Wind power plant equipment communication method and system
Through real-time detection and remote fault analysis, abnormal situations of wind farm equipment are identified and the cause of failure is analyzed, and the problem of difficult line abnormalities in wind farm equipment communication is solved, and the operation safety and reliability of equipment are improved.
Patent Information
- Application Number
- CN202410922086.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-26
AI Technical Summary
It is difficult to identify and analyze line abnormalities caused by faults and environmental instability during the communication process of wind farm equipment, which affects the safe operation of the equipment and efficient power generation.
By real-time detection of wind farm equipment operating parameters and environmental information, establish a data transmission line, send data to the remote fault analysis end for fault analysis, and monitor the line status in real time, generate feedback signals to analyze the cause of line abnormalities, provide emergency and verification analysis results and Call the police.
It realizes timely monitoring and fault analysis of wind farm equipment operating status, improves the operating safety and reliability of equipment, and ensures the stable operation of wind farms.
Smart Images

Figure CN119030849A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power generation, and more particularly to a wind farm equipment communication method and system. Background Art
[0002] In a wind farm, equipment communication refers to the process of information exchange and transmission between various equipment such as wind turbines, substations, and monitoring systems. Generally, the wind farm equipment communication process can be divided into the following steps: Data acquisition: Wind turbines collect various data such as wind speed, rotation speed, temperature, etc. through sensors and measuring equipment; Data processing: The collected data is processed and analyzed by the data processing unit inside the wind turbine to generate useful information and signals; Communication transmission: The generated information and signals are transmitted to the control system or monitoring system of the wind turbine through the communication module; The communication module can use wireless communication technology (such as wireless sensor networks, wireless communication modules) or wired communication technology (such as Ethernet, Modbus, etc.) s communication protocol); data analysis: after receiving the transmitted information and signals, the control system or monitoring system will analyze and process them to obtain information about the equipment status, operating data, etc.; data storage and analysis: the received information and signals are usually stored in a database or historical data storage system for subsequent analysis and query; communication technology acts as a bridge between various devices to ensure timely data transmission and effective control of equipment, thereby ensuring the safe operation and efficient power generation of wind farms; however, in actual application, due to unstable factors such as wind farm equipment failure and abnormal environment, communication line failure is very likely to occur; and during line failure, the operating status of the equipment cannot be known, which poses a hidden danger to the operation of the wind farm;
[0003] Therefore, how to provide a wind farm equipment communication method and system that can timely identify abnormal conditions of wind farm equipment, quickly analyze the cause of line faults, provide emergency response and verify analysis results has become a problem to be solved in the field. Summary of the invention
[0004] To solve the above problems, the present invention provides the following technical solutions:
[0005] A wind farm equipment communication method comprises the following steps:
[0006] Step 1: Real-time detection of wind farm equipment operating parameters and wind farm environmental information;
[0007] Step 2: Establish a data transmission line to send the detected operating parameter data and environmental information to the remote fault analysis terminal for fault analysis;
[0008] Step 3: monitor the state of the data transmission line in real time, and generate feedback signal 1 and feedback signal 2 when an abnormality occurs and recovery occurs during the line transmission process, and send them to the remote fault analysis terminal;
[0009] Step 4: After receiving feedback signal 1, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment, obtains the cause of the current line abnormality according to the analysis result, and generates an emergency analysis result; after receiving feedback signal 2, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment and a preset time limit 2 after the moment, obtains the cause of the current line abnormality according to the analysis result, and generates a verification analysis result;
[0010] Step 5: Generate a response plan based on the emergency analysis results and verification analysis results, and provide an alarm.
[0011] Preferably, in the above-mentioned wind farm equipment communication method, the step 1 of performing real-time detection of wind farm equipment operating parameters and wind farm environmental information comprises:
[0012] Installing operation data acquisition equipment at key locations of the wind farm, and using the operation data acquisition equipment to monitor and record operation parameters of the key locations in real time;
[0013] Environmental data collection equipment is installed at preset peripheral measuring points of the wind farm, and the environmental data at the wind farm is monitored and recorded in real time through the environmental data collection equipment.
[0014] Preferably, in the above-mentioned wind farm equipment communication method, the step 2 of establishing a data transmission line to send the detected operating parameter data and environmental information to the remote fault analysis terminal for fault analysis includes:
[0015] Performing preliminary processing on the collected operating parameters and environmental data, the preliminary processing process includes data filtering, data integration and data compression, and generating a data set 1 carrying the operating parameters and environmental data;
[0016] Perform screening processing on the data set 1, wherein the screening processing process includes data integrity check and calibration algorithm application, retaining the data set 1 that passes the screening processing, and generating the data set 2;
[0017] Sending the second data set to the remote fault analysis terminal in a wireless transmission manner;
[0018] When the remote fault analysis terminal receives the data set 2, the data set 2 is named according to the time value of this reception;
[0019] The remote fault analysis terminal compares the various operating parameters in the second data set according to the preset parameter standard range, and generates equipment fault information according to the comparison result;
[0020] The data set 2 named with the time value and the corresponding equipment fault information are stored in the database.
