Tailings pond rainfall monitoring point setting method, device, electronic equipment and storage medium
By dividing the water catchment area of the tailings pond into sub-catch areas within and outside the warehouse, and setting rainfall monitoring points according to the importance, the problem of excessive monitoring costs caused by the arrangement of rainfall sensors in the tailings pond sub-catch area is solved. The effect of precise monitoring and cost reduction is achieved by sub-regional.
Patent Information
- Application Number
- CN202411516122.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2044-10-29
AI Technical Summary
The arrangement of rain sensors in all subcatchment areas of tailings ponds leads to the problem of excessive monitoring costs.
The water catchment area of the tailings pond is divided into one water catchment area and multiple sub-catch areas outside the warehouse. The importance of each sub-catch area is calculated based on the flood peak flow, inlet flood flow and discharge flow, and according to the importance Set the rainfall monitoring point.
Through region division and importance sorting, precise rainfall monitoring is achieved by region-by-regional, reducing the number of rainfall monitoring points, reducing monitoring costs, and supporting dynamic adjustment of rainfall monitoring points.
Smart Images

Figure CN119026819B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tailings pond safety technology, and in particular to a method, a device, an electronic device and a storage medium for setting rainfall monitoring points in a tailings pond. Background Art
[0002] Tailings ponds are places for storing ore sorting waste and are a man-made high-potential debris flow hazard source. For valley-type tailings ponds, floods caused by rainfall pose a serious safety threat to tailings ponds, leading to disasters such as flooding and dam breaches, which have a serious impact on the safety of people's lives, property and the environment downstream of the tailings ponds. Accurate monitoring of rainfall can effectively predict floods and help tailings ponds take emergency precautions in advance, thereby avoiding flooding and dam breaches.
[0003] At present, the common method for rainfall monitoring is to treat the entire tailings pond and the upstream catchment area as a whole and set up only one rainfall monitoring point. However, the catchment areas of different tailings ponds are not the same size, and the rainfall at different locations within the catchment area may be inconsistent. Therefore, relevant technicians have proposed dividing the tailings pond into different sub-catchment areas and setting up rainfall sensors in each sub-catchment area to achieve rainfall distribution monitoring. However, for some tailings ponds, the number of sub-catchment areas may reach more than 10. If rainfall sensors are deployed in all of them, the monitoring cost will be too high. Summary of the invention
[0004] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method, device, electronic device and storage medium for setting rainfall monitoring points in a tailings pond, which effectively solves the problem of excessively high monitoring costs caused by arranging rainfall sensors in all sub-catchment areas of the tailings pond.
[0005] In a first aspect, the present invention provides a method for setting rainfall monitoring points in a tailings pond, the method comprising:
[0006] Divide the catchment area of the tailings pond into an inner catchment area and multiple outer catchment areas;
[0007] Calculating the peak flow and peak time of each sub-catchment area outside the reservoir respectively;
[0008] Calculate the flood flow into the reservoir in the catchment area of the reservoir;
[0009] Calculate the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow entering the reservoir;
[0010] Obtaining the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak flow period;
[0011] A corresponding rainfall monitoring point of the sub-catchment area outside the reservoir is set according to the importance.
[0012] Furthermore, the water catchment area of the tailings pond is divided into an inner water catchment area and a plurality of outer water catchment areas, including:
[0013] Obtaining a measured topographic map of the tailings pond;
[0014] According to the measured topographic map, the beach surface and the water catchment area of the tailings pond are used as the water catchment area in the reservoir;
[0015] A plurality of ridge lines above the channel in the external catchment area of the reservoir are obtained according to the measured topographic map, and a plurality of closed circles formed by the plurality of ridge lines and the edge line of the internal catchment area are used as a plurality of the external catchment areas.
[0016] Furthermore, the step of respectively calculating the peak flow and peak time of each sub-catchment area outside the reservoir includes:
[0017] Obtaining the watershed parameters of the tailings pond and the topographic parameters of each sub-catchment area outside the pond;
[0018] Draw the flood process curve of each sub-catchment area outside the reservoir according to the watershed parameters and the terrain parameters;
[0019] The flood peak flow and the flood peak time of each sub-catchment area outside the reservoir are determined according to the flood process curve.
[0020] Furthermore, the calculation of the flood flow into the reservoir in the catchment area includes:
[0021] The flood flow into the reservoir is obtained by calculation based on the area of the catchment area in the reservoir and the rainfall intensity.
[0022] Furthermore, the calculation of the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the inflow flood flow includes:
[0023] The total amount of flood directly entering the reservoir within the flood peak time of each of the sub-catchment areas outside the reservoir is calculated according to the flood flow into the reservoir and the flood peak time of each of the sub-catchment areas outside the reservoir;
[0024] Determine the real-time water level of each tailings pond according to the total amount of flood water directly entering the reservoir during each flood peak period;
[0025] The tailings pond discharge during the flood peak time of each sub-catchment area outside the pond is determined according to the real-time water level height of each tailings pond.
[0026] Further, the importance of each of the sub-catchment areas outside the reservoir is obtained according to the peak flow, the flood flow entering the reservoir and the tailings reservoir discharge during the peak time, including:
[0027] If there is a sub-catchment area outside the reservoir whose peak flow is less than the first threshold, the sub-catchment area outside the reservoir is determined to be of level 3 importance, and the first threshold is the minimum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir;
[0028] If there is a sub-catchment area outside the reservoir whose peak flow is greater than or equal to the first threshold and less than the second threshold, the sub-catchment area outside the reservoir is determined as the secondary importance, and the second threshold is the maximum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir;
[0029] If there is a sub-catchment area outside the reservoir whose flood peak flow is greater than or equal to the second threshold, the sub-catchment area outside the reservoir is determined to be of first-level importance.
