A method for detecting and analyzing the construction quality of asphalt concrete pavement

By extracting and analyzing asphalt concrete pavement seam label data, combined with flatness, density, driving experiments and temperature adaptability testing, the problem of insufficient detection of seams of pavement engineering in existing technologies has achieved more detailed and reliable reliability Path quality assessment.

CN119044462BActive Publication Date: 2025-01-28CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411546182.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-01
Publication Date
2025-01-28
Estimated Expiration
2044-11-01

AI Technical Summary

Technical Problem

The existing asphalt concrete pavement construction quality inspection technology ignores the careful consideration of various engineering joints on the pavement, resulting in a lack of meticulousness and reliability of the inspection results, making it difficult to accurately evaluate the pavement quality and discover potential problems.

Method used

Put up an analysis method for the construction quality detection of asphalt concrete pavement. By extracting the seam margin data, the planned and detection area is performed for flatness and density detection, and the construction quality of the pavement is comprehensively evaluated by simulating vehicle driving experiments and temperature adaptability testing. Quality and environment adaptation quality.

Benefits of technology

The detailed detection and evaluation of various types of engineering seams of the pavement has been realized, the details and reliability of the test results are improved, the quality of the pavement can be more accurately evaluated, the potential problems are found, and the high -quality construction and maintenance of the pavement can be guaranteed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119044462B_ABST
    Figure CN119044462B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of asphalt concrete pavement construction management, and relates to an asphalt concrete pavement construction quality detection and analysis method, which extracts joint mark data of a target pavement, plans each transverse joint area, each longitudinal joint area and each conventional area and respectively detects their corresponding flatness and density, and accurately evaluates the basic construction quality of the target pavement, and on the other hand analyzes the driving smoothness of the target pavement under various step humidity environments of various simulated vehicles, and accurately evaluates the basic driving quality of the target pavement, in addition, corresponding temperature adaptability tests are performed on each expansion joint position plate and each contraction joint position plate of the target pavement, and the environmental adaptability quality of the target pavement is evaluated, and the corresponding evaluation indicators of the basic construction quality, basic driving quality, and environmental adaptability quality of the target pavement are comprehensively considered, and a target pavement construction quality detection score with high accuracy and objectivity is output, providing strong support for road construction and maintenance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of asphalt concrete pavement construction management and relates to an asphalt concrete pavement construction quality detection and analysis method. Background Art

[0002] As one of the common pavement structures in road construction, asphalt concrete pavement is widely used in urban roads, highways, airport runways and other projects due to its good durability and bearing capacity. However, with the continuous increase in road traffic demand and the increasing vehicle load, higher requirements are placed on the quality of asphalt concrete pavement. Therefore, it is particularly important to detect and analyze the construction quality of asphalt concrete pavement.

[0003] However, the existing asphalt concrete pavement construction quality inspection technology still has certain limitations. Specifically, although the existing asphalt concrete pavement construction quality inspection technology has covered multiple inspection dimensions such as physical properties and structural performance inspection, surface properties and safety inspection, it ignores the detailed consideration of various engineering joints of the pavement and cannot provide strong support for the high-quality construction and maintenance of the pavement.

[0004] On the one hand, the lack of consideration of various types of engineering joints makes the road construction quality inspection results lack of detail. Different types of joints have different positions, functions and performance requirements in the road surface. For example, transverse joints and longitudinal joints mainly affect the flatness and integrity of the road surface, expansion joints and contraction joints are related to the stability of the road surface under temperature changes, and settlement joints play a key role in the road surface's adaptation to uneven foundation settlement. Existing technologies fail to include various types of engineering joints in the inspection process, resulting in the inability to accurately grasp the quality status of the road surface in various details, making it difficult to discover potential problems and hidden dangers.

