Production line conveying equipment based on golden chrysanthemum processing

The production line conveying equipment addresses the issue of quality classification in golden chrysanthemum processing by using visual and machine learning methods to sort complete and incomplete specimens, enhancing the selection of high-quality products and facilitating automated production.

CN119059151AInactive Publication Date: 2024-12-03XIUSHUI COUNTY GOLD HUANG JU AGRI DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411254022.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing automated production lines for golden chrysanthemum processing are unable to classify the quality of golden chrysanthemum, leading to simple batch production and inadequate selection of high-quality products.

Method used

A production line conveying equipment with a conveying mechanism, carrier plates, visual mechanism, and processor that uses image data to determine the integrity of golden chrysanthemum, routing complete specimens to one output channel and incomplete specimens to another, facilitated by a pushing mechanism to separate and release the chrysanthemum.

Benefits of technology

Enables automated selection and classification of golden chrysanthemum products, facilitating the choice of high-quality specimens through visual and machine learning verification, and aids in efficient packaging by shaping and compressing the chrysanthemum.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059151A_ABST
    Figure CN119059151A_ABST
Patent Text Reader

Abstract

The invention relates to the field of gold imperial chrysanthemum processing, in particular to production line conveying equipment based on gold imperial chrysanthemum processing, which comprises a conveying mechanism, a first carrier plate, a second carrier plate, a visual mechanism, a processor, a first output channel and a second output channel. The first carrier plate and the second carrier plate are arranged in parallel. The second carrier plate is provided with a rotating shaft and driven by the first driver, and the rotating axis of the second carrier plate is parallel to the plate surface. In the direction perpendicular to the second carrier plate, the first carrier plate is in sliding fit with the second carrier plate and is driven by the second driver. The first carrier plate and the second carrier plate are made of transparent materials. The conveying mechanism is used for conveying the golden chrysanthemum to the position between the first carrying plate and the second carrying plate. The first carrier plate and the second carrier plate are used for clamping and turning over the golden chrysanthemum, so that the visual mechanism can obtain image data of the two faces of the golden chrysanthemum. By means of the gold imperial chrysanthemum sorting device, good selection and classification of gold imperial chrysanthemum products can be achieved, high-quality gold imperial chrysanthemum products can be selected conveniently, and good condition selection under automatic production of gold imperial chrysanthemums can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of golden chrysanthemum processing, and in particular to a production line conveying equipment based on golden chrysanthemum processing. Background Art

[0002] In the processing of golden chrysanthemum, the existing automated production lines are unable to classify the qualities of golden chrysanthemum, resulting in simple batch production. The selection and classification of golden chrysanthemum cannot be achieved, which is not conducive to the selection of high-quality golden chrysanthemum products.

[0003] In view of this, this application is hereby filed. Summary of the invention

[0004] The purpose of the present invention is to provide a production line conveying equipment based on golden chrysanthemum processing, which can realize the selection and classification of golden chrysanthemum products, facilitate the selection of high-quality golden chrysanthemum products, and help to realize the quality selection of golden chrysanthemum under automated production.

[0005] The embodiment of the present invention is achieved as follows:

[0006] A production line conveying device based on golden chrysanthemum processing includes: a conveying mechanism, a first carrier plate, a second carrier plate, a visual mechanism, a processor, a first output channel and a second output channel.

[0007] The first carrier plate and the second carrier plate are arranged in parallel. The second carrier plate has a rotating shaft and is driven by the first driver, and the rotation axis of the second carrier plate is parallel to its plate surface. In a direction perpendicular to the second carrier plate, the first carrier plate is slidably matched with the second carrier plate and is driven by the second driver.

[0008] The first carrier plate and the second carrier plate are both made of transparent materials. The conveying mechanism is used to convey the golden chrysanthemum between the first carrier plate and the second carrier plate. The first carrier plate and the second carrier plate are used to clamp the golden chrysanthemum and turn it over so that the visual mechanism can obtain image data of both sides of the golden chrysanthemum.

