Landslide repairing structure of built pressure tunnel with vent pipe arranged in tunnel
By setting up vent pipes and anchor spray support structures in the already built pressure tunnels, the problem of air discharge in the cavity of the collapsed section is solved, and the repair effect is achieved with simplified construction, short construction period, safe and reliable, avoiding cavitation and prolonged engineering cycle .
Patent Information
- Application Number
- CN202411381498.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-29
AI Technical Summary
The remaining air in the hollow cavity of the hole caused by bare rock collapse and cavitation has been built, causing a larger area of landslide. The construction time of conventional repair methods is long, which cannot meet the needs of timely recovery of functions.
The repair structure with a vent pipe inside the hole, including an anchor spray support structure and a ventilation system. The vent pipe extends from the top of the hole in the bare rock collapse section to the branch hole, passes through the steel lining seal section, forms a terminal, and repairs it in the landslide Open as a transportation channel during the period to ensure air discharge and avoid cavitation.
It realizes landslide repair with simple construction, short construction period, safe and reliable, avoids cavitation, shortens repair time, reduces project investment, and ensures the safe operation of the tunnel.
Smart Images

Figure CN119041934A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnels in water conservancy and hydropower engineering, and in particular to a collapse repair structure of an existing pressure tunnel with a vent pipe arranged in the tunnel. Background Art
[0002] With the continuous construction of water conservancy and hydropower projects in my country, tunnel engineering has developed rapidly. In water conservancy projects such as power generation, water diversion, water supply and flood control, pressurized tunnels are widely used. A considerable number of these pressurized tunnels were built in the 20th century. At that time, in order to save investment, some tunnel sections with better surrounding rock did not use shotcrete support or secondary lining. After years of operation, the bare rock tunnel sections without support and lining may cause landslides due to softening by water, or due to the high internal pressure of the tunnel and the uneven inner surface, the residual air causes cavitation and then causes landslides. For the collapse of pressurized tunnels, if measures are not taken in time to repair them, a large amount of air will remain in the cavity on the top of the cave caused by the collapse and cannot be discharged during the operation period, which will cause more serious cavitation and lead to landslides on a larger scale.
[0003] Tunnels used for water supply, power generation and flood control are related to people's livelihood or power generation benefits, and often require very short time for inspection and repair. If conventional secondary lining or steel lining methods are used for repair, the construction time is often long and cannot meet the needs of timely restoration of functions. Therefore, it is necessary to propose a measure that is simple to construct, short in construction period, safe and reliable.
[0004] Based on this, this case is brought forward. Summary of the invention
[0005] The purpose of the present invention is to provide a structure for repairing collapse of an existing hydraulic tunnel with a ventilation pipe in the tunnel, which has the characteristics of simple construction, short construction period, safety and reliability, and can meet the needs of timely repairing collapse of an existing hydraulic tunnel.
[0006] In order to achieve the above object, the technical solution of the present invention is as follows:
[0007] A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel, comprising a main tunnel and a branch tunnel, wherein the main tunnel comprises a conventional main tunnel section and a bare rock collapse section, and the branch tunnel comprises a steel lining plugging section and a conventional branch tunnel section, wherein one end of the steel lining plugging section is connected to the conventional main tunnel section, and the other end is connected to the conventional branch tunnel section, and the steel lining plugging section is closed with a steel plug during operation and opened as a traffic passage during collapse repair period;
[0008] It includes a ventilation system, which includes a ventilation pipe. The starting end of the ventilation pipe is located at the top of the bare rock collapse section. The ventilation pipe is arranged along the wall of the main cave and extends to the branch cave, and then passes through the steel lining sealing section of the branch cave to reach the conventional branch cave section to form a terminal. An anchor spraying support structure is set in the bare rock collapse section.
[0009] Furthermore, the anchor-spraying support structure of the bare rock collapse section extends to the conventional main tunnel section of the upstream and downstream sections.
[0010] Furthermore, the anchor-sprayed support structure includes primary sprayed concrete, steel mesh, sprayed concrete, system anchor rods and random drainage holes. The primary sprayed concrete, steel mesh and sprayed concrete are arranged from the outside to the inside on the side wall of the tunnel, the system anchor rods are arranged radially along the tunnel, and the random drainage holes are arranged in the depressions and seepage areas of the tunnel rock surface.