[0030] Furthermore, setting the corresponding rainfall monitoring point of the sub-catchment area outside the reservoir according to the importance includes:
[0031] If there is a sub-catchment area outside the reservoir with the first-level importance, it is determined to set the rainfall monitoring point in the sub-catchment area outside the reservoir;
[0032] If there is a sub-catchment area outside the reservoir with the second-level importance, the rainfall monitoring point of the sub-catchment area outside the reservoir is set according to the actual demand of monitoring accuracy;
[0033] If there is a sub-catchment area outside the reservoir with the third level of importance, it is determined that the rainfall monitoring point is not set in the sub-catchment area outside the reservoir.
[0034] In a second aspect, the present invention provides a device for setting rainfall monitoring points in a tailings pond, the device comprising:
[0035] A region division module is used to divide the catchment area of the tailings pond into an inner catchment area and multiple outer catchment areas;
[0036] The first calculation module is used to calculate the peak flow and peak time of each sub-catchment area outside the reservoir respectively;
[0037] The second calculation module is used to calculate the flood flow into the reservoir in the catchment area of the reservoir;
[0038] A third calculation module is used to calculate the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow into the reservoir;
[0039] An importance determination module, for obtaining the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak time;
[0040] A monitoring point setting module is used to set the corresponding rainfall monitoring point of the sub-catchment area outside the reservoir according to the importance.
[0041] In a third aspect, the present invention provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for setting rainfall monitoring points in a tailings pond as described in the first aspect of the present invention.
[0042] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for setting rainfall monitoring points in a tailings pond as described in the first aspect of the present invention is implemented.
[0043] The method, device, electronic device and storage medium for setting the rainfall monitoring point of the tailings pond provided by the present invention can divide the importance of the sub-catchment areas according to the actual impact of floods formed in different sub-catchment areas on the tailings pond, and arrange the rainfall monitoring points in a targeted manner according to the order of importance, which can help mining enterprises decide on the key areas for rainfall monitoring of the tailings pond, and can realize accurate monitoring of rainfall in different regions while minimizing the number of rainfall monitoring points to the greatest extent, effectively reducing the monitoring cost. At the same time, according to the changes in the external drainage area inside and outside the reservoir during the operation of the tailings pond at different times, the rainfall monitoring points are adjusted in real time, realizing the dynamic optimization arrangement of the distributed rainfall monitoring points of the tailings pond, which is conducive to the enterprise dynamically adjusting the rainfall monitoring strategy with different production stages, and realizing cost control and efficient management. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0045] Figure 1 It is a first schematic diagram of the process of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0046] Figure 2 It is a second schematic diagram of the process of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0047] Figure 3 Schematic diagram of the water catchment area division of the tailings pond in an embodiment of the present invention;
[0048] Figure 4 3 is a schematic diagram of a method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0049] Figure 5 is a flood process curve of each sub-catchment area outside the reservoir in the embodiment of the present invention;
[0050] Figure 6 4 is a schematic diagram of a method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0051] Figure 7 5 is a fifth schematic diagram of a method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0052] Figure 8 6 is a schematic diagram of a method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0053] Fig. 9 It is a schematic diagram of the structure of a device for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention;
[0054] Fig.10 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention.
[0055] Description of main component symbols:
[0056] 900. Tailings pond rainfall monitoring point setting device; 910. Area division module; 920. First calculation module; 930. Second calculation module; 940. Third calculation module; 950. Importance determination module; 960. Monitoring point setting module; 1000. Electronic device; 1010. Processor; 1020. Communication interface; 1030. Memory; 1040. Communication bus. DETAILED DESCRIPTION
[0057] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be further clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. It should be noted that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0058] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0059] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used in this specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.
[0060] A common method for monitoring rainfall in tailings ponds is to treat the entire tailings pond and the upstream catchment area as a whole and only set up one rainfall monitoring point. However, the catchment areas of different tailings ponds are not the same size, and the rainfall at different locations within the catchment area may be inconsistent. Therefore, relevant technicians have proposed dividing the tailings pond into different sub-catchment areas and setting up rainfall sensors in each sub-catchment area to achieve rainfall distribution monitoring. However, for some tailings ponds, the number of sub-catchment areas may reach more than 10. If rainfall sensors are deployed in all of them, the monitoring cost will be too high.
[0061] Example 1
[0062] The embodiment of the present invention provides a method for setting rainfall monitoring points in a tailings pond, which effectively solves the problem of excessively high monitoring costs caused by arranging rainfall sensors in all sub-catchment areas of the tailings pond. Figure 1 : is a first schematic diagram of the process of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention, such as Figure 1 As shown, the method comprises the following steps:
[0063] S100, dividing the catchment area of the tailings pond into an in-pond catchment area and a plurality of out-pond sub-catchment areas.
[0064] Figure 2 2 is a second schematic diagram of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention. Figure 2 As shown in Figure 1, the division of the catchment area includes the following steps:
[0065] S110. Obtain a measured topographic map of the tailings pond.
[0066] In the embodiment of the present invention, satellite images and three-dimensional oblique photography images are used to perform image preprocessing and extract the study area, so as to obtain a three-dimensional measured topographic map of the tailings pond.
[0067] S120. Based on the measured topographic map, the beach surface and catchment area of the tailings pond shall be used as the catchment area within the pond.
[0068] The catchment area of the tailings pond is divided according to the three-dimensional measured topographic map. The catchment area inside the pond refers to the area where the water flow inside the tailings pond can naturally flow to the tailings pond and be stored in it. Figure 3 Schematic diagram of the catchment area division of the tailings pond in the embodiment of the present invention, Figure 3 As shown, the beach and catchment area of the tailings pond are taken as the catchment area in the reservoir. In the embodiment of the present invention, it is assumed that the basin area of the catchment area in the reservoir is F .
[0069] S130, obtaining multiple ridge lines above the channel in the watershed outside the reservoir according to the measured topographic map, and using multiple closed circles formed by the multiple ridge lines and the edge lines of the watershed inside the reservoir as multiple sub-watersheds outside the reservoir.