[0009] The processor is used to determine the integrity of the golden chrysanthemum according to the image data. If the golden chrysanthemum has a complete appearance, the first carrier plate and the second carrier plate are controlled to rotate to the first output channel and the golden chrysanthemum is released thereto. If the golden chrysanthemum has an incomplete appearance, the first carrier plate and the second carrier plate are controlled to rotate to the second output channel and the golden chrysanthemum is released thereto.

[0010] Furthermore, a first protrusion is provided on one side of the first carrier plate close to the second carrier plate, and the first protrusions are distributed in an array along the surface of the first carrier plate. A first partition is also installed on one side of the first carrier plate close to the second carrier plate, and the first partition plate is provided with a first clearance hole adapted to the first protrusion. One side edge of the first partition plate is hinged to the first carrier plate, and the rotation axis of the first partition plate is arranged parallel to the plate surface of the first carrier plate.

[0011] A second protrusion is provided on one side of the second carrier plate close to the first carrier plate, and the second protrusions are distributed in an array along the surface of the second carrier plate. A second partition is also installed on one side of the second carrier plate close to the first carrier plate, and the second partition is provided with a second clearance hole adapted to the second protrusion. One side edge of the second partition is hinged to the second carrier plate, and the rotation axis of the second partition is arranged parallel to the plate surface of the second carrier plate. The plane where the rotation axis of the first partition plate and the second partition plate are located is arranged perpendicular to the plate surfaces of the first partition plate and the second partition plate.

[0012] The production line conveying equipment based on golden chrysanthemum processing also has a pushing mechanism. When the first carrier plate is separated from the second carrier plate, the pushing mechanism pushes the first partition plate to rotate to separate from the first carrier plate, and simultaneously pushes the second partition plate to rotate to separate from the second carrier plate.

[0013] Furthermore, the pushing mechanism includes: a convex ridge, a first sliding block, a first pushing rod, a second sliding block, and a second pushing rod.

[0014] The ridge is arranged on one side of the first carrier plate close to the second carrier plate, the ridge is arranged parallel to the rotation axis of the first partition plate and the second partition plate, and the ridge is located on the side of the first partition plate and the second partition plate away from their rotation axis. The second carrier plate is provided with a strip through hole adapted to the ridge.

[0015] The convex ridge has a receiving groove on both sides, and the receiving groove is arranged near the end of the convex ridge. The receiving groove is matched with an elastic rib adapted thereto, and one end of the elastic rib near the end of the convex ridge is fixedly connected to the end wall of the receiving groove near the end of the convex ridge. In a natural state, one end of the elastic rib away from the end of the convex ridge extends out of the receiving groove.

[0016] The first carrier plate has a first inner cavity. In a direction perpendicular to the first carrier plate, the first slider and the first push rod are both slidably matched in the first inner cavity. The first push rod penetrates to the side of the first carrier plate close to the second carrier plate and fits with the first partition plate. The first slider and the first push rod are fixedly connected. The accommodating groove is provided with a connecting hole, which extends along the convex ridge and communicates with the first inner cavity. The first slider and the middle part of the elastic rib are connected by a drawstring, and the drawstring is located in the connecting hole. A first elastic member is abutted between the side of the first slider close to the convex ridge and the inner wall of the first inner cavity.

[0017] The carrier plate has a second inner cavity. Along a direction perpendicular to the second carrier plate, the second slider and the second push rod are both slidably matched in the second inner cavity. The second push rod penetrates to the side of the second carrier plate close to the first carrier plate and fits with the second partition plate. The second slider and the second push rod are fixedly connected. The second slider has an extension portion, which penetrates to the side of the second carrier plate away from the first carrier plate, and the extension portion is arranged close to the strip-shaped through hole. A second elastic member is abutted between the side of the second slider close to the first carrier plate and the inner wall of the second inner cavity.

[0018] In the natural state, the first slider is located on the side of the first inner cavity away from the ridge, the middle of the elastic rib is located in the accommodating groove, the second slider is located on the side of the second inner cavity away from the first carrier plate, and the extension portion extends out of the second carrier plate.

