Automatic transfer equipment for aluminum ingots

Through the combination of chain plate conveyor belt, clamping device, flip plate and lifting device of aluminum ingot automatic transfer equipment, the problems of low efficiency and safety hazards of aluminum ingot transport are solved, and the efficient, safe and automated transfer of aluminum ingots is achieved, reducing the efficiency, safety and automation of aluminum ingots. labor intensity and safety risks.

CN119043010APending Publication Date: 2024-11-29SHANGQIU SUNSHINE ALUMINUM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410965664.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing aluminum ingot transport technology is low in efficiency, has high safety risks and high cost. Forklifts operate frequently in the workshop, resulting in slow loading speed and large safety risks.

Method used

An automatic transfer equipment of aluminum ingots was designed, using a chain plate conveyor belt and adjustment device. The aluminum ingots were kept flush with clamping device and flip plate, and combined with lifting device and material collection device, the efficient, safe and automated transfer of aluminum ingots was achieved. .

Benefits of technology

It significantly improves the efficiency of transporting aluminum ingots from storage ground to smelting furnace, reduces labor intensity and safety risks, and ensures the fluency and safety of aluminum ingots during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043010A_ABST
    Figure CN119043010A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of aluminum ingot transfer, in particular to automatic aluminum ingot transfer equipment which comprises a conveying device used for conveying bundles of aluminum ingots, an adjusting device used for adjusting the uniformity of the bundles of aluminum ingots is arranged at the output end of the conveying device, and a lifting device used for adjusting the height of the bundles of aluminum ingots is arranged on the lower portion of the adjusting device. A material receiving device is arranged at the output end of the lifting device and comprises a base, a rotating disc is arranged at the top of the base, a material receiving support is arranged at the top of the rotating disc, a movable pallet fork sliding in the length direction is arranged on the top face of the material receiving support, and a movable plate trailer used for feeding is arranged on the side edge of the movable pallet fork; efficient, safe and automatic transfer of aluminum ingots from a storage place to a smelting furnace is achieved, the production efficiency is remarkably improved, and the labor intensity and the safety risk are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of aluminum ingot transportation, and in particular to an automatic aluminum ingot transportation device. Background Art

[0002] At present, aluminum ingots for domestic smelting furnaces are generally transported from the aluminum ingot storage area to the smelting furnace by forklift. Due to the large number of aluminum ingots used, forklifts need to be used for loading multiple times. The forklift travels a long distance during the transportation process, which takes a long time and the loading speed is slow. During the transportation process, bundles of aluminum ingots will be skewed. Due to the large mass of bundled aluminum ingots, it is difficult to correct the skewed aluminum ingots during the loading process. In addition, the transportation cost is high, the forklift failure rate is high, and the forklift frequently runs back and forth in the workshop, which overlaps with the on-site operations, has low efficiency and poses a great safety hazard.

[0003] Therefore, in order to eliminate safety hazards, speed up the loading speed of aluminum ingots, improve and reduce the turnover cost of raw materials, and reduce the labor intensity of employees, the market needs an aluminum ingot transfer equipment that can transfer aluminum ingots to the smelting furnace in time and is easy to operate. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art in that the aluminum ingots are slow in efficiency and take a long time to load, and to provide an automatic aluminum ingot transfer device.

[0005] In order to achieve the above-mentioned purpose, the embodiment of the present invention specifically adopts the following technical scheme: an automatic transfer equipment for aluminum ingots, comprising a conveying device for transporting bundles of aluminum ingots, the output end of the conveying device is provided with an adjustment device for adjusting the neatness of the bundles of aluminum ingots, the lower part of the adjustment device is provided with a lifting device for adjusting the height of the bundles of aluminum ingots, the output end of the lifting device is provided with a material receiving device, the material receiving device comprises a base, the top of the base is provided with a turntable, the top of the turntable is provided with a material receiving bracket, the top surface of the material receiving bracket is provided with a movable fork sliding along the length direction, and the side of the movable fork is provided with a movable pallet truck for feeding materials.

[0006] Furthermore, the conveying device is a chain conveyor belt, and the upper surface of the chain conveyor belt is arranged horizontally.

[0007] Furthermore, the adjustment device includes a fixed frame, a first roller group is arranged at the bottom of the frame, the rotation direction of the first roller group is consistent with the rotation direction of the conveying device and is on the same horizontal plane, and left and right clamping devices are arranged on the sides of the first roller group.

[0008] Furthermore, the left and right clamping devices include two push plates relatively arranged on the rack, the push plates are slidably connected to the rack via a sliding rod horizontally arranged on the back side, and a power rod facing the bundled aluminum ingots is arranged in the middle position of the push plates.

