Pantograph monitoring system based on digital twinning and rail train
Through digital twin technology monitoring and analyzing the operating status of pantographs, the problem of pantograph failure monitoring in rail transit vehicles is solved, timely handling of faults is achieved, and vehicle operation safety and maintenance efficiency are improved.
Patent Information
- Application Number
- CN202411524224.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art is difficult to effectively monitor and deal with pantograph failures in rail transit vehicles, affecting the safety of vehicle operation.
The pantograph monitoring system based on digital twins is adopted to obtain operation data through the acquisition device on the vehicle, and the digital twin of the pantograph is displayed on the ground data platform to determine the fault, correlate the fault with the vehicle's operating path, and generate a fault map. Realize real-time monitoring and early warning.
It realizes synchronous display of the pantograph operation status and timely handling of faults, improving the operation safety and maintenance efficiency of rail transit vehicles.
Smart Images

Figure CN119058776A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of vehicle engineering technology, and in particular to a pantograph monitoring system and method based on digital twins and a rail train. Background Art
[0002] The pantograph is one of the important equipment for rail transit vehicle operation. It is installed on the roof of rail transit vehicles to ensure that the vehicles can reliably obtain electricity under high-speed operation conditions. If there is a fault in the pantograph during operation and it is not effectively detected and handled in time, it will affect the safety of rail vehicle operation.
[0003] Therefore, how to more effectively monitor the operation of the pantograph is a technical problem that technical personnel in this field currently need to solve. Summary of the invention
[0004] In view of this, an object of the present invention is to provide a pantograph monitoring system, method and rail train based on digital twin, which can more effectively monitor the operation of the pantograph.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A pantograph monitoring system based on digital twin, comprising:
[0007] A collection device, provided on the vehicle, for acquiring the operation data of the pantograph on the vehicle;
[0008] A ground data platform, for displaying a digital twin of the pantograph according to received data, determining a fault of the pantograph, and associating the fault of the pantograph with a vehicle operation path and obtaining a fault map, wherein the data received by the ground data platform includes the operation data;
[0009] A transmission device is used to communicatively connect the acquisition device to the ground data platform.
[0010] Preferably, the ground data platform is also used to pop up a reminder when the vehicle runs to the corresponding fault section in the fault map.
[0011] Preferably, the ground data platform includes a ground server front end and a ground server back end;
[0012] The ground server backend has a pantograph simulation model and a pantograph fault prediction model;
[0013] The ground server back end is used to run the pantograph simulation model based on the received data, and display the corresponding digital twin on the ground server front end; and is used to run the pantograph fault prediction model based on the received data, and display the corresponding warning information on the ground server front end.
[0014] Preferably, the data received by the back end of the ground server includes static parameter data, dynamic parameter data and train offline data;
[0015] The static parameter data include physical structural parameters of the pantograph;
[0016] The dynamic parameter data includes part of the operation data transmitted in real time by the transmission device and acquired by the acquisition device;
[0017] The train offline data includes part of the operating data stored on the vehicle and acquired by the acquisition device, and data stored on the vehicle and acquired through manual detection.
[0018] Preferably, the collection device comprises:
[0019] A pantograph video monitoring device, arranged in the vicinity of the pantograph on the roof of the vehicle, for monitoring the pantograph raising state;
[0020] An air pressure detection device, connected to the pantograph, for detecting the air pressure state of the air bag or cylinder of the pantograph;
[0021] The high-voltage power supply monitoring device 6 is arranged in the vehicle and is used to receive the voltage information and current information of the high-voltage electricity obtained by the vehicle from the contact network.
[0022] Preferably, the pantograph video monitoring device is also connected to a pantograph video analysis server in the vehicle, and the pantograph video analysis server is connected to a monitoring screen 9 in the vehicle;
[0023] The pantograph video analysis server is used to determine the abnormal condition of the pantograph according to the preset pantograph abnormality judgment standard, and transmit the image or video obtained by the pantograph video monitoring device at the time when the abnormal condition occurs and within the set time before and after it to the monitoring screen 9 for display.
[0024] Preferably, the ground data platform can also switch to display the images or videos acquired by the pantograph video monitoring device.
[0025] A pantograph monitoring method, comprising:
[0026] The collecting device on the vehicle obtains the operating data of the pantograph on the vehicle and transmits it to the ground data platform through the transmitting device;
[0027] The ground data platform displays the digital twin of the pantograph based on the received data, determines the fault of the pantograph, and associates the fault of the pantograph with the vehicle operation path to obtain a fault map, wherein the received data includes the operation data.
