Device and method for treating coking wastewater by utilizing sintering flue gas and waste heat

By designing a device that uses sintered flue gas and waste heat to treat coking wastewater in an iron smelting plant, efficient purification and energy recovery of coking wastewater is achieved, and the problems of unstable water quality, large land occupation and high energy consumption are solved. It is suitable for coking and sintering Iron smelting plant with co-operation of technology.

CN119038812APending Publication Date: 2024-11-29BEIJING LONGYUAN WEIDE ENERGY TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411400698.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

There are problems of unstable water quality, large area and high energy consumption in coking wastewater treatment. Especially in iron smelting plants that operate coking and sintering processes, it is difficult for the existing technology to effectively use sintered flue gas and waste heat for wastewater treatment.

Method used

A device is designed, including a flue gas reactor, a preloader, a waste heat boiler, a catalytic reactor and a turbine compressor, through the high-temperature cracking, adsorption, neutralization of sintered flue gas and coking wastewater and Redox reaction, combined with waste heat boiler, heats the wastewater, and uses catalysts to carry out catalytic oxidation reactions to achieve deep purification of wastewater and reduce energy consumption through energy recovery.

Benefits of technology

It effectively removes pollutants in coking wastewater, reduces water quality pollution, saves energy consumption and land occupation, and improves treatment efficiency. It is suitable for iron smelting plants that operate coking and sintering processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119038812A_ABST
    Figure CN119038812A_ABST
Patent Text Reader

Abstract

The invention provides a device and method for treating coking wastewater through sintering flue gas and waste heat, the device comprises a flue gas reactor, a sedimentation tank, a high-pressure pump, a preheater and a waste heat boiler which are connected in sequence, the waste heat boiler is connected with a catalytic reactor, and the top of the catalytic reactor is connected with a water vapor inlet of the preheater; a water vapor outlet of the preheater is connected with the steam-water separator, an outlet of the steam-water separator is connected with the turbine compressor, and the turbine compressor is connected with the catalytic reactor. The flue gas of the sintering machine head is used for pretreating the wastewater, and pollutants in the wastewater are subjected to high-temperature cracking, adsorption, neutralization, oxidation reduction and other reactions, so that the pollutants in the wastewater are effectively removed; the waste water is heated and pressurized by utilizing hot air at the first section of the sintering circular cooler and a high-pressure pump, and a wet catalytic oxidation reaction is carried out. Sintering flue gas and waste heat are fully utilized, coking wastewater is efficiently treated in an energy-saving mode, superheated water and steam discharged after catalytic reaction are subjected to two times of energy recovery through the preheater and the turbine compressor, and energy conservation and consumption reduction are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy-saving and environmental protection industry, and in particular to a device and method for treating coking wastewater by utilizing sintering flue gas and waste heat. Background Art

[0002] Coking wastewater is wastewater produced in the process of producing coke, coal gas, tar and coking products in coking plants. It has complex composition and contains a large number of highly toxic and carcinogenic substances that are difficult to degrade and harmful to aquatic life and human body. Coking wastewater is generally treated by biochemical method, but the process operation is unstable, the COD and ammonia nitrogen in the treated drainage are difficult to meet the standards, the color and odor are heavy, the land occupation is large, and the treatment cost is high.

[0003] For the treatment of coking wastewater, such as wet catalytic oxidation, it has a good effect on pollutants such as COD and ammonia nitrogen. The indicators after treatment meet my country's emission standards, but there are still various problems. Wet catalytic oxidation requires harsh conditions of about 250°C and 4-8MPa to completely degrade COD. The reaction time is proportional to the concentration of pollutants in the influent. The heat source generally uses electric heating, which consumes a lot of electricity. Reasonable pretreatment of high-concentration coking wastewater can appropriately reduce the reaction temperature, pressure and time of wet catalytic oxidation.

