Multi-stage stochastic optimization scheduling method and system containing photo-thermal power generation power system

By adopting a three-stage random planning model and accelerated optimization methods of load aggregation and photothermal unit aggregation in the photothermal power system, the problems of numerous variables and complex constraints are solved, the resolution speed and efficiency of the power system are improved, and the implementation of the Efficient operation planning analysis.

CN119051002AActive Publication Date: 2024-11-29XI AN JIAOTONG UNIV +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411153373.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-29
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The existing multi-stage random planning model is slow in the solution speed in the photothermal power generation power system, and it is difficult to effectively optimize the operation planning of the power system.

Method used

Using a three-stage random planning model combined with the accelerated optimization method of load aggregation and photothermal unit aggregation, a scene tree structure is generated, a multi-stage random optimization scheduling model is constructed, and variables and constraints are simplified through load aggregation and photothermal unit aggregation algorithms are improved to improve the solution efficiency .

Benefits of technology

It significantly improves the solution speed of the model, reduces the number of variables and constraints, realizes efficient power system operation planning analysis, and provides a solution tool for medium- and long-term timing production simulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051002A_ABST
    Figure CN119051002A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-stage stochastic optimization scheduling method and system containing a photo-thermal power generation electric power system. The method comprises the steps of 1, obtaining unit parameters and a new energy output prediction curve; 2, generating at least five scenes based on the prediction curve, and constructing a multi-stage scene tree structure; 3, on the basis of the scene tree structure, a multi-stage stochastic programming model is used as a framework, and a multi-stage stochastic optimization scheduling model containing the photo-thermal power generation power system is constructed; 4, optimizing the stage 3 by adopting two methods of load polymerization and photo-thermal unit polymerization, and constructing an accelerated optimization model; and 5, solving the acceleration optimization comprehensive model. The system comprises a data acquisition module, a scene tree construction module, a model construction module, a model optimization module and a model solving module. According to the method, the defect that the multi-stage stochastic optimization scheduling model containing the photo-thermal power generation power system is low in solving speed can be overcome, and the method has certain significance for large-scale medium-and-long-term power system planning.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power system planning and operation, and specifically relates to a multi-stage random optimization scheduling method and system for a solar thermal power generation power system. Background Art

[0002] Solar thermal power generation technology is an emerging renewable energy power generation technology in recent years. It has the advantages of zero carbon emissions, excellent controllability, high energy utilization, etc. Large-scale grid connection of solar thermal power generation can play its role of peak shaving and valley filling, effectively reduce carbon emissions, promote the consumption of new energy, and reduce the operating costs of the power system. Solar thermal power stations can be divided into four types according to the different technologies of the heat collection link: trough type, tower type, dish type, and Fresnel type.

[0003] However, due to the uncertainty of light resources, there are certain difficulties in the large-scale grid connection of solar thermal power generation. In this regard, researchers have proposed a multi-stage stochastic programming model to solve the uncertainty problem of solar thermal power generation with a multi-scenario algorithm. The present invention uses a three-stage stochastic programming model as a framework to construct a multi-stage stochastic optimization scheduling model for a power system containing solar thermal power generation. However, due to the large amount of calculation required by the multi-scenario algorithm, the long time span involved, the large number of variables involved, and the complex constraints, the solution time is long and the solution efficiency is low. Load aggregation and solar thermal unit aggregation, as two accelerated optimization algorithms, can reduce the scale of solution, merge the state variables of solar thermal units, and thus improve the solution efficiency. At present, multi-stage stochastic optimization scheduling modeling of power systems combined with load aggregation and solar thermal unit aggregation has not yet been carried out. By combining these two accelerated optimization algorithms for modeling, the model solution efficiency is improved, which is of great significance to the operation planning analysis of power systems containing solar thermal power generation. Summary of the invention

[0004] The purpose of the present invention is to provide a multi-stage random optimization scheduling method and system for a power system containing solar thermal power generation, so as to make up for the shortcomings of slow solution speed caused by the multi-stage random optimization scheduling model of the power system containing solar thermal power generation involving many variables and complex constraints.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] A multi-stage stochastic optimization scheduling method for a solar thermal power generation power system comprises the following steps:

[0007] Step 1: Obtain the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of renewable energy output;

[0008] Step 2: Based on the forecast curve of renewable energy output, use the scenario generation method to generate at least five scenarios and construct a multi-stage scenario tree structure to describe the uncertainty of solar thermal power generation and wind power generation;

[0009] Step 3: Based on the scenario tree structure of step 2, a multi-stage random programming model is used, combined with the parameters of the thermal power units and the CSP units obtained in step 1, to construct a three-stage random optimization scheduling model for the CSP power system, where stage 1 is to perform day-ahead scheduling for the first day, and solve the day-ahead start and stop plan of the unit based on the predicted value of the output of new energy; stage 2 is to use the principle of economic allocation based on the scenario value of the output of new energy, and to make real-time allocation of the unit output and reserve planned for the first day; stage 3 is to perform forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, and arranging and planning the unit output in the next few days, as well as the heat storage capacity of the CSP thermal storage system;

[0010] Step 4: For phase 3 involving a longer period of time, two accelerated optimization methods, load aggregation and CSP unit aggregation, are used to optimize the phase 3, and a comprehensive accelerated optimization model is constructed;

[0011] Step 5: Solve the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time.

[0012] A further improvement of the present invention is that, in step 2, the scenario generation method adopts a scenario constructed based on Weibull distribution.