[0028] A rail train comprises a vehicle and a pantograph arranged above the vehicle; and also comprises a pantograph monitoring system based on digital twin as described above.
[0029] Preferably, the vehicle has a SCADA subsystem, and the pantograph monitoring system based on digital twin is connected to the SCADA subsystem through a network sniffer and a filter.
[0030] The pantograph monitoring system based on digital twin provided by the present invention includes: a collection device, which is arranged on a vehicle and is used to obtain the operating data of the pantograph on the vehicle; a ground data platform, which is used to display the digital twin of the pantograph according to the received data, determine the fault of the pantograph, and associate the fault of the pantograph with the vehicle operation path to obtain a fault map, wherein the data received by the ground data platform includes operating data; a transmission device, which is used to communicate and connect the collection device to the ground data platform.
[0031] This pantograph monitoring system based on digital twin is based on digital twin technology. During the operation of the vehicle, the operation status of the pantograph is displayed on the ground data platform through a virtual digital twin, reflecting the operating status of the pantograph. Specifically, it can realize synchronous display and virtual-real interaction between the physical structure and the twin model, which is convenient for analyzing the entire operation process of the pantograph. It can more effectively monitor the operation of the pantograph and obtain fault maps so that the pantograph fault can be handled in time. Specifically, the pantograph can be repaired when it is not in operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0033] FIG1 is a schematic diagram of a specific embodiment 1 of a pantograph monitoring system based on digital twins provided by the present invention;
[0034] Figure 2 is a schematic diagram of the ground data platform part of the specific embodiment 1 of the pantograph monitoring system based on digital twin provided by the present invention.
[0035] Reference numerals:
[0036] Ground data platform 1, ground server front end 101, ground server back end 102;
[0037] Pantograph video monitoring device 2;
[0038] Pantograph 3;
[0039] Voltage and current sensor 4;
[0040] Pantograph controller 5, air pressure detection device 51;
[0041] High voltage power supply monitoring device 6;
[0042] Pantograph video analysis server 7;
[0043] Carriage controller 8;
[0044] Monitoring screen 9;
[0045] Wireless transmission device WTD10;
[0046] Collection device 11. DETAILED DESCRIPTION
[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0048] The core of the present invention is to provide a pantograph monitoring system, method and rail train based on digital twin, which can more effectively monitor the operation of the pantograph.
[0049] The specific embodiment 1 of the pantograph monitoring system based on digital twin provided by the present invention, please refer to Figures 1 and 2, includes a collection device 11, a ground data platform 1 and a transmission device.
[0050] The collection device 11 is arranged on the vehicle and is used to obtain the operation data of the pantograph 3 on the vehicle. The operation data includes the data directly collected by the collection device 11 and the data obtained by the collection device 11 through preliminary analysis of the collected data.
[0051] The transmission device is used to communicatively connect the collection device 11 to the ground data platform 1 so as to transmit the operation data of the collection device 11 to the ground data platform 1 .
[0052] The ground data platform 1 is used to display the digital twin of the pantograph 3 and determine the fault of the pantograph 3 based on the received data (including the operation data obtained by the collection device 11), and to associate the fault of the pantograph 3 with the vehicle operation path and obtain a fault map as a theoretical support for line operation and maintenance. For example, the vehicle operation path can be obtained through the GPS on the vehicle, and the pantograph spark and the bow head deflection angle are associated with the train GPS position information to serve as a fault map.
[0053] The pantograph monitoring system based on digital twin in this embodiment is based on digital twin technology. During the operation of the vehicle, the operation status of the pantograph 3 is displayed on the ground data platform 1 through a virtual digital twin, reflecting the operation status of the pantograph 3. Specifically, synchronous display can be achieved, and virtual-real interaction between the physical structure and the twin model can be realized, so as to facilitate the analysis of the entire operation process of the pantograph 3, more effectively monitor the operation of the pantograph 3, and obtain a fault map, so as to be able to handle the pantograph 3 fault in time. Specifically, the pantograph 3 can be repaired when it is not in operation.
[0054] In the ground data platform 1, it includes a ground server front end 101 and a ground server back end 102. The ground server back end 102 has functions such as data processing, coupling analysis, deep learning, and fault diagnosis. Specifically, it can pre-store and receive data, including data collected or acquired by the acquisition device 11, calculate and analyze these data, and then transmit the results to the ground server front end 101 for display in the form of digital twins.
