Water supply pipe network layout construction process
The stability and cost reduction of pipelines are achieved in the installation of water supply pipelines through multi-layer shock absorption buffer devices, and the construction cost and labor intensity problems caused by the inability to remove the buffer brackets in the prior art are solved.
Patent Information
- Application Number
- CN202410970418.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing water supply pipeline installation process, the buffer bracket cannot be removed after each pipeline is installed, resulting in an increase in construction costs and an increase in labor intensity.
Multi-layer shock absorbing buffering device, including shock absorbing brackets, limit columns, flip blocks, hinge plates and spring components, fall into the bracket through the pipe weight and use elastic ropes and compression rollers to perform multi-layer shock absorption to ensure the stability of the pipe. and quickly remove after a single pipeline is placed to reduce construction costs.
The stability of pipeline installation and multi-layer shock absorption effect are achieved, while reducing construction costs and labor intensity for workers, making it convenient for pipeline alignment and installation.
Smart Images

Figure CN119062825A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water supply pipe network installation construction technology, and in particular, to a water supply pipe network installation construction technology. Background Art
[0002] Water pipe network layout refers to the process of planning and arranging the pipe system inside a city or building, including water supply pipes and drainage pipes. In order to ensure long-term stable operation, water pipes will give priority to corrosion-resistant, pressure-resistant, and wear-resistant materials. During the installation process of water supply pipes and drainage pipes, the slope, connection method, and bracket of the pipes need to be considered to ensure the stability of the pipe system and smooth drainage.
[0003] In the prior art, a Chinese patent with publication number "CN113074280B" discloses a highway drainage pipe installation process, in which a buffer bracket used in the installation process includes a bottom plate, an airbag fixed on the upper end surface of the bottom plate, a top plate fixed on the upper end surface of the airbag, and an arc-shaped bottom frame fixed on the upper end surface of the top plate, and the arc-shaped bottom frame opens upward.
[0004] Although the above technology can ensure that the outer wall of the pipeline will not be damaged and can reduce the labor intensity of workers, this installation method has the following technical problems: the pipeline on the road is composed of several sections of pipelines, and each section of the pipeline requires a buffer bracket for installation. After installation, the buffer bracket cannot be removed, which adds a large amount of additional expenses during the laying process of the pipeline, that is, increases the construction cost. Summary of the invention
[0005] The present invention proposes a water supply pipe network installation construction process, which can play a multi-layer shock-absorbing role on the falling pipes, thereby ensuring the stability of the pipe installation and reducing the construction cost.
[0006] The technical solution of the present invention is as follows:
[0007] The water supply network installation process includes the following process steps:
[0008] S100: Plan the direction of the water supply pipeline, purchase the water supply pipeline, and mark the pipeline location, waiting for trenching;
[0009] S200: Trenching: trenching is performed in the road marking area;
[0010] S300: Installing a buffer device: installing a group of water supply pipe brackets at a certain distance in the groove, and after installing each group of water supply pipe brackets, installing the buffer device between two adjacent groups of water supply pipe brackets;
[0011] S400: Laying pipes: Hang the purchased pipes above two sets of water supply pipe brackets with buffer devices, then place the pipes on the buffer devices, and finally limit them on the two sets of water supply pipe brackets;
[0012] S500: Pipeline assembly: After separating the buffer device from the water supply pipe bracket, take out the groove, and then assemble several limited pipe units in sequence;
[0013] S600: Backfilling: Fill the trench with the pipe.
[0014] Step S400 of laying pipelines includes the following steps:
[0015] S410: placing a single pipe on the buffer device, and then gradually dropping the pipe into the two sets of water supply pipe supports by the pipe's own weight, and after the single pipe has been placed, removing the buffer device from between the two sets of water supply pipe supports and installing it in the two adjacent sets of water supply pipe supports;
[0016] S420: Then, the next pipe is hoisted above two sets of water supply pipe supports with buffer devices, and after the pipe falls on the two sets of water supply pipe supports, the position of the pipe is adjusted with that of the previous pipe, and then the buffer device is removed to continue the installation of the next pipe.
