Incremental launching construction method applied to variable-height curved beam

By combining variable height support system, step-type push-up system and multi-linked intelligent control system, the construction problem of variable height curve bridges is solved, and intelligent push-up of large-span variable height curve steel box girders is realized, which is suitable for the construction of complex terrain bridges , improve construction efficiency and accuracy.

CN119041316APending Publication Date: 2024-11-29XIAN MUNICIPAL ENG (GRP) CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411484600.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

It is difficult to effectively construct variable-height curved bridges in the prior art, especially in the case of large spans, the multi-point overhead pushing process is more complex and has few applications.

Method used

Using variable height support system, step-type pushing system, lateral deviation correction force transmission system and multi-linked intelligent control system, the smooth drop and lateral deviation correction of the beam body are achieved through intelligent control, ensuring smooth changes in the bridge plane elevation, suitable for variable height curves The top push of the steel box girder.

Benefits of technology

It realizes intelligent overhanging of steel box girders with large span variable height curves, which is highly applicable and is suitable for bridge construction spanning complex waters and highways, reducing on-site monitoring manpower and improving construction efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041316A_ABST
    Figure CN119041316A_ABST
Patent Text Reader

Abstract

The invention relates to an incremental launching construction method applied to a variable-height curve beam, which comprises the following steps of: controlling a walking type incremental launching system to jack up a beam body firstly through a multi-linkage intelligent control system, then moving forwards and falling down, then supporting by a vertical variable-height supporting system, and then continuously jacking up the beam body by the walking type incremental launching system; at the moment, the beam height of the beam body changes along the pushing longitudinal path, after the beam body falls down, the jack of the vertical height-variable supporting system correspondingly descends at the corresponding position, and the balance of the main beam is maintained. And meanwhile, a vertical lifting system and a transverse deviation correction force transmission system of the transverse deviation correction device apply different horizontal forces to the main beam along with advancing of the pushing, transverse deviation correction of the curve beam is completed, coordinate programs are set in advance in the whole process, automatic control is achieved, and therefore intelligent pushing operation of the whole variable-height curve steel box beam is completed. The large-span variable-height curve steel box girder incremental launching construction method has the advantages that incremental launching construction of the large-span variable-height curve steel box girder is achieved, and the method has good applicability to bridges crossing complex water areas and roads.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge engineering, and in particular to a jacking construction method applied to a variable-height curved beam. Background Art

[0002] Since its application, bridge pushing technology has been increasingly used in crossing rivers, valleys and busy lines. There are two types of pushing technology: multi-point pushing and single-point pushing. Multi-point pushing usually does not require the setting of a slideway and its application range is larger than single-point pushing.

[0003] At present, multi-point jacking is usually used in the construction of bridges of equal height. The multi-point jacking of bridges of variable height has always been a difficult point in the industry because the fixed-height fulcrums cannot match the changes in beam height, and there are very few related cases. At the same time, there are very few multi-point jacking technologies for variable-height box girders on curves. Summary of the invention

[0004] The purpose of the present invention is to provide a jacking construction method for variable height curved beams based on the above-mentioned deficiencies of the prior art, thereby solving the jacking problem of large-span variable height curved steel beams. The present invention has strong applicability and is worthy of promotion.

[0005] The purpose of the present invention is achieved by the following technical solutions: A top-pushing construction method for a variable-height curved beam, characterized in that it comprises the following steps: A variable height support system and a walking-type pushing system are arranged at the bottom of the beam body, wherein the walking-type pushing system is arranged on both sides of the variable height support system, and at the same time, a lateral deviation correction force transmission system is arranged at the side of the beam body, and a lateral deviation correction device vertical elevation system is arranged at the bottom of the lateral deviation correction force transmission system, and the working states of the variable height support system, the walking-type pushing system, the lateral deviation correction device vertical elevation system, and the lateral deviation correction force transmission system are connected and controlled by the multi-linkage intelligent control system; The multi-linkage intelligent control system controls the walking jacking system to first lift the beam, then move forward and fall to be supported by the vertical variable height support system, and then continue to lift the beam by the walking jacking system. At this time, the beam height of the beam changes at the jacking bracket, and the jack of the vertical variable height support system is lowered accordingly to ensure that after the beam falls, the plane elevation of the bridge changes smoothly and maintains the balance of the main beam. At the same time, the vertical lifting system of the lateral correction device and the lateral correction force transmission system apply different horizontal forces to the main beam as the jacking advances, completing the lateral correction of the curved beam, thereby completing the intelligent jacking operation of the entire variable height curved steel box beam.

