Photovoltaic curtain wall assembly testing method and system

Through the light source simulation module and environmental simulation module combined with adaptive spectral analysis and digital twin technology, the problem of single conditions and insufficient data correlation in photovoltaic curtain wall assembly testing is solved, and comprehensive performance evaluation and optimization suggestions are achieved in complex environments, improving Test accuracy and efficiency are achieved, reducing maintenance costs.

CN119064249APending Publication Date: 2024-12-03NANJING SANHUI CONSTR ENG CO LTD
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202411194076.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing photovoltaic curtain wall component testing methods have problems such as single testing conditions, lack of correlation of data, limitations in durability testing, and lack of intelligence and remote control, which leads to the inability to fully reflect the performance of components in complex environments, affecting the actual application of components. Performance and maintenance costs.

Method used

Adopting light source simulation module and environmental simulation module, combining adaptive spectral analysis, multi-factor coupling durability testing and digital twin technology, comprehensive performance testing and intelligent data analysis are carried out, detailed performance reports and optimization suggestions are generated, and remote monitoring and data management are supported. .

Benefits of technology

It realizes a comprehensive evaluation of the performance of photovoltaic curtain wall components in complex environments, improves the accuracy and efficiency of testing, provides targeted optimization suggestions, reduces maintenance costs, and improves product reliability and market competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119064249A_ABST
    Figure CN119064249A_ABST
Patent Text Reader

Abstract

The invention provides a photovoltaic curtain wall assembly test method and system. The method comprises the following steps: establishing a test environment of a photovoltaic curtain wall assembly; evaluating the electrical performance of the photovoltaic curtain wall assembly; performing an efficiency test based on adaptive spectral analysis; multi-factor coupling durability testing is carried out; testing the integration performance of the photovoltaic curtain wall assembly; performing performance prediction and optimization based on a digital twinning technology; and intelligent analysis and report generation of comprehensive test data. The system and the method have remarkable advantages in the aspects of complex environment simulation, intelligent data analysis, durability evaluation, remote collaborative management and the like, can greatly improve the testing precision and efficiency of the photovoltaic curtain wall assembly, and provide powerful technical support for product design, manufacturing, operation and maintenance in practical application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of photovoltaic technology, and in particular to a photovoltaic curtain wall component testing method and system. Background Art

[0002] With the continuous development of renewable energy technology, photovoltaic curtain walls, as a new type of building material that integrates building facades and solar power generation functions, have received widespread attention. Photovoltaic curtain walls not only provide green energy, but also have advantages such as beauty and energy saving, so they have been widely used in modern buildings. However, in order to ensure the efficient operation of photovoltaic curtain walls in actual use, their components must undergo rigorous testing and evaluation before installation to verify their performance and reliability under various environmental conditions.

[0003] At present, the testing methods for photovoltaic curtain wall components usually use single or separate testing equipment, such as photovoltaic component IV characteristic testers, environmental simulation chambers and aging test equipment. These equipments independently test the electrical performance, light response, environmental adaptability, etc. of photovoltaic components. For example, the commonly used IV characteristic tester can measure the current-voltage curve of the component under different light intensities to evaluate its maximum power point and conversion efficiency. The environmental simulation chamber is used to simulate extreme climate conditions such as high temperature, high humidity, and low temperature to test the anti-aging performance of the component.