[0019] When the first carrier plate and the second carrier plate approach and clamp the golden chrysanthemum, the convex edge moves into the strip-shaped through hole, and the hole wall of the strip-shaped through hole pushes the elastic rib into the accommodating groove.

[0020] When the first carrier plate and the second carrier plate clamp the golden chrysanthemum, the convex ridge fully extends into the strip-shaped through hole, the elastic rib moves to the side of the second carrier plate away from the first carrier plate, and the end of the elastic rib away from the end of the convex ridge extends out of the accommodating groove.

[0021] When the first carrier plate is separated from the second carrier plate, the convex ridge withdraws from the strip through hole, and the hole wall of the strip through hole pushes the elastic rib to elastically deform toward the side away from the first carrier plate, the elastic rib pulls the first slider, the first push rod pushes the first partition plate to separate from the first carrier plate, and the elastic rib presses the extension part, so that the second slider drives the second push rod, and the second push rod pushes the second partition plate to separate from the second carrier plate.

[0022] The beneficial effects of the technical solution of the embodiment of the present invention include:

[0023] The production line conveying equipment based on golden chrysanthemum processing provided by the embodiment of the present invention can verify the integrity of golden chrysanthemum through visual components. It can not only be combined with manual judgment, but also with machine learning methods. The complete image of golden chrysanthemum is used to train the model to realize automatic judgment of the integrity of golden chrysanthemum products.

[0024] In addition, when acquiring the image data of the golden chrysanthemum, the first carrier plate and the second carrier plate fully clamp the golden chrysanthemum product (sun-dried golden chrysanthemum), and at the same time complete the shaping and compression of the golden chrysanthemum, making it easier to package the golden chrysanthemum.

[0025] In general, the production line conveying equipment based on golden chrysanthemum processing provided by the embodiment of the present invention can realize the selection and classification of golden chrysanthemum products, facilitate the selection of high-quality golden chrysanthemum products, and help to realize the quality selection of golden chrysanthemum under automated production. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1An overall schematic diagram of a production line conveying device based on golden chrysanthemum processing provided by an embodiment of the present invention (when the first carrier plate and the second carrier plate are separated);

[0028] Figure 2 An overall schematic diagram of a production line conveying device based on golden chrysanthemum processing provided by an embodiment of the present invention (when the first carrier plate and the second carrier plate clamp and fix the golden chrysanthemum);

[0029] Figure 3 An overall schematic diagram of a production line conveying device based on golden chrysanthemum processing provided by an embodiment of the present invention (when the first carrier plate and the second carrier plate rotate to the first conveying channel);

[0030] Figure 4 An overall schematic diagram of a production line conveying device based on golden chrysanthemum processing provided by an embodiment of the present invention (when the first carrier plate and the second carrier plate rotate to the second conveying channel);

[0031] Figure 5 is a structural schematic diagram of a first carrier board;

[0032] Figure 6 is a schematic structural diagram of a first partition;

[0033] Figure 7 is a schematic structural diagram of a second carrier board;

[0034] Figure 8 is a schematic structural diagram of the second partition;

[0035] Fig. 9 is a schematic diagram of the cooperation between the first carrier board and the second carrier board;

[0036] Fig.10 is a structural schematic diagram when the first carrier plate approaches the second carrier plate;

[0037] Fig.11 It is a structural schematic diagram of the first carrier plate and the second carrier plate clamping the golden chrysanthemum;

[0038] Fig.12 is a structural schematic diagram when the first carrier plate is separated from the second carrier plate;

[0039] Fig.13 It is a schematic diagram of the cooperation between the first partition plate and the second partition plate when the first carrier plate is separated from the second carrier plate.

[0040] Description of reference numerals:

[0041] Production line conveying equipment 1000; conveying mechanism 100; first carrier plate 200; first protrusion 210; convex ridge 220; accommodating groove 221; elastic rib 222; first partition plate 300; first clearance hole 310; second carrier plate 400; second protrusion 410; bar-shaped through hole 420; second partition plate 500; second clearance hole 510; visual mechanism 600; first output channel 700; second output channel 800; first slider 910; first push rod 920; pull rope 930; first elastic member 940; second slider 950; extension portion 951; second push rod 960; second elastic member 970. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0043] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0045] The terms “first”, “second”, etc. are only used for distinguishing descriptions and should not be understood as indicating or implying relative importance.