[0011] Furthermore, the ventilation system includes a pipe head and a pipe head fixing structure. The starting end of the ventilation pipe is connected to the pipe head. The pipe head fixing structure includes a pressure plate and bolts. The pressure plate presses and fixes the pipe head to the top of the bare rock collapse section. The pressure plate is fixed to the top of the bare rock collapse section by bolts.
[0012] Furthermore, there are several pipe heads, which are connected to the ventilation pipe through three-way or four-way joints. The several pipe heads are respectively arranged at different local high points on the cave top of the bare rock collapse section, and the elevations of the different local high points are consistent or close.
[0013] Furthermore, when the ventilation pipe is arranged along the cave wall of the bare rock collapse section, the ventilation pipe is buried in the steel mesh and sprayed concrete of the anchor spraying support structure.
[0014] Furthermore, when the ventilation pipe is arranged along the cave wall of the conventional main cave section, it is fixed by the main cave groove structure and / or pipe clamps. The main cave groove structure includes a cave wall groove and a cement mortar layer. The ventilation pipe is arranged in the cave wall groove and fixed by the cement mortar layer.
[0015] Furthermore, when the ventilation pipe passes through the steel lining plugging section of the branch tunnel, it is fixed by a drilling fixing structure, the drilling fixing structure includes a plugging body borehole and a cement mortar layer, the two ends of the plugging body borehole are respectively connected to the conventional main tunnel section and the conventional branch tunnel section, the ventilation pipe passes through the plugging body borehole and is fixed by the cement mortar layer;
[0016] And / or, the ventilation pipe is arranged at the bottom of the steel pipe of the steel lining plugging section and fixed by a cement mortar layer, and a hole is drilled at the end of the steel lining plugging section for the ventilation pipe to pass through.
[0017] Furthermore, the end of the ventilation pipe located in the conventional branch tunnel section is connected with an inspection section and ventilation equipment, the inspection section includes a detachable union joint, an inspection groove and an inspection cover plate, the union joint is located in the inspection groove, one end of which is connected to the ventilation pipe, and the other end is connected to the ventilation equipment, and the inspection cover plate covers the inspection groove;
[0018] The ventilation equipment includes a maintenance gate valve, an air valve, a drain valve and a connecting pipe, the front end of the connecting pipe is connected to a detachable union joint, the maintenance gate valve is installed at the pipe body of the connecting pipe, and the rear end of the connecting pipe is divided into two paths, respectively connected to the air valve and the drain valve;
[0019] The ventilation pipe is arranged along the slope in the tunnel.
[0020] Furthermore, the portion of the ventilation pipe arranged along the cave wall is made of PE pipe, and the connecting pipe is made of steel pipe.
[0021] The advantages of the present invention are:
[0022] 1. Safe and reliable: The anchor-spraying support structure is adopted for the collapsed section of the built pressure tunnel to ensure the support stability of the collapsed section; the ventilation structure is set to effectively solve the problem that a large amount of air remains in the cavity on the top of the collapsed section and cannot be discharged, avoiding the cavitation caused by the residual air in the cavity and causing a larger collapse. When the main tunnel needs to be emptied for maintenance, the ventilation structure can also reversely provide air to the cavity on the top of the bare rock collapse section to prevent the bare rock collapse section from being subjected to additional adverse negative pressure when the main tunnel is drained, which provides a guarantee for the safe operation of the tunnel. At the same time, the construction of the support structure in the tunnel is carried out step by step from one side to the other, which also ensures the safety during the construction period.
[0023] 2. The construction is simple and the construction period is short, with little impact on project benefits: the landslide section only adopts the repair measures of anchor spraying support structure and ventilation system. Although the ventilation system involves a long line, the overall workload is greatly reduced compared with the conventional secondary concrete lining repair. In addition, the cleaning of landslide slag, the anchor spraying support structure at the bare rock landslide section and the construction of the ventilation system can be carried out simultaneously, which effectively saves the repair time. Compared with the conventional repair measures of first cleaning the slag and then carrying out secondary concrete lining, it can save more than 50% of the construction period, and has little impact on the subsequent water supply, power generation, flood control and other engineering benefits.