[0055] The ground data platform 1 is also used to pop up a window reminder when the vehicle runs to the corresponding fault section in the fault map, specifically, the ground server front end 101. At this time, a dynamic pop-up window reminder is displayed at the geographical location of the fault-prone area, and the three-dimensional model of the pantograph 3 is dynamically displayed, so that the staff can judge whether the previous fault of the pantograph 3 has been improved.
[0056] The ground server backend 102 has a pantograph simulation model and a pantograph fault prediction model. The ground server backend 102 is used to run the pantograph simulation model according to the received data, and display the corresponding digital twin on the ground server frontend 101. The ground server backend 102 is also used to run the pantograph fault prediction model according to the received data, and display the corresponding warning information on the ground server frontend 101, which can be displayed in the form of text or images, and in the form of pop-up windows. At this time, in addition to the fault prediction results, the warning information can also include influencing factors and corresponding solutions for reference by staff.
[0057] At this time, in addition to displaying the digital twin of the pantograph in real time, the ground data platform 1 can also predict the failure and life of the pantograph based on the acquired data and provide timely reminders.
[0058] Specifically, the ground data platform 1 utilizes the multi-source heterogeneous data of WTD landing, combined with the pantograph dynamics principle, to establish pantograph physical and mechanism models such as the pantograph dynamics model and the carbon slide wear prediction model, forming a digital twin of the pantograph 3.
[0059] Specifically, the pantograph motion characteristic index calculated at the ground server back end 102 is used as the key parameter displayed at the ground server front end 101. Specifically, the pantograph raising angle, raising rate and other motion characteristic indexes can be calculated based on the relevant variables of the pantograph operation such as the airbag pressure, and the pantograph frame motion differential equation is referred to to dynamically simulate the pantograph raising and lowering process. The corresponding pantograph three-dimensional model and digital twin displayed in the interface of the ground server front end 101 can be developed using WebGL and Three.js, and adopt the BS architecture, so that the ground server front end 101 can display the working status of the pantograph 3 and related high-voltage systems in real time, and perform real-time dynamic rendering during the three-dimensional model display process to achieve consistency between the digital twin and the physical state of the pantograph 3 of the current vehicle.
[0060] The data received by the ground server backend 102 includes static parameter data, dynamic parameter data and train offline data.
[0061] The static parameter data may be pre-stored in the ground data platform 1 , including physical structural parameters of the pantograph 3 , for example, pantograph structural parameters, manufacturing information, three-dimensional model and other parameters.
[0062] The dynamic parameter data include part of the operating data acquired by the acquisition device 11 and transmitted in real time through the transmission device, for example, the data acquired by the relevant sensors in the acquisition device 11, including the air pressure status data of the airbag or cylinder of the pantograph, the voltage information and current information of the high voltage electricity acquired by the vehicle from the contact network, etc.; or, the analysis processor included in the acquisition device 11 itself performs a preliminary analysis on at least part of the operating data, and the analysis results are transmitted to the ground data platform 1 via the transmission device, for example, the intermediate parameters of the high-voltage detection equipment and the pantograph detection equipment in the acquisition device, and the reported results and other data.
[0063] Train offline data includes part of the operating data stored on the vehicle and acquired by the acquisition device 11, and data stored on the vehicle and manually detected. For some larger data, or information that the ground data platform 1 does not need to follow up or display synchronously when the pantograph is running, it can be obtained as train offline data by manual copying or using a wireless transmission device after the train is offline. For example, after the train returns to the depot, the pantograph monitored by 4G is used to monitor images, videos and other data.
[0064] In addition, the ground data platform 1 can also include the following functions: pantograph history query including material name, material code, and material manufacturer; pantograph status monitoring, including pantograph raising time, pantograph airbag target pressure, sensor-measured actual pressure, and carbon slide replacement status; pantograph life prediction, including carbon slide wear model life prediction and carbon slide inventory query.
[0065] In the transmission device, it includes a train backbone network arranged on the vehicle and a wireless transmission device WTD10 arranged on the vehicle. At least part of the data of the collection device 11 can be transmitted to the train backbone network according to the agreed data transmission protocol, such as the train real-time data protocol TRDP. The wireless transmission device WTD10 receives and records the operation data on the train backbone network in real time, and packages the operation data within the preset monitoring time to generate a data packet, and then sends the data packet to the ground data platform 1. For example, the wireless transmission device WTD10 records the train backbone network data in real time, and packages and lands the data according to the importance of the data and the prescribed data communication cycle.