[0013] A further improvement of the present invention is that, in step 3, based on the scenario tree structure of step 2, a multi-stage stochastic programming model is used to construct a three-stage stochastic optimization scheduling model for a power system containing solar thermal power generation, and the scheduling model objective function is as follows:

[0014] minimize Cost Sys =Cost DA +Cost RT +Cost LA (1)

[0015]

[0016] Among them, t represents from 1 to N T The time sequence number of stage 1 and stage 2; k represents from 1 to N K The time sequence number of stage 3; g represents from 1 to N G The unit number; SU represents the start-stop cost calculation matrix of the thermal power unit; the 0-1 variable x represents the start-stop status of the thermal power unit; C G represents the operating cost calculation matrix of the thermal power unit; P represents the output of the thermal power unit: C Ru , C Rd They represent the deployment cost of upward / downward rotation reserve of thermal power units; R Ru , R RdRespectively represent the upward / downward rotation reserve output put into operation; s represents from 1 to N s The sequence number of the stage 2 scene; h represents from 1 to N H The sequence number of the stage 3 scenarios; π represents the probability of each scenario; "~" represents the corresponding two-stage variable; "^" represents the corresponding three-stage variable; δ Voll represents the load abandonment penalty fee; L Cur Indicates the load shedding size of the system; i represents a range from 1 to N I The load node number;

[0017] The objective function is to minimize the expected operating cost. Sys ; The first part is the cost of the day-ahead power generation plan deployment. DA , including the start-up and shutdown costs of thermal power units, coal consumption costs, and upward / downward rotation reserve plan costs; the second part is the expected real-time allocation cost Cost RT , including the backup deployment cost of thermal power units and the penalty cost of load abandonment; the third part is the expected operating cost in the next few days. LA ;

[0018] The relevant constraints for phase 1 are as follows:

[0019] The relevant constraints for thermal power units are as follows:

[0020]

[0021] Among them, UR g , RD g They represent the ramp rate of the unit respectively; Δt represents the unit ramp time; 0-1 variables m and n represent the start and stop actions of the unit respectively; Respectively represent the minimum start and stop time of the unit; Respectively represent the maximum and minimum output limits of the unit;

[0022] Formulas (5) and (6) represent the ramp constraints of the unit; Formulas (7) and (8) represent the minimum start-up and shutdown time constraints of the unit; Formulas (9) and (10) represent the start-up and shutdown 0-1 variable constraints of the unit; Formula (11) represents the upper and lower output limits of the unit;

[0023] The relevant constraints for wind turbines are as follows:

[0024]

[0025] Among them, w represents from 1 to N w The wind farm serial number; represents the output of wind farm w in period t; represents the wind curtailment of wind farm w in period t; represents the predicted value of wind power resources in period t;

[0026] Formula (12) represents the output constraint of the wind turbine;

[0027] The relevant constraints for CSP units are as follows:

[0028]

[0029] ES c,min ≤ES c,t ≤ES c,max (17)

[0030] ES c,ini =ES c,0 (18)

[0031]

[0032] Among them, c represents from 1 to N C Serial number of the CSP unit; It represents the predicted value of solar energy absorbed by CSP unit c in period t; Energy provided for electric heating systems; To normalize the energy loss in each link to a unified expression of the concentrated solar collector system; The heat input into the heat storage system from the concentrated solar collector system; Release the heat from the thermal storage system into the power generation system for power generation; are the maximum input and output heat allowed by the heat storage system; ES c,t represents the heat storage capacity of CSP unit c in period t; η in , η out are the heat input efficiency and heat output efficiency of the heat storage system respectively; ES c,min ,ES c,max Respectively represent the upper and lower limits of heat storage of the heat storage system; ES c,ini ,ES c,end They represent the initial heat storage and final heat storage of the heat storage system respectively; They are all 0-1 variables, 0 represents shutdown and 1 represents startup; Respectively represent the start and stop status of the steam turbine; It is the initial start and stop state of the steam turbine; Represents the start and stop action of the steam turbine; Respectively represent the minimum start and stop time of the steam turbine; is the output of turbine c of the power generation system at time t, which includes two parts: the power delivered to the electric heating system And the power supplied to the system α c , β care coefficients related to the thermal-electric conversion efficiency of steam turbines; Indicates the efficiency of converting the power supplied to the electric heating system into heat in the working fluid; Indicates the amount of heat delivered to the working fluid by the electric heating system; They represent the reserve output of the power generation system respectively; Indicates the efficiency of the power generation system in converting heat into electrical energy;

[0033] Formula (13) represents the heat balance constraint of the solar thermal power generation system; Formula (14) and (15) represent the upper and lower limit constraints of the heat flow of the heat storage system; Formula (16) represents the dynamic constraint that the heat storage capacity of the heat storage system should meet the time change; Formula (17) represents the upper and lower limit constraints of the heat storage capacity of the heat storage system; Formula (18) and (19) represent the constraints on the initial and final heat storage capacity of the heat storage system; Formula (20)-(23) represent the start-stop 0-1 variable constraints that the steam turbine needs to meet; Formula (24) and (25) represent the minimum start-stop time constraints that the steam turbine meets during operation; Formula (26) can be understood as follows: is the heat flowing into the unit, Represents the heat consumed when the unit is started. The difference between the two is the actual heat used by the turbine for power generation, which is then multiplied by the efficiency coefficient α c is the actual output of the unit; Formula (27) shows that the output of the CSP unit can be divided into two parts: For the flow of input system, To supply power to the electric heating system, is the power flowing into the electric heating system With efficiency is converted into heat energy in the heat transfer medium; Formula (28) represents the upper and lower limits of the output of the CSP unit, and the upper and lower limits of the power of the electric heating system; Formula (29) represents that when the steam turbine is in the power generation state, the upward reserve provided by the power generation system shall not exceed and the available heat storage system heat release range; Formula (30) indicates that the upward reserve provided by the electric heating system does not exceed its expected output. Similarly, the downward reserve provided by the power generation system and the electric heating system is constrained by Formulas (31) and (32);

[0034] The relevant constraints for the system are as follows:

[0035]

[0036] Among them, i represents from 1 to N I The load node number; D i,t represents the load of node i in period t; represents the load abandonment size of node i in time period t; GST represents the transfer factor matrix of thermal power unit output to the line; GSW represents the transfer factor matrix of wind power unit output to the line; GSC represents the transfer factor matrix of solar thermal unit output to the line; GSF represents the transfer factor matrix of node load to the line; F l max Represents the maximum value of the flow allowed to flow through the line in the forward and reverse directions;

