Casting production line and casting production method

By using AGV trolleys and handling robots for automated transportation and online inspection in the casting production line, the line shutdown problems caused by equipment failure and the labor intensity and quality fluctuations caused by manual transportation are solved, and the automation and continuity of casting production are achieved, improving the improvement of the production of castings The degree of automation and product quality of the production line.

CN119035492APending Publication Date: 2024-11-29CHONGQING CHANGAN AUTOMOBILE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411130139.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing casting production line will cause the entire production line to be shut down when equipment failures, and the casting logistics between processes rely on manual transportation, resulting in high labor intensity, high cost and large fluctuations in quality.

Method used

A casting production line was designed, using AGV trolleys and handling robots to automatically transfer and process castings, including side-by-side arrangement of multiple die-casting units and post-processing units and multiple functional buffer zones to ensure that the castings can be automatically transferred to storage in case of equipment failure. Area, avoid line shutdowns and solve burr and dimensional correction problems through online inspection and automated cleaning.

Benefits of technology

It realizes uninterrupted and continuity of casting production, reduces labor intensity and cost, improves the degree of automation of the production line and the consistency of product quality, and avoids overall production suspension caused by failure of a single equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119035492A_ABST
    Figure CN119035492A_ABST
Patent Text Reader

Abstract

The invention provides a casting production line and a casting production method, the casting production line comprises a die-casting unit, the die-casting unit comprises a plurality of processing devices, and all the processing devices are sequentially arranged along a preset die-casting process sequence; and the transfer unit can transfer the first casting parts on any one of the processing equipment to a storage area and transfer the first casting parts from the storage area to the die-casting unit or a production unit at the downstream of the die-casting unit. The problem of overall line stop caused by faults of a certain processing device of the die-casting unit is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of production casting technology, and in particular to a casting production line and a casting production method. Background Art

[0002] At present, the existing integrated casting production line for large integrated castings in China adopts the die-casting unit for processing. The die-casting unit has a fully automated cooling and pouring system for removing castings. The casting unloading place of the die-casting unit is equipped with a manual cleaning station to complete the cleaning of casting burrs. After cleaning, manual correction is used to complete the size correction work. There are the following technical problems: when a certain equipment in the production line fails, it will result in the whole production line stopping. Summary of the invention

[0003] In view of this, one of the purposes of the embodiments of the present application is to provide a casting production line that can improve the problem that when a certain device fails, the entire production line will be shut down.

[0004] In order to achieve the above technical objectives, the technical solutions adopted in this application are as follows:

[0005] In the first aspect, the present application embodiment provides a

[0006] A casting production line, comprising:

[0007] a die casting cell, including multiple processing equipment;

[0008] A transfer unit is used to transfer the first cast part on any of the processing equipment to a storage area, and to transfer the first cast part from the storage area to the die casting unit or a production unit downstream of the die casting unit.

[0009] According to the above technical means, since the transfer unit can transfer the first cast part on any processing equipment to the storage area, when a processing equipment or a production unit downstream of the die-casting unit fails, the transfer unit can transfer the first cast part before the faulty processing equipment to the storage area, thereby avoiding the entire line shutdown due to the failure of a processing equipment of the die-casting unit or the failure of the downstream production unit.

[0010] Further, the die-casting unit includes a first processing center and a second processing center, the first processing center includes a part of the processing equipment, the second processing center includes another part of the processing equipment, and the second processing center is located downstream of the first processing center;

[0011] When the second machining center fails, the transfer unit transfers the first cast part of the first machining center to the storage area, and after the second machining center recovers from the failure, transfers the first cast part of the storage area to the second machining center.

[0012] According to the above technical means, the problem of the die-casting unit being shut down due to a failure of the processing equipment in the second machining center is avoided.

[0013] Further, the transfer unit includes a first handling robot and a first AGV trolley, and the processing equipment of the first processing center is located within the gripping range of the first handling robot;

[0014] The first machining center also includes an abnormal parts station;

[0015] When the second machining center fails, the first handling robot transfers the first casting part of the first machining center to the abnormal part station, and the first AGV vehicle transfers the first casting part from the abnormal part station to the storage area;

[0016] After the second machining center recovers from the fault, the first AGV transfers the first casting part from the storage area to the second machining center.

[0017] Furthermore, the casting production line also includes:

[0018] a post-processing unit, located downstream of the die-casting unit, for post-processing the first cast part into a second cast part;

[0019] When the post-processing unit is blocked, the transfer unit transfers the first cast part of the second machining center to the storage area; when the post-processing unit is unblocked, the transfer unit transfers the first cast part from the storage area to the post-processing unit.

[0020] According to the above technical means, the problem of the post-processing unit being blocked and the die-casting unit being unable to produce normally due to the inability to feed materials can be avoided.

[0021] Further, the transfer unit includes a second handling robot and a second AGV trolley, and the processing equipment of the second processing center is located within the gripping range of the second handling robot;

[0022] When the head end of the post-processing unit is blocked, the second handling robot transfers the first casting part of the second processing center to the second AGV trolley, and the second AGV trolley transfers the first casting part to the storage area;

[0023] After the head end of the post-processing unit is unblocked, the second AGV trolley transfers the first casting part to the post-processing unit.

