Control method, device and equipment of off-grid integrated energy system and medium
Through environmental and load prediction, adjusting the operating mode of the off-grid energy system, combining multiple energy systems, the problem of unstable energy supply in the off-grid energy system is solved, the continuity and reliability of energy is achieved, and the energy needs in remote areas are met.
Patent Information
- Application Number
- CN202411078381.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The energy supply level of off-grid integrated energy systems is unstable and it is difficult to meet the sustained and reliable energy needs. Especially in remote mountainous areas and islands, traditional power grids cannot meet the full-day production and household electricity needs.
Through environmental forecasting and load demand forecasting, the operating mode of the off-grid integrated energy system is adjusted in real time, and combined with new energy power generation systems, electrochemical energy storage systems, diesel power generation systems, electrode steam boiler systems and natural gas steam boiler systems, determine power supply and steam supply Priority ensures continuity and reliability of energy.
The energy supply continuity and reliability of off-grid integrated energy system is achieved, the waste of insufficient or excessive energy supply is avoided, the stability and efficiency of the system are improved, and the energy security of the target area is ensured.
Smart Images

Figure CN119030014A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of information processing technology, and in particular to a control method, device, equipment and medium for an off-grid integrated energy system. Background Art
[0002] In the traditional energy supply model, most regions rely on a large power grid to meet energy needs. However, with the development of society and the diversification of energy needs, some specific scenarios and regions, such as remote mountainous areas and islands, face many difficulties and high costs in accessing large power grids, resulting in weak grid structure and unstable power supply structure. The end of the grid cannot meet the continuous production and living electricity needs of enterprises throughout the day.
[0003] In this context, off-grid integrated energy systems came into being. Off-grid integrated energy systems are a comprehensive energy system that is independent of traditional power grids and can autonomously meet the energy needs of a specific region. They usually integrate a variety of sustainable energy sources. However, the energy supply level of sustainable energy is unstable. Taking solar energy as an example, its energy supply is significantly affected by weather and the alternation of day and night. On sunny days, the supply of solar energy is relatively sufficient, but on cloudy days, rainy days and even at night, the output of solar energy will be greatly reduced or even zero. The supply of hydropower is also unstable. Seasonal changes in precipitation will affect the flow of rivers, thereby affecting the production capacity of hydropower. During the dry season, the supply of hydropower may not be able to meet demand.
[0004] Therefore, how to improve the stability of the energy supply level of the off-grid integrated energy system is a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention
[0005] The present application provides a control method, device, equipment and medium for an off-grid integrated energy system. Through environmental prediction and load demand prediction, the operation mode of the off-grid integrated energy system is adjusted in real time to achieve continuity and reliability of energy supply, thereby ensuring the safe and stable operation of the off-grid integrated energy system.
[0006] According to one aspect of the present application, a control method for an off-grid integrated energy system is provided, wherein the off-grid integrated energy system includes a new energy power generation system, an electrochemical energy storage system, a diesel power generation system, an electrode steam boiler system, and a natural gas steam boiler system; the method includes:
[0007] Determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determine the predicted power consumption and steam consumption required by the production and living system in a preset time period according to the production plan of the target area;
[0008] Determine the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and the preset priority; wherein the preset priority includes power supply priority, power consumption priority and steam supply priority;
[0009] According to the operation mode, a first power generation of the electrochemical energy storage system, a second power generation of the diesel power generation system, a first steam supply of the electrode steam boiler system, and a second steam supply of the natural gas steam boiler system are determined.
[0010] According to another aspect of the present application, a control device for an off-grid integrated energy system is provided, the device comprising:
[0011] A parameter prediction module, used to determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and to determine the predicted power consumption and steam consumption required by the production and living system in a preset time period according to the production plan of the target area;
[0012] A mode determination module, used to determine the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and a preset priority; wherein the preset priority includes power supply priority, power consumption priority and steam supply priority;
[0013] The energy supply determination module is used to determine the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system according to the operating mode.
[0014] According to another aspect of the present application, an electronic device is provided, the device comprising:
[0015] At least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the control method of the off-grid integrated energy system described in any embodiment of the present application.
[0016] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the control method of an off-grid integrated energy system described in any embodiment of the present application when executed.
