Submarine pipeline interpenetrating lining hose repair model test platform and method

By designing test pipes for detachable connection of elbow sections and straight pipe sections, and equipped with traction and reverse tension equipment, the problem of simple and inability to simulate actual working conditions in the prior art is solved, and more scientific and accurate Undersea pipeline repair test.

CN119049376APending Publication Date: 2024-11-29SOUTHEAST UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411235913.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The test device for restoring submarine oil and gas pipelines in the prior art has a simple structure, which is difficult to meet the diverse test needs, and it is impossible to accurately simulate the construction process under the conditions of lining hoses of different lengths, resulting in distortion of the test results.

Method used

Design a model test platform for repairing subsea pipes interspersed lining hose, including two test benches and test pipes with removable connection of elbow sections and straight sections, equipped with traction equipment and loading equipment, which provides reverse tension to Simulate construction resistance to ensure that the lining hose enters the test pipeline under more fitting conditions.

Benefits of technology

The functionality of the test platform is broadened, and multiple tests can be carried out to simulate construction resistance under different length hoses, improve the accuracy of the test results, and provide scientific, safe and reliable technical support for the restoration of subsea pipelines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119049376A_ABST
    Figure CN119049376A_ABST
Patent Text Reader

Abstract

The invention discloses a submarine pipeline interpenetrating lining hose repair model test platform and method, and the platform comprises a first test bench, a second test bench, and a test pipeline connected with the first test bench and the second test bench, the test pipeline comprises a plurality of elbow sections, and every two adjacent elbow sections are connected through a straight pipe section. The adjacent elbow section and straight pipe section are detachably connected; the device further comprises traction equipment and stowage equipment, the traction equipment is used for providing traction force for the lining hose, and the stowage equipment is used for providing reverse pulling force opposite to the pulled direction for the lining hose. The invention provides a submarine pipeline interpenetrating lining hose repair model test platform and a submarine pipeline interpenetrating lining hose repair model test method, so as to solve the problems that a test device in the prior art is simple in structure and difficult to meet various test requirements, and achieve the purposes of widening the functionality of the test platform, improving the accuracy of a test result and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of trenchless repair of oil and gas pipelines, and in particular to a submarine pipeline interlaced liner hose repair model test platform and method. Background Art

[0002] The working pressure of submarine long-distance oil and gas pipelines is high and the medium is highly corrosive. Due to the limitations of seabed depth and topography, submarine long-distance oil and gas pipelines have tortuous and changeable directions, many elbows and large curvatures, and are difficult to repair and maintain. When they reach the end of their service life or have fatal defects, they can only be scrapped and replaced, which is costly. In order to overcome the above problems, the hose insertion technology was proposed. This technology is to use a hose to penetrate the submarine steel pipe as a bushing to overcome the failure problem caused by deformation of the steel pipe or corrosion defects. The hose insertion technology can not only avoid submarine construction operations, but also shorten the pipeline repair time and extend the service life, and the economic benefits are very obvious. However, no standardized and universal test platform has been proposed in the prior art. The known test devices for the hose insertion technology are relatively simple and difficult to meet the increasing test needs of various types. And with the continuous improvement and optimization of the lining hose itself, there is no test platform suitable for the new lining hose in the prior art. Summary of the invention

[0003] The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method to solve the problem that the test device in the prior art has a simple structure and is difficult to meet various test requirements, thereby achieving the purpose of broadening the functionality of the test platform and improving the accuracy of the test results.

[0004] The present invention is achieved through the following technical solutions:

[0005] A submarine pipeline interspersed liner hose repair model test platform comprises a first test bench, a second test bench, and a test pipeline connected to the first test bench and the second test bench, wherein the test pipeline comprises a plurality of elbow sections, two adjacent elbow sections are connected by a straight pipe section, and the adjacent elbow sections and straight pipe sections can be detachably connected; the platform also comprises a traction device and a loading device, wherein the traction device is used to provide traction force for the liner hose, and the loading device is used to provide a reverse pulling force for the liner hose that is opposite to the traction direction.

