Ceramic matrix composite large-size through beam structure assembly tool and method

By using the combination of foundation plate, positioning components and upper surface detection card plate in the assembly tooling of the beam structure, the precise assembly and processing of the beam structure is achieved. Combined with CVI deposition technology, the strength and assembly accuracy of the beam structure are solved. Problem, improving overall performance.

CN119036328APending Publication Date: 2024-11-29XIAN XINGUI CERAMIC COMPOSITE MATERIAL CO LTD

Patent Information

Application Number
CN202411034792.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The local strength in the centralized load area of ​​the beam structure is difficult to ensure, and the existing assembly devices cannot realize the online calibration and assembly processing of the beam structure.

Method used

The assembly tooling includes foundation plates, positioning components, support blocks and upper surface detection card plates is adopted. Through positioning, supporting and calibration, precise assembly and processing of the beam structure is achieved, and local strength is improved in combination with CVI deposition technology.

Benefits of technology

The machining accuracy and assembly accuracy of the outer surface of the beam structure are improved, the overall contour accuracy and local strength of the large-size beam structure are enhanced, and assembly problems and insufficient strength are solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119036328A_ABST
    Figure CN119036328A_ABST
Patent Text Reader

Abstract

The invention relates to a through beam structure assembly tool and method, in particular to a ceramic matrix composite large-size through beam structure assembly tool and method. The defects that the local strength of a concentrated load area of a through beam structure is difficult to guarantee, and an existing assembling device cannot achieve online shape correction and assembling machining of the through beam structure are overcome. The assembling tool comprises a foundation plate, a first positioning assembly and a second positioning assembly which are arranged in the length direction of the foundation plate, and a plurality of first supporting blocks and a plurality of upper profile detection clamping plates which are arranged between the first positioning assembly and the second positioning assembly in the length direction of the foundation plate. Third positioning assemblies are arranged between part of the first supporting blocks and used for conducting segmented positioning on the through beam structure in the length direction. The assembling method is based on the assembling tool, after the through beam structure is assembled and machined in a segmented and coordinated mode, butt-joint assembling is conducted, and the assembling problem of large-size long beam type structure products is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an assembly tool and an assembly method for a through-beam structure, and in particular to an assembly tool and a method for an through-beam structure with a large size made of ceramic-based composite materials. Background Art

[0002] Continuous fiber reinforced silicon carbide ceramic matrix composite (CMC-SiC), as an internationally recognized new strategic and cutting-edge thermal structural material, has broad application prospects in the field of lightweight thermal protection products for aircraft. However, the preparation process of this material is complicated and has high requirements for the deposition flow field. The overall cabin size of the aircraft is large, and the length is generally greater than 2000mm, resulting in the inability of existing deposition equipment to meet the requirements for the preparation of this material. In order to solve the bottleneck problem of material preparation, the overall cabin is usually designed as a segmented structure, generally divided into the front cabin, the middle cabin and the rear cabin, so as to improve its structural manufacturability and processability. However, the segmented structure will have an adverse effect on the rigidity and strength of the overall structure. In order to improve the overall strength, a through-beam structure is usually designed on both sides of the overall cabin to form a good force transmission path.

[0003] Therefore, the form and manufacturing quality of the through-beam structure determine the structural strength of the entire cabin section. Due to the large length dimension of the through-beam structure in the heading direction, it is generally designed as a double U-shaped structure with segmented docking, including a front cabin section, a middle cabin section and a rear cabin section. The middle cabin section is overlapped with the front cabin section and the rear cabin section through the tenon parts set at both ends, thereby forming a concentrated load area at the overlapped part, making it difficult to ensure the local strength of the concentrated load area; Chinese patent CN211468823U discloses a coordinated assembly device, which is only suitable for docking and positioning of through-beam structures, cannot achieve the shape correction of through-beam structures, and cannot meet the assembly and processing requirements of complex special-shaped composite material through-beam structures. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that the local strength of the concentrated load area of ​​the through-beam structure is difficult to ensure, and the existing assembly device cannot realize the online profiling and assembly processing of the through-beam structure, and to provide an assembly tool and method for a large-size through-beam structure made of ceramic-based composite materials.

