Primary frequency modulation control method and device for photovoltaic power station

By calculating the frequency modulation response sensitivity of the photovoltaic power generation system and building the frequency modulation sequence, the frequency modulation participation of the photovoltaic power station is optimized, and the problem of insufficient active power regulation caused by different frequency modulation response sensitivity in traditional methods is solved, and the frequency support capacity and safety of the power grid are improved.

CN119029921APending Publication Date: 2024-11-26CHINA SOUTHERN POWER GRID COMPANY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410967455.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The traditional photovoltaic power station primary frequency regulation control method cannot effectively consider the frequency regulation response sensitivity of different photovoltaic power units, resulting in insufficient active power regulation, affecting the frequency support capacity and safety of the power grid.

Method used

By obtaining the historical operation data of the photovoltaic power generation system, calculating the delay time and adjustment time, building a sensitivity calculation strategy, calculating the frequency modulation response sensitivity, and building a frequency modulation sequence and frequency modulation instructions based on the grid frequency and active power measurement values, optimizing the frequency modulation of the photovoltaic power generation system participate.

Benefits of technology

It improves the frequency support capability of the power grid and the safety of the power grid, optimizes the frequency modulation performance of the photovoltaic power station, and ensures the stability of the power grid frequency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029921A_ABST
    Figure CN119029921A_ABST
Patent Text Reader

Abstract

The invention discloses a primary frequency modulation control method and device for a photovoltaic power station. The method comprises the following steps: acquiring historical operation data of a photovoltaic power generation system; calculating delay time and adjustment time; constructing a sensitivity calculation strategy; according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation state of the photovoltaic power station, frequency modulation response sensitivity is calculated; constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of the photovoltaic power generation systems; calculating a total frequency modulation power value to be provided by the power station according to the power grid frequency measurement value and the power station grid-connected point active power measurement value; calculating an active power reference value according to the power station power predicted value and the total number of photovoltaic power generation systems; and performing primary frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value. Primary frequency modulation control is achieved, and the power grid frequency supporting capacity and the power grid safety are improved. The method can be applied to the technical field of new energy grid-connected operation control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of new energy grid-connected operation control, and in particular to a primary frequency modulation control method and device for a photovoltaic power station. Background Art

[0002] In recent years, new energy sources such as photovoltaic power generation have developed rapidly. However, low-inertia power systems are prone to inertia shortages, which can cause frequency accidents, especially when DC interlocking or new energy sources are collectively disconnected from the grid, resulting in active power loss. When a grid frequency event occurs, the traditional primary frequency regulation control method calculates the active power adjustment required by the power station by measuring the obtained frequency deviation, and evenly distributes the power adjustment to each photovoltaic power generation unit in the power station. However, the frequency regulation response sensitivity of each photovoltaic power generation unit is different, resulting in inadequate active power regulation, affecting the primary frequency regulation performance of the photovoltaic power station, low grid frequency support capacity, and low grid security.

[0003] In summary, the technical problems existing in the relevant technologies need to be improved. Summary of the invention

[0004] The embodiments of the present invention provide a primary frequency regulation control method and device for a photovoltaic power station, which effectively improves the frequency support capability and safety of a power grid.

[0005] On the one hand, an embodiment of the present invention provides a primary frequency modulation control method for a photovoltaic power station, comprising the following steps:

[0006] Obtain historical operation data of photovoltaic power generation system;

[0007] Calculating the delay time and adjustment time according to the historical operation data of the photovoltaic power generation system;

[0008] Constructing a sensitivity calculation strategy according to the delay time and the adjustment time;

[0009] Calculating the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station;

[0010] Constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the measured active power of the photovoltaic power generation system and the total number of photovoltaic power generation systems;

[0011] Calculate the total frequency regulation power value to be provided by the power station based on the measured value of the power grid frequency and the measured value of the active power at the power station connection point;

[0012] Calculating an active power reference value according to the power plant power prediction value and the total number of the photovoltaic power generation systems;

[0013] A frequency modulation control is performed according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

[0014] In some embodiments, constructing a sensitivity calculation strategy according to the delay time and the adjustment time includes:

[0015] According to a first preset number of groups, the delay time is divided into a first group to obtain a plurality of delay time groups;

[0016] According to a second preset number of groups, the adjustment time is divided into a second group to obtain a plurality of adjustment time groups;

[0017] The sensitivity calculation strategy is constructed according to the plurality of delay time groups and the plurality of adjustment time groups.

[0018] In some embodiments, the calculating the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station includes:

[0019] According to the delay time, selecting a target delay time group from the sensitivity calculation strategy;

[0020] According to the adjustment time, selecting a target adjustment time group from the sensitivity calculation strategy;

[0021] Calculating a first response sensitivity according to the target delay time grouping and the target adjustment time grouping;

[0022] The frequency modulation response sensitivity is calculated according to the operating state of the photovoltaic power station and the first response sensitivity.

[0023] In some embodiments, the step of constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the measured active power value of the photovoltaic power generation system and the total number of photovoltaic power generation systems includes:

[0024] Calculating the adjustable active power according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of the photovoltaic power generation systems;

[0025] The frequency modulation sequence is constructed according to the frequency modulation response sensitivity and the adjustable active power.

