Liquid crystal instrument durability test method, system and equipment and readable storage medium
By measuring the current value and maintenance time of the LCD instrument and accurately distinguishing the working state, the problem of visual detection inability to distinguish between low power consumption and sleep, wake-up and switch transients is solved, and a low-cost and efficient LCD instrument durability test is achieved.
Patent Information
- Application Number
- CN202411175415.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-03
AI Technical Summary
In the durability test of existing LCD instruments, visual inspection cannot accurately distinguish between low power consumption and sleep states, and cannot distinguish between wake-up and switch transients, resulting in inaccurate test results, and high equipment costs and cannot detect multiple samples at the same time.
By obtaining the actual current value and maintenance time of each working state of the LCD instrument, comparing with the standard current value and design maintenance time, distinguishing each working state to obtain accurate test results, using CNC voltage-controlled power supply and detection equipment to measure the current value, canceling vision Detection system.
It realizes accurate identification of the working status of the LCD instrument, reduces the testing cost, can detect multiple instruments at the same time, improves detection efficiency, and ensures the accuracy of the test results.
Smart Images

Figure CN119063972A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of liquid crystal instrument testing, and in particular to a liquid crystal instrument durability testing method, system, equipment and readable storage medium. Background Art
[0002] The most common serious software failure of LCD instrument cluster is black screen (e.g., the driver turns on the power after getting in the car and finds that the instrument cluster does not light up), and the scenario with the highest probability of triggering black screen BUG occurs when the working state of the LCD instrument cluster is switched. Therefore, the LCD instrument cluster must undergo a special durability test for working state switching to verify whether the LCD instrument cluster has a black screen BUG.
[0003] In some related technologies, visual inspection technology is used for verification, and a camera is used to capture and judge the display status of the LCD instrument. That is, through image comparison, it is judged whether the LCD screen is in a bright screen display or a black screen without display; then, combined with the power supply status and the instrument LCD screen status, it is judged whether the current instrument LCD screen of the LCD instrument is in an abnormal situation such as a black screen; however, there are the following problems:
[0004] The instrument has five working states, including normal working, low power consumption, sleep, wake-up and switching transient state; the five working states show four LCD screen states, that is, normal working shows image and backlight; low power consumption and sleep show no image and no backlight (i.e. black screen); wake-up shows image and backlight; switching transient shows no image and backlight (i.e. gray screen);
[0005] Visual inspection cannot distinguish whether the black screen phenomenon is low power consumption or sleep mode, and cannot distinguish whether the gray screen phenomenon is wake-up or switching transient, resulting in inaccurate durability test results. In addition, a visual inspection system (consisting of engineering cameras, darkroom, software, etc.) costs at least RMB 300,000, and professional software training is required to perform image formation programming and design. The economic and labor costs are high.
[0006] There are also the following problems with visual inspection: multiple instrument samples cannot be inspected at the same time, that is, visual inspection can only capture a unique image, and multiple LCD instrument displays will cause system misjudgment, omission, and wrong judgment; the size of the darkroom is limited and multiple samples cannot be placed in it; the focal length of the camera is limited, and the captured image area is restricted. Summary of the invention
[0007] The embodiments of the present application provide a liquid crystal instrument durability test method, system, device and readable storage medium to solve the problem in the related art that visual detection cannot distinguish whether the black screen phenomenon is low power consumption or sleep, and cannot distinguish whether the gray screen phenomenon is wake-up or switching transient, resulting in inaccurate durability test results.
[0008] In a first aspect, a method for testing the durability of a liquid crystal instrument is provided, comprising:
[0009] Obtaining the actual current value and actual maintenance time of each working state of the liquid crystal instrument in a cycle test; the working state includes normal state, low power consumption state, sleep state, wake-up state and switching transient state;
[0010] Compare the current standard value and the designed holding time corresponding to each working state with the corresponding actual current value and the actual holding time to obtain the test result;
[0011] The test results of each of the working states are taken as the endurance test results of one cycle test.
[0012] In some embodiments, the standard current values corresponding to the normal state, low power consumption state, sleep state and awake state are fixed point values, and the standard current value corresponding to the switching transient state is a range value; the minimum value of the range value is equal to the standard current value corresponding to the low power consumption state, and the maximum value is equal to the standard current value corresponding to the awake state;
[0013] Compare the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain the test result, which specifically includes the following steps:
[0014] Comparing the range value and the designed holding time corresponding to the switching transient with the actual current value and the actual holding time of the switching transient to obtain first test data;
[0015] Compare the standard current value and the designed holding time of each working state except the switching transient state with the corresponding actual current value and the actual holding time to obtain second test data;
[0016] The first test data and the second test data are used as test results.
