Visualization device and method for simulating measurement of parameters of bubbles and aerosol in MCCI molten pool
By designing a visualization device that simulates the MCCI melt pool, the difficulties of gas migration and bubble parameter measurement are solved, the number of pores and gas flow is adjusted, the visualization and data accuracy of the experiment are improved, the structure and operation of the device are simplified, and the structure and operation of the device are enhanced. The reliability of the experiment.
Patent Information
- Application Number
- CN202411250414.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-03
AI Technical Summary
In the MCCI melt pool, the prior art cannot effectively calculate the detailed kinetics of gas migration and the release of fission product, and bubble parameters are difficult to visually measure, and the number of pores and gas flow are difficult to adjust, affecting the accuracy of systematic analysis.
A visualization device that simulates the measurement of bubbles and aerosol parameters in the MCCI molten pool is designed, including housing, sampling and inlets, exhaust ports, shunt loops, ventilation holes and other components. It is manufactured through visual materials to facilitate observation and photographing of bubbles. and the migration characteristics of the gas and aerosol are adjusted through the shunt device and the vent.
Detailed measurement of bubble and aerosol parameters is achieved, the number of pores and gas flow can be adjusted, the visualization and data accuracy of the experiment is improved, the device structure and operation are simplified, and the reliability of the experiment is improved.
Smart Images

Figure CN119064225A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of visualization of gas migration in liquid, and particularly relates to a visualization device and method for simulating bubble and aerosol parameter measurement in an MCCI molten pool. Background Art
[0002] During a MCCI (molten core concrete interaction) accident in a reactor, the high-temperature melt melts through the concrete floor, forming a melt pool. Simultaneously, due to decay heat and heat generated by chemical reactions, the concrete decomposes, producing large amounts of water vapor and carbon dioxide. These gases enter the melt pool and migrate within it, causing turbidity. They also react chemically with the melt to produce hydrogen and carbon monoxide, which continue to migrate within the melt pool. Fission products in the melt, such as cesium iodide, can also enter bubbles and be carried out of the melt pool into the containment vessel. Therefore, characterizing the gas migration mechanism in the MCCI melt pool is crucial for calculating the chemical reactions, fission product release, and melt pool stratification during the MCCI process. However, current systematic calculation programs are unable to account for the detailed kinetics of gas migration and fission product release. Therefore, experimental studies of this complex MCCI process are needed to determine key parameters of bubble migration within the melt pool, such as gas flow rate, bubble size distribution, average diameter, and rise rate, to refine the corresponding modules in the systematic analysis program. Summary of the Invention
[0003] To solve the above problems, the present invention provides a visualization device and method for measuring bubble and aerosol parameters in a simulated MCCI melt pool, which can be used to study the migration and washing characteristics of gas and aerosol in a melt replacement fluid under different vent flow rates and vent numbers.
[0004] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0005] A visualization device for simulating the measurement of bubble and aerosol parameters in an MCCI molten pool comprises a shell 1-1, a sampling tube 1-2, a sampling port 1-3, a sampling hose 1-4, a sampling valve 1-5, an air inlet 1-6, an air inlet hose 1-7, an air inlet valve 1-8, an exhaust port 1-9, an exhaust hose 1-10, an exhaust valve 1-11, a drain port 1-12, a drain hose 1-13, a drain valve 1-14, a vent 1-15, a vent bolt 1-16, a vent hole 1-17, and a shell connecting screw hole 1- 18, sealing cover 2, pressure gauge interface 2-1, sealing cover connecting screw hole 2-2, diverter device consisting of bottom-layer diverter ring pipe 3-1, middle-layer diverter ring pipe 3-2, top-layer diverter ring pipe 3-3, bottom-layer ring pipe air inlet pipe 3-4, middle-layer ring pipe air inlet pipe 3-5, top-layer ring pipe air inlet pipe 3-6, bottom-layer ring pipe gas outlet 3-7, middle-layer ring pipe gas outlet 3-8, top-layer ring pipe gas outlet 3-9, central gas outlet pipe 3-10, gas outlet valve 3-11, gas outlet hose 3-12, check valve 3-13, and ring pipe connecting rod 3-14;
[0006] The housing 1-1 is used to carry liquid and serves as the main experimental location.
