Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

2938results about "Workpiece edge portions" patented technology

Method of pacing travel speed

A method of pacing a desired travel speed of a manual arc welding process performed by a welder for depositing weld metal on a workpiece and along a test groove with a given test length defined by a visible start location and a visual end location using a specified amount of energy distributed generally uniformly in the groove between the locations. The method comprises providing a power source with output leads and an arc current and an arc voltage; setting the output welding power of the power source; providing a consumable welding wire; connecting the output leads across the welding wire and the workpiece; determining the time T for the wire to traverse the test length to consume the specific amount of energy; marking the groove with a visible indicia spaced from the start location a given distance; associating a programmable haptic device with an exposed body part of the welder where the device has a tactile alarm activated after a programmed time t from start of the haptic device, which time t is coordinated with the given distance to give the desired travel speed; starting the haptic device when the operator commences welding at the start location and employs a manual rate of travel; and, changing the manual rate of travel according to the relationship of the wire to the indicia when the tactile alarm is activated.
Owner:LINCOLN GLOBAL INC

Welding method of girth weld of inner cladding thin-walled stainless steel composite tube

The invention relates to a welding method of a girth weld of an inner cladding thin-walled stainless steel composite tube. The welding method comprises the following steps: girth welds of the inner cladding stainless steel composite tube are respectively and gradually welded by three welding seams, an inner cladding layer welding seam and a transition layer welding seam are welded by argon tungsten-arc welding, the stainless steel inner cladding layer welding seam adopts welding wires with the same quality thereof, the transition layer welding seam adopts ER309 welding wires, and the base layer is welded by shielded metal arc welding or CO2 gas shielded welding and adopts a welding material matched with the strength of the base layer; and the inner cladding layer, the transition layer and the first layer of the base layer are welded under back argon gas protection. The welding method guarantees corrosion resistance of a joint of the inner cladding layer and mechanical property of a welding joint of the base layer; and the method plays an important role in promoting wide application of the inner cladding stainless steel composite tube in businesses such as oil-gas delivery, chemical industry, oil refining and the like, improving corrosion resistance of an inner wall of a pipe, and solving the problems of high cost and the like caused by adopting a full wall-thickness stainless steel pipe.
Owner:XI AN JIAOTONG UNIV

Large caliber aluminium alloy pipeline non-pad tungsten electrode argon arc single face welding and double face shaping method

The invention discloses a method for large-calibre aluminium-alloy pipeline no-liner tungsten electrode argon arc one-side welding both-side formation, comprising the following steps of: assembling of groove angle and clearance, grinding of tungsten electrode, cleaning before welding, adjusting welding process parameters, tack welding, and welding of a bottom coating, a filling layer and a covering layer. The pipe is horizontally fixed and the position is marked by hour; the welding sequence is left half-ring and right half-ring; each half-ring comprises overhead welding, vertical position welding and downhand welding; the welding is started at a position where L is equal to 5-10mm close to six of the overhead welding; the vertical position welding is then carried out; finally, the front half-ring is ended at 12 of the downhand welding; before the rear half-ring starts welding, the connection is grinded as a slope; the welding seam formed by the connection and the front half-ring welding position is overlapped by 3-5mm; the welding of the rear half-ring is started from 6 of the overhead welding and ended at 12 of the downhand welding through the vertical position welding; the welding is carried out by a continuous feeding method. The surface of the welding seam of the method has no pores or cracks, is completely welded and beautiful, and has good internal and external forming; by the non-destructive testing, the first-time qualification rate achieves 100%, the welding seam achieves the class-1 quality, the construction procedures are reduced, and the construction cost is reduced.
Owner:ANGANG CONSTR CONSORTIUM
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products