[0005] On the other hand, the lack of consideration of various engineering joints also makes the road construction quality inspection results unreliable. During the use of the road, the joints are often prone to diseases, such as cracks, misalignment, water seepage, etc. Ignoring the importance of engineering joint quality in construction quality inspection may lead to more serious road damage in the subsequent use of asphalt concrete pavement, affecting the service life and driving safety of the road. Summary of the invention

[0006] In view of this, in order to solve the problems raised in the above background technology, a method for detecting and analyzing the construction quality of asphalt concrete pavement is proposed.

[0007] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a method for detecting and analyzing the construction quality of asphalt concrete pavement, including: S1. Recording the completed asphalt concrete pavement to be inspected as the target pavement, and extracting the joint marking data of the target pavement, including the corresponding positions and lengths of each transverse joint, each longitudinal joint, each expansion joint, each contraction joint, and each settlement joint.

[0008] S2. According to the position and length of each transverse joint and each longitudinal joint of the target road surface, various inspection areas of the target road surface are planned and corresponding flatness inspections and density inspections are carried out. The various inspection areas include each transverse joint area, each longitudinal joint area and each conventional area, so as to analyze the basic construction quality evaluation indicators of the target road surface.

[0009] S3. Various types of simulated vehicles equipped with vehicle-mounted vibration devices and wheel force sensing devices are placed on the target road surface in turn for driving experiments, and the driving performance data of various types of simulated vehicles are recorded to analyze the basic driving quality evaluation indicators of the target road surface.

[0010] S4. According to the positions and lengths of each expansion joint and each contraction joint of the target road surface, plan each expansion joint position block and each contraction joint position block of the target road surface and conduct corresponding temperature adaptability tests, so as to analyze the environmental adaptability quality evaluation index of the target road surface.

[0011] S5. Comprehensively consider the corresponding evaluation indicators of the target road surface’s basic construction quality, basic driving quality, and environmental adaptability quality, calculate the target road surface’s construction quality inspection score, and provide feedback.

[0012] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention helps to have a more comprehensive understanding of the overall flatness and density of the road surface by planning each transverse joint area, each longitudinal joint area and each conventional area and detecting their corresponding flatness and density respectively, so as to accurately evaluate the basic construction quality of the target road surface.

[0013] (2) The present invention analyzes the driving smoothness of target road surfaces under various levels of humidity environments when various types of simulated vehicles are placed, wherein the driving paths of the simulated vehicles include various settlement joints. This helps to understand the vibration and friction conditions of the target road surface during driving. From the perspective of user experience, it intuitively reflects the actual performance of the road surface, thereby accurately evaluating the basic driving quality of the target road surface.

[0014] (3) The present invention helps to understand the expansion joint environmental tolerance and contraction joint environmental tolerance of the target road surface by performing corresponding temperature adaptability tests on each expansion joint position plate and each contraction joint position plate of the target road surface, thereby evaluating the environmental adaptability quality of the target road surface and providing strong support for ensuring the quality and performance of asphalt concrete pavement.

[0015] (4) The present invention not only helps provide a more comprehensive and objective construction quality inspection score for the target road surface by comprehensively considering the corresponding evaluation indicators of the target road surface's basic construction quality, basic driving quality, and environmental adaptability quality, but also has strong practicality and environmental adaptability, providing strong support for road construction and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0017] Figure 1 The present invention is a flowchart of the steps for implementing the method. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] See also Figure 1 As shown, the present invention provides a method for detecting and analyzing the construction quality of asphalt concrete pavement, including: S1. Recording the completed asphalt concrete pavement to be inspected as the target pavement, extracting the joint marking data of the target pavement, including the corresponding positions and lengths of each transverse joint, each longitudinal joint, each expansion joint, each contraction joint, and each settlement joint.