[0024] Further, the post-processing unit comprises:

[0025] A post-processing module, used for post-processing the first casting part into a second casting part;

[0026] The detection module is used to detect whether there are defects in the appearance and / or size of the second casting part.

[0027] Further, the transfer unit includes a third AGV trolley;

[0028] The storage area includes a finished product storage area and an inspected product storage area. The third AGV trolley transfers the second cast parts with defects in appearance or size to the inspected product storage area, and the third AGV trolley transfers the second cast parts with no defects in appearance and size to the finished product storage area.

[0029] Further, the post-processing module includes:

[0030] A trimming machine, used for trimming the first casting part on the on-line pickup station;

[0031] A cleaning device, located downstream of the trimming machine, is used to remove burrs from the first casting part after the trimming process;

[0032] A correction machine, located downstream of the cleaning device, is used to correct the size of the first casting part after the burr is cleaned to obtain a second casting part;

[0033] relay station;

[0034] Transfer slide;

[0035] A trimming and handling robot, used for transferring the first casting part from the on-line pickup station to the trimming machine, and the trimming and handling robot is also used for transferring the first casting part after trimming from the trimming machine to the transfer table;

[0036] A cleaning and transporting robot, used for transferring the first casting part on the transfer table to the cleaning device, and the cleaning and transporting robot is also used for transferring the first casting part after burr cleaning to the orthopedic machine;

[0037] The orthopedic handling robot is used for transferring the second casting part to the inspection module.

[0038] According to the above technical means, the automated production of the post-processing unit is realized.

[0039] Further, the first machining center includes a die-casting host, a cooling water tank, a defect detection device and a laser coding device;

[0040] The second processing center includes a laser coding device, a delimbing machine, a hydraulic shear and a framing station.

[0041] Furthermore, the transfer unit also includes a third AGV trolley, which is used to transfer the first cast part on the die-casting unit to a post-processing unit.

[0042] Furthermore, there are multiple die-casting units and multiple post-processing units, and the die-casting units and the post-processing units are arranged side by side, and the die-casting units and the post-processing units correspond to each other one by one.

[0043] In the second aspect, the embodiment of the present application proposes a casting production method, based on the above-mentioned casting production line, the method is specifically as follows:

[0044] Based on the die casting unit, a first cast part is produced;

[0045] framing the first casting part;

[0046] The transfer unit transfers the framed first casting part to the post-processing unit, and the post-processing unit post-processes the first casting part into a second casting part.

[0047] Further, the manufacturing of the first casting part based on the die casting unit includes:

[0048] Die casting on-line: Aluminum is hydraulically formed into the first casting part using a die casting machine and corresponding molds;

[0049] Defect detection: After the first handling robot takes out the first casting part, it will check the vacuum branches and runners to ensure that there are no residual vacuum branches in the mold;

[0050] Casting cooling: The first handling robot places the first casting part into the cooling water tank for complete immersion;

[0051] Coding and engraving: The first handling robot puts the cooled first casting part into the laser coding device to engrave the plain code and QR code;

[0052] Debranching: The second handling robot transfers the engraved first casting part to the hydraulic shears, and then puts it into the debranching machine to punch out the vacuum branches.

[0053] Further, the post-processing unit post-processes the first casting part into the second casting part, including:

[0054] Runner cleaning: The trimming and handling robot puts the first casting part into the trimming machine, and the trimming machine cooperates with the corresponding trimming mold to punch and cut the runner;

[0055] Burr removal: The cleaning and handling robot takes the first casting part with the runner cleaned from the transfer table, and then puts it into the cleaning equipment to remove the burrs of the first casting part;

[0056] Orthopedics: The orthopedic handling robot takes out the first cast part that has been cleaned of burrs from the transfer slide, and then puts it into the orthopedic machine, which corrects the size of the first cast part to form a second cast part.

[0057] Further, after the post-processing unit post-processes the first casting part into a second casting part, the method further includes:

[0058] Blue light inspection: placing the second casting part into the blue light dimension inspection device to determine whether the second casting part has dimension defects;

[0059] Visual inspection: Take out the second casting part after the size inspection and put it into the visual appearance inspection equipment to determine whether the second casting part has appearance defects;

[0060] Post-processing framing: After the framing handling robot takes out the second cast part from the visual appearance inspection equipment, it transfers the second cast part with defects in appearance or size to the inspection frame according to the judgment results of size inspection and appearance inspection, and the second cast part in the inspection frame is transferred by the transfer unit to the processing buffer area in the storage area; the second cast part with no defects in appearance and size is transferred to the qualified frame, and the second cast part in the qualified frame is transferred by the transfer unit to the finished product buffer area in the storage area.