[0024] 3. Low project investment: The anchor spraying support structure and ventilation system mainly involved in the present invention have low investment, which can save more than 65% of direct investment compared with the conventional repair measures of first cleaning slag and then secondary concrete lining. If the indirect investment caused by subsequent engineering benefits such as water supply or power generation is considered, the investment saving ratio will be even higher;
[0025] 4. It has little impact on other maintenance work of the tunnel. The anchor spraying support structure and ventilation system construction mainly involved in the invention occupy a small space in the tunnel and the time is short, which does not affect the implementation of other maintenance work of the tunnel. When the collapsed section is repaired, other locations of the tunnel can be inspected and corresponding repair measures can be taken simultaneously. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1It is a schematic diagram of the plan layout of a pressure tunnel collapse repair structure that has been built with a ventilation pipe in the tunnel in the embodiment;
[0027] Figure 2 It is a longitudinal section schematic diagram of a built pressure tunnel collapse repair structure with a vent pipe in the tunnel in the embodiment;
[0028] Figure 3 yes Figure 1 and Figure 2 A-A cross-sectional schematic diagram;
[0029] Figure 4 yes Figure 3 Detailed drawing A;
[0030] Figure 5 yes Figure 4 1-1 cross-sectional schematic diagram;
[0031] Figure 6 yes Figure 5 2-2 sectional schematic diagram;
[0032] Figure 7 yes Figure 5 3-3 sectional schematic diagram;
[0033] Figure 8 yes Figure 1 and Figure 2 B-B cross-sectional view of FIG.
[0034] Fig. 9 yes Figure 8 Detailed drawing B;
[0035] Fig.10 yes Figure 1 C-C cross-sectional schematic diagram;
[0036] Fig.11 yes Figure 1 and Fig.10 D-D cross-sectional schematic diagram;
[0037] Fig.12 yes Figure 1 Detailed drawing C;
[0038] Fig.13 yes Figure 1 , Fig.10 , Fig.12 E-E cross-sectional schematic diagram;
[0039] Description of symbols
[0040] 1-existing pressure tunnel; 11-main tunnel; 11a-bare rock section; 11b-bare rock collapse section; 11c-collapsed slag; 11d-sprayed concrete section; 11e-concrete lining section; 12-branch tunnel; 12a-steel lining plugging section; 12b-conventional branch tunnel section; 2-anchor spraying support structure; 21-primary spraying concrete; 22-steel mesh; 23-spraying concrete; 24-system anchor rod; 25-random drainage hole;
[0041] 3-ventilation system; 31-ventilation pipe; 32-pipe head; 33-pipe head fixing structure; 34-main hole slotting fixing structure; 35-branch hole blocking section drilling fixing structure; 36-branch hole newly poured concrete bottom plate; 37-maintenance section; 38-ventilation equipment; 33a-pressure plate; 33b-bolt; 37a-disassembly joint; 37b-maintenance slot; 37c-maintenance cover; 38a-maintenance gate valve; 38b-air valve; 38c-drain valve; 38d-connecting steel pipe. DETAILED DESCRIPTION
[0042] The present invention is further described in detail below in conjunction with the embodiments. It should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" herein are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention.
[0043] like Figures 1 to 13 As shown, this embodiment proposes a structure for repairing collapse of an existing pressure tunnel with a ventilation pipe arranged inside the tunnel, comprising an existing pressure tunnel 1, an anchor spraying support structure 2 and a ventilation system 3.
[0044] The existing pressure tunnel 1 includes a main tunnel 11 and a branch tunnel 12. The main tunnel 11 and the branch tunnel 12 are arranged vertically in the plane. The main tunnel 11 includes a conventional main tunnel section (bare rock section 11a, shotcrete section 11d and concrete lining section 11e), a bare rock collapse section 11b, collapse slag 11c, and the collapse slag 11c is located at the bottom of the bare rock collapse section 11b and needs to be cleaned during the collapse repair period. The branch tunnel 12 includes a steel lining plugging section 12a and a conventional branch tunnel section 12b, wherein one end of the steel lining plugging section is connected to the main tunnel and the other end is connected to the conventional branch tunnel section. The steel lining plugging section 12a is closed with a steel plug during the operation period and needs to be opened as a traffic channel during the collapse repair period.