[0026] In some embodiments, the calculating of the total frequency modulation power value to be provided by the power station according to the power grid frequency measurement value and the power station grid connection point active power measurement value includes:

[0027] Determine the target value of grid frequency according to the grid operation status;

[0028] Calculating the power value to be adjusted of the photovoltaic power station according to the grid frequency measurement value, the grid frequency target value and the frequency regulation coefficient of the photovoltaic power station;

[0029] The total frequency regulation power value to be provided by the photovoltaic power station is calculated according to the power value to be regulated by the photovoltaic power station and the active power measurement value of the power station grid connection point.

[0030] In some embodiments, performing a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value includes:

[0031] If the total frequency modulation power value to be provided by the power station is not less than the power station power prediction value, then sending a first power adjustment instruction to each photovoltaic power generation system in the photovoltaic power station according to the active power reference value;

[0032] If the total frequency regulation power value to be provided by the power station is less than the power forecast value of the power station, the number of photovoltaic power generation systems to be dispatched is calculated according to the measured active power value of the power station grid connection point, the power forecast value of the power station, the total number of photovoltaic power generation systems and the power value to be adjusted of the photovoltaic power station;

[0033] According to the frequency modulation sequence, selecting the photovoltaic power generation system scheduling number of photovoltaic power generation systems from the photovoltaic power station to obtain a target scheduling group;

[0034] According to the active power reference value, the second power adjustment instruction is sent to each photovoltaic power generation system in the target scheduling group respectively.

[0035] In some embodiments, the step of calculating the adjustable active power according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems includes:

[0036] According to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems, the adjustable active power is calculated by the adjustable active power calculation formula, and the adjustable active power calculation formula is:

[0037]

[0038] Where ΔP reg_n is the adjustable active power of the nth photovoltaic power generation system, P prid is the power prediction value of the power station, n is the total number of photovoltaic power generation systems, P meas_n It is the measured value of active power of the photovoltaic power generation system of the nth photovoltaic power generation system.

[0039] In some embodiments, the calculating the power value to be adjusted of the photovoltaic power station according to the grid frequency measurement value, the grid frequency target value and the frequency regulation coefficient of the photovoltaic power station includes:

[0040] According to the grid frequency measurement value, the grid frequency target value and the photovoltaic power station frequency regulation coefficient, the photovoltaic power station power value to be regulated is calculated by the photovoltaic power station power value to be regulated calculation formula, and the photovoltaic power station power value to be regulated calculation formula is:

[0041] ΔP reg = k*(f reg -f meas )

[0042] Where ΔP reg is the power value to be adjusted of the photovoltaic power station, k is the frequency regulation coefficient of the photovoltaic power station, f reg is the target value of the grid frequency, f meas is the measured value of the grid frequency.

[0043] In some embodiments, the method further comprises:

[0044] Conduct a frequency modulation experiment of a photovoltaic power station;

[0045] The photovoltaic power station primary frequency modulation experiment comprises the following steps:

[0046] Use the preset simulation platform to build a four-machine two-zone system model;

[0047] A frequency modulation is performed according to the four-machine two-zone system model to obtain a frequency modulation result.

[0048] On the other hand, an embodiment of the present invention provides a primary frequency regulation control device for a photovoltaic power station, comprising:

[0049] The first module is used to obtain historical operation data of the photovoltaic power generation system;

[0050] The second module is used to calculate the delay time and the adjustment time according to the historical operation data of the photovoltaic power generation system;

[0051] A third module is used to construct a sensitivity calculation strategy according to the delay time and the adjustment time;

[0052] A fourth module is used to calculate the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station;

[0053] A fifth module is used to construct a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems;

[0054] The sixth module is used to calculate the total frequency regulation power value to be provided by the power station according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point;

[0055] The seventh module is used to calculate the active power reference value according to the power station power prediction value and the total number of photovoltaic power generation systems;

[0056] The eighth module is used to perform a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

[0057] The beneficial effects of the present invention are as follows:

[0058] The present invention first obtains historical operation data of the photovoltaic power generation system, calculates the delay time and the adjustment time, and constructs a sensitivity calculation strategy. Then, according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation status of the photovoltaic power station, the frequency modulation response sensitivity is calculated. According to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems, a frequency modulation sequence is constructed. Then, according to the grid frequency measurement value and the active power measurement value of the power station grid connection point, the total frequency modulation power value to be provided by the power station is calculated. According to the power prediction value of the power station and the total number of photovoltaic power generation systems, an active power reference value is calculated. Finally, according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value, a primary frequency modulation control is performed. Therefore, the active power reference value can be used to adjust the active power output by the photovoltaic power generation system to realize primary frequency modulation control, thereby improving the frequency support capability and safety of the power grid.

