Power plant equipment scheduling method and device

By obtaining new energy and user-side load data, and generating power plant equipment scheduling instructions based on preset models, the problem of single resource allocation of electric and heating system is solved, and system flexibility and user satisfaction are enhanced.

CN119026828APending Publication Date: 2024-11-26NARI NANJING CONTROL SYSTEM CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410926786.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the resource allocation method of the electric heating joint supply system is relatively single and has poor flexibility, making it difficult to meet the demand for the system's safe, green and economic operation of the power supply and grid side regulation resources. It is urgent to guide the demand-side resources to participate in the electric heating market scheduling.

Method used

By obtaining new energy output data, user-side load data and power plant equipment parameters, analyzing and processing is performed based on the preset scheduling model, scheduling instructions for power plant equipment are generated, scheduling control is performed, and the comprehensive satisfaction of electric heating on the user side is determined, taking into account user needs comprehensively. To enhance the flexibility of power equipment scheduling and resource optimization allocation capabilities.

Benefits of technology

The demand-side resources are achieved to participate in the electric heating market scheduling, improve the flexibility of the electric heating joint supply system and the resource optimization allocation capabilities, and improve user experience and satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026828A_ABST
    Figure CN119026828A_ABST
Patent Text Reader

Abstract

The invention provides a power plant equipment scheduling method and device, and belongs to the technical field of power equipment control. The method comprises the steps of obtaining basic data including new energy output data, user side load data and power plant equipment parameter data, then performing analysis processing on the basic data based on a preset scheduling model, generating a scheduling instruction of power plant equipment, then performing scheduling control on the power plant equipment according to the scheduling instruction, and performing scheduling control on the power plant equipment according to the scheduling instruction. And obtaining load parameters after dispatching operation of the power plant equipment, and determining the electric heating comprehensive satisfaction degree of the user side based on the load parameters. According to the method, the user demand side is comprehensively considered in the scheduling process of the power plant equipment, the scheduling flexibility of the power equipment is enhanced, the resource optimization configuration capability is improved, and the user experience and satisfaction are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power equipment control, and in particular to a method and device for dispatching power plant equipment. Background Art

[0002] With the continuous development of the economy, it is urgent to enhance the flexibility of the power system and improve the ability to optimize resource allocation in order to build a new power system with new energy as the main body.

[0003] In the relevant technologies, the regulating resources on the power supply side and the grid side can no longer meet the system's safe, green and economical operation requirements. It is urgent to guide the demand-side resources to participate in the electricity and heat markets to play a diversified value. Therefore, how to provide a power plant equipment dispatching technology to guide the demand-side resources to participate in the resource dispatching of the electricity and heat markets has become an urgent problem to be solved. Summary of the invention

[0004] The embodiments of the present invention provide a method and device for dispatching power plant equipment to solve the problem of guiding demand-side resources to participate in resource dispatching.

[0005] In a first aspect, an embodiment of the present invention provides a method for dispatching power plant equipment, including:

[0006] Obtaining basic data; wherein the basic data includes new energy output data, user-side load data and power plant equipment parameter data;

[0007] Based on a preset scheduling model, the basic data is analyzed and processed to generate a scheduling instruction for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for power plant equipment;

[0008] According to the dispatching instruction, the power plant equipment is dispatched and controlled; and the load parameters of the power plant equipment after the dispatching operation are obtained, and based on the load parameters, the comprehensive electric and heat satisfaction of the user side is determined.

[0009] In one possible implementation, the preset scheduling model takes the total cost of power plant operation and maintenance as the objective function, and takes energy balance constraints, demand response constraints and equipment operation constraints as constraints; wherein the energy balance constraints are used to ensure the balance between energy supply and demand, the demand response constraints are used to respond to grid demand, and the equipment operation constraints are used to ensure that power equipment operates within a safe and efficient range.

[0010] In a possible implementation, the basic data is parsed and processed based on a preset scheduling model to generate a scheduling instruction for power plant equipment, including:

[0011] According to the basic data, under the constraints of the balance constraint, the demand response constraint and the equipment operation constraint, the objective function is subjected to an uncertain solution process to determine the optimal solution of the objective function; wherein the optimal solution is the output data of each power device that makes the objective function obtain the minimum value;

[0012] According to the preferred solution, a dispatching instruction for power plant equipment is generated; wherein the dispatching instruction is used to dispatch the output of each power equipment.

[0013] In a possible implementation, the total operation and maintenance cost of the power plant includes energy purchase cost, carbon trading cost, operation and maintenance cost, spinning reserve cost, interruptible load compensation cost and system power sales benefit;

[0014] The method further comprises:

[0015] Calculating the sum of the energy purchase cost, the carbon trading cost, the operation and maintenance cost, the spinning reserve cost and the interruptible load compensation cost;

[0016] The objective function is determined based on the difference between the sum and the system electricity sales benefit.

[0017] In one possible implementation, the energy balance constraints include electrical balance constraints and thermal balance constraints, the demand response constraints include spinning reserve constraints; the equipment operation constraints include new energy output constraints, gas turbine constraints, organic Rankine cycle-waste heat boiler constraints, gas boiler constraints, electric boiler constraints, carbon capture equipment constraints, and energy storage output constraints.

[0018] In a possible implementation, after the power plant equipment is dispatched and controlled according to the dispatch instruction, the method further includes:

[0019] Determine the economic benefits and carbon emissions after the power plant equipment is dispatched and operated.

[0020] In a possible implementation, the load parameters include electric load data and thermal load data; based on the load parameters, determining the comprehensive electric and thermal satisfaction of the user side includes:

[0021] The comprehensive electric-heat satisfaction degree on the user side is determined based on the actual electric load, initial electric load, actual heat load and initial heat load on the user side, wherein the comprehensive electric-heat satisfaction degree is used to characterize the user's thermal comfort and the user's electric comfort.