[0004] Although the existing technology can test and evaluate photovoltaic curtain wall components to a certain extent, there are obvious deficiencies in the following aspects: First, the singleness and limitations of the test conditions. Most of the existing test equipment can only simulate a single test condition, such as light or environmental factors, and cannot test the performance of the components in a comprehensive environment at the same time. This results in the test results often not being able to fully reflect the performance of photovoltaic curtain wall components in actual applications, especially in complex and changeable natural environments. Second, the test data lacks relevance. Because the test equipment is scattered and independent, there is a lack of linkage and association between various test data. For example, the light response test and the durability test are carried out separately, which makes it impossible to evaluate the comprehensive performance and long-term stability of the components under unified conditions. The disconnection between the data affects the accuracy of the evaluation of the overall performance of the components. The third is the limitations of durability and aging tests. Existing aging test equipment is mostly based on a single environmental factor (such as high temperature, ultraviolet rays), and cannot simulate the aging process of components under the combined action of multiple stress factors. In actual applications, photovoltaic curtain walls are often simultaneously affected by multiple factors such as light, temperature and humidity, and wind load for a long time. The interaction of these factors will accelerate the aging of components, and the existing test methods cannot effectively capture this composite effect. Fourth, there is a lack of intelligence and remote control. Most existing test systems are manually operated and locally controlled, and cannot achieve intelligent parameter adjustment and remote monitoring. With the expansion of the scale of photovoltaic curtain wall projects and the increase in diversified needs, the existing system is difficult to meet the requirements of efficient testing and collaborative management.

[0005] Due to the above-mentioned problems in the existing technology, the following adverse consequences may occur in the actual application of photovoltaic curtain wall components: the performance deviation of the components in the actual environment is large, resulting in a decrease in the efficiency of the components in actual use, and the expected power generation cannot be achieved; potential faults cannot be discovered early, and the lack of comprehensive and correlation tests makes it impossible to expose potential problems of components in complex environments (such as hot spot effects and material aging) during the testing phase, which in turn leads to failures in system operation and increased maintenance costs; product quality and market competitiveness are affected, and imperfect testing methods affect the improvement of product quality and weaken competitiveness in the market; maintenance and operation costs increase. Due to insufficient durability testing, photovoltaic curtain walls may face frequent maintenance needs in long-term operation, which increases operation and maintenance costs and has a negative impact on the overall economic efficiency of the project. Summary of the invention

[0006] To overcome the shortcomings of the prior art, the present invention proposes a photovoltaic curtain wall component testing method and system, which can accurately reproduce various complex lighting conditions (such as different time periods, weather changes) and environmental conditions (such as temperature, humidity, wind speed, dust, etc.) through the light source simulation module and the environmental simulation module, ensuring that the test results can reflect the actual performance of photovoltaic curtain wall components in actual applications. The collaborative work of different modules enables the test to cover the performance of components under extreme working conditions.

[0007] To achieve the above object, the present invention provides a photovoltaic curtain wall assembly testing method, comprising:

[0008] Step 1: Establish a test environment for photovoltaic curtain wall components;

[0009] Step 2: Preliminary evaluation of the electrical performance of photovoltaic curtain wall components;

[0010] Step 3: Efficiency test based on adaptive spectrum analysis;

[0011] Step 4: Durability test of multi-factor coupling;

[0012] Step 5: Photovoltaic curtain wall component integration performance test;

[0013] Step 6: Performance prediction and optimization based on digital twin technology;

[0014] Step 7: Intelligent analysis and report generation of comprehensive test data.

[0015] Furthermore, step 1 is as follows:

[0016] Step 1.1: Design a simulation test platform with adjustable angles according to the installation position of the photovoltaic curtain wall to ensure that the lighting conditions of the components at different tilt angles can reproduce the actual application scenarios;

[0017] Step 1.2: Configure a high-precision light source simulator on the test platform. The light source simulator should be able to adjust the spectral distribution to simulate the light intensity in different time periods (such as early morning, noon, and evening) and different weather conditions (such as sunny, cloudy, and rainy days);

[0018] Step 1.3: The environmental simulation part includes a temperature control system and a humidity control device, which are used to adjust the temperature and humidity in the test environment to simulate the working conditions of components in extreme environments ranging from extreme cold to high temperature, from dry to humid;

[0019] Step 1.4: A wind speed controller and a particle injection system must also be set up in the test environment to simulate the actual operating environment under harsh conditions such as wind, sand, dust, and acid rain.

