Positioning monitoring device based on building shock insulation support and use method
By using positioning plate frames, laser level, acousto-optical alarm and other devices during the installation of the shock isolation support, the problem of low installation accuracy is solved, and the high accuracy and stability of the shock isolation support is achieved, ensuring the impact of the shock isolation support Force uniformity and long-term use.
Patent Information
- Application Number
- CN202411011417.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The installation accuracy of existing shock-isolating support is low during installation and lacks monitoring devices, which affects the stability and force uniformity of the shock-isolating support.
Use positioning plate frames, laser level, embedded parts, positioning steel mesh and acoustic and optical alarms to ensure the horizontality and centering position of the positioning plates, and ensure the verticality of the embedded anchor bars through distance control strips and triangular thin steel plates. , real-time monitoring and adjustment to improve installation accuracy.
It improves the installation accuracy and stability of the earthquake isolation support, ensures the uniformity of the earthquake isolation support and long service life, and reduces errors and complexity during construction.
Smart Images

Figure CN119061946A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of building equipment monitoring, and more specifically, relates to a positioning monitoring device based on a building seismic isolation support and a use method thereof. Background Art
[0002] Seismic isolation bearings refer to supporting devices installed in structures to meet seismic isolation requirements. Seismic isolation layers are added between the superstructure and the foundation, and rubber seismic isolation bearings are installed to provide a soft connection with the ground. Through this technology, about 80% of the energy of an earthquake can be offset. For example, laminated rubber bearings (also called seismic isolation rubber bearings, sandwich rubber pads, etc.). It is a structural member with low horizontal stiffness and high vertical stiffness. It can withstand large horizontal deformations and can be used as part of the load-bearing system. Seismic isolation bearings are used in buildings to increase the building's ability to resist earthquakes under the effects of horizontal and vertical earthquakes, torsion, etc. There are connecting plates at the upper and lower ends of the seismic isolation bearings, which can connect the seismic isolation bearings to the foundation and superstructure as a whole.
[0003] The existing seismic isolation bearing design depth, processing accuracy, and material properties meet the basic requirements, but the construction quality and installation accuracy are uncontrollable and unstable. The overall construction process is relatively rough, which affects the overall performance of the seismic isolation bearing and the structure.
[0004] Patent number: CN205907841U, title: An invention patent for a rubber seismic isolation support that can be quickly positioned and assembled. By adding a positioning strip on the side of the lower embedded plate, the rubber support body can be quickly and accurately positioned during installation. However, the seismic isolation support needs to be closely attached to the main structure without leaving any gaps to ensure good mechanical properties. The durability of the positioning strip cannot be guaranteed, and the stress effect of the seismic isolation support during its long service life cannot be guaranteed.
[0005] Patent number: CN113846753A, title: An invention patent for an efficient construction method for seismic isolation bearings. The steel bar positions of the lower pier and the upper pier are optimized through BIM software, the lower pier steel cage and the upper pier steel cage are prefabricated and tied off-site, and micro-lifting adjusters, plane level measuring devices, anchor bar quick fixing cards and guide positioning pins are used as special auxiliary tools to reduce errors and repeated adjustments caused by human factors. However, the construction process is too cumbersome and complicated, and there is a lack of positioning devices, resulting in a lack of control over the centering degree and whether the overall lower pier is off-axis or off-line.
[0006] Patent number: CN106593058B, named invention patent for positioning device of rubber seismic isolation bearing and its manufacturing and installation method, by providing a mounting structure and a positioning bearing, the mounting structure is anchored in the pier seat and a mounting end is formed on the top surface of the pier seat, the positioning bearing is used to improve the positioning accuracy of the rubber seismic isolation bearing, but the installation method is relatively simple, and the correction and verification of the embedded parts of the seismic isolation bearing cannot be evaluated and monitored as a whole. Summary of the invention
[0007] In view of the problems of low installation accuracy and lack of monitoring devices during the installation of seismic isolation bearings in the prior art, the present invention provides a positioning monitoring device based on building seismic isolation bearings and a method for use thereof, which ensures that the positioning plate is in a centered position and the pre-embedded accuracy by arranging a positioning plate, a positioning plate sleeve, a laser level and a centered level bubble; a distance control strip is provided to ensure that the centroid of the positioning plate and the lower pier is centered, and the spacing of the concrete slab strips after pouring is uniform, thereby ensuring the stability and uniform force of the seismic isolation bearing and improving the installation accuracy of the seismic isolation bearing; a positioning steel mesh, a triangular thin steel plate and an anchor bar positioning hole are provided at the bottom to ensure that the pre-embedded anchor bars pass through the anchor bar positioning holes, and an audible and visual alarm is provided on the pre-embedded anchor bars to monitor the verticality of the pre-embedded anchor bars at all times.