[0006] The variable height support system includes a wedge-shaped angle steel at the bottom of the beam, a top steel plate, a double-row I-beam support short column and a vertical jack, wherein the double-row I-beam support short column is installed on the vertical jack, the top steel plate is set on the double-row I-beam support short column, and the wedge-shaped angle steel at the bottom of the beam is set on the top steel plate.

[0007] A rubber bearing is arranged between the double-row I-steel supporting short columns and the top steel plate.

[0008] The vertical lifting system of the lateral correction device includes a jack, an I-beam, an upper support system, and a lower support system, wherein the jack is arranged on the lower support system, the I-beam is arranged on the jack, the upper support system is arranged on the I-beam, and the upper support system is connected to the lateral correction force transmission system.

[0009] The lateral correction force transmission system includes upper and lower horizontal jacks, a channel steel reaction frame, and a wedge-shaped pad, wherein the channel steel reaction frame is connected to the upper support system of the vertical lifting system of the lateral correction device, the upper and lower horizontal jacks are connected to the channel steel reaction frame, and the wedge-shaped pad is set at the pushing end position of the upper and lower horizontal jacks.

[0010] A rubber pad is arranged between the upper and lower horizontal jacks and the wedge-shaped pad.

[0011] The multi-linkage intelligent control system includes sensors arranged at the bottom and both sides of the beam and a main controller. The main controller controls the operation of the variable height support system, the walking jacking system, the vertical lifting system of the lateral correction device, and the lateral correction force transmission system according to the monitoring data of the sensors.

[0012] The invention has the advantages of realizing the jacking construction of large-span variable-height curved steel box girders and having good applicability to bridges crossing complex waters and roads. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a elevation layout diagram of the present invention; Figure 2 is a plan layout diagram of the present invention; Figure 3 is an elevation view of the variable height support system of the present invention; Figure 4 It is an elevation view of the lateral deviation correction system of the present invention; Figure 5 This is a elevational layout diagram of the second embodiment provided by the present invention; Figure 6 This is a elevational layout diagram of the third embodiment provided by the present invention. DETAILED DESCRIPTION

[0014] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art: like Figure 1-6 As shown, the symbols in the figure respectively represent: vertical variable height support system 1, walking type pushing system 2, lateral deviation correction device vertical lifting system 3, lateral deviation correction force transmission system 4, multi-linkage intelligent control system 5, main beam web edge line 6, pushing bracket 7; Beam bottom wedge angle steel 11, top steel plate 12, rubber bearing 13, double-row I-beam support short column 14, vertical jack 15, box beam bottom plate 16, lower bracket 17; Jack 31, I-beam beam 32, upper support system 33, lower support system 34; Upper and lower horizontal jacks 41 , channel steel reaction frames 42 , rubber pads 43 , wedge-shaped pads 44 , horizontal slideways 45 , laterally movable triangular brackets 46 , and inner and outer double vertical slideway steel reaction frames 47 .

[0015] Embodiment: The jacking construction method applied to variable height curved beams in the present invention is mainly realized by the cooperation of five units, the first is a vertical variable height support system 1, the second is a walking jacking system 2, the third is a lateral correction device vertical lifting system 3, the fourth is a lateral correction force transmission system 4, and the fifth is a multi-linkage intelligent control system 5.

