Manufacturing process of integrated machine room trolley

By designing the small frame and the computer room enclosure wall as an integral structure, installing two layers of common bases on the chassis and using corrugated plates to make the enclosure wall, the existing technology of small frame and computer room enclosure wall occupying a large area and work on the existing technology. The problem of poor performance achieves precise installation and efficient use.

CN119057399AActive Publication Date: 2024-12-03NANTONG COSCO HEAVY IND
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202411291112.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-12-03
Estimated Expiration
2044-09-14

AI Technical Summary

Technical Problem

The existing small frame and the computer room enclosure are two separate components, which leads to a large area and poor working performance, making it difficult to achieve accurate installation of the overall structure.

Method used

The small frame and the machine room enclosure wall are used as an integral structure, and are welded by columns and connection oblique braces. The driver's room hanger is connected to the chassis in the form of a hinge shaft, and two layers of common bases are installed on the chassis to enhance the load-bearing capacity. Corrugated plates are used. We use the formula tube to manufacture the wall of the computer room to prevent fire and moisture.

Benefits of technology

The overall structural installation of the small frame and the computer room enclosure wall is realized, which reduces the floor area, improves the working performance and service life of the small frame, and ensures the fire and moisture resistance of the computer room.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057399A_ABST
    Figure CN119057399A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of trolley frame welding and assembling, and discloses a manufacturing process of an integrated machine room trolley, which comprises the following steps: step 1, manufacturing a trolley frame; the trolley frame is divided into an anchoring side and a non-anchoring side, and a horizontal wheel bracket is mounted on the trolley frame on the anchoring side; 2, manufacturing a machine room main body frame and connecting stand columns; the machine room body frame is mainly composed of H-shaped steel and steel pipes. The H-shaped steel is assembled into a square frame sheet body; step 3, manufacturing a base plate; fourthly, the chassis and the machine room body frame are assembled; 5, machine room enclosure bulkheads are manufactured; 6, manufacturing a cab hanging bracket; and seventhly, structure final assembly is conducted. The trolley frame and the machine room enclosure bulkhead are of an integral structure and are connected through the stand columns and the inclined struts in a welded mode, the cab hanging bracket is connected with the chassis in a hinged shaft mode, the requirement for the installation precision of the trolley frame is met, meanwhile, the size of the machine room enclosure bulkhead is considered, and the occupied area of the machine room trolley is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of trolley frame welding and assembly, in particular to a manufacturing process of an integrated machine room trolley. Background Art

[0002] Conventional machine room trolleys are used for container loading and unloading at docks. The trolley frame structure and the machine room wall structure are two separate components with unrelated sizes, and the machine room trolley occupies a relatively large area.

[0003] The relevant reference document CN113464232A discloses a process for manufacturing and assembling a small vehicle frame, in which the small vehicle frame is divided into six components, which are manufactured separately and then assembled. However, there is a large deviation when assembling the common base, and the working performance of the small vehicle frame is poor. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a manufacturing process for an integrated machine room trolley which reduces the floor space occupied by the machine room trolley and ensures that the working performance of the trolley frame is continuously good.