[0037] Formula (33) indicates that the system output and load are always balanced; Formula (34) indicates that the current flowing through each branch in the forward and reverse directions cannot exceed the upper limit of the current allowed by the branch; Formulas (35) and (36) indicate that the reserve provided by the thermal power unit, solar thermal unit and electric heating system must meet the minimum upward / downward reserve requirements of the system;

[0038] The relevant constraints for phase 2 are as follows:

[0039] The relevant constraints for thermal power units are as follows:

[0040]

[0041] Formulas (37) and (38) represent the ramping constraints that the output of thermal power units must meet in stage 2; Formula (39) represents the upper and lower limit constraints of the unit output; Formula (40) represents that the output of thermal power units in stage 2 is equal to the sum of the output in stage 1 and the upward / downward spinning reserve put into operation; Formula (41) represents that the output of the upward / downward spinning reserve put into operation in stage 2 does not exceed the spinning reserve capacity deployed in stage 1;

[0042] The relevant constraints for wind turbines are as follows:

[0043]

[0044] in, is the wind power resource value corresponding to scenario s; Formula (42) has the same meaning as Formula (12) in stage 1 and will not be repeated here;

[0045] The relevant constraints for CSP units are as follows:

[0046]

[0047] in, is the light and heat resource value corresponding to scene s;

[0048] Formula (53) indicates that the operating state of the power generation system is determined in stage 1; Formulas (54) and (56) indicate that the output allocation of the unit is equal to the sum of the planned output of the day before and the real-time deployed spinning reserve; Formulas (55) and (57) indicate that the real-time reserve allocation should be limited to the feasible range, that is, the reserve output of the power generation system and the electric heater system put into operation does not exceed the planned deployment reserve obtained in stage 1; the other constraints are the same as those in stage 1, but are replaced by the expression form of the variables in stage 2;

[0049] The relevant constraints for the system are as follows:

[0050]

[0051] The relevant constraints for stage 3 are as follows:

[0052] The relevant constraints for thermal power units are as follows:

[0053]

[0054] The relevant constraints for wind turbines are as follows:

[0055]

[0056] The relevant constraints for CSP plants are as follows:

[0057]

[0058]

[0059] The relevant constraints for the system are as follows:

[0060]

[0061] In summary, objective functions (1)-(4) and constraints (5)-(85) constitute a multi-stage stochastic optimization scheduling model for a power system containing CSP.

[0062] A further improvement of the present invention is that, in step 4, the phase 3 of the model established in step 3 is modified by using a load aggregation optimization algorithm, and the phase 3 model modified by the load aggregation method is as follows:

[0063] The objective function of stage 3 is changed to:

[0064]

[0065] Where v represents the time period number after load aggregation, which ranges from 1 to N. V ; Y v Indicates the length of the timing segment v of the LSTC curve;

[0066] The relevant constraints for thermal power units are as follows:

[0067]

[0068] When the operating status of a thermal power unit changes, the power is limited to The unit outputs of the same time segment in the aggregated load curve are limited to the same value, which makes it difficult to accurately describe the above situation. Therefore, the weighted average formula of formula (87) is used to approximately limit the unit outputs of the time segment where the start and stop actions occur to In the formula, Y ave represents the average length of each time segment, which is calculated by formula (88); ave Considering that the power adjustment margin of the unit is related to the length of the timing segment, the ramp constraint can be modified as shown in equations (89) and (90). Equations (91) to (94) are the minimum start-up and shutdown time constraints of the thermal power unit modified according to the load state transfer curve. Taking the minimum start-up time constraint (91) as an example, the parameter Take the minimum value that satisfies formula (93), which means the minimum number of sequential load segments that the unit needs to keep in the on state to meet the minimum on-time constraint, and the minimum off-time parameter The method of determining is the same;

[0069] The relevant constraints for wind turbines are as follows:

[0070]

[0071] The relevant constraints for CSP plants are as follows:

[0072]

[0073]

[0074] Among them, equations (110)-(113) are modified by analogy with the minimum start-stop time constraint of thermal power units, which will not be repeated here;

[0075] The relevant constraints for the system are as follows:

[0076]

[0077] After the original time series load curve is aggregated, the output curve of the renewable energy scenario should also be changed accordingly to meet the calculation needs, with the wind power resource scenario curve Take the example of obtaining: divide the original curve into segments according to the length Y of each time series v Segmentation, the time segment v corresponds to the Y in the original curve vThe length of time, assuming that the value corresponding to each time is equally likely to appear in this time segment, the value corresponding to each time After summing, take the average value as the value of the time series segment v, that is, Similar segmentation processing is also performed on the light and heat resource data.

[0078] A further improvement of the present invention is that, in step 4, the accelerated optimization algorithm of the photothermal unit aggregation is used for stage 3 of the model established in step 3 to accelerate the optimization of the model solution; specifically, the operating state variables of the photothermal unit in the original stage 3 model are And the unit start and stop action variables All use integer variables, with values ​​of 0, 1, 2, ..., N C , N C is the number of units of this type, indicating the number of units in class c that are in operation, starting, or shutting down. Modifications are made based on the original stage 3 model. The constraints of thermal power and wind turbines remain unchanged, and the CSP units are aggregated. The relevant constraints of the CSP power station are modified as follows:

[0079]

[0080] Among them, for the aggregated unit type c, the parameters of its heat storage link, such as heat storage capacity, minimum and maximum power, etc., are the sum of the parameters of the units in the same category.

[0081] A further improvement of the present invention is that in step 4, after the model of stage 3 is modified using two accelerated optimization algorithms, the objective functions (1)-(3), (86), stage 1 constraints (5)-(36), stage 2 constraints (37)-(59), stage 3 constraints (87)-(98), (117)-(134) together constitute a comprehensive model of multi-stage random optimization scheduling accelerated optimization of a power system containing solar thermal power generation.

