Double-return-stroke vertical gas water jacket furnace
By adding flue gas return and fin tube design in the vertical gas water jacket furnace, the problems of low burner efficiency and high smoke exhaust temperature are solved, the thermal efficiency and safety are improved, and the characteristics of the diverse accompanying gas components in the oil field are adapted to the oil field. .
Patent Information
- Application Number
- CN202310653609.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-02
- Publication Date
- 2024-12-03
AI Technical Summary
The existing vertical water jacket furnace burners have low efficiency, high smoke exhaust temperature, and waste gas energy, resulting in low thermal efficiency.
A dual return trip vertical gas water jacket furnace was designed. By increasing the flue gas return trip and the use of fin tubes, the heat exchange area and heat recovery are increased, the flue gas emission temperature is reduced, and the explosion-proof is set on the top of the upper smoke box. Door to reduce accident risk.
It improves the thermal efficiency of the gas water jacket furnace, reduces energy waste, reduces flue gas emission temperature, reduces accident risk, and facilitates ash cleaning operation.
Smart Images

Figure CN119063249A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of crude oil transport and heating equipment and relates to a double-return vertical gas-fired water-jacketed furnace. Background Art
[0002] Crude oil heating is a very important part of the surface gathering and transportation process of oil fields. It plays an important role in ensuring the safety of crude oil transportation, reducing wax deposition in oil pipelines, and demulsification of produced fluids. The water-jacketed furnace is an indispensable main equipment in the production and gathering and transportation process of oil and gas fields. It is mainly responsible for heating oil and gas field products and supplying energy to the gathering and transportation system. At the same time, it is also one of the largest self-consumable fuel equipment in oil and gas fields. Its technical level and thermal efficiency directly affect the level of surface engineering construction, energy conservation and emission reduction, and economic benefits of oil and gas fields.
[0003] In the prior art, the most common water jacket furnace is the vertical water jacket furnace, which is widely used due to its simple structure, small footprint, and convenient loading and unloading of heating coils. However, during use, the vertical water jacket furnace has low burner efficiency and low furnace flame temperature of the commonly used burner, and generally has problems such as high exhaust temperature, low combustion efficiency, and waste of gas energy. Summary of the invention
[0004] The purpose of the present invention is to provide a double-return vertical gas-fired water-jacketed furnace, which prolongs the distance of the flue gas of the heating furnace in the boiler drum and increases the heat exchange area, thereby achieving the purpose of improving the efficiency of the heating furnace.
[0005] The scheme of the present invention is a double-return vertical gas-fired water-jacketed boiler, comprising a cylindrical boiler drum, a furnace core is sleeved inside the boiler drum, a burner is fixedly connected to the lower part of the outer surface of the boiler drum, the furnace core passes through the boiler drum and is connected to the burner, an annular upper smoke box is arranged on the top of the furnace core, a plurality of smoke pipes are arranged on the inner surface of the upper smoke box, a lower smoke box group is connected to the end of the smoke pipe away from the upper smoke box, the lower smoke box group is connected to a chimney through a circular smoke pipe, a heating coil is installed in the cavity between the boiler drum and the furnace core, the top of the heating coil passes through the boiler drum, two liquid level gauge interfaces are arranged on the upper part of the side of the boiler drum, and a pipeline interface group is arranged on the outer surface of the boiler drum.