[0004] Coking and sintering are both processes used by iron smelters to treat coal and iron ores. The flue gas temperature at the sintering machine head is relatively high, and the dust in the flue gas is formed at high temperatures. Similar to fly ash, it has a strong adsorption effect. The flue gas contains acidic gases such as sulfur dioxide and nitrogen oxides, which can crack, adsorb and neutralize pollutants in coking wastewater. The cooling process of sintered ore generates a large amount of waste heat. At present, the cooling of sintered ore generally adopts traditional ring coolers. The hot gas temperature of the first stage of the ring cooler can reach 350-500℃, which can meet the requirements of the heat source of wet catalytic oxidation.

[0005] In summary, in an ironmaking plant where coking and sintering processes are operated together, a process is needed to treat coking wastewater by utilizing sintering flue gas and waste heat, so as to reuse the waste gas and waste heat and treat coking wastewater efficiently and energy-savingly. Summary of the invention

[0006] The purpose of the present invention is to provide a device and method for treating coking wastewater by utilizing sintering flue gas and waste heat, which comprehensively utilizes the waste gas and waste heat generated by the sintering process to treat the coking wastewater with high efficiency and energy saving, and effectively solves the problems of unstable water quality, large footprint and high energy consumption in the biochemical treatment of coking wastewater. The device is particularly suitable for ironmaking plants where coking and sintering processes are operated together.

[0007] According to one object of the present invention, the present invention provides a device for treating coking wastewater using sintering flue gas and waste heat, comprising a flue gas reactor, a sedimentation tank, a high-pressure pump, a preheater, a waste heat boiler, a catalytic reactor, a steam-water separator and a turbine compressor, wherein the flue gas reactor, the sedimentation tank, the high-pressure pump, the preheater and the waste heat boiler are connected in sequence; the waste heat boiler is connected to the bottom of the catalytic reactor, the top of the catalytic reactor is connected to the water vapor inlet of the preheater, the water vapor outlet of the preheater is connected to the steam-water separator, the outlet of the steam-water separator is connected to the turbine compressor, and the turbine compressor is connected to the bottom of the catalytic reactor.

[0008] Furthermore, a drug adding device is provided on the front end pipeline of the high pressure pump.

[0009] Furthermore, a nozzle is provided inside the flue gas reactor, and the nozzle is connected to the coking wastewater pipeline; the bottom of the flue gas reactor is connected to the sintering flue gas pipeline, and a porous filler is provided inside the flue gas reactor.

[0010] Furthermore, a mud hopper is provided at one side of the bottom of the sedimentation tank, and a mud discharge port is provided at the bottom of the sedimentation tank; and a drainage port is provided at the bottom of the steam-water separator.

[0011] Furthermore, the waste heat boiler is connected to the ring cooling hot gas pipeline, the hot gas temperature of the ring cooling hot gas in the ring cooling hot gas pipeline is 350-500°C; the reaction temperature in the catalytic reactor is 200-230°C, the pressure is 1.6-3MPa, and the residence time is 30-90min.

[0012] Furthermore, the catalyst in the catalytic reactor is based on TiO2 and ZrO2 as carriers, loaded with one or more active components of Fe, Co, Ni, Ru, Rh, Pd, Pt, Cu, and Au, and arranged in a honeycomb form.

[0013] According to another object of the present invention, the present invention provides a method for using the above-mentioned device for treating coking wastewater using sintering flue gas and waste heat, comprising the following steps:

[0014] S1, wastewater enters from the top of the flue gas reactor and is evenly sprayed, the sintering machine head flue gas enters from the bottom of the flue gas reactor, and the waste gas after the reaction returns to the sintering machine head flue;

[0015] S2, the wastewater after the reaction enters the sedimentation tank for gravity sedimentation, and the precipitated sludge is discharged into the sludge treatment system through the bottom sludge discharge port;

[0016] S3, the upper clear water after sedimentation is pressurized by a high-pressure pump, and the pressurized wastewater enters the cold inlet of the preheater, and enters the waste heat boiler after being preheated by the preheater;