[0021] Preferably, in the above-mentioned wind farm equipment communication method, the step three of real-time monitoring the state of the data transmission line, generating feedback signal 1 and feedback signal 2 correspondingly when an abnormality occurs and recovery occurs during line transmission, and sending them to the remote fault analysis terminal includes:
[0022] A signal monitoring device is provided at the connection between the remote fault analysis terminal and the data transmission line, for detecting the transmission rate data between the remote fault analysis terminal and the data transmission line in real time;
[0023] Plotting the detected transmission rate data as a rate waveform graph;
[0024] Preset a rate standard waveform under normal conditions, obtain a characteristic value in the rate standard waveform, compare it with the detected rate waveform graph, and determine the normal or abnormal state of the line at this moment according to the comparison result;
[0025] When the line is in an abnormal state, a feedback signal 1 is generated and sent to the remote fault analysis terminal;
[0026] When the line is in a normal state, a feedback signal 2 is generated and sent to the remote fault analysis terminal.
[0027] Preferably, in the above-mentioned wind farm equipment communication method, the real-time monitoring of the state of the data transmission line further comprises:
[0028] Acquiring the packet loss rate and data error rate of the data during the comparison of the operating parameters in the second data set by the remote fault analysis terminal;
[0029] Preset the minimum packet loss rate and data error rate;
[0030] When either the packet loss rate or the data error rate exceeds a preset minimum value, it is determined that the line is in an abnormal state.
[0031] Preferably, in the above-mentioned wind farm equipment communication method, the analysis process of the emergency analysis result includes:
[0032] When the remote fault analysis terminal receives the feedback signal 1, the abnormal time value T0 of the current time is obtained;
[0033] Calculate the time interval (T0-t1, T0) within the preset time limit t1 before calculating the abnormal time value T0;
[0034] Matching a data set 2 corresponding to a time limit interval 1 (T0-t1, T0) in the database;
[0035] The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, draws a parameter change curve of the operating parameters in the time limit interval 1 (T0-t1, T0) and an environmental change curve of the environmental data in the time limit interval 1 (T0-t1, T0); presets a standard slope value K0, and calculates the absolute value |K| of the slope of the parameter change curve and the environmental change curve;
[0036] Calculate the slope multiple n=|K| / K0 of each change curve in turn; sort the parameter change curve and the environment change curve from large to small according to their corresponding slope multiples n; use the equipment or environment data corresponding to the first change curve as the cause of the line abnormality, and generate emergency analysis results.
[0037] Preferably, in the above-mentioned wind farm equipment communication method, the analysis process of verifying the analysis result includes:
[0038] When the remote fault analysis terminal receives the second feedback signal, it obtains the restoration time value T1 at the current moment and the abnormal time value T0 corresponding to the restoration time value T1;
[0039] Calculate the time interval two (T0-t1, T0) and (T1, T1+t2) within the preset time limit one t1 before the abnormal time value T0 and within the preset time limit two t2 after the recovery time value T1;
[0040] Matching a data set 2 corresponding to a time interval 2 (T0-t1, T0) and (T1, T1+t2) in the database;
[0041] The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, and draws a parameter change curve of the operating parameters in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2) and an environmental change curve of the environmental data in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2);
[0042] Repeat the analysis process of the emergency analysis results to obtain the ranking result one of the slope multiples n of the parameter change curve and the environment change curve within the time limit interval two;
[0043] In the process of drawing the change curve, the data between time T0 and time T1 are directly connected, and the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve is calculated respectively, and the standard jump slope value I0 is preset;
[0044] Calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curves and environment change curves in this analysis process from large to small according to their corresponding jump slope multiples g, and generate sorting result 2;
[0045] The sorting result 2 is combined with the sorting result 1, and the equipment or environmental data corresponding to the change curve that is ranked first after the combination is used as the cause of the line abnormality to generate a verification analysis result.
[0046] A wind farm equipment communication system, comprising:
[0047] Wind farm equipment, which is installed at key locations in the wind farm and preset environmental measurement points, and is used to detect operating parameters and environmental information in real time;
[0048] A remote fault analysis terminal, which is connected to the wind farm equipment via a data transmission line, and is used to analyze operating parameters and environmental information from the wind farm equipment, generate equipment fault analysis results for equipment problems, and generate emergency analysis results and verification analysis results for line problems;
[0049] A signal monitoring device, which is arranged at the connection between the remote fault analysis end and the data transmission line, and is used to monitor the transmission rate of the data transmission line in real time to detect the abnormality and recovery of the line, and to generate feedback signal 1 and feedback signal 2 accordingly, and send the feedback signal to the remote fault analysis end, so that the remote fault analysis end generates emergency analysis results and verification analysis results for the line problem when receiving the feedback signal;
[0050] An alarm processing unit is connected to the remote fault analysis terminal and is used to generate an alarm according to the emergency analysis result and the verification analysis result, and provide a processing solution.