[0045] The anchor spraying support structure 2 includes initial spraying concrete 21, steel mesh 22, spraying concrete 23, system anchor rods 24 and random drainage holes 25. The initial spraying concrete 21, steel mesh 22 and spraying concrete 23 are arranged from outside to inside on the side wall of the tunnel, and the system anchor rods 24 are arranged along the radial direction of the tunnel. The initial spraying concrete 21 is used for the initial support of the bare rock collapse section 11b to reduce the risk of collapse again during repair construction. The random drainage holes 25 should be arranged in the depressions and seepage areas of the rock surface. The scope of the anchor spraying support structure 2 at the bare rock collapse section 11b of the main tunnel 11 should be appropriately extended upward and downstream to ensure the stability of the support.
[0046] The ventilation system 3 includes a ventilation pipe 31, a pipe head 32, a pipe head fixing structure 33, a main hole slot fixing structure 34, a branch hole sealing section drilling fixing structure 35, a branch hole newly poured concrete bottom plate 36, a maintenance section 37 and a ventilation device 38. The ventilation pipe 31 is initially arranged along the cave wall from the top of the bare rock collapse section 11b of the main cave 11 to the branch cave 12, and then passes through the steel lining sealing section 12a of the branch cave 12 to the conventional branch cave section 12b.
[0047] refer to Figure 5 and Figure 7 The starting end pipe head 32 of the ventilation system 3 needs to be fixed by a pipe head fixing structure 33. The pipe head fixing structure 33 includes a pressure plate 33a and bolts 33b. The pressure plate 33a presses and fixes the pipe head 32 on the top of the bare rock collapse section 11b. The pressure plate 33a is fixed to the top of the bare rock collapse section 11b by bolts 33b.
[0048] refer to Figure 5 In order to enhance the stability of the ventilation pipe 31 arranged along the cave wall, the ventilation pipe 31 should be buried in the steel mesh 22 and shotcrete 23 of the anchor-spray support structure 2 when arranged along the cave wall of the bare rock collapse section 11b.
[0049] refer to Fig. 9 When the ventilation pipe 31 is arranged along the bare rock section 11a, the sprayed concrete section 11d and the concrete lining section 11e of the main tunnel 11, it should be fixed by the main tunnel groove fixing structure 34. The main tunnel groove fixing structure 34 includes a tunnel wall groove 34a and a cement mortar layer 34b. The ventilation pipe 31 is arranged in the tunnel wall groove 34a and fixed by the cement mortar layer 34b.
[0050] refer to Fig.10 and Fig.11 When the ventilation pipe 31 is arranged along the steel lining plugging section 12a of the branch hole 12, it should be fixed by using the branch hole plugging section drilling fixing structure 35. The branch hole plugging section drilling fixing structure 35 includes a plugging body drilling hole 35a and a backfill cement mortar layer 35b. The two ends of the plugging body drilling hole are respectively connected to the main hole 11 and the conventional branch hole section 12b. The ventilation pipe 31 passes through the plugging body drilling hole 35a and is fixed by the cement mortar layer 35b.
[0051] refer to Fig.10 , Fig.12 and Fig.13 The ventilation pipe 31 is led to the conventional branch hole section 12b of the branch hole 12 and buried in the newly cast concrete bottom plate 36 of the branch hole at the bottom of the hole. The ventilation pipe 31 is provided with an inspection section 37 in the newly cast concrete bottom plate 36 of the branch hole, and the end of the inspection section is connected to the ventilation equipment 38. The inspection section 37 includes a detachable joint 37a, an inspection groove 37b and an inspection cover plate 37c. The detachable joint 37a is located in the inspection groove 37b, and one end is connected to the ventilation pipe 31, and the other end is connected to the ventilation equipment 38. The inspection cover plate 37c covers the inspection groove 37b. When the ventilation pipe 31 is inspected, the impurities in the ventilation pipe 31 can be discharged by unscrewing the detachable joint 37a. The ventilation device 38 includes a maintenance gate valve 38a, an air valve 38b, a drain valve 38c and a connecting pipe 38d. The front end of the connecting pipe 38d is connected to the detachable flexible joint 37a. The maintenance gate valve 38a is installed at the pipe body of the connecting pipe 38d. The rear end of the connecting pipe is divided into two paths, which are respectively connected to the air valve 38b and the drain valve 38c. The maintenance gate valve 38a is usually in an open state and is closed only when the air valve 38b and the drain valve 38c need to be repaired.
