Electric power operation and maintenance management system based on operation state monitoring of electric power information acquisition equipment
By collecting electricity consumption data in real time at the power grid nodes and calculating the proportion of electricity consumption, generating early warning signals, the problem of difficult to identify leakage abnormalities in the existing technology is solved, the accuracy and response speed of the power grid are improved, and the stability of the power grid is ensured. Run safely.
Patent Information
- Application Number
- CN202411132355.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
AI Technical Summary
The existing grid risk management system is difficult to accurately identify small abnormalities such as leakage, and lacks effective methods for identifying leakage accidents, which limits the efficiency and effectiveness of grid safety management.
By installing a metering device at the power grid node, electricity consumption data is collected in real time, electricity consumption proportion and deviation values are calculated in each period, early warning signals of different levels are generated, potential leakage accidents are identified in a timely manner and corresponding measures are taken.
It improves the accuracy and response speed of power grid monitoring, ensures the stable and safe operation of the power grid, and optimizes the detection and response process of leakage accidents.
Smart Images

Figure CN119030139A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid risk identification, and in particular to a power operation and maintenance management system based on operating status monitoring of power information collection equipment. Background Art
[0002] As an important infrastructure of the national economy, the safe and stable operation of the power grid is of vital importance. In recent years, with the increasing complexity of the power system and the continuous increase in electricity demand, the risks of power grid operation have also increased. Among them, leakage accidents are one of the common risks in power grid safety. At present, power grid risk management mainly relies on traditional monitoring systems and experience judgments to identify the state of the power grid by monitoring parameters such as current, voltage, and frequency. Some advanced monitoring systems have introduced data analysis and pattern recognition technologies, which can predict the abnormal behavior of the power grid to a certain extent, and can carry out intelligent analysis of power grid operation risks based on the maintenance plan of the power grid and the operation status of the power grid maintenance.
[0003] Existing technologies have certain limitations in identifying and handling power grid risks. First, the existing monitoring systems are difficult to accurately identify minor anomalies such as leakage, and lack a way to identify leakage accidents. It is mainly difficult to judge the abnormal parameters that may appear in the power grid based on historical power consumption, and thus it is impossible to complete the intelligent classification of power grid accident risks, which limits the efficiency and effectiveness of power grid safety management. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides an electric power operation and maintenance management system based on operating status monitoring of electric power information collection equipment, which solves the problems in the background technology.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: an electric power operation and maintenance management system based on operating status monitoring of electric power information collection equipment, comprising:
[0006] Step 1: First, by installing metering devices at each node of the power grid, the power consumption data of each node is collected in real time and stored;
[0007] Step 2: Define the target node and select the analysis node, then obtain the daily power consumption of the analysis node within the preset time, and calculate the average daily power consumption, divide the day into peak, flat and low peak periods, calculate the power consumption proportion of each period, then determine the average and deviation value of the power consumption proportion of each period, and compare them with the preset value to determine the judgment value of the power consumption proportion of each period;
[0008] Step 3: Obtain the power consumption of the target node in different time periods through monitoring, obtain the average daily power consumption of the monitoring node in the preset time, and use the ratio of the two as the evaluation value to compare with the judgment value of the power consumption proportion of the monitoring node in the corresponding time period to determine whether to generate an early warning signal. When an early warning signal is generated, different levels of early warning signals are generated according to the degree of exceeding the judgment value;
[0009] Step 4: Obtain all nodes that generate warning signals, determine different leakage accidents for nodes that generate warning signals of different levels, and take corresponding measures.
[0010] Preferably, in step 2, obtaining the determination value of the proportion of electricity consumption in each time period includes the following steps:
[0011] S1: Define each node in the power grid as a target node, and select any node from the target nodes as an analysis node, where there are m target nodes, and all m nodes can be used as analysis nodes;
[0012] S2: Get the daily power consumption of the analysis node within the preset time T and mark it as DET k-i ,
[0013] The preset time T is the time period n days from the current time. The data of the day on which the data is obtained is not included. k is any node among the m nodes. 0 <k≦m;
[0014] S3: Obtain the average daily power consumption within the preset time T
[0015] S4: Divide a day into three time periods, namely peak period, off-peak period and low-peak period. The specific division method is: peak period is from 17:00 to 01:00, low-peak period is from 01:00 to 9:00 and off-peak period is from 9:00 to 17:00;
[0016] S5: Obtain the power consumption DETG of the analysis node during the daily peak hours within the preset time T k-i , Electricity consumption during off-peak hours DETP k-i and off-peak electricity consumption DETS k-i Then calculate the proportion of electricity in three periods of each day within the preset time T, that is, the proportion of electricity during the peak period GET k-i =DETG k-i / DET k-i , PET of off-peak hours k-i =DETP k-i / DET k-i and low peak period ratio SET k-i =DETS k-i / DET k-i .
