Power management apparatus
Through the processor control of power management equipment, the reference value of power supply and demand of virtual power plants is maintained without crossing, solving the problem of power adjustment system burden caused by fluctuations in renewable energy generation, and extending the time period of less burden.
Patent Information
- Application Number
- CN202410647864.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-05-24
- Filing Date
- 2024-05-23
- Publication Date
- 2024-11-26
Smart Images

Figure CN119029832A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a power management device, and more particularly, to a power management device that manages adjustment power of power delivered by a transaction business operator to a power transmission and distribution business operator. Background Art
[0002] In recent years, a supply and demand adjustment market has been established, which is a market in which trading business operators such as aggregators obtain adjustment power for electricity to be delivered to general power transmission and distribution business operators. Virtual power plants (VPPs) can be used in the supply and demand adjustment market. VPPs refer to energy resources such as power generation facilities, storage facilities, and demand facilities on the consumer side, as well as energy resources such as power generation facilities, storage facilities, and demand facilities that are directly connected to the power system by their owners or third parties such as aggregators. Provide functions equivalent to power plants (for example, see Japanese Unexamined Patent Application Publication No. 2022-113460).
[0003] In VPP, demand response (DR) can be used to perform supply and demand adjustments of electricity. DR means changing the supply and demand pattern of electricity due to the control of energy resources by a third party or the owner of the energy resources on the consumer side. DR is mainly divided into lowering DR and raising DR according to the mode of supply and demand control, wherein lowering DR reduces demand and increases supply, while raising DR increases demand and reduces supply. Summary of the invention
[0004] In the supply and demand adjustment of the VPP, when the power generation amount of renewable energy (hereinafter also referred to as "regenerative energy") fluctuates, the command value of supply and demand may fluctuate. As a result, the command value may deviate from the reference value assumed for the time frame. The reference value is an adjusted power value of the supply and demand of electricity when DR is not performed. Therefore, the reference value is a value that is less burdensome for energy resources. When the command value fluctuates from the first command value to the second command value to cross the reference value, the following occurs. When the reference value is passed immediately, the time period that is less burdensome for energy resources becomes an instantaneous time period despite passing the reference value.
[0005] The present disclosure has been made in order to solve the above-mentioned problems, and an object of the present disclosure is to provide a power management apparatus capable of making as long as possible a period of time that is less burdensome for a system that adjusts supply and demand of power.
[0006] The power management device according to the present disclosure is a power management device that manages the adjustment power of the power delivered by the trading business operator to the power transmission and distribution business operator. The power management device is capable of controlling the adjustment system of the supply and demand of power, and includes: a memory that stores a predetermined program in the memory; and a processor that executes the predetermined program. The processor controls the adjustment system by executing the predetermined program so that when the instruction value of the supply and demand power to the adjustment system changes from the first instruction value before the change to the second instruction value after the change, the reference value of the supply and demand of power is crossed, and the time period during which the reference value is maintained by the adjustment system is experienced.
[0007] According to the above configuration, in the case where the reference value is crossed when the command value for supply and demand power of the adjustment system changes from the first command value to the second command value, a time period for maintaining the reference value can be experienced. Therefore, it is possible to provide a power management device that can make the time period that is less burdensome for the system for adjusting the supply and demand of power as long as possible.
[0008] The processor can control the adjustment system by executing a predetermined program, whose goal is: when the instruction value of the supply and demand of electric power to the adjustment system changes from a first instruction value before the change to a second instruction value after the change, the first instruction value is linearly changed to the second instruction value without crossing a baseline value of the supply and demand of electric power to the adjustment system.
[0009] According to the above configuration, the first instruction value can be changed to the second instruction value by simple control.
[0010] When the adjustment system is controlled to maintain a reference value over a period of time, the processor can control the speed at which the adjustment system changes the supply and demand of electricity to a controllable maximum speed during the period of transition from the first instruction value to the reference value and the period of transition from the reference value to the second instruction value.