[0020] Furthermore, step 2 is as follows:

[0021] Step 2.1: Connect a multi-channel data acquisition system, including a high-precision current sensor and a voltage sensor, to collect the open-circuit voltage, short-circuit current, maximum power point voltage, and current of the PV module in real time;

[0022] Step 2.2: The data acquisition system is linked with the test control software to set different light intensity, angle and frequency of the light source, and record the output curve of the component under these conditions in real time;

[0023] Step 2.3: By comparing the actual test data with the standard PV test curve, evaluate whether the module has obvious electrical performance defects, such as power attenuation, abnormal open-circuit voltage, etc.

[0024] Furthermore, step 3 is specifically as follows:

[0025] Step 3.1: Use an adaptive spectrum analyzer to monitor the spectrum distribution on the component surface in real time to ensure the accuracy of test data under different time periods and lighting conditions;

[0026] Step 3.2: The adaptive spectrum analyzer has a dynamic adjustment function, which automatically adjusts its band range according to the changes of different test light sources and environments to ensure maximum spectrum coverage;

[0027] Step 3.3: During the test, the conversion efficiency of the photovoltaic module under a specific spectrum is calculated in real time, and the parameters such as spectral intensity, incident angle, and temperature are recorded;

[0028] Step 3.4: The data analysis part normalizes the energy conversion efficiency under different spectra to obtain the comprehensive efficiency performance of the photovoltaic module under the full spectrum.

[0029] Furthermore, step 4 is as follows:

[0030] Step 4.1: In a closed test environment, introduce ultraviolet radiation, temperature and humidity cycle changes, acid rain simulation and particle injection to simulate various destructive factors of photovoltaic curtain walls in long-term operation;

[0031] Step 4.2: The test equipment uses a multi-dimensional stress loading system to periodically apply mechanical stress (such as stretching, compression, bending, etc.), and conducts a coupled test in combination with temperature stress to observe the attenuation of the component under the combined action of stress and environmental factors;

[0032] Step 4.3: Introduce a thermal imager to monitor the temperature distribution on the component surface and identify potential hot spots;

[0033] Step 4.4: After the long-term aging test is completed, the components are tested for physical properties to check changes in indicators such as mechanical strength, sealing, and light transmittance, and compared and analyzed with the initial state.

[0034] Furthermore, step 5 is as follows:

[0035] Step 5.1: Integrate the individually tested photovoltaic modules into the simulated building structure to form a practical application environment. Through the lighting system simulating the sun's trajectory, observe the shading, light transmission and power generation performance of the photovoltaic curtain wall in the building;

[0036] Step 5.2: In an integrated environment, configure a multi-point data acquisition device to collect real-time data such as electrical parameters, light intensity, temperature, etc. in different areas of the photovoltaic curtain wall to evaluate the performance consistency of the components in different areas;

[0037] Step 5.3: During the test, the load distribution and stress changes of the photovoltaic curtain wall in the building structure are recorded to ensure its structural safety under extreme conditions such as wind load and earthquake;

[0038] Step 5.4: Simulate the performance of the curtain wall under different seasons and climate conditions, and calculate the annual power generation and shading effect.

[0039] Furthermore, step 6 is as follows:

[0040] Step 6.1: Establish a three-dimensional digital twin model of the photovoltaic curtain wall component, which contains the component's geometric information, material properties, electrical performance parameters and other data;

[0041] Step 6.2: Train the digital twin model through historical test data and field monitoring data to improve its performance prediction accuracy under different working conditions;

[0042] Step 6.3: Introduce environmental factors (such as sunlight angle, temperature, dust coverage, etc.) into the model and simulate the operation of photovoltaic modules in the next few years to predict their power generation efficiency, aging speed and maintenance needs;

[0043] Step 6.4: Based on the simulation results of the digital twin model, propose targeted optimization solutions, such as adjusting the component cleaning frequency and improving the surface coating, to extend the component life and improve the overall system performance.