[0051] Preferably, in the above-mentioned wind farm equipment communication system, the remote fault analysis terminal includes:
[0052] A data receiving unit, which is connected to the data transmission line, is used to perform preliminary processing on the collected operating parameters and environmental data, wherein the preliminary processing process includes data filtering, data integration and data compression, and generates a data set 1 carrying the operating parameters and environmental data; performs screening processing on the data set 1, wherein the screening processing process includes data integrity check and calibration algorithm application, retains the data set 1 that passes the screening processing, and generates a data set 2;
[0053] A naming unit, connected to the data receiving unit, for naming the data set 2 according to the time value of this reception;
[0054] The equipment analysis unit is connected to the data receiving unit and is used to compare the various operating parameters in the data set 2 according to the preset parameter standard range, generate equipment fault information according to the comparison result; and store the data set 2 named with the time value and the corresponding equipment fault information in the database.
[0055] Preferably, in the above-mentioned wind farm equipment communication system, the remote fault analysis terminal further includes:
[0056] A feedback signal confirmation unit, connected to the signal monitoring device, for receiving and analyzing the type of the feedback signal; generating an abnormal instruction when feedback signal 1 is obtained, and generating a recovery instruction when feedback signal 2 is obtained;
[0057] The emergency analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 1, it obtains the abnormal time value T0 at the current moment; calculates the time interval 1 (T0-t1, T0) within the preset time limit 1 t1 before the abnormal time value T0; matches the data set 2 corresponding to the time interval 1 (T0-t1, T0) in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the operating parameters in the time interval 1 ( The parameter change curve within the time interval (T0-t1, T0) and the environmental change curve of the environmental data within the time interval (T0-t1, T0); preset a standard slope value K0, and calculate the absolute value of the slope of the parameter change curve and the environmental change curve |K|; calculate the slope multiple n=|K| / K0 of each change curve in turn; sort the parameter change curve and the environmental change curve from large to small according to their corresponding slope multiples n; take the equipment or environmental data corresponding to the first change curve as the cause of the line abnormality, and generate emergency analysis results;
[0058] A verification and analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 2, it obtains the recovery time value T1 at this moment and the abnormal time value T0 corresponding to the recovery time value T1; calculates the time interval 2 (T0-t1, T0) and (T1, T1+t2) within the preset time limit 1 t1 before the abnormal time value T0 and the preset time limit 2 t2 after the recovery time value T1; matches the data set 2 corresponding to the time interval 2 (T0-t1, T0) and (T1, T1+t2) in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the parameter change curve of the operating parameters in the time interval 2 (T0-t1, T0) and (T1, T1+t2) and the environmental data in the time interval 2 (T0-t1, T0) and (T1, T1+t2). t1, T0) and the environmental change curve within (T1, T1+t2); repeat the analysis process of the emergency analysis results to obtain the slope multiple n ranking result one of the parameter change curve and the environmental change curve within the time limit interval two; directly connect the data between time T0 and time T1 in the process of drawing the change curve, and calculate the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve respectively, and preset the standard jump slope value I0; calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curve and the environmental change curve in this analysis process from large to small according to their corresponding jump slope multiples g, and generate a ranking result two; combine the ranking result two with the ranking result one, and take the equipment or environmental data corresponding to the change curve that is ranked first after the combination as the cause of the line abnormality, and generate a verification analysis result.
[0059] It can be seen from the above technical solutions that compared with the prior art, the present application has the following beneficial effects:
[0060] The present invention provides a wind farm equipment communication method and system, including: real-time detection of wind farm equipment operating parameters and wind farm environmental information; establishing a data transmission line, and sending the detected operating parameter data and environmental information to a remote fault analysis end for fault analysis; real-time monitoring of the state of the data transmission line, and correspondingly generating a feedback signal when an abnormality occurs and recovery occurs during line transmission, and sending it to the remote fault analysis end; the remote fault analysis end receives the feedback signal, analyzes the operating parameter data and environmental information within a preset time limit before and after the abnormal moment, obtains the cause of the line abnormality according to the analysis result, generates an emergency analysis result and a verification analysis result; and generates a response plan and provides an alarm; the present invention monitors the state of the data transmission line in real time through remote fault analysis and response processing, can timely discover line abnormalities and recovery situations, and effectively improves the operational safety and reliability of wind farm equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0062] Figure 1 is a flow chart of the method of the present invention;
[0063] Figure 2 It is a system flow chart of the present invention. DETAILED DESCRIPTION
[0064] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention. The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.
[0065] In the present invention, the terms "first", "second", and "third" are used for descriptive purposes only and should not be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise clearly defined. The terms "installed", "connected", "connected", "fixed", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0066] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as “upper”, “lower”, “left”, “right”, “front” and “back” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or unit referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, cannot be understood as a limitation on the present invention.
[0067] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0068] In one embodiment, see Figure 1 , a wind farm equipment communication method, comprising the following steps:
[0069] Step 1: Real-time detection of wind farm equipment operating parameters and wind farm environmental information;
[0070] Step 2: Establish a data transmission line to send the detected operating parameter data and environmental information to the remote fault analysis terminal for fault analysis;
[0071] Step 3: monitor the status of the data transmission line in real time, and generate feedback signal 1 and feedback signal 2 when an abnormality or recovery occurs during the line transmission process, and send them to the remote fault analysis end;
[0072] Step 4: After receiving feedback signal 1, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment, obtains the cause of the current line abnormality according to the analysis result, and generates an emergency analysis result; after receiving feedback signal 2, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment and a preset time limit 2 after the moment, obtains the cause of the current line abnormality according to the analysis result, and generates a verification analysis result;
[0073] Step 5: Generate a response plan based on the emergency analysis results and verification analysis results, and provide an alarm.