[0017] Preferably, after step S5, the following steps are further included:
[0018] S6: Obtain the peak period electricity proportion, the off-peak period electricity proportion and the low-peak period electricity proportion of each day within the preset time T of the analysis node, and calculate the average values GXk, PXk and SXk of the peak period electricity proportion, the off-peak period electricity proportion and the low-peak period electricity proportion. Take the peak period electricity proportion as an example:
[0019] Average power consumption during peak hours
[0020] Synchronously, according to the same principle, the average values PXk and SXk of the average values of the proportion of electricity in the off-peak period and the proportion of electricity in the off-peak period are calculated by the formula;
[0021] Then calculate the deviation value B of the peak period, the average period and the low peak period 1-k , B 2-k and B 3-k , taking the proportion of electricity during peak hours as an example:
[0022] Deviation value B of peak period electricity consumption 1-k :
[0023]
[0024] According to the same principle, the deviation value B of the proportion of electricity in the off-peak period and the proportion of electricity in the off-peak period is calculated by the formula 2-k and B 3-k ;
[0025] Then the deviation value B 1-k , B 2-k and B 3-k Compare with the preset values F1, F2 and F3 respectively to obtain the judgment value H of the proportion of electricity in peak period, the proportion of electricity in flat period and the proportion of electricity in low peak period 1-k , H 2-k and H 3-k , to obtain the peak period electricity consumption determination value H 1-k For example:
[0026] When the deviation value B1 k>F1, delete its value, according to |GET k-i -GXk|GET in descending order k-i Sort by order, and get the first GET in order k-i Value, each time a GET is obtained k-i value, delete it, and calculate the deviation value B again after deletion1-k , re - determine the deviation value B 1-k and the magnitude of F1 until the deviation value B 1-k < F1, then obtain the number D1 of deleted GET k-i values, and calculate the average value of the D1 deleted GET k-i values as the judgment value H 1-k ;
[0027] When the deviation value B 1-k ≦ F1, obtain the largest GET k-i value among the electricity consumption during the peak hours of each day within the preset time T as the judgment value H 1-k ;
[0028] Synchronously compare according to the same principle to obtain the judgment values H 2-k and H 3-k for the proportion of electricity during the flat - peak period and the proportion of electricity during the low - peak period
[0029] Preferably, after step S6, it further includes:
[0030] S7: By repeating steps S1 - S6, obtain the average daily electricity consumption DETk of each node in the target node within the preset time T and the judgment value H at different time periods j-k , where the value of j is 1, 2, or 3, representing the peak period, flat - peak period, and low - peak period respectively
[0031] Preferably, in step three, generating warning signals at different levels includes the following steps:
[0032] P1: In the target node, randomly select a node as the monitoring node. According to different time periods of the monitoring node, obtain the judgment value H of the monitoring node at different time periods j-k , real - time statistically record the electricity consumption data. When entering the next time period, obtain the specific electricity consumption used in the current time period and record it as V j-k ;
[0033] P2: Then obtain the average daily electricity consumption DETk of this monitoring node, and calculate the evaluation value VD j-k = V j-k / DETk, compare the magnitude of VD j-k with H j-k :
[0034] P21: When VD j-k > H j-k , generate a warning signal, calculate the difference C j-k = VD j-k - H j-k , through C j-kCompare with the interval range [Y1, Y2], and generate warning signals of different levels according to the comparison results;
[0035] When C j-k < Y1, generate a first-level warning signal;
[0036] When Y1 ≤ C j-k ≤ Y2, generate a signal marked as "1", and then perform subsequent judgments;
[0037] When C j-k > Y2, generate a third-level warning signal;
[0038] where Y1 and Y2 are preset values;
[0039] P22: When VD j-k ≤ H j-k do nothing.
[0040] Preferably, after step P2, it further includes:
[0041] P3: Then obtain all monitoring nodes, repeat the above steps P1 - P2, monitor the target node, and determine whether to generate the corresponding first-level warning signal and third-level warning signal.