[0061] The invention adopting the above technical solution has the following advantages:

[0062] In the technical solution provided in the present application, the transfer unit can transfer the first cast part on any processing equipment to the storage area. Therefore, when any processing equipment fails, or the production unit downstream of the die-casting unit fails, the transfer unit can transfer the first cast part on the processing equipment before the fault handling equipment to the storage area, avoiding the problem of overall line shutdown caused by the failure of one or more processing equipment. When the fault handling equipment or the production unit downstream of the die-casting unit recovers from the fault, the transfer unit transfers the first cast part from the storage area to the die-casting unit, ensuring the uninterrupted and continuous production of the die-casting unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] The present application may be further described by the non-limiting embodiments given in the accompanying drawings. It should be understood that the following drawings only illustrate certain embodiments of the present application and therefore should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings may be obtained based on these drawings without creative effort.

[0064] Figure 1 This is an overall structural diagram provided for Example 1 of the present application.

[0065] Figure 2 This is a structural diagram of the die-casting unit provided in Example 1 of the present application.

[0066] Figure 3 This is a structural diagram of the post-processing unit provided in Example 1 of the present application.

[0067] Figure 4 This is a diagram of the storage area structure provided in Example 1 of the present application.

[0068] Figure 5 This is a flow chart of the casting production method proposed in Example 2.

[0069] Icon: 1-die casting unit; 2-transfer unit; 3-post-processing unit; 4-storage area;

[0070] 101-die casting machine; 102-spraying robot; 103-cooling water tank; 104-cache rack; 105-waste parts station; 106-abnormal parts station; 107-defect detection device; 108-laser coding device; 109-delimbing machine; 110-hydraulic shears; 112-framing station; 113-sampling inspection table;

[0071] 201-first handling robot; 202-second handling robot;

[0072] 301-online pickup station; 302-trimming machine; 303-trimming handling robot; 304-transfer table; 305-cleaning handling robot; 306-cleaning equipment; 307-transfer slide; 308-blue light size detection equipment; 309-orthopedic machine; 310-orthopedic handling robot; 311-visual appearance inspection equipment; 312-framing handling robot; 313-sampling table; 314-offline framing station;

[0073] 401- post-processing buffer area; 402- pending inspection buffer area; 403- finished product buffer area; 404- abnormal product buffer area. DETAILED DESCRIPTION

[0074] The present application will be described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that in the drawings or descriptions, similar or identical parts use the same figure numbers, and the implementation methods not shown or described in the drawings are forms known to ordinary technicians in the relevant technical field. In the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0075] In this embodiment, the prior art still has the following problems: the process between the die-casting unit and the manual cleaning equipment is disconnected, the casting logistics between the processes are manually transferred, the manual labor intensity is high, and the working environment is poor; the manual cleaning station and size assurance are manually handled, the quality fluctuates greatly, and the labor cost is high.

[0076] For example, Chinese patent CN117086304A proposes an engine aluminum alloy cylinder casting production line and casting method, which introduces an engine cylinder automated production line, including a die-casting unit, a heat treatment unit, and a post-processing unit. Conveyor lines are used between processes, and manual forklifts are used to transfer castings from the framing area to the casting storage area. The following technical problems exist: the transmission method of the conveyor line cannot meet the transportation of large integrated castings; when a fault occurs at the end of the conveyor line, the entire die-casting unit will be shut down; and the transportation of castings by manual forklifts will inevitably increase labor costs.

[0077] Example 1

[0078] Based on the above problems, the present application proposes a casting production line, such as Figure 1 As shown, the casting production line proposed in this embodiment includes: multiple die-casting units 1, AGV carts 2, post-processing units 3, and storage areas 4, which are arranged vertically; multiple die-casting units 1 are arranged horizontally, the post-processing units 3 and the storage area 4 are arranged horizontally, and the AGV cart 2 shuttles between the various units to transfer castings; adopting the above-mentioned technical scheme, by arranging multiple die-casting units 1 and post-processing units 3, when a device in a die-casting unit 1 or a post-processing unit 3 fails or needs to be repaired, other die-casting units 1 and post-processing units 3 can work normally, which can reduce or eliminate the problem of line stoppage caused by the failure of a certain equipment.

[0079] In this embodiment, the die-casting unit 1 includes a plurality of processing devices, all of which are arranged in sequence along a preset die-casting process sequence, and also includes a transfer unit capable of transferring the first cast part on any processing device to the storage area 4, and transferring the first cast part from the storage area 4 to the die-casting unit 1.

[0080] When the die-casting unit 1 executes the preset die-casting process, the original casting passes through each processing equipment in turn to complete the die-casting. For better description, in this embodiment, the casting processed on any processing equipment is called the first casting part, and each processing equipment completes at least one process of the preset die-casting process. When a processing equipment of the die-casting unit 1 fails, since the transfer unit can transfer the first casting part on any processing equipment to the storage area 4, the transfer unit transfers the first casting part processed on the previous processing equipment of the fault processing equipment to the storage area 4, so that the first casting part is not piled up on the production line of the die-casting unit 1, and the parts before and after the fault processing equipment can be produced normally. After the fault is restored, the transfer unit transfers the first casting part in the storage area 4 to the die-casting unit 1 again, and the corresponding die-casting process is carried out again.