[0011] According to the above configuration, it is possible to make longer the time period which is less burdensome for the system which adjusts the supply and demand of electric power.
[0012] According to the present disclosure, it is possible to provide a power management apparatus capable of making as long as possible a period of time that is less burdensome for a system that adjusts supply and demand of power. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Features, advantages, and technical and industrial significance of exemplary embodiments of the present invention will be described below with reference to the accompanying drawings, in which like symbols represent like elements, and in which:
[0014] Figure 1 is a block diagram showing an outline of a configuration of a power management system according to an embodiment of the present disclosure;
[0015] Figure 2 is a flow chart showing the flow of power adjustment related processing performed by the aggregator server in this embodiment;
[0016] Figure 3 is a schematic diagram showing changes in supply and demand power exchanged with a power transmission and distribution business operator in this embodiment; and
[0017] Figure 4 It is an enlarged diagram showing changes before and after the reference value is crossed in changes in supply and demand power exchanged with the power transmission and distribution business operator in this embodiment. DETAILED DESCRIPTION
[0018] The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings. The same or equivalent parts in the accompanying drawings are represented by the same reference numerals, and their description will not be repeated.
[0019] Figure 1 1 is a block diagram showing an outline of the configuration of a power management system 1 according to an embodiment of the present invention. Figure 1 , a thick solid line with an arrow indicates the flow of power, and a thin solid line and a dotted line with an arrow indicate the flow of data. In the power management system 1, the power transmission and distribution business operator 50 (e.g., a general power transmission and distribution business operator) performs the delivery of power generated by the power generation business operator 60 to the consumer 20 as a retail destination of the retail power business operator 30 (e.g., a regional power company, a new power producer and supplier).
[0020] The supply and demand adjustment market 40 is a market in which an electric power transmission and distribution business operator 50 obtains adjustment power for performing supply and demand adjustment and frequency adjustment. The adjustment power includes primary adjustment power, secondary adjustment power (1), (2) and tertiary adjustment power (1), (2). Among them, the secondary adjustment power (2) and the tertiary adjustment power (1) are adjustment powers transmitted from the aggregator 10 or the power generation business operator 60 to the electric power transmission and distribution business operator 50 in response to a forecast error regarding a demand plan. The tertiary adjustment power (2) is an adjustment power transmitted from the aggregator 10 or the power generation business operator 60 to the electric power transmission and distribution business operator 50 in response to a forecast error of renewable energy such as power generated by photovoltaic power generation or wind power generation. For a segment (for example, three hours) of a target period in the supply and demand adjustment market 40, the aggregator 10 or the power generation business operator 60 performs a bid for the tertiary adjustment power (1), (2) one day before the segment. The aggregator 10 or the power generation business operator 60 is obliged to deliver the contracted amount of adjustment power (ΔkW) of the successful bidding result to the power transmission and distribution business operator 50 in the target section based on the reference value (kW) of the power demand. The primary adjustment power and the secondary adjustment power (1) and (2) are still not traded in the supply and demand adjustment market 40. The supply and demand adjustment market and the adjustment power are described in detail on the websites of the Ministry of Economy, Trade and Industry and the Transmission & Distribution Grid Council, etc.
[0021] The power generation business operator 60 has a power generation facility 610 (e.g., a nuclear power generation facility, a thermal power generation facility, a hydroelectric power generation facility, a photovoltaic power generation facility, a wind power generation facility, a geothermal power generation facility, etc.) that generates power and a power generation business operator server 600 that manages the power generation business operation. The power transmission and distribution business operator 50 has a power transmission and distribution facility 510 that transmits and distributes power, and a power transmission and distribution business operator server 500 that manages the power transmission and distribution business operation. The power generation facility 610 and the power transmission and distribution facility 510 configure the power system (grid). The supply and demand adjustment market 40 has a supply and demand adjustment market server 400 for managing the supply and demand of power. The retail power business operator 30 has a retail power business operator server 300 that manages the retail power business operation.