[0017] The technical solution provided by this application determines the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determines the predicted power consumption and predicted steam consumption required by the production and living system in the preset time period according to the production plan of the target area; determines the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, predicted power consumption, predicted steam consumption and preset priority; determines the power supply and steam supply required for each part of the off-grid integrated energy system according to the operation mode. This technical solution adjusts the operation mode of the off-grid integrated energy system in real time through environmental prediction and load demand prediction, realizes the continuity and reliability of energy supply, and ensures the safe and stable operation of the off-grid integrated energy system.
[0018] It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 A flow chart of a control method for an off-grid integrated energy system provided in Example 1 of the present application;
[0021] Figure 2 A schematic diagram of the structure of an off-grid integrated energy control system provided in Example 1 of the present application;
[0022] Figure 3 A flow chart of a control method for an off-grid integrated energy system provided in Example 2 of the present application;
[0023] Figure 4 A schematic diagram of the structure of a control device for an off-grid integrated energy system provided in Example 3 of the present application;
[0024] Figure 5 It is a structural schematic diagram of a device for implementing a control method for an off-grid integrated energy system of an embodiment of the present application. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0026] It should be noted that the terms "history", "preset", "prediction", "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0027] Embodiment 1
[0028] Figure 1 A flow chart of a control method for an off-grid integrated energy system provided in Example 1 of the present application. This embodiment can be applicable to off-grid power supply situations in the mining and metallurgical fields. The method can be executed by a control device of the off-grid integrated energy system. The control device of the off-grid integrated energy system can be implemented in the form of hardware and / or software. The control device of the off-grid integrated energy system can be configured in a device with data processing capabilities.
[0029] Figure 2 A schematic diagram of the structure of an off-grid integrated energy control system provided in Example 1 of the present application is shown in FIG. Figure 2 As shown, the solid arrows indicate the energy flow direction, and the dotted arrows indicate the data flow direction. The off-grid integrated energy control system comprises an off-grid integrated energy system 10 , a production and living system 20 , and a microgrid energy management system 30 .
[0030] Among them, the off-grid integrated energy system 10 includes a new energy power generation system, an electrochemical energy storage system, a diesel power generation system, an electrode steam boiler system and a natural gas steam boiler system.
[0031] Among them, the new energy power generation system is a system that uses new renewable energy to produce electricity, which is used to provide electricity for production and living systems, electrochemical energy storage systems and electrode steam boiler systems. The new energy power generation system can be a photovoltaic power generation system, a wind power generation system, a hydropower generation system, a bioenergy power generation system, etc. The embodiment of the present application does not limit the type of new energy power generation system, and a suitable new energy power generation system can be selected according to actual conditions. For example, the new energy power generation system can be a photovoltaic power generation system, or a combination of a photovoltaic power generation system and a wind power generation system.
[0032] Among them, the electrochemical energy storage system is a system that realizes energy storage and release through electrochemical processes. It is used to store excess electricity generated by new energy power generation systems and provide electricity for production and living systems.
[0033] The diesel generator system is a power generation system that uses diesel as fuel, converts chemical energy into mechanical energy through an internal combustion engine, and then converts mechanical energy into electrical energy through a generator. It is used to provide electrical energy for production and living systems. The diesel generator system includes a diesel storage system and a diesel power supply system.
[0034] Among them, the electrode steam boiler system is a system that utilizes the conductivity of water to directly convert electrical energy into thermal energy through electrodes to quickly generate steam, which is used to provide steam for production and living systems.
[0035] The natural gas steam boiler system is a system that uses natural gas combustion to generate heat energy to produce steam, which is used to provide steam for production and living systems. The natural gas steam boiler system includes a natural gas storage system and a natural gas steam boiler steam supply system.
[0036] The production and living system 20 may be a unit or individual that needs electricity and steam in the target area. The production and living system includes a production electricity system, a living electricity system, a production steam system, and a living heating system.
[0037] In addition, the off-grid integrated energy system may also include a microgrid energy management system 30 for analyzing the data of the above-mentioned subsystems to achieve unified coordinated control.
[0038] On this basis, if Figure 1 As shown, the control method of the off-grid integrated energy system includes:
[0039] S110. Determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determine the predicted power consumption and predicted steam consumption required by the production and living system in the preset time period according to the production plan of the target area.
[0040] The target area may be the area covered by the off-grid integrated energy system.
[0041] Environmental parameters may be parameters that affect renewable energy power generation, and may be determined according to the type of renewable energy power generation system. For example, environmental parameters may be lighting conditions, wind speed, longitude and latitude, altitude, and the like.
[0042] The preset time period may be a pre-set time range, for example, the next four hours, the next day, the next week, the next month, etc.
