Production scheduling method and device and storage medium
By calculating and evaluating all possible product arrangements on the interactive panel production line, selecting arrangements with low production time loss and low logistics intensity, the problems of excessive production time and capacity loss caused by unreasonable production schedules in the prior art are solved, and the production time and capacity loss are achieved. A more efficient production process.
Patent Information
- Application Number
- CN202310590183.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, the production schedule of the interactive panel production line is usually formulated according to the arrangement order in the product order, resulting in excessive production time loss and large capacity loss during the production process, and excessive replacement time.
By calculating all possible product arrangements, evaluating production time loss and logistics strength for each arrangement, selecting arrangements with lower loss and strength as the scheduling plan, and implementing this process using calculation modules and storage media.
It effectively reduces the production time loss and logistics intensity during the production process, greatly reduces the impact of product replacement, and thus reduces the capacity loss.
Smart Images

Figure CN119026822A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of production and manufacturing technology, and in particular to a production scheduling method, device and storage medium. Background Art
[0002] When producing various types of interactive panels and other products on the production line, it is necessary to formulate a production schedule for the production sequence of various types of products. Since different types of products require different types of parts, fixtures, and process methods, when switching to production of different types of products, it takes a certain amount of product changeover time to adjust the fixtures and process methods on the device.
[0003] In the related art, the production schedule is usually formulated according to the arrangement order of various types of interactive panels in the product order. The production schedule is unreasonable, resulting in excessive loss of total production time in the entire production process, thereby causing a large loss of production capacity. Summary of the invention
[0004] The present application provides a production scheduling method, device and storage medium, which can reduce production time loss and logistics intensity in the entire production process, thereby reducing production capacity loss in the production process.
[0005] In a first aspect, the present application provides a production scheduling method, comprising: obtaining product models of products to be scheduled, the number of the product models being n, and the n product models forming n! product arrangements; calculating the production time loss and logistics intensity required for each of the product arrangements when scheduling according to the n! product arrangements; and generating a production scheduling plan according to the production time loss and logistics intensity required for each of the product arrangements.
[0006] In some embodiments of the present application, the step of forming n! product arrangements from the n product models includes: arranging the n product models to generate n! product arrangements; or, according to the n product models, obtaining n! product arrangements formed from the n product models.
[0007] In some embodiments of the present application, the step of generating a production schedule according to the production time loss and logistics intensity required for each product arrangement includes: determining a first product arrangement with the smallest production time loss among n product arrangements, the number of the first product arrangements being m; determining a second product arrangement with the smallest logistics intensity among the m first product arrangements; and generating the production schedule according to the second product arrangement.
[0008] In some embodiments of the present application, before the step of calculating the production time loss and logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements, the scheduling method further includes: combining n product models to generate product combinations; calculate the product changeover time and parts changeover type when two products in each of the product combinations are changed, wherein the product changeover time when two products in each of the product combinations are changed is the production time loss when the two products in each of the product combinations are changed; the parts changeover type when the two products in each of the product combinations are changed is the logistics intensity when the two products in each of the product combinations are changed.
[0009] In some embodiments of the present application, the step of calculating the product changeover time of two products in each product combination includes: determining the first workstation among the workstations producing the products that needs to be adjusted when the two products in each product combination are changed; calculating the workstation adjustment time of all the first workstations; determining the maximum workstation adjustment time based on the workstation adjustment time of all the first workstations, and determining the maximum workstation adjustment time as the product changeover time of the two products in each of the product combinations.
[0010] In some embodiments of the present application, the step of calculating the production time loss required for each product arrangement when scheduling according to n! types of product arrangements includes: determining the sum of the product changeover time of all products in each product arrangement according to the product changeover time required when two products in each product combination are changed, wherein the sum of the product changeover time of all products in each product arrangement is the production time loss required for each product arrangement.
[0011] In some embodiments of the present application, the step of calculating the logistics intensity required for each of the product arrangements when scheduling according to n! types of product arrangements includes: determining the sum of the types of part changes for all products in each of the product arrangements according to the types of part changes when two products in each product combination are changed, wherein the sum of the types of part changes for all products in each of the product arrangements is the logistics intensity required for each of the product arrangements.