[0059] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0061] Figure 1 This is a flow chart of a primary frequency modulation control method for a photovoltaic power station according to an embodiment of the present invention;

[0062] Figure 2 This is an example diagram of a sensitivity calculation strategy according to an embodiment of the present invention;

[0063] Figure 3A single-line diagram of a standard four-machine two-zone system model according to an embodiment of the present invention;

[0064] Figure 4 A schematic diagram of per-unit parameters of a generator according to an embodiment of the present invention;

[0065] Figure 5 A schematic diagram of a power grid frequency comparison curve result according to an embodiment of the present invention;

[0066] Figure 6 A schematic diagram of comparison results of active power reference value curves of different photovoltaic power generation systems according to an embodiment of the present invention;

[0067] Figure 7 A schematic diagram of a comparison result of actual active power output curves of different photovoltaic power generation systems according to an embodiment of the present invention;

[0068] Figure 8 A schematic diagram of an overall process of performing a frequency modulation control according to an embodiment of the present invention;

[0069] Fig. 9 The present invention is a schematic structural diagram of a primary frequency modulation control device for a photovoltaic power station according to an embodiment of the present invention. DETAILED DESCRIPTION

[0070] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is further described in detail below in conjunction with the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the embodiments of the present application. They are only examples of devices and methods consistent with some aspects of the embodiments of the present application as detailed in the attached claims.

[0071] It is understood that the terms "first", "second", etc. used in this application can be used to describe various concepts in this article, but unless otherwise specified, these concepts are not limited by these terms. These terms are only used to distinguish one concept from another concept. For example, without departing from the scope of the embodiment of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the words "if" and "if" as used herein can be interpreted as "at the time of" or "when" or "in response to determination".

[0072] The terms "at least one", "multiple", "each", "any", etc. used in this application, at least one includes one, two or more, multiple includes two or more, each refers to each of the corresponding multiple, and any refers to any one of the multiple.

[0073] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.

[0074] Before describing the embodiments of the present application in detail, some nouns and terms involved in the embodiments of the present application are first described. The nouns and terms involved in the embodiments of the present application are subject to the following explanations.

[0075] Primary frequency regulation: refers to the automatic control process in which the control system of the unit in the power grid automatically controls the increase or decrease of the unit's active power, limits the change of the power grid frequency, and maintains a stable power grid frequency once the power grid frequency deviates from the rated value.

[0076] Among the related technologies, new energy sources such as wind power and photovoltaic power generation have developed rapidly in recent years. In the context of energy conservation, the installed capacity of wind power and photovoltaic power generation has exceeded 800 million kilowatts, accounting for more than 30%. The grid-connected installed capacity of wind power and photovoltaic power generation continues to be high and still shows a rapid growth trend. However, wind power and photovoltaic power generation generally use power electronic converters to interface with the grid, do not participate in grid frequency regulation, and show "hidden" inertia or zero inertia characteristics. As their penetration rate continues to increase, the impact on the dynamic safety of system frequency has aroused concern, and the operating pressure of the grid is increasing, requiring it to have the ability to participate in system frequency regulation. Low-inertia power systems are prone to frequency accidents caused by inertia shortages, especially under the impact of large-capacity active power loss such as DC interlocking or the collective disconnection of new energy from the grid. A DC lockout occurred in a certain place, resulting in an instantaneous loss of millions of active power, causing the grid frequency to drop to 49.69Hz and 49.77Hz respectively; a blackout occurred in a certain place where the proportion of renewable energy generation was 48.36%, causing the frequency of its power system to drop from 49.5Hz to 47Hz at a rate of 6.25Hz / s in the early stage of the change; a blackout occurred in a certain place where the proportion of wind power output exceeded 30%, causing the frequency to drop to 49.1Hz. The above frequency events show that the reduction in inertia level not only worsens the maximum frequency deviation of the system, but also leads to a rapid increase in the frequency change rate, and the system frequency stability is seriously challenged. The above grid stability events show that how to improve the frequency stability of a high-proportion renewable energy power system is one of the key technologies for renewable energy grid connection control. Usually, when a frequency event occurs in the power grid, the frequency regulation control system of the photovoltaic power station calculates the active power adjustment required by the power station by measuring the obtained frequency deviation, and evenly distributes the power adjustment to each photovoltaic power generation unit in the substation. However, this distribution method usually does not take into account the operating status and active adjustable amount of equipment in different photovoltaic power stations, which can easily lead to inadequate power regulation, affect the primary frequency regulation performance of the photovoltaic power station, and reduce the frequency support capacity and security of the power grid.

[0077] To solve the above problems, the present invention is aimed at large-scale photovoltaic power stations, fully considers the frequency modulation response sensitivity of different photovoltaic power generation systems in the photovoltaic power station, and determines the priority of each photovoltaic power generation system in participating in the primary frequency modulation of the power grid by calculating the active power sensitivity of each photovoltaic power generation system in the power station. Photovoltaic power generation systems with strong grid frequency support capabilities are given priority to participate in the primary frequency modulation of the power grid, and the primary frequency modulation performance of the photovoltaic power station is optimized, thereby realizing centralized optimization and coordination of the frequency modulation resources of large-scale photovoltaic power stations, improving the grid frequency support capability of photovoltaic power stations, and ensuring safe and stable operation of the power grid.