[0022] The consumer 20 has a demand side response (DSR) 210 and a home energy management system (HEMS) 200 that manages the DSR 210, the DSR 210 including at least one of a demand facility (e.g., electrical appliances, machines, and charging and discharging electric vehicles) as an energy resource connected to a power receiving point or lower, a power storage facility (e.g., a fixed battery or a charging and discharging electric vehicle), and a power generation facility (e.g., a photovoltaic power generation facility or a wind power generation facility).
[0023] The aggregator 10 has an aggregator server 100. The aggregator server 100 controls and manages distributed energy resources (DERs) 310, which include at least one of power generation facilities or power storage facilities (e.g., charging electric vehicles, charging and discharging electric vehicles, or stationary batteries), which are energy resources directly connected to the power system or DSR 210.
[0024] The aggregator server 100 includes a processor 110, a memory 120, an input unit 130, an output unit 140, an auxiliary storage device 160, and a communication unit 190. The memory 120 includes a random access memory (RAM), a read only memory (ROM), a flash memory, etc., and stores therein software such as a program executed by the aggregator server 100, data to be processed, etc. The auxiliary storage device 160 includes a hard disk drive (HDD), a solid state drive (SSD), a removable medium drive, etc., assists the memory 120, stores therein data of a larger capacity than the memory 120, and stores therein software such as a program executed by the aggregator server 100, data to be processed, etc. The input unit 130 includes input means such as a keyboard, a mouse, etc., and transmits information input by a consumer from the input means to the processor 110. The output unit 140 includes output means such as a display and a speaker, and outputs information received from the processor 110 to the output means. The communication unit 190 is a device that can communicate with an external device such as another server via a communication network 900 such as the Internet and transmit and receive predetermined information to and from the external device. The processor 110 processes data from the input unit 130 or the communication unit 190 or data stored in the memory 120 or the auxiliary storage device 160 according to a program stored in the memory 120 or the auxiliary storage device 160, causes the output unit 140 or the communication unit 190 to output data, and causes the memory 120 or the auxiliary storage device 160 to store data therein.
[0025] The retail power business operator server 300 , the supply and demand adjustment market server 400 , the power transmission and distribution business operator server 500 , and the power generation business operator server 600 have configurations similar to those of the above-described aggregator server 100 .
[0026] HEMS 200 may communicate with external devices such as an aggregator server 100, a retail electricity business operator server 300, or an electricity transmission and distribution business operator server 500 via a communication network 900, control the supply and demand of electricity at the DSR 210, and obtain measured electricity from a smart meter that measures the amount of electricity exchanged between the DSR 210 and the power system.
[0027] The HEMS 200 may have a function of a smart meter. The aggregator server 100 may directly or indirectly control and manage the DSR 210 .
[0028] In the supply and demand adjustment of the VPP in the power management system 1 as described above, when the power generation of renewable energy fluctuates, the command values of supply and demand may fluctuate. As a result, the command value may deviate from the reference value assumed for the time frame. Among them, the reference value is the adjusted power value of the supply and demand of electricity when DR is not performed. Therefore, the reference value is a value that is less burdensome for energy resources. When the command value fluctuates from the first command value to the second command value to cross the reference value, the following occurs. When the reference value is passed immediately, the time period that is less burdensome for energy resources becomes an instantaneous time period despite passing the reference value.
[0029] Therefore, when the previously declared reference value of supply and demand power of the DER 310 or DSR 210 is crossed when the instruction value of supply and demand power of the DER 310 or DSR 210 is changed from the first instruction value before the change to the second instruction value after the change, the processor 110 of the aggregator server 100 controls the DER 310 or DSR 210 to undergo a time period for maintaining the reference value.
[0030] Therefore, when the reference value is crossed when the command value of supply and demand power to DER 310 or DSR 210 changes from the first command value to the second command value, a period of time during which the reference value is maintained can be passed. As a result, a period of time during which the burden on the system for adjusting the supply and demand of power is small can be made as long as possible.