[0046] In addition, the terms "parallel", "vertical", etc. do not mean that the components must be absolutely parallel or vertical, but can be slightly tilted. For example, "parallel" only means that its direction is more parallel than "vertical", and does not mean that the structure must be completely parallel, but can be slightly tilted.

[0047] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0048] Please refer to Figure 1 to Figure 4 The present embodiment provides a production line conveying device 1000 based on golden chrysanthemum processing, and the production line conveying device 1000 includes: a conveying mechanism 100, a first carrier plate 200, a second carrier plate 400, a visual mechanism 600, a processor (not shown in the figure), a first output channel 700 and a second output channel 800.

[0049] The first carrier plate 200 and the second carrier plate 400 are arranged in parallel. The second carrier plate 400 has a rotating shaft (not shown in the figure) and is driven by a first driver (not shown in the figure). The rotation axis of the second carrier plate 400 is parallel to its plate surface. In a direction perpendicular to the second carrier plate 400, the first carrier plate 200 is slidably matched with the second carrier plate 400 and is driven by a second driver (not shown in the figure). The second driver is used to control the approach and separation between the first carrier plate 200 and the second carrier plate 400.

[0050] The first carrier plate 200 and the second carrier plate 400 are both made of transparent materials.

[0051] The conveying mechanism 100 is used to convey the golden chrysanthemum to between the first carrier plate 200 and the second carrier plate 400. The conveying mechanism 100 can be a conveyor belt, but is not limited thereto.

[0052] The first carrier plate 200 and the second carrier plate 400 are used to clamp the golden chrysanthemum and turn it over so that the visual mechanism 600 can obtain image data of both sides of the golden chrysanthemum. The processor is used to determine the integrity of the golden chrysanthemum according to the image data.

[0053] If the appearance of the golden chrysanthemum is complete, the first carrier plate 200 and the second carrier plate 400 are controlled to rotate to the first output channel 700. Figure 3 As shown, the first carrier plate 200 and the second carrier plate 400 are controlled to separate to release golden chrysanthemum into the first output channel 700 .

[0054] If the appearance of the golden chrysanthemum is incomplete, the first carrier plate 200 and the second carrier plate 400 are controlled to rotate to the second output channel 800. Figure 4 As shown, the first carrier plate 200 and the second carrier plate 400 are controlled to separate to release golden chrysanthemum into the second output channel 800.

[0055] The first output channel 700 and the second output channel 800 may be communicated with each other through a packaging bag, but are not limited thereto.

[0056] Through the above design, the integrity of the golden chrysanthemum can be verified through the visual component. It can not only be combined with manual judgment, but also with machine learning methods. The model can be trained using the complete image of the golden chrysanthemum to achieve automatic judgment of the integrity of the golden chrysanthemum product.

[0057] In addition, when acquiring the image data of golden chrysanthemum, the first carrier plate 200 and the second carrier plate 400 fully clamp the golden chrysanthemum product (sun-dried golden chrysanthemum), and simultaneously complete the shaping and compression of the golden chrysanthemum, making it easier to package the golden chrysanthemum.

[0058] In general, the production line conveying equipment 1000 based on golden chrysanthemum processing provided in this embodiment can realize the selection and classification of golden chrysanthemum products, facilitate the selection of high-quality golden chrysanthemum products, and help to realize the quality selection of golden chrysanthemum under automated production.

[0059] In this embodiment, please combine Figures 5 to 8 A first protrusion 210 is provided on one side of the first carrier 200 close to the second carrier 400, and the first protrusions 210 are distributed in an array along the surface of the first carrier 200. A first partition 300 is also installed on one side of the first carrier 200 close to the second carrier 400, and the first partition 300 is provided with a first clearance hole 310 adapted to the first protrusion 210. One side edge of the first partition 300 is hinged to the first carrier 200, and the rotation axis of the first partition 300 is arranged parallel to the plate surface of the first carrier 200.