[0016] The vertical variable height support system 1 includes a wedge-shaped angle steel 11 at the bottom of the beam, which is beveled into a triangle on the web surface of the angle steel and welded to the bottom plate 16 of the box beam, so as to achieve the leveling of the bottom plate of the box beam locally, and then the rubber bearing 13 is glued on the side of the wing plate to evenly bear the force. Under the corresponding rubber bearing 13, a double row of I-beam support short columns 14 are arranged, and two rows of vertical jacks 15 are arranged under the double row of I-beam support short columns 14, so that as the vertical jacks 15 move up and down, the support function is achieved at different times corresponding to different beam heights during the jacking process.

[0017] The walking longitudinal pushing system 2 is similar to a conventional walking longitudinal pushing device, but in this embodiment, the vertical range of the walking longitudinal pushing system 2 is increased and the lower part is relatively wider, thereby satisfying the large height variation range and stability issues of the lower part.

[0018] The vertical lifting system 3 of the lateral correction device is composed of two jacks 31, an I-beam crossbeam 32, an upper support system 33, and a lower support system 34. The jack 31 is fixed to the lower support system 34, the I-beam crossbeam 32 is fixed on the jack 31 and moves up and down with the jack 31, and the upper support system 33 is welded to the I-beam crossbeam 32. Its purpose is to rise and fall laterally as the web height changes.

[0019] The lateral correction force transmission system 4 includes two horizontal jacks with different ranges, namely, upper and lower horizontal jacks 41, wherein the jack located at the lower side has a larger stroke than the jack located at the upper side, thereby ensuring that the horizontal correction force is more balanced for the steel beam of the inclined web. The lateral correction force transmission system 4 is fixed on the vertical lifting system 3 of the lateral correction device to adapt to height changes.

[0020] In this embodiment, rubber pads 43 are arranged at the ends of the upper and lower horizontal jacks 41. The rubber pads 43 are circular and can be replaced by supports. For the inclined web, the pads can be composed of wedge-shaped steel and rubber pads.

[0021] In this embodiment, a channel steel reaction frame 42 is arranged on the back of the upper and lower horizontal jacks 41, fixed to the lower upper bracket system 33, and the channel steel reaction frame 42 can also be added with diagonal braces and fixed to the lower bracket to maintain the stability of the variable height correction unit. A slideway can be arranged on the channel steel reaction frame 42 and grease can be applied to provide reaction force while allowing the double push unit to slide up and down against the channel steel reaction frame 42.

[0022] The multi-linkage intelligent control system 5 adopts wireless optical fiber and radar reflection principle. Sensors are arranged at the bottom and sides of the beam. The main controller reflects the light waves, which are then received by the sensors to determine the real-time position of each monitoring point of each steel beam, and then fed back to the main control box to control the work of each jack, thereby realizing the automated management of the entire process. Satellite positioning system can also be used for real-time monitoring.

[0023] In this embodiment, the sensors arranged in the multi-linkage intelligent control system 5 can also be used as permanent monitoring devices during the bridge operation phase to monitor the displacement and deflection of the steel box girder.

[0024] During construction, after the main beam is assembled, each unit is set up in advance and commanded by the master controller of the multi-linkage intelligent control system 5, which feeds back various data in real time and achieves data visualization construction, which can greatly reduce the number of on-site monitoring operators and save manpower.

[0025] When applied, this embodiment includes the following steps: The support is set up on site. The support is a top-pushing support 7 for top-pushing construction. It is built with steel pipe columns and angle steels. The top of the steel pipe columns is a double row of horizontal I-beams. Then, a longitudinal lower support 17 and a lower support system 34 are set at the bottom of each unit. So far, the top-pushing support has been set up. Different numbers of supports can be set according to different spans during construction to ensure stable support and top-pushing effects. The form is not much different from the above.