[0017] Furthermore, the buffer device includes two shock-absorbing brackets, both sides of which are fixedly connected to limiting columns, each of which is slidably connected to a second flip block, each of which is hinged with a flip plate, each of which is hinged to a first flip block at one end of the flip plate away from the second flip block, each of which is slidably connected to a limiting block at one end of the first flip block away from the flip plate, each of which is slidably connected to a screw on the water supply pipe bracket, a shock-absorbing assembly for buffering and shock-absorbing the falling pipe is connected between the two shock-absorbing brackets, a covering assembly for cooperating with the shock-absorbing assembly to limit the pipe is connected between the two shock-absorbing brackets, and a clamping assembly for reducing the working pressure of the shock-absorbing assembly is connected to each shock-absorbing bracket.
[0018] Furthermore, the shock absorbing assembly includes an adjusting column, which is rotatably connected to the shock absorbing bracket, a transmission block is threadedly connected to the adjusting column, a linkage block is fixedly connected to the transmission block, two reset columns are slidably connected to the linkage block, one end of each reset column away from the linkage block is fixedly connected to a shock absorbing plate, two locking hooks are fixedly connected to the shock absorbing plate, a shock absorbing spring is sleeved on each reset column, and two ends of the shock absorbing spring are respectively abutted against the linkage block and the shock absorbing plate.
[0019] Furthermore, a first gear is fixedly connected to the adjusting column, a second gear is rotatably connected to the shock absorbing bracket, the first gear is meshed with the second gear, and an adjusting handle is coaxially fixedly connected to a side of the second gear away from the adjusting column.
[0020] Furthermore, the clamping assembly includes a support plate, a guide plate is fixedly connected to the support plate, a transmission roller is rotatably connected to the guide plate, a positioning groove is opened on the guide plate, a clamping roller is slidably connected to the inner wall of the positioning groove, both ends of the clamping roller are rotatably connected to the clamping plate, a positioning column is slidably connected to the clamping plate, the two ends are respectively fixedly connected with a first positioning plate and a second positioning plate, the first positioning plate and the second positioning plate are both fixedly connected to the outer wall of the guide plate, a clamping spring is sleeved on the positioning column, and the two ends of the compression spring are respectively abutted against the second positioning plate and the clamping plate.
[0021] Furthermore, the covering assembly includes a covering cloth, to which two elastic ropes are fixedly connected, and one end of each elastic rope away from the covering cloth is fixedly connected to a hook, and the hook is in contact with the locking hook.
[0022] Furthermore, both sides of the upper end of the shock-absorbing bracket are rotatably connected to guide wheels, and the elastic rope is in contact with the clamping roller, the transmission roller and the outer wall of the guide wheel in sequence.
[0023] The beneficial effects of the present invention are:
[0024] The shock-absorbing assembly cooperates with the covering assembly and the clamping assembly to enable the buffer device to play a multi-layer shock-absorbing role on the falling pipe, thereby ensuring the stability of the pipe installation. At the same time, after a single pipe is installed, the buffer device can be quickly removed and used for the installation of the next pipe, reducing construction costs. The shock-absorbing assembly can control the distance between the V-shaped contact surface of the pipe and the water supply pipe bracket, so that when the next pipe is aligned with the previous pipe, it can be convenient for workers to align and install it, reducing the labor intensity of workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0026] Figure 1 It is a schematic diagram of the positive axis of the present invention;
[0027] Figure 2 for Figure 1 A is an enlarged schematic diagram;
[0028] Figure 3 It is a local positive axis schematic diagram of the present invention;
[0029] Figure 4 It is a partial cross-sectional schematic diagram of the present invention;
[0030] Figure 5 It is a schematic cross-sectional view of the clamping assembly of the present invention;
[0031] Figure 6for Figure 3 A magnified schematic diagram of B;
[0032] Figure 7 It is a partial positive axis enlarged schematic diagram of the present invention.