[0044] Furthermore, step 7 is as follows:

[0045] Step 7.1: The multidimensional data collected during the test is transmitted to the central data processing platform through the Internet of Things, and the AI ​​algorithm performs preliminary cleaning and analysis on the data;

[0046] Step 7.2: Use big data analysis technology to detect correlation, trend and anomaly of multi-source test data to form a multi-dimensional analysis model of component performance;

[0047] Step 7.3: Automatically generate a structured test report, including electrical performance analysis, durability evaluation, spectral efficiency, integrated performance, etc., and provide data visualization charts to help decision makers better understand the test results;

[0048] Step 7.4: The test report also contains predictive data from the digital twin simulation results, further supplementing the long-term performance information that cannot be covered in the actual test, forming a complete technical evaluation and improvement suggestions.

[0049] A photovoltaic curtain wall component testing system, applicable to the photovoltaic curtain wall component testing method, comprising:

[0050] A test platform module, used to fix and adjust the installation angle and position of the photovoltaic curtain wall assembly to be tested, the test platform module includes an angle adjustment unit and a fixing unit, the angle adjustment unit is controlled by a servo motor to adjust the tilt angle of the photovoltaic assembly within a range of 0° to 90°, and the fixing unit is used to stabilize the photovoltaic curtain wall assembly to ensure that it is not disturbed by external factors during the test;

[0051] A light source simulation module is used to simulate natural lighting conditions, including a full-spectrum LED light source array and a lighting angle control unit. The full-spectrum LED light source array can simulate sunlight with different spectral distributions and automatically adjust the band and intensity of the spectral output according to preset lighting conditions. The lighting angle control unit adjusts the lighting angle through a programmable reflector system to simulate the sunlight path in different time periods;

[0052] The environmental simulation module is used to simulate the impact of different environmental conditions on photovoltaic curtain wall components. It includes a temperature and humidity control unit, a wind speed adjustment unit and a particle injection unit. The temperature and humidity control unit is used to adjust the temperature and humidity in the test environment. The wind speed adjustment unit is used to generate different wind speed conditions. The particle injection unit sprays simulated dust and pollutants through a multi-directional adjustable nozzle system to test the performance of photovoltaic components in harsh environments.

[0053] Furthermore, it also includes:

[0054] The data acquisition and analysis module is used to collect and process the output data of photovoltaic curtain wall components in real time, including multi-channel current and voltage sensors, spectral analysis units and data processing centers. The spectral analysis unit dynamically adjusts the sampling frequency and spectral resolution to ensure the accuracy of test data under different light source conditions. The data processing center combines AI algorithms and digital twin technology to perform real-time modeling of test data, and combines machine learning algorithms to predict the long-term performance changes of photovoltaic curtain wall components. The data acquisition and analysis module also includes angle sensors and position sensors for real-time monitoring and feedback of the installation angle and position of photovoltaic components.

[0055] Durability test module, used to simulate the long-term use environment of photovoltaic curtain wall components, including ultraviolet radiation source, stress loading unit and thermal imager. The stress loading unit adopts hydraulic servo control technology, realizes complex stress field simulation through multi-axis stress coupling, and conducts coupled test in combination with temperature and humidity cycle. The thermal imager identifies potential thermal defects through multi-band scanning and generates hot spot distribution map in combination with the data processing center.

[0056] Compared with the prior art, the present invention has the following beneficial effects:

[0057] 1. The present invention provides a photovoltaic curtain wall component testing method and system. Through the light source simulation module and the environment simulation module, various complex lighting conditions (such as different time periods, weather changes) and environmental conditions (such as temperature, humidity, wind speed, dust, etc.) can be accurately reproduced to ensure that the test results can reflect the actual performance of photovoltaic curtain wall components in practical applications. The collaborative work of different modules enables the test to cover the performance of components under extreme working conditions.

[0058] 2. The present invention provides a photovoltaic curtain wall component testing method and system, which integrates a multi-channel sensor and a spectral analysis unit, and can collect the electrical performance, spectral response and environmental data of photovoltaic components in real time. The data acquisition and analysis module uses AI algorithms and digital twin technology to conduct in-depth analysis of test data and generate detailed performance reports and optimization suggestions. This intelligent analysis process improves test efficiency and provides data support for product optimization.