[0026] The wedge-shaped angle steel 11 at the bottom of the box beam 16 of the corresponding beam is arranged, and two angle steels are welded into a T shape, or T-shaped steel is directly used to cut the rib position into a triangle or trapezoid, which is welded to the outer side of the box beam bottom plate 16, and then the top steel plate 12 is welded at the wing plate position.

[0027] The jack 15 and the I-beam 14 are arranged on the bracket 17, and the I-beam 14 and the top of the jack 17 are welded. A circular rubber bearing 13 is pasted on the upper end of the I-beam, and a square one can also be used, and the size should be adapted to the size of the wing plate of the I-beam 14.

[0028] The walking support unit 2 is arranged to perform walking pushing on the beam body, wherein angle steel 11 and steel plate pad 12 are also arranged on the upper part of the walking pushing unit 2 .

[0029] Lateral leveling units 3 and 4 are arranged at the corresponding positions of the web side 6, and two vertical jacks 31 are arranged on the bracket longitudinal beam 34, and then double-jointed I-beams 32 are arranged thereon, and then double-row angle steel frames 33 are welded thereon, so that the bracket system composed of the I-beams 32 and the angle steel frames 33 can move up and down with the jacks 31.

[0030] Then, arrange the jack channel steel reaction seat 42 on the I-beam 34. Pay attention to reserve the slide groove on the channel steel reaction seat 42, polish it flat and smooth, and apply butter during construction. Arrange two rows of horizontal jacks 41 on the bracket angle steel 33. The lower row of jacks has a larger range. The jacks 41 are welded and fixed to the bracket 33 so that they can move up and down with the bracket 33. Arrange a wedge-shaped steel plate rubber support 44 at the front end of the jack 41.

[0031] Optical wireless sensors are arranged at the corresponding positions of the lower edge and side of the main beam. Photoelectric transmission and reception of reflected signals are adopted to monitor the position movement of the main beam in real time.

[0032] The real-time position signals collected above are centrally processed and analyzed by the multi-linkage intelligent control system 5, and then the feedback instructions are transmitted to the vertical variable height support system 1, the walking jacking system 2, the lateral deviation correction device vertical lifting system 3, and the lateral deviation correction transmission system 4 for cooperation. Specifically, as the jacking instruction is issued, the walking jacking system 2 first lifts the beam, then moves forward and falls to be supported by the vertical variable height support system 1, and then continues to be lifted by the walking jacking system 2. At this time, the beam height of the main beam changes at the jacking bracket, and the jack of the vertical variable height support system 1 is lowered accordingly, ensuring that after the beam falls, the plane elevation of the bridge changes smoothly to maintain the balance of the main beam. At the same time, the lateral deviation correction device vertical lifting system 3 and the lateral deviation correction transmission system 4 apply different horizontal forces to the main beam as the jacking advances, completing the lateral deviation correction of the curved beam, thereby completing the jacking operation of the entire variable height curved steel box beam.

[0033] like Figure 5 As shown, the present system is also applicable to the main beam with straight webs. Meanwhile, the horizontal jacks can be arranged in one row, and there is no need to set two jacks with different upper and lower ranges.

[0034] like Figure 6 As shown, a horizontal slide 45 and a temporary locking device can also be arranged under the vertical lifting system 3 of the lateral correction device and the lateral correction force transmission system 4, so that it can be more suitable for the main beam jacking with large changes in the bottom plate width or large slope of the box beam web.

[0035] The horizontal slideway 45 of the deviation correction system can be made of angle steel and polished flat, and the positions of the horizontal slideway 45 of the deviation correction system and the jack 31 correspond.

[0036] The inner and outer double vertical slide steel reaction frame 47 also corresponds to the position of the horizontal slide 45 of the correction system. The inner and outer double vertical slide steel reaction frame 47 is made of double-channel steel, with slides at the front and back, and the outer slide is a unidirectional slide.

