SMT finished product steel mesh frame stacking stock bin

By designing an automated material collection, palletization and storage system, the inefficiency and safety hazards caused by manual operation during the palletization of SMT finished steel mesh frames are solved, and automated operation and cost reduction are achieved, and corporate efficiency is improved.

CN119037975AInactive Publication Date: 2024-11-29SUZHOU AUTOLINE TECH CO LTD

Patent Information

Application Number
CN202411553869.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

SMT finished steel mesh frames require manual operation during the palletization and stacking process, resulting in workers' fatigue, safety hazards and high costs, and the existing robot handling costs are too high, making them not suitable for enterprises.

Method used

An automated system including material pick-up and discharge mechanism, feed-loading and palletizing mechanism and palletizing storage mechanism is designed. By grabbing components such as suction cups, sprockets and electric rotating discs, it realizes automatic material pick-up and palletizing of finished steel mesh frames. and storage, reduce manual intervention, improve efficiency and reduce costs.

Benefits of technology

It realizes automated operations, reduces labor costs, improves palletizing work efficiency, avoids workers' safety risks, and optimizes space utilization through batch palletizing, which significantly improves corporate efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119037975A_ABST
    Figure CN119037975A_ABST
Patent Text Reader

Abstract

The invention discloses an SMT (Surface Mount Technology) finished steel mesh frame stacking stock bin, which belongs to the technical field of steel mesh frame stacking, and has the technical key points that the stock bin comprises a bottom plate, material taking and discharging operation of finished steel mesh frames can be well completed through an arranged material taking and discharging mechanism, and the automatic operation mode greatly reduces manual intervention, reduces labor cost and improves production efficiency. The finished steel mesh frames on the first inclined material guide seat can be well transferred to the second inclined material guide seat to be conveyed through the arranged feeding and stacking mechanism, manual climbing conveying and stacking operation is not needed, operation protection on operators is achieved, meanwhile, the cost of enterprises is greatly reduced, and the production efficiency of the enterprises is improved. Batch stacking operation can be achieved through the arranged stacking storage mechanism, by means of the stacking mode, the labor cost is saved, space utilization is optimized, therefore, the working efficiency is remarkably improved, the benefits of enterprises are improved, and the beneficial effects that stacking and feeding are convenient, and the working efficiency is high are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of steel mesh frame stacking, and in particular to a SMT finished product steel mesh frame stacking silo. Background Art

[0002] SMT surface mounting technology is the most popular technology and process in the electronic assembly industry. It is a circuit assembly technology that mounts pinless or short-lead surface mounting components on the surface of a printed circuit board or other substrate, and assembles them by soldering through reflow soldering or dip soldering.

[0003] At present, the finished SMT steel mesh frames are mostly stacked manually. Repetitive manual operations can easily make workers tired, which in turn affects work efficiency and accuracy. At the same time, the manual stacking process involves the handling of heavy objects. When stacking and storing at high places, it is easy to cause workers to suffer sprains, strains and other work-related injuries. It is also easy to cause collisions or scratches on the steel mesh frames, affecting their service life and precision. Some also use robots for stacking, but the cost is high, which is not convenient for production and use by enterprises and cannot meet the actual use needs.

[0004] Therefore, it is necessary to provide a SMT finished product steel mesh frame stacking silo to solve the above problems. Summary of the invention

[0005] In view of the deficiencies in the prior art, an embodiment of the present invention aims to provide a SMT finished product steel mesh frame stacking silo, aiming to solve the technical problems raised in the background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions: A SMT finished steel mesh frame stacking silo, comprising a bottom plate, a conveyor for conveying the finished steel mesh frame and a silo for storing the finished steel mesh frame are arranged on the bottom plate, a second limiting plate for limiting the finished steel mesh frame is arranged on the conveyor, and further comprising: A material picking and discharging mechanism, which is installed on a support seat and is used to take out the finished steel mesh frames on the conveyor one by one for loading and processing. The material picking and discharging mechanism includes a grabbing suction cup, a grabbing arm, a transverse moving plate and an L-shaped moving plate for driving the material picking and discharging. The grabbing suction cup is fixedly installed on the grabbing arm, and the grabbing arm is fixedly installed on the transverse moving plate. The transverse moving plate is connected to the L-shaped moving plate by a second slider in a limited sliding manner, and the L-shaped moving plate is connected to the support seat by a fourth slider in a limited sliding manner. A material loading and stacking mechanism is installed on the bottom plate and the support frame, and is used to stack and transport the taken-out finished steel mesh frames one by one and drive the material taking and discharging mechanism to operate synchronously. The material loading and stacking mechanism includes a first oblique material guide seat and a second oblique material guide seat for oblique material guide transmission and a moving block for material loading and transmission. The moving block is movably installed on the support frame. A plurality of support rods for receiving materials are arranged on the moving block. The support rods are equidistantly and obliquely installed on the moving block. A first limit plate is arranged above one side of the support rod, and the first limit plate is fixedly installed on the moving block. The stacking storage mechanism is installed on the supporting rotating disk and is used to drive the silos to store and receive the finished steel mesh frames one by one. There are several silos and they are all installed on the supporting rotating disk. The supporting rotating disk is rotatably installed on the bottom plate through an electric rotating seat.