[0074] The principle of the above embodiment is: by real-time detection of the operating parameters and environmental information of the wind farm equipment, the data is transmitted to the remote fault analysis end for fault analysis; at the same time, the status of the data transmission line is monitored in real time, feedback signal one and feedback signal two are generated, and line abnormality and recovery information is provided; the remote fault analysis end analyzes the data according to the feedback signal and the preset time limit range, generates emergency analysis results and verification analysis results; finally, a response plan is formulated according to the analysis results, and an alarm service is provided.
[0075] The beneficial effects of the above embodiments are: timely acquisition of changes in equipment status and environmental conditions, early detection of potential problems, use of analysis algorithms to process and analyze data, and rapid and accurate identification and location of fault causes; elimination of communication problems and enhanced communication stability; based on data before and after the abnormal moment, the remote fault analysis terminal generates emergency analysis results and verification analysis results, including information such as fault causes, abnormal parameters and environmental changes, to provide a basic basis for subsequent response measures; measures are taken to resolve abnormal situations to ensure the safe and stable operation of wind farm equipment.
[0076] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, step 1, real-time detection of wind farm equipment operating parameters and wind farm environmental information includes:
[0077] Install operation data collection equipment at key locations of the wind farm to monitor and record the operation parameters of key locations in real time through the operation data collection equipment;
[0078] Environmental data collection equipment is installed at preset peripheral measuring points of the wind farm, and the environmental data at the wind farm is monitored and recorded in real time through the environmental data collection equipment.
[0079] It should be noted that the operating parameters include the current, voltage, temperature, rotation speed, etc. of key position components, and the environmental data include temperature and humidity, wind speed, wind direction, etc.; this embodiment improves the accuracy and real-time performance of equipment detection, and can fully understand the changes in the environment in which the equipment is located, providing a favorable reference basis for the operation and maintenance management of the equipment, and timely adjusting the equipment operation strategy.
[0080] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, step 2, establishing a data transmission line, sending the detected operating parameter data and environmental information to a remote fault analysis terminal for fault analysis, including:
[0081] Performing preliminary processing on the collected operating parameters and environmental data, the preliminary processing process includes data filtering, data integration and data compression, and generating a data set 1 carrying the operating parameters and environmental data;
[0082] Perform screening processing on the data set 1, wherein the screening processing process includes data integrity check and calibration algorithm application, retaining the data set 1 that passes the screening processing, and generating the data set 2;
[0083] Sending the second data set to a remote fault analysis terminal by wireless transmission;
[0084] When the remote fault analysis end receives the data set 2, it names the data set 2 according to the time value of this reception;
[0085] The remote fault analysis terminal compares the various operating parameters in the second data set according to the preset parameter standard range, and generates equipment fault information according to the comparison result;
[0086] The data set 2 named with the time value and the corresponding equipment fault information are stored in the database.
[0087] It should be noted that, by performing preliminary processing on the collected operating parameter data and environmental information, such as filtering, integration and compression, unnecessary noise and redundant information can be removed, thereby improving the accuracy of the data; the filtered and processed data set 2 is sent to the remote fault analysis terminal via wireless transmission, which reduces the possibility of time delay and information loss in transmission and improves the efficiency of data transmission; various operating parameters are compared according to the preset parameter standard range, and equipment fault information is obtained through comparative analysis; because the data set has been filtered and processed, the accuracy and reliability of the data are improved, making the fault analysis results more accurate and reliable; the data set 2 named with the time value and the corresponding equipment fault information are stored in the database, which facilitates the storage and management of data and makes the retrieval and query of historical data and fault information more convenient.
[0088] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, step three, real-time monitoring of the state of the data transmission line, when an abnormality occurs and recovery occurs during the line transmission process, corresponding feedback signal 1 and feedback signal 2 are generated, and sent to the remote fault analysis end, including:
[0089] A signal monitoring device is provided at the connection between the remote fault analysis terminal and the data transmission line to detect the transmission rate data between the remote fault analysis terminal and the data transmission line in real time;
[0090] Plotting the detected transmission rate data as a rate waveform graph;
[0091] Preset a rate standard waveform under normal conditions, obtain a characteristic value in the rate standard waveform, compare it with the detected rate waveform graph, and determine the normal or abnormal state of the line at this moment according to the comparison result;
[0092] When the line is in an abnormal state, a feedback signal 1 is generated and sent to a remote fault analysis terminal;
[0093] When the line is in a normal state, a feedback signal 2 is generated and sent to the remote fault analysis terminal.
[0094] It should be noted that the drawing of the rate waveform diagram and the feature extraction and comparison principle of the rate standard waveform are existing technical means; this embodiment can timely discover and handle line abnormalities, improve fault analysis efficiency, and optimize the operation and maintenance management of wind farm equipment.
