The existing reservoir dispatch map compilation method has failed to achieve the coordination and unity of runoff adjustment calculation and dispatch map compilation. There are differences in the selection of representative years and water supply damage. There are cross-cutting problems in the scheduling line drawing, which leads to the complex and inconsistent preparation of the reservoir multi-level dispatch map. precise.
The improved long series method is adopted to define the two water level lines in the year of water supply damage, and to calculate the comprehensive water supply flow and Xingli storage capacity by using the long series of dispatch lines and the reservoir characteristic water level lines, and draw the upper and lower distribution lines and restricted water supply lines. Realize one-time drawing and inspection of multi-level scheduling maps of reservoirs.
The randomness and uncertainty of representing the year selection is avoided, and the year of damage is accurately identified, which reduces the complexity and intersection of the scheduling map drawing, ensures the realization of the design guarantee rate and the satisfaction of water supply tasks, and reduces the depth of damage.
Smart Images

Figure CN113849884B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water conservancy and hydropower engineering, and in particular relates to a method for compiling a multi-level dispatching diagram of a reservoir based on an improved long series method. Background Art
[0002] Reservoir dispatching is the core link of reservoir operation and management. Its dispatching methods are divided into conventional dispatching and optimized dispatching. In actual operation, conventional reservoir dispatching diagrams are generally used for comprehensive reservoir dispatching. However, the existing reservoir dispatching diagram compilation method has failed to achieve the coordination and unification of runoff regulation calculation and dispatching diagram compilation. There are certain deviations in the results of the drawing, and most of them are for reservoirs with a single benefit task. Different dispatching tasks of comprehensive utilization reservoirs correspond to their own dispatching lines, and the compilation process is more complicated. At present, the relevant domestic specifications are "Reservoir Dispatching Design Code" (GB / T 50587-2010) and "Water Conservancy Calculation Code for Water Conservancy Projects" (SL104-2015), but the compilation methods of reservoir dispatching diagrams have not yet been unified, and there are the following problems:
[0003] (1) Both the "Reservoir Operation Design Code" (GB / T 50587-2010) and the "Water Conservancy Calculation Code for Water Conservancy Projects" (SL104-2015) use the representative year method to draw multi-level operation diagrams, but there are differences in the selection of representative years. The former uses the year when the annual water flow or annual water consumption is close to the design guarantee rate as the representative year, while the latter selects the representative year based on the principle that the water flow in the wet and dry seasons is close to the guarantee rate. Although the representative years selected by these two methods are basically the same under normal circumstances, when encountering long series of runoff data with large changes in runoff series, difficulty in dividing the wet and dry seasons, and large changes in annual water consumption, there will be differences in the selected representative years.
[0004] (2) When the natural runoff varies significantly during the year and the water inflow and water use processes differ greatly, even if the reservoir water supply meets the water use requirements, there will be a problem of failure to meet the water supply task in some months due to large changes in water use. The "Design Code for Reservoir Operation" (GB / T 50587-2010) and the "Code for Hydraulic Calculation of Water Conservancy Projects" (SL104-2015) do not take this kind of damage into account.
[0005] (3) There are also differences in the drawing of the dispatching line between the "Reservoir Operation Design Code" (GB / T 50587-2010) and the "Water Conservancy Calculation Code for Water Conservancy Projects" (SL104-2015). The former uses the upper envelope of all damaged years as the water supply reduction line, while the latter uses the lower envelope of representative years as the water supply reduction line. At the same time, after the multi-level dispatching diagram of the reservoir drawn using the representative year method is completed, it is necessary to conduct a long series of runoff adjustment review based on manual experience to ensure that the specific water supply task guarantee rate requirements are met.
[0006] Therefore, effectively solving the technical difficulties in compiling multi-level reservoir dispatching diagrams is the fundamental guarantee for achieving comprehensive utilization of reservoirs. Summary of the invention
[0007] The purpose of the present invention is to overcome the problems existing in the prior art and propose a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method. The present invention specifically defines two water level line conditions in the year of water supply damage, uses the long series dispatching line and the reservoir characteristic water level line to select the damage year, and clearly gives the drawing scheme of the upper and lower dispatching lines and the restricted water supply line. It can not only reduce the damage depth while meeting the design guarantee rate requirements, but also enable multi-level dispatching. Figure 1 The successful one-time drawing avoids the complexity of manual inspection and adjustment, and provides technical support for the comprehensive utilization of reservoirs.