[0005] In order to solve the above technical problems, the present invention provides a manufacturing process of an integrated machine room trolley, comprising the following steps: Step 1: Make a small car frame; The trolley frame is divided into an anchoring side and a non-anchoring side. The horizontal wheel bracket is installed on the trolley frame on the anchoring side. Bolt holes are drilled on the horizontal wheel bracket and the trolley frame. The trolley frame adopts the reverse manufacturing method. Step 2: Make the main frame of the machine room and connect the columns; The main frame of the machine room is mainly composed of H-shaped steel and steel pipes; the H-shaped steel is assembled into a square frame body, the H-shaped steel panels in the middle of the frame body are welded together through the connecting seat, and the H-shaped steel panels at the four corners of the frame body are butt welded; the steel pipe and the connecting plate are grouped together, and the group is installed on the bottom surface of the frame body; the connecting plate parts are punched; Step 3: Make the chassis; The middle I-beam structure, front and rear longitudinal beams and chassis are welded on the tire frame in sequence; then the chassis and the tire frame are turned over together, and the pattern plate is welded on the chassis; finally, the common base is installed on the chassis; Step 4: Assemble the chassis and the main frame of the machine room; Temporary support channel steel is installed on the chassis at a height of 2100m. The main frame of the machine room is hoisted onto the chassis, the height and horizontal position are determined, and the horizontal diagonal braces at the four corners of the square frame of the main frame of the machine room are installed; Step 5: Make the wall of the machine room; Step 6: Make the driver's cab hanger; Step 7: Structural assembly; Install the upper support on one long side of the main frame of the machine room, and install the lower support on a long beam of the chassis; Install the machine room wall, cab hanger and trolley frame on the main frame of the machine room in sequence; assemble the upper connecting seat and lower connecting seat of the cab hanger with the upper support and lower support; adjust the level of the cab hanger according to the level of the chassis, and weld the hinge shaft after the adjustment is completed; According to the horizontal size of the main frame of the machine room, mark the trimming line of the column, trim the margin, and assemble the left and right trolley frames; since the trolley frame is eccentric to the column, it is necessary to connect the diagonal brace to the bottom of the trolley frame on the column, adjust the horizontal and center positioning of the trolley frame, and check whether the level and margin meet the processing requirements after welding; the trolley frame is welded to the top of the column, and pay attention to the position of the anchoring side during assembly.

[0006] By adopting the above technical solution, the trolley frame and the machine room wall are an integral structure, which are welded together by columns and connecting diagonal braces in the middle, and the driver's cab hanger is connected to the chassis in the form of a hinge axis. While meeting the installation accuracy of the machine room trolley, it also takes into account the size of the machine room wall. Compared with the traditional trolley frame and machine room wall as two separate components with unrelated sizes, the footprint is greatly reduced.

[0007] Preferably, in step 2, the columns are adjusted to be vertical during installation; 250mm slow welding is left on the top of the columns when they are assembled; temporary supports are installed on the columns, and the columns are installed on the connecting seats of the main frame of the machine room, with a 50mm trimming margin on the top of the columns.

[0008] By adopting the above technical solution, the column can be installed stably and the trolley frame can be easily assembled.

[0009] Preferably, in step three, when making the middle welded I-beam structure, the panel grooves are uniformly facing upwards, and the structure is made on a frame, and welded after straightening, leaving 200 mm slow welds at both ends of the beam.

[0010] By adopting the above technical solution, the welding angle and speed can be better controlled, the uniformity of the welding seam can be improved, and the occurrence of welding defects can be avoided. Leaving a 200mm slow weld provides convenience for subsequent operation and maintenance.

[0011] Preferably, in step three, the front and rear longitudinal beams are I-beam structures. When manufacturing the I-beam structure, the connecting plates are in bulk and do not participate in the panel assembly. The web plates and connecting plates are centrally assembled and welded, and the panel assembly seams are fully penetrated and welded.

[0012] By adopting the above technical solution and using I-beams to make longitudinal beams, the load pressure can be better distributed and borne, thereby reducing material waste while ensuring structural strength.

[0013] Preferably, in step three, when installing the common base, a common base positioning line is drawn with the center of the chassis as a reference; Position and install the first layer of the public base, hoist the first layer base, add temporary support L100*10 angle steel between the reducer bases, check the size and the corresponding hard gear, adjust the level, report the pre-welding size, weld after passing the inspection, weld in the middle first and then weld symmetrically on both sides; Position and install the second layer of the public base, remove the temporary support of the first layer, check the size and the corresponding hard stop, adjust the level, weld the middle first and then weld symmetrically on both sides, and do not weld the baffle and pad of the second layer base.

[0014] By adopting the above technical solution and installing two layers of common base on the chassis, the lifting load can be effectively dispersed and borne, the carrying capacity of the trolley frame can be further enhanced, the working performance of the trolley frame can be ensured to be continuously good, and the service life of the machine room trolley can be improved.