[0005] To achieve the above objectives, the technical solutions provided by the present invention are as follows:

[0006] A large-size through-beam structure assembly tool made of ceramic-based composite materials is special in that it includes a base plate, a first positioning component and a second positioning component arranged along the length direction of the base plate, and a plurality of first support blocks and a plurality of upper profile detection card plates arranged between the first positioning component and the second positioning component along the length direction of the base plate; the first positioning component and the second positioning component are used to position and control the overall length of the through-beam structure; a third positioning component is arranged between some of the first support blocks, which is used to position the through-beam structure in sections along the length direction; the upper surface of the first support block matches the corresponding position of the outer profile of the through-beam structure, which is used to position and support it; the first support block is respectively provided with a fourth positioning component and a detection reference block at both ends along the width direction of the base plate, which are used to limit the width direction of the through-beam structure; a positioning hole is opened on the upper profile detection card plate, the upper side wall of the positioning hole matches the upper profile of the through-beam structure, the through-beam structure is arranged through the positioning hole, the through-beam structure is pressed by the upper profile detection card plate, and the contour of the upper profile of the through-beam is controlled.

[0007] Furthermore, the first support block and the upper profile detection card plate are respectively detachably connected to the base plate;

[0008] The first positioning assembly and the third positioning assembly are respectively detachably connected to the base plate.

[0009] Furthermore, the first support block is positioned on the base plate by two pins on one side and is detachably connected to the base plate by screws;

[0010] Some of the first support blocks are provided with machining clearance grooves or tightening threaded holes, the machining clearance grooves are used to machine the shaft mounting holes corresponding to the through-beam structures, and the tightening threaded holes are used to set screws to connect the first support blocks with the base plate;

[0011] A second positioning groove is provided on part of the first support blocks, which is used to set a plug-in positioning plate to position the through-beam structure in sections along the length direction.

[0012] Furthermore, it also includes a plurality of second support blocks arranged on the base plate, the plurality of second support blocks are located between the first positioning assembly and the second positioning assembly, and are used to support the through-beam structure;

[0013] The base plate is also provided with a tooling reference hole for positioning the base plate.

[0014] At the same time, a method for assembling a large-size through-beam structure of a ceramic-based composite material is also provided. Based on the above-mentioned large-size through-beam structure assembly tool for a ceramic-based composite material, the method is special in that it includes the following steps:

[0015] S1. Segmented coordinated assembly and processing of through-beam structure

[0016] Install the front cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin;

[0017] Install the middle cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin;

[0018] Install the rear cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin;

[0019] S2. Butt-jointed assembly of through-beam structure

[0020] Based on the assembly tooling, the front cabin section, the middle cabin section and the rear cabin section are coordinated and connected; then the front cabin section, the middle cabin section and the rear cabin section are riveted or screwed using pins or connectors on the same base to obtain a through-beam structure;

[0021] S3. Through beam riveting CVI deposition

[0022] Deposit the through-beam structure according to the CVI process, and perform riveting and welding deposition on the riveted pins;

[0023] S4. Overall super finishing of through beam structure

[0024] Install the through-beam structure to the assembly fixture, and process the rudder base mounting holes, wing surface mounting holes, wing surface joint surfaces and overall appearance on the through-beam structure;

[0025] S5. Inspection and processing

[0026] The through-beam structure is subjected to full-size inspection and surface treatment, and CVI deposition is performed again to obtain a through-beam structure product.

[0027] Furthermore, in step S1, the front cabin section, the middle cabin section and the rear cabin section are all double U-shaped structures;

[0028] The double U-shaped structure includes an inner U-shaped part and an outer U-shaped part. The inner surface of the inner U-shaped part is used as a reference to process and assemble the prefabricated parts, and then coordinate and test fit them into the outer U-shaped part.

[0029] The prefabricated parts include supporting reinforcement parts and tenon parts and / or head parts.

[0030] Furthermore, in step S1, the front cabin section is installed on the assembly tool for coordinated positioning as follows:

[0031] The front cabin section is passed through the corresponding upper mold surface detection card plate and set on the corresponding first support block. The fourth positioning component and the detection reference block of the first support block are used to limit the front cabin section along its width direction. The first positioning component and the third positioning component are used to limit the front cabin section along its length direction, and then the length dimension margin is processed.

[0032] Furthermore, in step S1, the gap between the front compartment section and the positioning surface of the corresponding first support block is ≤0.1 mm;

[0033] In step S2, the butt joint gap of the coordinated butt joint is ≤0.1 mm, and the butt joint difference is ≤0.1 mm.