[0008] A method for compiling a multi-level reservoir dispatching diagram based on an improved long series method proposed in the present invention is characterized by comprising the following specific steps:
[0009] Step (1): Calculate the comprehensive water supply flow Q of the reservoir under the specific water inflow frequency P according to the design guarantee rate and water use requirements of the specific water supply task of the comprehensive utilization reservoir. s The design guarantee rate is an annual guarantee rate or a time guarantee rate, and the design method is as follows:
[0010] a. Convert the design guarantee rate of specific water supply tasks into an annual guarantee rate;
[0011] b. Formulate the guaranteed water supply flow rate for specific water supply tasks and determine the water supply reduction coefficient α according to the water demand of specific water supply tasks. i And the corresponding reduced water supply flow Q zi ;
[0012] c. Based on the previous two steps, for the specific water inflow frequency P, the following formula (1) is used to calculate the comprehensive water supply flow Q of the reservoir that undertakes n specific water supply tasks s :
[0013]
[0014] In formula (1): Q s is the comprehensive water supply flow; Q i (i=1~n) is the guaranteed water supply flow rate of the i-th water supply task; α i (i=1~n) is the water supply reduction coefficient of the i-th water supply task; P is the water supply frequency; P i (i=1~n) is the design guarantee rate corresponding to the i-th water supply task after unified conversion, where P 1 >P 2 >…>Pi …>P n , P n The minimum design guarantee rate for specific water supply tasks;
[0015] Step (2): Using the long series runoff data, perform long series runoff regulation calculations, sort the long series beneficial storage capacity, and select the beneficial storage capacity corresponding to the minimum frequency that is not less than the minimum value of the design guarantee rate as the initial proposed reservoir beneficial storage capacity;
[0016] Step (3): for a long series of years, the water supply flow is guaranteed according to the specific water supply task, starting from the dead water level at the end of the water supply period, and the reservoir water level lines of each period are drawn in reverse chronological order until they fall back to the dead water level at the beginning of the water storage period;
[0017] Step (4): define the destruction year, which is divided into two types: the first destruction year is defined as the year when the water level drawn in reverse chronological order exceeds the normal water storage level during the scheduling period; the second destruction year is defined as the year when the water level drawn in reverse chronological order cannot fall back to the dead water level at the beginning of the scheduling period;
[0018] Step (5): Count the years of damage and calculate the reservoir water supply guarantee rate. If the value is less than the minimum design guarantee rate of the specific water supply task, adjust the reservoir's beneficial storage capacity and repeat steps (3) to (5) until the reservoir's water supply guarantee rate is not less than the minimum design guarantee rate, and determine the reservoir's beneficial storage capacity and normal water storage level.
[0019] Step (6): Remove the damaged years from the long series of years, calculate the water level lines of each period in reverse order based on the specific water supply task to ensure the water supply flow, and take the upper envelope of the long series results as the upper adjustment line;
[0020] Step (7): Remove the damaged years from the long series of years. For the specific water inflow frequency P, according to formula (1), for the water supply task i whose design guarantee rate is less than the water inflow frequency, the reduced water supply flow Q after the water supply flow is reduced is guaranteed. zi Calculate the water level line of each period in reverse chronological order, and take the upper envelope of the long series results as the lower adjustment line;
[0021] Step (8): Remove the damaged years from the long series of years, calculate the water level lines of each period in chronological order based on the specific task to ensure the water supply flow, and take the lower envelope of the long series results as the restricted water supply line;
[0022] Step (9): Draw a multi-level reservoir dispatching diagram using the upward dispatching line, downward dispatching line, restricted water supply line and reservoir characteristic water level line.
[0023] A further preferred embodiment of the present invention is:
[0024] The process of drawing the reservoir water level line in each time period in reverse chronological order in step (3) of the present invention is divided into two time periods:
[0025] a. When the reservoir needs to supply water in the current month during the water supply period, it means that the reservoir must at least store the corresponding water supply at the beginning of the month, and the water level will rise in reverse chronological order from the low water level at the end of the month to the high water level at the beginning of the month;
[0026] b. When the reservoir is in the water storage period and no water supply is needed in that month, the additional water after deducting the water supply from the incoming water is regarded as the water storage capacity of the reservoir from the beginning to the end of the month, and the reservoir water level decreases in reverse chronological order from the high water level at the end of the month to the low water level at the beginning of the month.
[0027] The water level lines corresponding to the defined destruction years in step (4) of the present invention are:
[0028] a. In the first type of damaged year, the water level is at the dead water level at the beginning of the water storage period and the end of the water supply period, but the dispatching line between the water storage period and the water supply period is higher than the normal water storage level;
[0029] b. The water level line in the second type of destructive year is the scheduling line between the water storage period and the water supply period, which is between the dead water level and the normal water storage level, while the water level at the beginning of the water storage period is higher than the dead water level.