[0078] A method for controlling the primary frequency regulation of a photovoltaic power station provided in an embodiment of the present application relates to the technical field of grid-connected operation control of new energy sources. A method for controlling the primary frequency regulation of a photovoltaic power station provided in an embodiment of the present application can be applied to a terminal, can be applied to a server, or can be software running in a terminal or a server. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, and a vehicle-mounted terminal, etc., but is not limited thereto; the server side can be configured as an independent physical server, or can be configured as a server cluster or a distributed system consisting of multiple physical servers, and can also be configured as a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms. The server can also be a node server in a blockchain network; the software can be an application that implements a method for controlling the primary frequency regulation of a photovoltaic power station, etc., but is not limited to the above forms.

[0079] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.

[0080] The following is a detailed explanation of the embodiments of the present application in conjunction with the accompanying drawings:

[0081] Figure 1 is an optional flow chart of a primary frequency modulation control method for a photovoltaic power station provided in an embodiment of the present application. Figure 1 The method may include but is not limited to steps S101 to S108.

[0082] Step S101, obtaining historical operation data of a photovoltaic power generation system;

[0083] Step S102, calculating the delay time and the adjustment time according to the historical operation data of the photovoltaic power generation system;

[0084] Step S103: construct a sensitivity calculation strategy according to the delay time and the adjustment time;

[0085] Step S104, calculating the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station;

[0086] Step S105, constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems;

[0087] Step S106, calculating the total frequency modulation power value to be provided by the power station according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point;

[0088] Step S107, calculating an active power reference value according to the power plant power prediction value and the total number of photovoltaic power generation systems;

[0089] Step S108: Perform a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

[0090] Steps S101 to S108 shown in the embodiment of the present application implement primary frequency regulation control, thereby improving the frequency support capability and safety of the power grid.

[0091] In some embodiments, in step S101-step S102, the historical operation data of the photovoltaic power generation system can be obtained through the power station database. The historical operation data of the photovoltaic power generation system can also be obtained by other means, not limited thereto. Then, according to the historical operation data of the photovoltaic power generation system, the delay time t is calculated. d and adjustment time t s , in preparation for the subsequent calculation of FM response sensitivity.

[0092] In some embodiments, in step S103, a sensitivity calculation strategy is constructed according to the delay time and the adjustment time, which may include but is not limited to the following steps:

[0093] According to a first preset number of groups, the delay time is divided into a first group to obtain a plurality of delay time groups;

[0094] According to a second preset number of groups, the adjustment time is divided into a second group to obtain a plurality of adjustment time groups;

[0095] A sensitivity calculation strategy is constructed according to a plurality of delay time groups and a plurality of adjustment time groups.

[0096] In some embodiments, the delay time may be first divided into a first number of delay time groups according to a first preset number of groups to obtain a plurality of delay time groups. Figure 2As shown, the first preset number of groups can be set to 4, and different numerical ranges can be divided for the delay time. The obtained delay time grouping can include delay time <0.2s, 0.2s <delay time <0.5s, 0.5s <delay time <2s, and delay time >2s. Then, according to the second preset number of groups, the adjustment time is divided into a second number to obtain several adjustment time groups. Exemplarily, the second preset number of groups can be set to 4, and different numerical ranges can be divided for the adjustment time. The obtained adjustment time grouping can include 0s <adjustment time <1s, 1s <adjustment time <3s, 3s <adjustment time <5s, and adjustment time >5s. Finally, according to several delay time groups and several adjustment time groups, a sensitivity calculation strategy is constructed. Exemplarily, several delay time groups and several adjustment time groups can be combined to form a two-dimensional table, and the value corresponding to a delay time group and an adjustment time group can be set to a preset sensitivity value, such as setting the delay time grouping to delay time <0.2s, and the value corresponding to the adjustment time grouping to 0s <adjustment time <1s is set to 7. After all values ​​in the two-dimensional table are set, the sensitivity calculation strategy is obtained. It can be understood that the specific setting value of the frequency modulation response sensitivity can also be adjusted according to the actual operation of the photovoltaic power station. The overall setting principle is that the shorter the delay time and the shorter the adjustment time, the higher the frequency modulation response sensitivity of the photovoltaic power generation system.

[0097] In some embodiments, in step S104, the frequency modulation response sensitivity is calculated according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation status of the photovoltaic power station, which may include but is not limited to the following steps:

[0098] According to the delay time, a target delay time group is selected from the sensitivity calculation strategy;

[0099] According to the adjustment time, a target adjustment time group is selected from the sensitivity calculation strategy;

[0100] Calculating the first response sensitivity according to the target delay time grouping and the target adjustment time grouping;

[0101] The frequency modulation response sensitivity is calculated according to the operating status of the photovoltaic power station and the first response sensitivity.

[0102] In some embodiments, the target delay time group can be selected from the sensitivity calculation strategy according to the delay time, and then the target adjustment time group can be selected from the sensitivity calculation strategy according to the adjustment time, and then the first response sensitivity can be calculated based on the target delay time group and the target adjustment time group. Exemplarily, when the delay time is 0.3s and the adjustment time is 2s, the target delay time group can be selected from the sensitivity calculation strategy as 0.2s<delay time<0.5s, and the target adjustment time group can be selected from the sensitivity calculation strategy as 1s<adjustment time<3s. The values ​​corresponding to the target delay time group and the target adjustment time group are 5, that is, the first response sensitivity is 5. Since the current operating state of the photovoltaic power station has an impact on the sensitivity, the first response sensitivity can be adaptively adjusted according to the operating state of the photovoltaic power station to obtain the frequency modulation response sensitivity to better fit the current operating state of the photovoltaic power station.