[0060] A second protrusion 410 is provided on one side of the second carrier plate 400 close to the first carrier plate 200, and the second protrusions 410 are distributed in an array along the surface of the second carrier plate 400. A second partition plate 500 is also installed on one side of the second carrier plate 400 close to the first carrier plate 200, and the second partition plate 500 is provided with a second clearance hole 510 adapted to the second protrusion 410. One side edge of the second partition plate 500 is hinged to the second carrier plate 400, and the rotation axis of the second partition plate 500 is arranged parallel to the plate surface of the second carrier plate 400. The plane where the rotation axis of the first partition plate 300 and the second partition plate 500 are located is perpendicular to the plate surface of the first partition plate 300 and the second partition plate 500.

[0061] The production line conveying device 1000 based on golden chrysanthemum processing also has a push mechanism. When the first carrier plate 200 is separated from the second carrier plate 400, the push mechanism pushes the first partition plate 300 to rotate to separate from the first carrier plate 200, and simultaneously pushes the second partition plate 500 to rotate to separate from the second carrier plate 400.

[0062] Through this design, when the first carrier 200 and the second carrier 400 are separated to release the golden chrysanthemum, the first partition 300 is separated from the first carrier 200, and the second partition 500 is separated from the second carrier 400, which can effectively prevent the golden chrysanthemum from adhering to the first carrier 200 or the second carrier 400, and help the golden chrysanthemum to fall off completely.

[0063] Further, please combine Figures 9 to 13The pushing mechanism includes: a convex ridge 220, a first slider 910, a first push rod 920, a second slider 950, and a second push rod 960.

[0064] The ridge 220 is disposed on a side of the first carrier plate 200 close to the second carrier plate 400. The ridge 220 protrudes from the plate surface of the first carrier plate 200 toward the second carrier plate 400. The ridge 220 is disposed parallel to the rotation axis of the first partition plate 300 and the second partition plate 500. The ridge 220 is located on a side of the first partition plate 300 and the second partition plate 500 that is away from the rotation axis. The second carrier plate 400 is provided with a strip-shaped through hole 420 that matches the ridge 220.

[0065] The convex rib 220 has receiving grooves 221 on both sides thereof, and the receiving grooves 221 are arranged near the ends of the convex rib 220. The receiving grooves 221 are matched with elastic ribs 222 adapted thereto, and one end of the elastic rib 222 near the end of the convex rib 220 is fixedly connected to one end wall of the receiving groove 221 near the end of the convex rib 220, and in a natural state, one end of the elastic rib 222 away from the end of the convex rib 220 extends out of the receiving groove 221.

[0066] The first carrier plate 200 has a first inner cavity. In a direction perpendicular to the first carrier plate 200, the first slider 910 and the first push rod 920 are both slidably matched in the first inner cavity. The first push rod 920 penetrates to the side of the first carrier plate 200 close to the second carrier plate 400 and fits with the first partition plate 300. The first slider 910 and the first push rod 920 are fixedly connected. The receiving groove 221 is provided with a connecting hole, which extends along the convex rib 220 and communicates with the first inner cavity. The first slider 910 and the middle part of the elastic rib 222 are connected by a drawstring 930, and the drawstring 930 is located in the connecting hole. A first elastic member 940 is in contact between the side of the first slider 910 close to the convex rib 220 and the inner wall of the first inner cavity.

[0067] The second carrier plate 400 has a second inner cavity. In a direction perpendicular to the second carrier plate 400, the second slider 950 and the second push rod 960 are both slidably matched in the second inner cavity. The second push rod 960 penetrates to the side of the second carrier plate 400 close to the first carrier plate 200 and fits with the second partition plate 500. The second slider 950 and the second push rod 960 are fixedly connected. The second slider 950 has an extension portion 951, which penetrates to the side of the second carrier plate 400 away from the first carrier plate 200. The extension portion 951 is arranged close to the strip-shaped through hole 420. A second elastic member 970 is in contact between the side of the second slider 950 close to the first carrier plate 200 and the inner wall of the second inner cavity.

