Intelligent electric energy metering terminal based on mutual inductor
By determining the current confidence interval and performing correlation analysis in the electric energy metering device, the problem of insufficient current interval and transformer performance evaluation in the prior art is solved, and more accurate current metering evaluation and energy loss management are achieved, and the stability of the system is improved. Sex and efficiency.
Patent Information
- Application Number
- CN202411516773.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-10-29
Smart Images

Figure CN119044595A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric power technology, and in particular to an electric energy intelligent metering terminal based on a transformer. Background Art
[0002] In the power industry, the accuracy of electric energy metering is an important indicator of electric energy operation. Electric energy metering devices usually consist of potential transformers (PT), current transformers (CT) and electric energy meters. The accuracy of voltage and current transformers and electric energy meters directly affects the accuracy of secondary metering. Therefore, when performing on-site error detection on electric energy metering devices, it is usually necessary to detect PT errors, CT errors and electric energy meter errors separately.
[0003] For example, Chinese patent publication number CN111983542A discloses an online detection system and method for measuring transformer measurement errors, the system comprising a first online metering transformer detector and a second online metering transformer detector, the first online metering transformer detector being respectively connected to a first voltage transformer and a first current transformer at a first end of a transmission line, the second online metering transformer detector being respectively connected to a second voltage transformer and a second current transformer at a second end of the transmission line, the first online metering transformer detector and the second online metering transformer detector being clock synchronized, wherein the online metering transformer measurement error detection system online measures and matches the voltage information and current information of the first voltage transformer, the first current transformer, the second voltage transformer and the second current transformer, and calculates the transformation ratio errors of the first voltage transformer and the first current transformer and the second voltage transformer and the second current transformer.
[0004] However, the existing technology cannot evaluate the corresponding values of different current intervals and the relevant performance of the current transformer to determine whether there are corresponding problems when the transformer is measuring, such as energy consumption problems, resulting in inaccurate metering effect and energy loss of the transformer finally identified. Summary of the invention
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an intelligent electric energy metering terminal based on a transformer, comprising: determining a current confidence interval based on the design specifications of the transformer.
[0006] Identify and divide the current into a first metering interval and a second metering interval, wherein the first metering interval refers to the current level within the normal operating range, and the second metering interval refers to the current level within the safe operating range when it exceeds or approaches the rated value.
[0007] A correlation analysis is performed on the current values in the first metering interval and the second metering interval, and the first metering interval after the correlation analysis is compared with the second metering interval to determine a comparison result between the first metering interval and the second metering interval.
[0008] Determine the ratio error of current measurement under the comparison results, and determine the degree of influence of the ratio error on the performance of the transformer.
[0009] Simulate the energy loss of the system under the strain ratio error and determine the corresponding metrological adjustment measures for the energy loss.
[0010] The beneficial effects of the present invention are as follows: 1. The present invention can more accurately evaluate the changing trend and characteristics of the current by performing correlation analysis on the current values in the first metering interval and the second metering interval and comparing the results.
[0011] Second, the present invention determines the influence of the ratio error on the performance of the transformer by calculating the mean change rate and standard deviation change rate corresponding to the ratio error, which helps to timely discover potential problems of the transformer and improve the reliability and stability of the system.
[0012] 3. The present invention uses the autocorrelation coefficient and the Pearson correlation coefficient to perform correlation analysis on the current value, which can more accurately capture the inherent law of current change and provide a scientific basis for performance evaluation.
[0013] 4. The present invention constructs a loss relationship diagram to intuitively display the energy loss distribution under different ratio errors, which facilitates the rapid identification of high-loss areas.
[0014] 5. The present invention improves the adaptability and flexibility of the system by comparing different preset adjustment measures and selecting the most appropriate adjustment plan; adjusts the priority of the metering adjustment parameters according to the loss cause to ensure that the most effective adjustment measures are adopted first, thereby improving the overall performance and efficiency of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0016] Figure 1 The present invention is a flow chart of a smart electric energy metering terminal based on a transformer.
[0017] Figure 2 The present invention is a flow chart of step S3 of a transformer-based electric energy intelligent metering terminal.
[0018] Figure 3 The present invention is a flow chart of step S5 of a transformer-based electric energy intelligent metering terminal. DETAILED DESCRIPTION
[0019] The embodiments of the present invention are described in detail below. The embodiments described below are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention. If no specific techniques or conditions are specified in the embodiments, the techniques or conditions described in the literature in the art or the product specifications are used.
