Construction operation platform

By introducing the design of transport shelves and drive components on the construction work platform, safe and efficient cargo transportation in high-altitude operations is achieved, the problems of low pickup efficiency and insufficient safety in the existing technology are solved, and construction efficiency and safety are improved sex.

CN119062093APending Publication Date: 2024-12-03HEILONGJIANG BADA ROAD & BRIDGE CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411251621.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-08
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing construction lifting platform is inefficient and unsafe during the pick-up process, especially when workers work at high altitudes, it is difficult for workers to quickly complete the up and down transportation of goods, which affects construction efficiency and safety.

Method used

A construction platform including a base, operating table, scissor lift rack, fence, transport rack, drive assembly and locking parts is designed, and the transport rack is made at the delivery station and the pick-up station through the drive assembly. Switch between the two parts, use linkage components and elastic parts to ensure safe cargo transportation up and down, and locking parts and unlocking parts to ensure safe pick-up of goods within the enclosure range.

Benefits of technology

It improves construction efficiency, ensures that workers can safely and quickly transport goods when working at high altitudes, avoids the necessity of scissor lifting racks to drive workers to lower the pickup, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062093A_ABST
    Figure CN119062093A_ABST
Patent Text Reader

Abstract

The invention discloses a construction operation platform, and relates to the technical field of construction lifting platforms, the construction operation platform comprises a base and an operation platform, a shear fork type lifting frame is arranged between the base and the operation platform, the construction operation platform further comprises a fence, a goods transporting frame, a driving assembly and a locking piece, the fence comprises a first fence body and a second fence body, the first fence body is fixedly installed on the operation platform, and the second fence body is fixedly installed on the operation platform; the goods conveying frame is connected to the base in a sliding mode, the second fence body is connected to the first fence body in a sliding mode, and the second fence body is provided with an enclosure station making contact with the operation table and an avoiding station far away from the operation table in the sliding stroke relative to the first fence body. Cargos can be provided for workers in advance, and the scissor-fork type lifting frame and the workers do not need to descend together to take the cargos, so that the construction efficiency can be effectively improved; and on the other hand, workers can be located within the enclosure range of the fence when taking goods, so that the workers can take the goods more safely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction lifting platforms, in particular to a construction work platform. Background Art

[0002] The construction work platform is a tool used to transport construction workers to high places for construction. It is widely used in exterior wall decoration, anti-corrosion projects, maintenance and installation, and is an indispensable tool in building construction.

[0003] The patent with announcement number CN216273001U discloses a construction work lifting platform, which includes a transport vehicle and a scissor lift. The bottom of the scissor lift is arranged on the transport vehicle, and the top of the scissor lift is provided with an operating platform; the transport vehicle is provided with a support assembly for supporting the transport vehicle. The utility model can transport workers to high altitudes for work, and is easy to move and transport, saving time and effort.

[0004] In the prior art such as the above patent, workers are transported to the air for aerial work by a scissor lift. When working in the air, workers may inevitably forget to bring construction items or run out of them. If the scissor lift is used to lift and pick up the items, it will not only be relatively troublesome, but also affect the workers' construction efficiency. Summary of the invention

[0005] The purpose of the present invention is to provide a construction work platform to solve the deficiencies in the above-mentioned prior art.

[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a construction work platform, including a base and an operating platform, a scissor-type lifting frame is arranged between the base and the operating platform, and also includes: a fence, which includes a first fence body and a second fence body, the first fence body is fixedly installed on the operating platform, the second fence body is slidably connected to the first fence body, and the second fence body has a protective station in contact with the operating platform and a avoidance station away from the operating platform in the sliding stroke relative to the first fence body; a transport rack, which is vertically slidably connected to the guide member of the base, and has a There is a cargo placement station in contact with the base and a cargo pickup station away from the base; a driving component, which is used to drive the transport rack to switch between the cargo placement station and the cargo pickup station; a locking member, which is arranged between the first column body and the second column body, when the second column body is in the enclosure station, the locking member is used to lock the first column body and the second column body, and can be unlocked by an unlocking member arranged on the transport rack; when the transport rack is switched from the cargo placement station to the cargo pickup station, the transport rack drives the second column body to switch from the maintenance station to the avoidance station through at least one group of linkage components.

[0007] Furthermore, the linkage assembly includes: a wedge block, which is fixedly connected to the second fence body and can abut and cooperate with a first inclined surface opened on the transport rack; a first elastic member, whose elastic force of restoring deformation drives the second fence body to switch from the avoidance station to the enclosure station.

[0008] Furthermore, the first elastic member includes a tension spring, one end of which is connected to the first fence body, and the other end of which is connected to the second fence body.