[0070] The sub-catchment outside the reservoir refers to the area outside the tailings pond but with direct or indirect water flow connection with the tailings pond. The water flow in these areas may enter the tailings pond through surface runoff and groundwater infiltration. The sub-catchment outside the reservoir is divided according to the ditch inside the sub-catchment outside the reservoir. The closed circle formed by the ridge line above the ditch inside the sub-catchment outside the reservoir and the edge line of the internal catchment is regarded as the sub-catchment outside the reservoir, such as Figure 3 As shown, the embodiment of the present invention can obtain 5 sub-catchment areas outside the reservoir, which are H 1- H 5, whose areas are F 1- F 5. In the three-dimensional measured topographic map, the area of the watershed within the reservoir and the sub-watershed outside the reservoir are delineated. The drainage area results of the watershed area are shown in Table 1.
[0071] Table 1. Result table of drainage area of catchment area
[0072]
[0073] S200, respectively calculating the peak flow and peak time of each sub-catchment area outside the reservoir.
[0074] Figure 4 3 is a third schematic diagram of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention. Figure 4 As shown in Figure 2, the calculation of peak flow and peak time includes the following steps:
[0075] S210. Obtain the watershed parameters of the tailings pond location and the topographic parameters of each sub-catchment area outside the pond.
[0076] In an embodiment of the present invention, the watershed parameters of the tailings pond location are obtained according to the local hydrological manual, and the watershed parameters include but are not limited to runoff generation zones, rainfall runoff coefficients, infiltration coefficients and other parameters. Then, the terrain parameters of each sub-catchment area outside the tailings pond are obtained according to the actual terrain conditions of the tailings pond, and the terrain parameters include but are not limited to parameters such as catchment area, channel length and channel slope.
[0077] S220. Draw the flood process curve of each sub-catchment area outside the reservoir according to the basin parameters and terrain parameters.
[0078] Optionally, the peak flow and peak time are obtained by using a hydrological calculation method according to the basin parameters and the terrain parameters, and the hydrological calculation method includes but is not limited to a simplified reasoning method, a local empirical formula method, and a unit line algorithm. In an embodiment of the present invention, a unit line algorithm is used for hydrological calculation, and a flood process curve of the sub-catchment area outside the reservoir is drawn. The specific steps are as follows:
[0079] First, the rainfall amount every 10 minutes obtained by monitoring the rain gauge is a, and a is used as the continuous rainfall amount calculated this time. In the embodiment of the present invention, a is assumed to be 2 mm, and the rainfall period is Δt=1 / 6h.
[0080] Then, the hydrological manual was consulted to find that the runoff zone of the watershed where the tailings pond is located is Zone VII. According to the rainfall runoff table of Zone VII, under the continuous rainfall of 2 mm every 10 minutes, the rainfall intensity in each period is I (mm / h), as shown in Table 2.
[0081] Table 2. Schematic diagram of rainfall intensity in each rainfall period
[0082] Rainfall period Δ (min) 0~180 190 200 210 220 230 240 Rainfall intensity I (mm / h) 4.8 6 5.4 6 5.4 6 1.3 Rainfall period Δ (min) 250 260 270 280 290 300 310 Rainfall intensity I (mm / h) 7.8 7.2 7.8 7.8 8.4 7.8 8.4 Rainfall period Δ (min) 320 330 340 350 360 370 380 Rainfall intensity I (mm / h) 7.8 8.4 10.2 9.6 10.2 9.6 10.2 Rainfall period Δ (min) 390 400 410 420 430 440 450 Rainfall intensity I (mm / h) 10.8 10.8 10.2 10.8 10.8 10.8 11.4 Rainfall period Δ (min) 460 470 480 490 500 510 520~900 Rainfall intensity I (mm / h) 10.8 11.4 10.8 11.4 11.4 12 11.4
[0083] The net rainfall intensity of each rainfall period is calculated based on the rainfall intensity of each rainfall period and the infiltration coefficient. I N , the calculation formula is as follows:
[0084]
[0085] In the above formula, f Indicates the infiltration rate in mm / h; a 1 represents the infiltration coefficient. The infiltration coefficient of Area VII is 0.182. I represents the rainfall intensity, in mm / h. f z Indicates the total amount of infiltration, in mm; N stands for The net rainfall in each rainfall period, in mm; Δt represents the rainfall period, in h; I N It indicates the net rainfall intensity in each rainfall period, in mm / h.
[0086] According to Table 2 combined with the above calculation formula, a schematic table of net rain intensity in each rainfall period can be obtained, as shown in Table 3.
[0087] Table 3. Schematic diagram of net rainfall intensity in each rainfall period
[0088] Rainfall period Δ (min) 0~180 190 200 210 220 230 240 <![CDATA[Net rainfall intensity I N (mm / h)]]> 3.9264 4.908 4.4172 4.908 4.4172 4.908 6.3804 Rainfall period Δ (min) 250 260 270 280 290 300 310 <![CDATA[Net rainfall intensity I N (mm / h)]]> 6.3804 5.8896 6.3804 6.3804 6.8712 6.3804 6.8712 Rainfall period Δ (min) 320 330 340 350 360 370 380 <![CDATA[Net rainfall intensity I N (mm / h)]]> 6.3804 6.8712 8.3436 7.8528 8.3436 7.8528 8.3436 Rainfall period Δ (min) 390 400 410 420 430 440 450 <![CDATA[Net rainfall intensity I N (mm / h)]]> 8.8344 8.8344 8.3436 8.8344 8.8344 8.8344 9.3252 Rainfall period Δ (min) 460 470 480 490 500 510 520~900 <![CDATA[Net rainfall intensity I N (mm / h)]]> 8.8344 9.3252 8.8344 9.3252 9.3252 9.816 9.3252
[0089] Then calculate the confluence parameters, the calculation formula is as follows:
[0090]
[0091] In the above formula, m represents the confluence parameter, F i Represents the area of the ith subcatchment area outside the reservoir, in km 2 ; J It represents the basin slope expressed in thousandths, a, b, c and d represent coefficients determined according to the runoff generating zones. In the embodiment of the present invention, the values of coefficients a, b, c and d of zone VII are 3.95, 0.209, 0.045 and 0.315 respectively. The basin areas and basin slopes of the five sub-catchments outside the reservoir are shown in Table 4.