[0033] In the figure: 1. shock absorbing assembly; 11. clamping roller; 12. guide plate; 121. positioning groove; 13. transmission roller; 14. support plate; 15. adjustment column; 16. transmission block; 17. linkage block; 18. reset column; 19. shock absorbing spring; 110. lock hook; 111. shock absorbing plate; 112. adjustment handle; 113. first gear; 114. second gear; 21. shock absorbing bracket; 23. first flip block; 24. flip plate; 25. second flip block; 26. limiting column; 27. guide wheel; 28. limiting block; 311. first positioning plate; 312. second positioning plate; 32. positioning column; 33. clamping plate; 34. clamping spring; 4. water supply pipe bracket; 5. covering cloth; 51. elastic rope; 52. hook. DETAILED DESCRIPTION
[0034] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] like Figure 1 to Figure 7 As shown, this embodiment proposes a water supply network installation construction process, including the following process steps:
[0036] S100: Plan the direction of the water supply pipeline, purchase the water supply pipeline, and mark the pipeline location, waiting for trenching;
[0037] S200: Trenching: trenching is performed in the road marking area;
[0038] S300: Installing a buffer device: installing a group of water supply pipe brackets 4 at a certain distance in the groove, and after installing each group of water supply pipe brackets 4, installing the buffer device between two adjacent groups of water supply pipe brackets 4;
[0039] S400: Laying pipes: Hang the purchased pipes above two sets of water supply pipe brackets 4 with buffer devices, then place the pipes on the buffer devices, and finally limit them on the two sets of water supply pipe brackets 4;
[0040] S500: After separating the buffer device from the water supply pipe support 4, taking out the groove, and then assembling a plurality of position-limiting pipe units in sequence;
[0041] S600: Backfilling: Fill the trench with the pipe.
[0042] like Figure 1 to Figure 7 As shown, step S400 of laying pipelines includes the following steps:
[0043] S410: placing a single pipe on the buffer device, and then gradually dropping the pipe into the two groups of water supply pipe supports 4 by the pipe's own weight, and after the single pipe has been placed, removing the buffer device from between the two groups of water supply pipe supports 4 and installing it in the two adjacent groups of water supply pipe supports 4;
[0044] S420: Then, the next pipe is hoisted above the two sets of water supply pipe supports 4 with buffer devices, and after the pipe falls on the two sets of water supply pipe supports 4, the position of the pipe is adjusted with that of the previous pipe, and then the buffer device is removed to continue the installation of the next pipe.
[0045] like Figure 1 to Figure 7 As shown, the buffer device includes two shock-absorbing brackets 21, two limit columns 26 are fixedly connected on both sides of the shock-absorbing brackets 21, and each second flip block 25 is slidably connected to each limit column 26. Each second flip block 25 is hinged to each flip plate 24, and one end of each flip plate 24 away from the second flip block 25 is hinged to each first flip block 23, and one end of each first flip block 23 away from the flip plate 24 is slidably connected to the limit block 28. Each limit block 28 is slidably abutted against the screws on the water supply pipe bracket 4. The shock-absorbing bracket 21 determines that the shock-absorbing bracket 21 is located in the middle of the two water supply pipe brackets 4 through the alignment of the two first flip blocks 23 and the adjacent water supply pipe brackets 4 on both sides, which plays a balancing role when the pipeline falls, prevents the pipeline from being one high and one low during the downward movement, and thereby ensures that the pipeline can be stably installed.
[0046] The shock absorbing component 1 for buffering and absorbing the falling pipe is connected to the shock absorbing bracket 21, the covering component for limiting the pipe in cooperation with the shock absorbing component 1 is connected between the two shock absorbing brackets 21, and the clamping components for reducing the working pressure of the shock absorbing component 1 are connected to each shock absorbing bracket 21. The shock absorbing component 1 cooperates with the covering component and the clamping component so that the buffer device can play a multi-layer shock absorbing role on the falling pipe, thereby ensuring the stability of the pipe installation. At the same time, after a single pipe is installed, the buffer device can be quickly dismantled for the installation of the next pipe, thereby reducing the construction cost. The shock absorbing component 1 can control the distance between the V-shaped contact surface of the pipe and the water supply pipe bracket 4, so that when the next pipe is aligned with the previous pipe, it can be convenient for workers to align and install it, thereby reducing the labor intensity of workers.
[0047] like Figure 3 to Figure 5 and Figure 7As shown, the shock absorbing assembly 1 includes an adjusting column 15, which is rotatably connected to the shock absorbing bracket 21, a transmission block 16 is threadedly connected to the adjusting column 15, a linkage block 17 is fixedly connected to the transmission block 16, and two reset columns 18 are slidably connected to the linkage block 17. One end of each reset column 18 away from the linkage block 17 is fixedly connected to the shock absorbing plate 111, and two locking hooks 110 are fixedly connected to the shock absorbing plate 111. Each shock absorbing spring 19 is sleeved on each reset column 18, and the two ends of the shock absorbing spring 19 are respectively abutted against the linkage block 17 and the shock absorbing plate 111. When the covering cloth 5 performs shock absorbing on the falling of the pipeline, the movement direction of the shock absorbing plate 111 is upward at this time. Therefore, by rotating the adjusting column 15, the height of the transmission block 16 can be adjusted, that is, the height of the shock absorbing plate 111 can be controlled, and then the covering cloth 5 is subjected to a layer of shock absorbing effect through the shock absorbing spring 19.