[0007] The lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of the lifting of

[0008] As a further solution of the present invention, the loading and stacking mechanism also includes a first sprocket, a second sprocket and a chain for driving the support rod and the first limiting plate to carry out material feeding movement. The first sprocket and the second sprocket are both rotatably mounted on the support frame. The first sprocket and the second sprocket are both transmission-connected with the chain. The moving block is installed on the pin shaft of the chain through a sixth connecting shaft. The second sprocket is fixedly connected to the output shaft of the first motor, and the first motor is fixedly mounted on the support frame.

[0009] As a further solution of the present invention, the loading and stacking mechanism also includes a third material guide roller and a second motor for auxiliary material feeding at the rear end of the second inclined material guide seat. The third material guide rollers are several and rotatably connected to the second inclined material guide seat at equal intervals. The third material guide rollers are rotatably connected through a second synchronous belt. One end of the third material guide roller is fixedly connected to the output shaft of the second motor, and the second motor is fixedly installed on the second inclined material guide seat.

[0010] As a further solution of the present invention, the material picking and discharging mechanism also includes a first driving disk and a second driving disk for driving the grabbing suction cup to perform reciprocating movement control, the first driving disk and the second driving disk are both rotatably installed on the support seat through a second connecting shaft, a first sliding groove adapted for sliding connection with the first slider is provided on the transverse moving plate, a second sliding groove adapted for sliding connection with the second slider is provided on the L-shaped moving plate, a first pulley and one end of a connecting rotating rod are rotatably connected to the first slider, the other end of the connecting rotating rod is rotatably installed on the support seat through the first connecting shaft, a first driving disk is provided with a first driving groove adapted for sliding connection with the first pulley, and the first driving groove is provided with a first area and a second area.

[0011] As a further solution of the present invention, the material picking and discharging mechanism also includes a first connecting rod and a second connecting rod for driving the L-shaped movable plate to reciprocate, the first connecting rod and the second connecting rod are both fixedly mounted on a third connecting shaft, the third connecting shaft is rotatably mounted on a support seat, the first connecting rod and the second connecting rod are arranged at an angle of 90°, one end of the first connecting rod is rotatably connected to a third slider, a third sliding groove adapted for sliding connection to the third slider is provided on the L-shaped movable plate, one end of the second connecting rod is rotatably connected to a second pulley, a second driving groove adapted for sliding connection to the second pulley is provided on the second driving disk, and a third area and a fourth area are provided on the second driving groove.

[0012] As a further solution of the present invention, the material picking and discharging mechanism also includes a fifth connecting shaft for driving the first drive disk and the second drive disk to rotate, the second connecting shaft is rotatably connected to the fourth connecting shaft through a first synchronous belt, the fourth connecting shaft is fixedly connected to the first gear, the first gear is meshed with the second gear, the diameter of the first gear is larger than the second gear, the second gear is fixedly connected to the fifth connecting shaft, and the fourth connecting shaft and the fifth connecting shaft are both rotatably connected to the support seat.

[0013] As a further solution of the present invention, the material picking and discharging mechanism also includes a worm wheel and a worm for driving the fifth connecting shaft to rotate, the worm is fixedly connected to the rotating shaft of the first sprocket and the worm is rotatably connected to the support frame, the worm is meshingly connected to the worm wheel, and the worm wheel is fixedly connected to the fifth connecting shaft.

[0014] As a further solution of the present invention, the stacking storage mechanism includes an adjustment plate for storage adjustment in the silo, the adjustment plate is limitedly slidably connected to the interior of the silo, the adjustment plate is fixedly connected to the piston rod of the electric push rod, the electric push rod is fixedly installed on the supporting rotating disk, and the opening of the silo is arranged toward the second inclined material guide seat.

[0015] In summary, compared with the prior art, the embodiments of the present invention have the following beneficial effects: The material picking and discharging mechanism provided in the present invention can be synchronously driven by the material loading and stacking mechanism, so as to well complete the material picking and discharging operations of the finished steel mesh frame. This automated operation mode greatly reduces manual intervention and reduces labor costs, thereby significantly improving the work efficiency of the later stacking.