[0017] In some embodiments, comparing the range value and the designed holding time corresponding to the switching transient with the actual current value and the actual holding time of the switching transient to obtain first test data specifically includes the following steps:
[0018] If the actual current value of the switching transient is within the range, and the actual holding time is equal to the designed holding time, then entering the waiting verification mode;
[0019] If the actual current value of the switching transient is within the range, and the actual holding time is less than the designed holding time, then the switching transient is recorded as passing the test;
[0020] If the actual current value of the switching transient exceeds the range value, and the actual holding time is less than the designed holding time, it is recorded that the switching transient fails the test;
[0021] If the actual current value of the switching transient exceeds the range, and the actual holding time is equal to the designed holding time, it is recorded that the switching transient fails the test;
[0022] The recorded test results of the switching transient are collected into first test data.
[0023] In some embodiments, each working state in one cycle test is tested according to a design order; the design order of each working state in different cycles tests is the same or different;
[0024] The verification mode specifically includes the following steps:
[0025] Obtaining a test order of each working state in the cycle test, then extracting a current standard value corresponding to the next working state after the switching transient, and comparing the current standard value corresponding to the next working state with the actual current value corresponding to the switching transient;
[0026] If the two are not equal, the switching transient is recorded as failing the test; otherwise, the switching transient is recorded as passing the test.
[0027] In some embodiments, the standard current value and the designed holding time of each working state except the switching transient state are compared with the corresponding actual current value and the actual holding time to obtain the second test data, which specifically includes the following steps:
[0028] If the actual current value of the normal state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the normal state has passed the test; otherwise, it is recorded that the normal state has not passed the test;
[0029] If the actual current value of the low power consumption state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the low power consumption state has passed the test; otherwise, it is recorded that the low power consumption state has not passed the test;
[0030] If the actual current value of the sleep state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the sleep state has passed the test; otherwise, it is recorded that the sleep state has not passed the test;
[0031] If the actual current value of the awake state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then the awake state is recorded as passing the test; otherwise, the awake state is recorded as failing the test;
[0032] The recorded test results of each working state are collected into second test data.
[0033] In some embodiments, a cycle test is performed on multiple LCD meters according to the step of performing a cycle test on one LCD meter as described in claim 1, and historical data is recorded at the same time.
[0034] In some embodiments, the delay time of the switching transient is increased, and a digitally controlled voltage-stabilized power supply is used to measure the current value of the liquid crystal meter during the switching transient.
[0035] In a third aspect, a liquid crystal instrument durability testing system is provided, the liquid crystal instrument durability testing system comprising:
[0036] The first module is used to obtain the actual current value and actual maintenance time of each working state of the liquid crystal instrument in a cycle test; the working state includes normal state, low power consumption state, sleep state, awake state and switching transient state;
[0037] The second module is used to compare the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain a test result;
[0038] The third module is used to use the test results of each working state as the endurance test results of a cycle test.
[0039] In a third aspect, a liquid crystal instrument durability testing device is provided, comprising a processor, a memory, and a liquid crystal instrument durability testing program stored in the memory and executable by the processor, wherein when the liquid crystal instrument durability testing program is executed by the processor, the steps of the liquid crystal instrument durability testing method are implemented.
[0040] In a fourth aspect, a computer-readable storage medium is provided, on which a liquid crystal meter durability test program is stored, wherein when the liquid crystal meter durability test program is executed by a processor, the steps of the liquid crystal meter durability test method are implemented.
[0041] The beneficial effects of the technical solution provided by this application include:
[0042] The embodiments of the present application provide a liquid crystal instrument durability test method, system, device and readable storage medium. By comparing the actual current value and actual maintenance time of each working state with the corresponding calibrated current standard value and designed maintenance time, the test result of each working state can be accurately known. The current value can be used to distinguish whether the black screen phenomenon is a low power consumption state or a sleep state, and whether the gray screen phenomenon is a wake-up state or a switching transient state, thereby avoiding errors caused by visual detection and ensuring the accuracy of the durability test results.