[0020] See also Figure 1 , a transformer-based electric energy intelligent metering terminal, including: S1, based on the design specifications of the transformer, determining the current confidence interval, the current confidence interval at this time is to illustrate that the current measured within this range is reliable, and to ensure that the operation of the transformer within this interval can meet the accuracy requirements.
[0021] S2, identifying and dividing the first metering interval and the second metering interval corresponding to the current, wherein the first metering interval refers to the current level within the normal operating range, and the second metering interval refers to the current level that is still within the safe operating range when it exceeds or approaches the rated value.
[0022] S3, performing correlation analysis on the current values in the first metering interval and the second metering interval, comparing the first metering interval after the correlation analysis with the second metering interval, and determining a comparison result between the first metering interval and the second metering interval.
[0023] S4, determining the ratio error of the current measurement under the comparison result, and determining the influence degree of the ratio error on the performance of the transformer.
[0024] S5, simulate the energy loss of the system under the strain ratio error, and determine the metering adjustment measures corresponding to the energy loss.
[0025] The current confidence interval is obtained by finding the corresponding parameters of the transformer currently in use to determine the interval of the corresponding rated current and working current of the transformer to identify the corresponding current confidence interval.
[0026] For the set current confidence interval, by obtaining the time of the current data collection, the collected data is distributed in the form of a time series, the measured current value is recorded at the corresponding time point, and the 95% numerical interval of the current data is used as the current confidence interval at this time. This numerical interval is to convert the maximum current and the minimum current collected at this time into a numerical interval and multiply it by 95%. The data with a value within the 95% range of the numerical interval is selected as the current confidence interval verified at this time.
[0027] At this time, the ratio error is the ratio of the actual ratio to the standard ratio change. For example, the actual ratio is the ratio of the primary current to the secondary current. At this time, it is mainly to verify the relevant current values in the corresponding cases of the first metering interval and the second metering interval to verify whether there is an error in current transmission.
[0028] The first metering interval and the second metering interval are divided by sampling data at the same time point from the data of multiple mutual inductors under the same working conditions and the same equipment according to different selected interval ranges, and performing proportional sampling according to the range corresponding to the data, to ensure that when the first metering interval and the second metering interval are in different ranges, the collected data can display values in different ranges.
[0029] The primary side and the secondary side described above have the following meanings.
[0030] Primary Side: This is the part that is directly connected to the power supply, usually connected to a high voltage or high current circuit. The primary side receives input electrical energy and transfers energy to the secondary side through electromagnetic induction. The primary side current refers to the current flowing through the primary side winding.
[0031] Secondary Side: This part is connected to the load and usually outputs low voltage or small current. The secondary side obtains energy from the primary side and generates the required voltage or current through electromagnetic induction. The secondary side current refers to the current flowing through the secondary winding.
[0032] When energy loss is found through the ratio error, it is necessary to verify the type of loss generated at this time according to the identified ratio error, and handle it separately according to the corresponding type. The identified types can be metering error, copper loss, iron loss and other loss situations. When copper loss and iron loss appear at this time, it means that the current transformer has generated a large loss during use. If the loss value after verification exceeds the expected value, the transformer needs to be replaced, which will also cause metering error. If only metering error occurs, then the situation at this time may be a failure due to other reasons, such as poor contact of the transformer, aging of the metering equipment on the transformer, etc. At this time, it is also necessary to verify the corresponding ratio error and identify the error factors that appear at this time, so that targeted processing can be carried out to compensate for the error value and obtain accurate metering value.
[0033] The errors caused by the corresponding copper loss and iron loss are mainly defined as follows.
[0034] Copper loss: The resistance loss caused by the current flowing through the conductor (winding). If the current on the primary or secondary side increases due to the ratio error of the transformer, the corresponding copper loss will also increase.
[0035] Iron loss: This is the loss in magnetic materials (such as iron core), which mainly includes eddy current loss and hysteresis loss. When the transformer is working, the change of magnetic field in the iron core will induce eddy currents, which will generate heat inside the iron core, thereby consuming energy. In addition, the hysteresis effect will also cause energy loss. The ratio error may affect the rate of change of the magnetic field, which in turn affects the iron loss.