[0016] The loading and stacking mechanism set up can effectively transfer the finished steel mesh frame on the first inclined material guide seat to the second inclined material guide seat for transportation. There is no need for manual climbing for transportation and stacking operations, thus realizing the operation protection of the operator. In addition, the transmission through the first sprocket, the second sprocket and the chain and the limit of the movement of the lifting block can provide a stable driving force, so that the finished steel mesh frame maintains good stability during the rising process. At the same time, the wear degree of the first sprocket, the second sprocket and the chain is relatively low, thereby greatly reducing the cost of the enterprise.

[0017] Batch palletizing operations can be realized through the set palletizing storage mechanism. This palletizing method not only saves labor costs, but also optimizes space utilization, thereby significantly improving work efficiency and enhancing the benefits of the enterprise.

[0018] In order to more clearly illustrate the structural features and effects of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of an embodiment of the invention.

[0020] Figure 2 It is a rear structural schematic diagram of an embodiment of the invention.

[0021] Figure 3 It is a schematic diagram of the connection structure of the first inclined material guide seat in an embodiment of the invention.

[0022] Figure 4 It is a schematic diagram of the explosion structure of the grab arm connection in the embodiment of the invention.

[0023] Figure 5 It is a connection diagram of the second driving disk in the grab arm explosion structure in the embodiment of the invention.

[0024] Figure 6It is a connection diagram of the first driving disk in the grab arm explosion structure in the embodiment of the invention.

[0025] Figure 7 It is a schematic diagram of the connection structure inside the support base in an embodiment of the invention.

[0026] Figure 8 It is a schematic diagram of the side view structure of the internal connection of the support base in an embodiment of the invention.

[0027] Fig. 9 It is a schematic diagram of the state structure of the grabbing suction cup grabbing the finished steel mesh frame in the embodiment of the invention.

[0028] Fig.10 It is a schematic diagram of the connection structure on the back side of the support frame in an embodiment of the invention.

[0029] Fig.11 It is a schematic diagram of the connection structure of the lifting block in the embodiment of the invention.

[0030] Fig.12 It is a schematic diagram of the connection structure of the silo in the embodiment of the invention.

[0031] 1. Base plate; 2. Conveyor; 3. Finished steel mesh frame; 4. First oblique guide seat; 5. Support seat; 6. Support frame; 7. First guide roller; 8. First avoidance groove; 9. Grabbing suction cup; 10. Grabbing arm; 11. Lateral moving plate; 12. First slide groove; 13. First slider; 14. First pulley; 15. Connecting rotating rod; 16. First connecting shaft; 17. First driving disk; 18. Second connecting shaft; 19. Second driving disk; 20. First driving groove; 21. First area; 22. Second area; 23. Second driving groove; 24. Third area; 25. Fourth area; 26. L-shaped moving plate; 27. Second slide groove; 28. Second slider; 29. ​​Third connecting shaft; 30. First connecting rod; 31. Third slider; 32. Third slide groove ; 33. second connecting rod; 34. second pulley; 35. fourth slider; 36. first synchronous belt; 37. fourth connecting shaft; 38. first gear; 39. second gear; 40. fifth connecting shaft; 41. worm wheel; 42. worm; 43. first sprocket; 44. second sprocket; 45. first motor; 46. chain; 47. guide slide bar; 48. lifting block; 49. moving block; 50. sixth connecting shaft; 51. support rod; 52. first limit plate; 53. second oblique guide seat; 54. second avoidance groove; 55. second guide roller; 56. third guide roller; 57. second synchronous belt; 58. second motor; 59. supporting rotating disk; 60. silo; 61. adjustment plate; 62. electric push rod; 63. electric rotating seat; 64. second limit plate. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0033] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0034] Example 1, see Figures 1 to 11 A SMT finished steel mesh frame stacking silo includes a bottom plate 1, a conveyor 2 for conveying finished steel mesh frames 3 and a silo 60 for storing finished steel mesh frames 3 are arranged on the bottom plate 1, a second limiting plate 64 for limiting the finished steel mesh frames 3 is arranged on the conveyor 2, and further includes: The material picking and discharging mechanism is installed on the support seat 5, and is used to take out the finished steel mesh frames 3 on the conveyor 2 one by one for loading processing. The material picking and discharging mechanism includes a grabbing suction cup 9, a grabbing arm 10, a transverse moving plate 11 and an L-shaped moving plate 26 for driving the material picking and discharging. The grabbing suction cup 9 is fixedly installed on the grabbing arm 10, and the grabbing arm 10 is fixedly installed on the transverse moving plate 11. The transverse moving plate 11 is connected to the L-shaped moving plate 26 by a second slider 28 in a limited sliding manner, and the L-shaped moving plate 26 is connected to the support seat 5 by a fourth slider 35 in a limited sliding manner.