[0082] A multi-stage stochastic optimization dispatching system for a solar thermal power generation power system, comprising:

[0083] The data acquisition module obtains the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of new energy output;

[0084] The scenario tree construction module generates at least five scenarios based on the prediction curve of renewable energy output using the scenario generation method, and constructs a multi-stage scenario tree structure to describe the uncertainty of solar thermal power generation and wind power generation;

[0085] The model building module, based on the scenario tree structure, adopts a multi-stage random programming model, combines the parameters of thermal power units and solar thermal units, and constructs a three-stage random optimization scheduling model for the power system containing solar thermal power generation. Among them, stage 1 is the day-ahead scheduling for the first day, and the day-ahead start and stop plan of the unit is solved based on the predicted value of the new energy output; stage 2 is based on the scenario value of the new energy output, using the principle of economic allocation, and real-time allocation of the unit output and reserve planned for the first day; stage 3 is the forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, arranging and planning the unit output in the next few days, and the heat storage capacity of the solar thermal power station heat storage system;

[0086] The model optimization module uses two accelerated optimization methods, load aggregation and CSP unit aggregation, to optimize the phase 3 involving a longer time period, and builds an accelerated optimization comprehensive model;

[0087] The model solving module solves the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time.

[0088] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a multi-stage random optimization scheduling method for a solar thermal power generation power system.

[0089] Compared with the prior art, the present invention has at least the following beneficial technical effects:

[0090] The present invention provides a multi-stage random optimization scheduling method and system for a power system including solar thermal power generation. Based on the multi-stage random planning scheduling model of the power system including solar thermal power generation, the operating characteristics of the solar thermal units in the same solar thermal park are fully considered, and the solar thermal units with the same or similar parameters in the same park are aggregated into one category, simplifying the variables and constraints at the category level; in addition, by merging the same or similar load levels, the time scale is reduced. The present invention greatly improves the solution speed of the model by reducing the number of variables, simplifying the constraints, and reducing the solution scale. At the same time, the temporal characteristics of the model are kept intact as much as possible, and the overall cost can be calculated more accurately, and the day-ahead operation plan of various units can be formulated, providing an efficient solution tool for medium- and long-term temporal production simulation of power systems including solar thermal power generation. BRIEF DESCRIPTION OF THE DRAWINGS

[0091] Figure 1 It is the overall flow chart of the present invention.

[0092] Figure 2 This is a three-stage scene tree structure diagram.

[0093] Figure 3It is a single scenario wind power resource curve.

[0094] Figure 4 This is the single-scene solar thermal resource curve.

[0095] Figure 5 This is the load curve after load aggregation when the number of load states is 10.

[0096] Figure 6 The error in the solution results for load aggregation with different numbers of load states.

[0097] Figure 7 The error in the solution results of the comprehensive model for accelerated optimization for different numbers of load states.

[0098] Figure 8 To accurately solve the corresponding unit output planning on the previous day.

[0099] Fig. 9 To accurately solve the output and heat storage plan of the corresponding solar thermal power station on the previous day.

[0100] Fig.10 To accelerate the optimization of the comprehensive model to solve the unit output planning of the day ahead.

[0101] Fig.11 To accelerate the optimization of the comprehensive model, the output and heat storage plan of the solar thermal power station was solved a few days ago.

[0102] Fig.12 The error of the solution results of the acceleration optimization comprehensive model corresponding to different load state numbers.

[0103] Fig.13 The present invention is a structural block diagram of a multi-stage random optimization scheduling system including a solar thermal power generation power system. DETAILED DESCRIPTION

[0104] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0105] like Figure 1 As shown, the present invention provides a multi-stage random optimization scheduling method for a solar thermal power generation power system, comprising the following steps:

[0106] Step 1: Obtain the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of new energy output. The present invention takes a power system including thermal power generation, solar thermal power generation, and wind power generation as an example for introduction. The prediction curve of new energy output is mainly the prediction curve of wind power resources and solar thermal resources. The actual application can include other types of power generation such as photovoltaic power generation, hydropower generation, etc. The method used can be extended and expanded for use.

[0107] This example is based on the 168h dispatch plan of the improved IEEE-RTS79 system. The system includes 26 thermal power units with installed capacity ranging from 12MW to 400MW, 5 wind farms and 10 solar thermal units. The new energy forecast value curve comes from the statistical data of a province in Northwest my country.

[0108] Step 2: Based on the original renewable energy output prediction curve, use scenario generation methods (such as constructing scenarios based on Weibull distribution, etc.) to generate a certain number of scenarios and build a multi-stage scenario tree structure to describe the uncertainty of the output of new energy such as solar thermal power generation.

[0109] The present invention takes the three-stage scene tree result as an example to introduce the structure of the three-stage scene tree. Figure 2 shown.

[0110] Step three: Based on the scenario tree structure of step two, a multi-stage random programming model is used to construct a multi-stage random optimization scheduling model for a power system containing a solar thermal power generation system. The present invention takes a three-stage random programming model as an example. In practical applications, the total number of corresponding stages can be selected as needed. Stage 1 is to perform day-ahead scheduling for the first day, and solve the day-ahead start and stop plan of the unit based on the forecast curve of the new energy output; Stage 2 is based on the scenario value of the new energy output, and uses the principle of economic allocation to allocate the unit output and standby planned for the first day in real time; Stage 3 is to perform forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, arranging and planning the unit output in the next few days, and the heat storage system of the solar thermal power station. If the time period involved is longer, stage 4, stage 5, etc. can be added as needed for modeling;

[0111] Step 4: For phase 3 involving a longer period of time, two accelerated optimization methods, load aggregation and CSP unit aggregation, are used to optimize the phase, build an accelerated optimization comprehensive model, and improve the efficiency of model solution.

[0112] Load aggregation means that on the basis of retaining the time series characteristics of the original time series load curve as much as possible, a certain clustering method (such as k-means clustering, etc.) is adopted to merge the load values ​​with the same or similar load levels on the original time series load curve into the same type of load level based on the specified number of load states, and then replace the actual load value on the original time series load curve with the clustered load level, and merge multiple time periods with similar loads of length 1 into one time period of a certain length. In this way, load aggregation is achieved.