[0043] In this application, real-time and historical data such as wind speed, sunshine duration, temperature, etc. can be obtained through meteorological stations, geographic information systems or satellite remote sensing data; according to the type of new energy power generation system and the characteristics of the target area, a suitable prediction model is selected to predict the power generation of the new energy power generation system in a preset time period to obtain the predicted power generation.
[0044] Since it is an off-grid integrated energy system used in the mining and metallurgical fields, for example, the target area can be a production plant, and its production plans are planned in advance, so its electricity and steam consumption can be determined according to the production plan.
[0045] Specifically, a detailed production plan for the target area can be obtained, including the types of products, quantities, process flows, production schedules, etc.; a list of equipment involving electricity and steam consumption in the production and living systems, as well as parameters such as their power and operating time, can be determined; based on equipment parameters and production plans, the electricity and steam consumption of each device in a preset time period can be calculated, and additional factors that may affect energy consumption can be considered, such as differences in air conditioning use due to seasonal changes, and reduced efficiency due to equipment aging; finally, the electricity and steam consumption of all equipment and factors are summarized to obtain the predicted electricity and steam consumption for the preset time period.
[0046] Optionally, the new energy power generation system is a photovoltaic power generation system; accordingly, the predicted power generation of the new energy power generation system in a preset time period is determined according to the environmental parameters of the target area, including: determining the predicted light intensity and predicted light duration in the preset time period according to the environmental parameters of the target area; determining the predicted photovoltaic power generation according to the predicted light intensity, the predicted light duration and the working parameters of the photovoltaic power generation system.
[0047] The predicted light intensity may be an estimated value of the energy intensity of light that the target area may receive during a preset time period, usually expressed in watts per square meter. The predicted light duration may be an estimated length of time that the target area can receive effective light during a preset time period. In the present application, a light prediction model may be established to predict the light intensity and light duration of the target area during a preset time period.
[0048] Specifically, the illumination prediction model can calculate the solar altitude and azimuth based on the position of the sun, the rotation and revolution of the earth, and the longitude and latitude of the target area, so as to preliminarily estimate the theoretical illumination conditions. The illumination prediction model can also use machine learning algorithms such as neural networks and support vector machines to learn and train a large amount of historical illumination and environmental data.
[0049] The operating parameters may be relevant performance indicators and operating characteristics of the photovoltaic power generation system, such as the conversion efficiency of the photovoltaic modules, the loss coefficient of the system, the efficiency of the inverter, etc.
[0050] Specifically, the total light energy received by the target area within the preset time period can be determined based on the predicted light intensity and the predicted light duration; the total light energy is corrected based on the working parameters of the photovoltaic power generation system, such as the conversion efficiency of the photovoltaic modules, line losses, inverter efficiency, etc., to obtain the energy that can actually be converted into electrical energy; the corrected energy is multiplied by the installed capacity of the photovoltaic system to obtain the predicted photovoltaic power generation within the preset time period.
[0051] Optionally, the environmental parameters include at least one of the geographical location, topography, historical light intensity, historical light duration, predicted weather conditions in the preset time period, and season of the target area.
[0052] S120. Determine the operation mode of the off-grid integrated energy system in the preset time period based on the predicted power generation, the predicted power consumption, the predicted steam consumption and preset priorities; wherein the preset priorities include power supply priority, power consumption priority and steam supply priority.
[0053] The preset priority can be used to determine the order and importance of each subsystem in the off-grid integrated energy system in terms of power supply, power consumption and steam supply. Since different regions have different energy costs and environmental protection requirements for different subsystems, this embodiment of the application does not limit this and can be adjusted according to actual conditions.
[0054] Among them, the operating mode can be the working mode and energy allocation strategy of the off-grid integrated energy system within a preset time period, such as the opening and closing of different subsystems, the control of energy output and input, etc.
[0055] Specifically, the predicted power generation can be compared with the predicted power consumption to determine the balance between supply and demand of electricity, and the predicted steam consumption can be compared with the steam supply capacity to determine the balance between supply and demand of steam. Then, based on the balance between supply and demand of electricity and steam and their priority, the operating status and operating time of each subsystem in the off-grid integrated energy system in a preset time period can be determined.
[0056] It should be noted that during the preset time period, the actual energy supply and demand situation can be continuously monitored and the operating mode can be adjusted in real time according to the changes.
[0057] S130. According to the operation mode, determine a first power generation of the electrochemical energy storage system, a second power generation of the diesel power generation system, a first steam supply of the electrode steam boiler system, and a second steam supply of the natural gas steam boiler system.