[0048] To further illustrate, the shock absorbing plate 111 can adjust its own material or weight, and the speed at which the covering cloth 5 moves downward can be slowed down by the self-weight of the shock absorbing plate 111, thereby achieving a further shock absorbing effect.
[0049] like Figure 4 and Figure 7 As shown, the first gear 113 is fixedly connected to the adjusting column 15, and the second gear 114 is rotatably connected to the shock-absorbing bracket 21. The first gear 113 and the second gear 114 are meshed, and the second gear 114 is coaxially fixedly connected to the adjusting handle 112 away from the adjusting column 15. The user adjusts the height of the shock-absorbing plate 111 by rotating the adjusting handle 112, thereby controlling the tension of the elastic rope 51, that is, controlling the downward movement speed of the covering cloth 5, so that the covering cloth 5 can cope with pipes of different specifications, thereby increasing practicality.
[0050] like Figure 3 to Figure 7As shown, the clamping assembly includes a support plate 14, a guide plate 12 is fixedly connected to the support plate 14, a driving roller 13 is rotatably connected to the guide plate 12, a positioning groove 121 is provided on the guide plate 12, an inner wall of the positioning groove 121 is slidably connected to the clamping roller 11, two clamping plates 33 are rotatably connected to both ends of the clamping roller 11, the clamping plate 33 is slidably connected to the positioning column 32, and both ends are fixedly connected to the first positioning plate 311 and the second positioning plate 312, respectively, the first positioning plate 311 and the second positioning plate 312 are both fixedly connected to the outer wall of the guide plate 12, a clamping spring 34 is sleeved on the positioning column 32, and both ends of the clamping spring 34 are respectively The second retaining plate 312 and the pressure plate 33 are respectively in contact with each other, and the pressure plate 33, under the action of the pressure spring 34, moves the pressure roller 11 toward the driving roller 13, so that the pressure roller 11 and the driving roller 13 can clamp the elastic rope 51 wound therein, thereby slowing down the speed at which the covering cloth 5 moves downward due to the falling of the pipeline. At the same time, when the elastic rope 51 is not stretched enough, the force of the covering cloth 5 moving downward will straighten the elastic rope 51, that is, push the pressure roller 11 toward the second retaining plate 312, thereby releasing part of the length of the elastic rope 51, and the pressure spring 34 can also play a shock-absorbing role in the downward movement of the covering cloth 5.
[0051] like Figure 7 As shown, the covering assembly includes a covering cloth 5, and the covering cloth 5 is fixedly connected to two elastic ropes 51, and one end of each elastic rope 51 away from the covering cloth 5 is fixedly connected to a hook 52. The elastic rope 51 itself has the characteristic of stretching and rebounding, so when the covering cloth 5 moves down due to the falling of the pipeline, the elasticity of the elastic rope 51 itself is used as a layer of shock absorption to cushion the falling of the pipeline. The hook 52 is in contact with the locking hook 110. The worker can lock the hook 52 with the locking hook 110 so that the covering cloth 5 can cover and shock the falling pipeline. At the same time, the installed pipeline can be separated from the covering cloth 5 by separating the hook 52 from the locking hook 110, thereby increasing practicality.
[0052] like Figure 7 As shown, the two guide wheels 27 are rotatably connected to both sides of the upper end of the shock-absorbing bracket 21, and the elastic rope 51 is in contact with the outer walls of the clamping roller 11, the transmission roller 13 and the guide wheel 27 in turn. The clamping roller 11 is pressed toward the transmission roller 13, so that the elastic rope 51 wound around the clamping roller 11 and the transmission roller 13 is clamped, which can slow down the speed at which the covering cloth 5 falls due to the pipeline. The guide wheel 27 plays a supporting role, so that the rope body of the elastic rope 51 will not rub against the corners of the support plate 14 during the stretching or rebounding process, thereby ensuring the service life of the support plate 14.