[0103] In some embodiments, in step S105, a frequency modulation sequence is constructed according to the frequency modulation response sensitivity, the measured active power value of the photovoltaic power generation system and the total number of photovoltaic power generation systems, which may include but is not limited to the following steps:

[0104] Calculate the adjustable active power according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems;

[0105] The frequency modulation sequence is constructed according to the frequency modulation response sensitivity and the adjustable active power.

[0106] In some embodiments, the adjustable active power can be calculated by the adjustable active power calculation formula according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems. The adjustable active power calculation formula is: Where ΔP reg_n is the adjustable active power of the nth photovoltaic power generation system, P prid is the predicted power value of the power station, n is the total number of photovoltaic power generation systems, P meas_nis the measured value of the active power of the photovoltaic power generation system of the nth photovoltaic power generation system. Then, according to the frequency modulation response sensitivity and the adjustable active power, the frequency modulation order is constructed. Exemplarily, when the frequency modulation response sensitivities are different, they can be sorted according to the frequency modulation response sensitivity, and the photovoltaic power generation system with high frequency modulation response sensitivity is placed at the front of the sequence, and the photovoltaic power generation system with low frequency modulation response sensitivity is placed at the back of the sequence; when the frequency modulation response sensitivities are the same, they can be sorted according to the adjustable active power, and the photovoltaic power generation system with large adjustable active power is placed at the front of the sequence, and the photovoltaic power generation system with small adjustable active power is placed at the back of the sequence. It can be understood that in the sorting process, the photovoltaic power generation systems can be globally sorted according to the frequency modulation response sensitivity first, and the photovoltaic power generation systems with the same frequency modulation response sensitivity can be locally sorted according to the adjustable active power to obtain the frequency modulation order of the photovoltaic power generation systems.

[0107] In some embodiments, in step S106, the total frequency modulation power value to be provided by the power station is calculated according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point, which may include but is not limited to the following steps:

[0108] Determine the target value of grid frequency according to the grid operation status;

[0109] Calculate the power value to be adjusted of the photovoltaic power station according to the measured value of the grid frequency, the target value of the grid frequency and the frequency regulation coefficient of the photovoltaic power station;

[0110] According to the power value to be regulated by the photovoltaic power station and the measured active power value at the power station grid connection point, the total frequency regulation power value to be provided by the power station is calculated.

[0111] In some embodiments, the target value of the grid frequency f can be determined based on the grid operation status. reg It can be understood that the grid frequency target value f reg It can be modified online according to the current grid operation status, or it can be given in advance by the grid dispatching department. Then, according to the grid frequency measurement value, grid frequency target value and photovoltaic power station frequency regulation coefficient, the photovoltaic power station to be regulated power value is calculated by the photovoltaic power station to be regulated power value calculation formula. Among them, the photovoltaic power station to be regulated power value calculation formula is: ΔP reg = k*(f reg -f meas ), where ΔP reg is the power value to be adjusted in the photovoltaic power station, k is the frequency regulation coefficient of the photovoltaic power station, f reg is the target value of the grid frequency, f measis the measured value of the grid frequency. It is understandable that the frequency regulation coefficient k of the photovoltaic power station can be set to a fixed value. If the power station frequency control system supports the variable frequency regulation coefficient setting function, the frequency regulation coefficient k of the photovoltaic power station can also be changed according to the change of the grid frequency, and the specific value must meet the requirements of relevant standards. Finally, according to the power value to be adjusted by the photovoltaic power station and the measured value of the active power of the power station grid connection point, the total frequency regulation power value to be provided by the power station is calculated. Among them, the calculation formula for the total frequency regulation power value to be provided by the power station is: P Z =ΔP reg +P meas , where P Z The total frequency regulation power value to be provided by the power station, ΔP reg is the power value to be adjusted in the photovoltaic power station, P meas It is the measured value of active power at the power station grid connection point.

[0112] In some embodiments, in step S107, the active power reference value of the photovoltaic power generation system can be calculated according to the power station power prediction value and the total number of photovoltaic power generation systems. The calculation formula of the active power reference value is: Where P ref_i is the active power reference value of the ith photovoltaic power generation system, P prid is the power prediction value of the power station, and n is the total number of photovoltaic power generation systems. It can be understood that the power prediction value of the power station is the power value that the photovoltaic power station is expected to carry. The power prediction value that the photovoltaic power station can carry can be averaged to each photovoltaic power generation system to obtain the active power reference value.