[0015] Preferably, in step five, the enclosure wall of the machine room is mainly composed of four walls and a roof, the walls include 1.5 mm corrugated plates and square tubes, the square tubes are located at the four corners, and the 1.5 mm corrugated plates are installed between two square tubes by laser welding; the roof structure is welded by 3 mm corrugated plates and square tubes; the bottom of the enclosure wall of the machine room is sealed with 2 mm bent plates.

[0016] By adopting the above technical solution, the machine room walls are made of corrugated plates and square tubes, which can effectively prevent fire and moisture, increase the service life of the machine room trolley, and use laser welding to effectively control structural deformation.

[0017] Preferably, in step six, the driver's cab hanger is mainly composed of an upper connecting seat, a lower connecting seat, a pipe support and a driver's cab connecting frame; the upper connecting seat is processed with a reamed hole, and is only position-welded with the pipe support and welded during assembly; the lower connecting seat and the driver's cab connecting frame are equipped with drilled holes; the two driver's cab connecting frames are connected by a connecting pipe, and a pipe support is set on the top surface of the driver's cab connecting frame.

[0018] By adopting the above technical solution, the upper and lower connecting seats, pipe supports, and the driver's cab connecting frame are combined into a driver's cab hanger, so that the driver's cab is effectively fixed and supported, ensuring the stability and safety of the driver's cab during the working process, ensuring the safety of the driver's working environment, and enabling the driver to complete the operation task efficiently.

[0019] Compared with the prior art, the present invention has the following beneficial effects: 1. The trolley frame and the machine room wall of the present invention are of an integral structure, which are welded and connected by columns and diagonal braces in the middle. The driver's cab hanger is connected to the chassis in the form of a hinge shaft, which not only meets the installation accuracy of the trolley frame, but also takes into account the size of the machine room wall. Compared with the traditional trolley frame and the machine room wall, which are two separate components with unrelated sizes, the area occupied by the trolley in the machine room is greatly reduced.

[0020] 2. The present invention adopts a structural form of installing two layers of common base on the chassis, which can effectively disperse and bear the lifting load, further enhance the carrying capacity of the trolley frame, ensure the continuous good working performance of the trolley frame, and improve the service life of the machine room trolley.

[0021] 3. The present invention uses corrugated plates and square tubes to manufacture the machine room walls, which are effectively fireproof and moisture-proof, increase the service life of the machine room trolley, and use laser welding to effectively control structural deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a schematic diagram of the structure of the small vehicle frame of the present invention; Figure 3 This is a schematic diagram of the main frame structure of the computer room of the present invention; Figure 4 This is a schematic diagram of temporary support for the installation of a column of the present invention; Figure 5 This is a schematic diagram of the chassis structure of the present invention; Figure 6 This is a schematic diagram of the assembly of the chassis and the main frame of the machine room of the present invention; Figure 7 This is a schematic diagram of the wall structure of the machine room of the present invention; Figure 8 It is a schematic diagram of the structure of the driver's cab hanger of the present invention; Fig. 9 This is a schematic diagram of the general assembly tire frame of the present invention; Fig.10 It is a top view of the general assembly tire frame of the present invention.

[0023] Figure number: 1. Trolley frame, 2. Column, 3. Main frame of machine room, 4. Chassis, 5. Driver's cab hanger, 6. Machine room wall, 7. Assembly frame, 8. H-shaped steel, 9. Connecting plate, 10. Steel pipe, 11. Horizontal diagonal brace, 12. Connecting seat, 13. Common base, 14. Upper support, 15. Lower support, 16. Diagonal brace, 17. Upper connecting seat, 18. Lower connecting seat, 19. Pipe support, 20. Driver's cab connecting frame, 21. Bearing seat, 22. Horizontal wheel bracket, 23. Anchor side. DETAILED DESCRIPTION

[0024] The manufacturing process of the integrated machine room trolley includes the following steps: Step 1: Make the car frame like Figure 1 , 2 As shown, the trolley frame 1 is divided into an anchoring side and a non-anchoring side, and a horizontal wheel bracket 22 is installed on the trolley frame 1 on the anchoring side 23; the horizontal wheel bracket 22 and the trolley frame 1 are equipped with drilled bolt holes.