[0006] The present invention is also characterized in that: an explosion-proof door is provided on the top of the upper smoke box;
[0007] The lower smoke box group is arranged at the bottom end of the boiler drum;
[0008] The lower smoke box group includes a rectangular smoke box shell, a plurality of rows of fin tubes are arranged on the left side of the smoke box shell, a static pressure box is arranged on the right side of the smoke box shell, one end of the fin tube passes through the smoke box shell to contact the atmosphere, and the other end is connected to the static pressure box, and an ash cleaning port is also arranged on the surface of the smoke box wall, a flange blind plate is fixed to the side of the ash cleaning port, and the smoke box wall is connected to the chimney through a circular smoke pipe;
[0009] A burner air supply pipe is fixedly connected to one side of the static pressure box away from the fin tube, and the burner air supply pipe is connected to the burner;
[0010] The bottom of the chimney is fixedly connected to the boiler drum, and a cable is provided at the top of the chimney;
[0011] An atmosphere connecting pipe is provided on the top of the boiler drum;
[0012] The pipeline interface group includes an overflow pipe interface arranged on the outer surface of the boiler drum near the chimney, a heating water supply pipe interface is arranged obliquely below the overflow pipe interface, a heating return water pipe interface is arranged below the heating water supply pipe interface, and also includes a drainage pipe interface and a water supply pipe interface opened at the bottom of the outer surface of the boiler drum.
[0013] The beneficial effects of the present invention are:
[0014] 1. The present invention increases the flue gas return path, increases the heat exchange area, improves the recovery of combustion heat, reduces the flue gas emission temperature, reduces energy waste, and can effectively improve the thermal efficiency of the vertical gas-fired water-jacketed boiler;
[0015] 2. The invention is provided with an explosion-proof door on the top, and the explosion-release direction is upward, away from the personnel operation area, thus reducing the risk of injury caused by boiler accidents;
[0016] 3. The present invention sets a fin tube in the lower smoke box as a burner air preheater, uses low-temperature flue gas to heat the combustion air, and maximizes the use of heat in the flue gas;
[0017] 4. The smoke pipe of the furnace of the present invention is arranged vertically, so ash is not easy to adhere to, which reduces the blockage of the smoke pipe of the furnace;
[0018] 5. The present invention provides cleaning facilities on the upper smoke box and the lower smoke box respectively, which is convenient for daily furnace cleaning work and adapts to the characteristics of diverse components of associated gas in oil fields and easy accumulation of dust in the flue. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the side of the double-return vertical gas-fired water-jacketed furnace of the present invention;
[0020] Figure 2 It is a schematic structural diagram of a side cross-section of a double-return vertical gas-fired water-jacketed furnace of the present invention;
[0021] Figure 3 It is a schematic structural diagram of a front cross-sectional view of a double-return vertical gas-fired water-jacketed furnace of the present invention;
[0022] In the figure, 1. boiler drum, 2. furnace, 3. burner, 4. upper smoke box, 5. smoke pipe, 6. lower smoke box group, 6-1. smoke box shell, 6-2. fin tube, 6-3. ash cleaning port, 6-4. static pressure box, 7. chimney, 8. heating coil, 9. liquid level gauge interface, 10. pipeline interface group, 10-1. overflow pipe interface, 10-2. heating water supply pipe interface, 10-3. heating return water pipe interface, 10-4. drain pipe interface, 10-5. water supply pipe interface, 11. explosion-proof door, 12. burner air supply pipe, 13. atmosphere connecting pipe. DETAILED DESCRIPTION