[0068] In the natural state, the first slider 910 is located on the side of the first inner cavity away from the ridge 220, the middle of the elastic rib 222 is located in the accommodating groove 221, the second slider 950 is located on the side of the second inner cavity away from the first carrier 200, and the extension portion 951 extends out of the second carrier 400.

[0069] When the first carrier plate 200 and the second carrier plate 400 are close to and clamp the golden chrysanthemum, the convex edge 220 moves into the strip-shaped through hole 420, such as Fig.10 As shown, the hole wall of the strip-shaped through hole 420 pushes the elastic rib 222 into the receiving groove 221 .

[0070] When the first carrier plate 200 and the second carrier plate 400 clamp the golden chrysanthemum, the convex ridge 220 fully extends into the strip-shaped through hole 420, such as Fig.11 As shown, the elastic rib 222 moves to the side of the second carrier plate 400 away from the first carrier plate 200 , and one end of the elastic rib 222 away from the end of the ridge 220 extends out of the receiving groove 221 .

[0071] When the first carrier plate 200 is separated from the second carrier plate 400, the convex ridge 220 withdraws from the strip-shaped through hole 420. Fig.12 As shown, the hole wall of the strip through hole 420 pushes the elastic rib 222 to elastically deform toward the side away from the first carrier 200, the elastic rib 222 pulls the first slider 910, the first push rod 920 pushes the first partition 300 to separate from the first carrier 200, and the elastic rib 222 presses the extension part 951, so that the second slider 950 drives the second push rod 960, and the second push rod 960 pushes the second partition 500 to separate from the second carrier 400.

[0072] Through the above design, the movement of the first partition 300 and the second partition 500 can be conveniently controlled without additional power to promote the shedding of the golden chrysanthemum.

[0073] In summary, the production line conveying equipment 1000 based on golden chrysanthemum processing provided by the embodiment of the present invention can realize the selection and classification of golden chrysanthemum products, facilitate the selection of high-quality golden chrysanthemum products, and help to realize the quality selection of golden chrysanthemum under automated production.

[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A production line conveying equipment based on golden chrysanthemum processing, It is characterized in that include: A conveying mechanism, a first carrier plate, a second carrier plate, a visual mechanism, a processor, a first output channel, and a second output channel; The first carrier plate and the second carrier plate are arranged in parallel; the second carrier plate has a rotating shaft and is driven by the first driver, and the rotation axis of the second carrier plate is parallel to its plate surface; The first carrier plate is slidably matched with the second carrier plate in a direction perpendicular to the second carrier plate and is driven by a second driver; The first carrier plate and the second carrier plate are both made of transparent materials; the conveying mechanism is used to convey the golden chrysanthemum between the first carrier plate and the second carrier plate; the first carrier plate and the second carrier plate are used to clamp the golden chrysanthemum and turn it over so that the visual mechanism can obtain image data of both sides of the golden chrysanthemum; The processor is used to determine the integrity of the golden chrysanthemum based on the image data; if the golden chrysanthemum has a complete appearance, the first carrier plate and the second carrier plate are controlled to rotate to the first output channel and release the golden chrysanthemum thereto; if the golden chrysanthemum has an incomplete appearance, the first carrier plate and the second carrier plate are controlled to rotate to the second output channel and release the golden chrysanthemum thereto.