[0081] In at least one embodiment, the control process based on the above technical solution can be set as follows:

[0082] ①PLC receives a signal that a processing device is faulty and marks the processing device;

[0083] ② When the processing equipment before the fault processing equipment completes processing, the transfer unit is controlled to transfer the corresponding first casting part to the storage area 4;

[0084] ③ After the processing equipment recovers from the fault, the transfer unit is controlled to transfer the first cast part in the storage area 4 to the marked processing equipment to continue processing.

[0085] In at least one embodiment, Figure 2 As shown, the die-casting unit 1 includes a die-casting main machine 101, a spraying robot 102, a cooling water tank 103, a cache rack 104, a scrap part station 105, an abnormal part station 106, a defect detection device 107, a laser coding device 108, a debranching machine 109, a hydraulic shear 110, a framing station 111 and a sampling table 112. The processing equipment of the die-casting unit 1 includes the die-casting main machine 101, the spraying robot 102, the cooling water tank 103, the defect detection device 107, the laser coding device 108, the debranching machine 109, the hydraulic shear 110 and the framing station 111, which are arranged in sequence according to a preset die-casting process.

[0086] In at least one embodiment, the die casting unit 1 includes a first machining center and a second machining center, the first machining center includes a portion of the processing equipment, the second machining center includes another portion of the processing equipment, and the second machining center is located downstream of the first machining center.

[0087] The first processing center includes a die-casting main machine 101, a spraying robot 102, a cooling water tank 103, a cache rack 104, a scrap part station 105, an abnormal part station 106, a defect detection device 107 and a laser coding device 108, and the second processing center includes a delimbing machine 109, a hydraulic shear 110, a framing station 111 and a sampling table 112.

[0088] When the second machining center fails, the transfer unit 2 transfers the first cast part of the first machining center to the storage area 4, and after the failure of the second machining center is restored, the first cast part of the storage area 4 is transferred to the second machining center.

[0089] According to the above technical solution, when the processing equipment of the second processing center fails, the transfer unit 2 can transfer the first casting parts completed by the first processing center to the storage area 4 in time without causing the entire production line to stop.

[0090] In at least one embodiment, the transfer unit 2 includes a first handling robot 201 and a first AGV cart. All processing equipment of the first machining center are within the grasping range of the first handling robot 201. At the same time, the die-casting main machine 101, the spraying robot 102, the cooling water tank 103, the cache rack 104, the scrap parts station 105, the abnormal parts station 106, the defect detection device 107 and the laser coding device 108 are all within the grasping range of the first handling robot 201. The first handling robot 201 can grab the first casting part on any of the above equipment.

[0091] In this embodiment, the first handling robot 201 is arranged in the center, and the die-casting main machine 101, the spraying robot 102, the cooling water tank 103, the cache rack 104, the scrap parts station 105, the abnormal parts station 106, the defect detection device 107 and the laser coding device 108 are arranged around the first handling robot 201, so that all of the above-mentioned equipment are within the grasping range of the first handling robot 201.

[0092] In at least one embodiment, when a processing device of the second processing center fails, the first handling robot 201 directly places the first casting part processed by the first processing center to the abnormal part station 107, and the first AGV trolley transports the first casting part of the abnormal part station 107 to the storage area 4. When the processing equipment of the second processing center recovers from the failure, the first AGV trolley transports the castings in the storage area 4 to the sampling station 112 and processes them online again, thereby avoiding the risk of the die-casting unit 1 stopping due to the failure of the processing equipment of the second processing center. With the above technical solution, the die-casting unit 1 can realize the automatic production and transportation of castings.

[0093] The casting line in this embodiment further includes a post-processing unit 3, which is located downstream of the die-casting unit 1 and post-processes the first cast part into a second cast part.

[0094] The post-processing unit 3 in this embodiment is used to post-process the first casting part processed by the die-casting unit 1 to form a second casting part.

[0095] In this embodiment, after the first casting part is framed at the framing station 111, the transfer unit 2 transfers the framed first casting part to the head end of the post-processing unit 3 to perform post-processing on the first casting part. During the transfer process, if a device failure of the post-processing unit 3 causes blockage at the head end of the post-processing unit 3, in order to overcome this problem, this embodiment adopts the following method:

[0096] When the post-processing unit 3 is blocked, the transfer unit 2 transfers the first cast part of the second machining center to the storage area 4 . When the post-processing unit 3 is unblocked, the transfer unit 2 transfers the first cast part from the storage area 4 to the post-processing unit 3 .

[0097] In at least one embodiment, the control process that can implement the above technical solution is:

[0098] ①PLC receives the blocking signal from the head end of post-processing unit 3;

[0099] ②PLC controls the transfer unit 2 to transfer the first casting part to the storage area 4;

[0100] ③ When receiving the signal that the blocking fault of the faulty post-processing unit 3 is cleared, the PLC controls the transfer unit 2 to transfer the first cast part to the head end of the post-processing unit 3.