[0034] Furthermore, after step S2, it also includes cleaning of excess materials: disassembling the through-beam structure from the assembly tooling, cleaning and inspecting the excess materials, and applying powder to the surface;

[0035] Step S3 also includes grinding and cleaning: removing the pin heads and cleaning the inside and surface of the through-beam structure.

[0036] Beneficial effects of the present invention:

[0037] 1. The assembly tooling of the large-size through-beam structure of the ceramic-based composite material of the present invention is provided with a first support block to position and support the external surface of the through-beam structure during the assembly process, and the upper surface detection card plate is used to calibrate the external surface of the through-beam structure. At the same time, through the cooperation of other positioning components, the functions of positioning, clamping and profiling are simultaneously realized, thereby improving the processing accuracy and assembly accuracy of the external surface of the through-beam structure.

[0038] 2. The assembly tooling of the large-size through-beam structure of ceramic-based composite materials of the present invention adopts a modular design concept to realize the segmented assembly processing and overall assembly processing of the through-beam structure, which solves the processing difficulties caused by the large deflection and deformation control of the large-size through-beam structure itself, and improves the overall contour accuracy of the large-size through-beam structure.

[0039] 3. In the present invention, the first positioning assembly, the third positioning assembly, the first support block and the upper profile detection card plate are all detachably connected to the base plate, which is convenient for assembly and installation. After installation and positioning, they are disassembled and then the outer surface of the through-beam structure is processed to avoid interference.

[0040] 4. The assembly method of the large-size through-beam structure of the ceramic-based composite material of the present invention adopts segmented docking and uniformly coordinates the assembly benchmarks under the state of parts, thereby solving the problems of difficulty in coordinating the large-size through-beam structure and difficulty in ensuring accuracy.

[0041] 5. In the assembly method of a large-size through-beam structure of a ceramic-based composite material of the present invention, in order to increase the local strength of the concentrated load area of ​​the through-beam structure, supporting and reinforcing parts are pre-installed inside the through-beam structure to improve the local strength and achieve the purpose of weight reduction at the same time. The through-beam structure is then riveted together with pins on the same substrate, and then SiC is deposited between the connected parts and the rivets using a chemical vapor deposition (CVI) process to achieve a connection effect equivalent to "metal riveting".

[0042] 6. The assembly tooling and method of the present invention have strong process feasibility, solve the assembly problems of existing large-size long beam structural products, and have guiding and reference significance for the assembly technology problems of existing ceramic-based composite materials products. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a structural schematic diagram of an embodiment of an assembly tool for a large-size through-beam structure of a ceramic-based composite material according to the present invention;

[0044] Figure 2 An exploded view of a through beam structure in an embodiment of the present invention;

[0045] Figure 3 This is a schematic diagram of the structure of the first inner U-shaped part of the front compartment section of the through beam structure in an embodiment of the present invention;

[0046] Figure 4 It is a schematic diagram of the structure of the second inner U-shaped part of the cabin section in the through beam structure in an embodiment of the present invention;

[0047] Figure 5 This is a schematic diagram of the structure of the third inner U-shaped part of the rear cabin section of the through beam structure in an embodiment of the present invention;

[0048] Figure 6 It is a structural schematic diagram of the front cabin section of the through beam structure in an embodiment of the present invention;

[0049] Figure 7 It is a structural schematic diagram of a cabin section in a through beam structure in an embodiment of the present invention;

[0050] Figure 8 It is a structural schematic diagram of the rear cabin section of the through beam structure in an embodiment of the present invention;

[0051] Fig. 9 It is a schematic diagram of the assembly of the front cabin section of the through beam structure in an embodiment of the present invention;

[0052] Fig.10 It is a schematic diagram of the assembly of the cabin section in the through beam structure in an embodiment of the present invention;

[0053] Fig.11 It is a schematic diagram of the assembly of the rear cabin section of the through beam structure in an embodiment of the present invention;

[0054] Fig.12 It is a schematic diagram of the assembly of the front cabin section, the middle cabin section and the rear cabin section of the through beam structure in an embodiment of the present invention;

[0055] Fig.13 It is a schematic diagram of the assembly of the through beam structure in an embodiment of the present invention;

[0056] Fig.14 It is a structural schematic diagram of a through beam structure in an embodiment of the present invention;

[0057] Description of reference numerals:

[0058] 10-base plate, 101-first positioning groove, 102-first support block, 103-tightening threaded hole, 104-processing clearance groove, 105-positioning hole, 106-first positioning assembly, 107-second positioning assembly, 108-upper surface detection card plate, 109-third positioning assembly, 1010-fourth positioning assembly, 1011-detection reference block, 1012-second positioning groove, 1013-tooling reference hole, 1014-second support block;