[0052] After the collapse repair is completed, when the main tunnel 11 is running with water, the residual air in the cave top cavity of the bare rock collapse section 11b can be discharged along the pipe head 32 of the ventilation system 3 to the terminal air valve 38b, thereby preventing the residual air in the cave top cavity of the bare rock collapse section 11b from inducing cavitation and causing further collapse. When the main tunnel 11 needs to be emptied for maintenance, the air valve 38b can also reversely supply air to the cave top cavity of the bare rock collapse section 11b to prevent the bare rock collapse section 11b cave top rock mass from being subjected to additional adverse negative pressure when the main tunnel 11 is drained.
[0053] In order to prevent the residual water or impurities such as mud and sand in the vent pipe 31 from clogging the terminal air valve 38b, the detachable joint 37a of the maintenance section 37 should be opened before water is passed to allow the impurities in the vent pipe 31 to be discharged along the slope. In order to prevent the terminal air valve 38b from being blocked due to the above measures that cannot completely discharge the impurities in the vent pipe 31, when the main cave 11 is running with water, while relying on the air valve 38b to exhaust, the drain valve 38c of the terminal ventilation device 38 should also be opened until the drain valve 38c has a clean and stable water flow discharged, indicating that the residual air in the cave top cavity of the bare rock collapse section 11b has been exhausted. At this time, the drain valve 38c can be closed. This measure of using the air valve 38b and the drain valve 38c to exhaust at the same time not only increases the exhaust speed and shortens the exhaust time, but also avoids the exhaust failure caused by the blockage of the air valve 38b when only the air valve 38b is used, greatly increasing the reliability of exhaust.
[0054] The diameter and number of the ventilation pipes 31 of this embodiment can be adjusted according to the actual ventilation demand to meet the engineering requirements. At the same time, the material of the ventilation pipe 31 can be selected from PE pipes or steel pipes. The ventilation pipes 31 arranged along the cave wall should be made of PE pipes, which are easier to bend than steel pipes and convenient for construction and arrangement. The connecting pipe 38d of the terminal ventilation equipment 38 should be made of steel pipes. PE pipes and steel pipes can be converted and connected through the detachable flexible joint 37a in the maintenance section 37.
[0055] Preferably, the starting end of the ventilation system 3 may be provided with multiple pipe heads 32, which may be connected to the ventilation pipe 31 through a three-way or four-way joint, but the multiple pipe heads 32 should be arranged at different local high points on the top of the cave of the bare rock collapse section 11b, and the elevations of the different local high points should be consistent or close, so as to prevent the main cave 11 from being vented due to the low elevation of a certain pipe head 32 and causing the remaining pipe heads 32 to be unable to continue venting. At the same time, the ventilation pipe 31 should be arranged along the slope from the pipe head 32 to the maintenance section 37, and reverse slope is strictly prohibited, so as to avoid that when the detachable flexible joint 37a is unscrewed to inspect the ventilation pipe 31, some impurities remain in the ventilation pipe 31 due to the reverse slope and cannot be discharged.
[0056] When the vent pipe 31 is arranged along the main tunnel 11, in addition to being fixed by the slotted fixing structure 34, it can also be directly fixed to the tunnel wall by means of pipe clamps, etc., but the influence of the tunnel water flow velocity on the fixing stability should be considered. When the vent pipe 31 is arranged along the branch tunnel 12, in addition to being fixed by the branch tunnel plugging section drilling fixing structure 35, it can also be arranged along the bottom of the branch tunnel plugging steel pipe and backfilled with cement mortar for fixing, and then drilled out from the end of the branch tunnel plugging steel pipe, but the sealing welding at the intersection of the vent pipe and the end of the branch tunnel plugging steel pipe should be done well.
[0057] The collapsed slag 11c of the main tunnel 11 should be cleaned during the repair construction. The cleaning of the collapsed slag 11c, the anchor spraying support structure 2 at the bare rock collapse section 11b, and the construction of the ventilation system 3 should be carried out simultaneously, which can effectively save the repair time. At the same time, the anchor spraying support structure 2 at the bare rock collapse section 11b should first be sprayed with initial concrete 21 on the overall collapse surface to reduce the risk of collapse again during the repair construction. In addition, the anchor spraying support structure should be implemented step by step from the extended support range on one side of the bare rock collapse section to the other side to ensure that the implementation personnel are working in a safer working surface.