2. The production line conveying equipment based on golden chrysanthemum processing according to claim 1, It is characterized in that A first protrusion is provided on one side of the first carrier plate close to the second carrier plate, and the first protrusions are distributed in an array along the surface of the first carrier plate; a first partition is also installed on one side of the first carrier plate close to the second carrier plate, and the first partition is provided with a first clearance hole adapted to the first protrusion; one side edge of the first partition is hinged to the first carrier plate, and the rotation axis of the first partition is arranged parallel to the plate surface of the first carrier plate; A second protrusion is provided on one side of the second carrier plate close to the first carrier plate, and the second protrusions are distributed in an array along the surface of the second carrier plate; a second partition is also installed on one side of the second carrier plate close to the first carrier plate, and the second partition is provided with a second clearance hole adapted to the second protrusion; one side edge of the second partition is hinged to the second carrier plate, and the rotation axis of the second partition is arranged parallel to the plate surface of the second carrier plate; the plane where the rotation axis of the first partition plate and the second partition plate are located is perpendicular to the plate surfaces of the first partition plate and the second partition plate; The production line conveying equipment based on golden chrysanthemum processing also has a pushing mechanism; when the first carrier plate is separated from the second carrier plate, the pushing mechanism pushes the first partition plate to rotate to separate from the first carrier plate, and simultaneously pushes the second partition plate to rotate to separate from the second carrier plate.

3. The production line conveying equipment based on golden chrysanthemum processing according to claim 2, It is characterized in that The push mechanism comprises: a convex ridge, a first slider, a first push rod, a second slider, and a second push rod; The convex ridge is arranged on a side of the first carrier plate close to the second carrier plate, the convex ridge is arranged parallel to the rotation axis of the first partition plate and the second partition plate, and the convex ridge is located on a side of the first partition plate and the second partition plate away from their rotation axis; the second carrier plate is provided with a strip-shaped through hole adapted to the convex ridge; The convex ridge has a receiving groove on both sides, and the receiving groove is arranged near the end of the convex ridge; the receiving groove is matched with an elastic rib adapted thereto, and one end of the elastic rib near the end of the convex ridge is fixedly connected to the end wall of the receiving groove near the end of the convex ridge, and in a natural state, one end of the elastic rib away from the end of the convex ridge extends out of the receiving groove; The first carrier plate has a first inner cavity, and the first slider and the first push rod are both slidably matched in the first inner cavity along a direction perpendicular to the first carrier plate, the first push rod penetrates to a side of the first carrier plate close to the second carrier plate and fits with the first partition plate, and the first slider and the first push rod are fixedly connected; the accommodating groove is provided with a connecting hole, and the connecting hole extends along the convex ridge and communicates with the first inner cavity, the first slider and the middle part of the elastic rib are connected by a drawstring, and the drawstring is located in the connecting hole; a first elastic member is abutted between a side of the first slider close to the convex ridge and an inner wall of the first inner cavity; The carrier plate has a second inner cavity, and the second slider and the second push rod are both slidably matched in the second inner cavity along a direction perpendicular to the second carrier plate, the second push rod penetrates to a side of the second carrier plate close to the first carrier plate and fits with the second partition plate, and the second slider and the second push rod are fixedly connected; the second slider has an extension portion, the extension portion penetrates to a side of the second carrier plate away from the first carrier plate, and the extension portion is arranged close to the strip-shaped through hole; a second elastic member is abutted between a side of the second slider close to the first carrier plate and an inner wall of the second inner cavity; In a natural state, the first slider is located on a side of the first inner cavity away from the convex edge, the middle part of the elastic rib is located in the receiving groove, the second slider is located on a side of the second inner cavity away from the first carrier plate, and the extension portion extends out of the second carrier plate; When the first carrier plate and the second carrier plate are close to each other and clamp the golden chrysanthemum, the convex edge moves into the strip-shaped through hole, and the hole wall of the strip-shaped through hole pushes the elastic rib into the receiving groove; When the first carrier plate and the second carrier plate clamp the golden chrysanthemum, the convex ridge fully extends into the strip-shaped through hole, the elastic rib moves to the side of the second carrier plate away from the first carrier plate, and one end of the elastic rib away from the end of the convex ridge extends out of the receiving groove; When the first carrier plate is separated from the second carrier plate, the convex ridge withdraws from the strip through hole, and the hole wall of the strip through hole pushes the elastic rib to elastically deform toward the side away from the first carrier plate, and the elastic rib pulls the first slider, and the first push rod pushes the first partition plate to separate from the first carrier plate, and the elastic rib presses the extension part, so that the second slider drives the second push rod, and the second push rod pushes the second partition plate to separate from the second carrier plate.