[0053] The principle of this embodiment is:
[0054] The workers draw the water supply route through the water supply pipe, then mark out the area, and then use the excavator to dig a groove large enough to put the pipe in the road. Then the workers measure the length of the pipe, and then calculate the number of water supply pipe brackets 4 to be laid and the laying distance between the two sets of water supply pipe brackets 4. Then the workers install the water supply pipe brackets 4 along the marked route, that is, the screws on the water supply pipe brackets 4 are inserted into the bottom wall of the groove, so that the pipe can rely on the two sets of water supply pipe brackets 4 to complete the limit support function;
[0055] Then the workers will install the buffer device:
[0056] Step 1: The worker aligns the two limit blocks 28 with the two adjacent water supply pipe supports 4, and then slides the two second flip blocks 25 on the shock-absorbing support 21 along the limit columns 26 to open the flip plate 24, so that the first flip block 23 is slidably engaged with the limit block 28 on this side, and after waiting for the two first flip blocks 23 to be engaged, insert the shock-absorbing support 21 into the bottom of the groove. The two shock-absorbing supports 21 can be completely embedded in the groove by hammering so that the shock-absorbing support 21 can be supported. Then the elastic rope 51 is passed around the clamping roller 11, the transmission roller 13 and the guide wheel 27 in turn, and the hooks 52 at both ends of the elastic rope 51 are engaged with the locking hooks 110, so that the elastic rope 51 with the covering cloth 5 naturally droops, and then the worker lifts the pipeline by the crane and moves it to the top of the buffer device, and then after lowering it to the lowest distance, the pipeline is dropped, and the pipeline falls on the covering cloth 5. The first layer of shock absorption is completed through the elastic force of the elastic rope 51 itself, and then it is pressed. The roller 11 clamps the elastic rope 51 along the direction of the clamping groove 121 through the compression spring 34. The compression roller 11 and the transmission roller 13 clamp the elastic rope 51 to slow down the speed of the covering cloth 5 moving downward due to the pipeline, completing the second layer of shock absorption. Then, the shock absorbing spring 19 acts to buffer the elastic rope 51 when it moves upward with the lock hook 110, completing the third layer of shock absorption. At the same time, the shock absorbing plate 111 itself also has weight, which can slow down the working pressure of the shock absorbing spring 19 to a small extent. Under the action of multiple layers of shock absorption, the pipeline can slowly pass through the covering cloth 5 and fall on the two groups of water supply pipe brackets 4. The worker can adjust the height of the shock absorbing plate 111 by rotating the adjustment handle 112, that is, control the working pressure of the shock absorbing spring 19. After the single pipeline has been placed on the two groups of water supply pipe brackets 4, because the pipeline still has an upward force from the covering cloth 5, the worker can limit the position of the pipeline. After the adjustment is completed, wait for the second step of work;
[0057] Step 2: The worker rotates the adjustment handle 112 to increase the height of the shock absorbing plate 111, so that the elastic rope 51 can release part of the elastic force, which is convenient for the worker to remove the hook 52 from the lock hook 110, and then the remaining components are moved out in turn. After the removal is completed, the buffer device is moved to the two adjacent groups of water supply pipe brackets 4, and each component is limited according to the installation sequence of the first step, and then each pipeline is installed in turn. Finally, the worker splices the pipeline. After the splicing is completed, the pipeline pressure test is carried out and the pipeline is inspected. After the inspection is qualified, the soil is backfilled to hide the pipeline in the trench, and the laying of the pipeline is completed.
[0058] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A water supply network installation construction process, characterized in that: The process steps include: S100: Plan the direction of the water supply pipeline, purchase the water supply pipeline, and mark the pipeline location, waiting for trenching; S200: Trenching: trenching is performed in the road marking area; S300: Installing the buffer device: installing a group of water supply pipe brackets (4) at a certain distance in the groove, and after installing each group of water supply pipe brackets (4), installing the buffer device between two adjacent groups of water supply pipe brackets (4); S400: Laying pipes: hanging the purchased pipes above two sets of water supply pipe brackets (4) with buffer devices, then placing the pipes on the buffer devices, and finally limiting them on the two sets of water supply pipe brackets (4); S500: Pipeline assembly: After separating the buffer device from the water supply pipe support (4), taking out the groove, and then assembling a plurality of limited pipe units in sequence; S600: Backfilling: Fill the trench with the pipe.