[0043] In addition, by using the current value for detection, the visual detection system is eliminated, the testing cost is low, and multiple LCD instruments can be tested at the same time to improve the detection efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0045] Figure 1 A schematic diagram of the general flow of the durability test method of the liquid crystal instrument provided in the embodiment of the present application;
[0046] Figure 2 A schematic diagram of switching between the four working states of normal operation, low power consumption, sleep, and wake-up provided in an embodiment of the present application;
[0047] Figure 3 A schematic diagram of the connection between the LCD instrument, the digitally controlled voltage-stabilized power supply, and the detection and analysis equipment provided in the embodiment of the present application;
[0048] Figure 4 A schematic diagram of a specific process of a durability test method for a liquid crystal instrument provided in an embodiment of the present application. DETAILED DESCRIPTION
[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0050] The instrument has five working states, including normal working, low power consumption, sleep, wake-up and switching transient state; the five working states show four LCD screen states, that is, normal working shows image and backlight; low power consumption and sleep show no image and no backlight (i.e. black screen); wake-up shows image and backlight; switching transient shows no image and backlight (i.e. gray screen);
[0051] Visual inspection cannot distinguish whether the black screen phenomenon is low power consumption or sleep mode, and cannot distinguish whether the gray screen phenomenon is wake-up or switching transient, resulting in inaccurate durability test results. In addition, a visual inspection system (consisting of engineering cameras, darkroom, software, etc.) costs at least RMB 300,000, and professional software training is required to perform image formation programming and design. The economic and labor costs are high.
[0052] There are also the following problems with visual inspection: multiple instrument samples cannot be inspected at the same time, that is, visual inspection can only capture a unique image, and multiple LCD instrument displays will cause system misjudgment, omission, and wrong judgment; the size of the darkroom is limited and multiple samples cannot be placed in it; the focal length of the camera is limited, and the captured image area is restricted.
[0053] In response to the above problems, an embodiment of the present application provides a durability test method for a liquid crystal instrument to solve the problem in the related art that visual detection cannot distinguish whether the black screen phenomenon is low power consumption or sleep, and cannot distinguish whether the gray screen phenomenon is wake-up or switching transient, resulting in inaccurate durability test results.
[0054] See also Figure 1 and Figure 4 As shown, in the first aspect, a liquid crystal instrument durability test method is provided, which includes:
[0055] Step 100, obtaining the actual current value and actual maintenance time of each working state of the liquid crystal meter in a cycle test; the working state includes a normal state, a low power consumption state, a sleep state, a wake-up state and a switching transient state;
[0056] Step 101, comparing the current standard value and the designed holding time corresponding to each working state with the corresponding actual current value and the actual holding time to obtain a test result;
[0057] Step 102: Use the test results of each working state as the endurance test result of a cycle test.
[0058] The above steps can accurately know the test results of each working state by comparing the actual current value and actual maintenance time of each working state with the corresponding calibrated current standard value and designed maintenance time. The current value can be used to distinguish whether the black screen phenomenon is a low power state or a sleep state, and whether the gray screen phenomenon is a wake-up state or a switching transient state, thereby avoiding errors caused by visual inspection and ensuring the accuracy of the durability test results.
[0059] In addition, by using the current value for detection, the visual detection system is eliminated, the testing cost is low, and multiple LCD instruments can be tested at the same time to improve the detection efficiency.
[0060] It should be understood for the present application that the actual current value and the actual holding time in the above steps are obtained by real-time measurement of a digitally controlled voltage-stabilized power supply; the calibrated current standard value and the designed holding time are measured for a specific model of LCD instrument under normal conditions in all working states, and then stored.
[0061] In some preferred embodiments, multiple LCD meters are tested once in a cycle according to the above steps of testing one LCD meter once in a cycle, and historical data is recorded at the same time. That is, the digital control voltage regulator can be connected to multiple LCD meters at the same time for testing.
[0062] Obtaining the actual current value of the switching transient includes the following steps: increasing the delay time of the switching transient through software control, and using a digitally controlled voltage-stabilized power supply to measure the current value of the LCD instrument during the switching transient; in this way, the current value of the transient state can be accurately obtained. The above switching transient refers to the state when switching between the four states of ① normal operation ② low power consumption ③ sleep ④ wake-up. Please refer to the attached Figure 2 The switching diagram is shown.