[0031] Figure 2 1 is a flowchart showing the flow of the power adjustment related processing performed by the aggregator server 100 in this embodiment. Figure 2 , the processor 110 of the aggregator server 100 determines whether the current time is the bidding timing (step S111). The bidding timing is a specific time, such as a predetermined number of hours before the deadline for bidding. In the case of the three-level adjustment power (2), the bidding time is from 12 o'clock to 14 o'clock on the previous day. Therefore, the deadline for bidding is, for example, 13 o'clock, one hour before 14 o'clock.
[0032] When it is determined that the current time is the bidding timing (Yes in step S111), the processor 110 specifies the bid amount and the bid price from the possible amount predicted to be delivered by the DER 310 (or the DSR 210) in the time frame as the bidding target (step S112). The possible amount is the adjustment power of the demand for the power predicted to be reducible predicted from the information of the DER 310. The power including the safety factor in addition to the possible amount is set as the third-level adjustment power (2), and the bid amount is defined. Then, the processor 110 bids the bid amount and the bid price specified in step S112 on the supply and demand adjustment market server 400 (step S113).
[0033] When it is determined that the current time is not the bid timing (No in step S111) or after step S113, the processor 110 determines whether a notification indicating the contract result is given from the supply and demand adjustment market server 400 (step S121). The contract amount of the three-level adjustment power (2) is specified within the range of the bid amount. When it is determined that the notification of the contract result is given (Yes in step S121), the memory 120 or the auxiliary storage device 160 is caused to store the contract result therein (step S122).
[0034] When it is determined that it is not the timing to give the notification of the contract result (No in step S121) or after step S122, the processor 110 determines whether the current time is the timing to declare the reference value (step S131). The timing to declare the reference value is a specific time, such as a predetermined number of minutes before the deadline for declaring the reference value. In the case of the three-level adjustment power (2), the deadline is one hour before the start of the target frame, for example, 30 minutes before the deadline.
[0035] When it is determined that the current time is the timing to declare the reference value (Yes in step S131), the processor 110 declares the demand required for the frame of the third-level adjustment power (2) (when the DER 310 is an electric vehicle, charging the electric vehicle that needs charging) as the reference value to the supply and demand adjustment market server 400 (step S132).
[0036] When it is determined that the current time is not the timing of declaring the reference value (No in step S131) or after step S132, the processor 110 determines whether the current time is the start time of the target frame (step S141). When it is determined that the current time is not the start time of the target frame (No in step S141), the processor 110 returns the processing to be executed to the upper level processing which is the caller of the adjustment power related processing.
[0037] At the same time, when it is determined that the current time is the start time of the target frame (yes in step S141), the processor 110 determines whether an instruction is received from the power transmission and distribution business operator server 500 for changing the instruction value of the adjustment power of supply and demand power based on the contract result for the power transmission and distribution business operator 50 which is a business partner regarding the adjustment power of power (step S142).
[0038] When determining that the instruction to change the instruction value is received (Yes in step S142), processor 110 determines whether the reference value declared in step S132 is crossed when the supply and demand power transitions from the instruction value before the change to the instruction value after the change (step S143).
[0039] When it is determined that the reference value is not crossed at the time of transition (No in step S143), the processor 110 starts controlling the DER 310 (or the DSR 210) so as to make a transition to the command value of the supply and demand of the electric power exchanged with the electric power transmission and distribution business operator 50 (step S144), and returns the process to be executed to the upper level process which is the caller of the adjustment power related process. In this control, the transition to the command value after the change needs to be completed within the time period of the response time, and the transition can be performed at the maximum controllable speed. The maximum controllable speed is specified in advance by experiments, tests, or simulations.
[0040] Figure 3 1 is a diagram showing changes in supply and demand power exchanged with the power transmission and distribution service operator 50 in this embodiment. Figure 3 , when there is an instruction for changing the instruction value from the reference value to the instruction value 1, the reference value is not crossed at the time of transition, and thus the supply and demand power are changed at the maximum controllable speed within the period of the response time.