[0059] 11-inner U-shaped part, 111-third inner U-shaped part, 112-second inner U-shaped part, 113-first inner U-shaped part;

[0060] 12-outer U-shaped part, 121-third outer U-shaped part, 122-second outer U-shaped part, 123-first outer U-shaped part;

[0061] 13-Head parts;

[0062] 14-support reinforcement part, 141-first support reinforcement part, 142-second support reinforcement part, 143-third support reinforcement part, 144-fourth support reinforcement part;

[0063] 15-tenon part, 151-first tenon part, 152-second tenon part, 153-third tenon part; 16-adjusting plate, 17-rudder base mounting hole, 18-wing surface mounting hole, 19-wing surface joint surface. DETAILED DESCRIPTION

[0064] The large-size through-beam structure assembly tool of the ceramic-based composite material of the present invention is as follows: Figure 1 As shown, it includes a base plate 10, a first positioning assembly 106 and a second positioning assembly 107 arranged along the length direction of the base plate 10, and a plurality of first support blocks 102 and a plurality of upper surface detection card plates 108 arranged between the first positioning assembly 106 and the second positioning assembly 107 along the length direction of the base plate 10. A tooling reference hole 1013 is arranged on the base plate 10 for positioning the base plate 10.

[0065] The first positioning component 106 and the second positioning component 107 are used to position and control the overall length of the through-beam structure; a first positioning groove 101 is opened between some adjacent first support blocks 102, and a third positioning component 109 is arranged in the first positioning groove 101. The third positioning component 109 is used to segmentally position the through-beam structure along the length direction so as to segmentally control the length deviation of the through-beam structure. Both the third positioning component 109 and the first positioning component 106 are plug-in positioning plates.

[0066] The first support block 102 is adapted to the outer profile of the through-beam structure, and is used to position and support the through-beam structure, ensure the outer profile accuracy of the through-beam structure, and eliminate the deformation caused by the deadweight of the through-beam structure; the first support block 102 is positioned on the base plate 10 through two pins on one side, and then connected to the base plate 10 through screws. The upper surface of the first support block 102 is a positioning surface, which is used to position and support the through-beam structure. Some of the first support blocks 102 are provided with processing clearance grooves 104 or pressing threaded holes 103 at appropriate positions. The processing clearance grooves 104 are used to process the shaft mounting holes of the through-beam structure, and the pressing threaded holes 103 are used to set screws to connect the first support block 102 and the base plate 10, and the first support block 102 is pressed and fixed. Some of the first support blocks 102 are designed with second positioning grooves 1012 at appropriate positions, and the processing clearance grooves 104 are used to process the corresponding outer profiles. A plug-in positioning plate is set in the second positioning groove 1012 to position the through-beam structure along the length direction. After positioning is completed, it is removed without affecting the length dimension processing. A fourth positioning assembly 1010 and a detection reference block 1011 are respectively provided at two ends of the first support block 102 along the width direction of the base plate 10, for limiting the through-beam structure along the width direction.

[0067] The upper profile detection card plate 108 is positioned and connected to the base plate 10 through two pins on one side, and a positioning hole 105 is provided on it. The upper side wall of the positioning hole 105 matches the upper profile of the through-beam structure. The through-beam structure is arranged through the positioning hole 105. The upper profile detection card plate 108 is used to press the through-beam structure, and the upper profile of the through-beam is detected to control the contour of the upper profile of the through-beam.

[0068] In order to improve the support stability of the through-beam structure, a plurality of second support blocks 1014 are further arranged on the base plate 10 between the first positioning assembly 106 and the second positioning assembly 107 to support the through-beam structure. The first support block 102, the plurality of second support blocks 1014 and the plurality of upper profile detection card plates 108 are dispersedly arranged to ensure stable support for the through-beam structure.