[0030] The reduced water supply flow Q in step (7) of the present invention zi It refers to reducing the reservoir water supply flow rate during water supply task i according to the specific water inflow frequency: first determine the degree to which normal water supply is not guaranteed, that is, the damage depth k i (i=1~n), calculate the corresponding water supply reduction coefficient α i (i=1~n), on this basis, the water supply flow Q of the reservoir is reduced zi To reduce water supply:
[0031]
[0032] In formula (2): k i (i=1~n) is the damage depth of water supply task i; Q zi (i=1~n) is the reduced water supply flow rate of water supply task i; the meanings of other symbols are the same as those in formula (1);
[0033] After the long series of water level lines are drawn, check whether they meet the design guarantee rate requirements. If they do not meet the requirements, i (i=1~n) requirement, it is necessary to increase the damage depth k i (i=1~n) value.
[0034] Compared with the prior art, the present invention has the following significant advantages:
[0035] First, the present invention calculates the beneficial storage capacity and normal water level of the reservoir through long-series runoff regulation and beneficial storage capacity scheduling, which can avoid the randomness and uncertainty of the selection of representative years and ensure the practicality and accuracy of the drawn multi-level scheduling diagram.
[0036] Secondly, the present invention specifically defines two water level conditions in years of water supply disruption, and utilizes a long series of scheduling lines and reservoir characteristic water level lines to combine runoff regulation with scheduling diagram verification, which can accurately count disruption years, especially water supply disruptions in some months of the year, thereby overcoming the deficiency of existing methods that cannot identify this type of disruption years.
[0037] Third, the method for compiling the upper adjustment line, the lower adjustment line and the restricted water supply line proposed in the present invention is realized by using the long series of runoff data, which can avoid the problem of intersection between different task scheduling lines. The drawing results do not need to be repeatedly checked and corrected in form, and can realize multi-level scheduling of reservoirs. Figure 1 The first drawing was successful.
[0038] Fourthly, the present invention calculates the guarantee rate by accurately counting the number of years of destruction, and compares and verifies it with the design guarantee rate. While meeting the guarantee rate requirements of different tasks, the depth of destruction can be reduced as much as possible. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 The present invention provides a schematic block diagram of the implementation steps of a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method.
[0040] Figure 2 Schematic diagram of reservoir operation line under different situations.
[0041] Figure 3 It is a schematic diagram of the process of drawing the distribution lines for multi-level reservoir dispatching.
[0042] Figure 4 Draw a schematic diagram of the process for multi-level reservoir dispatching and dispatching.
[0043] Figure 5 Draw a process diagram for the multi-level dispatching restricted water supply line of the reservoir.
[0044] Figure 6 This is a schematic diagram of multi-level reservoir scheduling.
[0045] Figure 7 A long series of water level process line diagrams of reservoirs provided for examples of the present invention.
[0046] Figure 8 A process diagram for drawing the distribution lines for multi-level reservoir dispatching provided by the example of the present invention.
[0047] Fig. 9 A process diagram for drawing the multi-level dispatching and down-regulating distribution lines of a reservoir provided by an example of the present invention.
[0048] Fig.10 A process diagram for drawing a multi-stage reservoir scheduling restriction water supply line provided by an example of the present invention.
[0049] Fig.11 A multi-level reservoir scheduling diagram for integrated irrigation and water supply tasks provided by the example of the present invention. DETAILED DESCRIPTION
[0050] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings and examples.