[0041] Back to Figure 2 , when it is determined that the reference value is crossed at the time of transition (Yes in step S143), the processor 110 starts controlling the DER 310 (or DSR 210) so as to make a transition to the command value of the supply and demand of the electric power to be exchanged with the electric power transmission and distribution business operator, controls the time period for maintaining the reference value to be maximum in the transition (step S145), and returns the processing to be executed to the upper level processing which is the caller of the adjustment power related processing. In this control, the transition to the command value after the change needs to be completed within the time period of the response time. In the transition from the command value before the change to the reference value and the transition from the reference value to the command value after the change, it is desired to change the supply and demand electric power at the maximum controllable speed. The maximum controllable speed is specified in advance by experiments, tests, or simulations.
[0042] Reference again Figure 3, when there is an instruction for changing the instruction value from instruction value 1 to instruction value 2 and there is an instruction for changing the instruction value from instruction value 2 to instruction value 3, the reference value is crossed at the time of transition. Therefore, within the time period of the response time, the supply and demand power are changed at the maximum controllable speed, and the time for maintaining the reference value is controlled as long as possible.
[0043] In the case where the reference value is not crossed at the time of transition, the command value before the change is linearly changed to the command value after the change. Figure 4 This is an enlarged diagram showing changes before and after the reference value when the supply and demand power exchanged with the power transmission and distribution business operator 50 in this embodiment crosses the reference value. Figure 4 In the case of crossing the reference value at the time of transition, the command value before the change to the reference value and from the reference value to the command value after the change are changed linearly, and there are inflection points before and after the reference value. As a result, a time period for maintaining the reference value is provided.
[0044] return Figure 2 Meanwhile, when it is determined that it is not the timing to receive the instruction for changing the instruction value (No in step S142), the processor 110 determines whether the instruction value after the change is reached in the transition to the instruction value after the change (step S146). When it is determined that the instruction value after the change is not reached (No in step S146), the processor 110 continues the transition to the control of the instruction value after the change (step S147), and returns the processing to be executed to the upper level processing as the caller of the adjustment power related processing.
[0045] Meanwhile, when it is determined that the instruction value after the change is reached (Yes in step S146), the processor 110 switches the control of the DER 310 (or the DSR 210) so that the supply and demand power maintain the instruction value (step S148), and returns the processing to be executed to the upper processing which is the caller of the adjustment power related processing.
[0046] Variations
[0047] (1) In the above embodiments, Figure 1 As shown in , etc., DER 310 (or DSR 210) may mainly include demand facilities such as charging electric vehicles, and supplementarily include storage facilities such as charging electric vehicles. However, the above is not limited, and DER 310 (or DSR 210) may include at least one of demand facilities, storage facilities, and power generation facilities.
[0048] (2) In the above embodiment, if Figure 2As shown in FIG. 1 , the aggregator 10 exchanges supply and demand power with the power transmission and distribution business operator 50. However, the above is not limited, and a trading business operator or an individual such as a power generation business operator 60, a consumer 20, or a retail power business operator 30 may exchange supply and demand power with the power transmission and distribution business operator 50.
[0049] (3) In the above embodiment, if Figure 2 As shown in step S145 in , when the supply and demand power are changed from the command value before the change to the command value after the change, the control is performed so that the time period for maintaining the reference value becomes the maximum value. However, it is not limited to this, and the time period for maintaining the reference value only needs to be at least more than 0, and can be any time period as long as the time period is a time period between 0 and the maximum value. However, it is desirable that the time period is as long as possible.
[0050] (4) In the above-described embodiment, the power management device that manages the adjustment power of the power delivered by the trading business operator such as the aggregator 10 or the power generation business operator 60 to the power transmission and distribution business operator 50 is the aggregator server 100. However, not limited to this, the power management device may be other devices, and may be the supply and demand adjustment market server 400, may be the power generation business operator server 600, may be the retail power business operator server 300, or may be, for example, the power transmission and distribution business operator server 500.