[0007] There are multiple sampling ports 1-3 located on the upper part of the housing 1-1. The sampling tube 1-2 is located inside the container and connected to the sampling port 1-3. The sampling hose 1-4 is located outside the container and connected to the sampling port 1-3. The sampling valve 1-5 is connected to the sampling hose 1-4. The whole device is used to extract sample gas inside the device.
[0008] There are multiple air inlets 1-6 located on the upper part of the shell 1-1. The air inlet hose 1-7 is located outside the container and connected to the air inlet 1-6. The air inlet valve 1-8 is connected to the air inlet hose 1-7. The whole is used to inject gas into the device, which can replace the gas in the device or increase the pressure;
[0009] There are multiple exhaust ports 1-9 located on the upper part of the shell 1-1. The exhaust hose 1-10 is located outside the container and connected to the exhaust port 1-9. The exhaust valve 1-11 is connected to the exhaust hose 1-10. The whole device is used to discharge the gas in the device and stabilize the gas pressure in the device.
[0010] The drain port 1-12 is located at the bottom of the side of the housing 1-1, the drain hose 1-13 is located outside the container and connected to the drain port 1-12, and the drain valve 1-14 is connected to the drain hose 1-13, and the whole is used to discharge the liquid in the device;
[0011] There are multiple vents 1-15 located on the bottom surface of the housing 1-1, and used to fix the vent bolts 1-16 on the housing of the device;
[0012] There are multiple vent holes 1-17, which are obtained by processing the vent bolt 1-16 and are used to introduce gas into the device;
[0013] The housing connection screw hole 1-18 is located at the top of the housing 1-1 and is used to connect the housing 1-1 and the sealing cover 2;
[0014] The sealing cover 2 is used to seal the entire device and is located on the top of the housing 1-1;
[0015] The pressure gauge interface 2-1 is located on the sealing cover 2 and is used to place the pressure gauge on the sealing cover;
[0016] The sealing cover connecting screw hole 2-2 is located at the edge of the sealing cover 2 and is used to connect the sealing cover 2 and the housing 1-1;
[0017] The bottom-layer diversion ring pipe 3-1, the middle-layer diversion ring pipe 3-2, and the top-layer diversion ring pipe 3-3 are used to receive gas from the mainstream pipeline and divert the gas into the device. They are all placed below the housing 1-1 and are connected to the device through the gas valve 3-11, the gas hose 3-12, the check valve 3-13, and the vent 1-17 in sequence.
[0018] The bottom ring pipe air inlet pipe 3-4, the middle ring pipe air inlet pipe 3-5 and the top ring pipe air inlet pipe 3-6 are respectively located below the bottom diversion ring pipe 3-1, the middle diversion ring pipe 3-2 and the top diversion ring pipe 3-3, and are used to connect the corresponding diversion ring pipes and the main pipeline;
[0019] The bottom ring pipe gas delivery port 3-7, the middle ring pipe gas delivery port 3-8 and the top ring pipe gas delivery port 3-9 are located on the corresponding diversion ring pipes, are part of the diversion ring pipes, and are used to assemble the gas delivery valve 3-11;
[0020] The central gas pipe 3-10 is used to directly connect the main flow pipeline and the check valve 3-13 to ventilate the device;
[0021] The gas delivery valve 3-11 is located on the gas delivery port of the ring pipe, and is used to connect the diverter ring pipe and the gas delivery hose, and controls the ventilation volume of the diverter ring pipe to the device through its own opening;
[0022] The gas supply hose 3-12 is used to connect the gas supply valve 3-11 and the check valve 3-13 to supply gas to the device;
[0023] The check valve 3-13 is located on the vent 1-15 and is used to connect the device and the gas hose 3-12 and prevent the liquid in the device from flowing back;
[0024] The ring pipe connecting rod 3-14 is located between the three layers of diversion ring pipes and is used to connect and fix the three layers of diversion ring pipes.
[0025] The housing 1 - 1 and the sealing cover 2 are made of visual materials, which is convenient for photographing the morphology of bubbles in the liquid.
[0026] The bottom of the housing 1-1 has a total of 49 vents 1-15, evenly distributed in a pattern of 7*7. Correspondingly, there are a total of 49 vent bolts 1-16, annular pipe gas ports, gas valves 3-11, and check valves 3-13.