[0023] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0024] like Figure 1 , Figure 2 , Figure 3 As shown, the double-return vertical gas-fired water-jacketed boiler comprises a cylindrical boiler drum 1, a furnace 2 is sleeved inside the boiler drum 1, a burner 3 is fixedly connected to the lower part of the outer surface of the boiler drum 1, a cylindrical channel is provided at the lower part of the furnace 2, which passes through the boiler drum 1 and is connected with the burner 3 outside the boiler drum, a circular upper smoke box 4 is provided on the top of the furnace 2, the upper smoke box 4 is in a circular shape, an explosion-proof door 11 is provided on the top of the smoke box 4, the explosion-venting direction is upward, away from the personnel operation area, reducing the risk of boiler accident injury, and the center is close to the furnace The upper smoke box 4 is connected to the furnace 2; a sealing plate is arranged on the top of the drum 1, and the sealing plate is connected to the edges of the drum 1, the furnace 2, and the upper smoke box 4 by flanges. A plurality of smoke pipes 5 are arranged on the inner surface of the upper smoke box 4, and the end of the smoke pipe 5 away from the upper smoke box 4 is connected to the lower smoke box group 6. The smoke pipe 5 is arranged vertically, so that ash is not easy to adhere, which reduces the blockage of the furnace smoke pipe. The upper smoke box 4 and the lower smoke box group 6 are respectively provided with ash cleaning facilities, which is convenient for daily furnace ash cleaning work and adapts to the characteristics of the diverse components of associated gas in oil fields and the easy accumulation of ash in the flue;
[0025] The lower smoke box group 6 is connected to the chimney 7 through a circular smoke pipe. The lower smoke box group 6 is arranged at the bottom of the drum 1. The lower smoke box group 6 includes a rectangular smoke box shell 6-1. A plurality of rows of fin tubes 6-2 are arranged on the left side inside the smoke box shell 6-1. The low-temperature flue gas is used to heat the combustion air to maximize the use of the heat in the flue gas. A static pressure box 6-4 is arranged on the right side inside the smoke box shell 6-1. One end of the fin tube 6-2 passes through the smoke box shell 6-1 to contact the atmosphere, and the other end is connected to the static pressure box 6-4. A burner air supply pipe 12 is fixedly connected to the side of the static pressure box 6-2 away from the fin tube 602, and the burner air supply pipe 12 is connected to the burner 3.
[0026] The static pressure box 6-4 supplies air to the burner 3. The surface of the smoke box wall 6-1 is also provided with a ash cleaning port 6-3. The side of the ash cleaning port 6-3 is fixedly connected with a flange blind plate for daily blocking. The smoke box wall 6-1 is connected to the chimney 7 through a circular smoke pipe. The bottom end of the chimney 7 is fixedly connected to the boiler drum 1. A cable is provided on the top of the chimney 7 for top fixing.
[0027] A heating coil 8 is installed in the cavity between the drum 1 and the furnace 2. The top of the heating coil 8 passes through the top plate of the drum 1. An atmosphere connecting pipe 13 is provided on the top of the drum 1 to ensure that the water in the boiler is at a normal pressure. Two liquid level gauge interfaces 9 are provided on the upper side of the drum 1 for fixing the liquid level gauge. A pipeline interface group 10 is provided on the outer surface of the drum 1.
[0028] The pipeline interface group 10 includes an overflow pipe interface 10-1 arranged on the outer surface of the boiler drum 1 near the chimney 7, a heating water supply pipe interface 10-2 is arranged obliquely below the overflow pipe interface 10-1, a heating return water pipe interface 10-3 is arranged below the heating water supply pipe interface 10-2, and also includes a drainage pipe interface 10-4 and a water supply pipe interface 10-5 opened at the bottom of the outer surface of the boiler drum 1.
[0029] Example 1
[0030] The double-return vertical gas-fired water-jacketed boiler of this embodiment comprises a cylindrical boiler drum 1, a furnace 2 is sleeved inside the boiler drum 1, a burner 3 is fixedly connected to the lower part of the outer surface of the boiler drum 1, the furnace 2 passes through the boiler drum 1 and is connected to the burner 3, a circular upper smoke box 4 is arranged on the top of the furnace 2, a plurality of smoke pipes 5 are arranged on the inner surface of the upper smoke box 4, a lower smoke box group 6 is connected to the end of the smoke pipe 5 away from the upper smoke box 4, and the lower smoke box group 6 is connected to a chimney 7 through a circular smoke pipe, a heating coil 8 is installed in the cavity between the boiler drum 1 and the furnace 2, the top of the heating coil 8 passes through the boiler drum 1, two liquid level gauge interfaces 9 are arranged on the upper side of the boiler drum 1, and a pipeline interface group 10 is arranged on the outer surface of the boiler drum 1. An explosion-proof door 11 is arranged on the top of the upper smoke box 4; the lower smoke box group 6 is arranged at the bottom of the boiler drum 1.