[0025] The trolley frame 1 adopts the reverse manufacturing method, and the high and low tire frames need to be made according to the structural form. The bottom plate is used as the reference, and the high and low tire frames are fixed to the top plate; the bottom plate is welded, and the bottom plate groove marks the partition line and the side plate line on the structural surface; the partition and side plate are positioned and assembled; the side plate groove is welded on the structural surface, first the vertical fillet welding and then the flat fillet welding.

[0026] Assemble the bearing seat 21 on one side. The bearing seat 21 is first processed in pairs, and the hole is left with a margin to form an integral structure for overall marking and boring during assembly; the bearing seat 21 is positioned according to the center line of the structure; assemble the motor base support assembly; make full penetration welds at the grooves at both ends of the welding side plate. Position and weld the side plate and the bearing seat 21 on the other side. The bearing seat 21 needs to be positioned and installed according to the installed bearings to prevent too much concentricity difference, resulting in insufficient margin for the bearing hole for overall processing. Install other parts such as the sealing plate and buffer support tube.

[0027] After welding, the pyrotechnician corrects the overall size, checks whether the bearing seat 21 can still meet the processing conditions, and draws the center cross line for subsequent reference. Adjust the horizontal and vertical structure of the trolley frame, assemble and weld the motor base, and do not weld the motor base pad for the time being. After the final assembly, measure the size and process the material according to the actual situation.

[0028] Step 2: Make the main frame of the machine room and connect the columns like Figure 3 As shown, the main frame 3 of the machine room is mainly composed of H-shaped steel 8 and steel pipes 10. In order to reduce the amount of assembly welding, the H-shaped steel structure is first welded into a small group to prevent the assembled structure from being deformed too much and the size is not well controlled. The H-shaped steel 8 is assembled into a square frame sheet. The H-shaped steel 8 panels in the middle of the frame sheet are welded together through a connecting seat 12, and the H-shaped steel 8 panels at the four corners of the frame sheet are butt welded. The H-shaped steel 8 panels on the long sides of the frame sheet are punched on site. Horizontal diagonal braces 11 are installed on the frame sheet, and the horizontal diagonal braces 11 and the diagonal brace connecting plates are punched. The four horizontal diagonal braces are numbered 1, 2, 3, and 4, and steel stamps are knocked on the corresponding diagonal brace connecting plates. The steel pipe 10 and the connecting plate 9 are made into a small group, and the small group is installed on the bottom surface of the frame sheet; the connecting plate 9 is punched in part status.

[0029] Check the size and positioning; prepare for welding and assemble the extinguishing plate; the overall welding requirements are to weld symmetrically from the inside to the outside, and step by step on both sides of the center; the butt joint of the H-shaped steel 8 panel is fully penetrated UT100%; after assembly, complete the panel butt joint at the four corners first; then weld the middle beam: the butt weld of the H-shaped steel 8 panel and the connecting seat 12; then weld the vertical fillet welds at the four corners of the frame sheet; then weld the vertical fillet welds at the intersection of the middle beam 23 from the inside to the outside; horizontal correction.

[0030] like Figure 4As shown, when installing the column 2, adjust the column 2 vertically; when the column 2 is grouped, leave 250mm slow welding at the top; install a temporary support on the column 2, and weld the column 2 to the temporary support. There is a 50mm trimming margin on the upper part of the column 2, and the trimming margin is cut according to the actual level when the trolley frame 1 is installed. The column 2 is installed on the connecting seat 12 of the main frame 3 of the machine room, so that the column can be installed stably and convenient for the assembly of the trolley frame 1.