[0059] 3. The present invention provides a photovoltaic curtain wall component testing method and system. The durability test module comprehensively evaluates the aging process of photovoltaic components in long-term use through ultraviolet radiation, temperature and humidity cycles, and stress loading, and identifies potential fault points in combination with thermal imaging technology. This testing method makes the product more reliable in practical applications, and can provide a basis for subsequent maintenance planning through a life prediction model; the system supports remote monitoring and data management, and all data during the test process is uploaded to the cloud platform in real time. Users can adjust test parameters, view real-time data, and generate reports through a remote interface. The multi-user collaborative analysis function enables different teams to share test results, quickly make optimization decisions, and improve the flexibility and collaborative efficiency of the test.

[0060] 4. The present invention provides a photovoltaic curtain wall component testing method and system. The digital twin model generated based on the test data can not only predict the performance changes of the components in different environments in the future, but also provide targeted optimization suggestions (such as adjusting the installation angle, optimizing the cleaning cycle, etc.), helping designers and operation and maintenance teams to improve the overall performance and economic benefits of the product; the high degree of integration and flexible modular design between each module enable the system to be quickly configured and adjusted according to different testing requirements. Whether it is the development and testing of new products or the performance improvement of existing products, the system can provide fast, accurate and comprehensive testing services. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0062] Figure 1 It is a schematic diagram of the steps of the present invention

[0063] Figure 2 This is a schematic diagram of the system architecture of the present invention DETAILED DESCRIPTION

[0064] The technical solution of the present invention will be more clearly and completely explained below through description of preferred embodiments of the present invention in combination with the accompanying drawings.

[0065] like Figure 1 As shown, the present invention is:

[0066] Step 1: Establish a test environment for photovoltaic curtain wall components;

[0067] Step 2: Electrical performance evaluation of photovoltaic curtain wall components;

[0068] Step 3: Conduct efficiency test based on adaptive spectrum analysis;

[0069] Step 4: Conduct durability test of multi-factor coupling;

[0070] Step 5: Conduct photovoltaic curtain wall component integration performance test;

[0071] Step 6: Performance prediction and optimization based on digital twin technology;

[0072] Step 7: Intelligent analysis and report generation of comprehensive test data

[0073] The details are as follows:

[0074] Step 1: Establish a test environment for photovoltaic curtain wall components

[0075] Step 1.1 Simulation test platform design

[0076] The test platform adopts a multi-degree-of-freedom mechanical structure and has an adjustable mounting frame in three-dimensional space. Driven by a servo motor, the tilt angle of the photovoltaic module can be adjusted arbitrarily between 0° and 90° to simulate the installation method on different building facades.

[0077] Angle sensors are integrated on the platform to accurately monitor and adjust the installation angle of components, ensuring the accuracy of angle settings in different test scenarios.

[0078] Step 1.2 Light source simulation system

[0079] The light source simulator uses a full-spectrum LED light source array that can simulate the visible light, infrared light and ultraviolet light in natural light. The light source array consists of multiple independently controlled spectrum modules, each of which can adjust the wavelength, intensity and frequency according to preset parameters to simulate a variety of lighting scenes.

[0080] The light source system has a built-in light intensity sensor that adjusts the output light intensity in real time through closed-loop control to ensure that the photovoltaic modules receive stable light during different test phases. The light angle can also be adjusted through a programmable reflector system to simulate the sunlight path of all weather conditions.

[0081] Step 1.3 Environmental simulation system

[0082] The temperature and humidity control system consists of a heating / cooling unit and a humidification / dehumidification device, with a temperature control range of -20°C to +80°C and a humidity range of 10% to 95% RH. The temperature and humidity sensors monitor changes in the test environment in real time and adjust system parameters through feedback control, enabling it to accurately simulate various extreme environmental conditions.