[0009] Furthermore, the locking member includes: an insertion rod, which is vertically slidably connected to the second fence body; a second elastic member, which is used to drive the insertion rod to slide vertically; a fixed block, which is fixedly connected to the first fence body and is provided with a through hole that is plugged into the through hole, and a second inclined surface is opened on it.

[0010] Furthermore, a slide groove is provided on the second fence body, a sliding block is slidably connected to the slide groove, and the insertion rod is fixedly connected to the sliding block.

[0011] Furthermore, the second elastic member includes a compression spring, one end of which is connected to the inner wall of the slide groove, and the other end of which is connected to the slide block.

[0012] Furthermore, the driving assembly includes: a winch, which is fixedly installed on the operating table; a pull rope, one end of which is connected to the transport rack and the other end is wound and connected to the drum of the winch; and a fixed pulley, which is used to change the pulling direction of the pull rope.

[0013] Furthermore, the number of the guide members is two.

[0014] Furthermore, the guide member includes a plurality of connecting rods which are plugged in sequence.

[0015] Compared with the prior art, the present invention provides a construction work platform, which drives a transport rack with goods to move from a loading station to a picking station through a driving component. In the process of switching from the loading station to the loading station, the transport rack is first unlocked by an unlocking component on the transport rack. After the unlocking component is unlocked, the second column body can slide relative to the first column body. After the transport rack slides further, the second column body is driven by a linkage component to slide from the maintenance station to the avoidance station. When the second column body moves from the enclosing station to the avoidance station relative to the first column body, the transport rack needs to continue to rise until it moves to the loading station; when the transport rack is at the loading station and the second column body is at the avoidance station, a closed loop is still formed to enclose the entire operating platform to ensure the safety of workers when picking up goods from the transport rack at the picking station.

[0016] On the one hand, when workers working in the air are about to run out of goods, the goods can be provided to the workers in advance without the need to lower the scissor lift with the workers to pick up the goods, thereby effectively improving the efficiency of the construction; on the other hand, the workers can be within the protection range of the fence when picking up the goods, making it safer for the workers to pick up the goods. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0018] Figure 1 A schematic diagram of the structure of the second fence provided in an embodiment of the present invention being in a protective station and the transport rack being in a cargo placing station;

[0019] Figure 2 A schematic diagram of a structure of some devices provided in an embodiment of the present invention;

[0020] Figure 3 The embodiment of the present invention provides Figure 2 The enlarged structural diagram at A in the middle;

[0021] Figure 4 A schematic diagram of the structure of a part of the device provided by an embodiment of the present invention from another perspective;

[0022] Figure 5 The embodiment of the present invention provides Figure 4 The enlarged structural diagram at B in the middle;

[0023] Figure 6 A schematic diagram of the structure of the first fence body and the second fence body in a locked state provided by an embodiment of the present invention;

[0024] Figure 7 A schematic diagram of the structure of the second column provided in an embodiment of the present invention being in an avoidance position and the transport rack being in a pickup position;

[0025] Figure 8 The embodiment of the present invention provides Figure 7 The enlarged structural diagram at C in the middle;

[0026] Fig. 9 A schematic diagram of the guide structure provided in an embodiment of the present invention.

[0027] Description of reference numerals:

[0028] 1. Base; 11. Operating table; 111. Scissor lift; 2. Fence; 21. First fence; 22. Second fence; 221. Sliding block; 3. Transport rack; 31. First inclined plane; 4. Driving assembly; 41. Hoist; 42. Pull rope; 43. Fixed pulley; 5. Locking member; 51. Insert rod; 52. Second elastic member; 53. Fixed block; 531. Through hole; 532. Second inclined plane; 6. Linkage assembly; 61. Wedge block; 62. First elastic member; 7. Guide member; 71. Connecting rod; 8. Unlocking member. DETAILED DESCRIPTION

[0029] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.

[0030] See also Figure 1-9 A construction work platform provided by an embodiment of the present invention includes a base 1 and an operating platform 11, a scissor-type lifting frame 111 is arranged between the base 1 and the operating platform 11, and also includes a fence 2, a transport rack 3, a driving assembly 4 and a locking member 5. The fence 2 includes a first fence body 21 and a second fence body 22. The first fence body 21 is fixedly installed on the operating platform 11, and the second fence body 22 is slidably connected to the first fence body 21. The second fence body 22 has a protective station in contact with the operating platform 11 and an avoidance station away from the operating platform 11 in the sliding stroke relative to the first fence body 21; the transport rack 3 is vertically slidably connected to the guide member 7 of the base 1, and the transport rack 3 has a cargo placement station in contact with the base 1 and a cargo pickup station away from the base 1 in the sliding stroke relative to the base 1; the driving assembly 4 is used to drive the transport rack 3 to switch between the cargo placement station and the cargo pickup station; the locking member 5 is arranged on the first fence body 21 and the second fence body 2 2, when the second fence body 22 is in the enclosure position, the locking member 5 is used to lock the first fence body 21 and the second fence body 22, and can be unlocked by the unlocking member 8 arranged on the transport shelf 3; when the transport shelf 3 is switched from the cargo placing position to the cargo picking position, the transport shelf 3 drives the second fence body 22 to switch from the maintenance position to the avoidance position through at least one group of linkage components 6, specifically, the linkage component 6 includes a wedge block 61 and a first elastic member 62, the wedge block 61 is fixedly connected to the second fence body 22, and the wedge block 61 can abut and cooperate with the first inclined surface 31 opened on the transport shelf 3; the elastic force of the first elastic member 62 to restore the deformation drives the second fence body 22 to switch from the avoidance position to the enclosure position, wherein the first elastic member 62 includes a tension spring, one end of the tension spring is connected to the first fence body 21, and the other end is connected to the second fence body 22, and the number of linkage components 6 is two groups, and the two groups of linkage components 6 are arranged on both sides of the operating table 11.