[0022] In a possible implementation, determining the comprehensive electric and thermal satisfaction of the user side according to the actual electric load, the initial electric load, the actual thermal load and the initial thermal load of the user side includes:

[0023] Determine the power demand response value and the thermal demand response value at a certain moment on the user side, wherein the power demand response value is the absolute value of the difference between the actual electric load at that moment and the initial electric load at that moment, and the thermal demand response value is the absolute value of the difference between the actual thermal load at that moment and the initial thermal load at that moment;

[0024] Determine a first quotient value obtained by dividing the power demand response value by the initial power load at the moment, and determine a second quotient value obtained by dividing the thermal demand response value by the initial thermal load at the moment; wherein the first quotient value represents the proportion of the power demand response at the user side at the moment, and the second quotient value represents the proportion of the thermal demand response at the user side at the moment;

[0025] Based on the first quotient value and the second quotient value, a comprehensive satisfaction level corresponding to the moment is determined, wherein a sum of the first quotient value and the second quotient value is negatively correlated with the comprehensive satisfaction level corresponding to the moment.

[0026] In one possible implementation, the power plant equipment includes electric load equipment and thermal load equipment, wherein the electric load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment.

[0027] In a second aspect, an embodiment of the present invention provides a power plant equipment scheduling device, including:

[0028] An acquisition unit, used to acquire basic data; wherein the basic data includes new energy output data, user side load data and power plant equipment parameter data;

[0029] A first processing unit is used to parse and process the basic data based on a preset scheduling model to generate a scheduling instruction for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for power plant equipment;

[0030] The second processing unit is used to dispatch and control the power plant equipment according to the dispatch instruction; and obtain the load parameters of the power plant equipment after the dispatch operation, and determine the comprehensive electric and thermal satisfaction of the user side based on the load parameters.

[0031] The embodiment of the present invention provides a method and device for dispatching power plant equipment, which obtains basic data, including new energy output data, user-side load data, and power plant equipment parameter data, and then parses and processes the basic data based on a preset dispatch model to generate dispatch instructions for power plant equipment, and then dispatches and controls the power plant equipment according to the dispatch instructions, and obtains the load parameters after the dispatch operation of the power plant equipment, and determines the comprehensive electric and thermal satisfaction of the user side based on the load parameters. The method comprehensively considers the user demand side in the dispatch process of power plant equipment, enhances the flexibility of power equipment dispatch, improves the resource optimization configuration capability, and improves the user experience and satisfaction. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 is a schematic diagram of a virtual power plant system architecture provided by an embodiment of the present invention;

[0034] Figure 2 is a flow chart for implementing the power plant equipment scheduling method provided by an embodiment of the present invention;

[0035] Figure 3 is a flow chart for implementing the power plant equipment scheduling method provided by an embodiment of the present invention;

[0036] Figure 4 A schematic diagram of the combined curve of electricity, heat load and wind and solar power provided in an embodiment of the present invention;

[0037] Figure 5 A schematic diagram of the electricity purchase price, gas purchase price and gas sales price provided in an embodiment of the present invention;

[0038] Figure 6 A schematic diagram of the power demand response effect provided by an embodiment of the present invention;

[0039] Figure 7 A schematic diagram of the operation of a power subsystem provided in an embodiment of the present invention;

[0040] Figure 8 A schematic diagram of a thermal demand response effect provided by an embodiment of the present invention;

[0041] Fig. 9 A schematic diagram of the operation of a thermal subsystem provided in an embodiment of the present invention;

[0042] Fig.10It is a structural schematic diagram of a power plant equipment dispatching device provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0043] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention. SUMMARY OF THE INVENTION

[0045] The inventors have found that in the relevant technologies, the resource allocation method of the combined heat and power generation system is relatively simple and has poor flexibility. The regulating resources on the power supply side and the grid side can hardly meet the safe, green and economical operation requirements of the combined heat and power generation system. Therefore, it is urgent to guide the demand-side resources to participate in the electric heat market and give play to their diversified values.

[0046] In order to guide the demand-side resources to participate in resource scheduling and improve the ability to optimize resource allocation, in the embodiments of this application, the preset scheduling model of the source-load dual response is combined with the new energy output data, the user-side load data, the power plant equipment parameter data, and the power plant equipment scheduling optimization solution, and then, according to the scheduling instructions, the power plant equipment is dispatched and controlled. In addition, the load parameters after the power plant equipment is dispatched and operated are obtained to determine the comprehensive satisfaction of the user side with electricity and heat. In this way, the demand-side resources participate in the electricity and heat market scheduling, enhance the flexibility of the combined electricity and heat supply system, and improve the ability to optimize resource allocation.

[0047] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0048] Figure 1 Schematic diagram of the virtual power plant system architecture corresponding to the power plant equipment scheduling method provided in an embodiment of the present invention. Figure 1 As shown in the figure, the power load is supplied by wind power, photovoltaic, electric energy storage, gas turbine and other equipment, and the thermal load is supplied by electric boiler, organic Rankine cycle-waste heat boiler, gas boiler, thermal energy storage and other equipment. The energy supply part provides users with a variety of options for energy use. At the same time, in order to improve the operating efficiency and ensure the operation of the carbon capture system to reduce carbon emissions, demand response (DR) is used, that is, dual response on the source side and the load side to coordinate the dispatch of power plant equipment.

[0049] Figure 2 The implementation flow chart of the power plant equipment scheduling method provided by the embodiment of the present invention is detailed as follows:

[0050] Step 201, obtaining basic data; wherein the basic data includes new energy output data, user side load data and power plant equipment parameter data.

[0051] Exemplarily, this embodiment obtains basic data, including new energy output data, such as the hourly output of photovoltaic and wind power; user-side load data, such as the hourly electrical load and thermal load on the user side; and power plant equipment parameter data, such as unit operation and maintenance costs, operating efficiency, output upper and lower limits, etc.