[0020] It should be noted that the joint marking data of the above-mentioned target pavement is obtained and uploaded based on the precise marking measurement by professionals during the actual construction process, among which the transverse joints and longitudinal joints are the working joints of the target pavement. The transverse joints are usually located at the end or start of construction on each day during the construction of the target pavement. They are the joints between the uncompacted edges left at the end of the previous day's construction and the new materials constructed on the second day, or the joints between two construction sections on the same day. The longitudinal joints are usually located at the connection positions where two pavers are working simultaneously or between different lanes. The expansion joints, contraction joints and settlement joints are the functional joints of the target pavement. Expansion joints are functional joints set to prevent the concrete slab from expanding and cracking when the temperature rises. Contraction joints are functional joints set to prevent the concrete slab from shrinking and cracking when the temperature drops. Settlement joints are usually set at the junction of different geological conditions or structural types, such as near structures such as bridges and culverts. They are functional joints set to prevent cracking due to uneven foundation settlement.

[0021] S2. According to the position and length of each transverse joint and each longitudinal joint of the target road surface, various inspection areas of the target road surface are planned and corresponding flatness inspections and density inspections are carried out. The various inspection areas include each transverse joint area, each longitudinal joint area and each conventional area, so as to analyze the basic construction quality evaluation indicators of the target road surface.

[0022] Specifically, the various detection areas of the planned target road surface include: taking each transverse joint as the central axis, planning a rectangular area with a length consistent with the length of the corresponding transverse joint and a width of a preset width, and taking each rectangular area as each transverse joint area.

[0023] Similarly, taking each longitudinal seam as the central axis, a rectangular area with a length consistent with the length of the corresponding longitudinal seam and a width of a preset width is planned to obtain each longitudinal seam area.

[0024] The remaining area of ​​the target road surface except the longitudinal joint areas and the transverse joint areas is regarded as a whole, and grid division is performed according to the preset rectangular size. It is required that each divided grid has no overlapping part with the transverse joint area or the longitudinal joint area, and each divided grid is regarded as a regular area.

[0025] Specifically, the specific process of the flatness detection and density detection corresponding to various detection areas of the target road surface includes: for a certain type of detection area of ​​the target road surface, each linear partition is cut through the central axis, and based on the symmetry principle that the vertical distance between each point in each linear partition and the central axis is equal, each symmetrical node pair is randomly selected, and the elevation difference of each symmetrical node pair is detected by a flatness meter, and the maximum elevation difference and a preset constant are accumulated, and the reciprocal of the accumulated value is used as the flatness detection index of this type of detection area, thereby obtaining the flatness detection index of various detection areas of the target road surface. ,in are the numbers of various detection areas. .

[0026] It should be noted that the cutting directions of the above-mentioned linear partitions are clearly divided according to the regional characteristics. Specifically, when the transverse seam area and the conventional area are cut, the linear partitions formed are arranged as upper and lower partitions, while when the longitudinal seam area is cut, the linear partitions formed are arranged as left and right partitions.

[0027] The density value of each unit node on the axis of each test area of ​​the target road surface is measured by a nuclear density meter , is the number of each unit node on the central axis, , through the formula

[0028] Analyze the density detection indicators of various detection areas of the target road surface, including Target road The first axis on the detection area The density value of each unit node, is the number of unit nodes on the central axis.

[0029] Specifically, the analysis of the basic construction quality evaluation index of the target road surface includes: collecting the corresponding flatness detection index and density detection index of various detection areas of the target road surface, setting the corresponding influence weights of various detection areas , combined with the asphalt concrete pavement construction acceptance standard specification flatness detection index reaching the standard threshold value stored in the WEB cloud and density detection index reaching the standard threshold , calculate the basic construction quality evaluation index of the target road surface ,

[0030] ,in Count the number of detection areas.

[0031] The embodiment of the present invention helps to more comprehensively understand the overall flatness and density of the road surface by planning each transverse joint area, each longitudinal joint area and each conventional area and respectively detecting their corresponding flatness and density, so as to accurately evaluate the basic construction quality of the target road surface.