[0101] In at least one embodiment, the blockage of the head end of the post-processing unit 3 can be determined by the following technical solution: an infrared receiving sensor is set at a certain position of the equipment at the head end of the post-processing unit 3. When the first cast parts at the head end of the post-processing unit 3 are accumulated to a certain number due to a certain equipment failure of the post-processing unit 3 or other reasons, the infrared receiving sensor will be blocked. When the infrared receiving sensor cannot receive infrared rays, a high-level signal is issued, and the level signal is a blockage signal. When the faulty equipment of the post-processing unit 3 is resolved so that the post-processing unit 3 can perform the post-processing process normally, the first cast parts accumulated at the head end of the post-processing unit 3 are processed one by one, thereby reducing the number of the first cast parts at the head end of the post-processing unit 3, until the infrared receiving sensor can receive infrared rays, a low-level signal is issued, and the level signal is a blockage release signal.

[0102] In this embodiment, the transfer unit 2 includes a second handling robot 202 and a second AGV trolley, and the processing equipment of the second processing center is located within the gripping range of the second handling robot. When the post-processing unit 3 is blocked, the second handling robot 202 transfers the first casting part of the second processing center to the second AGV trolley, and the second AGV trolley transfers the first casting part to the storage area 4. After the post-processing unit 3 is unblocked, the second AGV trolley transfers the first casting part to the post-processing unit.

[0103] In this embodiment, the second handling robot 202 is arranged in the center, and the delimbing machine 109, hydraulic shears 110, framing station 111 and sampling table 112 of the second processing center are arranged around the second handling robot 202, so that the above-mentioned equipment are all located within the grasping range of the second handling robot 202.

[0104] The post-processing unit 3 includes a post-processing module and a detection module. The post-processing module is used to post-process the first casting part into a second casting part, and the detection module is used to detect whether there are defects in the appearance and / or size of the second casting part. The detection module is located downstream of the post-processing module.

[0105] like Figure 3 As shown, the post-processing unit 3 includes an online pickup station 301, a trimming machine 302, a trimming and handling robot 303, a transfer table 304, a cleaning and handling robot 305, a cleaning device 306, a blue light size detection device 307, an orthopedic machine 308, an orthopedic handling robot 309, a visual appearance detection device 310, a framing and handling robot 311, a sampling table 312, and an offline framing station 313.

[0106] like Figure 4 As shown, the storage area 4 includes a post-processing buffer area 401, a to-be-inspected product buffer area 402, a finished product buffer area 403, and an abnormal product buffer area 404. Each buffer area is used to store different types of parts.

[0107] Therefore, the post-processing module includes a trimming machine 302, a trimming and handling robot 303, a transfer table 304, a cleaning and handling robot 305, a cleaning device 306, an orthopedic machine 308, an orthopedic handling robot 309 and a framing and handling robot 311, and the detection module includes a blue light size detection device 307 and a visual appearance detection device 310.

[0108] Storage area 4 includes a finished product buffer area 403 and an inspected product buffer area 402. The third AGV trolley transfers the second cast parts with defects in appearance or size to the inspected product buffer area, and the third AGV trolley transfers the second cast parts with no defects in appearance and size to the finished product buffer area.

[0109] The finished product buffer area 403 is used to store qualified second cast parts, and the to-be-inspected product buffer area 402 is used to store unqualified second cast parts.

[0110] In this embodiment, the post-processing module 3 includes the following equipment:

[0111] The trimming machine 302 is used for trimming the first casting part on the online pickup station 301;

[0112] A cleaning device 306, located downstream of the trimming machine 302, is used to remove burrs from the first casting part after the trimming process;

[0113] The correction machine 309 is located downstream of the cleaning device 306 and is used to correct the size of the first casting part after the burr cleaning to obtain a second casting part;

[0114] Relay station 304;

[0115] Transfer slide 307;

[0116] The trimming and handling robot 303 is used to transfer the first casting part of the online pickup station 301 to the trimming machine 302. The online pickup station 301 is located at the head end of the post-processing unit 3. The trimming and handling robot 303 is also used to transfer the first casting part after the trimming process from the trimming machine 302 to the transfer table 304;

[0117] The cleaning and transporting robot 305 is used to transfer the first cast part from the transfer table 304 to the cleaning device 306 . The cleaning and transporting robot 305 is also used to transfer the first cast part after burr cleaning to the orthopedic machine 309 .

[0118] The orthopedic handling robot 310 is used to transfer the second casting part to the inspection module.