[0036] When determining the comparison results between the first metering interval and the second metering interval, it is first necessary to calculate the current value existing in the first metering interval, and verify the relationship between the currents within the normal range based on the current value of the first metering interval. For the second metering interval, it is necessary to verify the situation when the current exceeds or approaches the rated value, and the current is directly output when the transformer works. The relationship between the currents at this time is quantified, and the two relationships are compared to determine the error existing at this time and the corresponding error value.
[0037] like Figure 2 As shown, the implementation method of determining the comparison result between the first metering interval and the second metering interval includes: S31, performing correlation analysis on the first metering interval to obtain a first correlation of the current value in the first metering interval.
[0038] S32, performing correlation analysis on the second measurement interval to obtain a second correlation of the current value in the second measurement interval.
[0039] S33, jointly comparing the first correlation with the second correlation to obtain a comparison result between the first measurement interval and the second measurement interval.
[0040] The current value existing in the first measurement interval is determined by acquiring historical data within a normal range and analyzing the current value in the historical data, so as to determine the correlation between the current values at each time point.
[0041] For example, the first correlation is expressed as obtaining the current value at each time point and determining the autocorrelation coefficient between the current values in the first measurement interval.
[0042] Autocorrelation coefficient It is expressed as: ;in, represents the current value corresponding to the time point t, Indicates the current value corresponding to the time point tk, represents the covariance, Represents variance. The k set at this time represents the lag stage, which is used to select the relationship between the time point of verification at this time and the time point corresponding to which stage before, so that the autocorrelation coefficient between the corresponding currents can be known. The lag stage set at this time is the situation where there are multiple or fewer time points when calculating t. At this time, tk expresses the autocorrelation coefficient between the currents in the time period from the currently selected time point t to the time point tk. Adjusting the lag stage is to adjust the relative size of this time period to determine the autocorrelation of each t in the corresponding time period after taking the value.
[0043] The covariance of the above formula is calculated as follows: ;in, It represents the average value of the current value corresponding to the time point t. It represents the average value of the current value corresponding to the time point tk, represents the number of time points, , the value range of k can be 1 to n-1. The value of k needs to be adjusted according to the currently calculated autocorrelation coefficient so that the overall autocorrelation coefficient difference can be minimized.
[0044] The variance of the current value corresponding to the time point t can be: .
[0045] The variance of the current value corresponding to the time point tk can be: ; Thus, the autocorrelation coefficient at the corresponding time point can be obtained.
[0046] The obtained autocorrelation coefficient is tested, and the tested autocorrelation coefficient is output as the first correlation; the method for testing the obtained autocorrelation coefficient is shown below.
[0047] ;in, It represents the statistic during the test, which is used to test the autocorrelation coefficient of multiple lag stages. k represents the lag stage. represents the number of lag stages, represents the exponential constant, represents the autocorrelation coefficient with lag stage k, represents the autocorrelation coefficient with a lag period of k-1, Indicates the number of time points; when k=1 in the above formula, it corresponds to It represents the initial value set when starting to collect current data, and at this time, the value range of k is 1 to h. At this time, the maximum value of the lag stage can be n-1, and the minimum is 1. Then the number of lag stages corresponds to the value of 1 to n-1.
[0048] When the statistics of the test are obtained, if the currently calculated statistics are greater than the preset threshold, the corresponding data and the corresponding autocorrelation coefficient are output. The output data at this time indicates that there is a corresponding autocorrelation between the current current values, which meets the currently required correlation data.
[0049] If it is less than the preset threshold, it means that there is no obvious correlation at this time, and it is necessary to re-acquire the corresponding amount of data and repeat the judgment until the data with obvious correlation is output.
[0050] For the second correlation, it is necessary to determine the probability of the currently identified current value appearing in the second metering interval, and the residual corresponding to this probability value, to calculate the Pearson correlation coefficient of the current value in the second metering interval. When the Pearson correlation coefficient is greater than the preset threshold, the data corresponding to the Pearson correlation coefficient is output as the data of the second correlation identified at this time; when calculating the current value in the second metering interval, the number of data sampled at this time is consistent with the number of the first metering interval, and the set time point is also adjusted to a consistent time point.
[0051] That is, the Pearson correlation coefficient of the current value in the second measurement interval at this time It is expressed as follows.
[0052] ;in, It is expressed as the probability of the current value appearing in the second measurement interval at time point t; represents the average value of the probability of the current value appearing in the second measurement interval, It is expressed as the residual of the current value at time point t, Represents the average value of the residual of the current value; in this case, the residual is the difference between the current value at time point t and the standard value. represents the number of time points, .