[0066] Among them, for the sensor data in the collection device 11, a sensor collection network can be established to transmit the data to the ground data platform 1 through a wireless sensor network formed by various wireless communication methods such as 3G / 4G networks. Different network communication methods are selected according to different signal characteristics, so as to maximize the integration of various technologies in terms of power consumption, transmission rate, bandwidth, computing power, storage space and other resource advantages, and meet various technical indicators and scalability requirements.
[0067] The acquisition device 11 includes a pantograph video monitoring device 2, an air pressure detection device 51 and a high-voltage power supply monitoring device 6, which are used to monitor and / or analyze the status of the pantograph 3 at different positions or structures during the operation of the train, and obtain the corresponding operation data of the pantograph 3 during the operation.
[0068] The pantograph video monitoring device 2 is arranged in the vicinity of the pantograph on the roof, and monitors the pantograph 3 raising state in real time in the vicinity of the pantograph on the roof to obtain image or video information.
[0069] The pantograph video monitoring device 2 can capture and monitor the pantograph 3 pantograph raising status in real time, and includes a camera, a fill light, a video monitoring power supply unit, a video monitoring control unit, and a video monitoring transmission unit. The video monitoring power supply unit is used to supply power to the camera, the fill light, the video monitoring control unit, and the video monitoring transmission unit; the fill light is used to fill light for the camera; the video monitoring control unit is connected to the camera and the fill light respectively; and the video monitoring transmission unit is used to transmit data between the video monitoring control unit and the transmission device.
[0070] Among them, for the application of the pantograph video monitoring device 2, it can also provide real-time video or images to the vehicle for real-time monitoring of the pantograph 3 inside the car. Specifically, the car controller 8 on the vehicle receives the video sent by the pantograph video monitoring device 2 through Ethernet, and then forwards the video to the car controllers 8 of the adjacent cars in the order of the cars through Ethernet, until the video is transmitted to the car controller 8 of the car where the monitoring screen 9 is located. The car controller 8 of the car where the monitoring screen 9 is located transmits the video to the monitoring screen 9, and the staff monitors the pantograph 3 in real time through the monitoring screen 9.
[0071] In addition, the ground data platform 2 can also switch to display the images or videos obtained by the pantograph video monitoring device 3 to retrieve the real-scene information of the pantograph as needed for analysis by the staff.
[0072] Among them, a pantograph video analysis server 7 is arranged on the vehicle, which is connected between the pantograph video monitoring device 2 and the transmission device, and between the pantograph video monitoring device 2 and the car controller 8. It can analyze and process the pantograph 3 video and image obtained by the pantograph video monitoring device 2. Specifically, deep learning and image processing algorithms can be used to analyze the large sparks in the bow head area of the pantograph 3, the bow head mechanical structure, and suspended foreign objects, and automatically alarm according to different abnormality types, and record the pantograph 3 monitoring video and abnormal image 1 minute before and after the abnormality, so that they can be displayed in real time on the monitoring screen 9 or the ground data platform 1 or retrieved on demand, providing a basis for query and access to the human-computer interaction smart screen.
[0073] The air pressure detection device 51 is used to detect the air pressure state of the airbag of the pantograph 3. The air pressure detection device 51 is arranged in the pantograph 3 or connected to the pantograph 3. Specifically, it can be a pressure sensor arranged or connected to the airbag and / or the air path or valve connected to the airbag. The pressure sensor is usually arranged in the vehicle. Specifically, it can be integrally arranged on the pantograph controller 5. The pressure sensor is connected to the air path connected to the airbag. At this time, a three-way structure can be set on the air path, in which two ports are connected to the air path, and the remaining interface is installed with a pressure sensor. The airbag or cylinder pressure of the pantograph 3 can be monitored according to the air pressure signal collected by the pressure sensor, so that the lifting and lowering pantograph failure can be monitored.
[0074] Among them, for the pantograph raising and lowering failure, the ground data platform 1 can combine some key information such as the air pressure value in the airbag, the pantograph raising height of the pantograph 3 when working, the contact force value between the contact line of the contact network and the bow head of the pantograph 3, and the tension value and bending moment value of the lower guide rod of the pantograph 3, to comprehensively analyze and determine the cause of the pantograph 3 raising and lowering failure.