[0063] Among them, the effectiveness of detection by current detection method can be demonstrated in the following ways:
[0064] 1. Use a digitally controlled voltage-stabilized power supply to measure the current value of the LCD meter in the following four states: ① normal operation ② low power consumption ③ sleep ④ wake-up;
[0065] 2. Increase the delay time of the switching transient by software means, and use a digitally controlled voltage-stabilized power supply to measure the current value of the LCD instrument during the switching transient;
[0066] 3. Summarizing the above current value data, the current values of the LCD meter in the five states of ① normal operation ② low power consumption ③ sleep ④ wake-up ⑤ switching moment are different;
[0067] 4. Derivation and demonstration; Conclusion 1: The transient current value of the LCD instrument switching is in the range between ② low power consumption and ④ wake-up;
[0068] Conclusion 2: By detecting the current value, the working status of the instrument and the status of the LCD screen can be reversely confirmed.
[0069] Therefore, the above can detect whether it can pass the detection by detecting the current value of each working state, and can accurately distinguish the specific working states corresponding to the black screen and gray screen phenomena, avoiding the cost problems and limited detection quantity problems brought by visual detection.
[0070] In some preferred embodiments, since the instantaneous current value of the LCD instrument switching is in the range between ② low power consumption and ④ wake-up; the standard current values corresponding to the normal state, low power consumption state, sleep state and wake-up state are fixed point values, and the standard current value corresponding to the switching instantaneous state is a range value; the minimum value of the range value is equal to the standard current value corresponding to the low power consumption state, and the maximum value is equal to the standard current value corresponding to the wake-up state; then when performing a specific comparison, the comparison method will be different, as follows:
[0071] Step 101 specifically includes:
[0072] Step 10100, comparing the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain a test result, specifically comprising the following steps:
[0073] Step 10101: Compare the range value and the designed holding time corresponding to the switching transient with the actual current value and the actual holding time of the switching transient to obtain first test data;
[0074] Step 10102: Compare the standard current value and the designed holding time of each working state except the switching transient state with the corresponding actual current value and the actual holding time to obtain second test data;
[0075] Step 10103: Use the first test data and the second test data as test results.
[0076] Furthermore, step 10101 specifically includes the following steps:
[0077] Case 1: if the actual current value of the switching transient is within the range, and the actual holding time is equal to the designed holding time, then the verification mode is entered;
[0078] Each working state in the cycle test is tested according to the design sequence; the design sequence of each working state in different cycle tests is the same or different;
[0079] The verification mode specifically includes the following steps:
[0080] Obtaining a test order of each working state in the cycle test, then extracting a current standard value corresponding to the next working state after the switching transient, and comparing the current standard value corresponding to the next working state with the actual current value corresponding to the switching transient;
[0081] If the two are not equal, the switching transient is recorded as failing the test; otherwise, the switching transient is recorded as passing the test.
[0082] Case 2: if the actual current value of the switching transient is within the range, and the actual holding time is less than the designed holding time, then the switching transient is recorded as passing the test;
[0083] Case 3: If the actual current value of the switching transient exceeds the range, and the actual holding time is less than the designed holding time, it is recorded that the switching transient fails the test;
[0084] Case 4: if the actual current value of the switching transient exceeds the range, and the actual holding time is equal to the designed holding time, then it is recorded that the switching transient has failed the test;
[0085] The recorded test results of the switching transient are collected into first test data.
[0086] The above mode to be verified can determine whether the expected switching working state is achieved after switching. For example, the time shown in the table below is 0:03:15, the current value is 0.676, and the judgment of the switching transient does not reach the switching purpose; the above mode to be verified can filter out the situation where the switching transient current is not stable and the output test results are recorded. The time in the table below is 0:02:00, the current value is 0.124, and the judgment of the switching transient.
[0087]
[0088]
[0089] Furthermore, step 10100 specifically includes the following steps:
[0090] If the actual current value of the normal state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the normal state has passed the test; otherwise, it is recorded that the normal state has not passed the test;
[0091] If the actual current value of the low power consumption state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the low power consumption state has passed the test; otherwise, it is recorded that the low power consumption state has not passed the test;
[0092] If the actual current value of the sleep state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the sleep state has passed the test; otherwise, it is recorded that the sleep state has not passed the test;
[0093] If the actual current value of the awake state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then the awake state is recorded as passing the test; otherwise, the awake state is recorded as failing the test;
[0094] The recorded test results of each working state are collected into second test data.