[0053] At this time, the method of jointly comparing the first correlation and the second correlation is to compare the data corresponding to the first correlation with the data corresponding to the second correlation to select the corresponding data, so as to know the corresponding error existing in the current measurement.
[0054] Then the comparison result can be obtained by determining whether the time points of the data corresponding to the first correlation and the second correlation are adjacent. If so, the corresponding adjacent data are output as the comparison result; if not, the cosine similarity of the data corresponding to the first correlation and the second correlation is calculated, and a group of data corresponding to the maximum value of the cosine similarity is output as the comparison result.
[0055] At this time, the method of calculating the cosine similarity is to convert the data corresponding to the first correlation and the second correlation into characteristic values, and divide them into multiple groups of data in equal proportions, calculate the cosine similarity of each group of data in turn, and output the group of data that can take the maximum value at this time to identify the most relevant part of the current value collected at this time, so as to assist in the subsequent verification of the error corresponding to the data at this time; here, the cosine similarity is obtained by multiplying the characteristic values of the first correlation and the second correlation and dividing them by the modulus of the corresponding data.
[0056] Determine the ratio error of current measurement under the comparison results, and determine the degree of influence of the ratio error on the performance of the transformer. At this time, the ratio error is the ratio of the actual ratio to the standard ratio, such as the actual ratio is the ratio of the primary current to the secondary current; at this time, it is mainly to verify the relevant current values in the corresponding cases of the first metering interval and the second metering interval to verify whether there is an error in current transmission.
[0057] Then the calculation source of the selected ratio error is to subtract the value of the corresponding data in the comparison result from the predicted value to obtain the existing error; the influence degree of the ratio error can be verified by verifying the fluctuation amplitude of the ratio error under the corresponding data when the ratio error occurs, as well as the overall change level of the data to quantify the influence degree, so as to determine the main degree value that will be produced under the ratio error.
[0058] For example, the mean change rate and standard deviation change rate corresponding to the ratio error at this time can be calculated to obtain the degree of influence corresponding to the ratio error.
[0059] ;in, Indicates the degree of influence corresponding to the ratio error, It represents the mean change rate corresponding to the ratio error, It represents the standard deviation change rate corresponding to the ratio error, represents the weight of the mean change rate corresponding to the ratio error, Represents the weight of the standard deviation change rate corresponding to the ratio error; the mean change rate is the ratio of the difference between the mean value of the ratio error and the mean value of the standard ratio error to the mean value of the standard ratio error. The standard deviation change rate is calculated in the same way as the mean change rate to quantify the level of change of the ratio error identified at this time relative to the overall level.
[0060] The purpose of simulating the energy loss of the system under the ratio error is to identify the energy loss of the current system after completing the analysis of the overall amplitude of the ratio error, and to determine the problem of incomplete final measurement value due to error or energy loss during measurement.
[0061] In the present invention, the type of loss that occurs is first identified, and the amount of loss that can exist under the current current is determined. According to the identified loss amount, a metering adjustment parameter corresponding to the loss amount is selected, and the current transformer is adjusted according to the selected metering adjustment parameter, and finally a metering adjustment measure for energy loss is obtained.
[0062] The loss type identified at this time is mainly through calculating the copper loss between the current and resistance of the current transformer and the iron loss corresponding to the magnetic induction intensity, to verify whether the overall energy loss of the transformer changes when the current value of the current transformer fluctuates and the corresponding error occurs.
[0063] like Figure 3 As shown, at this time, the method for simulating the energy loss of the system under the corresponding ratio error and determining the metering adjustment measures corresponding to the energy loss includes: S51, determining the error type corresponding to the ratio error according to the influence degree of the obtained ratio error.
[0064] S52, determining a loss relationship diagram under different transformation ratio errors according to the error type of the transformation ratio error.
[0065] S53, determining the loss situation and loss cause according to the loss relationship diagram.
[0066] S54, determine the metering adjustment measures based on the loss situation and loss reasons.
[0067] At this time, the error type in step S51 is mainly based on the influence degree of the transformation ratio error. The error type is set according to the different influence degree values for the current transformation ratio error. For example, it is set according to the levels of 1-5, where level 5 has the smallest risk, indicating that the currently identified transformation ratio error may affect the stability of the transformer. Level 1 has the largest risk, indicating that the risk is serious enough to need to be dealt with immediately and the transformer is forced to shut down.