[0031] Example 2
[0032] The double-return vertical gas-fired water-jacketed boiler of this embodiment comprises a cylindrical boiler drum 1, a furnace 2 is sleeved inside the boiler drum 1, a burner 3 is fixedly connected to the lower part of the outer surface of the boiler drum 1, the furnace 2 passes through the boiler drum 1 and is connected to the burner 3, a circular upper smoke box 4 is arranged on the top of the furnace 2, a plurality of smoke pipes 5 are arranged on the inner surface of the upper smoke box 4, a lower smoke box group 6 is connected to the end of the smoke pipe 5 away from the upper smoke box 4, and the lower smoke box group 6 is connected to a chimney 7 through a circular smoke pipe, a heating coil 8 is installed in the cavity between the boiler drum 1 and the furnace 2, the top of the heating coil 8 passes through the boiler drum 1, two liquid level gauge interfaces 9 are arranged on the upper side of the boiler drum 1, and a pipeline interface group 10 is arranged on the outer surface of the boiler drum 1. An explosion-proof door 11 is arranged on the top of the upper smoke box 4; the lower smoke box group 6 is arranged at the bottom of the boiler drum 1.
[0033] The lower smoke box group 6 includes a rectangular smoke box shell 6-1, a plurality of rows of fin tubes 6-2 are arranged on the left side of the smoke box shell 6-1, a static pressure box 6-4 is arranged on the right side of the smoke box shell 6-1, one end of the fin tube 6-2 passes through the smoke box shell 6-1 to contact the atmosphere, and the other end is connected to the static pressure box 6-4, and a cleaning port 6-3 is also arranged on the surface of the smoke box wall 6-1, and a flange blind plate is fixed to the side of the cleaning port 6-3, and the smoke box wall 6-1 is connected to the chimney 7 through a circular smoke pipe.
[0034] A burner air supply pipe 12 is fixedly connected to a side of the static pressure box 6 - 2 away from the fin tube 6 - 2 , and the burner air supply pipe 12 is connected to the burner 3 .
[0035] Example 3
[0036] The double-return vertical gas-fired water-jacketed boiler of this embodiment comprises a cylindrical boiler drum 1, a furnace 2 is sleeved inside the boiler drum 1, a burner 3 is fixedly connected to the lower part of the outer surface of the boiler drum 1, the furnace 2 passes through the boiler drum 1 and is connected to the burner 3, a circular upper smoke box 4 is arranged on the top of the furnace 2, a plurality of smoke pipes 5 are arranged on the inner surface of the upper smoke box 4, a lower smoke box group 6 is connected to the end of the smoke pipe 5 away from the upper smoke box 4, and the lower smoke box group 6 is connected to a chimney 7 through a circular smoke pipe, a heating coil 8 is installed in the cavity between the boiler drum 1 and the furnace 2, the top of the heating coil 8 passes through the boiler drum 1, two liquid level gauge interfaces 9 are arranged on the upper side of the boiler drum 1, and a pipeline interface group 10 is arranged on the outer surface of the boiler drum 1. An explosion-proof door 11 is arranged on the top of the upper smoke box 4; the lower smoke box group 6 is arranged at the bottom of the boiler drum 1.
[0037] The lower smoke box group 6 includes a rectangular smoke box shell 6-1, a plurality of rows of fin tubes 6-2 are arranged on the left side of the smoke box shell 6-1, a static pressure box 6-4 is arranged on the right side of the smoke box shell 6-1, one end of the fin tube 6-2 passes through the smoke box shell 6-1 to contact the atmosphere, and the other end is connected to the static pressure box 6-4, and a cleaning port 6-3 is also arranged on the surface of the smoke box wall 6-1, and a flange blind plate is fixed to the side of the cleaning port 6-3, and the smoke box wall 6-1 is connected to the chimney 7 through a circular smoke pipe.
[0038] A burner air supply pipe 12 is fixedly connected to a side of the static pressure box 6 - 2 away from the fin tube 6 - 2 , and the burner air supply pipe 12 is connected to the burner 3 .
[0039] The bottom end of the chimney 7 is fixedly connected to the boiler drum 1 , a cable is provided at the top of the chimney 7 , and an atmosphere connecting pipe 13 is provided at the top of the boiler drum 1 .