[0113] Compared with the initial model in stage 3, the load aggregation method is used to merge the same or similar load levels, and the time periods with the same load levels after merging are merged into a new large time period, thereby greatly reducing the calculation time scale of the stage 3 model. At the same time, the output of the new energy scenario is assisted by corresponding processing, and the constraints are modified accordingly, thereby achieving improved solution efficiency.

[0114] CSP unit aggregation refers to the basic assumption of unit aggregation research, which holds that after CSP units are aggregated, the parameters of units in the same class are consistent, and the power generation capacity of units in the same state in the same class at the same time is the same. The operating status of the entire class is represented only by the number of units in each state in the class, without making any detailed distinction between the units in the class.

[0115] Compared with the model established in the initial stage 3, the CSP unit aggregation modeling merges the operating state variables and start-stop action variables from 0-1 variables into integer variables, adds some continuous variables, and corrects the values ​​of some parameters, achieving an approximate description of the operating process of a class of CSP units, reducing the number of variables and constraints in the stage 3 model, and achieving the purpose of improving the solution efficiency.

[0116] In this step, only the accelerated optimization algorithm is used to modify stage 3, and the constraints of stage 1 and stage 2 are not modified. This is because the constraints of stage 1 and stage 2 only involve the operation plan of the first day, and the variables and constraints contained are relatively few, which will not take up too much solution time. Stage 3 involves a longer subsequent time period and is a mixed integer linear programming, so the solution rate is low. Therefore, the accelerated optimization algorithm is used to modify stage 3 to improve the calculation rate, and the operation plan of the first day solved will be put into use. If the aggregation method is used in stage 1 and stage 2, it may affect the accuracy of the solution result to a certain extent. The solution result of stage 3 is only used to estimate the total operating cost and adjust the operation plan of the first day, and is not put into use. Therefore, the accelerated optimization algorithm can be used to modify it to improve the solution efficiency. If the model constructed in the actual use of this patent is more than three stages, it should also be accurately solved in stage 1 and stage 2, and the accelerated optimization algorithm should be used in the subsequent stage with a longer time scale to improve the model solution speed while ensuring the accuracy of the results.

[0117] Step 5: Solve the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time, and verify the solution efficiency and accuracy of the accelerated optimization comprehensive model.

[0118] The following criteria are used to judge the acceleration effect of the aggregation method. The results obtained by the aggregation method are indicated by a superscript “*”, and the results obtained without the aggregation method are indicated by superscript “*”.

[0119] (1) System power generation cost error:

[0120]

[0121] (2) Power generation error:

[0122]

[0123] (3) Power-on status error:

[0124]

[0125] (4) Speedup ratio:

[0126] The ratio of the solution time of the original model to the solution time of the model using the accelerated optimization algorithm is defined as the acceleration ratio, which is used to evaluate the acceleration effect of the accelerated optimization algorithm.

[0127]

[0128] First, in order to verify the advantages of the present invention in terms of solution accuracy and solution speed, while at the same time reducing the amount of calculation required for verification as much as possible and improving verification efficiency, a single scenario model is introduced here. The single scenario model refers to extracting a certain wind power and solar thermal resource scenario from the multi-scenario model in step three to solve the three-stage random programming model. The remaining parameters are the same, and the calculation is performed with the data of this single scenario. This can not only verify the acceleration effect and accuracy of the accelerated optimization algorithm, but also reduce the verification scale and improve verification efficiency. The values ​​of wind power and solar thermal resources in a single scenario are as follows: Figure 3 , Figure 4 shown.

[0129] In order to compare and verify the advantages of the present invention, a simplified model is introduced for comparison. One of the reasons why the random optimization scheduling model of the power system containing solar thermal power generation takes a long time to solve is that the period involved in stage 3 is long and there are many variables. In addition, the three stages themselves are mixed integer linear programming operations. Many 0-1 variables greatly reduce the efficiency of solving. The scheduling plan of stage 3 itself is only used to estimate the overall cost and is not put into operation. Therefore, a simplified model is introduced here to simplify the original constraints into constraints without 0-1 variables, so as to improve the efficiency of solving and reduce the running time. Therefore, the solution results of this model are used as a set of comparison results.

[0130] A single scenario model is adopted, and the solution of the random optimization dispatch model containing the CSP power generation system in step 3 is taken as the exact solution. The results obtained by solving the simplified model, only load aggregation, only CSP unit aggregation and the accelerated optimization comprehensive model proposed by the present invention are compared. The results are shown in Table 1. Figure 5 This is the result obtained after processing the time series load curve when the number of load states is set to 10.

[0131] Table 1 Comparison of verification results of single scenario examples

[0132]

[0133] According to the comparison of the above results, we can find that: 1) Since the simplified model does not consider the 0-1 variable constraint in stage 3, the running time is greatly reduced, but the result obtained has a larger error than the other three methods; 2) The accelerated optimization comprehensive model uses two accelerated optimization algorithms in combination, so the acceleration ratio is the largest, that is, the optimal acceleration effect is obtained, but the error is slightly larger than the other two results, but the accuracy is still within an acceptable range, which is equivalent to slightly sacrificing accuracy in exchange for a significant improvement in solution efficiency.

[0134] To further study the influence of load state number on load aggregation effect, the load state number is 7-13, and the calculation results of load aggregation and acceleration optimization comprehensive model are as follows: Figure 6 , Figure 7 shown.

[0135] from Figure 6 , Figure 7 It can be found that for load aggregation, when the number of load states is small, the solution time is short, but the error is large; and as the number of load states gradually increases, the error of the solution result gradually decreases, the accuracy gradually improves, but the corresponding solution time will also increase.