[0068] In step S52, the loss relationship diagram is mainly obtained by obtaining data on abnormal loss of the current transformer when a ratio error occurs. At this time, the loss relationship diagram is obtained by establishing an image using each ratio error and the corresponding loss as a coordinate system. In the loss relationship diagram, each ratio error is used as the horizontal coordinate, and the joint probability density of the ratio error and the corresponding loss is used as the vertical coordinate to construct the loss relationship diagram to show the comprehensive probability of the loss occurring in the ratio error, thereby evaluating the joint distribution of the ratio error and energy loss. Based on the value obtained, it is convenient to verify the subsequent loss situation and the cause of the loss.
[0069] The joint probability density of the loss amount corresponding to the transformation ratio error is expressed as: the loss amount corresponding to the current transformation ratio error and the probability of occurrence of the loss amount are obtained, the loss amount and the probability of occurrence of the loss amount are normalized, and the joint probability density corresponding to the current transformation ratio error is calculated.
[0070] ;in, represents the joint probability density of the loss corresponding to the ratio error, represents pi, and represents the bandwidth function, which controls the degree of smoothing of the joint probability density at this time; represents the initial value of the loss, represents the loss of the i-th sample point, represents the initial value of the probability of loss occurrence, represents the probability of occurrence of the loss of the i-th sample point, represents the number of sample points, .
[0071] After obtaining the value of the joint probability density, the loss relationship diagram is now constructed. For the loss amount used in constructing the loss relationship diagram, the total energy loss calculated at this time is used as the loss amount used in the loss relationship diagram by simulating the total energy loss of the current loss; the total energy loss is the sum of copper loss and iron loss; the method of obtaining the total energy loss is shown below.
[0072] Copper loss is expressed as the product of the square of the current value and the resistance. If the current value passing through the transformer changes at this time, the copper loss generated will also increase.
[0073] Iron loss requires the judgment of hysteresis loss and eddy current loss. The sum of hysteresis loss and eddy current loss can be used to obtain the current iron loss value that can be generated. The loss amount is expressed as the sum of the calculated iron loss and copper loss.
[0074] The hysteresis loss is expressed as follows.
[0075] ;in, represents the hysteresis loss, represents the hysteresis loss coefficient; represents the maximum value of magnetic induction intensity, represents the magnetic field frequency, Indicates the volume of the magnetic core. At this time, the hysteresis loss is mainly related to the loss of the magnetic core and related magnetic materials set in the transformer. When the magnetic material in the transformer has a certain degree of loss, the direct measurement of the current of the transformer will also have certain fluctuations. At this time, the status of the transformer is detected to determine whether there is a corresponding abnormal situation.
[0076] The eddy current loss is expressed as follows.
[0077] ;in, represents the eddy current loss, represents the eddy current loss coefficient, represents the maximum value of magnetic induction intensity, represents the magnetic field frequency, Indicates the thickness of the iron core. Represents the volume of the magnetic core; the eddy current loss generated at this time is mainly caused by the change of the induced current. At this time, it is necessary to verify whether there is corresponding eddy current loss when the corresponding ratio error exists.
[0078] After completing the sorting of the corresponding data in the loss relationship diagram, the loss situation and the cause of the loss are determined at this time. The joint probability density of the calculated ratio error and the loss amount is used as the output data to represent the current damage situation. The cause of the loss is determined based on the current ratio error, error type and loss amount. For example, the ratio error, error type and loss amount are normalized, and the comprehensive loss coefficient is calculated. The loss cause with the highest similarity to the comprehensive loss coefficient in the preset database is output as the loss cause at this time.
[0079] The method of calculating the similarity with the comprehensive loss coefficient in the preset database is to use the Pearson correlation coefficient. The formula is consistent with the formula for calculating the current value in the second metering interval. At this time, the comprehensive loss coefficient, the standard value of the comprehensive loss coefficient, the value corresponding to the comprehensive loss coefficient in the preset database, and the standard value of the value corresponding to the comprehensive loss coefficient in the preset database are used as input to calculate the similarity with the comprehensive loss coefficient in the preset database, and the maximum value is used to determine the cause of the loss at this time.