[0040] Example 4
[0041] The double-return vertical gas-fired water-jacketed boiler of this embodiment comprises a cylindrical boiler drum 1, a furnace 2 is sleeved inside the boiler drum 1, a burner 3 is fixedly connected to the lower part of the outer surface of the boiler drum 1, the furnace 2 passes through the boiler drum 1 and is connected to the burner 3, a circular upper smoke box 4 is arranged on the top of the furnace 2, a plurality of smoke pipes 5 are arranged on the inner surface of the upper smoke box 4, a lower smoke box group 6 is connected to the end of the smoke pipe 5 away from the upper smoke box 4, and the lower smoke box group 6 is connected to a chimney 7 through a circular smoke pipe, a heating coil 8 is installed in the cavity between the boiler drum 1 and the furnace 2, the top of the heating coil 8 passes through the boiler drum 1, two liquid level gauge interfaces 9 are arranged on the upper side of the boiler drum 1, and a pipeline interface group 10 is arranged on the outer surface of the boiler drum 1. An explosion-proof door 11 is arranged on the top of the upper smoke box 4; the lower smoke box group 6 is arranged at the bottom of the boiler drum 1.
[0042] The lower smoke box group 6 includes a rectangular smoke box shell 6-1, a plurality of rows of fin tubes 6-2 are arranged on the left side of the smoke box shell 6-1, a static pressure box 6-4 is arranged on the right side of the smoke box shell 6-1, one end of the fin tube 6-2 passes through the smoke box shell 6-1 to contact the atmosphere, and the other end is connected to the static pressure box 6-4, and a ash cleaning port 6-3 is also arranged on the surface of the smoke box wall 6-1, and a flange blind plate is fixed to the side of the ash cleaning port 6-3, and the smoke box wall 6-1 is connected to the chimney 7 through a circular smoke pipe. A burner air supply pipe 12 is fixed to the side of the static pressure box 6-2 away from the fin tube 6-2, and the burner air supply pipe 12 is connected to the burner 3.
[0043] The bottom end of the chimney 7 is fixedly connected to the boiler drum 1, a cable is provided on the top of the chimney 7, and an atmosphere connecting pipe 13 is provided on the top of the boiler drum 1;
[0044] The pipeline interface group 10 includes an overflow pipe interface 10-1 arranged on the outer surface of the boiler drum 1 near the chimney 7, a heating water supply pipe interface 10-2 is arranged obliquely below the overflow pipe interface 10-1, a heating return water pipe interface 10-3 is arranged below the heating water supply pipe interface 10-2, and also includes a drainage pipe interface 10-4 and a water supply pipe interface 10-5 opened at the bottom of the outer surface of the boiler drum 1.
[0045] The working principle of the present invention is that the boiler drum 1 is filled with clean water, the gas enters the furnace 2 through the burner 3 for combustion, and the heat generated by the combustion is transferred to the clean water in the boiler drum through the furnace 2. The smoke generated by the combustion enters the upper smoke box 4 upward, and then enters the smoke pipe 5 downward through the upper smoke box 4, and the smoke continues to transfer heat to the clean water in the boiler drum 1 through the smoke pipe 5. The low-temperature smoke after secondary heat exchange enters the lower smoke box group 6 downward, and the smoke exchanges heat with the air in the fin tube 6-2 in the lower smoke box group 6, and continues to release heat. Finally, it is discharged to the atmosphere through the side chimney 7.
[0046] When the furnace burner is started, the air for combustion first enters the fin tube 6-2 through the opening on the left side of the lower smoke box group 6, exchanges heat with the flue gas in the fin tube 6-2 to increase the temperature, then enters the static pressure box 6-4, enters the blower of the burner 3 through the burner air supply pipe 12 on the static pressure box 6-4, and finally enters the furnace 2 to participate in the combustion of gas.