[0017] S4, the wastewater heated by the waste heat boiler enters the catalytic reactor for catalytic reaction, and the superheated water and steam discharged from the catalytic reactor are introduced into the hot inlet of the preheater to preheat the wastewater;

[0018] S5, after the catalytic oxidation reaction, the superheated water and steam complete the heat exchange with the inlet water in the preheater, and then enter the steam-water separator. The separated outlet water is discharged from the bottom of the steam-water separator for reuse or discharge in compliance with the standards; the waste gas separated by the steam-water separator is discharged from the top and enters the turbine air inlet of the turbine compressor to provide power for the operation of the turbine compressor;

[0019] S6, the compressed air produced by the turbine compressor is introduced into the bottom of the catalytic reactor, and the amount of gas introduced is converted according to the amount of oxygen required for the calculated catalytic oxidation reaction.

[0020] Furthermore, in S1, the flow rate of the flue gas in the flue gas reactor is controlled to be 1-2 m / s; in S2, the sedimentation time of the sedimentation tank is controlled to be greater than 1.5 h, and intermittent sludge discharge is adopted according to the water quality conditions.

[0021] Furthermore, the maximum pressure of the high-pressure pump in S3 is 5MPa, and frequency conversion regulation is adopted. The operating pressure is set according to the water quality of the inlet and outlet water. A dosing port of the dosing device is reserved in the inlet process pipeline of the high-pressure pump, and an auxiliary oxidant or scale inhibitor is selected according to the water quality. Furthermore, a section of hot gas from the sintering ring cooler is introduced into the bottom of the boiler of the waste heat boiler in S3 as a heat source, and the hot gas temperature is 350-500℃. The tail gas after heating returns to the ring cooler or is introduced into the next step of waste heat recovery device; the reaction temperature of the catalytic reactor in S4 is 200-230℃, the pressure is 1.6-3MPa, and the residence time is 30-90min.

[0022] Furthermore, in S5, both the exhaust port and the drain port of the steam-water separator are provided with pressure regulating valves, and the valve opening is adjusted to control the internal pressure of the catalytic reactor and adjust the exhaust-water ratio.

[0023] The technical solution of the present invention rationally utilizes the flue gas from the sintering machine head to pre-treat the wastewater. According to the characteristics of high temperature of the waste gas and strong adsorption of smoke dust, the pollutants in the wastewater are subjected to high-temperature cracking, adsorption, neutralization and oxidation-reduction reactions, which not only effectively removes the pollutants in the wastewater, but also has a certain dust removal and humidification effect on the flue gas. At the same time, it enhances the precipitation effect of suspended matter in the wastewater and preheats the wastewater. The present invention uses a waste heat boiler to heat the wastewater so that the wastewater reaches the temperature required for the wet catalytic oxidation reaction. The hot gas from the first stage of the sintering ring cooler is used as a heat source, which effectively utilizes the waste heat generated in the cooling process of the sintered ore, thereby saving energy and reducing consumption. The superheated water and steam discharged after the catalytic reaction is completed in the present invention are recycled twice through a preheater and a turbine compressor, thereby saving energy and reducing consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0025] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;

[0026] In the figure, 1. Flue gas reactor; 2. Sedimentation tank; 3. High-pressure pump; 4. Preheater; 5. Waste heat boiler; 6. Catalytic reactor; 7. Steam-water separator; 8. Turbine compressor; 9. Dosing device. DETAILED DESCRIPTION

[0027] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0029] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0030] Example 1

[0031] like Figure 1 As shown, a device for treating coking wastewater by using sintering flue gas and waste heat comprises a flue gas reactor 1, a sedimentation tank 2, a high-pressure pump 3, a preheater 4, a waste heat boiler 5, a catalytic reactor 6, a steam-water separator 7, a turbine compressor 8 and a dosing device 9; wherein the flue gas reactor 1, the sedimentation tank 2, the high-pressure pump 3, the preheater 4 and the waste heat boiler 5 are connected in sequence through pipelines; the waste heat boiler 5 is connected to the bottom of the catalytic reactor 6 through a pipeline, the top of the catalytic reactor 6 is connected to the water vapor inlet of the preheater 4, the water vapor outlet of the preheater 4 is connected to the steam-water separator 7, the outlet of the steam-water separator 7 is connected to the turbine compressor 8, and the turbine compressor 8 is connected to the bottom of the catalytic reactor 6; the dosing device 9 is connected to the front end pipeline of the high-pressure pump 3.