[0012] In some embodiments of the present application, after the step of calculating the product changeover time and the part changeover type when two products in each product combination are changed, the production scheduling method further includes: establishing a database corresponding to the product changeover time and the part changeover type of all the product combinations.
[0013] In a second aspect, the present application provides a production scheduling device, comprising: a collection module, used to obtain product models of products to be scheduled, the number of the product models is n, and the n product models form n! product arrangements; a calculation module, used to calculate the production time loss and logistics intensity required for each product arrangement when scheduling according to the n! product arrangements; a production scheduling module, used to generate a production scheduling plan according to the production time loss and logistics intensity required for each product arrangement.
[0014] In a third aspect, the present application provides a storage medium having a computer program stored thereon, which, when executed by a processor, implements the production scheduling method described in any of the above embodiments.
[0015] The beneficial effects of the present application are as follows: in the present application, when formulating a production schedule, all possible product arrangements of the product are first listed, and then according to the production time loss and logistics intensity during the product changeover, a product arrangement with lower production time loss and logistics intensity can be selected as the production schedule, which can reduce the production time loss and logistics intensity during the entire production process, greatly reduce the impact of product changeover, and thus reduce the production capacity loss during the production process. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 This is a flow chart of a production scheduling method in one embodiment of the present application;
[0018] Figure 2 This is a flow chart of step S30 in one embodiment of the present application;
[0019] Figure 3 This is a flow chart of step S40 in one embodiment of the present application;
[0020] Figure 4 This is a flow chart of step S42 in one embodiment of the present application;
[0021] Figure 5 Schematic diagram of the structure of the production scheduling device in one embodiment of the present application. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0023] In the related art, the production schedule is usually formulated according to the arrangement order of various types of interactive panels in the product order. The production schedule is unreasonable, resulting in excessive loss of total production time in the entire production process, thereby causing a large loss of production capacity.
[0024] The present application provides a production scheduling method, device and storage medium to solve the problem in the related art that a production scheduling plan is usually formulated according to the arrangement order of various types of interactive panels in a product order, and the production scheduling order is unreasonable, resulting in a total product changeover time of too long in the entire production process, thereby causing a large loss of production capacity.
[0025] In a first aspect, the present application provides a production scheduling method, such as Figure 1 As shown, the scheduling method may include:
[0026] S10: Obtain product models of products to be scheduled, the number of product models is n, and the n product models form n kinds of product arrangements.
[0027] Generally speaking, before using the production line to produce products, a corresponding production order will be formulated according to market demand. The product model of the product to be scheduled is recorded in the production order. Therefore, the product model of the product to be scheduled can be obtained from the production order. The product model represents the type of product. Different types of products have different sizes or structures. For example, the product is an interactive panel, which has sizes of 43 inches, 46 inches, 49 inches, 55 inches, and 86 inches.
[0028] The product arrangement formed by n product models refers to the arrangement and combination formed by n product models arranged in sequence, and n product models have a total of n! product arrangements, n is a positive integer greater than 1, n! = n(n-1)...1. The following embodiment is described by taking n as 5, and the 5 product models are A, B, C, D, and E as an example:
[0029] 5! = 5*4*3*2*1 = 120, 5 product models can form 120 product arrangements, in which the corresponding product arrangement order can be ABCDE, BACDE, CBADE or BCADE, etc. This application does not list the arrangement order of the products in the product arrangement one by one.
[0030] S20. Calculate the production time loss and logistics intensity required for each product arrangement when scheduling according to n! products.
[0031] Scheduling by product arrangement means producing each product in sequence according to the order of the product types in the product arrangement. For example, when scheduling by product arrangement of ABCDE, the production order of the products is ABCDE.
[0032] It is understandable that when producing multiple types of products on a production line, a certain amount of production time is lost to carry out tasks such as product changeover and production line adjustment. Different products require different materials. When switching to produce different types of products, it is usually necessary to replace materials and transport the materials needed for the products to the production site. The logistics intensity depends on the types of materials that need to be replaced. Generally speaking, the more types of materials that need to be replaced, the more materials that need to be transported and the greater the logistics intensity.