[0008] In order to solve the above problems, according to the first aspect of the present invention, a positioning monitoring device based on a building seismic isolation bearing is provided, including a positioning plate frame, a positioning plate, a laser level, embedded parts, a positioning steel mesh and an audible and visual alarm. The positioning plate frame is arranged on the positioning plate, the embedded parts are provided with at least four and the tops are respectively connected to the four corners of the positioning plate, and the bottoms are connected to the four corners of the positioning steel mesh. The audible and visual alarm is arranged on the embedded parts for monitoring the verticality of the embedded parts. A level positioning mechanism is provided at the center of the positioning plate frame, and a positioning plate casting hole corresponding to the level positioning mechanism is provided on the positioning plate. The laser level is cooperated and connected with the level positioning mechanism to ensure that the positioning plate is horizontal and the casting hole of the positioning plate remains centered.
[0009] Preferably, the surface area of the positioning plate sleeve is larger than the surface area of the positioning plate, and a center plate is provided in the middle of the positioning plate sleeve and corresponds to the casting hole of the positioning plate, the positioning plate sleeve and the positioning plate are nested and installed, and the level positioning mechanism is provided on the center plate, and the positioning plate sleeve is provided with four positioning grooves evenly spaced around the level positioning mechanism, the level positioning mechanism includes a centered level bubble and a laser positioning hole, the centered level bubble is located at the center of the positioning plate sleeve, and the laser positioning hole is evenly arranged around the centered level bubble and corresponds to the laser level.
[0010] Preferably, the edge of the center plate is 0.2 mm to 0.5 mm smaller than the edge of the casting hole of the positioning plate.
[0011] Preferably, it further comprises an edge control strip, and the center plate and the positioning groove are connected by the edge control strip.
[0012] Preferably, the positioning plate sleeve is an aluminum alloy plate with a thickness of 2 mm.
[0013] Preferably, triangular thin steel plates are provided at the four corners of the positioning steel bar mesh, and three evenly distributed anchor bar positioning holes are provided at the four corners of the triangular thin steel plate. Bolt holes corresponding to the anchor bar positioning holes are provided on the positioning plate. The bottom of the embedded part passes through the anchor bar positioning holes and is connected to the foundation, and the top is connected to the positioning plate through the bolt holes.
[0014] Preferably, the embedded part includes an embedded sleeve and an embedded anchor bar, the top of the embedded anchor bar is connected to the positioning plate, and the bottom passes through the positioning steel mesh, the embedded sleeve is sleeved on the top of the embedded anchor bar and connected to the positioning plate, and the sound and light alarm is arranged on the embedded anchor bar.
[0015] Preferably, it also includes pre-embedded bent anchor bars, the top of which is connected to the positioning plate, and the bottom passes through the positioning steel mesh.
[0016] According to a second aspect of the present invention, a method for using a positioning monitoring device based on a building seismic isolation support is provided, which is used for the positioning monitoring device based on a building seismic isolation support, and comprises the following steps: S1. Binding of steel bars for lower piers: Process and bind the steel bars for lower piers according to the design drawings, and check whether the steel bars for lower piers meet the construction requirements after binding; S2. Positioning steel bars and monitoring: Set up positioning steel mesh, arrange the main reinforcement and embedded anchor bars of the lower pier, drill anchor bar positioning holes on the triangular thin steel plate, ensure that the embedded anchor bars pass through the anchor bar positioning holes, and install sound and light alarms on the embedded anchor bars; S3. Install the positioning plate and the positioning plate frame: Connect the positioning plate and the positioning plate frame by means of nested buckles, and ensure that the positioning plate is in a horizontal and centered position; S4. Install the embedded sleeve: insert the embedded sleeve into the steel bars of the lower pier one by one and fix them with the positioning plate; S5. Concealed acceptance: Check all the specifications and quantity of steel bars, positioning plates, embedded anchor bars and embedded sleeves to ensure they meet the requirements of the design drawings; S6. Installation of lower pier formwork: Install the side formwork of the lower pier, measure the height of the formwork and control the uniformity of each side to ensure that the positioning plate and the centroid of the lower pier are centered; S7. Concrete pouring of the lower pier: Conduct concealed engineering acceptance for each component of the lower pier, pour the concrete of the lower pier at one time, and the concrete is poured into the mold at the location where the positioning plate is poured. During the pouring process, ensure that the positioning plate does not move or dislocate. After pouring, remove the positioning plate before final setting, and plaster the surface of the concrete of the lower pier to ensure that the concrete is dense and flat; S8. Installation and acceptance of seismic isolation bearings: Grind the surface of the lower pier and install the seismic isolation bearings after the concrete strength reaches the requirements. After the installation of the seismic isolation bearings is completed, conduct acceptance of the sub-projects and proceed with the superstructure construction after passing the acceptance.