[0047] After the water-jacketed furnace has been running for a long time, ash has accumulated in the flue. First, shut down the furnace and cut off the gas source. Open the upper smoke box 4 through the explosion-proof door 11, and clean the accumulated ash in the smoke pipe 5 from the top; then remove the flange sealing plate on the lower smoke box group 6, open the ash cleaning port 6-3, and clean the fallen ash out of the furnace. After the cleaning is completed, restore the sealing plate and the explosion-proof door 11. During the operation of the furnace, a deflagration occurs, and the pressure in the furnace suddenly increases. The explosion-proof door 11 automatically opens to vent the explosion, and the burner is chained and shut down, and the gas source is cut off.
Claims
1. Double return vertical gas water jacket boiler, It is characterized in that The invention comprises a cylindrical boiler drum (1), wherein a furnace (2) is sleeved inside the boiler drum (1), a burner (3) is fixedly connected to the lower part of the outer surface of the boiler drum (1), the furnace (2) passes through the boiler drum (1) and is connected to the burner (3), a circular ring-shaped upper smoke box (4) is arranged on the top of the furnace (2), a plurality of smoke pipes (5) are arranged on the inner surface of the upper smoke box (4), a lower smoke box group (6) is connected to the end of the smoke pipe (5) away from the upper smoke box (4), and the lower smoke box group (6) is connected to a chimney (7) through a circular smoke pipe, a heating coil (8) is installed in the cavity between the boiler drum (1) and the furnace (2), the top of the heating coil (8) passes through the boiler drum (1), two liquid level gauge interfaces (9) are arranged on the upper part of the side of the boiler drum (1), and a pipeline interface group (10) is arranged on the outer surface of the boiler drum (1).
2. The double-pass vertical gas-fired water-jacketed furnace according to claim 1, It is characterized in that An explosion-proof door (11) is provided on the top of the upper smoke box (4).
3. The double-pass vertical gas-fired water-jacketed furnace according to claim 1, It is characterized in that The lower smoke box group (6) is arranged at the bottom end of the boiler drum (1).
4. The double-pass vertical gas-fired water-jacketed furnace according to claim 1, It is characterized in that The lower smoke box group (6) comprises a rectangular smoke box shell (6-1), a plurality of rows of finned tubes (6-2) are arranged on the left side of the interior of the smoke box shell (6-1), a static pressure box (6-4) is arranged on the right side of the interior of the smoke box shell (6-1), one end of the finned tube (6-2) passes through the smoke box shell (6-1) to contact the atmosphere, and the other end is connected to the static pressure box (6-4), the surface of the smoke box wall (6-1) is also provided with an ash cleaning port (6-3), the side of the ash cleaning port (6-3) is fixedly connected with a flange blind plate, and the smoke box wall (6-1) is connected to the chimney (7) through a circular smoke pipe.
5. The double-return vertical gas-fired water-jacketed boiler according to claim 4, It is characterized in that A burner air supply pipe (12) is fixedly connected to a side of the static pressure box (6-2) away from the fin tube (6-2), and the burner air supply pipe (12) is connected to the burner (3).
6. The double-pass vertical gas-fired water-jacketed boiler according to claim 1, It is characterized in that The bottom end of the chimney (7) is fixedly connected to the boiler drum (1), and a cable is provided at the top of the chimney (7).
7. The double-pass vertical gas-fired water-jacketed boiler according to claim 1, It is characterized in that An atmosphere communication pipe (13) is provided at the top of the boiler drum (1).
8. The double-pass vertical gas-fired water-jacketed boiler according to claim 1, It is characterized in that The pipeline interface group (10) comprises an overflow pipe interface (10-1) arranged on the outer surface of the boiler drum (1) near the chimney (7), a heating water supply pipe interface (10-2) is arranged obliquely below the overflow pipe interface (10-1), a heating return water pipe interface (10-3) is arranged below the heating water supply pipe interface (10-2), and also comprises a drainage pipe interface (10-4) and a water supply pipe interface (10-5) opened at the bottom of the outer surface of the boiler drum (1).