[0031] Compared with the prior art, the present invention provides a construction work platform, which drives the transport rack 3 with goods to move from the cargo placing station to the cargo picking station through the driving component 4. In the process of switching from the cargo placing station to the cargo picking station, the transport rack 3 first unlocks the locking member 5 through the unlocking member 8 on the transport rack 3. After the unlocking member 8 is unlocked, the second column body 22 can slide relative to the first column body 21. After the transport rack 3 slides further, the wedge block 61 fixedly connected to the second column body 22 abuts against the first inclined surface 31 of the transport rack 3, so that the second column body 22 can slide in the horizontal direction. When the wedge block 61 abuts against the first inclined surface 31 of the transport rack 3, the second column body 22 can slide in the horizontal direction. After the abutment of the inclined surface 31 is completed, the second fence body 22 moves from the enclosing position to the avoidance position relative to the first fence body 21, and the transport shelf 3 needs to continue to rise until it moves to the cargo placement position; the transport shelf 3 is at the cargo placement position and the second fence body 22 is at the avoidance position, still forming a closed loop to enclose the entire operating platform 11 to ensure the safety of workers when picking up goods from the transport shelf 3 at the picking up position. It is worth mentioning that a plurality of ball bearings (not shown in the figure) can be arranged on the wedge block 61, so that the ball bearings on the wedge block 61 can roll with the first inclined surface 31 to reduce the resistance encountered by the transport shelf 3 during the rising process.

[0032] On the one hand, when workers working in the air are about to run out of goods, the goods can be provided to the workers in advance without the need to lower the scissor lift 111 and the workers to pick up the goods, thereby effectively improving the efficiency of the construction; on the other hand, the workers can be within the protection range of the fence 2 when picking up the goods, making it safer for the workers to pick up the goods.

[0033] Among them, Figure 3 , Figure 7 as well as Figure 8The locking member 5 includes an insertion rod 51, a second elastic member 52 and a fixed block 53. The insertion rod 51 is vertically slidably connected to the second fence body 22; the second elastic member 52 is used to drive the insertion rod 51 to slide vertically; the fixed block 53 is fixedly connected to the first fence body 21, and a through hole 531 is provided on the fixed block 53 to be plugged and matched with the through hole 531. A second inclined surface 532 is provided on the fixed block 53. Specifically, a slide groove is provided on the second fence body 22, and a slider 221 is slidably connected to the slide groove. The insertion rod 51 is fixedly connected to the slider 221. The second elastic member 52 includes a compression spring. The compression spring One end of the locking member 5 is connected to the inner wall of the slide groove, and the other end is connected to the slider 221. When the operating table 11 is in the air, there are two movement processes for the locking member 5, one is the unlocking process and the other is the locking process; unlocking process: when the transport shelf 3 is rising, the unlocking member 8 will first be inserted into the through hole 531 (the insertion direction of the insertion rod 51 is opposite to the insertion direction of the unlocking member 8). The unlocking member 8 is an L-shaped rod. After the L-shaped rod is inserted into the through hole 531, the transport shelf 3 continues to rise and abuts against the insertion rod 51, so that the insertion rod 51 is separated from the through hole 531. During the process of the insertion rod 51 being separated from the through hole 531, the slider 2 is driven The first inclined surface 31 on the transport rack 3 is in contact with the wedge block 61 of the second fence body 22, so that the second fence body 22 slides horizontally, and the insertion rod 51 is separated from the L-shaped rod. The elastic force of the compression spring causes the slider 221 to reset, and then the insertion rod 51 is reset. This process completes the unlocking process of the locking member 5; and the movement of the transport rack 3 from the picking station to the placing station involves the locking process of the locking member 5; the locking process: when the second fence body 22 moves from the avoidance station to the enclosure station, the insertion rod 51 will first contact with the fixed The second inclined surface 532 on the block 53 abuts and cooperates, so that the insertion rod 51 and the slider 221 slide vertically upward, and the slider 221 squeezes the compression spring while sliding. When the insertion rod 51 moves to the through hole 531, the insertion rod 51 is no longer hindered by the fixed block 53 and receives the elastic force of the compression spring. At this time, the slider 221 and the insertion rod 51 are reset, and the insertion rod 51 is inserted through to complete the locking of the second column body 22; it is worth mentioning that there are two locking members 5 here, and the two locking members 5 are arranged on both sides of the operating table 11, and there are two corresponding unlocking members 8.