[0035] Furthermore, the material picking and discharging mechanism also includes a first driving disk 17 and a second driving disk 19 for driving the grabbing suction cup 9 to perform reciprocating movement control. The first driving disk 17 and the second driving disk 19 are both rotatably installed on the support seat 5 through the second connecting shaft 18. The transverse moving plate 11 is provided with a first sliding groove 12 adapted for sliding connection with the first slider 13. The L-shaped moving plate 26 is provided with a second sliding groove 27 adapted for sliding connection with the second slider 28. The first slider 13 is rotatably connected with the first pulley 14 and one end of the connecting rotating rod 15. The other end of the connecting rotating rod 15 is rotatably installed on the support seat 5 through the first connecting shaft 16. The first driving disk 17 is provided with a first driving groove 20 adapted for sliding connection with the first pulley 14. The first driving groove 20 is provided with a first area 21 and a second area 22.

[0036] Furthermore, the material picking and discharging mechanism also includes a first connecting rod 30 and a second connecting rod 33 for driving the L-shaped movable plate 26 to reciprocate. The first connecting rod 30 and the second connecting rod 33 are both fixedly mounted on the third connecting shaft 29, and the third connecting shaft 29 is rotatably mounted on the support seat 5. The first connecting rod 30 and the second connecting rod 33 are arranged at an angle of 90°. One end of the first connecting rod 30 is rotatably connected to the third slider 31, and the L-shaped movable plate 26 is provided with a third sliding groove 32 adapted for sliding connection to the third slider 31. One end of the second connecting rod 33 is rotatably connected to the second pulley 34, and the second driving disk 19 is provided with a second driving groove 23 adapted for sliding connection to the second pulley 34. The second driving groove 23 is provided with a third area 24 and a fourth area 25.

[0037] Furthermore, the material picking and unloading mechanism also includes a fifth connecting shaft 40 for driving the first driving disk 17 and the second driving disk 19 to rotate. The second connecting shaft 18 is rotatably connected to the fourth connecting shaft 37 through the first synchronous belt 36. The fourth connecting shaft 37 is fixedly connected to the first gear 38. The first gear 38 is meshed with the second gear 39. The diameter of the first gear 38 is larger than that of the second gear 39. The second gear 39 is fixedly connected to the fifth connecting shaft 40. The fourth connecting shaft 37 and the fifth connecting shaft 40 are both rotatably connected to the support seat 5.

[0038] Furthermore, the material picking and discharging mechanism also includes a worm wheel 41 and a worm 42 for driving the fifth connecting shaft 40 to rotate. The worm 42 is fixedly connected to the rotating shaft of the first sprocket 43 and is rotatably connected to the support frame 6. The worm 42 is meshingly connected to the worm wheel 41, and the worm wheel 41 is fixedly connected to the fifth connecting shaft 40.

[0039] Preferably, the finished steel mesh frames 3 are conveyed one by one on the conveyor 2, and the second limit plate 64 on the conveyor 2 limits the finished steel mesh frames 3. When the material is picked up, loaded and stacked, the worm 42 is driven to rotate accordingly under the driving action of the first motor 45 in the loading and stacking mechanism, and the second gear 39 on the fifth connecting shaft 40 is driven to rotate under the meshing connection between the worm 42 and the worm wheel 41, and the first driving disk 17 and the second driving disk 19 on the second connecting shaft 18 are driven to rotate under the meshing connection between the second gear 39 and the first gear 38 and the synchronous driving action of the first synchronous belt 36. Under the driving action of the first driving groove 20 in the first driving groove 23 in the second driving disk 19, the grabbing suction cup 9 on the conveyor 2 and the material discharge processing on the first inclined guide seat 4 can be completed.

[0040] The specific working method is as follows: since the second pulley 34 on the second connecting rod 33 is adapted to be slidably connected to the second driving groove 23 on the second driving plate 19, and the first pulley 14 is adapted to be slidably connected to the first driving groove 20 on the first driving plate 17, and the first slider 13 is adapted to be slidably connected to the first slide groove 12, the transverse moving plate 11 is adapted to be slidably connected to the L-shaped moving plate 26 through the second slider 28, and the third slider 31 connected to one end of the first connecting rod 30 is adapted to be slidably connected to the third slide groove 32 on the L-shaped moving plate 26, so that the second driving plate 19 is driven by the second driving plate 19. When the second connecting rod 33 on the movable second pulley 34 and the first connecting rod 30 are flipped, the L-shaped movable plate 26 can be reciprocated on the support seat 5 accordingly. When the first driving disk 17 drives the first sliding block 13 to slide back and forth and is connected to the transverse movable plate 11, the grabbing suction cup 9 on the grabbing arm 10 can be synchronously driven to move back and forth, thereby completing the material picking and discharging operation of the finished steel mesh frame 3. This automated operation method greatly reduces manual intervention, improves production efficiency, and reduces labor costs, thereby significantly improving the work efficiency of later stacking.