[0032] S3. Various types of simulated vehicles equipped with vehicle-mounted vibration devices and wheel force sensing devices are placed on the target road surface in turn for driving experiments, and the driving performance data of various types of simulated vehicles are recorded to analyze the basic driving quality evaluation indicators of the target road surface.

[0033] Specifically, the basic driving quality evaluation index of the target road surface is analyzed, including: setting a reference moisture content to sequentially simulate each step humidity environment of the target road surface, wherein each step humidity environment indicates that the road surface moisture content reaches the product value of the reference moisture content and its corresponding step number.

[0034] Place various types of simulated vehicles on the test starting line of the target road surface under various levels of humidity environment, plan the driving route according to the location and length of each settlement joint, and drive the vehicle until it reaches the test end line of the target road surface in combination with the preset speed control strategy. Collect the driving adhesion and driving vibration amplitude of each unit line segment on the driving route during the driving experiment of various types of simulated vehicles on the target road surface under various levels of humidity environment, and calculate the driving stability of various types of simulated vehicles on the target road surface under various levels of humidity environment , The numbers of various simulated vehicles. , is the number of each step humidity environment, , according to the formula Get the basic driving quality evaluation index of the target road surface, where For the The simulated vehicles correspond to the preset weights, For the Each level of humidity environment corresponds to a preset weight. .

[0035] It should be noted that the above-mentioned planned driving route includes various settlement joints and has the shortest path length. The preset speed control strategy requires the simulated vehicle to accelerate at a preset positive acceleration at the test starting line, travel at a constant speed after a fixed period of time, and decelerate at a preset negative acceleration when the distance to the test ending line is a preset length until the simulated vehicle stops.

[0036] Specifically, the The specific calculation formula is:

[0037] ,in The preset permissible upper limit of the vibration amplitude of the simulated vehicle and the preset reasonable lower limit of the driving adhesion stored in the WEB cloud are respectively, Respectively The simulated vehicle is placed in the During the target road driving test under a stepped humidity environment, the settlement joints on the driving route were Driving adhesion and driving vibration amplitude of each unit line segment, is the number of each unit line segment of the settlement joint on the driving route, , Respectively The simulated vehicle is placed in the During the target road driving test under a stepped humidity environment, the first Driving adhesion and driving vibration amplitude of each unit line segment, is the number of each unit line segment on the driving route that does not belong to the settlement joint, , are the number of unit line segments that belong to settlement joints and the number of unit line segments that do not belong to settlement joints on the driving route, They are the preset weights corresponding to the settlement joints and the settlement joints not belonging to the driving route, .

[0038] Specifically, the various types of simulated vehicles are vehicles of different weight levels under the same preset size specifications.

[0039] The embodiment of the present invention analyzes the driving smoothness of target road surfaces under various levels of humidity environments of various simulated vehicles, wherein the driving paths of the simulated vehicles include settlement joints, to help understand the vibration and friction conditions of the target road surface during driving. From the perspective of user experience, it intuitively reflects the actual performance of the road surface, thereby accurately evaluating the basic driving quality of the target road surface.

[0040] S4. According to the positions and lengths of each expansion joint and each contraction joint of the target road surface, plan each expansion joint position block and each contraction joint position block of the target road surface and conduct corresponding temperature adaptability tests, so as to analyze the environmental adaptability quality evaluation index of the target road surface.

[0041] It should be noted that the planning method of each expansion joint position block and each contraction joint position block of the above-mentioned target road surface is consistent with the planning method of each transverse joint area.

[0042] Specifically, the specific process of the temperature adaptability test of each expansion joint position plate and each contraction joint position plate of the target road surface includes: moving the portable hot and cold air blower to each expansion joint position plate of the target road surface, continuously outputting preset high-temperature hot air to each expansion joint position plate for a preset time to simulate the high-temperature adaptability test, and recording the abnormal performance indicators of each expansion joint position plate at the end of the high-temperature adaptability test, including the degree of plate deformation. , cracking number and maximum crack length 、Number of mismatches And the maximum height of the staggered platform , is the number of each expansion joint location plate, .