[0042] Preferably, after step P3, it further includes:
[0043] P4: Then perform subsequent judgments, count the number X of signals marked as "1", and calculate the ratio U = X / m;
[0044] P41: When the ratio U < Y3, generate a second-level warning signal;
[0045] P42: When the ratio U ≥ Y3, generate a first-level warning signal;
[0046] where Y3 is a preset value.
[0047] Preferably, in step four, the specific way to take corresponding measures is:
[0048] Nodes generating the first-level warning signal: Determine as a potential leakage accident;
[0049] Measures: Remind the staff to pay attention and conduct key monitoring;
[0050] Nodes generating the second-level warning signal: Determine as an intermittent leakage accident, and remind the staff to conduct relevant inspections;
[0051] Nodes generating the third-level warning signal: Determine as a leakage accident, remind the staff that the power consumption exceeds the standard, and conduct on-site inspections.
[0052] The present invention provides an electric power operation and maintenance management system based on the operation status monitoring of electric power information collection equipment. Compared with the prior art, it has the following beneficial effects:
[0053] (1) The present invention collects power consumption data of power grid nodes in real time, analyzes the data in detail, calculates the power consumption ratio and its deviation value by time period, and analyzes the power consumption behavior in different time periods in depth. The model can timely discover abnormal power consumption patterns and quickly generate early warning signals. This method not only increases the accuracy of power grid monitoring, but also improves the response speed to potential problems, allowing power grid operators to take timely measures in the event of power leakage, prevent potential accidents, and ensure the stable and safe operation of the power grid.
[0054] (2) The present invention can generate different levels of warning signals according to the degree of excess when the power consumption exceeds the normal range. For example, the first-level warning indicates potential leakage, and the third-level warning indicates obvious leakage accidents. This hierarchical warning mechanism enables power grid operators to prioritize high-risk areas according to the warning level, ensure timely response, and prevent leakage accidents from expanding or causing more serious consequences. It improves the detection efficiency of leakage accidents and optimizes the accident response process, providing strong technical support for the safe operation of power grids. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] The present invention will be further described below in conjunction with the accompanying drawings.
[0056] Figure 1 It is a flowchart of the steps of the power operation and maintenance management system based on the operation status monitoring of the power information collection equipment of the present invention;
[0057] Figure 2 The present invention is a flow chart of obtaining a determination value of the proportion of electricity consumption in each time period by an electric power operation and maintenance management system based on operating status monitoring of electric power information collection equipment. DETAILED DESCRIPTION
[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0059] Embodiment 1
[0060] See also Figure 1-Figure 2 , the present invention provides an electric power operation and maintenance management system based on the operation status monitoring of electric power information collection equipment, including;
[0061] Step 1: First, install metering devices at each node of the power grid, collect the power consumption data of each node in real time, and store the power consumption data.
[0062] It should be noted that each node in the power grid includes power generation station output nodes, industrial and commercial power consumption nodes, etc. Large industrial and commercial users will have their own metering devices to measure specific power consumption.
[0063] Step 2: Define the target nodes and select the analysis nodes, then obtain the daily power consumption of the analysis nodes within the preset time, calculate the average daily power consumption, divide a day into peak, flat peak, and low peak periods, calculate the proportion of power consumption in each period, then determine the average value and deviation value of the proportion of power consumption in each period, and compare with the preset value to determine the judgment value of the proportion of power consumption in each period.
[0064] Obtaining the judgment value of the proportion of power consumption in each period includes the following steps:
[0065] S1: Define each node in the power grid as a target node, and arbitrarily select one node from the target nodes as the analysis node. Among them, there are m target nodes, and all m nodes can be used as analysis nodes.
[0066] S2: Obtain the daily power consumption of the analysis node within the preset time T, and mark it as DET k-i ,
[0067] Among them, the preset time T represents a time period starting from the current time and pushing forward n days, and the data of the current day when obtaining the data is not included. In this embodiment, n = 30, 0 < i ≤ 30, k represents any one of the m nodes, 0 < k ≤ m.
[0068] S3: Obtain within the preset time T and calculate the average daily power consumption
[0069] S4: Divide a day into three time periods, namely peak period, flat peak period, and low peak period. The specific division method is: the peak period is from 17:00 to 01:00, the low peak period is from 01:00 to 9:00, and the flat peak period is from 9:00 to 17:00.