[0017] Preferably, S3 specifically includes the following steps: S3-1. Elevation control: weld four short steel bars on the top surface of the lower pier. The top elevation of the short steel bars is the design elevation of the lower pier. Check the flatness of the short steel bars. Buckle the positioning plate sleeve on the positioning plate and ensure the horizontality by using the centering level bubble and laser level. S3-2, center line review: Before construction, the center line of the positioning plate 2 is popped out, and a cross engineering line is used to pull the line. The position of the positioning plate 2 can be determined by coinciding the center line with the hung cross engineering line; S3-3. Positioning plate position monitoring: The laser level monitors whether the positioning plate is in a horizontal position. If the positioning plate does not remain horizontal, the laser level will sound and light alarms.
[0018] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art: 1. The positioning monitoring device based on the building seismic isolation support of the present invention monitors the horizontality of the positioning plate at all times by arranging a positioning plate frame to be nested on the positioning plate and arranging a laser level on the positioning plate frame. A centering level bubble is provided on the positioning plate frame corresponding to the casting hole of the positioning plate to ensure that the positioning plate is in a center position and the embedding accuracy is guaranteed.
[0019] 2. The present invention provides distance control strips on the positioning plate frame. When sealing the membrane, the lower pier formwork is close to the distance control strips to ensure that the centroid of the positioning plate and the lower pier are centered. The spacing between the strips of the concrete slab after pouring is uniform, thereby ensuring the stability and uniform force of the seismic isolation bearing and improving the installation accuracy of the seismic isolation bearing.
[0020] 3. The present invention arranges positioning steel mesh, triangular thin steel plate and anchor bar positioning holes at the bottom to ensure that the embedded anchor bars pass through the anchor bar positioning holes, and arranges sound and light alarms on the embedded anchor bars to monitor the verticality of the embedded anchor bars at all times to ensure that the column bars and the embedded anchor bars are prone to collision during construction and need to be cut or bent. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the structural decomposition of the positioning monitoring device based on the building seismic isolation support of the present invention; Figure 2 This is a cross-sectional view of the installation of the positioning monitoring device based on the building seismic isolation support of the present invention; Figure 3 This is a structural diagram of the positioning plate sleeve frame of the present invention; Figure 4 It is a plan view of the positioning plate of the present invention; Figure 5 Positioning steel bar plan for the present invention; Figure 6 This is the cross-sectional view of the seismic isolation bearing installation; Figure 7 This is a process flow chart of a positioning monitoring device based on building seismic isolation bearings; Figure 8 The present invention is a flow chart of the method of using the positioning monitoring device based on the building seismic isolation bearing.