[0043] Move the portable hot and cold air blowers to each contraction joint position block of the target road surface, continuously output preset low-temperature cold air to each contraction joint position block for a preset time to simulate a low-temperature adaptability test, and record the abnormal performance indicators of each contraction joint position block at the end of the low-temperature adaptability test.

[0044] After the high-temperature adaptability test of each expansion joint position plate and the low-temperature adaptability test of each contraction joint position plate are completed, adjust the working mode of the portable hot and cold air blower to the hot and cold alternating cycle mode, set the number of hot and cold alternating cycles to the preset value, and require the portable hot and cold air blower to alternately output the preset high-temperature hot air and the preset low-temperature cold air of the same preset length for each expansion joint position plate and each contraction joint position plate in a single hot and cold alternating cycle to simulate the high-temperature alternating adaptability test of each expansion joint position plate and each contraction joint position plate, and record the newly added abnormal performance indicators of each expansion joint position plate and each contraction joint position plate after the high-temperature alternating adaptability test is completed, including the newly added plate deformation degree, the newly added number of cracks and the newly added maximum crack length, the newly added number of misalignments and the newly added maximum misalignment height.

[0045] Specifically, the environmental adaptability quality evaluation index of the target road surface is analyzed, including: calculating the expansion joint environmental tolerance coefficient of the target road surface according to the abnormal performance indicators of the high temperature adaptability test of the expansion joint position plates of the target road surface and the newly added abnormal performance indicators of the high and low temperature alternating adaptability test. ,

[0046] ,in For the The expansion joint length of the plate at each expansion joint position, are the preset reference cracking number and reference misalignment number, The standard road height for the target road surface design stored in the WEB cloud. is the number of plates at the expansion joint location, Respectively The new plate deformation degree, new crack number and new maximum crack length, new misalignment number and new maximum misalignment height of the plates at each expansion joint position after the high and low temperature alternating adaptability test are completed.

[0047] According to the abnormal performance indicators of the low-temperature adaptability test of the slabs at each contraction joint position of the target pavement and the newly added abnormal performance indicators of the high and low temperature alternating adaptability test, the contraction joint environmental tolerance coefficient of the target pavement is calculated in accordance with the calculation method of the expansion joint environmental tolerance coefficient of the target pavement.

[0048] The cumulative value of the expansion joint environmental tolerance coefficient and the contraction joint environmental tolerance coefficient of the target pavement is used as the environmental adaptability quality evaluation index of the target pavement.

[0049] The embodiment of the present invention helps to understand the expansion joint environmental tolerance and contraction joint environmental tolerance of the target road surface by performing corresponding temperature adaptability tests on each expansion joint position plate and each contraction joint position plate of the target road surface, thereby evaluating the environmental adaptability quality of the target road surface and providing strong support for ensuring the quality and performance of the asphalt concrete pavement.

[0050] S5. Comprehensively consider the corresponding evaluation indicators of the target road surface’s basic construction quality, basic driving quality, and environmental adaptability quality, calculate the target road surface’s construction quality inspection score, and provide feedback.

[0051] Specifically, the calculation of the construction quality inspection score of the target road surface includes: extracting the threshold values ​​of the basic construction quality, basic driving quality, and environmental adaptability quality corresponding to the evaluation indicators of the asphalt concrete road surface construction acceptance standard planning stored in the WEB cloud, and comparing them with the basic construction quality, basic driving quality, and environmental adaptability quality corresponding to the evaluation indicators of the target road surface, and outputting the corresponding compliance factors of the basic construction quality, basic driving quality, and environmental adaptability quality of the target road surface, which are respectively recorded as , according to the formula Calculate the construction quality inspection score of the target road surface.