[0031] Step 3: Make the chassis like Figure 5 As shown, the chassis structure is mainly a welded I-beam structure. The I-beam is first made into a group, and the whole is marked, assembled and welded. Ceramic pads are used for the assembly and docking of the I-beam. Note that the grooves are all facing upward during assembly.

[0032] group: The middle welded I-beam structure and the front and rear longitudinal beams are made on a horizontal frame. The panel grooves are uniformly facing upwards and can be welded after straightening. A 200mm slow weld is left at both ends of the beam to better control the welding angle and speed, improve the uniformity of the welding weld, and avoid the occurrence of welding defects. A 200mm slow weld is left at both ends of the beam to facilitate subsequent operation and maintenance. When making the front and rear longitudinal beams, the connecting plate 9 is in bulk and does not participate in the panel assembly. The web and connecting plate 9 are assembled and welded in the center, and the panel seams are fully penetrated and welded. The use of I-beams to make longitudinal beams can better distribute and withstand load pressure, reduce material waste while ensuring structural strength. After the group is finished, it is numbered according to the group drawing, and after correction after welding, it is reported to the quality control inspection for passing.

[0033] Assembly: Make a tire frame with a height of 800m and a flatness of 2mm. Mark the center line and positioning line of the tire frame to facilitate assembly and positioning.

[0034] Chassis production: Marking is based on the center line, check the number of the middle welded I-beam, locate the long beam on the driver's cab side, and adjust the long beam horizontally and vertically; assemble the middle crossbeam according to the group number, assemble in order from inside to outside, with the groove facing upward; check the docking of all beams, check the size and positioning, prepare for welding, and assemble the extinguishing plate. The tire frame and the chassis 4 structures are welded and fixed; the overall welding requirements are from inside to outside, and the two sides of the center are welded symmetrically step by step; the panel butt seam of the I-beam is fully penetrated and UT100% welded; after assembly, the panel butt joint of the four corners of the chassis is completed first; then weld the butt weld of the middle beam panel and then weld the vertical fillet welds of the four corners of the chassis, and then weld the vertical angle at the intersection of the middle beam from the inside to the outside, turn over and weld the flat fillet weld between the web and the upper panel, and weld the remaining loose parts after welding.

[0035] The pattern plate and flat steel are first assembled, and after adjusting the plane, they are installed in the chassis 4 and welded. The pattern plate needs to be placed obliquely into the chassis using a suction cup. The structural chassis and tire frame are welded and fixed before welding, and the welding sequence is symmetrical from the middle to both sides.

[0036] Install the common base: Draw the structural center line and the structural horizontal line, draw the common base 13 positioning line based on the center, check the fixation of the tire frame and the chassis 4 structure, and ensure that the tire frame and the chassis 4 structure are welded and fixed; Position and install the first layer of the common base 13, hoist the first layer of the base, add temporary support L100*10 angle steel between the reducer bases, check the size and the corresponding hard gear, adjust the level, report the size before welding, weld after passing the test, weld the common base 13, first weld the middle and then weld symmetrically on both sides. Position and install the second layer of the common base 13, remove the first layer of temporary support, check the size and the corresponding hard gear, adjust the level, weld the second layer of the common base 13, first weld the middle and then weld symmetrically on both sides, follow the above steps, report the size before welding, weld after passing the test, note that the second layer of the base baffle and pad are not welded, measure the size after the final assembly, and then weld after cutting. The structural form of installing two layers of common base 13 on the chassis 4 can effectively disperse and bear the lifting load, further enhance the carrying capacity of the trolley frame 1, ensure the continuous good working performance of the trolley frame 1, and improve the service life of the machine room trolley.

[0037] The two reel bases are processed after the group is completed, and are assembled and positioned and welded on the chassis 4.