[0022] In the figure: 1. Positioning plate sleeve; 1-1. Center plate; 1-2. Positioning groove; 2. Positioning plate; 3. Lower pier; 4. Upper pier; 5. Seismic isolation bearing; 6. Laser level; 7. Centering level bubble; 8. Laser positioning hole; 9. Edge control strip; 10. Axis laser; 11. Positioning plate casting hole; 12. Bolt hole; 13. Embedded sleeve; 14. Embedded anchor bar; 15. Sound and light alarm; 16. Positioning steel mesh; 17. Anchor bar positioning hole; 18. Triangular thin steel plate; 19. Embedded bent anchor bar; 20. Positioning plate sleeve projection line; 21. Upper pier elevation; 22. Lower pier elevation; 23. Flange plate; 24. Bolt. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0024] Depend on Figures 1 to 6 As shown, a positioning monitoring device based on a building seismic isolation bearing of the present invention comprises a positioning plate frame 1, a positioning plate 2, a laser level 6, embedded parts, a positioning steel mesh 16 and an audible and visual alarm 15. The positioning plate frame 1 is nested on the positioning plate 2. The embedded parts are provided with multiple parts and the tops are respectively connected to the four corners of the positioning plate 2, and the bottoms are connected to the four corners of the positioning steel mesh 16. The audible and visual alarm 15 is provided on the embedded parts to monitor the verticality of the embedded parts. A level positioning mechanism is provided at the center of the positioning plate frame 1, and a positioning plate casting hole 11 corresponding to the level positioning mechanism is provided on the positioning plate 2. The laser level 6 is cooperatively connected to the level positioning mechanism to ensure that the positioning plate 2 is horizontal and the positioning plate casting hole 11 remains centered.
[0025] The positioning plate sleeve 1 is an aluminum alloy plate with a thickness of 2 mm. The surface area of the positioning plate sleeve 1 is larger than the surface area of the positioning plate 2. The two are installed by snap-fitting and nesting. A center plate 1-1 is provided in the middle of the positioning plate sleeve 1 and corresponds to the position of the positioning plate casting hole 11. The edge of each side of the center plate 1-1 is 0.2mm-0.5mm smaller than the edge of the positioning plate casting hole 11.
[0026] The leveling positioning mechanism is arranged on the center plate 1-1. The positioning plate frame 1 is evenly provided with four square hollow positioning grooves 1-1 with the leveling positioning mechanism as the center. The positioning plate frame 1 also includes an edge control strip 9. The center plate 1-1 and the positioning groove 2-1 are connected by the edge control strip 9. The width of the edge control strip 9 is consistent. When sealing the film, the lower pier template is close to the edge control strip 9 to ensure that the centroid of the positioning plate and the lower pier is centered, so that the spacing of the exposed concrete plate strips is uniform, which promotes the uniformity of the single and overall force of the seismic isolation support 5 after installation, and improves the stability and seismic isolation effect of the seismic isolation support 5.
[0027] The leveling positioning mechanism includes a centering level bubble 7 and a laser positioning hole 8. The centering level bubble 7 is located at the center of the positioning plate sleeve 2. A centering cross line is also provided at the center of the positioning plate sleeve 2. The laser positioning holes 8 are evenly arranged around the centering level bubble 7 and correspond to the laser level 6. The laser positioning hole 8 is used to install a detachable laser level 6 and keep it centered. The laser level 6 emits horizontal and vertical axis lasers 10 to review and monitor the axis, elevation, and centering to ensure installation accuracy. It can solve technical problems such as the disturbance or damage of the finished steel cage before pouring concrete, which will cause the steel cage to be skewed and the positioning plate to be not level and not centered and fail to be discovered in time. Real-time monitoring ensures the final embedded accuracy.
[0028] The embedded parts include embedded sleeves 13 and embedded anchor bars 14. The positioning steel mesh 16 is composed of multiple positioning steel bars. Triangular thin steel plates 18 are provided at the four corners of the positioning steel mesh 16. Three evenly distributed anchor bar positioning holes 17 are provided at the four corners of the triangular thin steel plate 18. Bolt holes 12 corresponding to the anchor bar positioning holes 17 are provided on the positioning plate 2. The bottom of the embedded anchor bar 14 passes through the anchor bar positioning holes 17 and is connected to the foundation, ensuring that the embedded anchor bar 14 is vertical, solving the problem that the column bar and the anchor bar collide during construction and need to be cut or bent to affect their pull-out resistance and anchoring length. The embedded sleeve 13 is sleeved on the top of the embedded anchor bar 14 and is fixedly connected to the positioning plate 2 through the bolt holes 12. The sound and light alarm 15 is arranged on the embedded anchor bar 14. When the sound and light alarm 15 detects that the embedded anchor bar 14 is not vertical, it will alarm. The sound and light alarm 15 will be removed before pouring concrete.