[0051] in conclusion
[0052] (1) Figure 1 As shown, the power management device (e.g., aggregator server 100, power generation service operator server 600) is a device that manages the adjustment power of the power delivered by the transaction service operator (e.g., aggregator 10, power generation service operator 60) to the power transmission and distribution service operator 50. Figure 1 As shown, the power management device can control the adjustment system of the supply and demand of power (eg, DER 310, DSR 210), and includes a predetermined program (eg, Figure 2 The present invention also provides a memory 120 for adjusting a program related to power as shown in the figure) and a processor 110 for executing a predetermined program.
[0053] like Figures 2 to 4 As shown, the processor 110 controls the adjustment system by executing a predetermined program so that when the instruction value of the supply and demand power to the adjustment system changes from a first instruction value before the change to a second instruction value after the change, when a reference value of the supply and demand of power is crossed, a pre-declared time period for maintaining the reference value maintained by the adjustment system is passed (for example, step S145).
[0054] Therefore, in the case where the reference value is crossed when the command value for supply and demand power of the adjustment system changes from the first command value to the second command value, a time period for maintaining the reference value can be experienced. As a result, a time period with less burden on the system for adjusting the supply and demand of power can be made as long as possible.
[0055] (2) Figure 2 and Figure 3 As shown, the processor 110 can control the adjustment system by executing a predetermined program, the purpose of which is: when the command value of the supply and demand of power to the adjustment system is changed from the first command value before the change to the second command value after the change (for example, step S144), when the reference value of the supply and demand of power of the adjustment system declared in advance is not crossed, the first command value is linearly changed to the second command value. As a result, the first command value can be changed to the second command value by simple control.
[0056] (3) Figures 2 to 4 As shown, the processor 110 can control the speed at which the supply and demand of electricity are changed by the adjustment system to a controllable maximum speed (e.g., step S145) during a time period in which the control adjustment system undergoes a time period in which the reference value is maintained, during a time period in which the first instruction value transitions to the reference value, and during a time period in which the reference value transitions to the second instruction value.
[0057] As a result, the time period during which the burden is less on the system that adjusts the supply and demand of electric power can be further extended.
[0058] It should be understood that the embodiments disclosed above are merely examples in all aspects and are not intended to limit the present invention. The scope of the present disclosure is limited by the scope of the claims. All modifications made within the scope and spirit equivalent to the scope and spirit of the claims are intended to be included in the present invention.
Claims
1. A power management device that manages the adjustment power of power delivered by a transaction business operator to a power transmission and distribution business operator, the power management device being capable of controlling an adjustment system for supply and demand of power, the power management device comprising: a memory storing a predetermined program in the memory; as well as A processor that executes the predetermined program, wherein the processor controls the adjustment system by executing the predetermined program so that when the instruction value of the supply and demand power to the adjustment system changes from a first instruction value before the change to a second instruction value after the change, a time period of maintaining the reference value of the supply and demand of power of the adjustment system is experienced while the reference value of the supply and demand of power of the adjustment system is crossed.
2. The power management device according to claim 1, wherein: The processor controls the adjustment system by executing the predetermined program with the goal of linearly changing the first instruction value to the second instruction value when the instruction value of the supply and demand of electric power to the adjustment system changes from the first instruction value before the change to the second instruction value after the change, without crossing a reference value of the supply and demand of electric power to the adjustment system.
3. The power management device according to claim 1, wherein: When the adjustment system is controlled to maintain the reference value for a period of time, the processor controls the speed at which the adjustment system changes the supply and demand of electricity in the time period from the first instruction value to the reference value and the time period from the reference value to the second instruction value to be a controllable maximum speed.
Citation Information
Patent Citations
Power adjustment device, power supply-demand balance adjustment system and method
JP2022113460A