[0051] Combination Figure 1 The present invention proposes a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method, comprising the following steps:
[0052] Step (1): Calculate the comprehensive water supply flow Q of the reservoir under the specific water inflow frequency P according to the design guarantee rate and water use requirements of the specific water supply task of the comprehensive utilization reservoir. s The design guarantee rate is an annual guarantee rate or a time guarantee rate, and the design method is as follows:
[0053] a. Convert the design guarantee rate of specific water supply tasks into an annual guarantee rate;
[0054] b. Formulate the guaranteed water supply flow rate for specific water supply tasks and determine the water supply reduction coefficient α according to the water demand of specific water supply tasks. i And the corresponding reduced water supply flow Q zi ;
[0055] c. Based on the previous two steps, for the specific water inflow frequency P, the following formula (1) is used to calculate the comprehensive water supply flow Q of the reservoir that undertakes n specific water supply tasks s :
[0056]
[0057] In formula (1): Q s is the comprehensive water supply flow; Q i (i=1~n) is the guaranteed water supply flow rate of the i-th water supply task; α i (i=1~n) is the water supply reduction coefficient of the i-th water supply task; P is the water supply frequency; P i (i=1~n) is the design guarantee rate corresponding to the i-th water supply task after unified conversion, where P 1 >P 2 >…>P i …>P n , P n The minimum design guarantee rate for specific water supply tasks;
[0058] Step (2): Using the long series runoff data, perform long series runoff regulation calculations, sort the long series beneficial storage capacity, and select the beneficial storage capacity corresponding to the minimum frequency that is not less than the minimum value of the design guarantee rate as the initial proposed reservoir beneficial storage capacity;
[0059] First, long series data are used to calculate runoff regulation. Each water supply task uses the guaranteed water supply flow. Given the water inflow process and water demand, the required annual beneficial storage capacity of the reservoir is calculated. The runoff regulation calculation is based on water balance, and the calculation formula for each period is as follows:
[0060] V t -V t-1 =(Q r,t -∑Q i,t -Q f,t -Q l,t -Q p,t )Δt (3)
[0061] In formula (3): V t 、V t-1 are the storage capacity of the reservoir at the end and beginning of the tth period respectively; Q r,t is the average inflow into the reservoir during the tth period; ∑Q i,t Q is the guaranteed water supply flow of the reservoir for the i-th water supply task in the t-th period; f,t is the average evaporation loss flow of the reservoir in period t; Q l,t is the average leakage loss flow of the reservoir in period t; Q p,t is the average water discharge of the reservoir in period t; Δt is the length of the calculation period;
[0062] Then the long series of beneficial storage capacity results are sorted, and the beneficial storage capacity corresponding to the minimum frequency that is not less than the minimum value of the design guarantee rate is selected as the initial proposed reservoir beneficial storage capacity;
[0063] Step (3): For a long series of years, according to the guaranteed water supply flow of the specific water supply task, the reservoir water level lines of each period are drawn in reverse chronological order, starting from the dead water level at the end of the water supply period, until it falls back to the dead water level at the beginning of the water storage period, and the scheduling period is divided into two periods:
[0064] a. When the reservoir needs to supply water in the current month during the water supply period, it means that the reservoir must at least store the corresponding water supply at the beginning of the month, and the water level will rise in reverse chronological order from the low water level at the end of the month to the high water level at the beginning of the month;
[0065] b. When the reservoir is in the water storage period and no water supply is needed in that month, the additional water after deducting the water supply from the incoming water is regarded as the water storage capacity of the reservoir from the beginning to the end of the month, and the reservoir water level decreases in reverse chronological order from the high water level at the end of the month to the low water level at the beginning of the month.
[0066] Step (4): Define the destruction year, which is divided into two types: the first destruction year is defined as the year when the water level line drawn in reverse chronological order exceeds the normal water storage level during the scheduling period; the second destruction year is defined as the year when the water level line drawn in reverse chronological order cannot fall back to the dead water level at the beginning of the scheduling period.
[0067] Figure 2 The following are schematic diagrams of dispatch lines for different situations:
[0068] a. Line 1 indicates that the water level at the beginning of the water storage period and the end of the water supply period is at the dead water level. The dispatching line between the water storage period and the water supply period is between the dead water level and the normal water storage level, which represents the years when the reservoir can supply water normally;
[0069] b. Line 2 is the situation where the water level is at the dead water level at the beginning of the water storage period and the end of the water supply period, but the dispatching line between the water storage period and the water supply period is higher than the normal water storage level, indicating that the beneficial storage capacity required in this year exceeds the initially planned beneficial storage capacity, which is a destructive year;
[0070] c. Line 3 is the dispatching line between the water storage period and the water supply period. It is between the dead water level and the normal water storage level, and the water level at the beginning of the water storage period is higher than the dead water level. This means that the water stored in the reservoir during the water storage period cannot meet the water supply requirements during the dry season, and the reservoir needs to pre-store the storage capacity for water supply in advance. This situation often occurs when the runoff is significantly unevenly distributed throughout the year, which is a destructive year for the annual regulation reservoir;
[0071] Step (5): Count the years of damage and calculate the reservoir water supply guarantee rate. If the value is less than the minimum design guarantee rate of the specific water supply task, adjust the reservoir's beneficial storage capacity and repeat steps (3) to (5) until the reservoir's water supply guarantee rate is not less than the minimum design guarantee rate, and determine the reservoir's beneficial storage capacity and normal water storage level.