[0009] Furthermore, the lifting device includes a lifting frame arranged at the output end of the first roller group, a second roller group is arranged on the top of the lifting frame, the lowest point of the second roller group is on the same horizontal plane as the first roller group, and a track frame for limiting is vertically arranged on the side of the lifting frame.

[0010] Furthermore, a baffle is provided on the side of the track frame, a flip plate is hingedly provided on the upper part of the frame near the track frame, and a power rod is hingedly provided on the back side of the flip plate to drive the flip plate toward one side of the track frame.

[0011] Furthermore, the upper vertex of the second roller group and the material receiving bracket are arranged on the same horizontal plane, the upper surface of the material receiving bracket is provided with a guide rail along the length direction, the bottom of the movable fork is provided with a movable seat, the bottom of the movable seat is connected to the guide rail through a slider, and the movable seat and the material receiving bracket are driven by a gear rack.

[0012] Furthermore, a truss is hingedly provided at the tail of the mobile fork and is hingedly connected to the mobile seat, and a power rod for driving the truss to rise and fall is hingedly provided at the lower part of the truss.

[0013] Furthermore, a reinforcing plate for maintaining balance is provided at the lower portion of the material receiving bracket and is connected to the turntable.

[0014] The beneficial effects of the embodiments of the present invention are as follows: the conveying device adopts a chain conveyor belt. During use, the chain conveyor belt is relatively long and can hold multiple groups of bundled aluminum ingots at the same time. The forklift places the bundled aluminum ingots on the chain conveyor belt. As the conveyor belt runs, the aluminum ingots are automatically transported to the adjustment device. Due to the long length, multiple forklifts can load the ingots at the same time, which increases the loading space. At the same time, since multiple groups of aluminum ingots can be placed in advance on the conveying device, the loading continuity is guaranteed during the loading process, thereby improving the loading efficiency.

[0015] On the side of the first roller group, two opposing push plates are arranged as left and right clamping devices. The power rod drives the push plates to move closer to the center to clamp the aluminum ingot so that the left and right sides of the aluminum ingot remain flush. A flip plate is also hinged on one side of the track frame, and the flip plate is controlled by the power rod. When the aluminum ingot moves to the second roller group, the flip plate flips downward and acts on the front end of the aluminum ingot. The rear end of the aluminum ingot is blocked by a baffle. Through the extrusion of the flip plate, the front and rear directions of the aluminum ingot can be kept flush. Through the extrusion of the push plate and the flip plate in the adjustment device, the aluminum ingot is kept flush during the transportation process to prevent the aluminum ingot from tilting and blocking the transportation. At the same time, it provides safety guarantee for the next step of transportation, ensures production safety, and realizes efficient, safe and automatic transportation of aluminum ingots from the storage area to the smelting furnace, which significantly improves production efficiency and reduces labor intensity and safety risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall top view structure of the present invention;

[0017] Figure 2 It is a schematic diagram of the installation structure of the present invention;

[0018] Figure 3 It is a schematic diagram of the enlarged structure of point A of the present invention;

[0019] Figure 4 It is a structural schematic diagram of the adjustment device of the present invention;

[0020] Figure 5 It is a schematic diagram of the enlarged structure of point B of the present invention;

[0021] Figure 6 It is a side view structural schematic diagram of the present invention;

[0022] In the figure: 1. chain conveyor belt; 2. adjustment device; 201. first roller group; 202. shelf; 203. push plate; 204. flip plate; 205. power rod; 3. lifting device; 301. track frame; 302. second roller group; 4. mobile cart; 5. material receiving device; 501. base; 502. turntable; 503. material receiving bracket; 504. moving seat; 505. truss; 506. moving fork; 507. guide rail. DETAILED DESCRIPTION

[0023] Preferred embodiments of the present invention are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0024] See also Figures 1 to 6The embodiment of the present invention discloses an automatic aluminum ingot transfer equipment, which is mainly composed of four parts: a conveying device, an adjusting device 2, a lifting device 3 and a receiving device 5. The conveying device adopts a chain plate conveyor belt 1, and its upper surface is arranged horizontally to ensure that the bundled aluminum ingots can move smoothly during the conveying process. The chain plate conveyor belt 1 is driven by a motor to realize continuous and stable aluminum ingot transportation. During use, the chain plate conveyor belt 1 is relatively long, and multiple groups of bundled aluminum ingots can be placed at the same time. The forklift places the bundled aluminum ingots on the chain plate conveyor belt 1. As the conveyor belt runs, the aluminum ingots are automatically transported to the adjusting device 2. Due to the long length, multiple forklifts can load the materials at the same time (since both ends of each aluminum ingot have protruding parts, the forklift is used to abut against the protruding parts to maintain the stability of the transfer), which increases the loading space. At the same time, since multiple groups of aluminum ingots can be placed in advance on the conveying device, the continuous loading is guaranteed during the loading process, thereby improving the loading efficiency.