[0006] In view of the problem that the test device in the prior art has a simple structure and is difficult to meet various test requirements, the present invention first proposes a submarine pipeline interlaced liner hose repair model test platform. The present invention builds two test benches, which are defined as the first test bench and the second test bench respectively. The test pipeline arranged therebetween includes a number of elbow sections, and every two adjacent elbow sections are detachably connected through a straight pipe section; in other words, the test pipeline in the present application is formed by alternating a number of elbow sections and a number of straight pipe sections in sequence, and any two adjacent pipe sections can be detachably connected, such as by flange connection. The platform provides traction for the inserted liner hose through a traction device. In addition, the inventors of this case discovered during the research process that the current test devices only provide traction but not reverse pulling force. This approach cannot simulate the construction traction force under the conditions of liner hoses of different lengths, making the existing test results relatively distorted and unable to accurately simulate the insertion and repair process of the oil and gas pipeline; based on this, the present application also provides a loading device, which provides the liner hose with a reverse pulling force opposite to the pulling direction through the loading device, so as to simulate the construction resistance under the conditions of hoses of different lengths, so that the tested liner hose can enter the test pipeline under the action of greater traction and in a stress condition that is more in line with the actual working conditions. This has obvious advantages for studying the mechanical properties, material durability and reliability of the insertion process.

[0007] The test platform of the present application can conduct various single factor tests (such as roughness, elbow angle, straight pipe length, pipe diameter, number of elbows and reverse tension), multi-bend insertion test, compound circle pressurization test, torsion and untwisting test, etc. in the repair process of interlaced liner hose by flexibly adjusting the number and position relationship of elbow sections and straight pipe sections, which significantly broadens the functionality of the test platform and is conducive to meeting more test needs; in addition, the present application can simulate the construction resistance under conditions of different lengths of hoses, so that the tested liner soft enters the test pipeline with a stress condition that is more in line with the actual operating conditions, providing more scientific and accurate technical support for the non-excavation repair construction of long-distance submarine pipelines, and making outstanding contributions to improving the safety, reliability and durability of pipeline repair.

[0008] Further, the elbow section includes a first elbow fixedly connected to the edge of the first test bench, and a seventh elbow and an eighth elbow respectively fixedly connected to the edges of the second test bench on opposite sides; the elbow section also includes a second elbow, a third elbow, a fourth elbow, a fifth elbow, a sixth elbow, and a ninth elbow located directly below the eighth elbow.

[0009] The axes of the first elbow, the second elbow, the sixth elbow, the seventh elbow, the eighth elbow and the ninth elbow are all located in a vertical plane; the axes of the second elbow, the third elbow and the fourth elbow are all located in a horizontal plane.

[0010] In this scheme, multiple elbows are set up to simulate a situation that is closer to the actual engineering environment. This complex pipeline layout has a very significant effect on verifying the applicability and accuracy of the repair model, because it covers almost all kinds of bending conditions that may be encountered in actual engineering.

[0011] Further, the angles of the first elbow, the second elbow, the fourth elbow, the fifth elbow, the sixth elbow, the seventh elbow, the eighth elbow and the ninth elbow are all 90°; the angle of the third elbow is greater than 90°;

[0012] The straight pipe section between the first elbow and the second elbow, the straight pipe section between the second elbow and the third elbow, the straight pipe section between the third elbow and the fourth elbow, the straight pipe section between the sixth elbow and the seventh elbow, the straight pipe section between the seventh elbow and the eighth elbow, and the straight pipe section between the eighth elbow and the ninth elbow all have a length of a;

[0013] The length of the straight pipe section between the fourth elbow and the fifth elbow is b;

[0014] The length of the straight pipe section between the fifth elbow and the sixth elbow is c;

[0015] Among them, a<b<c.

[0016] The actual angle of the third elbow can be adaptively set according to specific test requirements, and an elbow of 120° or 150° is preferably used.

[0017] This scheme not only sets up a complex pipeline layout, but also sets different angles and lengths. Under the conditions of a limited test site, it can more comprehensively examine the impact of different types of elbows and straight pipe sections of different lengths on the pipeline repair effect.

[0018] Furthermore, it also includes a traction head for connecting to the traction equipment; the traction head includes a cylindrical portion and a conical portion which are coaxially connected, and an arc chamfer is arranged at the junction of the cylindrical portion and the conical portion; the radius of the conical portion gradually decreases from one end close to the cylindrical portion to the end away from the cylindrical portion; it also includes a through hole radially opened on the conical portion and a U-shaped pull ring matching the through hole, and the two ends of the U-shaped pull ring are respectively used to insert the two ends of the through hole into the traction head; it also includes a clamping plate detachably connected to the end of the U-shaped pull ring, and a positioning column detachably connected between the two ends of the U-shaped pull ring; a plurality of positioning bolt holes are opened on the clamping plate.

[0019] At the joints of adjacent pipe sections of the test pipeline, there is a tendency for connection misalignment to occur, which may lead to jamming during the traction process. In order to solve this problem, this solution designs a special traction head, which includes a barrel portion and a tapered portion. The tapered portion has a variable cross-sectional outer diameter, and the intersecting area has a certain curvature, so that jamming at the misalignment can be effectively prevented, so that the traction head can pass through the test pipeline more smoothly, significantly reducing the risk of jamming, improving the efficiency and safety of the traction test process, and ensuring the smooth progress of the traction process.