[0041] It should also be noted that the movement and reciprocating descent of the grabbing suction cup 9 are driven by the second driving groove 23 in the second driving disc 19 and the first driving groove 20 in the first driving disc 17. When the second pulley 34 on the second connecting rod 33 moves to the third area 24 in the second driving disc 19 and the first pulley 14 moves to the second area 22 in the first driving disc 17, the grabbing arm 10 drives the grabbing suction cup 9 to discharge the finished steel mesh frame 3 on the first inclined guide seat 4. When the second pulley 34 on the second connecting rod 33 moves to the fourth area 25 in the second driving disc 19 and the first pulley 14 moves to the first area 21 in the first driving disc 17, the grabbing arm 10 drives the grabbing suction cup 9 to pick up the finished steel mesh frame 3 on the conveyor 2, which is a cycle, thereby completing the picking and discharging of the finished steel mesh frame 3 without manual intervention, and significantly improving the work efficiency. Fig. 9 This is a schematic diagram of the state of the grabbing suction cup 9 grabbing the finished steel mesh frame 3 on the conveyor 2. Figure 1 It is a schematic structural diagram of the state in which the finished steel mesh frame 3 is placed on the first inclined material guide seat 4 by grabbing the suction cup 9.

[0042] It should be particularly noted that the second connecting shaft 18 and the fourth connecting shaft 37 are both provided with pulleys which are synchronously connected to the first synchronous belt 36 .

[0043] Embodiment 2, as Figures 1 to 11As shown, based on Example 1, this embodiment further includes a loading and stacking mechanism, which is installed on the base plate 1 and the support frame 6, and is used to stack and transport the taken out finished steel mesh frames 3 one by one and drive the material picking and unloading mechanism to operate synchronously. The loading and stacking mechanism includes a first oblique material guide seat 4 and a second oblique material guide seat 53 for oblique material guide transmission and a moving block 49 for loading and transmission. The moving block 49 is movably installed on the support frame 6. A plurality of support rods 51 for receiving materials are arranged on the moving block 49. The support rods 51 are equidistantly and obliquely installed on the moving block 49. A first limit plate 52 is arranged on the upper side of one side of the support rod 51, and the first limit plate 52 is fixedly installed on the moving block 49.

[0044] Furthermore, the loading and stacking mechanism also includes a lifting block 48 for driving the moving block 49 to move, the lifting block 48 is slidably connected to the guide slide 47, the guide slide 47 is fixedly installed on the support frame 6, the moving block 49 is limitedly slidably connected to the inside of the lifting block 48, the first oblique material guide seat 4 is provided with a plurality of first material guide rollers 7 for feeding, the first material guide rollers 7 are rotatably connected to the first oblique material guide seat 4 at equal intervals, the first oblique material guide seat 4 is provided with a first avoidance groove 8 for avoiding the support rod 51, and the second oblique material guide seat 5 is provided with a plurality of first material guide rollers 7 for feeding, and the first material guide rollers 7 are rotatably connected to the first oblique material guide seat 4 at equal intervals. 3 is provided with a plurality of second material guiding rollers 55 for feeding materials, the second material guiding rollers 55 are rotatably connected to the second oblique material guiding seat 53 at equal intervals, the second oblique material guiding seat 53 is provided with a second avoiding groove 54 for avoiding the support rod 51, the first oblique material guiding seat 4 and the second oblique material guiding seat 53 are both obliquely arranged and installed on the bottom plate 1, and the second material guiding rollers 55 on the second oblique material guiding seat 53 and the first material guiding rollers 7 on the first oblique material guiding seat 4 do not interfere with the movable support rod 51 and the first limiting plate 52 and are cross-arranged.

[0045] Furthermore, the loading and stacking mechanism also includes a first sprocket 43, a second sprocket 44 and a chain 46 for driving the support rod 51 and the first limiting plate 52 to carry out material feeding movement. The first sprocket 43 and the second sprocket 44 are both rotatably mounted on the support frame 6. The first sprocket 43 and the second sprocket 44 are both transmission-connected with the chain 46. The moving block 49 is installed on the pin shaft of the chain 46 through the sixth connecting shaft 50. The second sprocket 44 is fixedly connected to the output shaft of the first motor 45, and the first motor 45 is fixedly mounted on the support frame 6.