[0052] Step 202, based on a preset scheduling model, the basic data is analyzed and processed to generate scheduling instructions for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for power plant equipment.

[0053] Exemplarily, after obtaining the basic data, this embodiment generates a scheduling optimization solution for the power plant equipment based on a preset scheduling model and the obtained basic data. For example, based on the preset scheduling model, the basic data is analyzed and solved to generate a scheduling optimization solution for the power plant equipment, and then generate scheduling instructions for the power plant equipment.

[0054] Step 203, according to the dispatching instruction, the power plant equipment is dispatched and controlled; and the load parameters after the power plant equipment is dispatched and operated are obtained, and based on the load parameters, the comprehensive electric and heat satisfaction of the user side is determined.

[0055] Exemplarily, this embodiment performs dispatch control on power plant equipment, including electric load equipment and thermal load equipment, according to the generated dispatch instruction. For example, based on the dispatch instruction, the power of the electric load equipment and the thermal load equipment is controlled, and when the electric load equipment and the thermal load equipment are in operation, or after the electric load equipment and the thermal load equipment are in operation, the load parameters on the user side after the dispatch operation of the power plant equipment are obtained, including the electric load data and the thermal load data on the user side, and the electric and thermal comprehensive satisfaction of the user side is determined based on the electric load data and the thermal load data on the user side. The electric and thermal comprehensive satisfaction is a comprehensive indicator that characterizes the thermal comfort and the electric comfort of the user.

[0056] After determining the comprehensive electricity-heat satisfaction on the user side, this embodiment can optimize the scheduling of power plant equipment based on the comprehensive electricity-heat satisfaction. If the comprehensive electricity-heat satisfaction on the user side is lower than a preset satisfaction threshold, the power plant equipment is adjusted to make the comprehensive electricity-heat satisfaction on the user side reach the preset satisfaction threshold.

[0057] The embodiment of the present invention includes the following steps: obtaining basic data, including new energy output data, user-side load data, and power plant equipment parameter data; parsing and processing the basic data based on a preset scheduling model to generate a scheduling instruction for the power plant equipment; scheduling and controlling the power plant equipment according to the scheduling instruction; and obtaining the load parameters after the power plant equipment is scheduled and operated, and determining the comprehensive electric and thermal satisfaction of the user side based on the load parameters. This method comprehensively considers the user-side demand side in the scheduling process of power plant equipment, enhances the flexibility of power equipment scheduling, improves the resource optimization configuration capability, and improves the user experience and satisfaction.

[0058] Figure 3 Another implementation flow chart of a power plant equipment scheduling method provided by an embodiment of the present invention is described in detail as follows:

[0059] Step 301, obtaining basic data; wherein the basic data includes new energy output data, user side load data and power plant equipment parameter data.

[0060] In one example, power plant equipment parameter data includes:

[0061] In one example, power plant equipment includes electric load equipment and thermal load equipment, wherein the electric load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment.

[0062] Exemplarily, this embodiment obtains basic data, including new energy output data, such as the hourly output of photovoltaic and wind power; user-side load data, such as the hourly electrical load and thermal load on the user side; and power plant equipment parameter data, including unit operation and maintenance cost, operating efficiency, output upper and lower limits, etc. Among them, in this embodiment, the power plant equipment includes power load equipment and thermal load equipment, the power load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment.

[0063] Step 302, based on the basic data, under the constraints of balance constraints, demand response constraints and equipment operation constraints, the objective function is subjected to uncertain solution processing to determine the optimal solution of the objective function; wherein the optimal solution is the output data of each power device that minimizes the objective function.

[0064] In one example, the preset scheduling model uses the total cost of power plant operation and maintenance as the objective function, and energy balance constraints, demand response constraints, and equipment operation constraints as constraints; among them, the energy balance constraint is used to ensure the balance between energy supply and demand, the demand response constraint is used to respond to grid demand, and the equipment operation constraint is used to ensure that power equipment operates within a safe and efficient range.

[0065] In one example, the total operation and maintenance cost of a power plant includes energy purchase cost, carbon trading cost, operation and maintenance cost, spinning reserve cost, interruptible load compensation cost and system power sales benefit; before step 302, this embodiment also includes:

[0066] Calculate the sum of energy purchase costs, carbon trading costs, operation and maintenance costs, spinning reserve costs and interruptible load compensation costs.

[0067] The objective function is determined based on the difference between the sum and the system's electricity sales efficiency.

[0068] In one example, energy balance constraints include electrical balance constraints and thermal balance constraints, demand response constraints include spinning reserve constraints; equipment operation constraints include renewable energy output constraints, gas turbine constraints, organic Rankine cycle-waste heat boiler constraints, gas boiler constraints, electric boiler constraints, carbon capture equipment constraints, and energy storage output constraints.

[0069] Exemplarily, after obtaining the basic data, this embodiment generates an optimal dispatching solution for power plant equipment based on a preset dispatching model and the obtained basic data. In this embodiment, the preset dispatching model takes the total operation and maintenance cost of the power plant as the objective function, and takes energy balance constraints, demand response constraints, and equipment operation constraints as constraints, and dispatches the power plant equipment based on a source-load flexible response mechanism. Therefore, after obtaining the basic data, this embodiment, under the constraints of balance constraints, demand response constraints, and equipment operation constraints, uses the Matlab-Cplex solver to consider uncertainty in planning, and performs uncertain solution processing on the objective function, that is, performs mixed integer linear programming solution on the objective function, and obtains the output data of each power equipment that minimizes the objective function as the optimal dispatching solution.