[0092] Table 4. Schematic diagram of drainage area and drainage slope of each sub-catchment area outside the reservoir
[0093] Subcatchment area outside the reservoir <![CDATA[H1]]> <![CDATA[H2]]> <![CDATA[H3]]> <![CDATA[H4]]> <![CDATA[H5]]> <![CDATA[Watershed area F i (km 2 )]]> 0.079195 0.194324 0.296377 0.175658 0.027097 Slope of the watershed expressed in parts per thousand 19 287 183 223 316
[0094] Calculate the unit line function for each rainfall period based on the confluence parameters q(t) , the calculation formula is as follows:
[0095]
[0096] In the above formula, S(t) represents the flow function in time period t, u(t) represents the flow increment function from time period t-1 to time period t, q(t) Represents the unit line function for each rainfall period.
[0097] The net rainfall intensity of each rainfall period I N The corresponding unit line function q ( t ) is multiplied by the net rain condition to obtain the flood process formed under the net rain condition. The flood process formed under the net rain condition in different rainfall periods is added together to obtain the flood process curve formed by the entire rainfall process. Figure 5 It is the flood process curve of each sub-catchment area outside the reservoir in the embodiment of the present invention.
[0098] S230. Determine the peak flow and peak time of each sub-catchment area outside the reservoir according to the flood process curve.
[0099] The peak flow and peak time of the five sub-catchments outside the reservoir were read according to the flood process curve, as shown in Table 5.
[0100] Table 5. Peak flow and peak time results of the five sub-catchments outside the reservoir
[0101]
[0102] S300, calculating the flood flow into the reservoir in the catchment area.
[0103] The flood flow into the reservoir is calculated based on the area of the reservoir catchment area and the rainfall intensity. The calculation formula for the flood flow into the reservoir is as follows:
[0104]
[0105] In the above formula, Q represents the flood flow into the reservoir catchment area, in m 3 / s; F represents the area of the catchment area in the reservoir, in m 2 ; I represents rainfall intensity, unit is mm / s.
[0106] In the embodiment of the present invention, the area of the water catchment area in the reservoir F =108753m 2 , the rainfall every 10 minutes monitored by the rain gauge is 2 mm, then the flood flow into the reservoir catchment area is:
[0107]
[0108] S400, calculating the tailings pond discharge flow rate during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow rate entering the reservoir.
[0109] Figure 6 4 is a schematic diagram of the method for setting the rainfall monitoring points in the tailings pond provided by the embodiment of the present invention. Figure 6 As shown in the figure, the steps for calculating the tailings pond discharge during the flood peak time of the sub-catchment area outside the reservoir include the following steps:
[0110] S410, calculating the total amount of flood directly entering the reservoir during the flood peak time of each sub-catchment area outside the reservoir according to the flood flow into the reservoir and the flood peak time of each sub-catchment area outside the reservoir.
[0111] The calculation formula for the total amount of flood water directly entering the reservoir during the flood peak period of the sub-catchment area outside the reservoir is as follows:
[0112]
[0113] In the above formula,V i Indicates i The total amount of flood water directly entering the reservoir during the flood peak period of each sub-catchment area outside the reservoir, unit: m 3 , Q Indicates the flood flow into the reservoir catchment area, in m 3 / s; t i Indicates i The flood peak time of each sub-catchment outside the reservoir, in seconds.
[0114] In the embodiment of the present invention, the calculation is performed by taking the sub-catchment area H1 outside the reservoir as an example, and its flood peak time is 700 minutes. Then the total amount of flood directly entering the reservoir during the flood peak time of the sub-catchment area H1 outside the reservoir is:
[0115]
[0116] The total amount of flood water directly entering the reservoir during the flood peak period of the five sub-catchments outside the reservoir is shown in Table 6.
[0117] Table 6. Schematic diagram of the total amount of flood water directly entering the reservoir during the flood peak period in the five sub-catchments outside the reservoir
[0118]
[0119] S420, determining the real-time water level height of each tailings pond according to the total amount of flood water directly entering the reservoir during each flood peak time.
[0120] In the embodiment of the present invention, the calculation formula for the real-time water level of the tailings pond after the total amount of flood water directly entering the tailings pond during the flood peak time of each sub-catchment area outside the reservoir enters the tailings pond is as follows:
[0121]
[0122] In the above formula, H i Indicates i The real-time water level of the tailings pond after the total amount of flood water entering the tailings pond directly from the flood peak time of each sub-catchment area outside the reservoir enters the tailings pond, in meters; H ( V i ) represents the corresponding relationship between the real-time water level of the tailings pond and the total amount of flood directly entering the pond during the flood peak period.
[0123] Combined with the contour map of the tailings pond, the corresponding relationship between the water level rise of the tailings pond and the total amount of flood water directly entering the reservoir during the flood peak period is obtained. Specifically, the area of adjacent contour lines on the contour map is first obtained, and the mean of the area of adjacent contour lines is calculated. The product of the mean of the area of adjacent contour lines and the height difference between adjacent contour lines is the volume between adjacent contour lines. The volume between contour lines is added to obtain the flood control storage capacity corresponding to different contour elevations. Then, the calculated total amount of flood water directly entering the reservoir during the flood peak period is substituted into the flood control storage capacity corresponding to the contour elevation, and the real-time water level of the tailings pond corresponding to the total amount of flood water directly entering the reservoir is obtained by interpolation.
[0124] In the embodiment of the present invention, the initial water level of the tailings pond is 1008.8m, and its contour elevation and the corresponding flood control storage capacity are shown in Table 7.