[0037] The laterally movable triangular bracket 46 is a diagonal brace for the inner and outer double vertical slide steel reaction frame 47. The lower end of the laterally movable triangular bracket 46 is hinged and fixed, and the upper end of the laterally movable triangular bracket 46 can slide on the outer unidirectional slide of the inner and outer double vertical slide steel reaction frame 47. The sliding direction is unidirectional sliding from top to bottom, and a locking structure is set from bottom to top to ensure the stability of the structure after it is in place.

[0038] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A top-pushing construction method for variable-height curved beams, characterized in that: The following steps are involved: A variable height support system and a walking-type pushing system are arranged at the bottom of the beam body, wherein the walking-type pushing system is arranged on both sides of the variable height support system, and at the same time, a lateral deviation correction force transmission system is arranged at the side of the beam body, and a lateral deviation correction device vertical elevation system is arranged at the bottom of the lateral deviation correction force transmission system, and the working states of the variable height support system, the walking-type pushing system, the lateral deviation correction device vertical elevation system, and the lateral deviation correction force transmission system are connected and controlled by the multi-linkage intelligent control system; The multi-linkage intelligent control system controls the walking-type jacking system to first jack up the beam, then move forward and fall to be supported by the vertical variable height support system, and then continue to jack up the beam by the walking-type jacking system. At this time, the beam height of the beam changes at the jacking bracket, and the jack of the vertical variable height support system is lowered accordingly to ensure that after the beam falls, the plane elevation of the bridge changes smoothly and maintains the balance of the main beam. At the same time, the vertical lifting system of the lateral correction device and the lateral correction force transmission system apply different horizontal forces to the main beam as the jacking advances, completing the lateral correction of the curved beam, thereby completing the intelligent jacking operation of the entire variable height curved beam.

2. The method for top-pushing construction applied to variable-height curved beams according to claim 1, characterized in that: The variable height support system includes a wedge-shaped angle steel at the bottom of the beam, a top steel plate, a double-row I-beam support short column and a vertical jack, wherein the double-row I-beam support short column is installed on the vertical jack, the top steel plate is set on the double-row I-beam support short column, and the wedge-shaped angle steel at the bottom of the beam is set on the top steel plate.

3. The method for top-pushing construction applied to variable-height curved beams according to claim 1, characterized in that: A rubber bearing is arranged between the double-row I-steel supporting short columns and the top steel plate.

4. The method for top-pushing construction applied to variable-height curved beams according to claim 1, characterized in that: The vertical lifting system of the lateral correction device includes a jack, an I-beam, an upper support system, and a lower support system, wherein the jack is arranged on the lower support system, the I-beam is arranged on the jack, the upper support system is arranged on the I-beam, and the upper support system is connected to the lateral correction force transmission system.

5. The method for top-pushing construction applied to variable-height curved beams according to claim 1, characterized in that: The lateral correction force transmission system includes upper and lower horizontal jacks, a channel steel reaction frame, and a wedge-shaped pad, wherein the channel steel reaction frame is connected to the upper support system of the vertical lifting system of the lateral correction device, the upper and lower horizontal jacks are connected to the channel steel reaction frame, and the wedge-shaped pad is set at the pushing end position of the upper and lower horizontal jacks.

6. The method for top-pushing construction applied to variable-height curved beams according to claim 5, characterized in that: A rubber pad is arranged between the upper and lower horizontal jacks and the wedge-shaped pad.

7. The method for top-pushing construction applied to variable-height curved beams according to claim 1, characterized in that: The multi-linkage intelligent control system includes sensors arranged at the bottom and both sides of the beam and a main controller. The main controller controls the operation of the variable height support system, the walking jacking system, the vertical lifting system of the lateral correction device, and the lateral correction force transmission system according to the monitoring data of the sensors.

Citation Information

Cited By

  • Curved bridge differential pushing walking type jack and pushing method

    CN120482990A

  • Pushing construction method and pushing equipment for fish-bellied variable web steel box girder

    CN121593414A