[0070] In this embodiment, the total operation and maintenance cost of the power plant is composed of energy purchase cost, carbon trading cost, operation and maintenance cost, rotating reserve cost, interruptible load compensation cost and system electricity sales benefit calculation; this embodiment also includes: calculating the sum of energy purchase cost, carbon trading cost, operation and maintenance cost, rotating reserve cost and interruptible load compensation cost, and then determining the functional expression of the total operation and maintenance cost of the power plant based on the difference between the sum and the system electricity sales benefit, that is, the objective function.

[0071] In an example, the objective function F can be expressed as follows:

[0072] F=min(C buy +C co2 +C op +C rr +C ZD -F sell )

[0073] Among them, F sell , C buy , C op , C rr and C ZD It can be obtained by the following formula:

[0074]

[0075]

[0076]

[0077]

[0078]

[0079] Among them, C ZD Characterizes the system's electricity sales efficiency, λ sell,t is the on-grid electricity price at time t, P sell,t is the electricity sold at time t, T is the time; C buy Represents the cost of purchased energy, is the electricity and gas purchase price at time t, P buy,t , G buy,t is the amount of electricity and gas purchased at time t; C op Characterizes the operation and maintenance costs, is the unit operation and maintenance cost of the n1th device, P n1,t Provides power for the operation of the n1th device; C rr Characterize the spinning reserve cost, δ GT is the GT unit spinning reserve cost coefficient, R GT,t is the GT spinning reserve cost at time t, δ ES is the unit electric energy storage spinning reserve cost coefficient, R ES,t C is the cost of electric energy storage spinning reserve at time t; ZD Characterizes the interruptible load compensation cost, δ e,ZD , δ h,ZD is the unit electricity and heat mid-segment load compensation coefficient, P t ZD is the compensation cost of interruptible load at time t, H t ZD is the interruptible heat load compensation cost at time t.

[0080] In this embodiment, energy balance constraints include electrical balance constraints and thermal balance constraints, which are used to ensure the balance between energy supply and demand; demand response constraints include spinning reserve constraints, which are used to respond to grid demand; equipment operation constraints include new energy output constraints, gas turbine constraints, organic Rankine cycle-waste heat boiler constraints, gas boiler constraints, electric boiler constraints, carbon capture equipment constraints and energy storage output constraints, which are used to ensure that power equipment operates within a safe and efficient range.

[0081] In one example, the constraint conditions in this embodiment can be expressed as follows:

[0082] (1) Constraints on new energy output:

[0083] Since wind power and photovoltaic power generation have uncertainty, this embodiment uses a probability density function for description. Wind power output is related to wind speed and its rated output, and wind speed obeys Weibull distribution. Photovoltaic output is related to solar radiation intensity and obeys gamma distribution.

[0084] (2) Gas turbine (GT) constraints:

[0085]

[0086] In the formula, The upper and lower limits of GT climbing. The upper and lower limits of GT input power. is the output power of the gas turbine at time t, is the output power of the gas turbine at time t-1.

[0087] (3) Organic Rankine cycle-waste heat boiler (WHB-ORC) constraints:

[0088]

[0089] In the formula, is the upper and lower limits of the organic Rankine cycle-waste heat boiler climbing, is the upper and lower limits of the organic Rankine cycle-waste heat boiler input power, P ORC,t is the output power of organic Rankine cycle-waste heat boiler at time t, P ORC,t-1 is the output power of the organic Rankine cycle-waste heat boiler at time t-1.

[0090] (4) Gas boiler (GB) constraints:

[0091]

[0092] In the formula, The upper and lower limits of the gas boiler climbing. It is the upper and lower limits of gas boiler input power. GB,t is the output power of the gas boiler at time t, PGB,t-1 is the output power of the gas boiler at time t-1.

[0093] (5) Electric boiler (EB) constraints

[0094]

[0095] In the formula, The upper and lower limits of EB climbing, It is the upper and lower limits of EB input power. EB,t is the output power of the electric boiler at time t, P EB,t-1 is the output power of the electric boiler at time t-1.

[0096] (6) Carbon capture and storage (CCS) constraints

[0097]

[0098] In the formula, is the upper limit of CCS operating power, is the CCS operating power at time t; It is the upper limit of the capacity of the rich liquid storage and the lean liquid storage. P,t is the capacity of the lean liquid storage at time t, V F,t is the rich liquid storage capacity at time t.

[0099] (7) Energy storage output constraints

[0100]

[0101]

[0102] In the formula, S t,n is the capacity of the nth energy storage at time t, S t-1,n is the capacity of the nth energy storage at time t-1, χ is the self-loss rate of the nth energy storage, They represent the charging and discharging power of the nth energy storage at time t, is the charging and discharging power of the nth energy storage at time t, η cha,n , η dis,n is the charging and discharging efficiency of the nth type of energy storage. are the upper and lower limits of the storage capacity of the nth type of energy storage, is the nth energy storage charging and discharging state at time t, is the upper limit of the charging and discharging power of the nth energy storage at time t, is the initial capacity of the nth type of energy storage.

[0103] (8) Electrical balance constraints

[0104]

[0105] Where P buy,t is the power purchased from the grid at time t, P sell,t To sell electricity to the grid, is the power generation of the gas turbine at time t, is the power generation of the organic Rankine cycle at time t, is the discharge power of the energy storage device at time t, P CCS,t is the power consumption of the carbon capture system, P a,t is the electrical load demand at time t, is the charging power of the energy storage device at time t.

[0106] (9) Thermal balance constraints

[0107]

[0108] In the formula, H a,t is the heat load demand at time t, is the power of heat storage tank, H GB,t is the output power of the gas boiler, H EB,t is the output power of the electric boiler, Output power of waste heat boiler.

[0109] (10) Spinning reserve constraints

[0110] Taking into account the extreme case where the combined output of wind and solar power may be 0, in this embodiment, gas turbines and electric energy storage are used as rotating standby units.