[0125] Table 7. Schematic diagram of contour elevations and corresponding flood control reservoir capacity
[0126]
[0127] Substitute the total amount of flood water directly entering the reservoir during the flood peak time of the five sub-catchments outside the reservoir in Table 6 into Table 7 for interpolation and back calculation to obtain the real-time water level height of the tailings pond after the total amount of flood water directly entering the reservoir during the flood peak time of the five sub-catchments outside the reservoir enters the tailings pond. The calculation results are shown in Table 8.
[0128] Table 8. Schematic diagram of real-time water level height of tailings pond during flood peak time in sub-catchment area outside the reservoir
[0129]
[0130] S430, determining the tailings pond discharge flow rate during the flood peak time of each sub-catchment area outside the pond according to the real-time water level height of each tailings pond.
[0131] The calculation formula for the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir is as follows:
[0132]
[0133] In the above formula, q i For the i The tailings pond discharge volume during the flood peak time of the sub-catchment area outside the reservoir, unit: m 3 / s; q ( H i ) is the corresponding relationship between the real-time water level of the tailings pond and the discharge volume of the tailings pond during the flood peak time.
[0134] Optionally, the correspondence between the water level elevation of the tailings pond and the discharge of the tailings pond during the flood peak time can be obtained through the empirical formula corresponding to the form of the tailings pond flood discharge structure, or through a physical model discharge test. The forms of tailings pond flood discharge structures include but are not limited to well-pipe type, well-hole type, trough-pipe type, trough-hole type, spillway type, or a combination of the above forms. The physical model discharge test directly obtains the relationship between the water level elevation height of the tailings pond and the discharge of the tailings pond based on laboratory hydraulic tests.
[0135] According to the water level elevation height and initial water level of the tailings pond, the real-time water level of the tailings pond can be calculated. The calculation formula is:
[0136]
[0137] In the above formula, H i Indicates i The real-time water level of the tailings pond after the total amount of flood water entering the tailings pond directly from the flood peak time of each sub-catchment area outside the reservoir enters the tailings pond, in meters; H 0 represents the initial water level of the tailings pond, in m; L i Indicates i The height of the tailings pond water level rise after the total amount of flood water directly entering the tailings pond during the flood peak time of each sub-catchment area outside the reservoir enters the tailings pond, in meters.
[0138] In an embodiment of the present invention, a physical model discharge test is used to obtain the relationship between the water level rise height of the tailings pond and the discharge volume of the tailings pond as shown in Table 9 below.
[0139] Table 9. Schematic diagram of the relationship between the water level rise height of the tailings pond and the discharge volume of the tailings pond
[0140] Tailings pond water level rise height (m) 0 0.2 0.4 0.6 0.8 1 <![CDATA[Tailing pond discharge (m 3 / s)]]> 0 1.4143775 4.683392 8.3932452 12.59786 17.1527 Tailings pond water level rise height (m) 1.2 1.4 1.6 1.8 2 2.2 <![CDATA[Tailing pond discharge (m 3 / s)]]> 21.951873 26.911556 31.962112 36.401512 38.529673 40.535076
[0141] In the embodiment of the present invention, the initial water level of the tailings pond is 1008.8 m, and the relationship between the water level elevation of the tailings pond and the discharge flow of the tailings pond is shown in Table 10 below.
[0142] Table 10. Schematic diagram of the relationship between tailings pond water level elevation and tailings pond discharge
[0143] Tailings pond water level elevation (m) 1008.8 1009 1009.2 1009.4 1009.6 1009.8 <![CDATA[Tailing pond discharge (m 3 / s)]]> 0 1.4143775 4.683392 8.3932452 12.59786 17.1527 Tailings pond water level elevation (m) 1010 1010.2 1010.4 1010.6 1010.8 1011 <![CDATA[Tailing pond discharge (m 3 / s)]]> 21.951873 26.911556 31.962112 36.401512 38.529673 40.535076
[0144] Substituting the real-time water level height of the tailings pond during the flood peak time of the five sub-catchments outside the reservoir in Table 8 into Table 10 for interpolation calculation, the tailings pond discharge during the flood peak time of the five sub-catchments outside the reservoir can be obtained as shown in Table 11.
[0145] Table 11. Schematic diagram of tailings pond discharge during flood peak time in 5 sub-catchments outside the reservoir
[0146]
[0147] S500, obtaining the importance of each sub-catchment area outside the reservoir according to the peak flow, the flood flow entering the reservoir and the discharge of the tailings reservoir during the peak time.
[0148] The flood inflow of the reservoir catchment area, the peak flow of each sub-catchment area outside the reservoir and the discharge of the tailings pond during the peak time are compared, and the importance of each sub-catchment area outside the reservoir is determined based on the comparison results. Figure 7 5 is a fifth schematic diagram of the method for setting rainfall monitoring points in a tailings pond provided by an embodiment of the present invention. Figure 7 As shown in Figure 2, determining the importance of each sub-catchment area outside the reservoir includes the following steps:
[0149] S510. If there is a sub-catchment outside the reservoir whose flood peak flow is less than the first threshold, the sub-catchment outside the reservoir is determined as the third-level importance, and the first threshold is the minimum value of the flood flow into the reservoir and the tailings pond discharge during the flood peak time of the sub-catchment outside the reservoir.
[0150] If there is i When M i <min( Q , q i ) i The sub-catchments outside the reservoir are determined as three levels of importance, among which M i Indicates i Peak flow of sub-catchment areas outside the reservoir, min( Q , q i ) is the first threshold, which represents the minimum value of the inflow flood flow and the tailings pond discharge during the flood peak time of the sub-catchment area outside the reservoir.
[0151] S520. If there is a sub-catchment outside the reservoir whose peak flow is greater than or equal to the first threshold and less than the second threshold, the sub-catchment outside the reservoir is determined as the secondary importance, and the second threshold is the maximum value of the inflow flood flow and the tailings pond discharge during the peak time of the sub-catchment outside the reservoir.