[0119] The preset post-processing process using the above technical solution is: the trimming and handling robot 303 is responsible for placing the casting at the online pickup station 301 into the trimming machine 302 for trimming. After the trimming is completed, the trimming and handling robot 303 places the casting into the transfer table 304. The cleaning and handling robot 305 places the first casting part of the transfer table 304 into the cleaning device 306 for burr removal. After the cleaning is completed, the cleaning and handling robot 305 places the first casting part into the transfer slide 307. The orthopedic handling robot 310 places the first casting part of the transfer slide 307 into the orthopedic machine 309 for size correction. After the correction is completed, the orthopedic handling robot 310 places the casting The casting is placed in the blue light size detection device 308 for size detection. After the detection is completed, the casting is placed in the visual appearance detection device 311 by the orthopedic handling robot 309 for casting appearance detection to identify casting defects. After the detection is completed, the framing handling robot 312 places it into the qualified product frame or the inspection-to-be-inspected product frame in the offline framing station 313 according to the detection results. The castings that have passed the inspection of the blue light size detection device 308 and the visual appearance detection device 311 are transferred by the AGV car 2 to the finished product buffer area 403. Any unqualified castings by the blue light size detection device 308 and the visual appearance detection device 311 are transferred by the AGV car 2 to the inspection-to-be-inspected product buffer area 402.

[0120] This embodiment can solve the problems of high labor intensity and fluctuations in production line quality by reasonably arranging the aluminum alloy body integrated casting production line, and can realize the automatic transmission of casting logistics between the die-casting unit, the post-processing unit, and the finished castings from the offline to the storage area. By setting up multiple functional cache areas, it can solve the problem of the die-casting unit's non-output shutdown caused by the failure of a single device, and improve the automation level of the aluminum alloy body integrated casting production line. The aluminum alloy body integrated casting production line proposed in this embodiment has a high degree of automation, which is reflected in the following points: 1. AGV is used between each process to realize the automatic transmission of castings, replacing the conventional forklift method of transporting castings; 2. The burrs of castings are cleaned by fully automated equipment instead of manual cleaning; multiple die-casting units and multiple post-processing units are arranged with multiple functional cache areas, and the die-casting host can still maintain continuous production when a certain device fails, ensuring that high-value processes create value.

[0121] This embodiment can reduce or eliminate the problem of line stoppage caused by failure of a certain equipment, improve the degree of automation of the aluminum alloy body integrated casting production line, and has the characteristics of high degree of automation, high consistency of product quality, large number of staff reductions, reduced labor intensity and ability to achieve non-stop production of the entire line.

[0122] The present invention solves the problem of how to automatically transmit the casting logistics between the die-casting unit 1, the post-processing unit 3, and the buffer area 4 and the whole line shutdown caused by the failure of a single device, which is mainly reflected in the following points: 1. The AGV trolley 2 is used between each process to realize the automatic transmission of castings, replacing the conventional forklift method of transporting castings; 2. The burrs of the castings integrated with the body are cleaned by the equipment in a fully automatic manner instead of manually; 3. Multiple die-casting units 1 and post-processing units 3 are arranged side by side in an "II" type, and a buffer area 4 is set between each process. When a certain device fails, the device on the other side can operate normally; 4. The casting size detection is equipped with an online blue light size detection device 307, and the casting appearance detection is equipped with an online visual appearance detection device 310, so as to realize the full-automatic processing and detection integration of the whole line, and the whole line can realize unmanned processing and production.

[0123] Example 2

[0124] This embodiment proposes a casting production method, which is based on the casting production line proposed in Example 1. Figure 1 As shown, the casting production line includes a plurality of die-casting units 1, a post-processing unit 3, and a transfer unit 2; the plurality of die-casting units 1 and the plurality of post-processing units 3 are arranged vertically, the post-processing unit 3 is located downstream of the plurality of die-casting units 1, the plurality of die-casting units 1 are arranged in sequence at intervals in the left-right direction, and the transfer unit 2 is used to transport the castings output by the plurality of die-casting units to the plurality of post-processing units.

[0125] The die-casting unit in this embodiment includes a die-casting main unit 101, a defect detection device 107, a cooling water tank 103, a buffer rack 104, a laser coding device 108, a hydraulic shear 110, a debranching machine 109, a framing station 112, and a sampling table 113; the die-casting main unit 101, the defect detection device 107, and the laser coding device 108 are arranged on one side of the first handling robot 201, and the cooling water tank 103 and the buffer rack 104 are arranged on the other side of the first handling robot 201, and are all located within the grasping range of the first handling robot 201; the hydraulic shear 110, the debranching machine 109, the framing station 112, and the sampling table 113 are arranged around the periphery of the second handling robot 202 and are all located within the grasping range of the second handling robot 202.

[0126] The post-processing unit 3 includes a trimming machine 302, a trimming and handling robot 303, an online pickup station 301, a transfer table 304, a cleaning device 306, a cleaning and handling robot 305, a transfer slide 307, an orthopedic machine 309, an orthopedic handling robot 310, a blue light size detection device 308, a visual appearance detection device 311, a framing and handling robot 312, and a sampling table 313. They are arranged according to vertical processes to complete the casting removal system, burr cleaning, casting orthopedics, size detection, and defect detection processes; multiple robots are used to complete the loading and unloading of all processes.

[0127] The storage area includes a post-processing buffer area 401, a waiting-to-be-inspected product buffer area 402, a finished product buffer area 403, and an abnormal product buffer area 404, which are used to balance the abnormal fault processing of each unit and improve the output of the entire line.