[0033] S30. Generate a production schedule based on the production time loss and logistics intensity required for each product arrangement.
[0034] It can be understood that in the present application, when formulating the production schedule, all possible product arrangements of the product are first listed, and then based on the production time loss and logistics intensity during the product changeover, the product arrangement with lower production time loss and logistics intensity can be selected as the production schedule, which can reduce the production time loss and logistics intensity during the entire production process, greatly reduce the impact of product changeover, and thus reduce the production capacity loss in the production process.
[0035] In an embodiment of the present application, step S10 includes:
[0036] S11, arranging n product models to generate n! kinds of product arrangements. Specifically, after obtaining n product models, arranging the n product models in sequence according to different arrangement orders can obtain different product arrangements. The arrangement orders of the n product models are n! kinds, so n! kinds of product arrangements can be generated. It should also be noted that when the number of product models is small, such as when n is less than or equal to 3, the product models can be arranged manually or by computer; and when the number of product models is large, such as when n is greater than or equal to 5, at this time, due to the large number of product arrangements, it is difficult to accurately calculate all product arrangements manually. Therefore, at this time, it is preferred to arrange the product models by computer.
[0037] In another embodiment of the present application, step S10 includes:
[0038] S12. According to the n product models, n! kinds of product arrangements formed by the n product models are obtained. The product arrangement can be obtained from a pre-stored product arrangement form, which records the product arrangement of the product models of all preset products. The products to be scheduled are all products in the preset products. Therefore, according to the n product models, the corresponding n! kinds of product arrangements can be directly queried and obtained in the product arrangement form, which can shorten the time for making production scheduling plans.
[0039] In some embodiments of the present application, Figure 2 As shown, step S30 includes:
[0040] S31. Determine the first product arrangement with the smallest production time loss among n! product arrangements, and the number of first product arrangements is m. Among them, m is a positive integer less than n. Among n! product arrangements, generally, there are multiple product arrangements with the same production time loss. For example, the arrangement order of products corresponding to one product arrangement is ABCDE, and the arrangement order of products corresponding to another product arrangement is BACDE. Although the arrangement orders of products corresponding to these two product arrangements are different, the production time loss in these two product arrangements may be the same. Therefore, among n! product arrangements, there will be m first product arrangements with the smallest production time loss and the same production time loss.
[0041] S32: Determine the second product arrangement with the smallest logistics intensity among the m first product arrangements. It can be understood that the second product arrangement is the first product arrangement with the smallest logistics intensity among the m first product arrangements, and the number of the second product arrangements can be one or more.
[0042] S33. Generate a production schedule according to the second product arrangement. When the number of second product arrangements is one, select the second product arrangement as the production schedule; when the number of second product arrangements is multiple, any second product arrangement can be selected as the production schedule, or a suitable second product arrangement can be selected as the production schedule based on factors such as the product quantity and the priority of product demand.
[0043] In some embodiments of the present application, Figure 3 As shown, before step S20, the production scheduling method further includes:
[0044] S41, combine n product models to generate product portfolio. Understandably, It indicates the number of product combinations that can be obtained by randomly selecting 2 product models from n product models to form a product combination. When n is 5, The 10 product combinations are AB, AC, AD, AE, BC, BD, BE, CD, CE, and DE.
[0045] S42. Calculate the product changeover time and part changeover types when two products in each product combination are changed. It is understandable that when multiple types of products are produced on a production line, different types of products require different jigs, process methods, and part types. Therefore, when changing to produce different types of products, a certain amount of product changeover time is required to change products, and when changing to produce different types of products, different types of parts are usually required to be replaced.
[0046] Among them, the product changeover time when two products in each product combination are changed is the production time loss when two products in each product combination are changed; the part changeover type when two products in each product combination are changed is the logistics intensity when two products in each product combination are changed. It can be understood that the production time loss during the product changeover process mainly depends on the product changeover time, so the product changeover time can be regarded as the production time loss; the logistics intensity during the product changeover process mainly depends on the types of parts that need to be replaced. Generally speaking, the more types of parts that need to be replaced, the greater the logistics intensity, so the types of part changeover can be regarded as the logistics intensity.