[0152] If there is i When min(Q,q i )≤M i <max(Q,q i ) When i The sub-catchment areas outside the reservoir are determined as secondary importance, max( Q , q i) is the second threshold, which represents the maximum value of the tailings pond discharge during the flood peak time of the inflow flood flow and the sub-catchment area outside the reservoir.
[0153] S530: If there is a sub-catchment area outside the reservoir whose flood peak flow is greater than or equal to the second threshold, the sub-catchment area outside the reservoir is determined as the first-level importance.
[0154] If there is i When M i ≥ max(Q,q i ) When i The sub-catchment area outside the reservoir is determined as the first-level importance.
[0155] In an embodiment of the present invention, a schematic table of the importance of five sub-catchments outside the reservoir is obtained by comparing the inflow flood flow of the reservoir catchment area, the peak flow of each sub-catchment area outside the reservoir, and the tailings pond discharge during the peak time, as shown in Table 12 below.
[0156] Table 12. Schematic diagram of the importance of the five sub-catchments outside the reservoir
[0157]
[0158] S600: Set corresponding rainfall monitoring points in the sub-catchment areas outside the reservoir according to their importance.
[0159] Figure 8 6 is a schematic diagram of the method for setting the rainfall monitoring points in the tailings pond according to an embodiment of the present invention. Figure 8 As shown in Figure 1, the setting of rainfall monitoring points includes the following steps:
[0160] S610: If there is a sub-catchment area outside the reservoir with a first-level importance, it is determined to set a rainfall monitoring point in the sub-catchment area outside the reservoir.
[0161] If there is i When the importance of a sub-catchment outside the reservoir is the first-level importance, it means that the flood formed in the sub-catchment outside the reservoir has a great impact on the tailings pond. In this case, a rainfall monitoring point must be set up in the sub-catchment outside the reservoir to evaluate the flood formed. The rainfall monitoring point may be equipped with equipment including but not limited to rain gauges, rain sensors and rainfall intensity meters.
[0162] S620. If there is a sub-catchment area outside the reservoir with a secondary importance, a rainfall monitoring point of the sub-catchment area outside the reservoir is set according to the actual demand for monitoring accuracy.
[0163] If there is iWhen the importance of a sub-catchment outside the reservoir is the second-level importance, it means that the flood formed in the sub-catchment outside the reservoir has a certain impact on the tailings pond. Whether to set up rainfall monitoring points can be selected according to the actual needs of monitoring accuracy. If the monitoring accuracy requirements for the tailings pond are high, rainfall monitoring points can be set up. If the monitoring accuracy is low, rainfall monitoring points may not be set up.
[0164] S630: If there is a sub-catchment area outside the reservoir with a third-level importance, it is determined that no rainfall monitoring point is set in the sub-catchment area outside the reservoir.
[0165] If there is i When the importance of a sub-catchment outside the reservoir is level three, it means that the flood formed in the sub-catchment outside the reservoir has little impact on the tailings pond, and there is no need to set up rainfall monitoring points.
[0166] In the embodiment of the present invention, the evaluation results of whether to set rainfall monitoring points in the five sub-catchments outside the reservoir are shown in Table 13 below.
[0167] Table 13. Schematic diagram of the evaluation results of whether to set up rainfall monitoring points
[0168]
[0169] Among them, the area where rainfall monitoring points must be set up is the third sub-catchment area H3 outside the reservoir. The areas where rainfall monitoring points can be set up according to the actual needs of monitoring accuracy are the second sub-catchment area H2 outside the reservoir and the fourth sub-catchment area H4 outside the reservoir. The areas where rainfall monitoring points may not be set up are the first sub-catchment area H1 outside the reservoir and the fifth sub-catchment area H5 outside the reservoir.
[0170] As a further implementation method of the present invention, the location of the rainfall monitoring point can be dynamically adjusted according to the changes in the water catchment area inside the reservoir and the sub-water catchment areas outside the reservoir. As the tailings discharge from the tailings pond continues to increase, the area of the water catchment area inside the reservoir will continue to increase, and the area of each sub-water catchment area outside the reservoir will continue to decrease. According to the aforementioned steps S100-S500, the importance of each sub-water catchment area outside the reservoir is determined in real time, and the setting location of the rainfall monitoring point of each sub-water catchment area outside the reservoir is dynamically adjusted.
[0171] In the embodiment of the present invention, if the area of the catchment area of the tailings pond in the next stage increases to F=126753m 2 The corresponding inflow flood flow, the area of the five sub-catchments outside the reservoir, the peak time, the peak flow and the tailings pond discharge during the peak time have all changed. The results of the rainfall monitoring point settings recalculated and determined according to steps S100-S500 are shown in Table 14 below.
[0172] Table 14. Schematic diagram of the results of setting up rainfall monitoring points to be determined in the next stage
[0173]
[0174] Among them, since the importance of the third sub-catchment area H3 outside the reservoir becomes the second-level importance, it can be selected whether to set the rainfall monitoring point area as the second sub-catchment area H3 outside the reservoir according to the actual demand for monitoring accuracy. 2、 The third and fourth sub-catchment areas outside the reservoir H3 and H4, and the areas where rainfall monitoring points may not be set are the first and fifth sub-catchment areas outside the reservoir H1 and H5.
[0175] The method for setting rainfall monitoring points in the tailings pond provided by the embodiment of the present invention can divide the importance of the sub-catchment areas according to the actual impact of floods on the tailings pond caused by different sub-catchment areas, and arrange rainfall monitoring points in a targeted manner according to the order of importance, thereby realizing accurate monitoring of rainfall in different regions while minimizing the number of rainfall monitoring points and effectively reducing the monitoring cost. At the same time, according to the changes in the external drainage area inside and outside the reservoir during the operation of the tailings pond at different times, the rainfall monitoring points are adjusted in real time, realizing the dynamic optimization arrangement of the distributed rainfall monitoring points in the tailings pond.