[0095] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, real-time monitoring of the state of the data transmission line also includes:
[0096] The packet loss rate and data error rate of the data are obtained during the comparison of various operating parameters in the second data set at the remote fault analysis end;
[0097] Preset the minimum packet loss rate and data error rate;
[0098] When either the packet loss rate or the data error rate exceeds a preset minimum value, it is determined that the line is in an abnormal state.
[0099] It should be noted that the means for detecting the packet loss rate and the data error rate are existing technologies; this embodiment improves the comprehensiveness of abnormality monitoring and avoids misjudgment.
[0100] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, the analysis process of the emergency analysis result includes:
[0101] When the remote fault analysis terminal receives the feedback signal 1, the abnormal time value T0 of the current moment is obtained;
[0102] Calculate the time interval (T0-t1, T0) within the preset time limit t1 before the abnormal time value T0;
[0103] Matching data set 2 corresponding to time interval 1 (T0-t1, T0) in the database;
[0104] The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, draws the parameter change curve of the operating parameters in the time limit interval 1 (T0-t1, T0) and the environmental change curve of the environmental data in the time limit interval 1 (T0-t1, T0); presets a standard slope value K0, and calculates the absolute value |K| of the slope of the parameter change curve and the environmental change curve;
[0105] Calculate the slope multiple n=|K| / K0 of each change curve in turn; sort the parameter change curve and the environment change curve from large to small according to their corresponding slope multiples n; use the equipment or environment data corresponding to the first change curve as the cause of the line abnormality, and generate emergency analysis results.
[0106] It should be noted that in the early stage of line abnormality, by predicting and analyzing a number of data before the abnormal moment, the factors causing the line failure are obtained, which makes it easier for personnel to learn and propose response plans in time; this embodiment improves the security of the communication process of wind farm equipment.
[0107] To further optimize the above solution, please refer to Figure 1 , a wind farm equipment communication method, the analysis process of verifying the analysis result includes:
[0108] When the remote fault analysis end receives the feedback signal 2, it obtains the restoration time value T1 at the current moment and the abnormal time value T0 corresponding to the restoration time value T1;
[0109] Calculate the time interval 2 (T0-t1, T0) and (T1, T1+t2) within the preset time limit 1 t1 before the abnormal time value T0 and the preset time limit 2 t2 after the recovery time value T1;
[0110] Matching a data set 2 corresponding to the time interval 2 (T0-t1, T0) and (T1, T1+t2) in the database;
[0111] The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the parameter change curve of the operating parameters in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2) and the environmental change curve of the environmental data in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2);
[0112] Repeat the analysis process of the emergency analysis results to obtain the ranking result one of the slope multiples n of the parameter change curve and the environment change curve within the time limit interval two;
[0113] In the process of drawing the change curve, the data between time T0 and time T1 are directly connected, and the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve is calculated respectively, and the standard jump slope value I0 is preset;
[0114] Calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curves and environment change curves in this analysis process from large to small according to their corresponding jump slope multiples g, and generate sorting result 2;
[0115] The sorting result 2 is combined with the sorting result 1, and the equipment or environmental data corresponding to the change curve that is ranked first after the combination is used as the cause of the line abnormality to generate a verification analysis result.
[0116] It should be noted that, under normal circumstances, the line will be automatically repaired after an abnormality occurs, and the repair method is usually to change the topology structure and other operations; after the line is restored, the data before and after the abnormal moment is analyzed to further verify the factors that caused the line failure; in this implementation, the jump slope multiples and slope multiples are sorted, and the sorting results are summarized to generate verification analysis results; for example, the factors involved in the analysis include a, b, c, d; when the sorting result is a>b>c>d, it is numbered, a=1, b=2, c=3, d=4; when the sorting result is c>a>b>d, it is numbered, a=2, b=3, c=1, d=4; the sum of the two numbers is a=3, b=5, c=4, d=8; then factor a is the verification analysis result; the verification analysis result and the emergency analysis result are output together to provide guidelines for personnel to prepare response plans; this embodiment further improves the security of the communication process of wind farm equipment, comprehensively understands the changes in the environment in which the equipment is located, provides a favorable reference basis for the operation and maintenance management of the equipment, and adjusts the equipment operation strategy in time.
[0117] In one embodiment, see Figure 2 , a wind farm equipment communication system, comprising:
[0118] Wind farm equipment, which is installed at key locations in the wind farm and preset environmental measurement points, and is used to detect operating parameters and environmental information in real time;
[0119] The remote fault analysis terminal is connected to the wind farm equipment through a data transmission line, and is used to analyze the operating parameters and environmental information from the wind farm equipment, generate equipment fault analysis results for equipment problems, and generate emergency analysis results and verification analysis results for line problems;
[0120] A signal monitoring device is provided at the connection between the remote fault analysis end and the data transmission line, and is used to monitor the transmission rate of the data transmission line in real time to detect the abnormality and recovery of the line, and to generate a feedback signal 1 and a feedback signal 2 accordingly, and send the feedback signal to the remote fault analysis end, so that the remote fault analysis end generates an emergency analysis result and a verification analysis result for the line problem when receiving the feedback signal;
[0121] The alarm processing unit is connected to the remote fault analysis terminal and is used to generate an alarm based on the emergency analysis results and the verification analysis results, and provide a processing solution.