[0027] The method for using the visualization device for measuring bubble and aerosol parameters in a simulated MCCI molten pool comprises the following steps:
[0028] Before using the device, assemble the diverter device and the housing 1-1 respectively, connect the diverter device to the main pipeline and the diverter device to the housing 1-1 respectively, seal the housing 1-1 with the sealing cover 2, and ensure that all joints are well sealed and have no obvious damage or leakage;
[0029] After assembly is completed, add liquid to the device to the specified height, close the gas valve 3-11, the air inlet 1-6, the exhaust port 1-9, and the sampling port 1-3 to seal the entire device. Leave it for a preset time and observe whether there is any liquid leakage in any part of the device. If there is, the sealing device needs to be reassembled; if not, it means that the device is well sealed and meets subsequent requirements;
[0030] Open the air inlet 1-6 and exhaust port 1-9 on the upper part of the visualization device, inject gas into the visualization device through the air inlet hose 1-7, and after all the air in the gas area is replaced with gas, close the air inlet 1-6; open a specified number of vents 1-15 and gas valves 3-11, and use an external gas injection device or a high-pressure gas cylinder to inject gas or aerosol into the liquid in the visualization device through the mainstream pipeline and the diversion device in turn, and at the same time open the exhaust port 1-9 to exhaust outwards, and open the designated sampling port 1-3 for sampling; during the gas injection process, it is necessary to pay attention to the pressure in the visualization device at all times. If there is a significant increase, it is necessary to open more exhaust hoses 1-10 for exhaust; at the same time, parameter measurements need to be performed during the gas injection stage. The bubble behavior in the liquid is photographed by an external high-speed camera, and the aerosol concentration after washing is measured by an external particle size spectrometer by sucking the gas from the exhaust hose 1-10;
[0031] After the gas injection phase is completed, record and organize the data and turn off the measuring equipment; drain the liquid in the device through the drain ports 1-12, open all the air inlets 1-6 and exhaust ports 1-9, open the sealing cover 2, add deionized water to the device for cleaning, and wait for the entire device to dry after cleaning.
[0032] Technical problems and advantages solved by the present invention:
[0033] Technical problems solved by the present invention:
[0034] 1. The device of the present invention solves the problem of difficulty in visually measuring bubble parameters in the MCCI molten pool;
[0035] 2. The device of the present invention solves the problem of difficulty in adjusting the number of pores and gas flow rate during bubble migration in the MCCI molten pool.
[0036] The present invention has the following advantages and beneficial effects:
[0037] 1. The main body of the device of the present invention is made of visual materials, which is convenient for parameter observation during use.
[0038] 2. The device of the present invention can change the number and size of the vent holes by replacing the bolts at the bottom of the experimental container, making it easier to meet the requirements of different working conditions.
[0039] 3. The device of the present invention has a simple structure, is easy to process and disassemble, and has high reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0041] Figure 1 It is a schematic diagram of the cross-sectional structure of the visualization device of the present invention.
[0042] Figure 2 It is a schematic diagram of the side structure of the visualization device of the present invention.
[0043] Figure 3 It is a schematic diagram of the top view of the structure of the visualization device of the present invention.
[0044] Figure 4 Schematic diagram of the structure of the diversion device of the present invention.
[0045] 1-1-housing, 1-2-sampling tube, 1-3-sampling port, 1-4-sampling hose, 1-5-sampling valve, 1-6-air inlet, 1-7-air inlet hose, 1-8-air inlet valve, 1-9-exhaust port, 1-10-exhaust hose, 1-11-exhaust valve, 1-12-drain port, 1-13-drain hose, 1-14-drain valve, 1-15-vent, 1-16-vent bolt, 1-17-vent hole, 1-18-housing connection screw hole, 2-sealing cover, 2-1- Pressure gauge interface, 2-2-sealing cover connecting screw hole, 3-1-bottom layer diversion ring pipe, 3-2-middle layer diversion ring pipe, 3-3-top layer diversion ring pipe, 3-4-bottom layer ring pipe air inlet pipe, 3-5-middle layer ring pipe air inlet pipe, 3-6-top layer ring pipe air inlet pipe, 3-7-bottom layer ring pipe gas outlet, 3-8-middle layer ring pipe gas outlet, 3-9-top layer ring pipe gas outlet, 3-10-center gas outlet, 3-11-gas outlet valve, 3-12-gas outlet hose, 3-13-check valve, 3-14-ring pipe connecting rod. DETAILED DESCRIPTION
[0046] The following embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples. The following embodiments are used to illustrate the present invention but are not intended to limit the scope of the present invention.