[0029] Taking into account the problem of dense local steel bars, pre-embedded bent anchor bars 19 are provided. The top of the pre-embedded bent anchor bars 19 is connected to the positioning plate 2, and the bottom passes through the positioning steel mesh 16. The pre-embedded bent anchor bars 19 can rotate flexibly, which solves the technical quality problem of insufficient anchoring length caused by the inability of the anchor bars to be lowered to the designed depth. It can be flexible and adaptable without lowering the design standards.
[0030] Depend on Figure 7 and Figure 8 As shown, a method for using a positioning monitoring device based on a building seismic isolation support is used for the positioning monitoring device based on the building seismic isolation support, comprising the following steps: S1. Binding of reinforcement bars for the lower pier: Process and bind the reinforcement bars for the lower pier according to the design drawings. During the steel bar binding process, determine the position of the embedded sleeve, embedded anchor bar or anchor rod to avoid mutual obstruction of the components, and check whether the steel bar binding of the lower pier meets the construction requirements; S2, positioning steel bars and monitoring: positioning steel bar mesh 16 is set by multiple positioning steel bars, the main bars of the lower pier and the embedded anchor bars 14 are reasonably arranged to avoid collision of the main bars, anchor bar positioning holes 17 are drilled on the triangular thin steel plate 18 to ensure that the embedded anchor bars 14 pass through the anchor bar positioning holes 17, and sound and light alarms 15 are installed on the embedded anchor bars 14 to ensure that the embedded anchor bars 14 are vertical; S3, installing the positioning plate 2 and the positioning plate frame 1: the positioning plate 2 and the positioning plate frame 1 are connected by nesting buckles to ensure that the positioning plate 1 is in a horizontal and centered position, specifically including the following steps: S3-1. Elevation control: Weld four short steel bars on the top surface of the lower pier 3, with a diameter of 12mm and a height of 200mm. The top elevation of the short steel bars is the design elevation of the lower pier 3. The upward end of the short steel bars must be cut flat with a toothless saw to check the flatness of the short steel bars; Insert the positioning plate frame 1 into the positioning plate 1, place the positioning plate frame 1 on the top surface of the four short steel bars, install the laser level 6 on the positioning plate frame 1 along the laser positioning hole 8, and observe the centered level bubble 7 with the laser level 6 to check the horizontality and axis position of the positioning plate 2. If the horizontality does not meet the construction requirements, the laser level 6 will alarm. After passing the inspection, proceed to the next step of construction. If the deviation is greater than 2mm, it should be checked and calibrated before proceeding to the next step.
[0031] S3-2. Centerline verification: Before construction and installation, pop out the centerline of the positioning plate 2, use a cross engineering line to pull the line, and the cross centerline on the positioning plate 2 coincides with the hung cross engineering line to determine the plane position of the positioning plate 2.
[0032] S3-3, position monitoring of the positioning plate 2: The laser level 6 emits an axis laser 10 to monitor whether the positioning plate 2 is in a horizontal position. If the positioning plate 2 does not remain horizontal, the laser level 6 will sound and light alarms.
[0033] S4. Install the embedded sleeve 13: insert the embedded sleeve 13 into the steel bars of the lower pier one by one, and fix them with the bolts 24 and the positioning plate 2. After fixing, check the elevation of the positioning plate 2, and recheck and record the plane position and horizontality of the positioning plate 2. Check whether the top surface of the embedded sleeve 13 is flush with the positioning plate 2, and whether the embedded anchor bar 14 is vertical. After passing the test, weld the upper and lower points of the positioning bar to the main bar of the lower pier, and fix them firmly. The positioning plate 2 and the lower connecting piece should be firmly fixed, and record them to ensure that the embedded anchor bar 14 passes through the anchor bar positioning hole 17 to ensure verticality. Install the embedded bent anchor bar 19 in the local dense steel bar area, and install the sound and light alarm 15 on the embedded anchor bar 14.
[0034] S5. Concealed acceptance: Before pouring concrete for the lower pier 3, check all specifications and quantities of the steel bars, positioning plates 2, embedded anchor bars 14 and embedded sleeves 13 to ensure that they meet the requirements of the design drawings. They can be concealed only after they have passed the inspection. Check the connection parameter table in the drawings to ensure that the sizes and models of the seismic isolation bearings 5, positioning plates 2 and embedded parts correspond.