[0025] The adjustment device 2 includes a fixed frame 202, and a first roller group 201 is installed at the bottom of the frame 202. The rotation direction of the first roller group 201 is consistent with the rotation direction of the conveying device and is on the same horizontal plane to ensure that the aluminum ingot can transition smoothly. On the side of the first roller group 201, two opposite push plates 203 are provided as left and right clamping devices. When the aluminum ingot reaches the adjustment device 2, the push plate 203 slides on the frame 202 through the horizontal sliding bar on the back side, and the power rod drives the push plate 203 to move closer to the center to clamp the aluminum ingot so that the left and right sides of the aluminum ingot remain flush. The power rod uses a cylinder or a hydraulic cylinder to ensure its neatness in the subsequent transportation process and ensure stability during the transportation process. The lifting device 3 is located below the other side of the shelf 202. The lowest point of the second roller group 302 is on the same horizontal plane as the first roller group 201. After being pushed left and right on the first roller group 201, the first roller group 201 starts to transport the aluminum ingot to the second roller group 302. The second roller group 302 is also connected to a motor with power, so that the aluminum ingot can be completely moved to the second roller group 302. The side of the lifting frame is vertically provided with a track frame 301 for limiting and maintaining the stability of the lifting, which is used to limit the horizontal deviation during the lifting process. The side of the track frame 301 is provided with a stop In addition, a flip plate 204 is hinged on one side of the track frame 301, and the flip plate 204 is controlled by a power rod 205. When the aluminum ingot moves to the second roller group 302, the flip plate 204 flips downward to act on the front end of the aluminum ingot, and the rear end of the aluminum ingot is blocked by a baffle. Through the extrusion of the flip plate 204, the front and rear directions of the aluminum ingot can be kept flush. Through the extrusion of the push plate 203 and the flip plate 204 in the adjustment device 2, the aluminum ingot is guaranteed to remain flush during the transportation process, and the aluminum ingot is prevented from tilting and blocking the transportation. At the same time, it provides safety guarantee for the next step of transportation to ensure production safety.

[0026] When the aluminum ingot passes through the adjusting device 2, the hydraulic cylinder at the bottom of the lifting frame extends out the second roller group 302 to drive the aluminum ingot to rise together. The lifting frame maintains stability. The second roller group 302 lifts the aluminum ingot to the same height as the receiving bracket 503. A protective plate is also installed on the upper part of the track frame 301 to ensure the stability of the aluminum ingot during the lifting process.

[0027] The material receiving device 5 includes a base 501, a turntable 502, a material receiving bracket 503 and a mobile fork 506. The base 501 is fixedly installed. The turntable 502 can drive the material receiving bracket 503 to rotate through a motor. A mobile pallet 4 connected to the furnace inlet is arranged on one side of the material receiving device 5. The aluminum ingot is placed on the mobile pallet 4 through the material receiving device 5. The mobile pallet 4 completes the loading. The material receiving bracket 503 is horizontally installed. A guide rail 507 is arranged on the top of the material receiving bracket 503 along the length direction. The mobile seat 504 at the bottom of the mobile fork 506 is connected to the guide rail 507 through a slider and is driven by a gear rack mechanism to slide along the guide rail 507. A truss 505 is arranged at the tail of the mobile fork 506. The lower part of the truss 505 is controlled by a hydraulic cylinder. The mobile fork 506 is installed at the other end of the truss 505. The toothing direction of the mobile fork 506 The second roller group 302, when the aluminum ingot is lifted to the height of the receiving bracket 503, the mobile fork 506 slides along the guide rail 507 to the bottom of the aluminum ingot under the drive of the gear rack, and then the truss 505 rises under the action of the hydraulic cylinder. After disengaging from the second roller group 302, the truss 505 retreats to allow the aluminum ingot to escape from the inside of the protective plate. When the aluminum ingot reaches the top of the receiving bracket 503 as a whole, the turntable 502 is started, so that the receiving bracket 503 faces the mobile cart 4, and the truss 505 moves to transport the aluminum ingot to the mobile cart 4. The turntable 502 is rotatable, which is convenient for transporting the aluminum ingot to different directions. The equipment position can be reasonably arranged according to site needs to improve space utilization. In the entire loading process, the aluminum ingot is efficiently, safely and automatically transported from the storage area to the smelting furnace, which significantly improves production efficiency and reduces labor intensity and safety risks.