[0058] Specifically, the first power generation can be determined according to parameters such as the discharge plan, power setting and operating time of the electrochemical energy storage system; the second power generation can be determined according to information such as the start-up time, operating power and continuous operating time of the diesel power generation system; the first steam supply can be determined according to the working instructions of the electrode steam boiler system, including requirements such as steam pressure, temperature and operating time; the second steam supply can be determined according to the operating settings of the natural gas steam boiler system, such as combustion intensity, operating time, etc.
[0059] Taking the discharge of an electrochemical energy storage system as an example for explanation, if it is determined according to the operating mode that the electrochemical energy storage system discharges at a power of 50 kW from 8 am to 12 noon, then the first power generation = 50 kW × 4 hours = 200 kWh.
[0060] Through the above technical solution, the power generation and steam supply of each energy system can be accurately determined, avoiding waste and cost increase caused by oversupply, and preventing insufficient supply from affecting normal production and life, thereby realizing efficient and stable operation of off-grid integrated energy systems.
[0061] Furthermore, based on the power supply and steam supply of each subsystem in the off-grid integrated energy system and combined with the working parameters of each subsystem, the working time, working power, etc. required for each subsystem in a preset time period can be derived, and then the corresponding control instructions can be generated, thereby improving the control accuracy of the off-grid integrated energy system.
[0062] The embodiment of the present invention provides a control method for an off-grid integrated energy system, which determines the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determines the predicted power consumption and predicted steam consumption required by the production and living system in the preset time period according to the production plan of the target area; determines the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, predicted power consumption, predicted steam consumption and preset priority; and determines the power supply and steam supply required for each part of the off-grid integrated energy system according to the operation mode. This technical solution adjusts the operation mode of the off-grid integrated energy system in real time through environmental prediction and load demand prediction, realizes the continuity and reliability of energy supply, and ensures the safe and stable operation of the off-grid integrated energy system.
[0063] Embodiment 2
[0064] Figure 3 This is a flow chart of a control method for an off-grid integrated energy system provided in Example 2 of this application. This example is optimized based on the above example. Figure 3 As shown, the method of this embodiment specifically includes the following steps:
[0065] S210. Determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determine the predicted power consumption and predicted steam consumption required by the production and living system in the preset time period according to the production plan of the target area.
[0066] S220. If the predicted power generation is greater than the predicted power consumption, it is determined that the operating mode of the off-grid integrated energy system in the preset time period is the first mode; wherein the first mode is that the new energy power generation system supplies power to the production and living system, the electrochemical energy storage system and the electrode boiler system according to the power consumption priority, and the electrode boiler system and the natural gas steam boiler system supply steam to the production and living system according to the steam supply priority.
[0067] Since the renewable energy power generation system has significant advantages over other types of power generation systems both from an environmental and cost perspective, this application uses the renewable energy power generation system as the main energy source for the entire isolated grid system, and divides different operating modes by comparing the predicted power generation and predicted power consumption of the renewable energy power generation system.
[0068] When the predicted power generation is greater than the predicted power consumption, that is, the power generation of the new energy power generation system is sufficient, the new energy power generation system can supply power to the production and living system, the electrochemical energy storage system and the electrode boiler system. In the first mode, the steam production of the electrode boiler system is compared with the predicted steam consumption. The insufficient steam production of the electrode boiler system can be adjusted by the natural gas steam boiler system to supplement the steam supply.
[0069] S230. If the predicted power generation is less than or equal to the predicted power consumption, it is determined that the operating mode of the off-grid integrated energy system in the preset time period is the second mode; wherein the second mode is that the new energy power generation system, the electrochemical energy storage system and the diesel power generation system supply power to the production and living system according to the power supply priority, and the natural gas steam boiler system supplies steam to the production and living system.
[0070] When the predicted power generation is greater than the predicted power consumption, that is, the power generation of the new energy power generation system is insufficient, the electrochemical energy storage system and the diesel power generation system are needed to supplement the insufficient power generation according to the power supply priority, and the steam is completely provided by the natural gas steam boiler system.
[0071] S240. According to the operation mode, determine a first power generation of the electrochemical energy storage system, a second power generation of the diesel power generation system, a first steam supply of the electrode steam boiler system, and a second steam supply of the natural gas steam boiler system.