[0047] like Figure 1 、 Figure 2 and Figure 3 As shown, the present invention simulates the visualization device for measuring bubble and aerosol parameters in the MCCI molten pool, the visualization device includes a shell 1-1, a sampling tube 1-2, a sampling port 1-3, a sampling hose 1-4, a sampling valve 1-5, an air inlet 1-6, an air inlet hose 1-7, an air inlet valve 1-8, an exhaust port 1-9, an exhaust hose 1-10, an exhaust valve 1-11, a drain port 1-12, a drain hose 1-13, a drain valve 1-14, a vent 1-15, a vent bolt 1-16, a vent hole 1-17, and a shell connecting screw hole 1-18, sealing cover 2, pressure gauge interface 2-1, sealing cover connecting screw hole 2-2, a diversion device consisting of a bottom-layer diversion ring pipe 3-1, a middle-layer diversion ring pipe 3-2, a top-layer diversion ring pipe 3-3, a bottom-layer ring pipe air inlet pipe 3-4, a middle-layer ring pipe air inlet pipe 3-5, a top-layer ring pipe air inlet pipe 3-6, a bottom-layer ring pipe gas outlet 3-7, a middle-layer ring pipe gas outlet 3-8, a top-layer ring pipe gas outlet 3-9, a central gas outlet pipe 3-10, a gas outlet valve 3-11, a gas outlet hose 3-12, a check valve 3-13 and a ring pipe connecting rod 3-14, such as Figure 4 shown.
[0048] The housing 1-1 is used to carry liquid and serves as the main experimental location;
[0049] There are four sampling ports 1-3 located on the upper part of the housing 1-1. The sampling tube 1-2 is located inside the container and connected to the sampling port 1-3. The sampling hose 1-4 is located outside the container and connected to the sampling port 1-3. The sampling valve 1-5 is connected to the sampling hose 1-4. The whole device is used to extract sample gas from the interior of the device.
[0050] There are two air inlets 1-6 located on the upper part of the housing 1-1. The air inlet hose 1-7 is located outside the container and connected to the air inlet 1-6. The air inlet valve 1-8 is connected to the air inlet hose 1-7. The whole is used to inject gas into the device, which can replace the gas in the device or increase the pressure;
[0051] There are two exhaust ports 1-9 located on the upper part of the shell 1-1. The exhaust hose 1-10 is located outside the container and connected to the exhaust port 1-9. The exhaust valve 1-11 is connected to the exhaust hose 1-10. The whole device is used to discharge the gas in the device and stabilize the gas pressure in the device.
[0052] The drain port 1-12 is located at the bottom of the side of the housing 1-1, the drain hose 1-13 is located outside the container and connected to the drain port 1-12, and the drain valve 1-14 is connected to the drain hose 1-13, and the whole is used to discharge the liquid in the device;
[0053] The vent 1-15 is located on the bottom surface of the housing 1-1 and is used to fix the vent bolt 1-16 to the device housing;
[0054] The vent hole 1-17 is obtained by machining the vent bolt 1-16 and is used to introduce gas into the device;
[0055] The housing connection screw hole 1-18 is located at the top of the housing 1-1 and is used to connect the housing 1-1 and the sealing cover 2;
[0056] The sealing cover 2 is used to seal the entire device and is located on the top of the housing (1-1);
[0057] The pressure gauge interface 2-1 is located at the center of the sealing cover 2 and is used to place the pressure gauge on the sealing cover;
[0058] The sealing cover connecting screw hole 2-2 is located at the edge of the sealing cover 2 and is used to connect the sealing cover 2 and the housing 1-1;
[0059] The bottom-layer diversion ring pipe 3-1, the middle-layer diversion ring pipe 3-2, and the top-layer diversion ring pipe 3-3 are used to receive gas from the mainstream pipeline and divert the gas into the device. They are all placed below the housing 1-1 and are connected to the device through the gas valve 3-11, the gas hose 3-12, the check valve 3-13, and the vent 1-17 in sequence.