[0032] In this embodiment, the coking wastewater enters from the top of the flue gas reactor 1 and is sprayed evenly, and the sintering head flue gas enters from the bottom. A porous filler is provided in the flue gas reactor 1 to make the wastewater and the flue gas fully contact, and the following reaction occurs, thereby removing some pollutants in the wastewater:

[0033] (1) High temperature cracking reaction: The sintering flue gas temperature of the sintering machine head can reach 250-280℃. Some macromolecular organic matter in the coking wastewater will be cracked at high temperature, while the wastewater temperature will be increased, providing conditions for subsequent units to treat the wastewater.

[0034] (2) Adsorption reaction: The main components of smoke in sintering (flue gas) exhaust gas are similar to fly ash, mainly containing SiO, Al2O3, Fe2O3, CaO, MgO, unburned carbon, etc., which have a large specific surface area under high temperature conditions, especially unburned carbon, which mostly has a loose porous structure and has a certain solid adsorption capacity, which can effectively remove COD, color and other difficult-to-degrade organic pollutants in wastewater.

[0035] (3) Acid-base neutralization reaction: Sintering (flue gas) waste gas contains acidic gases such as sulfur dioxide and nitrogen oxides. Coking water contains alkaline substances such as nitrogen, pyridine and carbonate, which undergo acid-base neutralization reaction in the reactor; phenolic compounds in coking waste water are organic weak acids, which react with alkaline substances such as calcium oxide in the waste gas dust.

[0036] (4) Redox reaction: Phenols, cyanides and ammonium salts in wastewater undergo redox reactions to remove some of the difficult-to-degrade pollutants in the wastewater. The reaction equation is as follows:

[0037] 2CN - +O2+4H2O→2NH4 + +2CO3 2-

[0038] CN -+2H2O→NH3+CO2+OH -

[0039] C6H5OH+7O2→6CO2+3H2O

[0040] 4MeO+2NH4CI→4H2O+N2+MeCl2+3Me

[0041] In the formula, Me is a general term for various metals.

[0042] The waste gas after the reaction is discharged from the top of the flue gas reactor 1 and then returns to the sintering machine head flue.

[0043] In this embodiment, the wastewater after the flue gas reaction enters the sedimentation tank 2, and the suspended matter in the wastewater is precipitated by gravity. Since the sintering smoke contains magnesium and aluminum oxides, it is carried out with the wastewater together with part of other smoke after reacting with the wastewater, thereby improving the sedimentation effect of the suspended matter in the wastewater. Therefore, there is no need to add chemicals to the sedimentation tank to aid flocculation. A mud hopper is provided on one side of the bottom of the sedimentation tank, and the precipitated sludge is discharged to the sludge treatment unit.

[0044] In this embodiment, the high-pressure pump 3 adopts variable frequency operation, and the operating pressure is adjustable. The inlet pipe of the high-pressure pump 3 is connected to a dosing device 9, which can add auxiliary oxidants, scale inhibitors and other agents according to water quality conditions.

[0045] In this embodiment, the preheater 4 preheats the wastewater through the superheated water and steam discharged from the catalytic reactor 6, recovers the energy of the entire process, and reduces the overall energy consumption.

[0046] In this embodiment, the waste heat boiler 5 is fed with a section of hot gas from the sintering ring cooler as a heat source, and the hot gas temperature is 350-500°C. The amount of hot gas introduced can be adjusted according to the reaction temperature and pressure predetermined by the process. The heated tail gas returns to the ring cooler or is introduced into the next step of the waste heat recovery device.