[0047] In an embodiment of the present application, after step S42, the production scheduling method further includes:
[0048] S43, establish a database corresponding to the product changeover time and part changeover type of all product combinations. The database stores n product models. The product changeover time and part changeover type of various product combinations can be directly obtained from the database when calculating the production time loss and logistics intensity required for each product arrangement, which can reduce the time required for formulating production plans.
[0049] As shown in Table 1 below, taking 5 products forming 10 product combinations as an example, Table 1 is a schematic diagram of the product changeover time of each product combination, where the product changeover time of product combination AB is T1, the product changeover time of product combination BC is T2, the product changeover time of product combination CD is T3, the product changeover time of product combination DE is T4, the product changeover time of product combination AC is T5, the product changeover time of product combination BD is T6, the product changeover time of product combination CE is T7, the product changeover time of product combination AD is T8, the product changeover time of product combination BE is T9, and the product changeover time of product combination AE is T10.
[0050] Table 1 Product changeover time for different product combinations
[0051] Product Model A B C D E A T1 T5 T8 T10 B T2 T6 T9 C T3 T7 D T4 E
[0052] As shown in Table 2 below, taking 10 product combinations formed by 5 products as an example, Table 2 is a schematic diagram of the logistics intensity of each product combination, among which the logistics intensity of product combination AB is Q1, the logistics intensity of product combination BC is Q2, the logistics intensity of product combination CD is Q3, the logistics intensity of product combination DE is Q4, the logistics intensity of product combination AC is Q5, the logistics intensity of product combination BD is Q6, the logistics intensity of product combination CE is Q7, the logistics intensity of product combination AD is Q8, the logistics intensity of product combination BE is Q9, and the logistics intensity of product combination AE is Q10.
[0053] Table 2 Logistics intensity of different product combinations
[0054] Product Model A B C D E A Q1 Q5 Q8 Q10 B Q2 Q6 Q9 C Q3 Q7 D Q4 E
[0055] In one embodiment of the present application, Figure 4 As shown, step S42 includes:
[0056] S421. Determine the first workstation that needs to be adjusted in the workstations that produce the product when two products in each product combination are changed. It is understandable that when producing one product, the entire production line includes multiple workstations, and when changing to produce different types of products, it is usually necessary to replace the fixtures and other adjustments to at least some of the workstations to adapt to the production requirements of the changed products. These workstations that need to be adjusted are the first workstations, and the number of first workstations can be one or more.
[0057] S422, calculating the station adjustment time of all first stations. The time required to adjust the first station is the station adjustment time of the first station. When there are multiple first stations, the station adjustment time of multiple first stations may be the same or different.
[0058] S423. Determine a maximum station adjustment time according to the station adjustment times of all first stations, and determine that the maximum station adjustment time is the product changeover time of two products in each product combination.
[0059] It is understandable that when adjusting multiple first workstations, the workstation adjustment times of the multiple first workstations may be different. The maximum workstation adjustment time refers to the workstation adjustment time of the first workstation that takes the longest workstation adjustment time among all the first workstations. Since the adjustments of multiple first workstations are usually carried out simultaneously, when two products are changed, the total workstation adjustment time of the entire production line is determined by the maximum workstation adjustment time. For example, the production line consists of 14 manual workstations and 1 automatic workstation. When the two products are changed, 5 manual workstations and 1 automatic workstation need to be adjusted, wherein the workstation adjustment time of the automatic workstation is 30 minutes, and the workstation adjustment time of the 5 manual workstations is 5 minutes each. At this time, the maximum workstation adjustment time is 30 minutes, and the total workstation adjustment time of the entire production line is 30 minutes. In addition, since the product changeover time of the two products mainly depends on the workstation adjustment time, other minor fragmented time in the product changeover process can be ignored. Taking the workstation adjustment time as the product changeover time of the two products in each product combination can more conveniently determine the product changeover time of the two products in each product combination.