[0060] The bottom ring pipe air inlet pipe 3-4, the middle ring pipe air inlet pipe 3-5 and the top ring pipe air inlet pipe 3-6 are respectively located below the bottom diversion ring pipe 3-1, the middle diversion ring pipe 3-2 and the top diversion ring pipe 3-3, and are used to connect the corresponding diversion ring pipes and the main pipeline;
[0061] The bottom ring pipe gas delivery port 3-7, the middle ring pipe gas delivery port 3-8 and the top ring pipe gas delivery port 3-9 are located on the corresponding diversion ring pipes, are part of the diversion ring pipes, and are used to assemble the gas delivery valve 3-11;
[0062] The central gas pipe 3-10 is used to directly connect the main flow pipeline and the check valve 3-13 to ventilate the device;
[0063] The gas delivery valve 3-11 is located on the gas delivery port of the ring pipe, and is used to connect the diverter ring pipe and the gas delivery hose, and controls the ventilation volume of the diverter ring pipe to the device through its own opening;
[0064] The gas supply hose 3-12 is used to connect the gas supply valve 3-11 and the check valve 3-13 to supply gas to the device;
[0065] The check valve 3-13 is located on the vent 1-15 and is used to connect the device and the gas hose 3-12 and prevent the liquid in the device from flowing back;
[0066] The ring pipe connecting rod 3-14 is located between the three layers of diversion ring pipes and is used to connect and fix the three layers of diversion ring pipes.
[0067] Preferably, the housing 1 - 1 and the sealing cover 2 of the present invention are made of visual materials to facilitate photographing the morphology of bubbles in the liquid.
[0068] Preferably, there are 49 air vents on the bottom of the shell 1-1 of the present invention, which are evenly distributed in a 7*7 pattern; correspondingly, there are 49 vent bolts 1-16, annular pipe air ports, air supply valves 3-11 and check valves 3-13 of the present invention, corresponding to 49 air vents; this air hole distribution method ensures a sufficient number of air holes, and the regular arrangement facilitates shooting on all sides of the experimental container.
[0069] The method of using the visualization device for simulating the measurement of bubble and aerosol parameters in the MCCI melt pool of the present invention is as follows:
[0070] Before using the device, assemble the diverter device and the housing 1-1 respectively, connect the diverter device and the main pipeline, and the diverter device and the housing 1-1 respectively, seal the housing 1-1 with the sealing cover 2, and ensure that each connection is well sealed and has no obvious damage or leakage.
[0071] After assembly is completed, add liquid to the device to the specified height, close the gas valve 3-11, the air inlet 1-6, the exhaust port 1-9 and the sampling port 1-3 to seal the entire device, let it stand for a sufficient time, and observe whether there is liquid leakage in various parts of the device. If so, the sealing device needs to be reassembled; if not, it means that the device is well sealed and meets subsequent requirements.
[0072] Open the air inlet 1-6 and exhaust port 1-9 on the top of the visualization device, and inject gas into the visualization device through the air inlet hose 1-7. After all the air in the gas area is replaced with gas, close the air inlet 1-6. Open a designated number of vents 1-15 and gas valves 3-11, and use an external gas injection device or high-pressure gas tank to inject gas or aerosol into the liquid in the visualization device through the mainstream pipeline and diversion device 3 in sequence. At the same time, open the exhaust port 1-9 to exhaust the air outward, and open the designated sampling port 1-3 for sampling. During the gas injection process, it is necessary to keep an eye on the pressure in the visualization device. If it increases significantly, it is necessary to open more exhaust hoses 1-10 to exhaust the air. At the same time, parameter measurements need to be performed during the gas injection stage. The bubble behavior in the liquid is captured by an external high-speed camera, and the aerosol concentration after washing is measured by an external particle size spectrometer by sucking gas from the exhaust hose 1-10.