[0111] For gas turbines, the reserve should meet the constraints:

[0112]

[0113] For electric energy storage, its backup should meet the constraints:

[0114]

[0115] In the formula, R GT,t is the spare capacity of the gas turbine at time t, is the output power of the gas turbine at time t,

[0116] is the gas turbine output efficiency, is the upper limit of GT input power, R ES,t is the reserve capacity of electric energy storage at time t, S t,e is the storage capacity at time t, is the lower limit of storage capacity at time t, is the upper limit of the charging and discharging power of the nth energy storage at time t, is the discharge power of the nth energy storage at time t, and Δt is the length of the time period.

[0117]

[0118] In the formula, E t The combined output of wind power and photovoltaic power is expected to be WT,t is the wind power output at time t, P PV,t The PV output power at time t, α is the pre-set confidence level of the spinning reserve.

[0119] Step 303, generating a dispatch instruction for the power plant equipment according to the optimal solution; wherein the dispatch instruction is used to dispatch the output of each power equipment.

[0120] Exemplarily, this embodiment generates corresponding dispatching instructions for power plant equipment based on the calculated optimal solution that minimizes the objective function, i.e., the output data information of each power device that minimizes the total operation and maintenance cost, to dispatch the output of each power device.

[0121] Step 304, according to the dispatching instructions, the power plant equipment is dispatched and controlled; and the electric load data and thermal load data after the power plant equipment is dispatched and operated are obtained, and the comprehensive electric and thermal satisfaction of the user side is determined according to the actual electric load, initial electric load, actual thermal load and initial thermal load on the user side, wherein the comprehensive electric and thermal satisfaction is used to characterize the user's thermal comfort and the user's electric comfort.

[0122] In one example, step 304 includes the following steps:

[0123] Determine the power demand response value and thermal demand response value at a certain moment on the user side, wherein the power demand response value is the absolute value of the difference between the actual electric load at that moment and the initial electric load at that moment, and the thermal demand response value is the absolute value of the difference between the actual thermal load at that moment and the initial thermal load at that moment.

[0124] Determine a first quotient obtained by dividing the electricity demand response value by the initial electricity load at that moment, and determine a second quotient obtained by dividing the thermal demand response value by the initial thermal load at that moment; wherein the first quotient represents the proportion of electricity demand response on the user side at that moment, and the second quotient represents the proportion of thermal demand response on the user side at that moment.

[0125] Based on the first quotient value and the second quotient value, a comprehensive satisfaction level corresponding to the moment is determined, wherein a sum of the first quotient value and the second quotient value is negatively correlated with the comprehensive satisfaction level corresponding to the moment.

[0126] Exemplarily, this embodiment performs dispatch control on power plant equipment according to the generated dispatch instruction. The power plant equipment, including the electric load equipment and the thermal load equipment, is dispatched and controlled to dispatch the output of each electric equipment. For example, based on the dispatch instruction, the power of the electric load equipment and the thermal load equipment is controlled so that the electric load equipment and the thermal load equipment, under the premise of meeting the constraint conditions, are operated based on the output data information of the electric load equipment in the preferred solution. In addition, after the electric load equipment and the thermal load equipment are operated, this embodiment monitors and obtains the load parameters on the user side after the dispatch operation of the power plant equipment in the target time period, including the electric load data and the thermal load data on the user side, and determines the comprehensive electric and thermal satisfaction on the user side based on the electric load data and the thermal load data on the user side. This indicator can be used as an evaluation indicator for evaluating the dispatch of this power plant equipment, and can also be used as a feedback indicator for optimizing the dispatch of power plant equipment.

[0127] In one example, the power plant equipment includes electric load equipment and thermal load equipment, wherein the electric load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment. The dispatching instruction includes various sub-control instructions for new energy equipment, electric energy storage equipment, gas turbine equipment, electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment. According to the corresponding sub-dispatching instructions, the new energy equipment, such as wind power and photovoltaic power, is controlled to supply electricity; the electric energy storage equipment is controlled to operate at a certain or variable charge and discharge power to provide electricity; the gas turbine equipment is controlled to operate at a certain or variable power; the input power of the electric boiler equipment is controlled to control the electric boiler to output heat; the organic Rankine cycle-waste heat boiler equipment is controlled to perform thermoelectric coupling; the operating power of the gas boiler equipment is controlled to provide heat; the thermal energy storage equipment is operated at a certain or variable charge and discharge power to provide heat.

[0128] In one example, determining the comprehensive electric and thermal satisfaction of the user side at a certain moment may include: after the power equipment is operated, determining the absolute value of the difference between the actual electric load at that moment and the initial electric load at that moment as the electric power demand response value of the user side at that moment, and determining the absolute value of the difference between the actual thermal load at that moment and the initial thermal load at that moment as the thermal demand response value of the user side at that moment; further, determining the first quotient value obtained by dividing the electric power demand response value by the initial electric load at that moment as the proportion of the electric power demand response on the user side at that moment, and determining the second quotient value obtained by dividing the thermal demand response value by the initial thermal load at that moment as the proportion of the thermal demand response on the user side at that moment; finally, determining the comprehensive satisfaction corresponding to the moment based on the first quotient value and the second quotient value, wherein the sum of the first quotient value and the second quotient value is negatively correlated with the comprehensive satisfaction corresponding to the moment.

[0129] In an example, the comprehensive electric heating satisfaction of the user side can be determined by the following formula:

[0130]

[0131] Among them, Z t is the comprehensive satisfaction of the user side with electricity and heating at time t, P a,t is the actual electrical load at time t, is the initial electrical load at time t. a,t is the actual heat load at time t, is the initial heat load at time t.

[0132] In one example, according to the load characteristics on the user side, the power load can be divided into base load that cannot provide demand response and flexible load that can provide demand response. Similar to the electric load, the thermal load is also divided into base load and flexible thermal load, where the flexible thermal load includes interruptible and shiftable thermal load. Among them, the flexible load includes shiftable load and interruptible load. Taking the power load as an example, the following formula is used:

[0133]

[0134] Among them, P t SY is the load that can be translated at time t, P t ZD is the interruptable load at time t, and the sum of the two is the flexible load that provides demand response. This is the participating demand response value at that moment, that is, the difference between the actual value and the base load.