[0072] Step (6): Remove the damaged years from the long series of years, calculate the water level lines of each period in reverse order based on the specific water supply task to ensure the water supply flow, and take the upper envelope of the long series results as the upper adjustment line;
[0073] Figure 3 The black dashed line is the reservoir water level line of each year calculated in reverse order according to the specific water supply task to ensure the water supply flow, the black dotted line is the water level line of the damaged year defined in step (4), and the black square line is the reservoir adjustment line of the upper envelope of the long series results;
[0074] Step (7): Remove the damaged years from the long series of years. For the specific water inflow frequency P, according to formula (1), for the water supply task i whose design guarantee rate is less than the water inflow frequency, the reduced water supply flow Q after the water supply flow is reduced is guaranteed. zi Calculate the water level line for each time period in reverse chronological order, and take the upper envelope of the long series results as the lower adjustment line.
[0075] Figure 4 The black dashed line is the reservoir water level line of each year calculated in reverse order according to the reduced water supply flow after the guaranteed water supply flow is reduced, the black dotted line is the water level line of the damaged year defined in step (4), and the black triangle line is the reservoir downward adjustment line of the upper envelope of the long series results;
[0076] Step (8): Remove the damaged years from the long series of years, calculate the water level lines of each period in chronological order based on the specific task to ensure the water supply flow, and take the lower envelope of the long series results as the restricted water supply line.
[0077] Figure 5 This is a schematic diagram of the restricted water supply line, where the black dotted line is the reservoir water level line of each year calculated in chronological order according to the specific task to ensure the water supply flow, and the white inverted triangle line is the restricted water supply line of the lower envelope of the long series results;
[0078] Step (9): Draw a multi-level reservoir dispatching diagram using the upward dispatching line, downward dispatching line, restricted water supply line and reservoir characteristic water level line.
[0079] Figure 6 The result of drawing the upward dispatching line, downward dispatching line and restricted water supply line on the same map. It divides the multi-level dispatching map of the reservoir into 4 dispatching areas to guide the operation of the reservoir, among which:
[0080] Zone ① is the increased water supply zone. When the reservoir water level is in this zone, on the premise of meeting the specific water supply task, the excess water after the reservoir is full can be used to increase the water supply;
[0081] ② Area is the water supply guarantee area, at which time the reservoir can meet the normal water demand of specific water supply tasks;
[0082] ③ Area is a partial water supply reduction area. When the reservoir water level is in this area, the reservoir meets the water supply requirements of the main task, and the water supply needs to be reduced according to the damage depth for the secondary task;
[0083] Area ④ is a restricted water supply area. In addition to ensuring the base flow, the reservoir must reduce water supply for both major and secondary tasks.
[0084] Example 1. Now, the specific implementation of the present invention is further described by taking the application of the present invention to a comprehensive utilization reservoir project as an example. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0085] (1) Design basis
[0086] a. For the long series runoff data of the reservoir, please see Appendix 1.
[0087] b. For information on reservoir irrigation water demand, please see Appendix 2.
[0088] c. Initial conditions:
[0089] The reservoir is a comprehensive annual regulation reservoir that undertakes irrigation and water supply tasks. The annual water supply guarantee rate of the reservoir is 95%, and the average daily water supply of the reservoir is 239,000 m 3 / d, the annual irrigation guarantee rate is 85%, and the irrigation cycle is from March to October.
[0090] (2) Implementation process
[0091] Step 1: Calculate the comprehensive water supply flow Q of the reservoir under the specific water inflow frequency P according to the design guarantee rate and water use requirements of the specific water supply task of the comprehensive utilization reservoir. s , the design guarantee rate is an annual guarantee rate or a time guarantee rate.
[0092] From the basic information, we can know that the main tasks of the reservoir are water supply and irrigation. The water supply guarantee rate is 95%, and the irrigation guarantee rate is 85%, which are unified as annual guarantee rates.
[0093] According to the requirements of water supply and irrigation tasks, the reservoir water supply is for the whole year, and the irrigation water supply is carried out according to the irrigation cycle in Appendix 2. At the same time, the reduction coefficient of the water supply task is 0.95, and the reduction coefficient of the irrigation task is 0.8. Calculate the comprehensive water supply flow of the reservoir under the specific water inflow frequency:
[0094]
[0095] In formula (4): Q s is the comprehensive water supply flow; P is the water supply frequency; Q 1 To ensure the water supply flow for water supply tasks; Q 2 The water supply flow rate is guaranteed for irrigation tasks. The calculation results are shown in Table 3.
[0096] Table 3 Reservoir long series water supply process Unit: 10,000 m 3
[0097]
[0098]
[0099] Step 2, using the long series runoff data, perform long series runoff regulation calculations, sort the frequencies of the long series beneficial storage capacity, and select the beneficial storage capacity corresponding to the minimum frequency that is not less than the minimum value of the design guarantee rate as the initial proposed reservoir beneficial storage capacity.