[0069] The front cabin section, middle cabin section and rear cabin section of the through-beam structure all adopt a double U-shaped structure, which is connected in sections by using the double U-shaped structure to form a closed through-beam structure. The double U-shaped structure includes an inner U-shaped part 11 and an outer U-shaped part 12, and both are deep cavity structures with a depth-to-width ratio greater than 7:1. The inner surface processing is difficult. To solve this problem, a processing allowance of 0.5 to 1 mm is reserved on the outer surface of the inner U-shaped part 11, and the inner surface of the outer U-shaped part 12 is matched with the processing, thereby improving the assembly accuracy of the inner U-shaped part 11 and the outer U-shaped part 12 and ensuring the overall performance of the structure. The prefabricated parts are processed based on the inner surface of the inner U-shaped part 11. The prefabricated parts include a head part 13, a support reinforcement part 14, and a tenon part 15. The tenon part 15 is arranged at the end of the inner U-shaped part 11 for mortise and tenon connection with the adjacent compartment section. The support reinforcement part 14 is arranged inside the inner U-shaped part 11 for improving the strength of the inner U-shaped part 11. The head part 13 is arranged at the end of the inner U-shaped part 11 in the rear compartment section for forming a seal for the through beam structure after the segmented docking. This arrangement solves the problem of difficulty in processing the deep cavity structure of the inner surface of the inner U-shaped part 11 and low precision, improves the assembly precision of the inner U-shaped part 11 and the head part 13, the support reinforcement part 14, and the tenon part 15, and ensures the overall performance of the structure. In this embodiment, the double U-shaped structure explosion diagram is shown in Figure 2 As shown, the coordinated trial fitting of the double U-shaped structure specifically includes the following steps:

[0070] Step 1: Coordinate and test fit the inner U-shaped part 11 with the prefabricated part

[0071] like Figure 3 As shown, the first inner U-shaped part 113 of the front cabin section is coordinated and fit with the first supporting reinforcement 141 and the first tenon part 151: taking the inner surface of the first inner U-shaped part 113 as a reference, the thickness dimensions of the first supporting reinforcement 141 and the first tenon part 151 are trial-fitted to ensure that the coordination fitting clearance between the first inner U-shaped part 113 and the first supporting reinforcement 141 and the first tenon part 151 is ≤0.15mm; the side of the first supporting reinforcement 141 is open, and the opening is flush with the opening of the first inner U-shaped part 113, and the first tenon part 151 is arranged at one end of the first inner U-shaped part 113 away from the middle cabin section, and the first supporting reinforcement 141 and the first tenon part 151 are riveted and fixed to the first inner U-shaped part 113 respectively with the same base pins.

[0072] like Figure 4As shown, the second inner U-shaped part 112 of the middle cabin section is coordinated and tested with the second supporting reinforcement part 142, the second tenon part 152, and the third tenon part 153: the thickness of the second supporting reinforcement part 142, the second tenon part 152, and the third tenon part 153 are tested and processed based on the inner profile of the second inner U-shaped part 112 to ensure that the second inner U-shaped part 112 is coordinated with the second supporting reinforcement part 142, the second tenon part 152, and the third tenon part 153. The debugging gap is ≤0.15mm; the side of the second supporting reinforcement 142 is opened, and the opening is flush with the opening of the second inner U-shaped part 112, the second tenon part 152 is arranged at one end of the second inner U-shaped part 112 close to the front compartment section, and the third tenon part 153 is arranged at the other end of the second inner U-shaped part 112, and the second supporting reinforcement 142, the second tenon part 152, and the third tenon part 153 are riveted and fixed to the second inner U-shaped part 112 respectively with the same base pins.

[0073] like Figure 5 As shown, the third inner U-shaped part 111 of the rear cabin section is coordinated and tested: the inner surface of the third inner U-shaped part 111 is used as a reference, and the thickness dimensions of the third support reinforcement 143, the fourth support reinforcement 144 and the head part 13 are tested and processed to ensure that the coordination test fitting clearance between the third inner U-shaped part 111 and the third support reinforcement 143, the fourth support reinforcement 144 and the head part 13 is ≤0.15mm; the sides of the third support reinforcement 143 and the fourth support reinforcement 144 are provided with openings, and the openings are flush with the openings of the third inner U-shaped part 111, and the head part 13 is provided at the end of the third inner U-shaped part 111 away from the middle cabin section, and the third support reinforcement 143, the fourth support reinforcement 144 and the head part 13 are riveted and fixed to the third inner U-shaped part 111 respectively with the same base pins.

[0074] In this step, the prefabricated parts are first positioned and installed inside the closed cavity, the assembly datum is unified and coordinated in the part state, the positioning pin holes are processed by CNC high-precision, and the positioning and riveting with the base pins are performed to ensure the overall position accuracy of the prefabricated parts and solve the problem of difficult positioning of the prefabricated parts.