[0135] In one example, after determining the comprehensive electric and thermal satisfaction index, this embodiment can evaluate the power plant equipment scheduling based on the index. When the value of the comprehensive electric and thermal satisfaction is higher than a certain value, it is considered that the corresponding power plant equipment scheduling is in line with expectations, while ensuring energy supply, it also guarantees the user experience and satisfaction; when the value of the comprehensive electric and thermal satisfaction is lower than a certain value, it is considered that the corresponding power plant equipment scheduling is not ideal, and fails to achieve the dual guarantee of ensuring energy supply and user experience and satisfaction.

[0136] In one example, in addition to the evaluation function, the comprehensive electric heat satisfaction index of this embodiment can also be used as a feedback index for optimizing the dispatch of power plant equipment. When the value of the comprehensive electric heat satisfaction is lower than a certain value, it can be backtracked based on the comprehensive electric heat satisfaction to determine the corresponding problems in the dispatch of the power plant equipment, and then optimize the dispatch based on the problem. For example, if it is determined that the value of the comprehensive electric heat satisfaction is lower than the preset threshold, a prompt message is output to remind the dispatch of the power plant equipment. The technician can then backtrack to find the problem, including one or more of the instruction execution problem, equipment operation problem, model solving problem, and parameter setting problem in the model solving process. Among them, the parameter setting problem in the model solving process can be the unreasonable setting of the constraint conditions, for example, the upper and lower limits of the equipment's climbing power, the upper and lower limits of the input and output power, the energy storage capacity, the upper and lower limits of the charging and discharging power, etc., are unreasonable, and the setting of the parameter data of each power plant equipment is unreasonable. After determining the problem, the dispatch of the power plant equipment is optimized.

[0137] Step 305, after dispatching and controlling the power plant equipment according to the dispatching instruction, determine the economic benefits and carbon emissions after the dispatching operation of the power plant equipment.

[0138] Illustratively, after dispatching and controlling the power plant equipment according to the dispatching instructions, this embodiment can further determine the economic benefits and carbon emissions of the power plant equipment after the dispatching operation based on the data after the corresponding power plant equipment operates.

[0139] In one example, after determining the economic benefits and carbon emissions after the power plant equipment is dispatched and operated, the dispatch of the power plant equipment can be evaluated based on the economic benefits and carbon emissions, and the dispatch can be optimized based on these indicators, see the dispatch optimization based on comprehensive electric and thermal satisfaction in step 304.

[0140] In summary, in this embodiment, a scheduling model of a virtual power plant based on a source-load flexible response mechanism is proposed. Based on the comprehensive demand response, the power equipment is scheduled, which can improve the economy and low-carbon operation of the power plant under the background of large-scale development of new energy. The power load is supplied by wind power, photovoltaics, electric energy storage and gas turbines, and the thermal load is supplied by electric boilers, organic Rankine cycle-waste heat boilers, gas boilers and thermal energy storage. The energy supply part provides users with a variety of options for energy use, which improves the flexibility of the cogeneration system. The introduction of organic Rankine cycle-waste heat boiler equipment on the supply side improves the thermoelectric coupling performance of the cogeneration power generation system and improves the energy utilization rate in the cogeneration system. A comprehensive satisfaction mechanism is proposed, which makes the needs of power and thermal loads more comprehensively considered in the scheduling strategy, which can improve the user experience and satisfaction while ensuring energy supply.

[0141] In order to intuitively feel the effectiveness of the method of the present application, the inventor conducted the following actual case analysis.

[0142] In one example, Figure 4 A schematic diagram of the combined curve of electricity, heat load and wind and solar power provided in an embodiment of the present invention, Figure 5 The schematic diagram of the electricity purchase price, gas purchase price and gas sales price provided in the embodiment of the present invention obtains basic data, including wind power, photovoltaic output and user-side electricity and heat load requirements. Figure 4 As shown in the figure, the system electricity and gas purchase prices are as follows: Figure 5 The power plant equipment parameter data are shown in Table 1, Table 2 and Table 3.

[0143] Table 1 Parameters of electric heating related equipment

[0144]

[0145] Table 2 Other parameters

[0146]

[0147]

[0148] Table 3 Energy storage parameters

[0149]

[0150] Set up the following four scenarios for comparative analysis:

[0151] Scenario 1: waste heat boilers and comprehensive demand response are not considered; Scenario 2: waste heat boilers are considered and comprehensive demand response is not considered; Scenario 3: waste heat boilers are not considered and comprehensive demand response is considered; Scenario 4: waste heat boilers and comprehensive demand response are considered at the same time.

[0152] The comparison of optimization results of each scenario is shown in Table 4.

[0153] Table 4 Optimization results of each scenario

[0154]

[0155] From the comparison between Scenario 1 and Scenario 2 in Table 4, it can be seen that Scenario 2 reduces the energy purchase cost by 22.4% and the operating cost by 7.16% compared with Scenario 1. That is, the introduction of waste heat boilers on the source side can improve the energy efficiency of the system and reduce the cost of purchasing energy from the outside, but has a lower impact on the carbon emissions of the system.

[0156] Comparing Scenario 1 and Scenario 3, we can see that Scenario 3 reduces the operating cost by 4.98% and the carbon emissions by 20.65% compared with Scenario 1, but the energy purchase cost increases by 22.4%. That is, considering only the comprehensive demand response on the demand side can reduce carbon emissions to a large extent, but it may cause an increase in the system's energy purchase cost.