[0047] The heated wastewater is passed into the catalytic reactor 6 from the bottom. Since the wastewater is pre-treated with flue gas reaction and precipitation, the reaction temperature is 200-230°C and the pressure is 1.6-3MPa. The temperature and pressure are adjusted according to the water quality of the inlet and outlet water. The catalytic reactor 6 is equipped with a catalyst to improve the oxidation decomposition ability, reduce the temperature and pressure required for the reaction, shorten the time, prevent equipment corrosion and reduce costs. The catalyst uses TiO2 and ZrO2 as carriers, and is loaded with one or more active components of Fe, Co, Ni, Ru, Rh, Pd, Pt, Cu, and Au. It is arranged in a honeycomb form to avoid clogging. The wastewater is kept in liquid state under high temperature and high pressure. The compressed gas outlet of the turbine compressor 8 is connected to the bottom of the catalytic reactor 6, and air is introduced for the catalytic reaction. Under the action of the catalyst, the pollutants in the coking wastewater are thoroughly oxidized and decomposed and converted into harmless substances, so that the wastewater is deeply purified. For example, the nitrogen-containing compounds in the wastewater, such as ammonia nitrogen, cyanide, thiocyanide, and organic nitrogen compounds, are decomposed to finally generate N2, CO2, and SO4. 2- wait:

[0048] 4NH3+3O2→6H2O+2N2

[0049] 2NH4SCN+7O2→2N2+2H2O+2H2SO4+2CO2

[0050] Organic pollutants such as phenols and hydrocarbons in wastewater are catalytically oxidized to generate CO2 and H2O, etc.:

[0051] C6H5OH+7O2→6CO2+3H2O

[0052] In this embodiment, the superheated waste water and steam after the reaction of the catalytic reactor 6 are discharged from the top, and after the heat recovery of the preheater 4, they enter the steam-water separator 7 for steam-water separation. The separated water is discharged from the bottom, and the waste gas is discharged from the top. The separated waste gas still has a high temperature and pressure, and is passed into the turbine air inlet of the turbine compressor 8 to provide a power source for the operation of the turbine compressor 8, and is discharged through the turbine air outlet. The main components of the waste gas are CO2, N2, water vapor and excess air, etc., and contain very small amounts of volatile organic compounds (VOCs) and CO, which meet the waste gas emission standards and can be directly discharged.

[0053] In this embodiment, the high-pressure pump 3, the preheater 4, the waste heat boiler 5, the catalytic reactor 6, the steam-water separator 7, the turbine compressor 8 and the connected pipelines are all made of 316L material with a pressure rating of 10 MPa.

[0054] The working process of the present invention is as follows:

[0055] Wastewater enters from the top of the flue gas reactor 1 and is sprayed evenly. The flue gas from the sintering machine head is introduced from the bottom. The flow rate of the flue gas in the flue gas reactor 1 is controlled to be 1-2m / s. The waste gas after the reaction returns to the flue of the sintering machine head; then it enters the sedimentation tank 2 for gravity sedimentation, and the sedimentation time is controlled to be greater than 1.5h. The precipitated sludge is discharged into the sludge treatment system through the bottom mud discharge port. Intermittent mud discharge is adopted according to the water quality; then it is pressurized by the high-pressure pump 3. The maximum pressure of the high-pressure pump is 5MPa, and the frequency conversion adjustment is adopted. The operating pressure is set according to the water quality of the inlet and outlet water. The dosing port of the dosing device 9 is reserved in the process pipeline of the high-pressure pump inlet, and the dosing port is selected according to the water quality. Different agents such as auxiliary oxidants and scale inhibitors; the pressurized wastewater enters the cold inlet of the preheater 4, and the superheated water and steam discharged from the catalytic reactor 6 are introduced into the hot inlet of the preheater to preheat the wastewater; then it enters the waste heat boiler 5, and the bottom of the boiler is introduced into a section of hot gas from the sintering ring cooler as a heat source. The hot gas temperature is 350-500℃, and the amount of hot gas introduced can be adjusted according to the reaction temperature and pressure predetermined by the process. The tail gas after heating returns to the ring cooler or is introduced into the next step of waste heat recovery device; then it enters the catalytic reactor 6, and the reaction temperature is controlled to be 200-230℃, the pressure is 1.6-3MPa, and the residence time is 30-90min. The pollutant removal rate is proportional to the temperature and pressure according to the quality of the inlet and outlet water. The compressed air generated by the turbine compressor 8 is introduced from the bottom of the catalytic reactor 6, and the amount of gas introduced is converted according to the calculated amount of oxygen required for the catalytic oxidation reaction. After the superheated water and steam after the catalytic oxidation reaction complete the heat exchange with the inlet water in the preheater 4, they enter the steam-water separator 7, and its exhaust port and drain port are both provided with pressure regulating valves. The valve opening is adjusted to control the internal pressure of the catalytic reactor 6 and adjust the exhaust and drain ratio. The separated water is discharged from the bottom for reuse or emission that meets the standards. The exhaust gas separated by the steam-water separator 7 is discharged from the top and enters the turbine air inlet of the turbine compressor 8 to provide a power source for the operation of the compressor and is discharged through the turbine air outlet.

[0056] The present invention rationally utilizes the flue gas from the sintering machine head to pretreat the wastewater. According to the characteristics of high temperature of the waste gas and strong adsorption of smoke dust, high-temperature cracking, adsorption, neutralization and oxidation-reduction reactions are performed on the pollutants in the wastewater. Not only the pollutants in the wastewater are effectively removed, but also the flue gas has a certain dust removal and humidification effect. At the same time, the precipitation effect of suspended matter in the wastewater is enhanced and the wastewater is preheated.

[0057] The present invention pre-treats wastewater through a flue gas reactor and a sedimentation tank, so that the temperature and pressure of the catalytic reactor are lower than those of a general wet catalytic oxidation process, making the process easier to operate and saving energy and reducing consumption.

[0058] The present invention adopts a waste heat boiler to heat the waste water, and uses the hot gas from a sintering ring cooler as a heat source, thereby effectively utilizing the waste heat generated during the cooling process of the sintered ore, thereby saving energy and reducing consumption.

[0059] The superheated water and steam discharged after the catalytic reaction is completed in the present invention are recycled twice through a preheater and a turbine compressor, thereby saving energy and reducing consumption.

[0060] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A device for treating coking wastewater using sintering flue gas and waste heat, characterized in that: The invention comprises a flue gas reactor, a sedimentation tank, a high-pressure pump, a preheater, a waste heat boiler, a catalytic reactor, a steam-water separator and a turbine compressor, wherein the flue gas reactor, the sedimentation tank, the high-pressure pump, the preheater and the waste heat boiler are connected in sequence; the waste heat boiler is connected to the bottom of the catalytic reactor, the top of the catalytic reactor is connected to the water vapor inlet of the preheater, the water vapor outlet of the preheater is connected to the steam-water separator, the outlet of the steam-water separator is connected to the turbine compressor, and the turbine compressor is connected to the bottom of the catalytic reactor.

2. The device for treating coking wastewater by utilizing sintering flue gas and waste heat according to claim 1, characterized in that: A drug adding device is arranged on the front end pipeline of the high pressure pump.

3. The device for treating coking wastewater by utilizing sintering flue gas and waste heat according to claim 1, characterized in that: A nozzle is arranged inside the flue gas reactor, and the nozzle is connected to a coking wastewater pipeline; a sintering flue gas pipeline is connected to the bottom of the flue gas reactor, and a porous filler is arranged inside the flue gas reactor.

4. The device for treating coking wastewater by utilizing sintering flue gas and waste heat according to claim 1, characterized in that: A mud hopper is arranged at one side of the bottom of the sedimentation tank, and a mud discharge port is arranged at the bottom of the sedimentation tank; and a drainage port is arranged at the bottom of the steam-water separator.