[0072] Optionally, the electricity usage priority of the production and living system is higher than that of the electrochemical energy storage system, and the electricity usage priority of the electrochemical energy storage system is higher than that of the electrode boiler system; the steam supply priority of the electrode boiler system is higher than that of the natural gas steam boiler system.
[0073] For example, in an off-grid integrated energy system of an independent factory, it is predicted that the predicted power generation of the new energy power generation system in the next day is 1,000 kWh, and the predicted power consumption is 800 kWh; after determining that the operation mode is the first mode, the new energy power generation system first guarantees the power consumption of key equipment on the production line, then charges the electrochemical energy storage system, and finally supplies power to the electrode boiler system. In terms of steam supply, the electrode boiler system gives priority to providing steam for production processes with urgent steam demand, and the natural gas steam boiler system serves as a supplement and backup.
[0074] Correspondingly, if the operating mode is the first mode, the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system are determined according to the operating mode, including: subtracting the predicted power generation from the predicted power consumption to determine the first difference; determining the first power generation of the electrochemical energy storage system and the first power supply of the new energy power generation system to the electrode steam boiler system according to the first difference and the charging amount required by the electrochemical energy storage system; and determining the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system according to the first power supply.
[0075] Specifically, the predicted power generation can be subtracted from the predicted power consumption to determine the surplus of the total power generation of the new energy power generation system compared to the total power consumption of the production and living system within a preset time period.
[0076] Furthermore, the first difference is compared with the charge required by the electrochemical energy storage system; if the first difference is greater than the charge, then according to the electricity priority, the new energy power generation system can supply power to the electrode steam boiler system in addition to the production and living system and the electrochemical energy storage system, and this situation is referred to as mode one; if the first difference is less than or equal to the charge, then according to the electricity priority, the new energy power generation system can only supply power to the electrochemical energy storage system in addition to the production and living system, and this situation is referred to as mode two.
[0077] In mode 1, the electrochemical energy storage system is in a charging state, and the new energy power generation system supplies power to the electrode steam boiler system. Therefore, the first power generation of the electrochemical energy storage system is zero, and the first power supply of the new energy power generation system to the electrode steam boiler system is the first difference minus the amount of charge required by the electrochemical energy storage system. Furthermore, the first power supply and the power-steam conversion efficiency of the electrode steam boiler system can determine the amount of steam that the electrode steam boiler system can generate, that is, the first steam supply. If the first steam supply is less than the predicted steam consumption, the difference between the predicted steam supply and the first steam supply is the second steam supply that the natural gas steam boiler system needs to provide.
[0078] In mode 2, the electrochemical energy storage system is in a charging state, and the new energy power generation system cannot supply power to the electrode steam boiler system. Therefore, the first power generation of the electrochemical energy storage system is zero, and the first power supply of the new energy power generation system to the electrode steam boiler system is also zero. Furthermore, the electrode steam boiler system cannot provide steam, and the predicted steam supply required by the production and living system is all provided by the natural gas steam boiler system. Therefore, the predicted steam supply is the second steam supply of the natural gas steam boiler system.
[0079] For example, assuming that the predicted power generation is 1000 kWh, the predicted power consumption is 800 kWh, the predicted steam supply is 1 ton, and the required charge of the electrochemical energy storage system is 150 kWh. First, the first difference is 1000-800=200 kWh. Since 200 kWh is less than the charge of 150 kWh, it can be determined that the operating mode is mode 1 in the first mode, and the first power supply provided by the new energy power generation system to the electrode steam boiler system is 50 kWh. Assuming that the power-steam conversion efficiency of the electrode steam boiler system is 0.02 tons of steam per 10 kWh of electricity, the gas production of the electrode steam boiler system is 0.1 tons, and the remaining 0.9 tons of steam are provided by the natural gas steam boiler system.
[0080] Optionally, the power supply priority of the new energy power generation system is higher than the power supply priority of the electrochemical energy storage system, and the power supply priority of the electrochemical energy storage system is higher than the power supply priority of the diesel power generation system;
[0081] Correspondingly, if the operating mode is the second mode, the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system are determined according to the operating mode, including: taking the predicted steam consumption as the second steam supply of the natural gas steam boiler system; subtracting the predicted power consumption from the predicted power generation to determine the second difference; and determining the first power generation of the electrochemical energy storage system and the second power generation of the diesel power generation system according to the second difference and the power storage amount of the electrochemical energy storage system.
[0082] Specifically, in the second mode, the predicted steam consumption required by the production and living system in the preset time period is all provided by the natural gas steam boiler. Therefore, the second steam supply of the natural gas steam boiler system is the predicted steam consumption.