[0034] Among them, Figure 5 The driving assembly 4 includes a winch 41, a pull rope 42 and a fixed pulley 43. The winch 41 is fixedly installed on the operating table 11; one end of the pull rope 42 is connected to the transport rack 3, and the other end is wound and connected to the drum of the winch 41; the fixed pulley 43 is used to change the pulling direction of the pull rope 42. The lifting and lowering control of the slide can be achieved through the winding and unwinding of the winch 41, and the fixed pulley 43 can change the pulling direction of the pull rope 42.

[0035] Among them, the guide member 7 includes a plurality of connecting rods 71 ​​that are plugged in sequentially. The guide member 7 can limit the sliding direction and position of the transport shelf 3. The height to which the transport shelf 3 needs to rise varies according to the height of the operating table 11, and thus the required height for the guide member 7 is different. In this way, the number of connecting rods 71 ​​constituting the guide member 7 can be selected according to the required height, so that the guide member 7 can be adapted to the required rising height of the transport shelf 3.

[0036] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A construction work platform, comprising a base (1) and an operating platform (11), wherein a scissor-type lifting frame (111) is arranged between the base (1) and the operating platform (11); characterized in that: Also includes: A fence (2) comprising a first fence body (21) and a second fence body (22), wherein the first fence body (21) is fixedly mounted on an operating table (11), and the second fence body (22) is slidably connected to the first fence body (21), and the second fence body (22) has a protective position in contact with the operating table (11) and a avoidance position away from the operating table (11) in a sliding stroke relative to the first fence body (21); A transport rack (3) is vertically slidably connected to a guide member (7) of a base (1), and has a placing position in contact with the base (1) and a picking position away from the base (1) during its sliding stroke relative to the base (1); A driving assembly (4) for driving the transport rack (3) to switch between a placing station and a picking station; A locking member (5) is arranged between the first fence (21) and the second fence (22). When the second fence (22) is in the enclosure position, the locking member (5) is used to lock the first fence (21) and the second fence (22), and can be unlocked by an unlocking member (8) arranged on the transport rack (3); When the transport rack (3) is switched from the placing position to the picking position, the transport rack (3) drives the second column (22) to switch from the maintenance position to the avoidance position through at least one group of linkage components (6).

2. A construction work platform according to claim 1, characterized in that: The linkage component (6) comprises: A wedge-shaped block (61) is fixedly connected to the second fence body (22) and can abut against a first inclined surface (31) formed on the transport rack (3); The elastic force of the first elastic member (62) to restore its deformation drives the second fence body (22) to switch from the avoidance position to the enclosure position.

3. A construction work platform according to claim 2, characterized in that: The first elastic member (62) comprises a tension spring, one end of which is connected to the first fence body (21), and the other end of which is connected to the second fence body (22).

4. A construction work platform according to claim 1, characterized in that: The locking member (5) comprises: An insertion rod (51) vertically slidably connected to the second fence body (22); A second elastic member (52) for driving the insertion rod (51) to slide vertically; The fixed block (53) is fixedly connected to the first fence body (21), and is provided with a through hole (531) for plugging and matching with the plug rod (51), and is provided with a second inclined surface (532).

5. A construction work platform according to claim 4, characterized in that: The second fence body (22) is provided with a sliding groove, a sliding block (221) is slidably connected to the sliding groove, and the insertion rod (51) is fixedly connected to the sliding block (221).

6. A construction work platform according to claim 5, characterized in that: The second elastic member (52) comprises a compression spring, one end of which is connected to the inner wall of the slide groove, and the other end of which is connected to the slide block (221).

7. A construction work platform according to claim 1, characterized in that: The driving assembly (4) comprises: A winch (41) fixedly mounted on the operating platform (11); A pull rope (42), one end of which is connected to the transport rack (3), and the other end of which is wound and connected to the drum of the winch (41); The fixed pulley (43) is used to change the pulling direction of the pull rope (42).

8. A construction work platform according to claim 1, characterized in that: The number of the guide members (7) is two.

9. A construction work platform according to claim 8, characterized in that: The guide member (7) comprises a plurality of connecting rods (71) which are plugged in sequence.