2. The water supply network installation construction process according to claim 1, characterized in that: Step S400 includes: S410: placing a single pipe on the buffer device, and then gradually dropping the pipe into the two groups of water supply pipe supports (4) by the pipe's own weight, and after the single pipe has been placed, removing the buffer device from between the two groups of water supply pipe supports (4) and installing it in the two adjacent groups of water supply pipe supports (4); S420: Then the next pipe is hoisted above the two sets of water supply pipe brackets (4) with buffer devices, and after the pipe falls on the two sets of water supply pipe brackets (4), the position of the pipe is adjusted with the previous pipe, and then the buffer device is removed to continue the installation of the next pipe.
3. The water supply network installation construction process according to claim 1, characterized in that: The buffer device in step S400 comprises two shock-absorbing brackets (21), both sides of the shock-absorbing brackets (21) are fixedly connected to limiting columns (26), each limiting column (26) is slidably connected to a second flip block (25), each second flip block (25) is hingedly connected to a flip plate (24), each flip plate (24) is hingedly connected to a first flip block (23) at one end away from the second flip block (25), and each first flip block (23) is hingedly connected to a second flip block (25). One end of the flip plate (24) is slidably connected to a limiting block (28), each of the limiting blocks (28) is slidably abutted against a screw on the water supply pipe bracket (4), a shock absorbing component (1) for buffering and absorbing the falling pipe is connected between the two shock absorbing brackets (21), a covering component for cooperating with the shock absorbing component (1) to limit the position of the pipe is connected between the two shock absorbing brackets (21), and each shock absorbing bracket (21) is connected to a clamping component for reducing the working pressure of the shock absorbing component (1).
4. The water supply network installation construction process according to claim 3, characterized in that: The shock absorbing assembly (1) comprises an adjusting column (15), the adjusting column (15) is rotatably connected to a shock absorbing bracket (21), a transmission block (16) is threadedly connected to the adjusting column (15), a linkage block (17) is fixedly connected to the transmission block (16), two reset columns (18) are slidably connected to the linkage block (17), one end of each reset column (18) away from the linkage block (17) is fixedly connected to a shock absorbing plate (111), two locking hooks (110) are fixedly connected to the shock absorbing plate (111), and each reset column (18) is sleeved with a shock absorbing spring (19), and two ends of the shock absorbing spring (19) are respectively in contact with the linkage block (17) and the shock absorbing plate (111).
5. The water supply network installation construction process according to claim 4, characterized in that: The adjusting column (15) is fixedly connected with a first gear (113), the shock absorbing bracket (21) is rotatably connected with a second gear (114), the first gear (113) and the second gear (114) are meshed, and the second gear (114) is coaxially fixedly connected with an adjusting handle (112) on a side away from the adjusting column (15).
6. The water supply network installation construction process according to claim 3, characterized in that: The clamping assembly comprises a support plate (14), the support plate (14) is fixedly connected with a guide plate (12), the guide plate (12) is rotatably connected with a transmission roller (13), the guide plate (12) is provided with a positioning groove (121), a clamping roller (11) is slidably connected on the inner wall of the positioning groove (121), both ends of the clamping roller (11) are rotatably connected with a clamping plate (33), the clamping plate (33) is slidably connected with a positioning column (32), the two ends are respectively fixedly connected with a first positioning plate (311) and a second positioning plate (312), the first positioning plate (311) and the second positioning plate (312) are both fixedly connected with the outer wall of the guide plate (12), a clamping spring (34) is sleeved on the positioning column (32), and the two ends of the clamping spring (34) are respectively abutted against the second positioning plate (312) and the clamping plate (33).
7. The water supply network installation construction process according to claim 6, characterized in that: The covering assembly comprises a covering cloth (5), to which two elastic ropes (51) are fixedly connected, and one end of each elastic rope (51) away from the covering cloth (5) is fixedly connected to a hook (52), and the hook (52) abuts against a locking hook (110).
8. The water supply network installation construction process according to claim 7, characterized in that: Both sides of the upper end of the shock-absorbing bracket (21) are rotatably connected to guide wheels (27), and the elastic rope (51) is in contact with the outer wall of the pressing roller (11), the transmission roller (13) and the guide wheel (27) in sequence.