[0136] By comparing the above results, the acceleration effect and solution accuracy of the accelerated optimization comprehensive model that simultaneously adopts load aggregation and CSP unit aggregation are demonstrated. It is used in the random optimization dispatch model of the power system containing CSP power generation proposed in step three, and compared with the solution result without using the accelerated optimization algorithm as the exact solution. Figure 8 , Fig. 9 In order to accurately solve the corresponding unit output planning, output and heat storage plan of the solar thermal power station, Fig.10 , Fig.11 Table 2 shows the results of the accelerated optimization comprehensive model for solving the unit output planning, the output and heat storage plan of the CSP power station for different load state numbers. Fig.12The error of the comprehensive model for accelerating optimization is solved for different numbers of load states.

[0137] Table 2 Accelerated optimization comprehensive model solution results

[0138]

[0139] From the above data, it can be seen that the adopted accelerated optimization comprehensive model can shorten the solution time to one fifth to one tenth of the original solution method while maintaining high accuracy, with excellent acceleration effect. This good acceleration advantage will be more significant in solving longer-term and larger-scale joint operation and dispatching models, which is of certain significance for the efficient implementation of long-term planning of large-scale power systems.

[0140] like Fig.13 As shown, the present invention provides a multi-stage random optimization scheduling system for a solar thermal power generation power system, comprising:

[0141] The data acquisition module obtains the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of new energy output;

[0142] The scenario tree construction module generates at least five scenarios based on the prediction curve of renewable energy output using the scenario generation method, and constructs a multi-stage scenario tree structure to describe the uncertainty of solar thermal power generation and wind power generation;

[0143] The model building module, based on the scenario tree structure, adopts a multi-stage random programming model, combines the parameters of thermal power units and solar thermal units, and constructs a three-stage random optimization scheduling model for the power system containing solar thermal power generation. Among them, stage 1 is the day-ahead scheduling for the first day, and the day-ahead start and stop plan of the unit is solved based on the predicted value of the new energy output; stage 2 is based on the scenario value of the new energy output, using the principle of economic allocation, and real-time allocation of the unit output and reserve planned for the first day; stage 3 is the forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, arranging and planning the unit output in the next few days, and the heat storage capacity of the solar thermal power station heat storage system;

[0144] The model optimization module uses two accelerated optimization methods, load aggregation and CSP unit aggregation, to optimize the phase 3 involving a longer time period, and builds an accelerated optimization comprehensive model;

[0145] The model solving module solves the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time.

[0146] The present invention provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it implements the steps of a multi-stage random optimization scheduling method for a power system containing solar thermal power generation.

[0147] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0148] The present application is described with reference to the flowcharts and / or block diagrams of the methods, systems and computer program products according to the embodiments of the present application. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A system that specifies the functions of a box or multiple boxes.

[0149] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0150] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0151] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the scope disclosed by the present invention, which belong to the protection scope of the present invention.

Claims

1. A multi-stage random optimization scheduling method for a power system containing solar thermal power generation, characterized in that: The following steps are involved: Step 1: Obtain the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of renewable energy output; Step 2: Based on the forecast curve of renewable energy output, use the scenario generation method to generate at least five scenarios and construct a multi-stage scenario tree structure to describe the uncertainty of solar thermal power generation and wind power generation; Step 3: Based on the scenario tree structure of step 2, a multi-stage random programming model is used, combined with the parameters of the thermal power units and the CSP units obtained in step 1, to construct a three-stage random optimization scheduling model for the CSP power system, where stage 1 is to perform day-ahead scheduling for the first day, and solve the day-ahead start and stop plan of the unit based on the predicted value of the output of new energy; stage 2 is to use the principle of economic allocation based on the scenario value of the output of new energy, and to make real-time allocation of the unit output and reserve planned for the first day; stage 3 is to perform forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, and arranging and planning the unit output in the next few days, as well as the heat storage capacity of the CSP thermal storage system; Step 4: For phase 3 involving a longer period of time, two accelerated optimization methods, load aggregation and CSP unit aggregation, are used to optimize the phase 3, and a comprehensive accelerated optimization model is constructed; Step 5: Solve the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time.

2. A multi-stage random optimization scheduling method for a solar thermal power generation power system according to claim 1, characterized in that: In step 2, the scenario generation method uses a scenario constructed based on Weibull distribution.