[0060] In an embodiment of the present application, step S20 includes:
[0061] S21. According to the product changeover time required when two products in each product combination are changed, the sum of the product changeover time of all products in each product arrangement is determined, wherein the sum of the product changeover time of all products in each product arrangement is the production time loss required for each product arrangement. Taking the product arrangement of ABCDE as an example, the product changeover time of product combination AB is T1, the product changeover time of product combination BC is T2, the product changeover time of product combination CD is T3, and the product changeover time of product combination DE is T4. Then the sum of the product changeover time of all products in the product arrangement = T1 + T2 + T3 + T4, and the production time loss required for the product arrangement = T1 + T2 + T3 + T4.
[0062] In an embodiment of the present application, step S20 further includes:
[0063] S22. According to the part change types when two products in each product combination change, determine the sum of the part change types of all products in each product arrangement, where the sum of the part change types of all products in each product arrangement is the logistics intensity required for each product arrangement. Taking the product arrangement of ABCDE as an example, the part change type of product combination AB is Q1, the part change type of product combination BC is Q2, the part change type of product combination CD is Q3, and the part change type of product combination DE is Q4. Then the sum of the part change types of all products in the product arrangement = Q1 + Q2 + Q3 + Q4, and the logistics intensity required for the product arrangement = Q1 + Q2 + Q3 + Q4.
[0064] In a second aspect, the present application also provides a production scheduling device 50, which can be used to execute the production scheduling method of the present application. Figure 5 As shown, the production scheduling device 50 includes a collection module 51 , a calculation module 52 and a production scheduling module 53 .
[0065] The acquisition module 51 is used to obtain the product models of the products to be scheduled. The number of product models is n, and the n product models form n! types of product arrangements.
[0066] The calculation module 52 is used to calculate the production time loss and logistics intensity required for each product arrangement when scheduling according to n! products.
[0067] The production scheduling module 53 is used to generate a production scheduling plan based on the production time loss and logistics intensity required for each product arrangement.
[0068] In an embodiment of the present application, the calculation module 52 is further used to arrange the n product models to generate n! product arrangements; or, the acquisition module 51 is further used to obtain n! product arrangements formed by the n product models according to the n product models.
[0069] In an embodiment of the present application, the production scheduling module 53 is further used to: determine a first product arrangement with the smallest production time loss among n! product arrangements, where the number of first product arrangements is m; determine a second product arrangement with the smallest logistics intensity among the m first product arrangements; and generate a production scheduling plan according to the second product arrangement.
[0070] In one embodiment of the present application, the calculation module 52 is further used to: before calculating the production time loss and logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements, combine the n product models to generate product combinations; calculate the product changeover time and parts changeover types when two products in each product combination are changed, where the product changeover time when two products in each product combination are changed is the production time loss when two products in each product combination are changed; the parts changeover types when two products in each product combination are changed is the logistics intensity when two products in each product combination are changed.
[0071] In one embodiment of the present application, the calculation module 52 is also used to: determine the first workstation that needs to be adjusted among the workstations producing the products when two products in each product combination are changed; calculate the workstation adjustment time of all the first workstations; determine the maximum workstation adjustment time based on the workstation adjustment time of all the first workstations, and determine the maximum workstation adjustment time as the product changeover time of the two products in each product combination.
[0072] In one embodiment of the present application, the calculation module 52 is also used to determine the sum of the product changeover times of all products in each product arrangement based on the product changeover time required for changing two products in each product combination, wherein the sum of the product changeover times of all products in each product arrangement is the production time loss required for each product arrangement.
[0073] In one embodiment of the present application, the calculation module 52 is also used to determine the sum of the types of parts changeovers of all products in each product arrangement based on the types of parts changeovers when two products in each product combination are changed over, wherein the sum of the types of parts changeovers of all products in each product arrangement is the logistics intensity required for each product arrangement.
[0074] In one embodiment of the present application, the calculation module 52 is further used to: establish a database corresponding to the product changeover time and part changeover type of all product combinations.