[0070] S5: Obtain the power consumption DETG of the analysis node during the peak period of each day within the preset time T k-i , the power consumption DETP during the flat peak period k-i and the power consumption DETS during the low peak period k-i , then calculate the proportion of power consumption in the three periods of each day within the preset time T, that is, the proportion of power consumption in the peak period GET k-i = DETG k-i / DET k-i, PET of off-peak hours k-i =DETP k-i / DET k-i and low peak period ratio SET k-i =DETS k-i / DET k-i ;
[0071] S6: Obtain the peak period electricity proportion, the off-peak period electricity proportion and the low-peak period electricity proportion of each day within the preset time T of the analysis node, and calculate the average values GXk, PXk and SXk of the peak period electricity proportion, the off-peak period electricity proportion and the low-peak period electricity proportion. Take the peak period electricity proportion as an example:
[0072] Average power consumption during peak hours
[0073] Synchronously, according to the same principle, the average values PXk and SXk of the average values of the proportion of electricity in the off-peak period and the proportion of electricity in the off-peak period are calculated by the formula;
[0074] Then calculate the deviation value B of the peak period, the average period and the low peak period 1-k , B 2-k and B 3-k , taking the proportion of electricity during peak hours as an example:
[0075] Deviation value B of peak period electricity consumption 1-k :
[0076]
[0077] According to the same principle, the deviation value B of the proportion of electricity in the off-peak period and the proportion of electricity in the off-peak period is calculated by the formula 2-k and B 3-k ;
[0078] Then the deviation value B 1-k , B 2-k and B 3-k Compare with the preset values F1, F2 and F3 respectively to obtain the judgment value H of the proportion of electricity in peak period, the proportion of electricity in flat period and the proportion of electricity in low peak period 1-k , H 2-k and H 3-k , to obtain the peak period electricity consumption determination value H 1-k For example:
[0079] When the deviation value B1 k>F1, delete its value, according to |GET k-i -GXk|GET in descending order k-i Sort by order, and get the first GET in orderk-i value, for each GET obtained k-i value, delete it, and recalculate the deviation value B after deletion 1-k , re-determine the deviation value B 1-k and the magnitude of F1 until the deviation value B 1-k < F1, then obtain the deleted GET k-i the number D1 of values, calculate the average value of the D1 deleted GETs k-i as the determination value H 1-k ;
[0080] When the deviation value B 1-k ≤ F1, obtain the largest GET among the electricity consumption during the peak hours of each day within the preset time T k-i value as the determination value H 1-k ;
[0081] Synchronously compare according to the same principle to obtain the determination values H 2-k and H 3-k ;
[0082] S7: By repeating steps S1 - S6, obtain the average daily electricity consumption DETk of each node in the target node within the preset time and the determination value H at different time periods j-k , where the value of j is 1, 2, or 3, representing the peak period, flat peak period, and low peak period respectively;
[0083] Step 3: Obtain the electricity consumption of the target node at different time periods through monitoring, obtain the average daily electricity consumption of the monitoring node within the preset time, and compare the ratio of the two as the evaluation value with the determination value of the electricity consumption ratio of the monitoring node at the corresponding time period to determine whether to generate an early warning signal. When an early warning signal is generated, generate different levels of early warning signals according to the degree of exceeding the determination value;
[0084] Example 2
[0085] In the specific implementation process of this example, on the basis of Example 1, and the difference from Example 1 is that the focus of this example is to generate different levels of early warning signals, including the following steps:
[0086] P1: In the target node, randomly select a node as the monitoring node, and according to the different time periods of the monitoring node, obtain the determination value H of the monitoring node at different time periods j-k , real-time statistics of the electricity consumption data, when entering the next time period, obtain the specific electricity consumption used in the current time period and record it as V j-k ;
[0087] P2: Then obtain the average daily electricity consumption DETk of the monitoring node, and calculate the evaluation value VDj-k = V j-k / DETk, compare VD j-k with H j-k to determine the size:
[0088] P21: When VD j-k > H j-k generate a warning signal, calculate the difference C j-k = VD j-k - H j-k , and compare C j-k with the range [Y1, Y2], and generate different levels of warning signals according to the comparison result;
[0089] When C j-k < Y1, generate a first-level warning signal;
[0090] When Y1 ≤ C j-k ≤ Y2, generate a signal marked as "1", and then perform subsequent judgments;
[0091] When C j-k > Y2, generate a third-level warning signal;