[0038] Step 4: Assemble the chassis and the main frame of the machine room Temporary support channel steel is installed on chassis 4, with a height of 2100m. Diagonal braces are required on both sides of the temporary support for protection. Figure 6 As shown, the main frame 3 of the machine room is hoisted onto the chassis 4 to locate the height and horizontal position. After removing the temporary support, install the horizontal diagonal braces 11 at the four corners of the square frame of the main frame 3 of the machine room, report the dimensions before welding, weld after passing the inspection, mark the structural center line, horizontal line, and re-measure the dimensions.

[0039] Step 5: Make the wall of the machine room like Figure 7 As shown, the machine room wall 6 is mainly composed of four walls and a roof. The wall includes 1.5mm corrugated plates and square tubes. The square tubes are located at the four corners. The 1.5mm corrugated plates are installed between two square tubes and laser welded. The roof structure is welded by 3mm corrugated plates and square tubes. A 1.001mm shrinkage margin is added to the machine room wall 6. The bottom of the machine room wall 6 is sealed with 2mm bent plates, and a full-length square tube or channel steel is used for temporary reinforcement during edge sealing. The machine room wall 6 is made of corrugated plates and square tubes, which is effective in preventing fire and moisture, and prolonging the service life of the machine room trolley. Laser welding is used to effectively control structural deformation.

[0040] Step 6: Make the driver's cab hanger like Figure 8As shown, the cab hanger 5 is mainly composed of an upper connecting seat 17, a lower connecting seat 18, a pipe support 19 and a cab connecting frame 20; the cab hanger 5 has a structural weight of 900kg. The upper connecting seat 17 is processed with a reaming hole, and is only tack welded with the pipe support 19, and welded during assembly. The cab connecting frame 20 is produced by a small group, and after completion, it is drilled with the lower connecting seat 18. The two cab connecting frames 20 are connected by a connecting pipe, and a pipe support 19 is set on the top surface of the cab connecting frame 20. The cab hanger 5 is combined with the upper and lower connecting seats, the pipe support 19, and the cab connecting frame 20 to ensure that the driver's cab is effectively fixed and supported, ensuring the stability and safety of the driver's cab during work, ensuring the safety of the driver's working environment, and enabling the driver to complete the operation task efficiently.

[0041] Step 7: Structural assembly like Fig. 9 , 10 As shown, the assembly tire frame 7 is manufactured, the assembly tire frame 7 is 1000mm high, D400*8 supporting steel pipe, the level of the assembly tire frame 7 is required to be ±2mm, and pay attention to the position of the middle auxiliary steel.

[0042] Assemble the upper support 14 based on the center. Note that the upper support 14 surface and the reaming holes are processed, painted before welding, and the reaming holes are oiled for protection. The upper support 14 is installed on a long side of the main frame 3 of the machine room. In this state, the connection seat on the driver's room hanger 5 needs to be welded, and subsequent welding after the machine room wall 6 is installed is difficult; the lower connection seat 18 only needs positioning welding. The lower support 15 is installed on a long beam of the chassis 4.

[0043] The machine room surrounding wall 6 is installed on the machine room main frame 3, first installing the front and rear side walls, then the left and right side walls, and finally installing the roof, which is bulk.

[0044] Pay attention to the I-beam and the wall side at the roof column 2 position. They need to be sealed with 3mm corrugated board before the roof is assembled, as this position will be difficult to paint later.

[0045] The cab hanger 5 is assembled with the upper support 14 and the lower support 15 of the machine room. Material preparation: connecting hinge shaft, spacer, self-lubricating bearing (existing technology), and painting at the hinge point. The upper connecting seat 17 and the lower connecting seat 18 of the cab hanger 5 are assembled with the upper support 14 and the lower support 15; the cab hanger 5 is adjusted to the level according to the chassis 4, and after the adjustment is completed, the hinge shaft is welded and the auxiliary steel is closed.

[0046] The trolley frame 1 is welded to the column 2. Pay attention to the position of the anchor side 23 during assembly. According to the horizontal size of the main frame 3 of the machine room, mark the trimming line of the column 2 and the connecting plate, trim the margin, and assemble the left and right trolley frames 1. Since the trolley frame 1 is eccentric to the column 2, it is necessary to connect the diagonal brace 16 to the bottom of the trolley frame 1 on the column 2, adjust the horizontal and center positioning of the trolley frame 1, and check whether the horizontal and margin meet the processing requirements after welding.