[0122] The remote fault analysis terminal includes:
[0123] A data receiving unit is connected to the data transmission line and is used to perform preliminary processing on the collected operating parameters and environmental data. The preliminary processing process includes data filtering, data integration and data compression to generate a data set 1 carrying the operating parameters and environmental data; the data set 1 is screened. The screening process includes data integrity check and calibration algorithm application. The data set 1 that passes the screening process is retained to generate a data set 2;
[0124] A naming unit, connected to the data receiving unit, for naming the data set 2 according to the time value of this reception;
[0125] The equipment analysis unit is connected to the data receiving unit and is used to compare the various operating parameters in the data set 2 according to the preset parameter standard range, generate equipment fault information according to the comparison result; and store the data set 2 named by the time value and the corresponding equipment fault information in the database.
[0126] The remote fault analysis terminal also includes:
[0127] A feedback signal confirmation unit, which is connected to the signal monitoring device and is used to receive and analyze the type of the feedback signal; when the feedback signal 1 is obtained, an abnormal instruction is generated; when the feedback signal 2 is obtained, a recovery instruction is generated;
[0128] The emergency analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 1, the abnormal time value T0 at this moment is obtained; the time interval 1 (T0-t1, T0) within the preset time limit 1 t1 before the abnormal time value T0 is calculated; the data set 2 corresponding to the time interval 1 (T0-t1, T0) is matched in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the parameter change curve of the operating parameters in the time interval 1 (T0-t1, T0) and the environmental change curve of the environmental data in the time interval 1 (T0-t1, T0); presets a standard slope value K0, and calculates the absolute value |K| of the slope of the parameter change curve and the environmental change curve; calculates the slope multiple n=|K| / K0 of each change curve in turn; sorts the parameter change curve and the environmental change curve from large to small according to their corresponding slope multiples n; takes the equipment or environmental data corresponding to the change curve at the front of the sort as the cause of the line abnormality, and generates the emergency analysis result;
[0129] The verification and analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 2, the recovery time value T1 of the current moment and the abnormal time value T0 corresponding to the recovery time value T1 are obtained; the time interval 2 (T0-t1, T0) and (T1, T1+t2) within the preset time limit 1 t1 before the abnormal time value T0 and the preset time limit 2 t2 after the recovery time value T1 are calculated; the data set 2 corresponding to the time interval 2 (T0-t1, T0) and (T1, T1+t2) is matched in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the parameter change curve of the operating parameters in the time interval 2 (T0-t1, T0) and (T1, T1+t2) and the environmental data in the time interval 2 (T0-t1, T0) and (T1, T1+t2). T1, T1+t2); repeat the analysis process of the emergency analysis results to obtain the parameter change curve and the environmental change curve in the time limit interval two The slope multiple n sorting result one; directly connect the data between time T0 and time T1 in the process of drawing the change curve, and calculate the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve, and preset the standard jump slope value I0; calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curve and the environmental change curve in this analysis process from large to small according to their corresponding jump slope multiples g, and generate a sorting result two; combine the sorting result two with the sorting result one, and use the equipment or environmental data corresponding to the change curve that is ranked first after the combination as the cause of the line abnormality to generate a verification analysis result.
[0130] It should be noted that the present embodiment can timely identify abnormal conditions of wind farm equipment, quickly analyze the causes of faults, provide emergency responses and verify analysis results; through remote fault analysis and response processing, the operational safety and reliability of wind farm equipment can be effectively improved; at the same time, by real-time monitoring of the status of data transmission lines, line abnormalities and recovery conditions can be discovered in a timely manner, further enhancing the stability and reliability of the communication system; it can improve the operating efficiency of wind farm equipment, reduce fault risks, discover and solve problems in advance, and ensure the stable operation and safety of wind farms.
[0131] It should be noted that the system provided in the above embodiment is only illustrated by the division of the above functional modules. In practical applications, the above functions can be assigned to different functional modules as needed, that is, the modules or steps in the embodiments of the present invention can be decomposed or combined. For example, the modules in the above embodiments can be combined into one module, or further divided into multiple sub-modules to complete all or part of the functions described above. The names of the modules and steps involved in the embodiments of the present invention are only for distinguishing the modules or steps, and are not regarded as improper limitations of the present invention.
[0132] The term "comprise" or any other similar term is intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus / device.
[0133] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0134] Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations in the above description of the disclosed embodiments, so that professionals in the field can implement or use the present invention. Various modifications to these embodiments will be obvious to professionals in the field, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features disclosed herein.