[0073] After the gas injection phase is complete, record and organize the data, turn off the measuring equipment, drain the liquid from the device through drain ports 1-12, open all air inlets 1-6 and exhaust ports 1-9, open the sealing cover 2, add deionized water to the device for cleaning, and allow the entire device to dry after cleaning.
[0074] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A visualization device for simulating the measurement of bubble and aerosol parameters in MCCI molten pool, characterized by: The visualization device comprises a housing (1-1), a sampling tube (1-2), a sampling port (1-3), a sampling hose (1-4), a sampling valve (1-5), an air inlet (1-6), an air inlet hose (1-7), an air inlet valve (1-8), an air outlet (1-9), an air outlet hose (1-10), an air outlet valve (1-11), a liquid discharge port (1-12), a liquid discharge hose (1-13), a liquid discharge valve (1-14), a vent (1-15), a vent bolt (1-16), a vent hole (1-17), a housing connection screw hole (1-18), a sealing cover (2), and a pressure A meter interface (2-1), a sealing cover connecting screw hole (2-2), a flow dividing device consisting of a bottom flow dividing ring pipe (3-1), a middle flow dividing ring pipe (3-2), a top flow dividing ring pipe (3-3), a bottom flow dividing ring pipe air inlet pipe (3-4), a middle flow dividing ring pipe air inlet pipe (3-5), a top flow dividing ring pipe air inlet pipe (3-6), a bottom flow dividing ring pipe gas outlet (3-7), a middle flow dividing ring pipe gas outlet (3-8), a top flow dividing ring pipe gas outlet (3-9), a central gas outlet pipe (3-10), a gas outlet valve (3-11), a gas outlet hose (3-12), a check valve (3-13) and a ring pipe connecting rod (3-14); Wherein, the housing (1-1) is used to carry liquid and serves as the main place for the experiment; There are a plurality of sampling ports (1-3) located at the upper part of the housing (1-1); the sampling tube (1-2) is located inside the container and connected to the sampling port (1-3); the sampling hose (1-4) is located outside the container and connected to the sampling port (1-3); the sampling valve (1-5) is connected to the sampling hose (1-4); and the whole is used to extract sample gas inside the device; There are multiple air inlets (1-6) located at the upper part of the shell (1-1); the air inlet hose (1-7) is located outside the container and connected to the air inlet (1-6); the air inlet valve (1-8) is connected to the air inlet hose (1-7); the whole is used to inject gas into the device, and can replace the gas in the device or increase the pressure; There are multiple exhaust ports (1-9) located at the upper part of the shell (1-1); the exhaust hose (1-10) is located outside the container and connected to the exhaust port (1-9); the exhaust valve (1-11) is connected to the exhaust hose (1-10); the whole is used to exhaust the gas in the device and stabilize the gas pressure in the device; The liquid discharge port (1-12) is located at the bottom of the side of the housing (1-1), the liquid discharge hose (1-13) is located outside the container and connected to the liquid discharge port (1-12), and the liquid discharge valve (1-14) is connected to the liquid discharge hose (1-13), and the whole is used to discharge liquid in the device; There are a plurality of vents (1-15), which are located on the bottom surface of the housing (1-1) and are used to fix the vent bolts (1-16) on the housing of the device; The vent holes (1-17) are multiple and are obtained by processing on the vent bolt (1-16) and are used to introduce gas into the device; The shell connecting screw hole (1-18) is located at the top of the shell (1-1) and is used to connect the shell (1-1) and the sealing cover (2); The sealing cover (2) is used to seal the entire device and is located on the top of the housing (1-1); The pressure gauge interface (2-1) is located on the sealing cover (2) and is used to place the pressure gauge on the sealing cover; The sealing cover connecting screw hole (2-2) is located at the edge of the sealing cover (2) and is used to connect the sealing cover (2) and the housing (1-1); The bottom-layer flow-dividing ring pipe (3-1), the middle-layer flow-dividing ring pipe (3-2) and the top-layer flow-dividing ring pipe (3-3) are used to receive gas from the mainstream pipeline and divert the gas into the device, and are all placed below the housing (1-1) and are connected to the device through the gas delivery valve (3-11), the gas delivery hose (3-12), the check valve (3-13) and the vent hole (1-17) in sequence; The bottom ring pipe air inlet pipe (3-4), the middle ring pipe air inlet pipe (3-5) and the top ring pipe air inlet pipe (3-6) are respectively located below the bottom flow diversion ring pipe (3-1), the