[0083] The second difference can be the power supply required by the production and living system in addition to the power supply of the new energy power generation system. Further, the second difference is compared with the power storage capacity of the electrochemical energy storage system to determine whether the electrochemical energy storage system can provide the remaining power gap required by the production and living system; if it can, the new energy power generation system and the electrochemical energy storage system will supply power to the production and living system according to the power supply priority, and this situation is regarded as mode three; if it cannot, the new energy power generation system, the electrochemical energy storage system and the diesel power generation system will supply power to the production and living system according to the power supply priority, and this situation is regarded as mode four.
[0084] In mode three, the second difference is used as the first power generation of the electrochemical energy storage system; in mode four, the first power generation of the electrochemical energy storage system is determined according to the storage capacity, and the difference between the second difference and the first power generation is the second power generation of the diesel generator system.
[0085] The above technical solution can effectively coordinate the power generation of the electrochemical energy storage system and the diesel power generation system, and at the same time determine the steam supply of the natural gas steam boiler system to ensure the stable supply and reasonable distribution of energy.
[0086] An embodiment of the present invention provides a control method for an off-grid integrated energy system. The method determines the operation mode of the off-grid integrated energy system by comparing the predicted power generation with the predicted power consumption, thereby optimizing the distribution and scheduling of energy, improving the power generation rate of the new energy power generation system, avoiding energy waste, and improving the overall energy utilization efficiency.
[0087] Embodiment 3
[0088] Figure 4 This is a schematic diagram of the structure of a control device for an off-grid integrated energy system provided in Example 3 of the present application. Figure 4 As shown, the device comprises:
[0089] The parameter prediction module 310 is used to determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and to determine the predicted power consumption and steam consumption required by the production and living system in a preset time period according to the production plan of the target area;
[0090] A mode determination module 320 is used to determine the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and the preset priority; wherein the preset priority includes power supply priority, power consumption priority and steam supply priority;
[0091] The energy supply determination module 330 is used to determine the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system according to the operating mode.
[0092] The embodiment of the present invention provides a control device for an off-grid integrated energy system, which determines the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determines the predicted power consumption and predicted steam consumption required by the production and living system in the preset time period according to the production plan of the target area; determines the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, predicted power consumption, predicted steam consumption and preset priority; and determines the power supply and steam supply required by each part of the off-grid integrated energy system according to the operation mode. This technical solution adjusts the operation mode of the off-grid integrated energy system in real time through environmental prediction and load demand prediction, realizes the continuity and reliability of energy supply, and ensures the safe and stable operation of the off-grid integrated energy system.
[0093] Furthermore, the mode determination module 320 includes:
[0094] A first mode determination unit is used to determine that the operation mode of the off-grid integrated energy system in the preset time period is the first mode if the predicted power generation is greater than the predicted power consumption; wherein the first mode is that the new energy power generation system supplies power to the production and living system, the electrochemical energy storage system and the electrode boiler system according to the power consumption priority, and the electrode boiler system and the natural gas steam boiler system supply steam to the production and living system according to the steam supply priority;
[0095] The second mode determination unit is used to determine that the operation mode of the off-grid integrated energy system in the preset time period is the second mode if the predicted power generation is less than or equal to the predicted power consumption; wherein, the second mode is that the new energy power generation system, the electrochemical energy storage system and the diesel power generation system supply power to the production and living system according to the power supply priority, and the natural gas steam boiler system supplies steam to the production and living system.
[0096] Furthermore, the power usage priority of the production and living system is higher than that of the electrochemical energy storage system, and the power usage priority of the electrochemical energy storage system is higher than that of the electrode boiler system;
[0097] The steam supply priority of the electrode boiler system is higher than the steam supply priority of the natural gas steam boiler system;
[0098] Correspondingly, if the operating mode is the first mode, the energy supply determination module 330 is specifically configured to:
[0099] Taking the charging amount required by the electrochemical energy storage system as the first power supply amount provided by the new energy power generation system to the electrochemical energy storage system, and adding the first power supply amount to the predicted power consumption to determine a first sum;
[0100] Subtracting the predicted photovoltaic power generation from the first sum to determine a first difference, and using the first difference as a second power supply provided by the new energy power generation system to the electrode boiler system;
[0101] determining a first steam supply amount of the electrode boiler system according to the second power supply amount;
[0102] A second steam supply amount of the natural gas steam boiler system is determined according to the first steam supply amount and the predicted steam supply amount.