[0095] Through the above explanations, we can know that when conducting durability tests on each LCD meter of different models or specifications, we first need to test the calibration current standard value and the design maintenance time, that is, the parameters of ① normal operation ② low power consumption ③ sleep ④ normal wake-up, and then analyze the above parameter data to obtain the range value corresponding to the switching transient. Finally, the input is stored in the detection and analysis equipment. The LCD meter to be tested is connected to the CNC regulated power supply, and the CNC regulated power supply is connected to the detection and analysis equipment, and the actual detection information is transmitted to the detection and analysis equipment. The detection and analysis equipment performs analysis and judgment. The process of analysis and judgment is the above LCD meter durability test method. Among them, the connection of the CNC regulated power supply N, the detection and analysis equipment M, and the LCD meter H is as shown in the figure. Figure 3 As shown, the detection and analysis equipment can be a computer, CPU or a device with computing power. The specific process of the test can be referred to Figure 4 shown.
[0096] The beneficial effects are:
[0097] Can detect and accurately identify and distinguish 5 working states of the instrument and 4 LCD screen states;
[0098] Test data can be saved and traced; (even if the black screen BUG that occurs during the test recovers by itself in subsequent tests, it can be analyzed and traced through the saved historical data); the test cost is low, and engineering cameras, dark boxes, and image recognition software are eliminated; the number of test samples is not limited.
[0099] In a second aspect, a liquid crystal instrument durability testing system is also provided, and the liquid crystal instrument durability testing system comprises:
[0100] The first module is used to obtain the actual current value and actual maintenance time of each working state of the liquid crystal instrument in a cycle test; the working state includes normal state, low power consumption state, sleep state, awake state and switching transient state;
[0101] The second module is used to compare the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain a test result;
[0102] The third module is used to use the test results of each working state as the endurance test results of a cycle test.
[0103] Among them, the functional implementation of each module in the above-mentioned liquid crystal instrument durability testing device corresponds to each step in the above-mentioned liquid crystal instrument durability testing method embodiment, and its functions and implementation processes are no longer repeated here.
[0104] In a third aspect, an embodiment of the present application provides a liquid crystal meter durability testing device, which may be a personal computer (PC), a notebook computer, a server, or other device with data processing capabilities.
[0105] The communication bus may be of any type and is used to interconnect the processor, the memory, and the communication interface.
[0106] The communication interface includes input / output (I / O) interface, physical interface and logical interface, etc., which are used to realize the interconnection of devices inside the LCD instrument durability test equipment, and the interface used to realize the interconnection of the LCD instrument durability test equipment with other devices (such as other computing devices or user devices). The physical interface can be an Ethernet interface, an optical fiber interface, an ATM interface, etc.; the user device can be a display (Display), a keyboard (Keyboard), etc.
[0107] The memory can be various types of storage media, such as random access memory (RAM), read-only memory (ROM), non-volatile RAM (NVRAM), flash memory, optical storage, hard disk, programmable ROM (PROM), erasable PROM (EPROM), electrically erasable PROM (EEPROM), etc.
[0108] The processor may be a general-purpose processor, which may call the LCD meter durability test program stored in the memory and execute the LCD meter durability test method provided in the embodiment of the present application. For example, the general-purpose processor may be a central processing unit (CPU). The method executed when the LCD meter durability test program is called may refer to the various embodiments of the LCD meter durability test method of the present application, which will not be described in detail here.
[0109] In a fourth aspect, an embodiment of the present application also provides a computer-readable storage medium.
[0110] The computer-readable storage medium of the present application stores a liquid crystal meter durability test program, wherein when the liquid crystal meter durability test program is executed by a processor, the steps of the liquid crystal meter durability test method described above are implemented.
[0111] Among them, the method implemented when the LCD instrument durability test program is executed can refer to the various embodiments of the LCD instrument durability test method of the present application, and will not be repeated here.
[0112] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0113] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0114] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A durability test method for liquid crystal instruments, It is characterized in that It includes: Obtain the actual current value and actual maintenance time of each working state of the LCD instrument in a cycle test; The working state includes a normal state, a low power consumption state, a sleep state, a wake-up state and a switching transient state; Compare the current standard value and the designed holding time corresponding to each working state with the corresponding actual current value and the actual holding time to obtain the test result; The test results of each of the working states are taken as the endurance test results of one cycle test.