[0020] Those skilled in the art should understand that the interior of the conical portion in the present solution is also a hollow structure, so perforation actually requires opening two relative through holes on the surface of the conical portion, so that the two ends of the U-shaped pull ring can be inserted into the corresponding two sockets, and then the splint or positioning column is connected as needed.

[0021] The inventor of this case found in actual tests that if the traction force is too large or the composite hose has been tested many times and the internal warp and weft lines are damaged, the lining hose is easily broken during the test by using two plywood to clamp the end of the lining hose; after carefully analyzing the causes of this phenomenon, the inventor found that: the tensile strength of the composite hose is mainly borne by the warp lines, while the weft lines mainly serve to connect the warp lines. However, when subjected to uneven force, the presence of the weft lines may aggravate the problem of uneven force on the warp lines, which in turn makes it difficult for all the warp lines to work together in the composite hose after the U-fold, and thus cannot meet the established tensile strength. Therefore, the method of simply using two plywood to clamp the end of the lining hose is less applicable to this application when a large traction force is applied. In order to overcome this problem, the present invention further provides a positioning column, which can be connected between the two ends of the U-shaped pull ring; when the traction force is large, one end of the lining hose is cut, the weft thread of the end is removed, and the warp thread of the end is woven into several strands, and then the woven warp thread is wrapped around the positioning column and knotted to fix it; this connection method can significantly reduce the risk of the lining hose being pulled apart. Field tests have shown that even under extremely high traction force, this connection method can still remain firm without disconnection. Therefore, the problem of easy breakage of the lining hose during the test is successfully overcome, ensuring the stable progress of the test.

[0022] The detachable connection between the splint, the positioning column and the U-shaped pull ring may be realized by any existing detachable connection technology, such as common bolt connection, etc., and is not specifically limited here.

[0023] The test method of the submarine pipeline interlaced liner hose repair model test platform in this application includes the following steps:

[0024] S1. Prepare the inner lining hose and apply lubricating oil on the outer surface of the inner lining hose;

[0025] S2. Perform pigging operation on the test pipeline;

[0026] S3, fold the inner lining hose into a U shape and connect the traction head to one end of the inner lining hose;

[0027] S4, passing the traction rope through the test pipe, and connecting the two ends of the traction rope to the traction head and the traction equipment respectively;

[0028] S5. Start the loading device to provide reverse pulling force for the lining hose, and start the traction device to drag the lining hose into the test pipe until it reaches the set position, during which the magnitude of the traction force and the length of the lining hose dragged into the test pipe are monitored in real time;

[0029] S6. Pressurize the inner lining hose to make it round, and monitor the rounding pressure in real time during the process.

[0030] Further, the method of connecting the traction head at one end of the liner hose includes: determining the magnitude of the reverse pulling force provided by the loading device during the test:

[0031] If the reverse pulling force is less than the set threshold, two clamps detachably connected to the traction head are used to clamp one end of the liner hose;

[0032] If the reverse pulling force is greater than or equal to the set threshold, one end of the liner hose is wound around a positioning column detachably connected to the traction head.

[0033] This scheme clarifies the specific method of selecting whether to use clamping or positioning columns to connect the liner hose; as mentioned above, in theory, the selection should be made based on the actual size of the traction force, however, the traction force is data that needs to be obtained in the actual test process, and the existing algorithms have low estimation accuracy; therefore, this scheme adopts the idea of ​​judging the size of the reverse pulling force to be used. For each test, the size of the reverse pulling force is data that needs to be prepared in advance. Therefore, this scheme can accurately judge the specific connection method of the liner hose before the test, thereby improving the test efficiency and the stability of the test process.

[0034] Of course, the threshold value can be adaptively set by those skilled in the art according to the hose material actually used or specific test requirements, and is not specifically limited here.

[0035] Further, the method of clamping one end of the liner hose with two clamps detachably connected to the traction head includes:

[0036] Insert the two ends of the U-shaped pull ring into the two holes on the traction head;

[0037] Install clamping plates at both ends of the U-shaped pull ring;

[0038] Put the traction head on one end of the liner hose so that the liner hose is located between the two clamping plates;

[0039] Install the bolts into the positioning bolt holes and tighten them.

[0040] The method has a simple operation process and high efficiency, and is suitable for use under working conditions where the reverse pulling force is relatively small.