[0046] Furthermore, the loading and stacking mechanism also includes a third material guide roller 56 and a second motor 58 for auxiliary material feeding at the rear end of the second inclined material guide seat 53. The third material guide roller 56 is rotatably connected to the second inclined material guide seat 53 at equal intervals. The third material guide roller 56 is rotatably connected through a second synchronous belt 57. One end of the third material guide roller 56 is fixedly connected to the output shaft of the second motor 58, and the second motor 58 is fixedly installed on the second inclined material guide seat 53.

[0047] Preferably, in this embodiment, the finished steel mesh frame 3 placed by the grabbing suction cup 9 is moved to the boundary of the first avoidance groove 8 under the oblique direction of the first oblique guide seat 4 and the transmission action of the first guide roller 7, and the second sprocket 44 is correspondingly driven to rotate by the rotation of the first motor 45, so that the circular transmission of the chain 46 is realized under the follower action of the first sprocket 43, and because the moving block 49 is installed on the pin shaft of the chain 46 through the sixth connecting shaft 50, and the moving block 49 is slidably connected to the inside of the lifting block 48, the moving block 49 can drive the support rod 51 and the first limit plate 52 to move back and forth up and down following the transmission of the chain 46, and because the first guide roller 7 on the first oblique guide seat 4 and the second guide roller 53 on the second oblique guide seat The material rollers 55 do not interfere with the movable support rod 51 and the first limit plate 52 and are cross-arranged, so that the support rod 51 and the first limit plate 52 follow the chain 46 to the lower position of the first inclined material guide seat 4, and the finished steel mesh frame 3 on the first inclined material guide seat 4 can be lifted up, and because the support rod 51 is tilted toward the first limit plate 52, the finished steel mesh frame 3 is effectively prevented from falling from the support rod 51. When the support rod 51 and the first limit plate 52 follow the chain 46 to the lower position of the second inclined material guide seat 53, the second material guide roller 55 on the second inclined material guide seat 53 can lift the finished steel mesh frame 3 on the support rod 51. At this time, the finished steel mesh frame 3 can be subsequently transmitted through the second material guide roller 55.

[0048] The transmission through the first sprocket 43, the second sprocket 44 and the chain 46 and the limit movement of the lifting block 48 can provide a stable driving force, so that the finished steel mesh frame 3 maintains good stability during the rising process, thereby facilitating subsequent transmission operations. At the same time, the wear degree of the first sprocket 43, the second sprocket 44 and the chain 46 is relatively low, which greatly reduces costs and significantly improves work efficiency.

[0049] Embodiment 3, as Figures 1 to 12 As shown, the present embodiment, based on the above-mentioned embodiment, further includes a stacking storage mechanism, which is installed on the supporting rotating disk 59 and is used to drive the silos 60 to store and receive the finished steel mesh frames 3 one by one. The number of silos 60 is several and all are installed on the supporting rotating disk 59. The supporting rotating disk 59 is rotatably installed on the base plate 1 through an electric rotating seat 63.

[0050] Furthermore, the stacking storage mechanism includes an adjustment plate 61 for adjusting storage in the silo 60. The adjustment plate 61 is limitedly slidably connected to the inside of the silo 60. The adjustment plate 61 is fixedly connected to the piston rod of the electric push rod 62. The electric push rod 62 is fixedly installed on the supporting rotating disk 59. The opening of the silo 60 is set toward the second inclined material guide seat 53.

[0051] Preferably, in the present embodiment, when the finished steel mesh frame 3 on the second oblique material guide seat 53 moves to the tail end of the second oblique material guide seat 53, the output shaft of the second motor 58 drives the third material guide roller 56 to rotate, thereby driving the plurality of third material guide rollers 56 to rotate under the synchronous driving action of the plurality of second synchronous belts 57, so as to facilitate the conveying and transmission of the finished steel mesh frame 3 on the third material guide roller 56 to the adjustment plate 61 in the silo 60, and according to the number of finished steel mesh frames 3 stacked in the silo 60, the electric push rod 62 drives the adjustment plate 61 to adjust the height direction, so as to complete the stacking operation of the finished steel mesh frame 3 in the silo 60, and the electric rotating seat 63 can correspondingly drive the silo 60 on the supporting rotating disk 59 to rotate, so as to complete the stacking operation of the silo 60 one by one, and realize batch stacking operation. This stacking method not only saves labor costs, but also optimizes space utilization, thereby significantly improving work efficiency and enhancing enterprise benefits.

[0052] It should be particularly noted that the third material guiding roller 56 is provided with a pulley which is synchronously connected with the second synchronous belt 57 .