Claims
1. A wind farm equipment communication method, characterized in that: The following steps are involved: Step 1: Real-time detection of wind farm equipment operating parameters and wind farm environmental information; Step 2: Establish a data transmission line to send the detected operating parameter data and environmental information to the remote fault analysis terminal for fault analysis; Step 3: monitor the state of the data transmission line in real time, and generate feedback signal 1 and feedback signal 2 when an abnormality occurs and recovery occurs during the line transmission process, and send them to the remote fault analysis terminal; Step 4: After receiving feedback signal 1, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment, obtains the cause of the current line abnormality according to the analysis result, and generates an emergency analysis result; after receiving feedback signal 2, the remote fault analysis terminal analyzes the operating parameter data and environmental information within a preset time limit 1 before the abnormal moment and a preset time limit 2 after the moment, obtains the cause of the current line abnormality according to the analysis result, and generates a verification analysis result; Step 5: Generate a response plan based on the emergency analysis results and verification analysis results, and provide an alarm.
2. A wind farm equipment communication method according to claim 1, characterized in that: The step 1 of performing real-time detection of wind farm equipment operating parameters and wind farm environmental information includes: Installing operation data acquisition equipment at key locations of the wind farm, and using the operation data acquisition equipment to monitor and record operation parameters of the key locations in real time; Environmental data collection equipment is installed at preset peripheral measuring points of the wind farm, and the environmental data at the wind farm is monitored and recorded in real time through the environmental data collection equipment.
3. A wind farm equipment communication method according to claim 1, characterized in that: The second step, establishing a data transmission line, sending the detected operating parameter data and environmental information to the remote fault analysis end for fault analysis includes: Performing preliminary processing on the collected operating parameters and environmental data, the preliminary processing process includes data filtering, data integration and data compression, and generating a data set 1 carrying the operating parameters and environmental data; Perform screening processing on the data set 1, wherein the screening processing process includes data integrity check and calibration algorithm application, retaining the data set 1 that passes the screening processing, and generating the data set 2; Sending the second data set to the remote fault analysis terminal in a wireless transmission manner; When the remote fault analysis terminal receives the data set 2, the data set 2 is named according to the time value of this reception; The remote fault analysis terminal compares the various operating parameters in the second data set according to the preset parameter standard range, and generates equipment fault information according to the comparison result; The data set 2 named with the time value and the corresponding equipment fault information are stored in the database.
4. A wind farm equipment communication method according to claim 1, characterized in that: The step three, monitoring the state of the data transmission line in real time, generating feedback signal 1 and feedback signal 2 correspondingly when an abnormality occurs and recovery occurs during line transmission, and sending them to the remote fault analysis terminal, includes: A signal monitoring device is provided at the connection between the remote fault analysis terminal and the data transmission line, for detecting the transmission rate data between the remote fault analysis terminal and the data transmission line in real time; Plotting the detected transmission rate data as a rate waveform graph; Preset a rate standard waveform under normal conditions, obtain a characteristic value in the rate standard waveform, compare it with the detected rate waveform graph, and determine the normal or abnormal state of the line at this moment according to the comparison result; When the line is in an abnormal state, a feedback signal 1 is generated and sent to the remote fault analysis terminal; When the line is in a normal state, a feedback signal 2 is generated and sent to the remote fault analysis terminal.
5. A wind farm equipment communication method according to claim 1, characterized in that: The real-time monitoring of the state of the data transmission line also includes: Acquiring the packet loss rate and data error rate of the data during the comparison of the operating parameters in the second data set by the remote fault analysis terminal; Preset the minimum packet loss rate and data error rate; When either the packet loss rate or the data error rate exceeds a preset minimum value, it is determined that the line is in an abnormal state.
6. A wind farm equipment communication method according to claim 1, characterized in that: The analysis process of the emergency analysis results includes: When the remote fault analysis terminal receives the feedback signal 1, the abnormal time value T0 of the current time is obtained; Calculate the time interval (T0-t1, T0) within the preset time limit t1 before calculating the abnormal time value T0; Matching a data set 2 corresponding to a time limit interval 1 (T0-t1, T0) in the database; The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, draws a parameter change curve of the operating parameters in the time limit interval 1 (T0-t1, T0) and an environmental change curve of the environmental data in the time limit interval 1 (T0-t1, T0); presets a standard slope value K0, and calculates the absolute value |K| of the slope of the parameter change curve and the environmental change curve; Calculate the slope multiple n=|K| / K0 of each change curve in turn; sort the parameter change curve and the environment change curve from large to small according to their corresponding slope multiples n; use the equipment or environment data corresponding to the first change curve as the cause of the line abnormality, and generate emergency analysis results.
7. A wind farm equipment communication method according to claim 1, characterized in that: The analysis process of verifying the analysis results includes: When the remote fault analysis terminal receives the second feedback signal, it obtains the restoration time value T1 at the current moment and the abnormal time value T0 corresponding to the restoration time value T1; Calculate the time interval two (T0-t1, T0) and (T1, T1+t2) within the preset time limit one t1 before the abnormal time value T0 and within the preset time limit two t2 after the recovery time value T1; Matching a data set 2 corresponding to a time interval 2 (T0-t1, T0) and (T1, T1+t2) in the database; The remote fault analysis terminal analyzes the operating parameters and environmental data in each data set 2 in turn, and draws a parameter change curve of the operating parameters in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2) and an environmental change curve of the environmental data in the time limit interval 2 (T0-t1, T0) and (T1, T1+t2); Repeat the analysis process of the emergency analysis results to obtain the ranking result one of the slope multiples n of the parameter change curve and the environment change curve within the time limit interval two; In the process of drawing the change curve, the data between time T0 and time T1 are directly connected, and the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve is calculated respectively, and the standard jump slope value I0 is preset; Calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curves and environment change curves in this analysis process from large to small according to their corresponding jump slope multiples g, and generate sorting result 2; The sorting result 2 is combined with the sorting result 1, and the equipment or environmental data corresponding to the change curve that is ranked first after the combination is used as the cause of the line abnormality to generate a verification analysis result.