[0041] Further, the method of winding one end of the liner hose around a positioning column detachably connected to the traction head includes:

[0042] Insert the two ends of the U-shaped pull ring into the two holes on the traction head;

[0043] Install the positioning column between the two ends of the U-shaped pull ring;

[0044] Cutting one end of the liner hose, removing the weft thread of the end, and weaving the warp thread of the end into at most four strands;

[0045] Wrap up to four strands of woven warp threads around the positioning post and tie a knot to secure.

[0046] It should be noted that the warp in the present application refers to the line along the axial direction of the liner hose; the weft in the present application refers to the line along the circumferential direction of the liner hose.

[0047] Further, the method of preparing the lined hose includes:

[0048] The inner lining layer, the middle layer and the outer covering layer are used in sequence from the inside to the outside. The inner lining layer and the outer covering layer are both polyethylene, and the middle layer is high-strength fiber.

[0049] Verify whether the hoop stress of the lining hose is less than the sum of the tensile strength of the weft: if so, the lining hose is usable; if not, the lining hose is unusable.

[0050] This plan clearly stipulates the use of fiber-reinforced lined hose as the repair material. Through its strong mechanical properties and corrosion resistance, it can effectively repair the corrosion defects of long-distance submarine pipelines. In addition, the fiber-reinforced lined hose also has the characteristics of high strength, light weight, and wear resistance. It can maintain stable performance in harsh submarine environments and provide reliable protection for the long-term operation of the pipeline.

[0051] This solution also verifies whether the used lining hose can be used for the repair of submarine pipelines. The inventor of this case found in the research process that in the lining hose, the circumferential weft plays a role in resisting internal pressure and external loads; since the hose may be subjected to various pressure loads during use, the circumferential weft needs to have sufficient tensile strength and rigidity to maintain the shape of the hose stable and resist deformation and distortion due to pressure. The strength and rigidity characteristics of the circumferential weft directly determine the hose's pressure bearing capacity and anti-deformation performance; in addition, the circumferential weft also plays an important role in the hose's wear resistance and resistance to external environmental influences. In addition, the circumferential weft can also provide the hose with flexibility and plasticity. The lining hose may need to bend, stretch and deform during operation. The material of the circumferential weft should have certain flexibility and plasticity to ensure that the hose can adapt to various complex pipeline layouts and operation requirements. The pressure of the lining hose depends on the tension of the middle layer of weft fibers. This solution clearly stipulates that the circumferential stress during the working process must be less than the sum of the tensile strength of the weft in the longitudinal section of the lining hose. Only lining hoses that meet this state can be used for repair materials. Among them, the magnitude of the hoop stress can be simulated using numerical simulation technology.

[0052] Furthermore, the total tensile strength of the weft is calculated by the following formula:

[0053] σ0=nN2F0 / (t frp ×dx)

[0054] Where: σ0 is the total tensile strength of the weft; n is the number of strands of warp fiber in any cross section; N2 is the safety factor; F0 is the average breaking strength of a single strand of weft fiber; t frp is the wall thickness of the lining hose; dx is the weft spacing.

[0055] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0056] 1. The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method, which can carry out various single factor tests, multi-bend interlaced tests, complex circle pressurization tests, torsion and untwisting tests, etc. in the process of interlaced liner hose repair, which significantly broadens the functionality of the test platform and is conducive to meeting more test needs.

[0057] 2. The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method, which can simulate the construction resistance under conditions of different hose lengths, allowing the tested liner hose to enter the test pipeline under a stress condition that is more in line with actual operating conditions, providing more scientific and accurate technical support for the non-excavation repair construction of long-distance submarine pipelines, and making outstanding contributions to improving the safety, reliability and durability of pipeline repair.

[0058] 3. The submarine pipeline interspersed liner hose repair model test platform and method of the present invention can simulate a situation that is closer to the actual engineering environment. It has a very significant effect on verifying the applicability and accuracy of the repair model through complex pipeline layout. It can more comprehensively examine the influence of different types of elbows and different lengths of straight pipe sections on the pipeline repair effect under limited test site conditions.

[0059] 4. The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method, and is designed with a special traction head, which can effectively prevent jamming at the misaligned joint, so that the traction head can pass through the test pipeline more smoothly, significantly reducing the risk of jamming, improving the efficiency and safety of the traction test process, and ensuring the smooth progress of the traction process.

[0060] 5. The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method, which provides a unique method for connecting the liner hose and the traction head, which can significantly reduce the risk of the liner hose being pulled off, successfully overcomes the problem of the liner hose being easily broken during the test, and ensures the stable progress of the test.