[0128] Based on the above, if Figure 5 As shown, the method includes:

[0129] S1, die casting on line: using the die casting host 101 and the corresponding mold, the aluminum is hydraulically formed into an integrated casting, and the integrated casting is the first casting part;

[0130] S2. Casting defect detection: After the first handling robot 201 takes out the first casting part, it detects the vacuum branches and runners to ensure that there are no residual vacuum branches in the mold;

[0131] S3, casting cooling: the first handling robot 201 puts the first casting part into the cooling water tank 103 for complete immersion, so as to achieve rapid cooling of the high-temperature casting;

[0132] S4, coding and engraving: the first handling robot 201 puts the cooled first casting part into the laser coding device 109 to engrave a plain code and a two-dimensional code;

[0133] S5, debranching: the second handling robot 402 directly grabs the first cast part that has been engraved, completes the vacuum branch segmentation task in the hydraulic shear 111, and then puts it into the debranching machine to punch and cut the vacuum branch;

[0134] S6, pre-processing and framing: the second handling robot 402 puts the first casting part with the branches removed into the framing station 113 for framing. After the framing is completed, the first AGV trolley transports it to the post-processing buffer area 401 or the online pickup station 301. The quality sampling is carried out by the second handling robot 400 to the sampling inspection station 114;

[0135] S7, runner cleaning: the trimming and handling robot 303 grabs the first casting part from the online pickup station 301 and puts it into the trimming machine 302, and the trimming machine 302 cooperates with the corresponding trimming mold to punch and cut the runner;

[0136] S8, burr cleaning: the cleaning and transporting robot 305 takes the first casting part whose runner has been cleaned from the transfer table 304, and then puts it into the cleaning device 306, and three robots hold knives to clean the burrs on the parting surfaces of the five surfaces of the first casting part;

[0137] S9, orthopedic: the orthopedic handling robot 310 removes burrs from the transfer slide 307 and then puts the first casting part into the orthopedic machine 309, and the orthopedic machine 309 and the corresponding orthopedic mold correct the product size to form a second casting part;

[0138] S10, blue light detection: the orthopedic handling robot 310 takes out the second cast part after orthopedic treatment from the orthopedic machine 309 and puts it into the blue light size detection device 308, and performs 3D scanning on the key matching surface of the second cast part to determine whether the position size is within the tolerance;

[0139] S11, visual inspection: the orthopedic handling robot 310 takes out the second casting part after the size inspection from the blue light size inspection device 308 and puts it into the visual appearance inspection device 311, and takes a photo to scan the appearance surface defects of the second casting part to determine whether there are corresponding defects in the appearance of the second casting part;

[0140] S12, post-processing framing: After the framing handling robot 312 takes out the second cast part from the visual appearance inspection device 311, it puts the second cast part into the qualified product frame or the pending processing frame of the offline framing station 314 according to the judgment results of the blue light inspection and the appearance inspection. The AGV car 2 transports it to the pending processing buffer area or the finished product buffer area. The quality sampling is completed by the framing handling robot 312 placing it on the sampling inspection table 313.

[0141] By adopting the above die-casting method, the various processes of die-casting, processing, cleaning and online quality inspection are integrated to achieve full automation of casting processing and full inspection of casting appearance and size, reduce labor costs and improve the quality level of the entire line.

[0142] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A casting production line, It is characterized in that include: a die casting cell, including multiple processing equipment; A transfer unit is used to transfer the first cast part on any of the processing equipment to a storage area, and to transfer the first cast part from the storage area to the die casting unit or a production unit downstream of the die casting unit.

2. The casting production line according to claim 1, Features: The die casting unit comprises a first processing center and a second processing center, wherein the first processing center comprises a part of the processing equipment among the plurality of processing equipment, the second processing center comprises another part of the processing equipment among the plurality of processing equipment, and the second processing center is located downstream of the first processing center; When the second machining center fails, the transfer unit transfers the first cast part of the first machining center to the storage area, and after the second machining center recovers from the failure, transfers the first cast part of the storage area to the second machining center.

3. The casting production line according to claim 2, Features: The transfer unit includes a first handling robot and a first AGV trolley, and the processing equipment of the first processing center is located within the gripping range of the first handling robot; The first machining center also includes an abnormal parts station; When the second machining center fails, the first handling robot transfers the first casting part of the first machining center to the abnormal part station, and the first AGV vehicle transfers the first casting part from the abnormal part station to the storage area; After the second machining center recovers from the fault, the first AGV transfers the first casting part from the storage area to the second machining center.

4. The casting production line according to claim 2, Features: The casting production line also includes: a post-processing unit, located downstream of the die-casting unit, for post-processing the first cast part into a second cast part; When the post-processing unit is blocked, the transfer unit transfers the first cast part of the second machining center to the storage area; when the post-processing unit is unblocked, the transfer unit transfers the first cast part from the storage area to the post-processing unit.