[0075] The high-voltage power supply monitoring device 6 is used to receive the voltage information and current information of the high-voltage electricity obtained by the vehicle from the contact network. Specifically, it can be connected to the current sensor and voltage sensor on the high-voltage side outside the vehicle to monitor the network voltage and network current status respectively, and then transmit the voltage and current data to the high-voltage power supply monitoring device 6.
[0076] Among them, after the high-voltage power supply monitoring device 6 obtains the train network voltage and network current in real time, it can analyze and calculate indicators such as the total harmonic content rate, the highest harmonic content rate, and the second highest harmonic content rate in the train network voltage and network current, and then send them to the ground data platform 1, so as to monitor the vehicle's current receiving status.
[0077] The high-voltage power supply monitoring device 6, the pantograph controller 5, the pantograph video analysis server 7 and other on-board equipment transmit the data to the train backbone network in accordance with the agreed data transmission protocol and the train real-time data protocol TRDP.
[0078] In this embodiment, multiple data sources are provided. The ground data platform 1 receives these data, acquires and integrates existing data, and adds new information sources according to specific needs, including data collected or monitored by the sensor collection network and the network camera monitoring unit. The data is combined with an intuitive three-dimensional model for presentation, which can more efficiently reflect the actual situation of the subway station and improve information sharing and data analysis.
[0079] In addition to the above-mentioned pantograph monitoring system, the present invention also provides a pantograph monitoring method, which applies the above-mentioned pantograph monitoring system based on digital twins, and monitors the status of the pantograph 3 and the contact network by using the train-mounted landing data based on digital twin technology.
[0080] The pantograph monitoring method comprises the following steps:
[0081] S1: The collection device 11 on the vehicle obtains the operating data of the pantograph 3 on the vehicle and transmits it to the ground data platform 1 through the transmission device.
[0082] Specifically, the EMU onboard monitoring equipment or system transmits the pantograph 3 airbag pressure, network flow, network pressure and other data measured by the sensor to the train backbone network according to the agreed train-level and vehicle communication protocols. The vehicle wireless transmission device WTD10 transmits the data on the backbone network in the form of binary data stream through the 3G / 4G network to the ground data platform 1 according to the agreed landing protocol. The ground data platform 1 parses the meaning of the landing data through the landing protocol.
[0083] S2: The ground data platform 1 displays the digital twin of the pantograph 3 according to the received data, determines the fault of the pantograph 3, and associates the fault of the pantograph 3 with the vehicle operation path to obtain a fault map, wherein the received data includes operation data
[0084] Specifically, the data such as the airbag pressure of the pantograph 3 is transmitted to the pantograph simulation model at the back end of the ground server, the current motion state of the pantograph 3 is simulated, and the motion state parameters such as the current pantograph raising height and pantograph raising speed are calculated. The calculated motion state parameters are then associated with the digital twin display of the pantograph at the front end of the ground server, and the virtual pantograph motion dynamics and vehicle-related parameters are displayed. The state of the pantograph 3 is monitored in real time through the real data and the virtual pantograph 3 and the key parameter display.
[0085] In addition to the above-mentioned pantograph monitoring system and method based on digital twin, the present invention also provides a rail train, which includes the above-mentioned pantograph monitoring system based on digital twin, and the above-mentioned pantograph monitoring method is applied, and the beneficial effects can be referred to the above embodiments accordingly. The structures of other parts of the rail train please refer to the prior art, which will not be repeated in this article.
[0086] The rail train in the present invention applies the above-mentioned pantograph monitoring system based on digital twin, through the EMU train-ground data communication, ground multi-source data fusion, and utilizes the pantograph operation mechanism, digital twin, and data modeling method to establish a train pantograph digital twin and a human-computer interaction interface, which can improve the train operation and maintenance efficiency.
[0087] Among them, the vehicle has a SCADA subsystem, and the pantograph monitoring system based on digital twins is connected to the SCADA subsystem through a network sniffer and filter. By reliably connecting the pantograph monitoring system based on digital twins with the existing SCADA subsystem, the stability and reliability of the system is guaranteed without changing the original system structure.