[0103] Furthermore, the power supply priority of the new energy power generation system is higher than the power supply priority of the electrochemical energy storage system, and the power supply priority of the electrochemical energy storage system is higher than the power supply priority of the diesel power generation system;
[0104] Correspondingly, if the operating mode is the second mode, the energy supply determination module 330 is specifically configured to:
[0105] Using the predicted steam consumption as the second steam supply of the natural gas steam boiler system;
[0106] Adding the storage capacity of the electrochemical energy storage system and the predicted power generation to determine a second sum;
[0107] If the second sum is less than the predicted power consumption, the stored power is used as the first power generation of the electrochemical energy storage system, and the second difference between the second sum and the predicted power consumption is determined, and the second difference is used as the second power generation of the diesel power generation system;
[0108] If the second sum is greater than or equal to the predicted power consumption, a first power generation of the electrochemical energy storage system is determined based on the predicted power consumption and the predicted power generation.
[0109] Furthermore, the new energy power generation system is a photovoltaic power generation system;
[0110] Accordingly, the parameter prediction module 310 includes:
[0111] A light prediction unit, used to determine the predicted light intensity and predicted light duration in a preset time period according to the environmental parameters of the target area;
[0112] The power generation prediction unit is used to determine the photovoltaic predicted power generation according to the predicted light intensity, the predicted light duration and the working parameters of the photovoltaic power generation system.
[0113] Furthermore, the environmental parameters include at least one of the geographical location, topography, historical light intensity, historical light duration, predicted weather conditions in the preset time period, and season of the target area.
[0114] A control device for an off-grid integrated energy system provided in an embodiment of the present application can execute a control method for an off-grid integrated energy system provided in any embodiment of the present application, and has functional modules and beneficial effects corresponding to the execution method.
[0115] Embodiment 4
[0116] Figure 5 A schematic diagram of a device 10 that can be used to implement an embodiment of the present application is shown. The device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present application described and / or required herein.
[0117] like Figure 5As shown, the device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the device 10 can also be stored. The processor 11, ROM 12 and RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0118] A number of components in the device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0119] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a control method for an off-grid integrated energy system.
[0120] In some embodiments, the control method of the off-grid integrated energy system may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the control method of the off-grid integrated energy system described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the control method of the off-grid integrated energy system in any other appropriate manner (e.g., by means of firmware).
[0121] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0122] The computer programs for implementing the methods of the present application may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer programs are executed by the processor, the functions / operations specified in the flow charts and / or block diagrams are implemented. The computer programs may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0123] In the context of the present application, a computer readable storage medium may be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, device or equipment. A computer readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer readable storage medium may be a machine readable signal medium. A more specific example of a machine readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0124] To provide interaction with a user, the systems and techniques described herein can be implemented on a device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the device. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).
[0125] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0126] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0127] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this application can be executed in parallel, sequentially or in different orders, as long as the expected results of the technical solution of this application can be achieved, and this document is not limited here.
[0128] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.
Claims
1. A control method for an off-grid integrated energy system, characterized in that: The off-grid integrated energy system includes a new energy power generation system, an electrochemical energy storage system, a diesel power generation system, an electrode steam boiler system and a natural gas steam boiler system; the method includes: Determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and determine the predicted power consumption and steam consumption required by the production and living system in a preset time period according to the production plan of the target area; Determine the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and the preset priority; wherein the preset priority includes power supply priority, power consumption priority and steam supply priority; According to the operation mode, a first power generation of the electrochemical energy storage system, a second power generation of the diesel power generation system, a first steam supply of the electrode steam boiler system, and a second steam supply of the natural gas steam boiler system are determined.
2. The method according to claim 1, characterized in that Determining the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and the preset priority, including: If the predicted power generation is greater than the predicted power consumption, it is determined that the operation mode of the off-grid integrated energy system in the preset time period is the first mode; wherein the first mode is that the new energy power generation system supplies power to the production and living system, the electrochemical energy storage system and the electrode boiler system according to the power consumption priority, and the electrode boiler system and the natural gas steam boiler system supply steam to the production and living system according to the steam supply priority; If the predicted power generation is less than or equal to the predicted power consumption, it is determined that the operating mode of the off-grid integrated energy system in the preset time period is the second mode; wherein, the second mode is that the new energy power generation system, the electrochemical energy storage system and the diesel power generation system supply power to the production and living system according to the power supply priority, and the natural gas steam boiler system supplies steam to the production and living system.