[0075] Step 2: Coordinate and test fit the inner U-shaped part 11 and the outer U-shaped part 12

[0076] like Figure 6 As shown, the first inner U-shaped part 113 and the first outer U-shaped part 123 are coordinated and tested, and the thickness of the first inner U-shaped part 113 is test-fitted based on the inner surface of the first outer U-shaped part 123 to ensure that the inner coordination test gap is ≤0.15mm, thereby obtaining the front cabin section.

[0077] like Figure 7 As shown, the second inner U-shaped part 112 and the second outer U-shaped part 122 are coordinated and fit together, and the thickness of the second inner U-shaped part 112 is fit-processed based on the inner surface of the second outer U-shaped part 122 to ensure that the inner coordination fit gap is ≤0.15mm, thereby obtaining the middle cabin section.

[0078] like Figure 8 As shown, the third inner U-shaped part 111 and the third outer U-shaped part 121 are coordinated and tested, and the inner surface of the third outer U-shaped part 121 is used as a reference to test-fit the thickness dimensions of the third inner U-shaped part 111 and the head part 13 to ensure that the inner coordination test gap is ≤0.15mm, thereby obtaining the rear cabin section.

[0079] The method is used to complete the coordinated trial fitting of the double U-shaped structures of the front cabin section, the middle cabin section and the rear cabin section, and then the ceramic matrix composite material large-size through-beam structure assembly tooling is used to perform segmented assembly and overall docking super-finishing of the through-beam structure. The process has good feasibility and low cost. The assembly method specifically includes the following steps:

[0080] S1. Segmented coordinated assembly and processing of through-beam structure

[0081] S1.1. Assembly and processing of the front cabin section

[0082] like Fig. 9 As shown, the front cabin section is coordinated and positioned, the front cabin section is passed through the corresponding upper mold surface detection card plate 108 and set on the corresponding first support block 102, ensuring that the gap between the front cabin section and the positioning surface of the corresponding first support block 102 is ≤0.1mm, and the fourth positioning component 1010 and the detection reference block 1011 of the first support block 102 are used to limit the front cabin section along its width direction to ensure the size requirements between the front cabin section and the detection reference block 1011, and the first positioning component 106 and the third positioning component 109 are used to limit the front cabin section along its length direction, and then the length dimension margin is processed to ensure the relevant size requirements, and the interfering positioning components are removed during processing.

[0083] S1.2. Assembly and processing of the middle cabin section

[0084] like Fig.10As shown, the middle cabin section is coordinated and positioned, and the middle cabin section passes through the corresponding upper mold surface detection card plate 108 and is set on the corresponding first support block 102, ensuring that the gap between the middle cabin section and the positioning surface of the corresponding first support block 102 is ≤0.1mm, and the fourth positioning component 1010 and the detection reference block 1011 of the first support block 102 are used to limit the middle cabin section along its width direction to ensure the size requirements between the middle cabin section and the detection reference block 1011. The third positioning component 109 is used to limit the middle cabin section along its length direction, and then the length dimension margin is processed to ensure the relevant size requirements, and the interfering positioning components are removed during processing.

[0085] Among them, the end of the third tenon part 153 of the middle cabin section is located in the middle position of the first support block 102, so the middle cabin section is positioned in the length direction by setting a plug-in positioning plate in the second positioning groove 1012 corresponding to the first support block 102.

[0086] S1.3. Assembly and processing of the rear cabin section

[0087] like Fig.11 As shown, the rear cabin section is coordinated and positioned, and the rear cabin section passes through the corresponding upper mold surface detection card plate 108 and is set on the corresponding first support block 102, ensuring that the gap between the rear cabin section and the positioning surface of the corresponding first support block 102 is ≤0.1mm, and the fourth positioning component 1010 and the detection reference block 1011 of the first support block 102 are used to limit the rear cabin section along its width direction to ensure the size requirements between the rear cabin section and the detection reference block 1011. The third positioning component 109 and the second positioning component 107 are used to limit the rear cabin section along its length direction, and the length dimension margin is processed to ensure the relevant size requirements. The interfering positioning components are removed during processing.

[0088] S2. Butt-jointed assembly of through-beam structure

[0089] like Fig.12 As shown, the front cabin section, the middle cabin section and the rear cabin section are positioned by assembly tooling, and the front cabin section, the middle cabin section and the rear cabin section are coordinated for docking. The first positioning component 106 and the second positioning component 107 are used for positioning to ensure that the gap between the front cabin section, the middle cabin section and the rear cabin section and the first support block 102 and each positioning component is ≤0.1mm, the docking gap is ≤0.1mm, and the connection difference is ≤0.1mm. The dimensional requirements with the corresponding detection reference block 1011 are ensured, and the clearance requirements for the detection card surface are ensured.