[0047] The base is wound and welded according to the horizontal and center reference. The level of the main frame 3 and the common base 13 of the machine room is measured, and the cutting thickness of each pad is fed back; the pad is processed according to the actual size and positioned and welded after processing.

[0048] Punch out the structure of the whole machine, the cross center punch for the machine room, the cross punch for the bearing seat 21 of the trolley frame 1 and the center punch for the structure; draw the processing line of the bearing seat 21.

[0049] The trolley frame 1 and the machine room wall 6 of the present application are of an integral structure, which are welded together by columns 2 and connecting diagonal braces 16 in the middle, and the driver's cab hanger 5 is connected to the chassis 4 in the form of a hinge axis, which not only meets the installation accuracy of the machine room trolley, but also takes into account the size of the machine room wall 6. Compared with the traditional trolley frame and the machine room wall as two separate components with unrelated sizes, the floor space occupied is greatly reduced.

[0050] Bearing seat processing: Machining and marking are carried out after the overall welding is completed and inspected to avoid correction and repair grinding after machining.

[0051] Before marking, calibrate the measuring instrument.

[0052] When marking, focus on checking that the verticality between the center line of the hinge and the center line of the machine room structure is within the tolerance range.

[0053] Transfer the center lines of the hinge points to the non-machined surfaces and make four-point sample punches for easy inspection.

[0054] Draw the center lines of all hinge holes at one time, and try to arrange them in the same time period.

[0055] The diameter of the punched hole for machined marking should be controlled within 0.2mm, and the marking accuracy should be strictly controlled.

[0056] When machining and marking, it should be inspected and qualified before processing.

[0057] The four bearing seats 21 are processed by a boring bar, and the coaxiality of the boring bar is measured to be less than 0.1 mm before processing; the bearing seats 21 are installed on the trolley frame 1.

[0058] After the processing is completed and the inspection is qualified, the boring bar is removed and the machined surface is oiled for protection.

[0059] Horizontal wheel bracket flange and shear block: The horizontal wheel bracket 22 is assembled and positioned, and a flange is fixed on the horizontal wheel bracket 22, which is installed on the trolley frame 1 on the anchoring side 23 through the flange.

[0060] The horizontal wheel bracket 22 group completes the overall processing. The center of the horizontal wheel bracket 22 reaming opening is the center of the wheel. During assembly, the left and right directions are positioned according to this reference; the up and down positioning is based on the center of the bearing seat to the processing surface of the horizontal wheel bracket 22.

[0061] After positioning, install and weld the anti-shear block and fish the hole. After the horizontal wheel bracket 22 is removed, drill and reamer the hole.

[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. The manufacturing process of the integrated machine room trolley is characterized by: The steps include: Step 1: Make the car frame The trolley frame is divided into an anchoring side and a non-anchoring side. The horizontal wheel bracket is installed on the trolley frame on the anchoring side. Bolt holes are drilled on the horizontal wheel bracket and the trolley frame. The trolley frame adopts the reverse manufacturing method. Step 2: Make the main frame of the machine room and connect the columns The main frame of the machine room is mainly composed of H-shaped steel and steel pipes; the H-shaped steel is assembled into a square frame body, the H-shaped steel panels in the middle of the frame body are welded together through the connecting seat, and the H-shaped steel panels at the four corners of the frame body are butt welded; the steel pipe and the connecting plate are grouped together, and the group is installed on the bottom surface of the frame body; the connecting plate parts are punched; Step 3: Make the chassis The middle I-beam structure, front and rear longitudinal beams and chassis are welded on the tire frame in sequence; then the chassis and the tire frame are turned over together, and the pattern plate is welded on the chassis; finally, the common base is installed on the chassis; Step 4: Assemble the chassis and the main frame of the machine room Temporary support channel steel is installed on the chassis at a height of 2100m. The main frame of the machine room is hoisted onto the chassis, the height and horizontal position are determined, and the horizontal diagonal braces at the four corners of the square frame of the main frame of the machine room are installed; Step 5: Make the wall of the machine room Step 6: Make the driver's cab hanger Step 7: Structural assembly Install the upper support on one long side of the main frame of the machine room, and install the lower support on a long beam of the chassis; Install the machine room wall, cab hanger and trolley frame on the main frame of the machine room in sequence; assemble the upper connecting seat and lower connecting seat of the cab hanger with the upper support and lower support; adjust the level of the cab hanger according to the level of the chassis, and weld the hinge shaft after the adjustment is completed; According to the horizontal size of the main frame of the machine room, mark the trimming lines of the columns, trim the allowances, and assemble the left and right trolley frames; pay attention to the position of the anchoring side during assembly.