[0035] S6. Installation of the lower pier 3 formwork: Install the side formwork of the lower pier 3, measure the formwork height and control the uniformity of each side by popping up a horizontal line on the formwork to ensure that the centroid of the positioning plate 2 and the lower pier 3 are centered; S7, pouring concrete for the lower pier 3, specifically including the following steps: S7-1: Before pouring concrete for the lower pier 3, conduct concealed engineering acceptance for the positioning plate 2 and the connecting parts, including the bolts 24 and the flange plate, and check the elevation, plane position and horizontality; S7-2: The lower pier concrete is cast in one step. The concrete is poured into the mold at the positioning plate casting hole 11. When pouring the lower pier concrete, strengthen construction management to avoid disturbing the positioning plate and connectors, ensure the accurate position of the positioning plate 2 and connectors. It is strictly forbidden to collide with the positioning plate and embedded anchor bars during the pouring process, and it is strictly forbidden to add water.
[0036] S7-3: It is forbidden to step directly on the positioning plate 2 to vibrate, so as to prevent the deviation of the axis, elevation and horizontality, which will affect the installation quality.
[0037] S7-4: When pouring concrete for the lower pier, allow the concrete to overflow the pouring hole 11 of the positioning plate and the exhaust hole by 5mm-10mm. Before the initial setting of the concrete, re-measure and record the plane position, elevation and levelness of the positioning plate 2 to ensure that the positioning plate 2 does not move or misalign.
[0038] S7-5: After the concrete pouring of the lower pier is completed and the initial setting is completed, the positioning plate 2 is removed before the final setting, and the bolt 24 is screwed back into the embedded sleeve 13. The concrete surface of the lower pier is slightly higher than the top surface of the embedded sleeve 13 by 2 to 3 mm. The excess concrete that is higher than the design elevation of the top of the lower pier is shoveled out, and the concrete surface of the top of the lower pier is plastered with original slurry before the final setting of the concrete to ensure that the finished concrete surface is dense, flat and smooth. Use a level ruler or a horizontal scraper to check the flatness and re-measure the surface of the lower pier and record it. The re-measurement content includes the elevation, center position and levelness.
[0039] S8. The installation and acceptance of the seismic isolation bearings include the following steps: S8-1. Top surface treatment: Use a level ruler to check the flatness of the surface of the lower pier 3, grind it flat with an angle grinder, and use a hair dryer to clean up the debris on the surface of the lower pier 3 and the embedded sleeve 13. The top surface of the embedded sleeve 13 should not be higher than the concrete surface of the lower pier 3. Re-measure the flatness, elevation, and axis of the surface of the lower pier 3. Only if they are qualified can the next step of construction be carried out, and measure the top surface levelness, center elevation, and plane center position. The deviation should meet the requirements of the specifications. According to the design drawings, mark the specifications and models of the seismic isolation bearing 5 on the upper surface of the lower pier 3, and check whether there are any errors in the specifications, models, positions, and elevations of the actual seismic isolation bearings on the design drawings.
[0040] S8-1. Installation of seismic isolation bearings: Seismic isolation bearing 5 is a rubber bearing. When installing seismic isolation bearing 5, the concrete strength of the lower pier should not be less than 75% of the design strength. Check the bearing model and position one by one against the design drawings. Focus on reviewing the installation positions of lead (LRB), lead-free (LNR) bearings and high damping (HDR) bearings of the same diameter. There must be no mistakes.
[0041] (1) Before installation, the bearings should be inspected to ensure that the paint surface of the connecting plate is intact. After the seismic isolation bearing 5 is in place, the connecting bolts should be tightened symmetrically: ① Screw all the bolts into the sleeves and tighten them symmetrically in two steps.
[0042] ② In general, the support connection bolts are 8.8 grade ordinary bolts with no torque requirements.
[0043] ③ If high-strength bolts are used, a torque wrench should be used to tighten them according to the initial tightening, repeated tightening and final tightening.