[0028] The operation process is as follows:

[0029] 1. The forklift places bundles of aluminum ingots on the chain conveyor belt:

[0030] 2. The aluminum ingot moves with the conveyor belt to the adjustment device, and the clamping devices in the front, back, left and right directions clamp the aluminum ingot:

[0031] 3. The lifting device starts to lift the aluminum ingot to the height of the receiving bracket:

[0032] 4. The mobile fork slides along the guide rail to the bottom of the aluminum ingot under the drive of the gear rack, and the truss rises to hold up the aluminum ingot:

[0033] 5. The moving fork transports the aluminum ingot to the mobile pallet truck, and the turntable rotates to adjust the direction in preparation for the next transfer.

[0034] It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for the convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0035] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] The term "comprise" or any other similar term is intended to cover a non-exclusive inclusion, such that a process, article, or apparatus / device that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, article, or apparatus / device.

[0037] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. An automatic aluminum ingot transfer device, characterized in that: The invention comprises a conveying device for transporting bundled aluminum ingots, wherein an adjusting device (2) for adjusting the neatness of the bundled aluminum ingots is arranged at the output end of the conveying device, a lifting device (3) for adjusting the height of the bundled aluminum ingots is arranged at the lower part of the adjusting device (2), a material receiving device (5) is arranged at the output end of the lifting device (3), and the material receiving device (5) comprises a base (501), a turntable (502) is arranged on the top of the base (501), a material receiving bracket (503) is arranged on the top of the turntable (502), a movable fork (506) sliding along the length direction is arranged on the top surface of the material receiving bracket (503), and a movable pallet truck (4) for feeding materials is arranged on the side of the movable fork (506).

2. The automatic aluminum ingot transfer equipment according to claim 1, characterized in that: The conveying device is a chain conveyor belt (1), and the upper surface of the chain conveyor belt (1) is arranged horizontally.

3. The automatic aluminum ingot transfer equipment according to claim 1, characterized in that: The adjustment device (2) comprises a fixed frame (202), a first roller group (201) is arranged at the bottom of the frame (202), the rotation direction of the first roller group (201) is consistent with the rotation direction of the conveying device and is on the same horizontal plane, and left and right clamping devices are arranged on the sides of the first roller group (201).

4. The aluminum ingot automatic transfer equipment according to claim 3 is characterized in that: The left and right clamping devices include two push plates (203) arranged relatively on a rack (202), the push plates (203) are slidably connected to the rack (202) via a sliding rod horizontally arranged on the back side, and a power rod (205) facing the bundled aluminum ingots is arranged at the middle position of the push plates (203).

5. The automatic aluminum ingot transfer equipment according to claim 3 is characterized in that: The lifting device (3) comprises a lifting frame arranged at the output end of the first roller group (201), a second roller group (302) being arranged on the top of the lifting frame, the lowest point of the second roller group (302) being on the same horizontal plane as the first roller group (201), and a track frame (301) for limiting position being vertically arranged on the side of the lifting frame.

6. The automatic aluminum ingot transfer equipment according to claim 5, characterized in that: A baffle is provided on the side of the track frame (301); a flip plate (204) is hingedly connected to the upper side of the frame (202) near the track frame (301); and a power rod (205) is hingedly provided on the back side of the flip plate (204) for driving the flip plate (204) toward one side of the track frame (301).

7. The automatic aluminum ingot transfer equipment according to claim 5, characterized in that: The upper vertex of the second roller group (302) and the material receiving bracket (503) are arranged on the same horizontal plane, and a guide rail (507) is arranged on the upper surface of the material receiving bracket (503) along the length direction. A movable seat (504) is arranged at the bottom of the movable fork (506), and the bottom of the movable seat (504) is connected to the guide rail (507) through a slider, and the movable seat (504) and the material receiving bracket (503) are driven by a gear rack.

8. The automatic aluminum ingot transfer equipment according to claim 7, characterized in that: The tail of the mobile fork (506) is provided with a truss (505) hinged with the mobile seat (504), and the lower part of the truss (505) is hinged with a power rod (205) for driving the truss (505) to rise and fall.

9. The automatic aluminum ingot transfer equipment according to claim 5, characterized in that: The lower part of the material receiving bracket (503) is provided with a reinforcing plate for maintaining balance and connected to the rotating disk (502).