[0061] 6. The present invention provides a submarine pipeline interspersed liner hose repair model test platform and method, which adopts a fiber-reinforced liner hose as a repair material. Through its strong mechanical properties and corrosion resistance, it can effectively repair the corrosion defects of long-distance submarine pipelines; and the fiber-reinforced liner hose also has the characteristics of high strength, light weight, and wear resistance, and can maintain stable performance in harsh submarine environments, providing reliable protection for the long-term operation of the pipeline.

[0062] 7. The present invention provides a submarine pipeline interlaced liner hose repair model test platform and method, which can verify whether the used liner hose can be used for submarine pipeline repair, filling the gap in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0064] Figure 1 It is a schematic diagram of the test pipeline structure of a specific embodiment of the present invention;

[0065] Figure 2 It is a cross-sectional view of a traction head structure in a specific embodiment of the present invention;

[0066] Figure 3 It is a cross-sectional view of another traction head structure in a specific embodiment of the present invention;

[0067] Figure 4It is a single elbow traction force curve of the test pipeline at different roughness levels in a specific embodiment of the present invention.

[0068] Marks and corresponding parts names in the attached drawings:

[0069] 1-first elbow, 2-second elbow, 3-third elbow, 4-fourth elbow, 5-fifth elbow, 6-sixth elbow, 7-seventh elbow, 8-eighth elbow, 9-ninth elbow, 10-first test bench, 11-second test bench, 12-cylindrical part, 13-conical part, 14-perforation, 15-U-shaped pull ring, 16-clamp, 17-positioning column, 18-positioning bolt hole. DETAILED DESCRIPTION

[0070] In order to make the objects, technical solutions and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the examples and the accompanying drawings. The schematic embodiments of the present invention and the description thereof are only used to explain the present invention and are not intended to limit the present invention. In the description of the present application, it should be understood that the orientation or positional relationship indicated by terms such as "front", "rear", "left", "right", "up", "down", "vertical", "horizontal", "high", "low", "inside", "outside", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present application.

[0071] Embodiment 1:

[0072] like Figure 1 A submarine pipeline interspersed liner hose repair model test platform shown includes a first test bench 10, a second test bench 11, and a test pipeline connected to the first test bench 10 and the second test bench 11, wherein the test pipeline includes a plurality of elbow sections, and two adjacent elbow sections are connected by a straight pipe section, and the adjacent elbow sections and straight pipe sections can be detachably connected; it also includes a traction device and a loading device, wherein the traction device is used to provide traction force for the liner hose, and the loading device is used to provide a reverse pulling force for the liner hose that is opposite to the traction direction.

[0073] The elbow section includes a first elbow 1 fixedly connected to the edge of the first test bench 10, and a seventh elbow 7 and an eighth elbow 8 respectively fixedly connected to the edges of the second test bench 11 on opposite sides; the elbow section also includes a second elbow 2, a third elbow 3, a fourth elbow 4, a fifth elbow 5, a sixth elbow 6, which are sequentially located between the first elbow 1 and the seventh elbow 7, and a ninth elbow 9 located directly below the eighth elbow 8;

[0074] The axes of the first elbow 1, the second elbow 2, the sixth elbow 6, the seventh elbow 7, the eighth elbow 8 and the ninth elbow 9 are all located in a vertical plane; the axes of the second elbow 2, the third elbow 3 and the fourth elbow 4 are all located in a horizontal plane.

[0075] The angles of the first elbow 1, the second elbow 2, the fourth elbow 4, the fifth elbow 5, the sixth elbow 6, the seventh elbow 7, the eighth elbow 8 and the ninth elbow 9 are all 90°; the angle of the third elbow 3 is 150°;

[0076] The straight pipe section between the first elbow 1 and the second elbow 2, the straight pipe section between the second elbow 2 and the third elbow 3, the straight pipe section between the third elbow 3 and the fourth elbow 4, the straight pipe section between the sixth elbow 6 and the seventh elbow 7, the straight pipe section between the seventh elbow 7 and the eighth elbow 8, and the straight pipe section between the eighth elbow 8 and the ninth elbow 9 are all 2 m in length;

[0077] The length of the straight pipe section between the fourth elbow 4 and the fifth elbow 5 is 4m;

[0078] The length of the straight pipe section between the fifth elbow 5 and the sixth elbow 6 is 5 m.

[0079] In this embodiment, any adjacent elbows and straight pipe sections are sealed and connected via flanges.

[0080] In this embodiment, the traction equipment used is a JK 8-ton electric winch with a rated pulling force of 80 kN and a rated power of 18.5 kw.

[0081] In this embodiment, the loading equipment used is a reverse tensile machine that can provide a maximum tensile force of 3 tons.

[0082] It should be noted that Figure 1 The direction of the cutter head in the figure represents the insertion direction of the liner hose.