2. The manufacturing process of the integrated machine room trolley according to claim 1, characterized in that: In the step 2, the columns are adjusted to be vertical during installation; 250mm slow welding is left at the top of the columns when they are assembled; temporary supports are installed on the columns, and the columns are installed on the connecting seats of the main frame of the machine room, with a 50mm trimming margin on the top of the columns.

3. The manufacturing process of the integrated machine room trolley according to claim 1, characterized in that: In the step 3, when making the middle welded I-beam structure, the panel grooves are uniformly facing upwards, and the structure is made on a frame, and then welded after straightening, leaving 200 mm slow welds at both ends of the beam.

4. The manufacturing process of the integrated machine room trolley according to claim 1, characterized in that: In the step three, the front and rear longitudinal beams are I-beam structures. When manufacturing the I-beam structure, the connecting plates are in bulk and do not participate in the splicing. The web plates and connecting plates are centrally assembled and welded, and the splicing seams are fully penetrated and welded.

5. The manufacturing process of the integrated machine room trolley according to claim 1 is characterized in that: In the step 3, when installing the common base, a common base positioning line is drawn based on the center of the chassis; Position and install the first layer of the public base, hoist the first layer base, add temporary support L100*10 angle steel between the reducer bases, check the size and the corresponding hard gear, adjust the level, report the pre-welding size, weld after passing the inspection, weld in the middle first and then weld symmetrically on both sides; Position and install the second layer of the public base, remove the temporary support of the first layer, check the size and the corresponding hard stop, adjust the level, weld the middle first and then weld symmetrically on both sides, and do not weld the baffle and pad of the second layer base.

6. The manufacturing process of the integrated machine room trolley according to claim 1, characterized in that: In the step 5, the enclosure wall of the machine room is mainly composed of four walls and a roof. The walls include 1.5mm corrugated plates and square tubes. The square tubes are located at the four corners. The 1.5mm corrugated plates are installed between two square tubes by laser welding. The roof structure is welded by 3mm corrugated plates and square tubes. The bottom of the enclosure wall of the machine room is sealed with 2mm bent plates.

7. The manufacturing process of the integrated machine room trolley according to claim 1, characterized in that: In the step six, the driver's cab hanger is mainly composed of an upper connecting seat, a lower connecting seat, a pipe support and a driver's cab connecting frame; the upper connecting seat is processed with a reamed hole, and is only tack welded with the pipe support and welded during assembly; the lower connecting seat and the driver's cab connecting frame are equipped with drilled holes; the two driver's cab connecting frames are connected by a connecting pipe, and a pipe support is set on the top surface of the driver's cab connecting frame.

Citation Information

Patent Citations

  • Small vehicle frame manufacturing and assembling technology for container yard intelligent equipment

    CN108657946A

  • Hoisting trolley device used for container production line board

    CN110498346A

  • Construction method of gantry crane trolley

    CN110539131A

  • Method for manufacturing door frame of double-trolley quayside container crane

    CN115285860A

  • Semicircular girder rail-mounted gantry crane trolley frame manufacturing process

    CN115890169A