[0092] where Y1 and Y2 are preset values, and the specific parameters are set by the staff;
[0093] P22: When VD j-k ≤ H j-k , do nothing;
[0094] P3: Then obtain all monitoring nodes and repeat the above steps P1 - P2 to monitor the target node and determine whether to generate the corresponding first-level and third-level warning signals;
[0095] P4: Then perform subsequent judgments, count the number X of signals marked as "1", and calculate the ratio U = X / m;
[0096] P41: When the ratio U < Y3, generate a second-level warning signal;
[0097] P42: When the ratio U ≥ Y3, generate a first-level warning signal;
[0098] where Y3 is a preset value, and the specific parameters are set by the staff;
[0099] Embodiment III
[0100] In the specific implementation process of this embodiment, based on Embodiment I and Embodiment II, and the difference from Embodiment I and Embodiment II is that this embodiment further includes Step Four:
[0101] Step 4: Obtain all nodes that generate warning signals, determine different leakage accidents for nodes that generate warning signals of different levels, and take corresponding measures to solve the leakage accidents;
[0102] The specific ways to take corresponding measures are:
[0103] Nodes that generate a first-level warning signal: Determined to be a potential leakage accident;
[0104] Measures: Remind staff members to pay attention and focus on them;
[0105] Nodes that generate a secondary warning signal: determine that it is an intermittent leakage accident, and remind staff to conduct relevant investigations;
[0106] Nodes that generate level 3 warning signals: If a leakage accident is detected, the staff will be reminded that the power consumption is exceeding the standard and an on-site investigation will be conducted;
[0107] Embodiment 4
[0108] The specific implementation process of this embodiment includes all the implementation processes of the above three groups of embodiments.
[0109] Some of the data in the above formulas are dimensionless and numerically calculated. Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0110] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment is characterized by: Including: Step 1: First, install metering devices at each node of the power grid, collect the power consumption data of each node in real time, and store the power consumption data. Step 2: Define the target node and select the analysis node. Then, obtain the daily power consumption of the analysis node within the preset time, calculate the average daily power consumption, divide a day into peak, flat peak, and low peak periods, calculate the proportion of power consumption in each period, and then determine the average value and deviation value of the proportion of power consumption in each period, and compare with the preset value to determine the judgment value of the proportion of power consumption in each period. Step 3: Obtain the power consumption of the target node at different time periods through monitoring, obtain the average daily power consumption of the monitoring node within the preset time, take the ratio of the two as the evaluation value and compare it with the judgment value of the proportion of power consumption in the corresponding period of the monitoring node to determine whether to generate an early warning signal. When an early warning signal is generated, different levels of early warning signals are generated according to the degree exceeding the judgment value. Step 4: Obtain all the nodes that generate early warning signals. For the nodes that generate early warning signals of different levels, determine different leakage accidents and take corresponding measures.
2. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 1 is characterized in that: In Step 2, obtaining the judgment value of the proportion of power consumption in each period includes the following steps: S1: Define each node in the power grid as the target node, and arbitrarily select one node from the target nodes as the analysis node. Among them, there are m target nodes, and any of the m nodes can be used as the analysis node. S2: Get the daily power consumption of the analysis node within the preset time T and mark it as DET k-i , Among them, the preset time T represents the time period from the current time and counting back n days, and the data of the current day when obtaining the data is not included. k represents any one of the m nodes, and 0 < k ≤ m. S3: Obtain the average daily power consumption within the preset time T S4: Divide a day into three time periods, namely the peak period, the flat peak period, and the low peak period. The specific division method is: the peak period is from 17:00 to 01:00, the low peak period is from 01:00 to 9:00, and the flat peak period is from 9:00 to 17:
00. S5: Obtain the power consumption DETG of the analysis node during the daily peak hours within the preset time T k-i , Electricity consumption during off-peak hours DETP k-i and off-peak electricity consumption DETS k-i Then calculate the proportion of electricity in three periods of each day within the preset time T, that is, the proportion of electricity during the peak period GET k-i =DETG k-i / DET k-i , PET of off-peak hours k-i =DETP k-i / DET k-i and low peak period ratio SET k-i =DETS k-i / DET k-i .
3. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 2 is characterized in that: After Step S5, it also includes: S6: Obtain the proportion of power consumption in the peak period, the proportion of power consumption in the flat peak period, and the proportion of power consumption in the low peak period of the analysis node every day within the preset time T, and calculate the average values GXk, PXk, and SXk of the average values of the proportion of power consumption in the peak period, the proportion of power consumption in the flat peak period, and the proportion of power consumption in the low peak period. Taking the proportion of power consumption in the peak period as an example: Average power consumption during peak hours Synchronously, according to the same principle, calculate the average values PXk and SXk of the average values of the proportion of power consumption in the flat peak period and the proportion of power consumption in the low peak period obtained through formula calculation. Then calculate the deviation value B of the peak period, the average period and the low peak period 1-k , B 2-k and B 3-k , taking the proportion of electricity during peak hours as an example: Deviation value B of peak period electricity consumption 1-k : According to the same principle, the deviation value B of the proportion of electricity in the off-peak period and the proportion of electricity in the off-peak period is calculated by the formula 2-k and B 3-k ; Then the deviation value B 1-k , B 2-k and B 3-k Compare with the preset values F1, F2 and F3 respectively to obtain the judgment value H of the proportion of electricity in peak period, the proportion of electricity in flat period and the proportion of electricity in low peak period 1-k , H 2-k and H 3-k , to obtain the peak period electricity consumption determination value H 1-k For example: When the deviation value B1k > F1, its value is deleted, and GET is sorted in descending order according to |GET k-i - GXk|, and the GET with the first rank in the sorting is obtained in turn. For each obtained GET k-i value, it is deleted. After deletion, the deviation value B is calculated again k-i , and the size of the deviation value B k-i and F1 is re-determined until the deviation value B 1-k < F1. Then, the number D1 of the deleted GET 1-k values is obtained, and the average value of the D1 deleted GET 1-k values is calculated as the judgment value H k-i ; k-i ; 1-k ; When the deviation value B 1-k ≦F1, get the maximum power consumption during the peak hours of each day within the preset time T k-i The value is taken as the judgment value H 1-k ; The same principle is used to compare the power consumption during the off-peak period and the power consumption during the off-peak period. 2-k and H 3-k .
4. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 3 is characterized in that: After Step S6, it also includes: S7: By repeating steps S1-S6, the average daily power consumption DETk of each node in the target node at the preset time T and the judgment value H at different time periods are obtained. j-k , where the value of j is 1, 2 or 3, representing peak hours, off-peak hours and low-peak hours respectively.
5. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 1 is characterized in that: In Step 3, generating different levels of early warning signals includes the following steps: P1: Among the target nodes, select any node as the monitoring node, and obtain the judgment value H of the monitoring node in different time periods according to the different time periods of the monitoring node. j-k , real-time statistics of power consumption data, when entering the next period, obtain the specific power used in the current period and record it as V j-k ; P2: Then obtain the average daily power consumption DETk of the monitoring node and calculate the evaluation value VD j-k =V j-k / DETk, compared with VD j-k With H j-k Size: P21: When VD j-k >H j-k When the warning signal is generated, the difference C is calculated j-k =VD j-k -H j-k , through C j-k Compare with the interval range [Y1, Y2], and generate different levels of warning signals according to the comparison results; When C j-k <When Y1, generate a first-level warning signal; When Y1 ≦ C j-k ≦Y2, a signal marked as "1" is generated, and subsequent judgment is performed; When C j-k >Y2, a level 3 warning signal is generated; Among them, Y1 and Y2 are preset values. P22: When VD j-k ≦H j-k No processing is done when 6. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 5 is characterized in that: After Step P2, it also includes: P3: Then obtain all monitoring nodes and repeat the above steps P1 - P2 to monitor the target node and determine whether to generate the corresponding first-level early warning signal and third-level early warning signal.
7. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 6 is characterized in that: After Step P3, it also includes: P4: Then conduct subsequent judgment, count the number X of signals marked as "1", and calculate the ratio U = X / m. P41: When the ratio U < Y3, generate a second-level early warning signal. P42: When the ratio U ≥ Y3, generate a first-level early warning signal. Among them, Y3 is a preset value.
8. The power operation and maintenance management system based on the operation status monitoring of the power information collection equipment according to claim 1 is characterized in that: In step 4, the specific methods of taking corresponding measures are: Nodes that generate a first-level warning signal: Determined to be a potential leakage accident; Measures: Remind staff members to pay attention and focus on them; Nodes that generate a secondary warning signal: determine that it is an intermittent leakage accident, and remind staff to conduct relevant investigations; Nodes that generate level 3 warning signals: determine that there is a leakage accident, remind staff that power consumption exceeds the standard, and conduct on-site inspections.
Citation Information
Cited By
Electric leakage monitoring method and system for smart power grid
CN120370220A