[0083] The test steps of this embodiment include:

[0084] S1. Prepare the inner lining hose and apply lubricating oil on the outer surface of the inner lining hose;

[0085] S2. Use a pipe cleaner to clean the test pipeline;

[0086] S3, a U-shaped lining hose, wherein one end of the lining hose is connected to a traction head; wherein the U-shaped lining hose is folded to form a U-shaped cross-section structure;

[0087] S4, passing the traction rope through the test pipe, and connecting the two ends of the traction rope to the traction head and the traction equipment respectively;

[0088] S5. Start the loading device to provide reverse pulling force for the lining hose, and start the traction device to drag the lining hose into the test pipe until it reaches the set position, during which the magnitude of the traction force and the length of the lining hose dragged into the test pipe are monitored in real time;

[0089] S6. Pressurize the inner lining hose to make it round, and monitor the rounding pressure in real time during the process.

[0090] Taking single factor analysis as an example, the inventors conducted an experiment to verify the effect of the roughness of the test pipe on the traction:

[0091] The effect of the roughness of the steel pipe on the penetration traction is an important research factor, and it is necessary to conduct in-depth research on the effect of the roughness. In order to achieve different friction coefficients, this embodiment adopts a corrosion experiment in which the test pipe is exposed to rainwater for different periods of time; in the corrosion experiment, the pipes are divided into three groups for treatment: an unpolished group, a half-polished group, and a fully polished group; each group of pipes is exposed to rainwater for corrosion treatment in different time periods to simulate the environmental conditions and pipe usage that may be encountered in actual projects.

[0092] For the unpolished group, the pipes were exposed to rainwater for corrosion treatment for 4 weeks. During this period, the pipe surface may corrode and oxidize to a certain extent, resulting in an increase in the friction coefficient. This treatment method can simulate the actual situation of the pipe being exposed to the natural environment for a long time.

[0093] For the half-polished group, half of the pipe was polished, and the other half was kept as it was, and exposed to rainwater for corrosion treatment for 2 weeks. This treatment method can simulate the partial polishing of the pipe surface and consider the impact of polishing on the friction coefficient; this design can be closer to the actual situation, taking into account the possible local polishing or uneven treatment in the project.

[0094] For all grinding groups, the entire surface of the pipe is ground to remove any surface irregularities or corrosion. This treatment method can obtain a completely ground pipe surface and take into account the change in friction coefficient; this design can more accurately simulate the fully ground pipe surface and control the friction coefficient.

[0095] The diameter of the test pipe to be repaired is DN250 and the elbow angle is 90 degrees. Figure 4The single elbow traction curve of the test pipeline at different roughness levels is shown. Considering that the speed of traction construction may be uneven, the curve has multiple peaks. However, due to the same geometric structure, the position of the traction peak under different friction coefficients should be basically the same; according to the actual situation and the characteristics of the curve, it can be inferred that the traction peak should appear at a position about 9 meters away from the starting point. Therefore, the remaining peaks should be due to the large traction caused by the dynamic response caused by the uneven construction speed.

[0096] from Figure 4 It can be concluded that the traction force of the unpolished steel pipe with a friction coefficient of 0.71 is the largest, reaching a peak value of 4363.13 N; the traction force of the half-polished steel pipe with a friction coefficient of 0.55 is second, with a peak value of 3224.37 N; the traction force of the fully polished steel pipe with a friction coefficient of 0.45 is the smallest, with a peak value of 2380.89 N. From the experimental results, the greater the friction coefficient, the greater the traction force of the steel pipe, which is in line with the basic law of friction.

[0097] Embodiment 2:

[0098] A submarine pipeline interspersed liner hose repair model test platform, based on Example 1, also includes a traction head for connecting to the traction equipment; the two ends of the traction rope are respectively connected to the traction head and the traction equipment.

[0099] The traction head includes a cylindrical portion 12 and a tapered portion 13 which are coaxially connected, and an arc chamfer is arranged at the junction of the cylindrical portion 12 and the tapered portion 13; the radius of the tapered portion 13 gradually decreases from one end close to the cylindrical portion 12 to the end away from the cylindrical portion 12; it also includes a through hole 14 radially opened on the tapered portion 13, and a U-shaped pull ring 15 matching the through hole 14, and the two ends of the U-shaped pull ring 15 are respectively used to insert the two ends of the self-through hole 14 into the traction head; it also includes a clamping plate 16 detachably connected to the end of the U-shaped pull ring 15, and a positioning column 17 detachably connected between the two ends of the U-shaped pull ring 15; a plurality of positioning bolt holes 18 are opened on the clamping plate 16.