[0058] The above embodiments are only used to explain the concept of the present invention, rather than to limit the protection of the rights of the present invention. Any non-substantial changes to the present invention using this concept shall fall within the protection scope of the present invention.
Claims
1. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel, comprising a main tunnel and a branch tunnel, wherein the main tunnel comprises a conventional main tunnel section and a bare rock collapse section, and the branch tunnel comprises a steel lining plugging section and a conventional branch tunnel section, wherein one end of the steel lining plugging section is connected to the conventional main tunnel section, and the other end is connected to the conventional branch tunnel section, and the steel lining plugging section is closed with a steel plug during operation and opened as a traffic passage during collapse repair period; It is characterized in that It includes a ventilation system, which includes a ventilation pipe. The starting end of the ventilation pipe is located at the top of the bare rock collapse section. The ventilation pipe is arranged along the wall of the main cave and extends to the branch cave, and then passes through the steel lining sealing section of the branch cave to reach the conventional branch cave section to form a terminal. An anchor spraying support structure is set in the bare rock collapse section.
2. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1, characterized in that: The anchor spraying support structure of the bare rock collapse section extends to the conventional main tunnel section of the upstream and downstream sections.
3. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1 or 2, characterized in that: The anchor-sprayed support structure includes primary sprayed concrete, steel mesh, sprayed concrete, system anchor rods and random drainage holes. The primary sprayed concrete, steel mesh and sprayed concrete are arranged from the outside to the inside on the side wall of the tunnel, the system anchor rods are arranged along the radial direction of the tunnel, and the random drainage holes are arranged in the depressions and seepage areas of the rock surface of the tunnel.
4. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1, characterized in that: The ventilation system includes a pipe head and a pipe head fixing structure. The starting end of the ventilation pipe is connected to the pipe head. The pipe head fixing structure includes a pressure plate and bolts. The pressure plate presses and fixes the pipe head on the top of the bare rock collapse section. The pressure plate is fixed to the top of the bare rock collapse section by bolts.
5. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 4, characterized in that: There are several pipe heads, which are connected to the ventilation pipe through three-way or four-way joints. The several pipe heads are respectively arranged at different local high points on the cave top of the bare rock collapse section, and the elevations of the different local high points are consistent or close.
6. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 3, characterized in that: When the ventilation pipe is arranged along the cave wall of the bare rock collapse section, the ventilation pipe is buried in the steel mesh and sprayed concrete of the anchor spraying support structure.
7. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1, characterized in that: When the ventilation pipe is arranged along the cave wall of the conventional main cave section, it is fixed by the main cave groove structure and / or pipe clamps. The main cave groove structure includes a cave wall groove and a cement mortar layer. The ventilation pipe is arranged in the cave wall groove and fixed by the cement mortar layer.
8. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1, characterized in that: When the ventilation pipe passes through the steel lining plugging section of the branch hole, it is fixed by a drilling fixing structure, the drilling fixing structure includes a plugging body drilling hole and a cement mortar layer, the two ends of the plugging body drilling hole are respectively connected to the conventional main hole section and the conventional branch hole section, the ventilation pipe passes through the plugging body drilling hole and is fixed by the cement mortar layer; And / or, the ventilation pipe is arranged at the bottom of the steel pipe of the steel lining plugging section and fixed by a cement mortar layer, and a hole is drilled at the end of the steel lining plugging section for the ventilation pipe to pass through.
9. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 1, characterized in that: The ventilation pipe is located at the end of the conventional branch tunnel section and is connected to an inspection section and ventilation equipment. The inspection section includes a detachable joint, an inspection slot and an inspection cover. The joint is located in the inspection slot and one end is connected to the ventilation pipe and the other end is connected to the ventilation equipment. The inspection cover covers the inspection slot. The ventilation equipment includes a maintenance gate valve, an air valve, a drain valve and a connecting pipe, the front end of the connecting pipe is connected to a detachable union joint, the maintenance gate valve is installed at the pipe body of the connecting pipe, and the rear end of the connecting pipe is divided into two paths, respectively connected to the air valve and the drain valve; The ventilation pipe is arranged along the slope in the tunnel.
10. A structure for repairing collapse of an existing pressure tunnel with a ventilation pipe in the tunnel as claimed in claim 9, characterized in that: The portion of the ventilation pipe arranged along the cave wall is made of PE pipe, and the connecting pipe is made of steel pipe.