5. The device for treating coking wastewater by utilizing sintering flue gas and waste heat according to claim 1, characterized in that: The waste heat boiler is connected to the ring cooling hot gas pipeline, the hot gas temperature of the ring cooling hot gas in the ring cooling hot gas pipeline is 350-500°C; the reaction temperature in the catalytic reactor is 200-230°C, the pressure is 1.6-3MPa, and the residence time is 30-90min.

6. The device for treating coking wastewater by utilizing sintering flue gas and waste heat according to claim 1, characterized in that: The catalyst in the catalytic reactor is carried by TiO2 and ZrO2, and is loaded with one or more active components of Fe, Co, Ni, Ru, Rh, Pd, Pt, Cu, and Au, and is arranged in a honeycomb form.

7. The method for using the device for treating coking wastewater by utilizing sintering flue gas and residual heat according to any one of claims 1 to 6, characterized in that: The steps include: S1, wastewater enters from the top of the flue gas reactor and is evenly sprayed, the sintering machine head flue gas enters from the bottom of the flue gas reactor, and the waste gas after the reaction returns to the sintering machine head flue; S2, the wastewater after the reaction enters the sedimentation tank for gravity sedimentation, and the precipitated sludge is discharged into the sludge treatment system through the bottom sludge discharge port; S3, the upper clear water after sedimentation is pressurized by a high-pressure pump, and the pressurized wastewater enters the cold inlet of the preheater, and enters the waste heat boiler after being preheated by the preheater; S4, the wastewater heated by the waste heat boiler enters the catalytic reactor for catalytic reaction, and the superheated water and steam discharged from the catalytic reactor are introduced into the hot inlet of the preheater to preheat the wastewater; S5, after the catalytic oxidation reaction, the superheated water and steam complete the heat exchange with the inlet water in the preheater, and then enter the steam-water separator. The separated effluent is discharged from the bottom of the steam-water separator for reuse or discharge in compliance with the standards; The exhaust gas separated by the steam-water separator is discharged from the top and enters the turbine air inlet of the turbine compressor to provide power for the operation of the turbine compressor; S6, the compressed air produced by the turbine compressor is introduced into the bottom of the catalytic reactor, and the amount of gas introduced is converted according to the amount of oxygen required for the calculated catalytic oxidation reaction.

8. The method for using the device for treating coking wastewater by utilizing sintering flue gas and residual heat according to claim 7, characterized in that: In S1, the flow rate of flue gas in the flue gas reactor is controlled to be 1-2m / s; in S2, the sedimentation time of the sedimentation tank is controlled to be greater than 1.5h, and intermittent sludge discharge is adopted according to the water quality conditions.

9. The method for using the device for treating coking wastewater by utilizing sintering flue gas and residual heat according to claim 7, characterized in that: The maximum pressure of the high-pressure pump in S3 is 5MPa. It adopts frequency conversion regulation and sets the operating pressure according to the water quality of the inlet and outlet water. A dosing port of the dosing device is reserved in the inlet process pipeline of the high-pressure pump, and auxiliary oxidants or scale inhibitors are selected according to the water quality. Furthermore, a section of hot gas from the sintering ring cooler is introduced into the bottom of the boiler of the waste heat boiler in S3 as a heat source. The hot gas temperature is 350-500℃, and the tail gas after heating returns to the ring cooler or is introduced into the next step of waste heat recovery device. The reaction temperature of the catalytic reactor in S4 is 200-230℃, the pressure is 1.6-3MPa, and the residence time is 30-90min.

10. The method for using the device for treating coking wastewater by utilizing sintering flue gas and residual heat according to claim 7, characterized in that: In S5, both the exhaust port and the drain port of the steam-water separator are provided with pressure regulating valves, and the valve opening is adjusted to control the internal pressure of the catalytic reactor and adjust the exhaust-water ratio.