[0044] ④ Before the acceptance of the seismic isolation sub-project, the bolts should be checked one by one to avoid looseness; (2) Select lifting tools. You can use tower cranes, truck cranes, gantry cranes, forklifts and other lifting equipment. Lift the corresponding manufacturing specifications and models into place according to the design drawings. During the support lifting process, pay attention to protecting the seismic isolation support 5; (3) After the installation of the seismic isolation bearing 5 is completed, the plane center position, top surface center elevation, and top surface horizontality of the seismic isolation bearing 5 should be checked, and their deviations should comply with the provisions of relevant specifications; (4) Installation inspection: Check the gap between the seismic isolation bearing 5 and the surface of the lower pier 3 (the flange plate 23 is in close contact with the surface of the lower pier 3), check whether the bolts 24 are tightened, and copy the bearing production number on the nameplate (for filling in information). If there are double bearings, check that the height difference does not exceed 5 mm.
[0045] (5) Installation acceptance: After the installation of the seismic isolation bearing is completed, a sub-project acceptance should be carried out. Only after passing the acceptance can the construction of the upper pier 4 be carried out.
[0046] The present invention embeds a positioning plate sleeve on the positioning plate, and arranges a laser level on the positioning plate sleeve to monitor the horizontality of the positioning plate at all times. A centering level bubble is provided on the positioning plate sleeve corresponding to the casting hole of the positioning plate to ensure that the positioning plate is in a centered position and the pre-embedded accuracy is guaranteed; a distance control strip is provided on the positioning plate sleeve, and the lower pier template is close to the distance control strip when sealing the film to ensure that the centroid of the positioning plate and the lower pier are centered, and the spacing of the concrete slab strips after casting is uniform to ensure the stability and uniform force of the seismic isolation bearing and improve the installation accuracy of the seismic isolation bearing; a positioning steel mesh, a triangular thin steel plate and an anchor bar positioning hole are arranged at the bottom to ensure that the pre-embedded anchor bar passes through the anchor bar positioning hole, and an audible and visual alarm is arranged on the pre-embedded anchor bar to monitor the verticality of the pre-embedded anchor bar at all times to ensure that the column bar and the pre-embedded anchor bar are prone to collision during construction and the anchor bar needs to be cut or bent.
[0047] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A positioning monitoring device based on a building seismic isolation support, characterized in that: The invention comprises a positioning plate frame (1), a positioning plate (2), a laser level (6), an embedded part, a positioning steel mesh (16) and an audible and visual alarm (15), wherein the positioning plate frame (1) is arranged on the positioning plate (2), the embedded part is provided with at least four parts and the tops are respectively connected to the four corners of the positioning plate (2), and the bottoms are connected to the four corners of the positioning steel mesh (16), the audible and visual alarm (15) is arranged on the embedded part and is used to monitor the verticality of the embedded part, the positioning plate frame (1) is provided with a leveling positioning mechanism at the center, the positioning plate (2) is provided with a positioning plate casting hole (11) corresponding to the leveling positioning mechanism, and the laser level (6) is connected to the leveling positioning mechanism and is used to ensure that the positioning plate (2) is horizontal and the positioning plate casting hole (11) remains centered.
2. The positioning monitoring device based on the building seismic isolation support according to claim 1 is characterized in that: The surface area of the positioning plate frame (1) is larger than the surface area of the positioning plate (2), and a center plate (1-1) is provided in the middle of the positioning plate frame (1) and corresponds to the casting hole (11) of the positioning plate. The positioning plate frame (1) and the positioning plate (2) are nested and installed. The level positioning mechanism is provided on the center plate (1-1). The positioning plate frame (1) is provided with four positioning grooves (1-1) evenly arranged with the level positioning mechanism as the center. The level positioning mechanism comprises a center level bubble (7) and a laser positioning hole (8). The center level bubble (7) is located at the center of the positioning plate frame (2). The laser positioning hole (8) is evenly arranged around the center level bubble (7) and corresponds to the laser level (6).
3. The positioning monitoring device based on building seismic isolation bearing according to claim 1 is characterized in that: The edge of the center plate (1-1) is 0.2 mm to 0.5 mm smaller than the edge of the positioning plate casting hole (11).
4. The positioning monitoring device based on building seismic isolation bearing according to claim 2 is characterized in that: It also comprises an edge control strip (9), and the central plate (1-1) and the positioning groove (2-1) are connected by the edge control strip (9).
5. The positioning monitoring device based on building seismic isolation bearing according to claim 2 is characterized in that: The positioning plate frame (1) is an aluminum alloy plate with a thickness of 2 mm.