[0088] It should be noted that when an element is referred to as "fixed" to another element, it may be directly on the other element or there may be an element in the middle. When an element is considered to be "connected" to another element, it may be directly connected to the other element or there may be an element in the middle. In addition, in the description of the present invention, unless otherwise specified, "multiple", "multiple roots", "multiple groups" mean two or more.
[0089] The terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features.
[0090] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0091] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0092] The pantograph monitoring system, method and rail train based on digital twin provided by the present invention are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims
1. A pantograph monitoring system based on digital twin, characterized in that: include: A collection device (11), arranged on a vehicle, for acquiring operating data of a pantograph (3) on the vehicle; A ground data platform (1) is used to display a digital twin of the pantograph (3) based on received data, determine a fault of the pantograph (3), and associate the fault of the pantograph (3) with a vehicle operation path to obtain a fault map, wherein the data received by the ground data platform (1) includes the operation data; A transmission device is used to communicatively connect the acquisition device (11) to the ground data platform (1).
2. The pantograph monitoring system based on digital twin according to claim 1, characterized in that: The ground data platform (1) is also used to issue a pop-up reminder when the vehicle runs to a corresponding fault section in the fault map.
3. The pantograph monitoring system based on digital twin according to claim 1, characterized in that: The ground data platform (1) comprises a ground server front end (101) and a ground server back end (102); The ground server backend (102) has a pantograph simulation model and a pantograph fault prediction model; The ground server back end (102) is used to run the pantograph simulation model based on the received data, and display the corresponding digital twin on the ground server front end (101); and is used to run the pantograph fault prediction model based on the received data, and display the corresponding warning information on the ground server front end (101).
4. The pantograph monitoring system based on digital twin according to claim 3 is characterized in that: The data received by the ground server back end (102) includes static parameter data, dynamic parameter data and train offline data; The static parameter data include physical structural parameters of the pantograph (3); The dynamic parameter data includes part of the operating data transmitted in real time by the transmission device and acquired by the acquisition device (11); The train offline data includes partial operation data stored on the vehicle and acquired by the acquisition device (11), and data stored on the vehicle and acquired through manual detection.
5. The pantograph monitoring system based on digital twin according to claim 1, characterized in that: The collection device (11) comprises: A pantograph video monitoring device (2), arranged in an area adjacent to the pantograph on the roof of the vehicle, and used to monitor the raised state of the pantograph (3); An air pressure detection device (51), connected to the pantograph (3), and used to detect the air pressure state of an air bag or an air cylinder of the pantograph (3); A high-voltage power supply monitoring device (6) is arranged in the vehicle and is used to receive voltage information and current information of the high-voltage electricity obtained by the vehicle from the contact network.
6. The pantograph monitoring system based on digital twin according to claim 5, characterized in that: The pantograph video monitoring device (2) is also connected to a pantograph video analysis server in the vehicle, and the pantograph video analysis server is connected to a monitoring screen (9) in the vehicle; The pantograph video analysis server is used to determine the abnormal condition of the pantograph (3) according to a preset pantograph abnormality judgment standard, and transmit the image or video acquired by the pantograph video monitoring device (2) at the time when the abnormal condition occurs and within a set time period before and after the abnormal condition to the monitoring screen (9) for display.
7. The pantograph monitoring system based on digital twin according to claim 6, characterized in that: The ground data platform (1) can also switch to display images or videos acquired by the pantograph video monitoring device (2).
8. A pantograph monitoring method, characterized in that: include: A collection device (11) on the vehicle acquires the operating data of the pantograph (3) on the vehicle and transmits the data to the ground data platform (1) via a transmission device; The ground data platform (1) displays a digital twin of the pantograph (3) based on the received data, determines the fault of the pantograph (3), and associates the fault of the pantograph (3) with a vehicle operation path to obtain a fault map, wherein the received data includes the operation data.
9. A rail train, characterized in that: It comprises a vehicle and a pantograph (3) arranged above the vehicle; and it also comprises a pantograph monitoring system based on digital twin according to any one of claims 1 to 7.
10. The rail vehicle according to claim 9, characterized in that: The vehicle has a SCADA subsystem, and the pantograph monitoring system based on digital twin is connected to the SCADA subsystem through a network sniffer and a filter.
Citation Information
Patent Citations
Pantograph slide plate abrasion calculation method, storage medium and computer equipment
CN113870333A
Pantograph monitoring operation and maintenance system based on digital twinning
CN114021400A
Pantograph foreign matter detection method and device based on image comparison and storage medium
CN114494161A