[0075] In a third aspect, the present application further provides a storage medium on which a computer program is stored, and when the program is executed by a processor, the production scheduling method in any of the above embodiments is implemented. The storage medium may include, but is not limited to, any type of disk, including a floppy disk, an optical disk, a DVD, a CD-ROM, a micro drive, and a magneto-optical disk, a ROM, a RAM, an EPROM, an EEPROM, a DRAM, a VRAM, a flash memory device, a magnetic card or an optical card, a nanosystem (including a molecular memory IC), or any type of medium or device suitable for storing instructions and / or data.
[0076] In the several embodiments provided in this application, it should be understood that the disclosed methods and devices can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of modules is only a logical function division. There may be other division methods in actual implementation, such as: multiple modules or components can be combined, or can be integrated into another system, or some features can be ignored or not executed.
[0077] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A production scheduling method, characterized in that: include: Obtain product models of products to be scheduled, the number of product models is n, and the n product models form n! types of product arrangements; Calculate the production time loss and logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements; A production schedule is generated based on the production time loss and logistics intensity required for each product arrangement.
2. The production scheduling method according to claim 1, characterized in that: The step of forming n product arrangements from the n product models comprises: Arrange n product models to generate n product arrangements; or, According to the n product models, n kinds of product arrangements formed by the n product models are obtained.
3. The production scheduling method according to claim 1, characterized in that: The step of generating a production schedule according to the production time loss and logistics intensity required for each product arrangement comprises: Determine the first product arrangement with the smallest production time loss among the n! product arrangements, the number of the first product arrangements being m; Determine a second product arrangement with the smallest logistics intensity among the m first product arrangements; The production schedule is generated according to the second product arrangement.
4. The production scheduling method according to claim 1, characterized in that: Before the step of calculating the production time loss and logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements, the scheduling method further includes: Combine n product models to generate product portfolio; Calculate the product changeover time and parts changeover type when two products in each product combination are changed, wherein the product changeover time when two products in each product combination are changed is the production time loss when the two products in each product combination are changed; the parts changeover type when two products in each product combination are changed is the logistics intensity when the two products in each product combination are changed.
5. The production scheduling method according to claim 4, characterized in that: The step of calculating the product changeover time of two products in each product combination comprises: Determine the first production station that needs to be adjusted when two products in each product combination are changed; Calculating the station adjustment time of all the first stations; The maximum station adjustment time is determined according to the station adjustment time of all the first stations, and the maximum station adjustment time is determined to be the product changeover time of the two products in each product combination.
6. The production scheduling method according to claim 4, characterized in that: The step of calculating the production time loss required for each product arrangement when scheduling according to n! types of product arrangements comprises: Based on the product changeover time required when two products in each product combination are changed, the sum of the product changeover time of all products in each product arrangement is determined, wherein the sum of the product changeover time of all products in each product arrangement is the production time loss required for each product arrangement.
7. The production scheduling method according to claim 4, characterized in that: The step of calculating the logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements comprises: According to the types of parts changeover when two products in each product combination are changed, the sum of the types of parts changeover for all products in each product arrangement is determined, wherein the sum of the types of parts changeover for all products in each product arrangement is the logistics intensity required for each product arrangement.
8. The production scheduling method according to claim 4, characterized in that: After the step of calculating the product changeover time and the part changeover types when two products in each product combination are changed, the production scheduling method further includes: A database corresponding to the product changeover time and part changeover type of all the product combinations is established.
9. A production scheduling device, characterized in that: include: The acquisition module is used to obtain the product models of the products to be scheduled, the number of the product models is n, and the n product models form n! kinds of product arrangements; A calculation module, used for calculating the production time loss and logistics intensity required for each product arrangement when scheduling according to n! types of product arrangements; The production scheduling module is used to generate a production schedule based on the production time loss and logistics intensity required for each product arrangement.
10. A storage medium, characterized in that: A computer program is stored thereon, and when the program is executed by a processor, the production scheduling method described in any one of claims 1 to 8 is implemented.