2. The liquid crystal instrument durability testing method according to claim 1, Features: The standard current values corresponding to the normal state, low power consumption state, sleep state and awake state are fixed point values, and the standard current value corresponding to the switching transient state is a range value; the minimum value of the range value is equal to the standard current value corresponding to the low power consumption state, and the maximum value is equal to the standard current value corresponding to the awake state; Compare the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain the test result, which specifically includes the following steps: Comparing the range value and the designed holding time corresponding to the switching transient with the actual current value and the actual holding time of the switching transient to obtain first test data; Compare the standard current value and the designed holding time of each working state except the switching transient state with the corresponding actual current value and the actual holding time to obtain second test data; The first test data and the second test data are used as test results.
3. The durability testing method of a liquid crystal instrument as claimed in claim 2, It is characterized in that Comparing the range value and the designed holding time corresponding to the switching transient with the actual current value and the actual holding time of the switching transient to obtain first test data specifically includes the following steps: If the actual current value of the switching transient is within the range, and the actual holding time is equal to the designed holding time, then entering the waiting verification mode; If the actual current value of the switching transient is within the range, and the actual holding time is less than the designed holding time, then the switching transient is recorded as passing the test; If the actual current value of the switching transient exceeds the range value, and the actual holding time is less than the designed holding time, it is recorded that the switching transient fails the test; If the actual current value of the switching transient exceeds the range, and the actual holding time is equal to the designed holding time, it is recorded that the switching transient fails the test; The recorded test results of the switching transient are collected into first test data.
4. The liquid crystal instrument durability testing method according to claim 3, Features: Each working state in the cycle test is tested according to the design sequence; the design sequence of each working state in different cycle tests is the same or different; The verification mode specifically includes the following steps: Obtaining a test order of each working state in the cycle test, then extracting a current standard value corresponding to the next working state after the switching transient, and comparing the current standard value corresponding to the next working state with the actual current value corresponding to the switching transient; If the two are not equal, the switching transient is recorded as failing the test; otherwise, the switching transient is recorded as passing the test.
5. The liquid crystal instrument durability testing method according to claim 2, It is characterized in that Comparing the standard current value and the designed holding time of each working state except the switching transient state with the corresponding actual current value and the actual holding time to obtain the second test data, specifically includes the following steps: If the actual current value of the normal state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the normal state has passed the test; otherwise, it is recorded that the normal state has not passed the test; If the actual current value of the low power consumption state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the low power consumption state has passed the test; otherwise, it is recorded that the low power consumption state has not passed the test; If the actual current value of the sleep state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then it is recorded that the sleep state has passed the test; otherwise, it is recorded that the sleep state has not passed the test; If the actual current value of the awake state is equal to the corresponding current standard value, and the actual maintenance time is equal to the designed maintenance time, then the awake state is recorded as passing the test; otherwise, the awake state is recorded as failing the test; The recorded test results of each working state are collected into second test data.
6. The liquid crystal instrument durability testing method according to claim 1, It is characterized in that Also includes: According to the step of performing a cycle test on one liquid crystal meter as claimed in claim 1, a cycle test is performed on multiple liquid crystal meters, and historical data is recorded at the same time.
7. The liquid crystal instrument durability testing method according to claim 1, It is characterized in that Obtaining the actual current value of the switching transient comprises the following steps: Increase the delay time of the switching transient and use a digitally controlled voltage-stabilized power supply to measure the current value of the LCD meter during the switching transient.
8. A liquid crystal instrument durability test system, It is characterized in that The liquid crystal instrument durability testing system comprises: The first module is used to obtain the actual current value and actual maintenance time of each working state of the liquid crystal instrument in a cycle test; the working state includes normal state, low power consumption state, sleep state, awake state and switching transient state; The second module is used to compare the current standard value and the designed maintenance time corresponding to each working state with the corresponding actual current value and the actual maintenance time to obtain a test result; The third module is used to use the test results of each working state as the endurance test results of a cycle test.
9. A liquid crystal instrument durability test equipment, It is characterized in that The LCD instrument durability testing device comprises a processor, a memory, and a LCD instrument durability testing program stored in the memory and executable by the processor, wherein when the LCD instrument durability testing program is executed by the processor, the steps of the LCD instrument durability testing method as described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a liquid crystal meter durability test program, wherein when the liquid crystal meter durability test program is executed by the processor, the steps of the liquid crystal meter durability test method according to any one of claims 1 to 7 are implemented.