[0100] Runoff regulation calculations are performed based on the runoff data in Appendix 1 and the comprehensive water supply flow obtained in Step 1, and the required beneficial reservoir capacity is frequency-adjusted in each year. The frequency-adjustment results are shown in Table 4 below.
[0101] Table 4 Calculation results of reservoir capacity and frequency regulation for long series of runoff regulation
[0102] frequency(%) years <![CDATA[Beneficial storage capacity (10,000 m 3 )]]> frequency(%) years <![CDATA[Beneficial storage capacity (10,000 m 3 )]]> 2.7 2012 0 51.4 1981 4973 5.4 1997 97 54.1 1985 5772 8.1 1994 165 56.8 1984 6037 10.8 2002 733 59.5 2003 6049 13.5 2015 857 62.2 2007 6813 16.2 1993 903 64.9 1992 7112 18.9 1999 1228 67.6 2009 7162 21.6 2006 1644 70.3 1988 7669 24.3 1982 1755 73.0 1983 7741 27.0 2001 1973 75.7 2010 7916 29.7 2013 2984 78.4 1989 8495 32.4 2004 3478 81.1 1986 9764 35.1 1987 3493 83.8 1990 9935 37.8 2008 3879 86.5 1991 10057 40.5 2014 3907 89.2 1980 10093 43.2 2000 4724 91.9 1995 10527 45.9 1996 4758 94.6 2011 11510 48.6 2005 4841 97.3 1998 13340
[0103] According to the storage capacity corresponding to the minimum design guarantee rate of 85%, the initial normal water level of the reservoir is 220m, the dead water level is 177m, and the beneficial storage capacity is 101.4 million m 3 .
[0104] Step (3) ensures the water supply flow rate according to the specific water supply task for a long series of years. Starting from the dead water level at the end of the water supply period, the reservoir water level line of each period is drawn in reverse chronological order until it falls back to the dead water level at the beginning of the water storage period. The scheduling period is divided into two periods for drawing.
[0105] The reservoir water level lines for each period are drawn based on the runoff data and water use conditions of each year. Figure 7 .
[0106] Step (4), define the destruction year, which is divided into two types: the first destruction year is defined as the year when the water level line drawn in reverse chronological order exceeds the normal water storage level during the scheduling period; the second destruction year is defined as the year when the water level line drawn in reverse chronological order cannot fall back to the dead water level at the beginning of the scheduling period.
[0107] exist Figure 7 The years corresponding to the black dotted lines are the years of destruction, namely 1980, 1995, 2011, and 1998.
[0108] Step (5), counting the years of damage, calculating the reservoir water supply guarantee rate, if the value is less than the minimum design guarantee rate of the specific water supply task, adjusting the reservoir's beneficial storage capacity, repeating steps (3) to (5) until the reservoir's water supply guarantee rate is not less than the minimum design guarantee rate, and determining the reservoir's beneficial storage capacity and normal water storage level;
[0109] According to the initially proposed beneficial storage capacity and normal water storage level, the number of years of destruction is 5 years, and the reservoir irrigation water supply guarantee rate is 86.1%, which meets the requirement of 85% of the task design guarantee rate. Therefore, the initially proposed beneficial storage capacity and normal water storage level of the reservoir remain unchanged, and continue with step (6);
[0110] Step (6), remove the damaged years from the long series of years, calculate the water level lines of each period in reverse order based on the specific water supply task to ensure the water supply flow, and take the upper envelope of the long series results as the upper adjustment line;
[0111] The long series method is used to draw the reservoir water level lines for each year. The reservoir regulation flow is taken from the water supply and irrigation to ensure the water supply flow, and the dead water level at the end of the water supply period is calculated in reverse chronological order to the dead water level at the beginning of the water storage period. Taking 1980 as an example, the calculation process is shown in Table 5.
[0112] Table 5 Reverse time series calculation table of reservoir water level in 1980 (water supply guaranteed water flow + irrigation guaranteed water flow)
[0113]
[0114] Similarly, the calculation method in Table 5 is used to calculate the reservoir water level process lines for the remaining years of the long series. The water level lines of all years are plotted on one graph. After removing the damaged years, the upper envelope of the long series results is taken as the reservoir upper adjustment line, see Figure 8 .
[0115] Step (7), remove the damaged years from the long series of years, and for the specific water inflow frequency P, according to formula (1), for the water supply task i whose design guarantee rate is less than the water inflow frequency, to ensure the reduced water supply flow Q after the water supply flow is reduced zi Calculate the water level line for each time period in reverse chronological order, and take the upper envelope of the long series results as the lower adjustment line.