[0053] It should be particularly noted that the components in this application are all universal standard parts or components well known to those skilled in the art, which effectively solve the technical problems raised in the background technology.

[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A SMT finished steel mesh frame stacking silo, comprising a bottom plate (1), characterized in that: The bottom plate (1) is provided with a conveyor (2) for conveying the finished steel mesh frame (3) and a silo (60) for storing the finished steel mesh frame (3), the conveyor (2) is provided with a second limiting plate (64) for limiting the position of the finished steel mesh frame (3), and further comprises: A material picking and discharging mechanism, which is mounted on a support seat (5) and is used to pick out finished steel mesh frames (3) on a conveyor (2) one by one for loading and processing, the material picking and discharging mechanism comprising a grabbing suction cup (9), a grabbing arm (10), a transverse moving plate (11) and an L-shaped moving plate (26) for driving the material picking and discharging, the grabbing suction cup (9) being fixedly mounted on the grabbing arm (10), the grabbing arm (10) being fixedly mounted on the transverse moving plate (11), the transverse moving plate (11) being limitedly slidably connected to the L-shaped moving plate (26) via a second slider (28), and the L-shaped moving plate (26) being limitedly slidably connected to the support seat (5) via a fourth slider (35); A material loading and stacking mechanism, which is installed on the bottom plate (1) and the support frame (6), and is used for stacking and transmitting the taken-out finished steel mesh frames (3) one by one and driving the material taking and discharging mechanism to operate synchronously, the material loading and stacking mechanism comprising a first inclined material guide seat (4) and a second inclined material guide seat (53) for inclined material guide transmission and a moving block (49) for loading and transmission, the moving block (49) being movably installed on the support frame (6), the moving block (49) being provided with a plurality of support rods (51) for receiving materials, the support rods (51) being installed on the moving block (49) at equal intervals and in an inclined manner, a first limit plate (52) being provided above one side of the support rod (51), the first limit plate (52) being fixedly installed on the moving block (49); A stacking storage mechanism is mounted on a supporting rotating disk (59) and is used to drive a silo (60) to store and receive finished steel mesh frames (3) one by one. The silos (60) are multiple in number and are all mounted on the supporting rotating disk (59). The supporting rotating disk (59) is rotatably mounted on a bottom plate (1) via an electric rotating seat (63).

2. The SMT finished steel mesh frame stacking silo according to claim 1, characterized in that: The loading and stacking mechanism further comprises a lifting block (48) for driving the moving block (49) to move, the lifting block (48) being slidably connected to a guide slide bar (47), the guide slide bar (47) being fixedly mounted on a support frame (6), the moving block (49) being limitedly slidably connected to the inside of the lifting block (48), the first oblique material guide seat (4) being provided with a plurality of first material guide rollers (7) for feeding materials, the first material guide rollers (7) being rotatably connected to the first oblique material guide seat (4) at equal intervals, the first oblique material guide seat (4) being provided with a first avoidance groove (8) for avoiding a support rod (51), the second oblique material guide seat (4) being provided with a plurality of first material guide rollers (7) for feeding materials, A plurality of second material guide rollers (55) for feeding materials are arranged on the seat (53); the second material guide rollers (55) are rotatably connected to the second inclined material guide seat (53) at equal intervals; the second inclined material guide seat (53) is provided with a second avoidance groove (54) for avoiding the support rod (51); the first inclined material guide seat (4) and the second inclined material guide seat (53) are both obliquely arranged and installed on the bottom plate (1); and the second material guide rollers (55) on the second inclined material guide seat (53) and the first material guide rollers (7) on the first inclined material guide seat (4) do not interfere with the movable support rod (51) and the first limit plate (52) and are cross-arranged.

3. The SMT finished steel mesh frame stacking silo according to claim 2, characterized in that: The loading and stacking mechanism further comprises a first sprocket (43), a second sprocket (44) and a chain (46) for driving the support rod (51) and the first limit plate (52) to move the material feeding, the first sprocket (43) and the second sprocket (44) are both rotatably mounted on the support frame (6), the first sprocket (43) and the second sprocket (44) are both transmission-connected with the chain (46), the moving block (49) is mounted and connected to the pin of the chain (46) via a sixth connecting shaft (50), the second sprocket (44) is fixedly connected to the output shaft of the first motor (45), and the first motor (45) is fixedly mounted on the support frame (6).