3. A multi-stage random optimization scheduling method for a solar thermal power generation system according to claim 1, characterized in that: In step 3, based on the scenario tree structure of step 2, a multi-stage stochastic programming model is used to construct a three-stage stochastic optimization scheduling model for a power system containing solar thermal power generation. The objective function of the scheduling model is as follows: minimize Cost Sys =Cost DA +Cost RT +Cost LA (1) Among them, t represents from 1 to N T The time sequence number of stage 1 and stage 2; k represents from 1 to N K The time sequence number of stage 3; g represents from 1 to N G The unit number; SU represents the start-stop cost calculation matrix of the thermal power unit; the 0-1 variable x represents the start-stop status of the thermal power unit; C G represents the operating cost calculation matrix of the thermal power unit; P represents the output of the thermal power unit: C Ru , C Rd They represent the deployment cost of upward / downward rotation reserve of thermal power units; R Ru , R Rd Respectively represent the upward / downward rotation reserve output put into operation; s represents from 1 to N s The sequence number of the stage 2 scene; h represents from 1 to N H The sequence number of the stage 3 scenarios; π represents the probability of each scenario; "~" represents the corresponding two-stage variable; "^" represents the corresponding three-stage variable; δ Voll represents the load abandonment penalty fee; L Cur Indicates the load shedding size of the system; i represents a range from 1 to N I The load node number; The objective function is to minimize the expected operating cost. Sys ; The first part is the cost of the day-ahead power generation plan deployment. DA , including the start-up and shutdown costs of thermal power units, coal consumption costs, and upward / downward rotation reserve plan costs; the second part is the expected real-time allocation cost Cost RT , including the backup deployment cost of thermal power units and the penalty cost of load abandonment; the third part is the expected operating cost in the next few days. LA ; The relevant constraints for phase 1 are as follows: The relevant constraints for thermal power units are as follows: Among them, UR g , RD g They represent the ramp rate of the unit respectively; Δt represents the unit ramp time; 0-1 variables m and n represent the start and stop actions of the unit respectively; Respectively represent the minimum start and stop time of the unit; Respectively represent the maximum and minimum output limits of the unit; Formulas (5) and (6) represent the ramp constraints of the unit; Formulas (7) and (8) represent the minimum start-up and shutdown time constraints of the unit; Formulas (9) and (10) represent the start-up and shutdown 0-1 variable constraints of the unit; Formula (11) represents the upper and lower output limits of the unit; The relevant constraints for wind turbines are as follows: Among them, w represents from 1 to N w The wind farm serial number; represents the output of wind farm w in period t; represents the wind curtailment of wind farm w in period t; represents the predicted value of wind power resources in period t; Formula (12) represents the output constraint of the wind turbine; The relevant constraints for CSP units are as follows: IS c,min ≤ES c,t ≤ES c,max (17) IS c,ini =ES c,0 (18) Among them, c represents from 1 to N C Serial number of the CSP unit; It represents the predicted value of solar energy absorbed by CSP unit c in period t; Energy provided for electric heating systems; To normalize the energy loss in each link to a unified expression of the concentrated solar collector system; The heat input into the heat storage system from the concentrated solar collector system; The heat storage system releases the heat entering the power generation system for power generation; are the maximum input and output heat allowed by the heat storage system; ES c,t represents the heat storage capacity of CSP unit c in period t; η in , η out are the heat input efficiency and heat output efficiency of the heat storage system respectively; ES c,min ,ES c,max Respectively represent the upper and lower limits of heat storage of the heat storage system; ES c,ini ,ES c,end They represent the initial heat storage and final heat storage of the heat storage system respectively; They are all 0-1 variables, 0 represents shutdown, 1 represents startup; Respectively represent the start and stop status of the steam turbine; It is the initial start and stop state of the steam turbine; Represents the start and stop action of the steam turbine; Respectively represent the minimum start and stop time of the steam turbine; is the output of turbine c of the power generation system at time t, which includes two parts: the power delivered to the electric heating system And the power supplied to the system α c , β c are coefficients related to the thermal-electric conversion efficiency of steam turbines; Indicates the efficiency of converting the power supplied to the electric heating system into heat in the working fluid; Indicates the amount of heat delivered to the working fluid by the electric heating system; They represent the reserve output of the power generation system respectively; Indicates the efficiency of the power generation system in converting heat into electrical energy; Formula (13) represents the heat balance constraint of the solar thermal power generation system; Formula (14) and (15) represent the upper and lower limit constraints of the heat flow of the heat storage system; Formula (16) represents the dynamic constraint that the heat storage capacity of the heat storage system should meet the time change; Formula (17) represents the upper and lower limit constraints of the heat storage capacity of the heat storage system; Formula (18) and (19) represent the constraints on the initial and final heat storage capacity of the heat storage system; Formula (20)-(23) represent the start-stop 0-1 variable constraints that the steam turbine needs to meet; Formula (24) and (25) represent the minimum start-stop time constraints that the steam turbine meets during operation; Formula (26) can be understood as follows: is the heat flowing into the unit, Represents the heat consumed when the unit is started. The difference between the two is the actual heat used by the turbine for power generation, which is then multiplied by the efficiency coefficient α c is the actual output of the unit; Formula (27) shows that the output of the CSP unit can be divided into two parts: For the flow of input system, To supply power to the electric heating system, is the power flowing into the electric heating system With efficiency is converted into heat energy in the heat transfer medium; Formula (28) represents the upper and lower limits of the output of the CSP unit, and the upper and lower limits of the power of the electric heating system; Formula (29) represents that when the steam turbine is in the power generation state, the upward reserve provided by the power generation system shall not exceed and the available heat storage system heat release range; Formula (30) indicates that the upward reserve provided by the electric heating system does not exceed its expected output. Similarly, the downward reserve provided by the power generation system and the electric heating system is constrained by Formulas (31) and (32); The relevant constraints for the system are as follows: Among them, i represents from 1 to N I The load node number; D i,t represents the load of node i in period t; represents the load abandonment size of node i in time period t; GST represents the transfer factor matrix of thermal power unit output to the line; GSW represents the transfer factor matrix of wind power unit output to the line; GSC represents the transfer factor matrix of solar thermal unit output to the line; GSF represents the transfer factor matrix of node load to the line; F l max Represents the maximum value of the flow allowed to flow through the line in the forward and reverse directions; Formula (33) indicates that the system output and load are always balanced; Formula (34) indicates that the current flowing through each branch in the forward and reverse directions cannot exceed the upper limit of the current allowed by the branch; Formulas (35) and (36) indicate that the reserve provided by the thermal power unit, solar thermal unit and electric heating system must meet the minimum upward / downward reserve requirements of the system; The relevant constraints for phase 2 are as follows: The relevant constraints for thermal power units are as follows: Formulas (37) and (38) represent the ramping constraints that the output of thermal power units must meet in stage 2; Formula (39) represents the upper and lower limit constraints of the unit output; Formula (40) represents that the output of thermal power units in stage 2 is equal to the sum of the output in stage 1 and the upward / downward spinning reserve put into operation; Formula (41) represents that the output of the upward / downward spinning reserve put into operation in stage 2 does not exceed the spinning reserve capacity deployed in stage 1; The relevant constraints for wind turbines are as follows: in, is the wind power resource value corresponding to scenario s; Formula (42) has the same meaning as Formula (12) in stage 1 and will not be repeated here; The relevant constraints for CSP units are as follows: in, is the light and heat resource value corresponding to scene s; Formula (53) indicates that the operating state of the power generation system is determined in stage 1; Formulas (54) and (56) indicate that the output allocation of the unit is equal to the sum of the planned output of the day before and the real-time deployed spinning reserve; Formulas (55) and (57) indicate that the real-time reserve allocation should be limited to the feasible range, that is, the reserve output of the power generation system and the electric heater system put into operation does not exceed the planned deployment reserve obtained in stage 1; the other constraints are the same as those in stage 1, but are replaced by the expression form of the variables in stage 2; The relevant constraints for the system are as follows: The relevant constraints for stage 3 are as follows: The relevant constraints for thermal power units are as follows: The relevant constraints for wind turbines are as follows: The relevant constraints for CSP plants are as follows: The relevant constraints for the system are as follows: In summary, objective functions (1)-(4) and constraints (5)-(85) constitute a multi-stage stochastic optimization scheduling model for a power system containing CSP.