[0052] It should be noted that the specific analysis process of the compliance factors corresponding to the basic construction quality, basic driving quality and environmental adaptability quality of the above-mentioned target road surface is as follows: if the corresponding evaluation index of the basic construction quality of the target road surface is greater than or equal to its compliance threshold, the output compliance factor corresponding to the basic construction quality of the target road surface is 1; if the corresponding evaluation index of the basic construction quality of the target road surface is less than its compliance threshold, the ratio of the corresponding evaluation index of the basic construction quality of the target road surface to its compliance threshold is used as its corresponding compliance factor. Similarly, the compliance factors corresponding to the basic driving quality and environmental adaptability quality of the target road surface are obtained.

[0053] It should also be noted that the calculation formula for the construction quality inspection score of the above target road surface refers to the tanh function, and the range of the construction quality inspection score is approximately Therefore, when the calculated construction quality inspection score of the target road surface is 99.51, it indicates a full score.

[0054] The embodiment of the present invention not only helps the target road surface to provide a more comprehensive and objective construction quality inspection score by comprehensively considering the basic construction quality, basic driving quality, and environmental adaptability quality corresponding evaluation indicators of the target road surface, but also has strong practicality and environmental adaptability, providing strong support for road construction and maintenance.

[0055] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. A method for detecting and analyzing the construction quality of asphalt concrete pavement, characterized in that: The method includes: S1. Record the completed asphalt concrete pavement to be inspected as the target pavement, and extract the joint marking data of the target pavement, including the corresponding positions and lengths of each transverse joint, each longitudinal joint, each expansion joint, each contraction joint, and each settlement joint; S2. According to the position and length of each transverse joint and each longitudinal joint of the target road surface, plan various detection areas of the target road surface and conduct corresponding flatness detection and density detection, wherein the various detection areas include each transverse joint area, each longitudinal joint area and each conventional area, so as to analyze the basic construction quality evaluation index of the target road surface; S3. Place various simulated vehicles equipped with vehicle-mounted vibration devices and wheel force sensing devices on the target road surface for driving experiments, record the driving performance data of various simulated vehicles, and analyze the basic driving quality evaluation indicators of the target road surface; The basic driving quality evaluation index of the target road surface is analyzed, including: setting a reference moisture content to sequentially simulate each step humidity environment of the target road surface, wherein each step humidity environment indicates that the road surface moisture content reaches the product value of the reference moisture content and its corresponding step number; Place various types of simulated vehicles on the test starting line of the target road surface under various levels of humidity environment, plan the driving route according to the location and length of each settlement joint, and drive the vehicle until it reaches the test end line of the target road surface in combination with the preset speed control strategy. Collect the driving adhesion and driving vibration amplitude of each unit line segment on the driving route during the driving experiment of various types of simulated vehicles on the target road surface under various levels of humidity environment, and calculate the driving stability of various types of simulated vehicles on the target road surface under various levels of humidity environment , The numbers of various simulated vehicles. , is the number of each step humidity environment, , according to the formula Get the basic driving quality evaluation index of the target road surface, where For the The simulated vehicles correspond to the preset weights, For the Each level of humidity environment corresponds to a preset weight. ; S4. According to the positions and lengths of the expansion joints and contraction joints of the target road surface, plan the expansion joint position plates and contraction joint position plates of the target road surface and conduct corresponding temperature adaptability tests, so as to analyze the environmental adaptability quality evaluation index of the target road surface; The analysis of the environmental adaptability quality evaluation index of the target road surface includes: calculating the expansion joint environmental tolerance coefficient of the target road surface according to the abnormal performance indicators of the high temperature adaptability test of the expansion joint position plates of the target road surface and the newly added abnormal performance indicators of the high and low temperature alternating adaptability test; The shrinkage joint environmental tolerance coefficient of the target pavement is calculated based on the abnormal performance indicators of the low-temperature adaptability test of the plates at each shrinkage joint position of the target pavement and the newly added abnormal performance indicators of the high-low temperature alternating adaptability test; The cumulative value of the expansion joint environmental tolerance coefficient and the contraction joint environmental tolerance coefficient of the target road surface is used as the environmental adaptability quality evaluation index of the target road surface; S5. Comprehensively consider the corresponding evaluation indicators of the target road surface’s basic construction quality, basic driving quality, and environmental adaptability quality, calculate the target road surface’s construction quality inspection score, and provide feedback.

2. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: The various detection areas of the planned target road surface include: taking each transverse joint as the central axis, planning a rectangular area with a length consistent with the length of the corresponding transverse joint and a width of a preset width, and taking each rectangular area as each transverse joint area; Similarly, taking each longitudinal seam as the central axis, a rectangular area with a length consistent with the length of the corresponding longitudinal seam and a width equal to a preset width is planned to obtain each longitudinal seam area; The remaining area of ​​the target road surface except the longitudinal joint areas and the transverse joint areas is regarded as a whole, and grid division is performed according to the preset rectangular size. It is required that each divided grid has no overlapping part with the transverse joint area or the longitudinal joint area, and each divided grid is regarded as a regular area.

3. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: The specific process of the flatness detection and density detection corresponding to various detection areas of the target road surface includes: for a certain detection area of ​​the target road surface, each linear partition is cut through the central axis, and based on the symmetry principle that the vertical distance between each point in each linear partition and the central axis is equal, each symmetrical node pair is randomly selected, and the elevation difference of each symmetrical node pair is detected by a flatness meter, and the maximum elevation difference and a preset constant are accumulated, and the reciprocal of the accumulated value is used as the flatness detection index of this type of detection area, thereby obtaining the flatness detection index of various detection areas of the target road surface ,in are the numbers of various detection areas. ,in Count the number of detection areas; The density value of each unit node on the axis of each test area of ​​the target road surface is measured by a nuclear density meter , is the number of each unit node on the central axis, , through the formula Analyze the density detection indicators of various detection areas of the target road surface, including Target road The first axis on the detection area The density value of each unit node, is the number of unit nodes on the central axis.

4. The asphalt concrete pavement construction quality detection and analysis method according to claim 3 is characterized by: The analysis of the basic construction quality evaluation index of the target road surface includes: collecting the corresponding flatness detection index and density detection index of various detection areas of the target road surface, setting the corresponding influence weights of various detection areas , combined with the asphalt concrete pavement construction acceptance standard specification flatness detection index reaching the standard threshold value stored in the WEB cloud and density detection index reaching the standard threshold , calculate the basic construction quality evaluation index of the target road surface , .

5. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: Said The specific calculation formula is: ,in The preset permissible upper limit of the vibration amplitude of the simulated vehicle and the preset reasonable lower limit of the driving adhesion stored in the WEB cloud are respectively, Respectively The simulated vehicle is placed in the During the target road driving test under a stepped humidity environment, the settlement joints on the driving route were Driving adhesion and driving vibration amplitude of each unit line segment, is the number of each unit line segment of the settlement joint on the driving route, , Respectively The simulated vehicle is placed in the During the target road driving test under a stepped humidity environment, the first Driving adhesion and driving vibration amplitude of each unit line segment, is the number of each unit line segment on the driving route that does not belong to the settlement joint, , are the number of unit line segments that belong to settlement joints and the number of unit line segments that do not belong to settlement joints on the driving route, They are the preset weights corresponding to the settlement joints and the non-settlement joints on the driving route, .

6. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: The various types of simulated vehicles are vehicles of different weight levels under the same preset size specifications.

7. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: The specific process of the temperature adaptability test of each expansion joint position plate and each contraction joint position plate of the target road surface includes: moving a portable hot and cold air blower to each expansion joint position plate of the target road surface, continuously outputting a preset high-temperature hot air to each expansion joint position plate for a preset time to simulate a high-temperature adaptability test, and recording abnormal performance indicators of each expansion joint position plate at the end of the high-temperature adaptability test, including the degree of plate deformation , cracking number and maximum crack length 、Number of mismatches And the maximum height of the staggered platform , is the number of each expansion joint location plate, , is the number of plates at the expansion joint location; Move the portable hot and cold air blower to each shrinkage joint position plate of the target road surface, output preset low-temperature cold air to each shrinkage joint position plate for a preset time to simulate the low-temperature adaptability test, and record the abnormal performance indicators of each shrinkage joint position plate at the end of the low-temperature adaptability test; After the high-temperature adaptability test of each expansion joint position plate and the low-temperature adaptability test of each contraction joint position plate are completed, adjust the working mode of the portable hot and cold air blower to the hot and cold alternating cycle mode, set the number of hot and cold alternating cycles to the preset value, and require the portable hot and cold air blower to alternately output the preset high-temperature hot air and the preset low-temperature cold air of the same preset length for each expansion joint position plate and each contraction joint position plate in a single hot and cold alternating cycle to simulate the high-temperature alternating adaptability test of each expansion joint position plate and each contraction joint position plate, and record the newly added abnormal performance indicators of each expansion joint position plate and each contraction joint position plate after the high-temperature alternating adaptability test is completed, including the newly added plate deformation degree, the newly added number of cracks and the newly added maximum crack length, the newly added number of misalignments and the newly added maximum misalignment height.

8. The asphalt concrete pavement construction quality detection and analysis method according to claim 7 is characterized by: The expansion joint environmental tolerance coefficient of the target pavement , ,in For the The expansion joint length of the plate at each expansion joint position, are the preset reference cracking number and reference misalignment number, The standard road height for the target road surface design stored in the WEB cloud. is the number of plates at the expansion joint location, Respectively The newly added plate deformation degree, newly added crack number and newly added maximum crack length, newly added misalignment number and newly added maximum misalignment height of each expansion joint position plate after the high and low temperature alternating adaptability test; According to the abnormal performance indicators of the low-temperature adaptability test of the slabs at each contraction joint position of the target pavement and the newly added abnormal performance indicators of the high and low temperature alternating adaptability test, the contraction joint environmental tolerance coefficient of the target pavement is calculated in accordance with the calculation method of the expansion joint environmental tolerance coefficient of the target pavement.

9. The asphalt concrete pavement construction quality detection and analysis method according to claim 1 is characterized by: The calculation of the construction quality inspection score of the target road surface includes: extracting the threshold values ​​of the basic construction quality, basic driving quality, and environmental adaptability quality corresponding to the evaluation indicators of the asphalt concrete road surface construction inspection and acceptance standard planning stored in the WEB cloud, and comparing them with the basic construction quality, basic driving quality, and environmental adaptability quality corresponding to the evaluation indicators of the target road surface, and outputting the corresponding compliance factors of the basic construction quality, basic driving quality, and environmental adaptability quality of the target road surface, which are respectively recorded as , according to the formula Calculate the construction quality inspection score of the target road surface; The specific analysis process of the compliance factors corresponding to the basic construction quality, basic driving quality and environmental adaptability quality of the above-mentioned target road surface is as follows: if the corresponding evaluation index of the basic construction quality of the target road surface is greater than or equal to its compliance threshold, the corresponding compliance factor of the basic construction quality of the target road surface is output as 1; if the corresponding evaluation index of the basic construction quality of the target road surface is less than its compliance threshold, the ratio of the corresponding evaluation index of the basic construction quality of the target road surface to its compliance threshold is used as its corresponding compliance factor. Similarly, the corresponding compliance factors of the basic driving quality and environmental adaptability quality of the target road surface are obtained.

Citation Information

Patent Citations

  • Road surface flatness evaluation method and device, computer equipment and storage medium

    CN117708562A

  • Crack detection early warning method and system for expressway construction

    CN118644089A