8. A wind farm equipment communication system, based on a wind farm equipment communication method according to claims 1-7, characterized in that: include: Wind farm equipment, which is installed at key locations in the wind farm and preset environmental measurement points, and is used to detect operating parameters and environmental information in real time; A remote fault analysis terminal, which is connected to the wind farm equipment via a data transmission line, and is used to analyze operating parameters and environmental information from the wind farm equipment, generate equipment fault analysis results for equipment problems, and generate emergency analysis results and verification analysis results for line problems; A signal monitoring device, which is arranged at the connection between the remote fault analysis end and the data transmission line, and is used to monitor the transmission rate of the data transmission line in real time to detect the abnormality and recovery of the line, and to generate feedback signal 1 and feedback signal 2 accordingly, and send the feedback signal to the remote fault analysis end, so that the remote fault analysis end generates emergency analysis results and verification analysis results for the line problem when receiving the feedback signal; An alarm processing unit is connected to the remote fault analysis terminal and is used to generate an alarm according to the emergency analysis result and the verification analysis result, and provide a processing solution.
9. A wind farm equipment communication system according to claim 1, characterized in that: The remote fault analysis terminal comprises: A data receiving unit, which is connected to the data transmission line, is used to perform preliminary processing on the collected operating parameters and environmental data, wherein the preliminary processing process includes data filtering, data integration and data compression, and generates a data set 1 carrying the operating parameters and environmental data; performs screening processing on the data set 1, wherein the screening processing process includes data integrity check and calibration algorithm application, retains the data set 1 that passes the screening processing, and generates a data set 2; A naming unit, connected to the data receiving unit, for naming the data set 2 according to the time value of this reception; The equipment analysis unit is connected to the data receiving unit and is used to compare the various operating parameters in the data set 2 according to the preset parameter standard range, generate equipment fault information according to the comparison result; and store the data set 2 named with the time value and the corresponding equipment fault information in the database.
10. A wind farm equipment communication system according to claim 1, characterized in that: The remote fault analysis terminal also includes: A feedback signal confirmation unit, connected to the signal monitoring device, for receiving and analyzing the type of the feedback signal; generating an abnormal instruction when feedback signal 1 is obtained, and generating a recovery instruction when feedback signal 2 is obtained; The emergency analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 1, it obtains the abnormal time value T0 at the current moment; calculates the time interval 1 (T0-t1, T0) within the preset time limit 1 t1 before the abnormal time value T0; matches the data set 2 corresponding to the time interval 1 (T0-t1, T0) in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the operating parameters in the time interval 1 ( The parameter change curve within the time interval (T0-t1, T0) and the environmental change curve of the environmental data within the time interval (T0-t1, T0); preset a standard slope value K0, and calculate the absolute value of the slope of the parameter change curve and the environmental change curve |K|; calculate the slope multiple n=|K| / K0 of each change curve in turn; sort the parameter change curve and the environmental change curve from large to small according to their corresponding slope multiples n; take the equipment or environmental data corresponding to the first change curve as the cause of the line abnormality, and generate emergency analysis results; A verification and analysis unit is connected to the feedback signal confirmation unit and the database; when the remote fault analysis end receives the feedback signal 2, it obtains the recovery time value T1 at this moment and the abnormal time value T0 corresponding to the recovery time value T1; calculates the time interval 2 (T0-t1, T0) and (T1, T1+t2) within the preset time limit 1 t1 before the abnormal time value T0 and the preset time limit 2 t2 after the recovery time value T1; matches the data set 2 corresponding to the time interval 2 (T0-t1, T0) and (T1, T1+t2) in the database; the remote fault analysis end analyzes the operating parameters and environmental data in each data set 2 in turn, and draws the parameter change curve of the operating parameters in the time interval 2 (T0-t1, T0) and (T1, T1+t2) and the environmental data in the time interval 2 (T0-t1, T0) and (T1, T1+t2). t1, T0) and the environmental change curve within (T1, T1+t2); repeat the analysis process of the emergency analysis results to obtain the slope multiple n ranking result one of the parameter change curve and the environmental change curve within the time limit interval two; directly connect the data between time T0 and time T1 in the process of drawing the change curve, and calculate the absolute value |I| of the jump slope of the curve at time T0 and time T1 in each change curve respectively, and preset the standard jump slope value I0; calculate the jump slope multiple g=|I| / I0 of each change curve in turn; sort the parameter change curve and the environmental change curve in this analysis process from large to small according to their corresponding jump slope multiples g, and generate a ranking result two; combine the ranking result two with the ranking result one, and take the equipment or environmental data corresponding to the change curve that is ranked first after the combination as the cause of the line abnormality, and generate a verification analysis result.