[0157] Scenario 4 considers both energy utilization on the source side and demand response on the load side. It can be seen that Scenario 4 has the lowest total cost, while the carbon emissions of Scenario 2 are 266.7 kg more than those of Scenario 4. That is, Scenario 4 has the best comprehensive benefits, and user satisfaction will remain at a high level.

[0158] It can be seen that load-side electric and thermal demand response can reduce peak load demand or move it to the load valley period, thereby improving various benefits. In particular, during peak electricity and thermal load periods, load reduction reduces the output of non-renewable energy units such as system gas turbines. During non-peak periods, increasing electricity and thermal load demand will absorb more new energy. Figure 6 A schematic diagram of the power demand response effect provided by an embodiment of the present invention, Figure 7 A schematic diagram of the operation of the power subsystem provided in an embodiment of the present invention, Figure 8 A schematic diagram of the thermal demand response effect provided by an embodiment of the present invention, Fig. 9 A schematic diagram of the operation of the thermal subsystem provided in an embodiment of the present invention.

[0159] like Figure 6-Figure 7 As shown in the figure, the implementation of power demand response on the load side significantly shortens the load peak-valley difference. The power demand of users is low during the 0:00-7:00 and 22:00-24:00 periods. Users shift the power demand during the peak period to this period, increase the load during this period, and perform a certain amount of load interruption from 5:00 to 22:00 to directly reduce the load during the period, thereby completing the power demand response. From the operation of the power subsystem, the wind power output is large at night (0:00-6:00 and 21:00-24:00) and the power purchase price from the large power grid is low. GT does not start, and only ES, wind power, and power purchase from the large power grid meet the power load demand. The power purchase power is large at night. The reason is that CSS starts at night and uses the low power price of the large power grid for carbon capture. The power price is higher during the day, and the power load is met by the generator sets in the system.

[0160] Depend on Figure 8 It can be seen that the heat load is larger at night and smaller during the day. The heat load curve can be made flat through heat demand response. Most of the heat load at night is supplied by electric boilers using off-peak electricity. Figure 7 , Fig. 9It can be seen that during the day (6:00-21:00), the gas boiler outputs power, and the remaining heat will be input into WHB and ORC to provide heat and electricity to users. Due to the increase in electricity prices during the day, the electricity price is higher than the natural gas price, and the heat load is mostly supplied by the gas turbine.

[0161] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0162] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.

[0163] Fig.10 The following is a schematic diagram of the structure of a power plant equipment dispatching device provided by an embodiment of the present invention. For ease of explanation, only the parts related to the embodiment of the present invention are shown, which are described in detail as follows:

[0164] like Fig.10 As shown, the power plant equipment dispatching device:

[0165] The acquisition unit 41 is used to acquire basic data; wherein the basic data includes new energy output data, user-side load data and power plant equipment parameter data.

[0166] The first processing unit 42 is used to parse and process the basic data based on a preset scheduling model to generate scheduling instructions for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for the power plant equipment.

[0167] The second processing unit 43 is used to dispatch and control the power plant equipment according to the dispatch instruction; and obtain the load parameters after the power plant equipment is dispatched and operated, and determine the comprehensive electric and heat satisfaction of the user side based on the load parameters.

[0168] In one possible implementation, the preset scheduling model takes the total cost of power plant operation and maintenance as the objective function, and takes energy balance constraints, demand response constraints, and equipment operation constraints as constraints; among them, energy balance constraints are used to ensure the balance between energy supply and demand, demand response constraints are used to respond to grid demand, and equipment operation constraints are used to ensure that power equipment operates within a safe and efficient range.

[0169] In a possible implementation, the first processing unit 42 includes:

[0170] The first processing sub-unit is used to perform uncertain solution processing on the objective function according to the basic data under the constraints of balance constraints, demand response constraints and equipment operation constraints, and determine the optimal solution of the objective function; wherein the optimal solution is the output data of each power equipment that makes the objective function obtain the minimum value.

[0171] The generation subunit is used to generate a dispatch instruction for power plant equipment according to the optimal solution; wherein the dispatch instruction is used to dispatch the output of each power equipment.

[0172] In one possible implementation, the total cost of power plant operation and maintenance includes energy purchase cost, carbon trading cost, operation and maintenance cost, spinning reserve cost, interruptible load compensation cost and system electricity sales benefit.

[0173] The device also includes:

[0174] The first calculation unit is used to calculate the sum of energy purchase costs, carbon trading costs, operation and maintenance costs, spinning reserve costs and interruptible load compensation costs.

[0175] The second calculation unit is used to determine the objective function based on the difference between the added sum and the system electricity sales benefit.

[0176] In one possible implementation, energy balance constraints include electrical balance constraints and thermal balance constraints, demand response constraints include spinning reserve constraints; equipment operation constraints include new energy output constraints, gas turbine constraints, organic Rankine cycle-waste heat boiler constraints, gas boiler constraints, electric boiler constraints, carbon capture equipment constraints, and energy storage output constraints.

[0177] In a possible implementation, it is characterized in that, after the second processing unit 43, the device further includes:

[0178] The third processing unit is used to determine the economic benefits and carbon emissions after the power plant equipment is dispatched and operated.

[0179] In a possible implementation, it is characterized in that the load parameters include electrical load data and thermal load data; the second processing unit 43 includes:

[0180] The second processing subunit is used to determine the comprehensive electric and thermal satisfaction of the user side according to the actual electric load, initial electric load, actual thermal load and initial thermal load of the user side, wherein the comprehensive electric and thermal satisfaction is used to characterize the user's thermal comfort and the user's electric comfort.

[0181] In a possible implementation manner, the second processing subunit is specifically configured to:

[0182] Determine the power demand response value and thermal demand response value at a certain moment on the user side, wherein the power demand response value is the absolute value of the difference between the actual electric load at that moment and the initial electric load at that moment, and the thermal demand response value is the absolute value of the difference between the actual thermal load at that moment and the initial thermal load at that moment.

