Maintenance method for large-angle high rock slope greening

By drilling planting holes and drainage holes on high-angle rock slopes, and laying pipeline components and cotton wire siphon watering using S-shaped paths, the problems of poor greening effect and vulnerability to damage are solved, and the stability of vegetation is achieved Planting and water-saving effects.

CN119054564APending Publication Date: 2024-12-03MCC SHENKAN ENG TECH CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411392474.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The greening effect of high rock slopes at high angles is poor and vulnerable to damage. The existing technology such as the web spraying method has insufficient adhesion and durability, especially after rainwater erosion, which may lead to partial failure.

Method used

Planting holes and drainage holes are drilled on the rock wall, and pipeline components and cotton thread are laid through S-shaped paths to ensure water supply and fixation of vegetation. Watering with cotton thread is siphon, combined with the design of sand, gravel and planting soil, to achieve stable planting of vegetation and Save water.

Benefits of technology

It effectively solves the problem that planting soil is difficult to retain, realizes the connection between multiple planting holes and water supply facilities, ensures the stable growth of vegetation through the flexibility and corrosion resistance of cotton thread, and has significant water-saving effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119054564A_ABST
    Figure CN119054564A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of engineering slope greening, and particularly provides a maintenance method for large-angle high rock slope greening, which specifically comprises the following steps: drilling planting holes in a rock wall; a drainage hole is drilled in the rock wall; by taking the pipeline assembly laid with the S-shaped path as a benchmark, fixing components are installed on the rock wall, and cotton thread inserting holes are formed in the pipeline assembly according to the hole distance of the planting holes; laying a pipeline assembly along the fixing component according to an S-shaped path, and adjusting the position of the pipeline assembly to ensure that the cotton thread insertion holes are in one-to-one correspondence with the planting holes; the starting end of a cotton thread is assembled to the cotton thread insertion hole, and the tail end of the cotton thread extends into the planting hole; the planting holes are filled with a small amount of gravel; and vegetation is inserted into the planting holes. And the planting holes are filled with planting soil. According to the method, the planting holes are drilled in the rock wall, and the problem that planting soil is difficult to retain in the rock slope environment is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering slope greening, and in particular provides a maintenance method for greening a high rock slope with a large angle. Background Art

[0002] With the continuous promotion of the concept of green mines, many regions have actively engaged in mine restoration and management. However, in the management process, the greening of high-angle rock slopes faces problems such as high technical complexity, poor greening effects, and easy damage after greening. For example, the common greening method of creepers is to plant creepers at the bottom of the slope and use its climbing characteristics to cover the slope to achieve the purpose of greening. But when facing higher slopes, it often takes a long time to achieve the expected greening effect.

[0003] Although the net-hanging spraying technology can achieve greening effects in a relatively short period of time, its process is relatively complicated, involving multiple steps such as anchor implantation, net hanging, grass stick tying, and grass seed spraying. For large-angle slopes, the adhesion of the spraying layer is poor, and once it is washed away by rain, the greening effect may be partially ineffective. Summary of the invention

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a maintenance method for greening high rock slopes with large angles, the specific steps of which include:

[0005] Step 1: Drill planting holes on the rock wall;

[0006] Step 2: Drill drainage holes on the rock wall;

[0007] Step 3: Using the pipe assembly for laying the S-shaped path as a reference, install the fixing member on the rock wall, and open the cotton thread insertion hole on the pipe assembly with reference to the hole spacing of the planting holes;

[0008] Step 4: Lay the pipe assembly along the fixed component in an S-shaped path, and adjust the position of the pipe assembly to ensure that the cotton thread insertion holes correspond to the planting holes one by one;

[0009] Step 5: Assemble the starting end of the cotton thread to the cotton thread insertion hole, and extend the end of the cotton thread into the planting hole;

[0010] Step 6: Fill a small amount of sand and gravel into the planting hole;

[0011] Step 7: Insert vegetation into the planting hole;

[0012] Step 8: Fill the planting hole with planting soil.

[0013] Furthermore, the planting hole is an inclined hole that is lower at the back and higher at the front, and the inclination angle is 30° to 60°.

[0014] Furthermore, the multiple planting holes constructed in step one are distributed in a matrix shape, and positions of two adjacent rows or columns are staggered.

[0015] Furthermore, the drainage hole constructed in step 2 is an inclined thin hole that is higher at the back and lower at the front, and the rear end of the drainage hole is connected to the rear end of the planting hole.

[0016] Furthermore, a water collecting device is provided at the top of the pipe assembly, and a screw cap is provided at the end of the pipe assembly.

[0017] Furthermore, a positioning piece is pre-installed at the end of the cotton thread, and the positioning piece is placed at the bottom of the planting hole.

[0018] The beneficial effects of using the present invention are:

[0019] This method uses a method of drilling planting holes on the rock wall to solve the problem that planting soil is difficult to retain in a rock slope environment;

[0020] By adopting a single-tube S-shaped series connection method, multiple planting holes can be connected to the water supply facilities at the same time, and the vegetation can be irrigated by cotton thread siphon method, which can effectively save water. The cotton thread material has good flexibility, corrosion resistance, aging resistance and environmental protection properties. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a schematic diagram of the present invention and the rock wall surface;

[0022] Figure 2 This is a cross-sectional view of the rock wall at the plant planting hole;

[0023] The reference numerals include: 1, planting hole; 2, sand and gravel; 3, planting soil; 4, cotton thread; 5, positioning piece; 6, drainage hole; 7, pipeline assembly; 8, fixing member; 9, vegetation; 10, water collection device; 11, screw cap; DETAILED DESCRIPTION

[0024] The present invention is described in detail below with reference to the accompanying drawings.