[0176] Example 2
[0177] Based on the same technical concept as the method embodiment of the above embodiment 1, the embodiment of the present invention provides a device for setting rainfall monitoring points in a tailings pond, Fig. 9 Schematic diagram of the structure of the device for setting the rainfall monitoring point of the tailings pond provided by the embodiment of the present invention. Fig. 9 As shown, the tailings pond rainfall monitoring point setting device 900 includes:
[0178] The area division module 910 is used to divide the catchment area of the tailings pond into an in-pond catchment area and a plurality of out-pond sub-catchment areas.
[0179] The first calculation module 920 is used to calculate the peak flow and peak time of each sub-catchment area outside the reservoir;
[0180] The second calculation module 930 is used to calculate the inflow flood flow of the catchment area in the reservoir.
[0181] The third calculation module 940 is used to calculate the tailings pond discharge flow rate during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow rate entering the reservoir.
[0182] The importance determination module 950 is used to obtain the importance of each sub-catchment area outside the reservoir according to the peak flow, the flood flow entering the reservoir and the discharge of the tailings reservoir during the peak time.
[0183] The monitoring point setting module 960 is used to set the corresponding rainfall monitoring points of the sub-catchment area outside the reservoir according to the importance.
[0184] The tailings pond rainfall monitoring point setting device provided in the embodiment of the present invention can arrange rainfall monitoring points in a targeted manner according to the order of importance, helping mining enterprises to decide on key areas for rainfall monitoring in tailings ponds, which is beneficial for enterprises to dynamically adjust rainfall monitoring strategies in different production stages to achieve cost control and efficient management.
[0185] It can be understood that the implementation method of the mine rainfall monitoring point setting method described in the above-mentioned embodiment 1 is also applicable to this embodiment and can achieve the same technical effect, so it will not be repeated here.
[0186] Example 3
[0187] Based on the same concept, an embodiment of the present invention further provides an electronic device, Fig.10 is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention, such as Fig.10 As shown, the electronic device 1000 may include: a processor 1010, a communication interface 1020, a memory 1030 and a communication bus 1040, wherein the processor 1010, the communication interface 1020 and the memory 1030 communicate with each other through the communication bus 1040. The processor 1010 may call the logic instructions in the memory 1030 to execute the steps of the method for setting the rainfall monitoring point of the tailings pond as described in the above embodiments. For example, it includes:
[0188] S100, dividing the catchment area of the tailings pond into an inner catchment area and a plurality of outer catchment areas;
[0189] S200, respectively calculating the peak flow and peak time of each sub-catchment area outside the reservoir;
[0190] S300, calculating the flood flow into the reservoir in the catchment area of the reservoir;
[0191] S400, calculating the tailings pond discharge flow rate during the flood peak time and inflow flood flow rate of each sub-catchment area outside the reservoir;
[0192] S500, obtaining the importance of each sub-catchment area outside the reservoir according to the peak flow, the flood flow entering the reservoir and the discharge of the tailings reservoir during the peak period;
[0193] S600: Set corresponding rainfall monitoring points in the sub-catchment areas outside the reservoir according to their importance.
[0194] The processor 1010 may be a central processing unit (CPU). The processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.
[0195] In addition, the logic instructions in the above-mentioned memory 1030 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.
[0196] The memory 1030 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the processor, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0197] Example 4
[0198] Based on the same concept, an embodiment of the present invention further provides a computer-readable storage medium, which stores a computer program, and the computer program includes at least one code segment, which can be executed by a main control device to control the main control device to implement the steps of the method for setting the rainfall monitoring point of the tailings pond as described in the above embodiments. For example, it includes:
[0199] S100, dividing the catchment area of the tailings pond into an inner catchment area and a plurality of outer catchment areas;
[0200] S200, respectively calculating the peak flow and peak time of each sub-catchment area outside the reservoir;
[0201] S300, calculating the flood flow into the reservoir in the catchment area of the reservoir;
[0202] S400, calculating the tailings pond discharge flow rate during the flood peak time and inflow flood flow rate of each sub-catchment area outside the reservoir;
[0203] S500, obtaining the importance of each sub-catchment area outside the reservoir according to the peak flow, the flood flow entering the reservoir and the discharge of the tailings reservoir during the peak period;
[0204] S600: Set corresponding rainfall monitoring points in the sub-catchment areas outside the reservoir according to their importance.
[0205] Based on the same technical concept, an embodiment of the present invention further provides a computer program, which is used to implement the above method embodiment when executed by a main control device.
[0206] The computer program may be stored in whole or in part on a computer-readable storage medium packaged with the processor, or may be stored in whole or in part on a memory not packaged with the processor.
[0207] Based on the same technical concept, an embodiment of the present invention further provides a processor, which is used to implement the above method embodiment. The above processor can be a chip.
[0208] In summary, the method, device, electronic device and storage medium for setting rainfall monitoring points in the tailings pond provided by the present invention divide the importance of sub-catchment areas according to the actual impact of floods formed in different sub-catchment areas on the tailings pond, and arrange rainfall monitoring points in a targeted manner according to the order of importance, which can help mining companies decide on the key areas for rainfall monitoring in tailings ponds, and can achieve accurate monitoring of rainfall in different regions while minimizing the number of rainfall monitoring points, effectively reducing monitoring costs. At the same time, according to the changes in the external drainage area inside and outside the reservoir during the operation of the tailings pond at different times, the rainfall monitoring points are adjusted in real time, realizing the dynamic optimization layout of the distributed rainfall monitoring points in the tailings pond, which is conducive to the company's dynamic adjustment of the rainfall monitoring strategy with different production stages, and realizing cost control and efficient management.