6. The positioning monitoring device based on building seismic isolation bearing according to claim 2 is characterized in that: Triangular thin steel plates (18) are provided at the four corners of the positioning steel bar mesh (16), and three evenly distributed anchor bar positioning holes (17) are provided at the four corners of the triangular thin steel plate (18). Bolt holes (12) corresponding to the anchor bar positioning holes (17) are provided on the positioning plate (2). The bottom of the embedded part passes through the anchor bar positioning holes (17) and is connected to the foundation, and the top is connected to the positioning plate (2) through the bolt holes (12).
7. The positioning monitoring device based on the building seismic isolation support according to claim 6 is characterized in that: The embedded part comprises an embedded sleeve (13) and an embedded anchor bar (14); the top of the embedded anchor bar (14) is connected to the positioning plate (2), and the bottom passes through the positioning steel mesh (16); the embedded sleeve (13) is sleeved on the top of the embedded anchor bar (14) and connected to the positioning plate (2); and the sound and light alarm (15) is arranged on the embedded anchor bar (14).
8. The positioning monitoring device based on the building seismic isolation support according to claim 7 is characterized in that: It also includes pre-buried bent anchor bars (19), the top of the pre-buried bent anchor bars (19) being connected to the positioning plate (2) and the bottom of the pre-buried bent anchor bars (19) passing through the positioning steel mesh (16).
9. A method for using a positioning monitoring device based on a building seismic isolation support, used for the positioning monitoring device based on a building seismic isolation support according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1. Binding of steel bars for lower piers: Process and bind the steel bars for lower piers according to the design drawings, and check whether the steel bars for lower piers meet the construction requirements after binding; S2, positioning steel bars and monitoring: setting a positioning steel bar mesh (16), arranging the main reinforcement of the lower pier and the embedded anchor bars (14), drilling anchor bar positioning holes (17) on the triangular thin steel plate (18), ensuring that the embedded anchor bars (14) pass through the anchor bar positioning holes (17), and installing an audible and visual alarm (15) on the embedded anchor bars (14); S3. Install the positioning plate (2) and the positioning plate frame (1): install and connect the positioning plate (2) and the positioning plate frame (1) by means of nested buckles, and ensure that the positioning plate (1) is in a horizontal and centered position; S4, installing the embedded sleeve (13): inserting the embedded sleeve (13) into the steel bars of the lower pier one by one, and fixing them to the positioning plate (2); S5. Concealed acceptance: Check all the specifications and quantity of steel bars, positioning plates, embedded anchor bars and embedded sleeves to ensure they meet the requirements of the design drawings; S6. Installation of the lower pier (3) formwork: Install the side formwork of the lower pier (3), measure the height of the formwork and control the uniformity of each side to ensure that the centroid of the positioning plate (2) and the lower pier (3) are centered; S7, pouring concrete of the lower pier (3): carrying out concealed engineering acceptance inspection on each component of the lower pier (3), pouring concrete of the lower pier at one time, the concrete is poured into the mold at the location of the positioning plate pouring hole (11), and during the pouring process, ensure that the positioning plate (2) does not move or misalign. After the pouring is completed and before the final setting, remove the positioning plate (2), and perform plastering treatment on the surface of the concrete of the lower pier to ensure that the concrete is dense and smooth; S8. Installation and acceptance of seismic isolation bearings: Grind the surface of the lower pier (3), install the seismic isolation bearings (5) after the concrete strength reaches the required level, and carry out acceptance of sub-projects after the installation of the seismic isolation bearings (5). After the sub-projects are qualified, carry out the construction of the upper structure.
10. The method for using the positioning monitoring device based on the building seismic isolation support according to claim 9, characterized in that: The S3 specifically includes the following steps: S3-1, elevation control: weld four short steel bars on the top surface of the lower pier (3), the top elevation of the short steel bars is the design elevation of the lower pier (3), and check the flatness of the short steel bars; buckle the positioning plate frame (1) on the positioning plate (1), and ensure the horizontality by the centering level bubble (7) and the laser level (6); S3-2, center line check: before construction, the center line of the positioning plate (2) is popped out, and a cross engineering line is used to pull the line. The position of the positioning plate (2) can be determined by aligning the center line with the hung cross engineering line; S3-3. Position monitoring of the positioning plate (2): The laser level (6) monitors whether the positioning plate (2) is in a horizontal position. If the positioning plate (2) is not kept horizontal, the laser level (6) will give an audible and visual alarm.