[0113] In some embodiments, in step S108, a frequency modulation control is performed according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station, and the active power reference value, which may include but is not limited to the following steps:

[0114] If the total frequency regulation power value to be provided by the power station is not less than the power station power prediction value, then according to the active power reference value, the first power regulation instruction is sent to each photovoltaic power generation system in the photovoltaic power station respectively;

[0115] If the total frequency regulation power value to be provided by the power station is less than the power station power forecast value, the number of photovoltaic power generation systems to be dispatched is calculated based on the active power measurement value of the power station grid connection point, the power forecast value of the power station, the total number of photovoltaic power generation systems and the power value to be adjusted by the photovoltaic power station;

[0116] According to the frequency modulation order, a photovoltaic power generation system with a scheduling number of photovoltaic power generation systems is selected from the photovoltaic power stations to obtain a target scheduling group;

[0117] According to the active power reference value, the second power adjustment instruction is sent to each photovoltaic power generation system in the target scheduling group respectively.

[0118] In some embodiments, during a frequency modulation control process, it can be determined whether the total frequency modulation power value to be provided by the power station is less than the power station power prediction value. If the total frequency modulation power value to be provided by the power station is not less than the power station power prediction value, that is, (ΔP reg +P meas )≥P prid , then the first power regulation instruction can be sent to each photovoltaic power generation system in the photovoltaic power station according to the active power reference value, so that the corresponding photovoltaic power generation system outputs active power according to the active power reference value to achieve primary frequency regulation. If the total frequency regulation power value to be provided by the power station is less than the power station power prediction value, that is, (ΔP reg +P meas ) <P prid , the number of photovoltaic power generation system dispatches can be calculated based on the active power measurement value of the power station grid connection point, the power forecast value of the power station, the total number of photovoltaic power generation systems and the power value to be adjusted by the photovoltaic power station. Among them, the number of photovoltaic power generation system dispatches can be calculated by the following formula: Where s is the number of photovoltaic power generation system dispatches, P meas is the measured active power value of the power station grid connection point, P prid is the power prediction value of the power station, n is the total number of photovoltaic power generation systems, ΔP reg is the power value to be adjusted by the photovoltaic power station. It can be understood that the value of the photovoltaic power generation system scheduling quantity s can be set to 1 first. If the above inequality is not satisfied, the value of the photovoltaic power generation system scheduling quantity s can be increased by 1. When the expression If the value of is just greater than the power value to be adjusted in the photovoltaic power station, the increment is terminated to obtain the number of photovoltaic power generation systems to be dispatched. Then, according to the frequency modulation order, the photovoltaic power generation systems with the number of photovoltaic power generation systems to be dispatched are selected from the photovoltaic power station to obtain the target dispatch group. Exemplarily, the photovoltaic power generation systems with the first s priority in the frequency modulation order can be selected from the photovoltaic power station as the target dispatch group. Finally, according to the active power reference value, the second power adjustment instruction is sent to each photovoltaic power generation system in the target dispatch group respectively, so that the corresponding first s photovoltaic power generation systems output active power according to the active power reference value to achieve primary frequency modulation.

[0119] In some embodiments, the method further comprises:

[0120] Conduct a frequency modulation experiment of a photovoltaic power station;

[0121] Among them, the primary frequency modulation experiment of the photovoltaic power station includes the following steps:

[0122] Use the preset simulation platform to build a four-machine two-zone system model;

[0123] Perform a frequency modulation according to the four-machine two-zone system model and obtain the frequency modulation result.

[0124] In some embodiments, in order to further understand the present invention, a photovoltaic power station primary frequency modulation experiment can be conducted, and the modeling and simulation method can be used to explain the practical application of this embodiment. A four-machine two-zone system model can be first constructed using a preset simulation platform, and then a primary frequency modulation is performed based on the four-machine two-zone system model to obtain a frequency modulation result. Figure 3 The figure shows the single-line diagram of a standard four-machine two-zone system model. The system model includes two similar zones connected by a weak tie line. Each zone has two coupled units, each with a capacity of 900MVA and a rated voltage of 20kV. The per-unit parameters of the generator at rated capacity (MVA) and rated voltage (kV) are as follows: Figure 4 As shown. When simulating the initial power flow setting, the system operates to transmit 400MW of power from area 1 to area 2, and the load carried by the generator is specifically set as follows: (1) G1: P = 700MW, Q = 185Mvar; (2) G2: P = 700MW, Q = 235Mvar; (3) G3: P = 719MW, Q = 176Mvar; (4) G4: P = 700MW, Q = 202Mvar. Correspondingly, the system load is set as follows: (1) Node 7: PL = 967MW; (2) Node 9: PL = 1767MW. In order to verify the effectiveness of this embodiment, during the verification process, based on the classic four-machine two-area system structure, a 500MW photovoltaic power station is added, and the grid connection point of the power station is Bus6 in area 1. Accordingly, the active output of G1 in area 1 is reduced by 500MW to achieve the source-load power balance of the system. During the simulation, when t=2s, the active power of load L7 increases by 333.5MW. The grid frequency comparison curve results are as follows: Figure 5 As shown, it is used to determine whether the photovoltaic power station has the frequency modulation control function. Figure 5 It can be seen that when the photovoltaic power station participates in the grid frequency regulation, the lowest point of the grid frequency drop is significantly higher than when it does not have the frequency regulation function, indicating that the photovoltaic power station with the primary frequency regulation function can effectively support the stability of the grid frequency. The comparison results of the active power reference value curves of different photovoltaic power generation systems when the primary frequency regulation control is performed using this embodiment are shown in Figure 2. Figure 6 As shown in the figure, the actual active power output curve comparison results are as follows Figure 7 As shown. Figure 6 and Figure 7It can be seen that the photovoltaic power generation system with higher primary frequency modulation sensitivity (photovoltaic power generation system 1 in the figure) takes priority in participating in the primary frequency modulation of the power grid and bears more frequency modulation power; the photovoltaic power generation system with the second highest primary frequency modulation sensitivity (photovoltaic power generation system 2 in the figure) bears less primary frequency modulation power; and the photovoltaic power generation system with lower primary frequency modulation sensitivity (photovoltaic power generation system 3 in the figure) does not participate in the primary frequency modulation of the power grid when the system power shortage is not large. The simulation shows that this embodiment can give full play to the regulation ability of different photovoltaic power generation systems in the photovoltaic power station, improve the frequency regulation ability of the photovoltaic power station, and ensure the stability of the power grid frequency.