[0116] The long series method is used to draw the water level process lines of each year. The water use process of the reservoir adopts the water supply task to ensure the water supply flow and the irrigation task to reduce the water supply flow. The irrigation water destruction depth is 20%, and the dead water level at the end of the water supply period is calculated in reverse chronological order to the dead water level at the beginning of the water storage period. Taking 1980 as an example, the calculation process is shown in Table 6.
[0117] Table 6 Reverse time series calculation table of reservoir water level in 1980 (guaranteed water supply flow + irrigation reduced water supply flow)
[0118]
[0119]
[0120] Similarly, the calculation method of Table 6 is used to calculate the reservoir water level process lines of the remaining years of the long series. The water level lines of all years are plotted on a graph. After removing the damaged years, the upper envelope of the long series results is taken as the reservoir down-adjustment line, see Fig. 9 .
[0121] Step (8), remove the damaged years from the long series of years, calculate the water level lines of each period in chronological order based on the specific task to ensure the water supply flow, and take the lower envelope of the long series results as the restricted water supply line.
[0122] According to the long series of reservoir capacity calculation results, the proposed beneficial reservoir capacity is used to select the normal water supply year that meets the development task requirements, and the time sequence adjustment calculation starts from the dead water level at the beginning of the water storage period. The adjustment flow uses the guaranteed water supply flow of water supply and irrigation. Taking 1980 as an example, its calculation process is shown in Table 7.
[0123] Table 7 Time series calculation table of reservoir water level in 1980 (water supply guaranteed water flow + irrigation guaranteed water flow)
[0124]
[0125] Similarly, the calculation method in Table 7 is used to calculate the reservoir water level process lines for the remaining years. The water level lines of all years are plotted on one graph. After removing the damaged years, the lower envelope of the long series results is taken as the reservoir water supply limit line, see Fig.10 .
[0126] Step (9), using the upward regulation line, the downward regulation line, the restricted water supply line and the reservoir characteristic water level line to draw a multi-level reservoir dispatching diagram.
[0127] On the basis of steps 6, 7 and 8, the upper regulation line, lower regulation line, restricted water supply line and reservoir characteristic water level line are drawn on the same diagram, which is the reservoir multi-level dispatching diagram, see Fig.11 .
[0128] Appendix 1: Long series runoff data of reservoirs
[0129]
[0130]
[0131] Appendix 2: Reservoir irrigation water demand Unit: 10,000 m 3
[0132]
[0133]
[0134] Any details not mentioned in the specific embodiments of the present invention belong to the known technologies in the art and can be implemented with reference to the known technologies.
[0135] The above specific implementation methods and examples are specific support for the technical idea of a method for compiling a multi-level reservoir scheduling diagram based on an improved long series method proposed in the present invention. They cannot be used to limit the protection scope of the present invention. Any equivalent changes or equivalent modifications made on the basis of this technical solution in accordance with the technical idea proposed in the present invention still fall within the scope of protection of the technical solution of the present invention.
Claims
1. A method for compiling multi-level reservoir dispatching diagrams based on the improved long series method. It is characterized in that The specific steps include: Step (1): Calculate the comprehensive water supply flow Q of the reservoir under the specific water inflow frequency P according to the design guarantee rate and water use requirements of the specific water supply task of the comprehensive utilization reservoir. s The design guarantee rate is an annual guarantee rate or a time guarantee rate, and the design method is as follows: a. Convert the design guarantee rate of specific water supply tasks into an annual guarantee rate; b. Formulate the guaranteed water supply flow rate for specific water supply tasks and determine the water supply reduction coefficient α according to the water demand of specific water supply tasks. i And the corresponding reduced water supply flow Q zi ; c. Based on the previous two steps, for the specific water inflow frequency P, the following formula (1) is used to calculate the comprehensive water supply flow Q of the reservoir that undertakes n specific water supply tasks s : In formula (1): Q s is the comprehensive water supply flow; Q i is the guaranteed water supply flow rate of the i-th water supply task, where i is i=1~n; α i is the water supply reduction coefficient for the i-th water supply task, where i is i=1~n; P is the water supply frequency; P i is the design guarantee rate corresponding to the i-th water supply task after unified conversion, where i is i=1~n, P 1 >P 2 >…>P i …>P n , P n The minimum design guarantee rate for specific water supply tasks; Step (2): Using the long series runoff data, perform long series runoff regulation calculations, sort the long series beneficial storage capacity, and select the beneficial storage capacity corresponding to the minimum frequency that is not less than the minimum value of the design guarantee rate as the initial proposed reservoir beneficial storage capacity; The long series runoff regulation calculation refers to the calculation of the required annual beneficial storage capacity of the reservoir by using the guaranteed water supply flow for each water supply task, knowing the water inflow process and water demand; the runoff regulation calculation is based on water balance, and the calculation formula for each period is as follows: V t -V t-1 =(Q r,t -ΣQ i,t -Q f,t -Q l,t -Q p,t )Δt (3) In formula (3): V t 、V t-1 are the storage capacities of the reservoir at the end and beginning of the tth period respectively; Q r,t is the average inflow into the reservoir during the tth period; ∑Q i,t Q is the guaranteed water supply flow of the reservoir for the i-th water supply task in the t-th period; f,t is the average evaporation loss flow of the reservoir in period t; Q l,t is the average leakage loss flow of the reservoir in period t; Q p,t is the average water discharge of the reservoir in period t; Δt is the length of the calculation period; Step (3): for a long series of years, the water supply flow is guaranteed according to the specific water supply task, starting from the dead water level at the end of the water supply period, and the reservoir water level lines of each period are drawn in reverse chronological order until they fall back to the dead water level at the beginning of the water storage period; Step (4): define the destruction year, which is divided into two types: the first destruction year is defined as the year when the water level drawn in reverse chronological order exceeds the normal water storage level during the scheduling period; the second destruction year is defined as the year when the water level drawn in reverse chronological order cannot fall back to the dead water level at the beginning of the scheduling period; Step (5): Count the years of damage and calculate the reservoir water supply guarantee rate. If the value is less than the minimum design guarantee rate of the specific water supply task, adjust the reservoir's beneficial storage capacity and repeat steps (3) to (5) until the reservoir's water supply guarantee rate is not less than the minimum design guarantee rate, and determine the reservoir's beneficial storage capacity and normal water storage level. Step (6): Remove the damaged years from the long series of years, calculate the water level lines of each period in reverse order based on the specific water supply task to ensure the water supply flow, and take the upper envelope of the long series results as the upper adjustment line; Step (7): Remove the damaged years from the long series of years. For the specific water inflow frequency P, according to formula (1), for the water supply task i whose design guarantee rate is less than the water inflow frequency, the reduced water supply flow Q after the water supply flow is reduced is guaranteed. zi Calculate the water level line of each period in reverse chronological order, and take the upper envelope of the long series results as the lower adjustment line; Step (8): Remove the damaged years from the long series of years, calculate the water level lines of each period in chronological order based on the specific task to ensure the water supply flow, and take the lower envelope of the long series results as the restricted water supply line; Step (9): Draw a multi-level reservoir dispatching diagram using the upward dispatching line, downward dispatching line, restricted water supply line and reservoir characteristic water level line.
2. According to claim 1, a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method, It is characterized in that The process of drawing the reservoir water level line in each time period in reverse chronological order in step (3) is divided into two time periods: a. When the reservoir needs to supply water in the current month during the water supply period, it means that the reservoir must at least store the corresponding water supply at the beginning of the month, and the water level will rise in reverse chronological order from the low water level at the end of the month to the high water level at the beginning of the month; b. When the reservoir is in the water storage period and no water supply is needed in that month, the additional water after deducting the water supply from the incoming water is regarded as the water storage capacity of the reservoir from the beginning to the end of the month, and the reservoir water level decreases in reverse chronological order from the high water level at the end of the month to the low water level at the beginning of the month.
3. According to claim 1, a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method, It is characterized in that The water level lines corresponding to the destruction years defined in step (4) are: a. In the first type of damaged year, the water level is at the dead water level at the beginning of the water storage period and the end of the water supply period, but the dispatching line between the water storage period and the water supply period is higher than the normal water storage level; b. The water level line in the second type of destructive year is the scheduling line between the water storage period and the water supply period, which is between the dead water level and the normal water storage level, while the water level at the beginning of the water storage period is higher than the dead water level.
4. According to claim 1, a method for compiling a multi-level reservoir dispatching diagram based on an improved long series method, It is characterized in that Step (7) The reduced water supply flow Q zi It refers to reducing the reservoir water supply flow rate during water supply task i according to the specific water inflow frequency: first determine the degree to which normal water supply is not guaranteed, that is, the damage depth k i , where i is i=1~n, and the corresponding water supply reduction coefficient α is calculated i , where i is i=1~n, on this basis, the water supply flow Q of the reservoir is reduced zi To reduce water supply: In formula (2): k i is the damage depth of water supply task i, where i is i=1~n; Q zi is the reduced water supply flow rate of water supply task i, where i is i=1~n; the meanings of other symbols are the same as those in formula (1); After the long series of water level lines are drawn, check whether they meet the design guarantee rate requirements. If they do not meet the requirements, i The requirement is to increase the damage depth k i The value of i is i=1~n.