5. The casting production line according to claim 4, Features: The transfer unit includes a second handling robot and a second AGV trolley, and the processing equipment of the second processing center is located within the gripping range of the second handling robot; When the post-processing unit is blocked, the second handling robot transfers the first casting part of the second processing center to the second AGV trolley, and the second AGV trolley transfers the first casting part to the storage area; After the post-processing unit is unblocked, the second AGV vehicle transfers the first casting part to the post-processing unit.

6. The casting production line according to claim 4, Features: The post-processing unit comprises: A post-processing module, used for post-processing the first casting part into a second casting part; The detection module is used to detect whether there are defects in the appearance and / or size of the second casting part.

7. The casting production line according to claim 6, Features: The post-processing unit also includes: Offline framing station, including qualified product frames and frames for products to be inspected; A frame loading and transporting robot is used to transfer the second casting part with defects in appearance or size to the inspection frame, and transfer the second casting part with no defects in appearance and size to the qualified frame; The storage area includes a finished product buffer area and a to-be-inspected product buffer area; The transfer unit includes a third AGV trolley, and the third AGV trolley is used to transfer the second cast part of the to-be-inspected product frame to the to-be-inspected product buffer area, and transfer the second cast part of the qualified product frame to the finished product buffer area.

8. The casting production line according to claim 7, Features: The post-processing module comprises: A trimming machine, used for trimming the first casting part on the on-line pickup station; A cleaning device, located downstream of the trimming machine, is used to remove burrs from the first casting part after the trimming process; A correction machine, located downstream of the cleaning device, is used to correct the size of the first casting part after the burr is cleaned to obtain a second casting part; relay station; Transfer slide; A trimming and handling robot, used for transferring the first casting part from the on-line pickup station to the trimming machine, and the trimming and handling robot is also used for transferring the first casting part after trimming from the trimming machine to the transfer table; A cleaning and transporting robot, used for transferring the first casting part on the transfer table to the cleaning device, and the cleaning and transporting robot is also used for transferring the first casting part after burr cleaning to the orthopedic machine; The orthopedic handling robot is used for transferring the second casting part to the inspection module.

9. The casting production line according to claim 3, Features: The first processing center includes a die-casting host, a cooling water tank, a defect detection device and a laser coding device; The die-casting main machine, cooling water tank, defect detection device and laser coding device are all arranged around the first handling robot.

10. The casting production line according to claim 5, Features: The second processing center includes a delimbing machine, a hydraulic shear and a framing station, and the delimbing machine, the hydraulic shear and the framing station are all arranged around the second handling robot.

11. The casting production line according to claim 4, Features: The number of the die-casting units and the number of the post-processing units are at least 2.

12. A casting production method of a casting production line according to any one of claims 1 to 11, Features: Based on the die casting unit, a first cast part is produced; framing the first casting part; The transfer unit transfers the framed first casting part to the post-processing unit, and the post-processing unit post-processes the first casting part into a second casting part.

13. The method according to claim 12, Features: The method of manufacturing the first casting part based on the die casting unit includes: Die casting on-line: Aluminum is hydraulically formed into the first casting part using a die casting machine and corresponding molds; Defect detection: After the first handling robot takes out the first casting part, it will check the vacuum branches and runners to ensure that there are no residual vacuum branches in the mold; Casting cooling: The first handling robot places the first casting part into the cooling water tank for complete immersion; Coding and engraving: The first handling robot puts the cooled first casting part into the laser coding device to engrave the plain code and QR code; Debranching: The second handling robot transfers the engraved first casting part to the hydraulic shears, and then puts it into the debranching machine to punch out the vacuum branches.

14. The method according to claim 12, Features: The post-processing unit post-processes the first casting part into the second casting part, comprising: Runner cleaning: The trimming and handling robot puts the first casting part into the trimming machine, and the trimming machine cooperates with the corresponding trimming mold to punch and cut the runner; Burr removal: The cleaning and handling robot takes the first casting part with the runner cleaned from the transfer table, and then puts it into the cleaning equipment to remove the burrs of the first casting part; Orthopedics: The orthopedic handling robot takes out the first cast part that has been cleaned of burrs from the transfer slide, and then puts it into the orthopedic machine, which corrects the size of the first cast part to form a second cast part.

15. The method according to claim 12, Features: After the post-processing unit post-processes the first casting part into a second casting part, the method further includes: Blue light inspection: placing the second casting part into the blue light dimension inspection device to determine whether the second casting part has dimension defects; Visual inspection: Take out the second casting part after the size inspection and put it into the visual appearance inspection equipment to determine whether the second casting part has appearance defects; Post-processing framing: After the framing handling robot takes out the second cast part from the visual appearance inspection equipment, it transfers the second cast part with defects in appearance or size to the inspection frame according to the judgment results of size inspection and appearance inspection, and the second cast part in the inspection frame is transferred by the transfer unit to the processing buffer area in the storage area; the second cast part with no defects in appearance and size is transferred to the qualified frame, and the second cast part in the qualified frame is transferred by the transfer unit to the finished product buffer area in the storage area.