[0209] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0210] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
[0211] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for setting rainfall monitoring points in a tailings pond, characterized in that: The method comprises: Divide the catchment area of the tailings pond into an inner catchment area and multiple outer catchment areas; Calculating the peak flow and peak time of each sub-catchment area outside the reservoir respectively; Calculate the flood flow into the reservoir in the catchment area of the reservoir; Calculate the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow entering the reservoir; Obtaining the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak flow period; Setting corresponding rainfall monitoring points of the sub-catchment area outside the reservoir according to the importance; The method of calculating the tailings pond discharge flow rate during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow rate entering the reservoir comprises: The total amount of flood directly entering the reservoir within the flood peak time of each of the sub-catchment areas outside the reservoir is calculated according to the flood flow into the reservoir and the flood peak time of each of the sub-catchment areas outside the reservoir; Determine the real-time water level of each tailings pond according to the total amount of flood water directly entering the reservoir during each flood peak period; Determine the tailings pond discharge during the flood peak period of each sub-catchment area outside the reservoir according to the real-time water level height of each tailings pond; The obtaining of the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak time includes: If there is a sub-catchment area outside the reservoir whose peak flow is less than the first threshold, the sub-catchment area outside the reservoir is determined to be of level 3 importance, and the first threshold is the minimum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir; If there is a sub-catchment area outside the reservoir whose peak flow is greater than or equal to the first threshold and less than the second threshold, the sub-catchment area outside the reservoir is determined as the secondary importance, and the second threshold is the maximum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir; If there is a sub-catchment area outside the reservoir whose flood peak flow is greater than or equal to the second threshold, the sub-catchment area outside the reservoir is determined to be of first-level importance.
2. The method for setting up rainfall monitoring points for tailings ponds according to claim 1, characterized in that: The water catchment area of the tailings pond is divided into an inner water catchment area and a plurality of outer water catchment areas, including: Obtaining a measured topographic map of the tailings pond; According to the measured topographic map, the beach surface and the water catchment area of the tailings pond are used as the water catchment area in the reservoir; A plurality of ridge lines above the channel in the external catchment area of the reservoir are obtained according to the measured topographic map, and a plurality of closed circles formed by the plurality of ridge lines and the edge line of the internal catchment area are used as a plurality of the external catchment areas.
3. The method for setting up rainfall monitoring points for tailings ponds according to claim 1, characterized in that: The respectively calculating the peak flow and peak time of each sub-catchment area outside the reservoir comprises: Obtaining the watershed parameters of the tailings pond and the topographic parameters of each sub-catchment area outside the pond; Draw the flood process curve of each sub-catchment area outside the reservoir according to the watershed parameters and the terrain parameters; The flood peak flow and the flood peak time of each sub-catchment area outside the reservoir are determined according to the flood process curve.
4. The method for setting up rainfall monitoring points for tailings ponds according to claim 3, characterized in that: The calculation of the flood flow into the reservoir in the catchment area includes: The flood flow into the reservoir is obtained by calculation based on the area of the catchment area in the reservoir and the rainfall intensity.
5. The method for setting up rainfall monitoring points for tailings ponds according to claim 1, characterized in that: The corresponding rainfall monitoring point of the sub-catchment area outside the reservoir is set according to the importance, including: If there is a sub-catchment area outside the reservoir with the first-level importance, it is determined to set the rainfall monitoring point in the sub-catchment area outside the reservoir; If there is a sub-catchment area outside the reservoir with the second-level importance, the rainfall monitoring point of the sub-catchment area outside the reservoir is set according to the actual demand of monitoring accuracy; If there is a sub-catchment area outside the reservoir with the third level of importance, it is determined that the rainfall monitoring point is not set in the sub-catchment area outside the reservoir.
6. A device for setting rainfall monitoring points in a tailings pond, characterized in that: The device comprises: A region division module is used to divide the catchment area of the tailings pond into an inner catchment area and multiple outer catchment areas; The first calculation module is used to calculate the peak flow and peak time of each sub-catchment area outside the reservoir respectively; The second calculation module is used to calculate the flood flow into the reservoir in the catchment area of the reservoir; A third calculation module is used to calculate the tailings pond discharge during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow into the reservoir; An importance determination module, for obtaining the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak time; A monitoring point setting module, used for setting the corresponding rainfall monitoring point of the sub-catchment area outside the reservoir according to the importance; The method of calculating the tailings pond discharge flow rate during the flood peak time of each sub-catchment area outside the reservoir according to the flood peak time and the flood flow rate entering the reservoir comprises: The total amount of flood directly entering the reservoir within the flood peak time of each of the sub-catchment areas outside the reservoir is calculated according to the flood flow into the reservoir and the flood peak time of each of the sub-catchment areas outside the reservoir; Determine the real-time water level of each tailings pond according to the total amount of flood water directly entering the reservoir during each flood peak period; Determine the tailings pond discharge during the flood peak period of each sub-catchment area outside the reservoir according to the real-time water level height of each tailings pond; The obtaining of the importance of each of the sub-catchment areas outside the reservoir according to the peak flow, the inflow flood flow and the tailings reservoir discharge during the peak time includes: If there is a sub-catchment area outside the reservoir whose peak flow is less than the first threshold, the sub-catchment area outside the reservoir is determined to be of level 3 importance, and the first threshold is the minimum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir; If there is a sub-catchment area outside the reservoir whose peak flow is greater than or equal to the first threshold and less than the second threshold, the sub-catchment area outside the reservoir is determined as the secondary importance, and the second threshold is the maximum value of the flood flow into the reservoir and the tailings pond discharge during the peak time of the sub-catchment area outside the reservoir; If there is a sub-catchment area outside the reservoir whose flood peak flow is greater than or equal to the second threshold, the sub-catchment area outside the reservoir is determined to be of first-level importance.
7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: The processor executes the computer program to implement the method for setting rainfall monitoring points in a tailings pond as described in any one of claims 1 to 5.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for setting rainfall monitoring points in a tailings pond as described in any one of claims 1 to 5 is implemented.
Citation Information
Patent Citations
Method for detecting phthalic acid ester in vehicle product
CN115060825A
Tailing pond distributed rainfall monitoring method, device and equipment and storage medium
CN117214980A