[0183] Determine a first quotient obtained by dividing the electricity demand response value by the initial electricity load at that moment, and determine a second quotient obtained by dividing the thermal demand response value by the initial thermal load at that moment; wherein the first quotient represents the proportion of electricity demand response on the user side at that moment, and the second quotient represents the proportion of thermal demand response on the user side at that moment.

[0184] Based on the first quotient value and the second quotient value, a comprehensive satisfaction level corresponding to the moment is determined, wherein a sum of the first quotient value and the second quotient value is negatively correlated with the comprehensive satisfaction level corresponding to the moment.

[0185] In one possible implementation, the power plant equipment includes electric load equipment and thermal load equipment, wherein the electric load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment.

[0186] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0187] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0188] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned power plant equipment scheduling method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device that can carry computer program code, recording media, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electrical carrier signal, telecommunication signal and software distribution medium, etc.

[0189] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A method for dispatching power plant equipment, characterized in that: The method comprises: Obtaining basic data; wherein the basic data includes new energy output data, user-side load data and power plant equipment parameter data; Based on a preset scheduling model, the basic data is parsed and processed to generate a scheduling instruction for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for power plant equipment; According to the dispatching instruction, the power plant equipment is dispatched and controlled; and the load parameters of the power plant equipment after the dispatching operation are obtained, and based on the load parameters, the comprehensive electric and heat satisfaction of the user side is determined.

2. The method according to claim 1, characterized in that The preset scheduling model takes the total cost of power plant operation and maintenance as the objective function, and energy balance constraints, demand response constraints and equipment operation constraints as constraints; wherein the energy balance constraints are used to ensure the balance between energy supply and demand, the demand response constraints are used to respond to grid demand, and the equipment operation constraints are used to ensure that power equipment operates within a safe and efficient range.

3. The method according to claim 2, characterized in that The method of parsing the basic data based on the preset dispatching model to generate dispatching instructions for power plant equipment includes: According to the basic data, under the constraints of the balance constraint, the demand response constraint and the equipment operation constraint, the objective function is subjected to an uncertain solution process to determine the optimal solution of the objective function; wherein the optimal solution is the output data of each power device that makes the objective function obtain the minimum value; According to the preferred solution, a dispatching instruction for power plant equipment is generated; wherein the dispatching instruction is used to dispatch the output of each power equipment.

4. The method according to claim 2, characterized in that: The total operation and maintenance cost of the power plant includes energy purchase cost, carbon trading cost, operation and maintenance cost, spinning reserve cost, interruptible load compensation cost and system power sales benefit; The method further comprises: Calculating the sum of the energy purchase cost, the carbon trading cost, the operation and maintenance cost, the spinning reserve cost and the interruptible load compensation cost; The objective function is determined based on the difference between the sum and the system electricity sales benefit.

5. The method according to claim 2, characterized in that: The energy balance constraints include electrical balance constraints and thermal balance constraints, the demand response constraints include spinning reserve constraints; the equipment operation constraints include new energy output constraints, gas turbine constraints, organic Rankine cycle-waste heat boiler constraints, gas boiler constraints, electric boiler constraints, carbon capture equipment constraints and energy storage output constraints.

6. The method according to any one of claims 1 to 5, characterized in that After the power plant equipment is dispatched and controlled according to the dispatch instruction, the method further includes: Determine the economic benefits and carbon emissions after the power plant equipment is dispatched and operated.

7. The method according to any one of claims 1 to 5, characterized in that The load parameters include electric load data and thermal load data; based on the load parameters, determining the comprehensive electric and thermal satisfaction of the user side includes: The comprehensive electric-heat satisfaction degree on the user side is determined based on the actual electric load, initial electric load, actual heat load and initial heat load on the user side, wherein the comprehensive electric-heat satisfaction degree is used to characterize the user's thermal comfort and the user's electric comfort.

8. The method according to claim 7, characterized in that Determining the comprehensive electric and thermal satisfaction of the user side according to the actual electric load, the initial electric load, the actual thermal load and the initial thermal load of the user side includes: Determine the power demand response value and the thermal demand response value at a certain moment on the user side, wherein the power demand response value is the absolute value of the difference between the actual electric load at that moment and the initial electric load at that moment, and the thermal demand response value is the absolute value of the difference between the actual thermal load at that moment and the initial thermal load at that moment; Determine a first quotient value obtained by dividing the power demand response value by the initial power load at the moment, and determine a second quotient value obtained by dividing the thermal demand response value by the initial thermal load at the moment; wherein the first quotient value represents the proportion of the power demand response at the user side at the moment, and the second quotient value represents the proportion of the thermal demand response at the user side at the moment; Based on the first quotient value and the second quotient value, a comprehensive satisfaction level corresponding to the moment is determined, wherein a sum of the first quotient value and the second quotient value is negatively correlated with the comprehensive satisfaction level corresponding to the moment.

9. The method according to any one of claims 1 to 5, characterized in that The power plant equipment includes electric load equipment and thermal load equipment, wherein the electric load equipment includes new energy equipment, electric energy storage equipment and gas turbine equipment, and the thermal load equipment includes electric boiler equipment, organic Rankine cycle-waste heat boiler equipment, gas boiler equipment and thermal energy storage equipment.

10. A power plant equipment dispatching device, characterized in that: The device comprises: An acquisition unit, used to acquire basic data; wherein the basic data includes new energy output data, user side load data and power plant equipment parameter data; A first processing unit is used to parse and process the basic data based on a preset scheduling model to generate a scheduling instruction for power plant equipment; wherein the preset scheduling model is used to generate a scheduling optimization solution for power plant equipment; The second processing unit is used to dispatch and control the power plant equipment according to the dispatch instruction; and obtain the load parameters of the power plant equipment after the dispatch operation, and determine the comprehensive electric and thermal satisfaction of the user side based on the load parameters.