4. A multi-stage random optimization scheduling method for a solar thermal power generation system according to claim 3, characterized in that: In step 4, the load aggregation optimization algorithm is used to modify the stage 3 of the model established in step 3. The stage 3 model modified by the load aggregation method is as follows: The objective function of stage 3 is changed to: Where v represents the time period number after load aggregation, which ranges from 1 to N. V ; Y v Indicates the length of the timing segment v of the LSTC curve; The relevant constraints for thermal power units are as follows: When the operating status of a thermal power unit changes, the power is limited to The unit outputs of the same time segment in the aggregated load curve are limited to the same value, which makes it difficult to accurately describe the above situation. Therefore, the weighted average formula of formula (87) is used to approximately limit the unit outputs of the time segment where the start and stop actions occur to In the formula, Y ave represents the average length of each time segment, which is calculated by formula (88); ave Considering that the power adjustment margin of the unit is related to the length of the timing segment, the ramp constraint can be modified as shown in equations (89) and (90). Equations (91) to (94) are the minimum start-up and shutdown time constraints of the thermal power unit modified according to the load state transfer curve. Taking the minimum start-up time constraint (91) as an example, the parameter Take the minimum value that satisfies formula (93), which means the minimum number of sequential load segments that the unit needs to keep in the on state to meet the minimum on-time constraint, and the minimum off-time parameter The method of determining is the same; The relevant constraints for wind turbines are as follows: The relevant constraints for CSP plants are as follows: Among them, equations (110)-(113) are modified by analogy with the minimum start-stop time constraint of thermal power units, which will not be repeated here; The relevant constraints for the system are as follows: After the original time series load curve is aggregated, the output curve of the renewable energy scenario should also be changed accordingly to meet the calculation needs, with the wind power resource scenario curve Take the example of obtaining: divide the original curve into segments according to the length Y of each time series v Segmentation, the time segment v corresponds to the Y in the original curve v The length of time, assuming that the value corresponding to each time is equally likely to appear in this time segment, the value corresponding to each time After summing, take the average value as the value of the time series segment v, that is, Similar segmentation processing is also performed on the light and heat resource data.

5. A multi-stage random optimization scheduling method for a power system including solar thermal power generation according to claim 4, characterized in that: In step 4, the accelerated optimization algorithm of the CSP unit aggregation is used for stage 3 of the model established in step 3 to accelerate the optimization of the model solution; specifically, the operating state variables of the CSP unit in the original stage 3 model are And the unit start and stop action variables All use integer variables, with values ​​of 0, 1, 2, ..., N C , N C is the number of units of this type, indicating the number of units in class c that are in operation, starting, or shutting down. Modifications are made based on the original stage 3 model. The constraints of thermal power and wind turbines remain unchanged, and the CSP units are aggregated. The relevant constraints of the CSP power station are modified as follows: Among them, for the aggregated unit type c, the parameters of its heat storage link, such as heat storage capacity, minimum and maximum power, etc., are the sum of the parameters of the units in the same category.

6. A multi-stage random optimization scheduling method for a power system including solar thermal power generation according to claim 5, characterized in that: In step 4, after the model of stage 3 is modified using two accelerated optimization algorithms, the objective functions (1)-(3), (86), stage 1 constraints (5)-(36), stage 2 constraints (37)-(59), stage 3 constraints (87)-(98), (117)-(134) together constitute a comprehensive model of multi-stage random optimization scheduling accelerated optimization of the power system containing solar thermal power generation.

7. A multi-stage random optimization dispatching system for a solar thermal power generation system, characterized in that: include: The data acquisition module obtains the parameters of thermal power units and solar thermal units in the power system, as well as the prediction curve of new energy output; The scenario tree construction module generates at least five scenarios based on the prediction curve of renewable energy output using the scenario generation method, and constructs a multi-stage scenario tree structure to describe the uncertainty of solar thermal power generation and wind power generation; The model building module, based on the scenario tree structure, adopts a multi-stage random programming model, combines the parameters of thermal power units and solar thermal units, and constructs a three-stage random optimization scheduling model for the power system containing solar thermal power generation. Among them, stage 1 is the day-ahead scheduling for the first day, and the day-ahead start and stop plan of the unit is solved based on the predicted value of the new energy output; stage 2 is based on the scenario value of the new energy output, using the principle of economic allocation, and real-time allocation of the unit output and reserve planned for the first day; stage 3 is the forward-looking operation from the second day to the seventh day, also based on the principle of economic allocation, considering the possible operating conditions in the next few days, arranging and planning the unit output in the next few days, and the heat storage capacity of the solar thermal power station heat storage system; The model optimization module uses two accelerated optimization methods, load aggregation and CSP unit aggregation, to optimize the phase 3 involving a longer time period, and builds an accelerated optimization comprehensive model; The model solving module solves the accelerated optimization comprehensive model to obtain the unit's day-ahead scheduling plan and solution time.

8. A multi-stage random optimization scheduling system for a solar thermal power generation power system according to claim 7, characterized in that: In the scene tree construction module, the scene generation method uses the Weibull distribution to construct the scene.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of a multi-stage stochastic optimization scheduling method for a solar thermal power generation power system according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Peak-shaving cost considered method for configuring the heat storage capacity of solar thermal storage power plant with thermal storage

    CN107425537A

  • Method for distributing electrical energy in a power network with a number of distribution network cells

    EP2533389A2