[0100] In the present embodiment, before one end of the liner hose is connected to the traction head, the magnitude of the reverse pulling force provided by the loading equipment during the test is first obtained and the following judgment is made:

[0101] If the reverse pulling force is less than the set threshold, the structure of the traction head used is as follows Figure 2As shown, one end of the lining hose is clamped by two clamps 16 detachably connected to the traction head; the specific method is: insert the two ends of the U-shaped pull ring 15 into the two through holes 14 on the traction head; install the clamps 16 on both ends of the U-shaped pull ring 15; put the traction head on one end of the lining hose so that the lining hose is located between the two clamps 16; install the bolts into the positioning bolt holes 18 and lock them.

[0102] If the reverse pulling force is greater than or equal to the set threshold, the structure of the traction head used is as follows Figure 3 As shown, one end of the lining hose is wound around a positioning column 17 which is detachably connected to the traction head; the specific method is: insert the two ends of the U-shaped pull ring 15 into the two through holes 14 on the traction head; install the positioning column 17 between the two ends of the U-shaped pull ring 15; cut one end of the lining hose, remove the weft thread of the end, and weave the warp thread of the end into 2 to 4 strands; wind the woven 2 to 4 strands of warp thread around the positioning column 17 and tie a knot to fix it.

[0103] Embodiment 3:

[0104] A submarine pipeline interspersed liner hose repair model test method. On the basis of any of the above embodiments, the liner hose used in this embodiment has a three-layer structure, which includes an inner liner layer, an intermediate layer, and an outer covering layer from the inside to the outside; the inner liner layer and the outer covering layer are both wear-resistant polyethylene, and the intermediate layer is high-strength fiber.

[0105] In a more preferred embodiment, before the test, it is also verified whether the liner hose is usable, and the verification method is:

[0106] Compare the hoop stress of the liner hose with the sum of the tensile strength of the weft:

[0107] If the hoop stress of the liner hose is less than the sum of the tensile strength of the weft, the liner hose can be used;

[0108] If the hoop stress of the liner hose is greater than or equal to the sum of the tensile strength of the weft wires, the liner hose is unusable.

[0109] The total tensile strength of the weft is calculated by the following formula:

[0110] σ0=nN2F0 / (t frp ×dx)

[0111] Where: σ0 is the total tensile strength of the weft; n is the number of strands of warp fiber in any cross section; N2 is the safety factor; F0 is the average breaking strength of a single strand of weft fiber; t frp is the wall thickness of the lining hose; dx is the weft spacing.

[0112] In this embodiment, the wall thickness t of the liner hose can also be designed by the following formula: frp :

[0113]

[0114] Where: D is the diameter of the test pipe; C is the deformation coefficient of the test pipe; E L is the elastic modulus of the test pipeline; F is the seawater pressure on the submarine pipeline to be repaired; F S is the safety factor; v is the Poisson’s ratio of the test pipeline.

[0115] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

[0116] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In addition, the term "connected" used in this article can be directly connected or indirectly connected via other components without special explanation.

Claims

1. A submarine pipeline interlaced liner hose repair model test platform, characterized in that: The invention comprises a first test bench (10), a second test bench (11), and a test pipe connected to the first test bench (10) and the second test bench (11), wherein the test pipe comprises a plurality of elbow sections, two adjacent elbow sections are connected by a straight pipe section, and the adjacent elbow sections and straight pipe sections can be detachably connected; and further comprises a traction device and a loading device, wherein the traction device is used to provide traction force for the lining hose, and the loading device is used to provide the lining hose with a reverse pulling force opposite to the traction direction.

2. A submarine pipeline interlaced liner hose repair model test platform according to claim 1, characterized in that: The elbow section comprises a first elbow (1) fixedly connected to the edge of a first test bench (10), and a seventh elbow (7) and an eighth elbow (8) respectively fixedly connected to the edges of two opposite sides of a second test bench (11); the elbow section also comprises a second elbow (2), a third elbow (3), a fourth elbow (4), a fifth elbow (5), a sixth elbow (6) which are sequentially located between the first elbow (1) and the seventh elbow (7), and a ninth elbow (9) which is located directly below the eighth elbow (8); The axes of the first elbow (1), the second elbow (2), the sixth elbow (6), the seventh elbow (7), the eighth elbow (8) and the ninth elbow (9) are all located in a vertical plane; the axes of the second elbow (2), the third elbow (3) and the fourth elbow (4) are all located in a horizontal plane.