[0125] In some embodiments, the overall process of performing a frequency modulation control is as follows: Figure 8 As shown in FIG, the operating status of the photovoltaic power station can be obtained from the photovoltaic power station grid connection point and input into the optimized frequency regulation control strategy. Then, the photovoltaic power generation system frequency regulation is sorted according to the data requirements such as the grid frequency, the active power of the grid connection point, and the active power of the photovoltaic power generation system. Finally, the active power is distributed and the active power reference value is sent to each photovoltaic power generation system to realize primary frequency regulation control.

[0126] The beneficial effects of implementing the embodiments of the present invention include: the embodiments of the present invention first obtain historical operation data of the photovoltaic power generation system, calculate the delay time and the adjustment time, and construct a sensitivity calculation strategy; then, according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation status of the photovoltaic power station, the frequency modulation response sensitivity is calculated; and according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems, a frequency modulation sequence is constructed; then, according to the grid frequency measurement value and the active power measurement value of the power station grid connection point, the total frequency modulation power value to be provided by the power station is calculated; and according to the power prediction value of the power station and the total number of photovoltaic power generation systems, an active power reference value is calculated; finally, according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value, a primary frequency modulation control is performed, so that the active power reference value can be used to adjust the active power output by the photovoltaic power generation system to achieve primary frequency modulation control, thereby improving the frequency support capability and security of the power grid. At the same time, this embodiment targets numerous photovoltaic power generation systems in large photovoltaic power stations, fully considers the regulation performance of each photovoltaic power generation system, uses historical operation data to calculate the frequency modulation response sensitivity of each photovoltaic power generation system, and then constructs the frequency modulation sequence of different photovoltaic power generation systems in the power station participating in the grid frequency modulation, so that photovoltaic power generation systems with excellent regulation performance can participate more in the primary frequency modulation of the grid, thereby improving the frequency modulation performance of the photovoltaic power station as a whole and improving the frequency stability of the grid.

[0127] like Fig. 9 As shown, the embodiment of the present invention further provides a primary frequency modulation control device for a photovoltaic power station, comprising:

[0128] The first module 801 is used to obtain historical operation data of the photovoltaic power generation system;

[0129] The second module 802 is used to calculate the delay time and the adjustment time according to the historical operation data of the photovoltaic power generation system;

[0130] The third module 803 is used to construct a sensitivity calculation strategy according to the delay time and the adjustment time;

[0131] The fourth module 804 is used to calculate the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation status of the photovoltaic power station;

[0132] The fifth module 805 is used to construct a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems;

[0133] The sixth module 806 is used to calculate the total frequency modulation power value to be provided by the power station according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point;

[0134] The seventh module 807 is used to calculate the active power reference value according to the power plant power prediction value and the total number of photovoltaic power generation systems;

[0135] The eighth module 808 is used to perform a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

[0136] The contents of the above method embodiments are all applicable to the present device embodiments. The functions specifically implemented by the present device embodiments are the same as those of the above method embodiments, and the beneficial effects achieved are also the same as those achieved by the above method embodiments.

[0137] The preferred embodiments of the present application are described above with reference to the accompanying drawings, but the scope of the rights of the present application is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present application should be within the scope of the rights of the present application.

Claims

1. A primary frequency modulation control method for a photovoltaic power station, characterized in that: The following steps are involved: Obtain historical operation data of photovoltaic power generation system; Calculating the delay time and adjustment time according to the historical operation data of the photovoltaic power generation system; Constructing a sensitivity calculation strategy according to the delay time and the adjustment time; Calculating the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station; Constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the measured active power of the photovoltaic power generation system and the total number of photovoltaic power generation systems; Calculate the total frequency regulation power value to be provided by the power station based on the measured value of the power grid frequency and the measured value of the active power at the power station connection point; Calculating an active power reference value according to the power plant power prediction value and the total number of the photovoltaic power generation systems; A frequency modulation control is performed according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

2. The method according to claim 1, characterized in that The constructing a sensitivity calculation strategy according to the delay time and the adjustment time includes: According to a first preset number of groups, the delay time is divided into a first group to obtain a plurality of delay time groups; According to a second preset number of groups, the adjustment time is divided into a second group to obtain a plurality of adjustment time groups; The sensitivity calculation strategy is constructed according to the plurality of delay time groups and the plurality of adjustment time groups.