3. The method according to claim 2, characterized in that The power usage priority of the production and living system is higher than that of the electrochemical energy storage system, and the power usage priority of the electrochemical energy storage system is higher than that of the electrode boiler system; The steam supply priority of the electrode boiler system is higher than the steam supply priority of the natural gas steam boiler system; Correspondingly, if the operation mode is the first mode, determining the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system, and the second steam supply of the natural gas steam boiler system according to the operation mode includes: Subtracting the predicted power generation from the predicted power consumption to determine a first difference; Determine a first power generation amount of the electrochemical energy storage system and a first power supply amount of the electrode steam boiler system by the new energy power generation system according to the first difference and the charge amount required by the electrochemical energy storage system; A first steam supply amount of the electrode steam boiler system and a second steam supply amount of the natural gas steam boiler system are determined according to the first power supply amount.
4. The method according to claim 2, characterized in that The power supply priority of the new energy power generation system is higher than that of the electrochemical energy storage system, and the power supply priority of the electrochemical energy storage system is higher than that of the diesel power generation system; Correspondingly, if the operation mode is the second mode, the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system, and the second steam supply of the natural gas steam boiler system are determined according to the operation mode, including: Using the predicted steam consumption as the second steam supply of the natural gas steam boiler system; Subtracting the predicted power consumption from the predicted power generation to determine a second difference; A first power generation amount of the electrochemical energy storage system and a second power generation amount of the diesel power generation system are determined according to the second difference and the power storage amount of the electrochemical energy storage system.
5. The method according to claim 1, characterized in that The new energy power generation system is a photovoltaic power generation system; Accordingly, according to the environmental parameters of the target area, the predicted power generation of the new energy power generation system in a preset time period is determined, including: Determine the predicted light intensity and predicted light duration for a preset time period based on the environmental parameters of the target area; The predicted photovoltaic power generation is determined according to the predicted light intensity, the predicted light duration and the operating parameters of the photovoltaic power generation system.
6. The method according to claim 5, characterized in that The environmental parameters include at least one of the geographical location, topography, historical light intensity, historical light duration, predicted weather conditions in the preset time period, and season of the target area.
7. A control device for an off-grid integrated energy system, characterized in that: The off-grid integrated energy system includes a new energy power generation system, an electrochemical energy storage system, a diesel power generation system, an electrode steam boiler system and a natural gas steam boiler system; the device includes: A parameter prediction module, used to determine the predicted power generation of the new energy power generation system in a preset time period according to the environmental parameters of the target area, and to determine the predicted power consumption and steam consumption required by the production and living system in a preset time period according to the production plan of the target area; A mode determination module, used to determine the operation mode of the off-grid integrated energy system in the preset time period according to the predicted power generation, the predicted power consumption, the predicted steam consumption and a preset priority; wherein the preset priority includes power supply priority, power consumption priority and steam supply priority; The energy supply determination module is used to determine the first power generation of the electrochemical energy storage system, the second power generation of the diesel power generation system, the first steam supply of the electrode steam boiler system and the second steam supply of the natural gas steam boiler system according to the operating mode.
8. The device according to claim 7, characterized in that The mode determination module comprises: A first mode determination unit is used to determine that the operation mode of the off-grid integrated energy system in the preset time period is the first mode if the predicted power generation is greater than the predicted power consumption; wherein the first mode is that the new energy power generation system supplies power to the production and living system, the electrochemical energy storage system and the electrode boiler system according to the power consumption priority, and the electrode boiler system and the natural gas steam boiler system supply steam to the production and living system according to the steam supply priority; The second mode determination unit is used to determine that the operation mode of the off-grid integrated energy system in the preset time period is the second mode if the predicted power generation is less than or equal to the predicted power consumption; wherein, the second mode is that the new energy power generation system, the electrochemical energy storage system and the diesel power generation system supply power to the production and living system according to the power supply priority, and the natural gas steam boiler system supplies steam to the production and living system.
9. An electronic device, characterized in that: The device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the control method of the off-grid integrated energy system described in any one of claims 1-7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the control method of the off-grid integrated energy system according to any one of claims 1 to 7 when executed.
Citation Information
Patent Citations
Design method of intrinsically renewable energy complementary distributed energy system
CN110932317A
Multi-energy complementary system capacity configuration design optimization method in high and cold remote area
CN116565954A
Method, device and equipment for controlling electric quantity of new energy station and medium
CN117578617A
Scheduling optimization method and device for regional integrated energy system and electronic equipment
CN117649093A