[0025] Reference Figure 1-Figure 2 , a maintenance method for greening high rock slopes with large angles, the specific steps are as follows:

[0026] Step 1: Drill a planting hole 1 on the rock wall;

[0027] The staff wore protective gear for high-altitude work and used drilling equipment to drill multiple planting holes on the rock wall1;

[0028] Specifically, the planting hole 1 is an inclined hole with a lower back and a higher front, and the inclination angle is 30° to 60°;

[0029] The plurality of planting holes 1 are distributed in a matrix shape, with two adjacent rows or columns being staggered, and the hole spacing being no less than 500 mm;

[0030] Preferably, according to the type of vegetation 9 to be planted, the diameter of the planting hole 1 is 80-120 mm, and the hole depth is 300-500 mm.

[0031] Step 2: Drilling drainage holes 6 on the rock wall;

[0032] Specifically, the drainage hole 6 is an inclined thin hole that is higher at the back and lower at the front, and the rear end of the drainage hole 6 is connected to the rear end of the planting hole 1.

[0033] Step 3: Using the pipe assembly 7 for laying the S-shaped path as a reference, a fixing member 8 is installed on the rock wall, and a cotton thread insertion hole is opened on the pipe assembly 7 with reference to the hole spacing of the planting holes 1.

[0034] Step 4: Lay the pipe assembly 7 along the fixing member 8 in an S-shaped path, and adjust the position of the pipe assembly 7 to ensure that the cotton thread insertion holes correspond to the planting holes 1 one by one;

[0035] Wherein, a water collecting device 10 is provided at the top of the pipe assembly 7, and a screw cap 11 is provided at the end of the pipe assembly 7;

[0036] The water collecting device 10 can collect rainwater and temporarily store water. It is filled up during the dry season, and the water is slowly transported to each planting hole 1 through the pipe assembly 7 and the cotton thread 4.

[0037] Step 5: Assemble the starting end of the cotton thread 4 to the cotton thread insertion hole, and extend the end of the cotton thread 4 into the planting hole 1;

[0038] Specifically, a positioning piece 5 is pre-installed at the end of the cotton thread 4, and the positioning piece 5 is placed at the bottom of the planting hole 1;

[0039] When the planting hole 1 is filled with planting soil 3, the positioning member 5 is buried under the planting soil 3. In this case, the cotton thread 4 is subjected to a large pulling force and will not easily fall out of the planting soil 3.

[0040] Preferably, the cotton thread 4 is made of corrosion-resistant and anti-aging materials, such as rock wool;

[0041] The positioning member 5 is a rod or a block.

[0042] Step 6: Fill a small amount of sand and gravel 2 into the planting hole 1;

[0043] The gravel 2 can completely cover the bottom of the planting hole 1, and the space occupied by it does not exceed 20% of the inner space of the planting hole 1;

[0044] It ensures that the bottom of the planting hole 1 has good air permeability and plays a filtering role at the same time, preventing the planting soil 3 from flowing out from the bottom of the planting hole 1 with the water, and avoiding the situation where the drainage hole 6 is blocked.

[0045] Step 7: Insert vegetation 9 into the planting hole 1.

[0046] Step 8: Fill the planting hole 1 with planting soil 3.

[0047] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, many changes can be made in the specific implementation methods and application scopes based on the ideas of the present invention. As long as these changes do not deviate from the concept of the present invention, they all belong to the protection scope of the present invention.

Claims

1. A maintenance method for greening high rock slopes at large angles, characterized in that: The specific steps include: Step 1: Drill planting holes on the rock wall; Step 2: Drill drainage holes on the rock wall; Step 3: Using the pipe assembly for laying the S-shaped path as a reference, install the fixing member on the rock wall, and open the cotton thread insertion hole on the pipe assembly with reference to the hole spacing of the planting holes; Step 4: Lay the pipe assembly along the fixed component in an S-shaped path, and adjust the position of the pipe assembly to ensure that the cotton thread insertion holes correspond to the planting holes one by one; Step 5: Assemble the starting end of the cotton thread to the cotton thread insertion hole, and extend the end of the cotton thread into the planting hole; Step 6: Fill a small amount of sand and gravel into the planting hole; Step 7: Insert vegetation into the planting hole; Step 8: Fill the planting hole with planting soil.

2. A maintenance method for greening high rock slopes at large angles according to claim 1, characterized in that: The planting hole is an inclined hole with a low back and a high front, and the inclination angle is 30° to 60°.

3. A maintenance method for greening high rock slopes at large angles according to claim 1, characterized in that: The multiple planting holes constructed in step one are distributed in a matrix shape, with positions of two adjacent rows or columns being staggered.

4. A maintenance method for greening high rock slopes at large angles according to claim 1, characterized in that: The drainage hole constructed in step 2 is an inclined thin hole that is higher at the back and lower at the front, and the rear end of the drainage hole is connected to the rear end of the planting hole.

5. A maintenance method for greening high rock slopes at large angles according to claim 1, characterized in that: The top of the pipeline assembly is provided with a water collecting device, and the end of the pipeline assembly is provided with a screw cap.

6. A maintenance method for greening high rock slopes at large angles according to claim 1, characterized in that: A positioning piece is pre-installed at the end of the cotton thread, and the positioning piece is placed at the bottom of the planting hole.

Citation Information

Patent Citations

  • Planting hole and method for using planting hole to green rock slope and breakage mountain body

    CN101258814A

  • Rock slope greening construction method

    CN108432495A

  • Ecological ditch slope protection structure

    CN109137823A

  • Novel ecological protection slope for water conservancy projects

    CN212452479U

  • Rock wool hole type stone slope greening device

    CN216586596U