4. The SMT finished steel mesh frame stacking silo according to claim 3, characterized in that: The loading and stacking mechanism further comprises a third material guide roller (56) and a second motor (58) for assisting material feeding by docking the rear end of the second inclined material guide seat (53); the third material guide roller (56) comprises a plurality of rollers rotatably connected to the second inclined material guide seat (53) at equal intervals; the third material guide roller (56) is rotatably connected via a second synchronous belt (57); one end of the third material guide roller (56) is fixedly connected to the output shaft of the second motor (58); and the second motor (58) is fixedly mounted on the second inclined material guide seat (53).

5. The SMT finished steel mesh frame stacking silo according to claim 1, characterized in that: The material picking and discharging mechanism further comprises a first driving disk (17) and a second driving disk (19) for driving the grabbing suction cup (9) to perform reciprocating movement control. The first driving disk (17) and the second driving disk (19) are both rotatably mounted on the support seat (5) via a second connecting shaft (18). The transverse moving plate (11) is provided with a first sliding groove (12) adapted to be slidably connected to the first sliding block (13). The L-shaped moving plate (26) is provided with a second sliding groove (27) adapted to be slidably connected to the second sliding block (28). The first sliding block (13) is rotatably connected to a first pulley (14) and one end of a connecting rotating rod (15). The other end of the connecting rotating rod (15) is rotatably mounted on the support seat (5) via a first connecting shaft (16). The first driving disk (17) is provided with a first driving groove (20) adapted to be slidably connected to the first pulley (14). The first driving groove (20) is provided with a first area (21) and a second area (22).

6. The SMT finished steel mesh frame stacking silo according to claim 5, characterized in that: The material picking and discharging mechanism further comprises a first connecting rod (30) and a second connecting rod (33) for driving the L-shaped movable plate (26) to reciprocate, the first connecting rod (30) and the second connecting rod (33) being fixedly mounted on a third connecting shaft (29), the third connecting shaft (29) being rotatably mounted on a support seat (5), the first connecting rod (30) and the second connecting rod (33) being arranged at an angle of 90°, one end of the first connecting rod (30) being rotatably connected to a third sliding block (31), the L-shaped movable plate (26) being provided with a third sliding groove (32) adapted to be slidably connected to the third sliding block (31), one end of the second connecting rod (33) being rotatably connected to a second pulley (34), the second driving disc (19) being provided with a second driving groove (23) adapted to be slidably connected to the second pulley (34), the second driving groove (23) being provided with a third area (24) and a fourth area (25).

7. The SMT finished steel mesh frame stacking silo according to claim 6, characterized in that: The material picking and discharging mechanism further comprises a fifth connecting shaft (40) for driving the first driving disk (17) and the second driving disk (19) to rotate; the second connecting shaft (18) is rotatably connected to a fourth connecting shaft (37) via a first synchronous belt (36); a first gear (38) is fixedly connected to the fourth connecting shaft (37); a second gear (39) is meshingly connected to the first gear (38); the diameter of the first gear (38) is larger than that of the second gear (39); the second gear (39) is fixedly connected to the fifth connecting shaft (40); and the fourth connecting shaft (37) and the fifth connecting shaft (40) are both rotatably connected to the support seat (5).

8. The SMT finished steel mesh frame stacking silo according to claim 7, characterized in that: The material picking and discharging mechanism also includes a worm wheel (41) and a worm (42) for driving the fifth connecting shaft (40) to rotate, wherein the worm (42) is fixedly connected to the rotating shaft of the first sprocket wheel (43) and the worm (42) is rotatably connected to the support frame (6), and the worm wheel (41) is meshingly connected to the worm (42), and the worm wheel (41) is fixedly connected to the fifth connecting shaft (40).

9. The SMT finished steel mesh frame stacking silo according to claim 1, characterized in that: The stacking storage mechanism comprises an adjustment plate (61) for adjusting storage in a silo (60); the adjustment plate (61) is slidably connected to the interior of the silo (60) in a limited position; the adjustment plate (61) is fixedly connected to a piston rod of an electric push rod (62); the electric push rod (62) is fixedly mounted on a supporting rotating disk (59); and the opening of the silo (60) is arranged toward the second inclined material guide seat (53).

Citation Information

Patent Citations

  • Method for manufacturing and commissioning of e.g. wedge-marked timber slats, involves carrying out continuous endless production without causing assortment changes to commissioning of goods ready for dispatch

    AT513102A2

  • Storage cabinet with racks on endless chain - has spacing links between pivots at ends of racks vertically movable to different positions within frame

    CH663882A5

  • Multi-inlet multi-outlet efficient circulating elevator

    CN105645012A

  • Goods taking and placing method based on carrying robot and system

    CN110482098A

  • Transfer device for stone slab production

    CN116986212A

Cited By

  • Wood stacking device for wood board production

    CN119637535A

  • A wood stacking device for wood board production

    CN119637535B