[0080] At this time, according to the loss situation and the cause of the loss, the implementation method of determining the metering adjustment measures is as follows: by comparing the joint probability density of the obtained transformation ratio error and loss amount with the preset adjustment measures in the database, the joint probability density of the current transformation ratio error and loss amount and the confidence of the preset adjustment measures are calculated, and the preset adjustment measures with the largest confidence value are used as the metering adjustment parameters output at this time; and the priority of the metering adjustment parameters is adjusted according to the calculated loss cause, and a group of metering adjustment parameters with the largest priority are used as the output metering adjustment measures.
[0081] The confidence level of the loss amount and the preset adjustment measure at this time is calculated by calculating the probability of occurrence of the corresponding value of the joint probability density of the ratio error and the loss amount in the preset adjustment measure, and taking the data with the highest probability of occurrence at this time as the selected measurement adjustment parameter, that is, when the joint probability density of the ratio error and the loss amount has the highest probability of occurrence in the preset adjustment measure, the confidence value is the largest, and the preset adjustment measure with the largest confidence value is the data currently needed to adjust the transformer.
[0082] The priority of the metering adjustment parameters is adjusted according to the calculated loss reasons. The principle of adjusting the priority at this time is to determine the main corrective measures for the current loss reasons based on the obtained loss reasons, such as voltage compensation, current compensation, reactive power compensation and active filter compensation; when the loss reasons are calculated, different loss reasons are set in the database with the compensation method corresponding to the loss reasons, as well as the priority of the compensation method. At this time, the corresponding compensation method is found from the selected metering adjustment parameters. For example, at this time, there is a certain disorder in the current, and current compensation is required to complete the metering of the transformer data at this time. Then, the metering adjustment parameters include three methods: voltage compensation, current compensation and reactive power compensation. At this time, the current compensation is used with the best first priority to obtain the metering adjustment measures; if at this time, the metering adjustment parameters only have two methods, voltage compensation and reactive power compensation, and voltage compensation is the second processing method in the corresponding situation, then voltage compensation is used as the metering adjustment measure, and the corresponding priority and corresponding metering adjustment measures are selected in this way.
[0083] An explanation of the quantitative adjustment measures is provided below.
[0084] Voltage compensation: The input voltage is adjusted to compensate for the output voltage drop due to iron loss.
[0085] Current compensation: The input current is adjusted to compensate for the output current drop due to copper loss.
[0086] Reactive power compensation: Reactive power compensation devices (such as capacitors or reactors) are introduced to reduce the reactive power demand of the system.
[0087] Active filters: Use active filters to dynamically compensate for harmonics and reactive power.
[0088] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. A person skilled in the art may make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention and they are still covered by the protection scope of the present invention.
Claims
1. An electric energy intelligent metering terminal based on a mutual inductor, characterized in that: include: Determine the current confidence interval based on the design specifications of the transformer; Identify and divide the current into a first metering interval and a second metering interval, wherein the first metering interval refers to the current level within the normal operating range, and the second metering interval refers to the current level that is still within the safe operating range when it exceeds or approaches the rated value; Performing correlation analysis on the current values in the first metering interval and the second metering interval, comparing the first metering interval after the correlation analysis with the second metering interval, and determining a comparison result between the first metering interval and the second metering interval; Determine the ratio error of current measurement under the comparison results, and determine the degree of influence of the ratio error on the performance of the transformer; Simulate the energy loss of the system under the strain ratio error and determine the corresponding metrological adjustment measures for the energy loss.
2. The electric energy intelligent metering terminal based on a mutual inductor according to claim 1 is characterized in that: The implementation method of determining the comparison result between the first metering interval and the second metering interval includes: Performing a correlation analysis on the first metering interval to obtain a first correlation of current values in the first metering interval; Performing a correlation analysis on the second metering interval to obtain a second correlation of the current value in the second metering interval; The first correlation is jointly compared with the second correlation to obtain a comparison result of the first measurement interval and the second measurement interval.
3. The electric energy intelligent metering terminal based on a mutual inductor according to claim 2 is characterized in that: The first correlation is expressed as: obtaining the current value at each time point, determining the autocorrelation coefficient between the current values in the first measurement interval; testing the obtained autocorrelation coefficient, and outputting the tested autocorrelation coefficient as the first correlation; Autocorrelation coefficient It is expressed as: ; in, represents the current value corresponding to the time point t, Indicates the current value corresponding to the time point tk, represents the covariance, represents the variance, and k represents the lag stage.