[0090] Use assembly tooling to position and coordinate with the adjustment plate 16 to ensure that the positioning clearance with the tooling is ≤0.1mm, the docking clearance is ≤0.1mm, the connection difference is ≤0.1mm, the size requirements with the corresponding detection reference block 1011 are ensured, and the clearance requirements of the detection card surface are ensured.

[0091] The front cabin section, the middle cabin section and the rear cabin section are riveted or screwed by using pins or connectors with the same base to obtain a through beam structure. During riveting, it is required to rivet through along the thickness direction to avoid single-sided deposition due to the lack of deposition channel in the internal cavity, which leads to the pin riveting deposition not meeting the requirements. Double-sided deposition of rivets can be achieved to improve the overall riveting quality of the product.

[0092] S3. Excess cleaning

[0093] like Fig.13 and Fig.14 As shown, the through-beam structure is disassembled from the assembly tooling, and the excess materials inside and outside the through-beam structure are cleaned and inspected. Then, ultrasonic equipment is used for cleaning, an oven is used for drying, and the surface is powder-coated.

[0094] S4. Through-beam riveting CVI deposition

[0095] The through-beam structure is deposited according to the CVI deposition process, and the riveted pins are deposited by riveting welding to ensure a density of 1.8g / cm3≤ρ≤2.0g / cm3.

[0096] S5. Grinding and cleaning

[0097] Remove the pin heads, clean up excess materials inside the through-beam structure, polish and clean the surface of the through-beam structure, clean it with alcohol, and let it air dry naturally. No floating debris, foreign matter, burrs or other excess materials visible to the naked eye are allowed.

[0098] S6. Overall super finishing of through beam structure

[0099] Using the assembly tool for positioning, the rudder base mounting hole 17, the wing surface mounting hole 18, the wing surface joint surface 19 and the overall shape are processed on the through beam structure to ensure the relevant dimensional requirements.

[0100] S7. Inspection

[0101] Carry out full-size inspection on the through-beam structure.

[0102] S8. Surface treatment

[0103] The through-beam structure is cleaned and dried, and the surface is powder-coated, mainly on gaps and uneven areas.

[0104] S9.CVI deposition

[0105] The through-beam structure is deposited according to the CVI deposition process to ensure a density of 1.9g / cm3≤ρ≤2.5g / cm3.

[0106] S10. Inspection

[0107] The external dimensions of the through-beam structure are comprehensively inspected, and finally the through-beam structure product is obtained.

Claims

1. A large-size through-beam structure assembly tool for ceramic-based composite materials, characterized by: It comprises a base plate (10), a first positioning assembly (106) and a second positioning assembly (107) arranged along the length direction of the base plate (10), and a plurality of first support blocks (102) and a plurality of upper surface detection card plates (108) arranged between the first positioning assembly (106) and the second positioning assembly (107) along the length direction of the base plate (10); The first positioning assembly (106) and the second positioning assembly (107) are used to position and control the overall length of the through-beam structure; A third positioning assembly (109) is provided between some of the first support blocks (102) for positioning the through-beam structure in sections along the length direction; The upper surface of the first support block (102) matches the outer surface of the through-beam structure at a position corresponding to that of the through-beam structure, and is used to position and support the through-beam structure; the first support block (102) is provided with a fourth positioning assembly (1010) and a detection reference block (1011) at two ends along the width direction of the base plate (10), respectively, and is used to limit the width direction of the through-beam structure; The upper profile detection card plate (108) is provided with a positioning hole (105), the upper side wall of the positioning hole (105) matches the upper profile of the through-beam structure, the through-beam structure is arranged through the positioning hole (105), the through-beam structure is pressed by the upper profile detection card plate (108), and the contour of the upper profile of the through-beam is controlled.

2. According to claim 1, the large-size through-beam structure assembly tool of ceramic matrix composite material is characterized by: The first support block (102) and the upper profile detection card plate (108) are respectively detachably connected to the base plate (10); The first positioning assembly (106) and the third positioning assembly (109) are respectively detachably connected to the base plate (10).