3. A submarine pipeline interlaced liner hose repair model test platform according to claim 2, characterized in that: The angles of the first elbow (1), the second elbow (2), the fourth elbow (4), the fifth elbow (5), the sixth elbow (6), the seventh elbow (7), the eighth elbow (8) and the ninth elbow (9) are all 90°; the angle of the third elbow (3) is greater than 90°; The straight pipe section between the first elbow (1) and the second elbow (2), the straight pipe section between the second elbow (2) and the third elbow (3), the straight pipe section between the third elbow (3) and the fourth elbow (4), the straight pipe section between the sixth elbow (6) and the seventh elbow (7), the straight pipe section between the seventh elbow (7) and the eighth elbow (8), and the straight pipe section between the eighth elbow (8) and the ninth elbow (9) all have a length a; The length of the straight pipe section between the fourth elbow (4) and the fifth elbow (5) is b; The length of the straight pipe section between the fifth elbow (5) and the sixth elbow (6) is c; Among them, a<b<c.

4. A submarine pipeline interlaced liner hose repair model test platform according to claim 1, characterized in that: It also includes a traction head for connecting with the traction equipment; the traction head includes a cylindrical portion (12) and a conical portion (13) which are coaxially connected, and an arc chamfer is arranged at the junction of the cylindrical portion (12) and the conical portion (13); the radius of the conical portion (13) gradually decreases from one end close to the cylindrical portion (12) to the end away from the cylindrical portion (12); it also includes a through hole (14) radially opened on the conical portion (13), and a U-shaped pull ring (15) matching the through hole (14), and the two ends of the U-shaped pull ring (15) are respectively used to insert the two ends of the through hole (14) into the traction head; it also includes a clamping plate (16) detachably connected to the end of the U-shaped pull ring (15), and a positioning column (17) detachably connected between the two ends of the U-shaped pull ring (15); a plurality of positioning bolt holes (18) are opened on the clamping plate (16).

5. A test method for a submarine pipeline interlaced liner hose repair model test platform based on any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Prepare the inner lining hose and apply lubricating oil on the outer surface of the inner lining hose; S2. Perform pigging operation on the test pipeline; S3, fold the inner lining hose into a U shape and connect the traction head to one end of the inner lining hose; S4, passing the traction rope through the test pipe, and connecting the two ends of the traction rope to the traction head and the traction equipment respectively; S5. Start the loading device to provide reverse pulling force for the lining hose, and start the traction device to drag the lining hose into the test pipe until it reaches the set position, during which the magnitude of the traction force and the length of the lining hose dragged into the test pipe are monitored in real time; S6. Pressurize the inner lining hose to make it round, and monitor the rounding pressure in real time during the process.

6. The test method according to claim 5, characterized in that The method of connecting the traction head at one end of the liner hose includes: Determine the magnitude of the reverse pulling force provided by the loading equipment during the test: If the reverse pulling force is less than the set threshold, two clamping plates (16) detachably connected to the traction head are used to clamp one end of the lining hose; If the reverse pulling force is greater than or equal to the set threshold, one end of the lining hose is wound around a positioning column (17) detachably connected to the traction head.

7. The test method according to claim 6, characterized in that: The method of clamping one end of the liner hose by using two clamping plates (16) detachably connected to the traction head comprises: Insert the two ends of the U-shaped pull ring (15) into the two through holes (14) on the traction head; Clamping plates (16) are installed at both ends of the U-shaped pull ring (15); Put the traction head on one end of the lining hose so that the lining hose is located between two clamping plates (16); Install the bolts into the positioning bolt holes (18) and tighten.

8. The test method according to claim 6, characterized in that: The method of winding one end of the liner hose around a positioning column (17) detachably connected to the traction head comprises: Insert the two ends of the U-shaped pull ring (15) into the two through holes (14) on the traction head; A positioning column (17) is installed between the two ends of the U-shaped pull ring (15); Cutting one end of the liner hose, removing the weft thread of the end, and weaving the warp thread of the end into at most four strands; The woven warp threads of at most four strands are wound around the positioning post (17) and tied to secure them.

9. The test method according to claim 5, characterized in that: Methods for preparing lined hose include: The inner lining layer, the middle layer and the outer covering layer are used in sequence from the inside to the outside. The inner lining layer and the outer covering layer are both polyethylene, and the middle layer is high-strength fiber. Verify whether the hoop stress of the lining hose is less than the sum of the tensile strength of the weft: if so, the lining hose is usable; if not, the lining hose is unusable.

10. The test method according to claim 9, characterized in that: The sum of the tensile strength of the weft is calculated by the following formula: σ0=nN2F0 / (t frp ×dx) Where: σ0 is the total tensile strength of the weft; n is the number of strands of warp fiber in any cross section; N2 is the safety factor; F0 is the average breaking strength of a single strand of weft fiber; t frp is the wall thickness of the lining hose; dx is the weft spacing.