4. The electric energy intelligent metering terminal based on a mutual inductor according to claim 3 is characterized in that: The method for testing the obtained autocorrelation coefficient is as follows: ; in, represents the statistic during the test, k represents the lag stage, represents the number of lag stages, represents the exponential constant, represents the autocorrelation coefficient with lag stage k, represents the autocorrelation coefficient with a lag period of k-1, Indicates the number of time points.
5. The electric energy intelligent metering terminal based on a mutual inductor according to claim 2 is characterized in that: The second correlation is represented as follows: the probability of the currently identified current value appearing in the second metering interval is determined, and the Pearson correlation coefficient of the current value in the second metering interval is calculated. When the Pearson correlation coefficient is greater than a preset threshold, the data corresponding to the Pearson correlation coefficient is output as the data of the second correlation identified at this time; Pearson correlation coefficient of current value in the second measurement interval It is expressed as: ; in, It is expressed as the probability of the current value appearing in the second measurement interval at time point t; represents the average value of the probability of the current value appearing in the second measurement interval, It is expressed as the residual of the current value at time point t, represents the average value of the residuals of the current values, represents the number of time points, .
6. The electric energy intelligent metering terminal based on a mutual inductor according to claim 2 is characterized in that: The comparison result can be obtained by determining whether the time points of the data corresponding to the first correlation and the second correlation are adjacent. If so, the corresponding adjacent data are output as the comparison result; if not, the cosine similarity of the data corresponding to the first correlation and the second correlation is calculated, and a group of data corresponding to the maximum value of the cosine similarity is output as the comparison result.
7. The electric energy intelligent metering terminal based on a mutual inductor according to claim 1 is characterized in that: The influence of the ratio error on the performance of the transformer is expressed as follows: the influence of the ratio error is obtained according to the mean change rate and standard deviation change rate corresponding to the ratio error; ; in, Indicates the degree of influence corresponding to the ratio error, It represents the mean change rate corresponding to the ratio error, It represents the standard deviation change rate corresponding to the ratio error, represents the weight of the mean change rate corresponding to the ratio error, The weight that represents the rate of change of standard deviation corresponding to the ratio error.
8. The electric energy intelligent metering terminal based on mutual inductor according to claim 1 is characterized in that: The implementation methods for simulating the energy loss of the system under the strain ratio error and determining the corresponding measurement adjustment measures for the energy loss include: According to the influence degree of the transformation ratio error obtained, the error type corresponding to the transformation ratio error is determined; According to the error type of the ratio error, determine the loss relationship diagram under different ratio errors; According to the loss relationship diagram, determine the loss situation and loss cause; Determine the measurement adjustment measures based on the loss situation and reasons for the loss.
9. The electric energy intelligent metering terminal based on mutual inductor according to claim 8, characterized in that: In the loss relationship diagram, the ratio error is used as the horizontal axis, and the joint probability density of the ratio error and the loss amount is used as the vertical axis to construct the loss relationship diagram; The joint probability density of the loss amount corresponding to the ratio error is expressed as: the loss amount corresponding to the current ratio error and the probability of occurrence of the loss amount are obtained, the loss amount and the probability of occurrence of the loss amount are normalized, and the joint probability density corresponding to the current ratio error is calculated; ; in, represents the joint probability density of the loss corresponding to the ratio error, represents pi, and represents the bandwidth function; represents the initial value of the loss, represents the loss of the i-th sample point, represents the initial value of the probability of loss occurrence, represents the probability of occurrence of the loss of the i-th sample point, represents the number of sample points, .
10. The electric energy intelligent metering terminal based on mutual inductor according to claim 8, characterized in that: According to the loss situation and the cause of the loss, the implementation method of determining the metering adjustment measures is as follows: by comparing the obtained joint probability density of the transformation ratio error and the loss amount with the preset adjustment measures in the database, the joint probability density of the current transformation ratio error and the loss amount and the confidence of the preset adjustment measures are calculated, and the preset adjustment measure with the largest confidence value is used as the metering adjustment parameter output at this time; and the priority of the metering adjustment parameters is adjusted according to the calculated cause of the loss, and a group of metering adjustment parameters with the largest priority is used as the output metering adjustment measures.
Citation Information
Patent Citations
On-line measurement error detection system and method for metering transformer
CN111983542A
Current transformer error abnormity identification method and system in same-tower double-circuit power transmission line
CN115267641A
Voltage transformer metering error evaluation method and system
CN115372881A
Current transformer operation error online evaluation optimization method based on big data deduction
CN115480204A
Metering point abnormity assessment method for provincial level metering gateway
CN116596352A