3. The large-size through-beam structure assembly tool of ceramic matrix composite material according to claim 1 or 2, characterized in that: The first support block (102) is positioned on the base plate (10) by two pins on one side, and is detachably connected to the base plate (10) by screws; A portion of the first support blocks (102) is provided with a processed clearance groove (104) or a tightening threaded hole (103), the processed clearance groove (104) is used to process the shaft mounting hole of the corresponding through-beam structure, and the tightening threaded hole (103) is used to set a screw to connect the first support block (102) and the base plate (10); A portion of the first support blocks (102) is provided with a second positioning groove (1012) for arranging a plug-in positioning plate to position the through-beam structure in sections along the length direction.

4. The large-size through-beam structure assembly tool of ceramic matrix composite material according to claim 3, characterized in that: It also includes a plurality of second support blocks (1014) arranged on the base plate (10), the plurality of second support blocks (1014) being located between the first positioning assembly (106) and the second positioning assembly (107) and being used to support the through-beam structure; The base plate (10) is also provided with a tooling reference hole (1013) for positioning the base plate (10).

5. A method for assembling a large-size through-beam structure of a ceramic-based composite material, based on the assembly tool for a large-size through-beam structure of a ceramic-based composite material according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Segmented coordinated assembly and processing of through-beam structure Install the front cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin; Install the middle cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin; Install the rear cabin section of the through-beam structure to the assembly tooling for coordinated positioning, and then process its length dimension margin; S2. Butt-jointed assembly of through-beam structure Based on the assembly tooling, the front cabin section, the middle cabin section and the rear cabin section are coordinated and connected; then the front cabin section, the middle cabin section and the rear cabin section are riveted or screwed using pins or connectors on the same base to obtain a through-beam structure; S3. Through beam riveting CVI deposition Deposit the through-beam structure according to the CVI process, and perform riveting and welding deposition on the riveted pins; S4. Overall super finishing of through beam structure The through-beam structure is installed to the assembly tool for positioning, and the rudder base installation hole (17), the wing surface installation hole (18), the wing surface joint surface (19) and the overall shape are processed on the through-beam structure; S5. Inspection and processing The through-beam structure is subjected to full-size inspection and surface treatment, and CVI deposition is performed again to obtain a through-beam structure product.

6. The method for assembling a large-size through-beam structure of a ceramic matrix composite material according to claim 5, characterized in that: In step S1, the front cabin section, the middle cabin section and the rear cabin section are all double U-shaped structures; The double U-shaped structure comprises an inner U-shaped part (11) and an outer U-shaped part (12). The inner surface of the inner U-shaped part (11) is used as a reference to process and assemble the prefabricated parts, which are then coordinated and fitted into the outer U-shaped part (12). The prefabricated part comprises a supporting reinforcement part (14) and a tenon part (15) and / or a head part (13).

7. The method for assembling a large-size through-beam structure of a ceramic matrix composite material according to claim 6, characterized in that: In step S1, the front cabin section is installed on the assembly tool for coordinated positioning as follows: The front cabin section is passed through the corresponding upper mold surface detection card plate (108) and set on the corresponding first support block (102), and the fourth positioning component (1010) and the detection reference block (1011) of the first support block (102) are used to limit the front cabin section along its width direction, and the first positioning component (106) and the third positioning component (109) are used to limit the front cabin section along its length direction, and then the length dimension margin is processed.

8. The method for assembling a large-size through-beam structure of a ceramic matrix composite material according to claim 7, characterized in that: In step S1, the gap between the front compartment section and the positioning surface of the corresponding first support block (102) is ≤0.1 mm; In step S2, the butt joint gap of the coordinated butt joint is ≤0.1 mm, and the butt joint difference is ≤0.1 mm.

9. The method for assembling a large-size through-beam structure of a ceramic matrix composite material according to claim 5, characterized in that: After step S2, the process also includes cleaning of excess materials: disassembling the through-beam structure from the assembly tooling, cleaning and inspecting the excess materials, and applying powder to the surface; Step S3 also includes grinding and cleaning: removing the pin heads and cleaning the inside and surface of the through-beam structure.

Citation Information

Patent Citations

  • Positioning tool for railway vehicle framework side frame

    CN102699604A

  • Machining method of combined cabin section

    CN115958390A

Cited By

  • Integrated butt joint tool and assembly method for C / SiC composite rudder wing cabin

    CN119589594A

  • Large-size composite material stringer stiffened wall plate appearance detection tool

    CN120947523A