middle flow diversion ring pipe (3-2) and the top flow diversion ring pipe (3-3), and are used to connect the corresponding flow diversion ring pipes and the main flow pipeline; The bottom ring pipe gas delivery port (3-7), the middle ring pipe gas delivery port (3-8) and the top ring pipe gas delivery port (3-9) are located on the corresponding flow dividing ring pipes, are part of the flow dividing ring pipes, and are used to assemble the gas delivery valve (3-11); The central gas delivery pipe (3-10) is used to directly connect the main flow pipeline and the check valve (3-13) to ventilate the device; The gas delivery valve (3-11) is located on the gas delivery port of the ring pipe, and is used to connect the shunt ring pipe and the gas delivery hose, and controls the ventilation volume of the shunt ring pipe to the device through its own opening; The gas delivery hose (3-12) is used to connect the gas delivery valve (3-11) and the check valve (3-13) and to deliver gas to the device; The check valve (3-13) is located on the vent (1-15) and is used to connect the device and the gas hose (3-12) and prevent the liquid in the device from flowing back; The ring pipe connecting rod (3-14) is located between the three layers of flow-dividing ring pipes and is used to connect and fix the three layers of flow-dividing ring pipes.
2. The visualization device for simulating the measurement of bubble and aerosol parameters in the MCCI molten pool according to claim 1, characterized in that: The outer shell (1-1) and the sealing cover (2) are made of visual materials, which facilitates photographing the morphology of bubbles in the liquid.
3. The visualization device for simulating the measurement of bubble and aerosol parameters in the MCCI molten pool according to claim 1, characterized in that: The bottom of the housing (1-1) has a total of 49 vents (1-15) evenly distributed in a 7*7 pattern; correspondingly, there are a total of 49 vent bolts (1-16), annular pipe gas delivery ports, gas delivery valves (3-11) and check valves (3-13), respectively.
4. A method for using the visualization device for simulating the measurement of bubble and aerosol parameters in a MCCI molten pool as claimed in any one of claims 1 to 4, characterized in that: The method comprises the following steps: Before the device is used, the flow splitter and the housing (1-1) are assembled respectively, the flow splitter and the main pipeline, the flow splitter and the housing (1-1) are connected respectively, the housing (1-1) is sealed with a sealing cover (2), and it is ensured that each joint is well sealed and has no obvious damage or leakage; After the assembly is completed, liquid is added to the device to a specified height, and the gas delivery valve (3-11), the air inlet (1-6), the exhaust port (1-9) and the sampling port (1-3) are closed to seal the entire device. The device is left to stand for a preset time to observe whether there is liquid leakage in various parts of the device. If so, the sealing device needs to be reassembled; if not, it means that the device has good sealing performance and meets subsequent requirements; Open the air inlet (1-6) and the exhaust port (1-9) on the upper part of the visualization device, inject gas into the visualization device through the air inlet hose (1-7), and after all the air in the gas area is replaced by gas, close the air inlet (1-6); open a specified number of vents (1-15) and gas delivery valves (3-11), use an external gas injection device or a high-pressure gas cylinder to inject gas or aerosol into the liquid in the visualization device through the mainstream pipeline and the diversion device in turn, and simultaneously open the exhaust port (1-9) to exhaust the gas outward, and open the specified sampling port (1-3) for sampling; during the gas injection process, it is necessary to pay attention to the pressure in the visualization device at all times. If there is a significant increase, it is necessary to open more exhaust hoses (1-10) for exhaust; at the same time, parameter measurement is required during the gas injection stage, the bubble behavior in the liquid is photographed by an external high-speed camera, and the aerosol concentration after washing is measured by an external particle size spectrometer to absorb the gas from the exhaust hose (1-10) for parameter measurement; After the gas injection phase is completed, the data is recorded and organized, and the measuring equipment is turned off; the liquid in the device is discharged through the drain port (1-12), all the air inlets (1-6) and the exhaust ports (1-9) are opened, the sealing cover (2) is opened, and deionized water is added to the device for cleaning. After the cleaning is completed, the entire device is dried.