3. The method according to claim 1, characterized in that The calculating the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operation state of the photovoltaic power station includes: According to the delay time, selecting a target delay time group from the sensitivity calculation strategy; According to the adjustment time, selecting a target adjustment time group from the sensitivity calculation strategy; Calculating a first response sensitivity according to the target delay time grouping and the target adjustment time grouping; The frequency modulation response sensitivity is calculated according to the operating state of the photovoltaic power station and the first response sensitivity.

4. The method according to claim 1, characterized in that: The step of constructing a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems comprises: Calculating the adjustable active power according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of the photovoltaic power generation systems; The frequency modulation sequence is constructed according to the frequency modulation response sensitivity and the adjustable active power.

5. The method according to claim 1, characterized in that The calculating of the total frequency modulation power value to be provided by the power station according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point includes: Determine the target value of grid frequency according to the grid operation status; Calculating the power value to be adjusted of the photovoltaic power station according to the grid frequency measurement value, the grid frequency target value and the frequency regulation coefficient of the photovoltaic power station; The total frequency regulation power value to be provided by the photovoltaic power station is calculated according to the power value to be regulated by the photovoltaic power station and the active power measurement value of the power station grid connection point.

6. The method according to claim 5, characterized in that The performing a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value comprises: If the total frequency modulation power value to be provided by the power station is not less than the power station power prediction value, then sending a first power adjustment instruction to each photovoltaic power generation system in the photovoltaic power station according to the active power reference value; If the total frequency regulation power value to be provided by the power station is less than the power forecast value of the power station, the number of photovoltaic power generation systems to be dispatched is calculated according to the measured active power value of the power station grid connection point, the power forecast value of the power station, the total number of photovoltaic power generation systems and the power value to be adjusted of the photovoltaic power station; According to the frequency modulation sequence, selecting the photovoltaic power generation system scheduling number of photovoltaic power generation systems from the photovoltaic power station to obtain a target scheduling group; According to the active power reference value, the second power adjustment instruction is sent to each photovoltaic power generation system in the target scheduling group respectively.

7. The method according to claim 4, characterized in that The step of calculating the adjustable active power according to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems includes: According to the measured active power value of the photovoltaic power generation system, the predicted power value of the power station and the total number of photovoltaic power generation systems, the adjustable active power is calculated by the adjustable active power calculation formula, and the adjustable active power calculation formula is: Where ΔP reg_n is the adjustable active power of the nth photovoltaic power generation system, P prid is the power prediction value of the power station, n is the total number of photovoltaic power generation systems, P meas_n It is the measured value of active power of the photovoltaic power generation system of the nth photovoltaic power generation system.

8. The method according to claim 5, characterized in that The calculating the power value to be adjusted of the photovoltaic power station according to the grid frequency measurement value, the grid frequency target value and the frequency regulation coefficient of the photovoltaic power station comprises: According to the grid frequency measurement value, the grid frequency target value and the photovoltaic power station frequency regulation coefficient, the photovoltaic power station power value to be regulated is calculated by the photovoltaic power station power value to be regulated calculation formula, and the photovoltaic power station power value to be regulated calculation formula is: APre9g=k*((freg-fmeas) Where ΔP reg is the power value to be adjusted of the photovoltaic power station, k is the frequency regulation coefficient of the photovoltaic power station, f reg is the target value of the grid frequency, f meas is the measured value of the grid frequency.

9. The method according to claim 1, characterized in that: The method further comprises: Conduct a frequency modulation experiment of a photovoltaic power station; The photovoltaic power station primary frequency modulation experiment comprises the following steps: Use the preset simulation platform to build a four-machine two-zone system model; A frequency modulation is performed according to the four-machine two-zone system model to obtain a frequency modulation result.

10. A primary frequency modulation control device for a photovoltaic power station, characterized in that: include: The first module is used to obtain historical operation data of the photovoltaic power generation system; The second module is used to calculate the delay time and the adjustment time according to the historical operation data of the photovoltaic power generation system; A third module is used to construct a sensitivity calculation strategy according to the delay time and the adjustment time; A fourth module is used to calculate the frequency modulation response sensitivity according to the delay time, the adjustment time, the sensitivity calculation strategy and the operating state of the photovoltaic power station; A fifth module is used to construct a frequency modulation sequence according to the frequency modulation response sensitivity, the active power measurement value of the photovoltaic power generation system and the total number of photovoltaic power generation systems; The sixth module is used to calculate the total frequency regulation power value to be provided by the power station according to the measured value of the power grid frequency and the measured value of the active power of the power station grid connection point; The seventh module is used to calculate the active power reference value according to the power station power prediction value and the total number of photovoltaic power generation systems; The eighth module is used to perform a frequency modulation control according to the frequency modulation sequence, the total frequency modulation power value to be provided by the power station and the active power reference value.

Citation Information

Cited By

  • Frequency modulation method for photovoltaic power station

    CN120955825A

  • A method for frequency modulation of a photovoltaic power station

    CN120955825B