[0083] The wind speed control system includes multiple fan arrays with a wind speed adjustment range of 0 to 15m / s. Different wind conditions are simulated by changing the fan speed and direction.

[0084] The particle injection system is equipped with dust and water mist injection devices, which can simulate the erosion of sand, dust, acid rain and pollutants. The nozzle of the injection system is designed to be multi-directionally adjustable to ensure that the entire surface of the photovoltaic module is covered.

[0085] Step 2: Preliminary evaluation of the electrical performance of photovoltaic curtain wall components

[0086] Step 2.1 Multi-channel data acquisition system

[0087] The data acquisition system consists of a high-precision current sensor (measuring range 0.1mA to 20A) and a voltage sensor (measuring range 0.1V to 1000V), with a collection frequency of up to 100kHz, ensuring real-time and high-precision collection of the electrical parameters output by the photovoltaic modules.

[0088] The data acquisition system is integrated with the control software, which can independently calibrate each channel to eliminate measurement errors. All collected data is transmitted to the data processing center via a high-speed serial bus to ensure real-time monitoring and analysis.

[0089] Step 2.2 Output curve measurement under lighting conditions

[0090] The test process simulates the output characteristics of photovoltaic modules under different lighting conditions by gradually changing the light source intensity. Through the software-controlled dimming system, the light source intensity changes from 0W / m 2 Gradually increase to 1000W / m 2 , the voltage and current curves of the components are collected at each stage.

[0091] The output data is transmitted to the analysis software, which automatically generates the IV characteristic curve and PV power curve. The analysis software automatically identifies the maximum power point and generates a performance report for the component.

[0092] Step 2.3 Electrical performance abnormality detection

[0093] The data analysis system identifies potential electrical performance anomalies, such as open-circuit voltage too low, short-circuit current deviation, power point drift, etc. by comparing the ideal curve under standard test conditions with the actual measurement results.

[0094] If an anomaly is detected, the system will automatically trigger the deep analysis mode and perform multiple measurements on the abnormal point to eliminate environmental interference factors and ensure the accuracy of the source of the anomaly.

[0095] Step 3: Efficiency test based on adaptive spectrum analysis

[0096] Step 3.1 Adaptive spectrum analyzer design

[0097] The spectrum analyzer uses a high-sensitivity photodetector combined with a spectrometer. The detector covers a wavelength range of 300nm to 1100nm and can accurately measure the spectral energy distribution of the reflection and transmission of the photovoltaic module surface.

[0098] The spectrometer has an adaptive adjustment function that can adjust its band distribution and resolution according to different light sources to ensure that the most relevant spectral information is captured under specific lighting conditions.

[0099] Step 3.2 Spectral coverage and dynamic adjustment function

[0100] The system automatically adjusts the sampling interval and spectral resolution of the spectrum analyzer to match the wavelength range of the current light source, ensuring that the test system maintains adequate spectral coverage regardless of how the wavelength of the light source changes.

[0101] During the test, the system also records spectral changes in real time and adjusts the sampling frequency to capture instantaneous spectral characteristics, such as sudden changes in light intensity or wavelength drift.

[0102] Step 3.3 Spectral efficiency test and data processing

[0103] The test data is processed by a specific algorithm to calculate the impact of different spectral components on the efficiency of photovoltaic modules. The algorithm fits the spectral energy and output power in each wavelength range to obtain the conversion efficiency under specific spectral conditions.

[0104] After data processing, a report including spectral response curve, conversion efficiency distribution diagram and spectral dependence coefficient is generated to help evaluate the comprehensive performance of photovoltaic modules under different spectral conditions.

[0105] Step 4: Durability test of multi-factor coupling

[0106] Step 4.1 Environmental simulation and stress loading system design

[0107] The system includes a UV radiation source, a temperature and humidity cycle control unit, an acid rain simulation unit and a particle injection device. The UV light source uses a high-intensity UV lamp with a radiation intensity of up to 1000W / m 2 , simulating long-term exposure of component materials to strong sunlight.

[0108] The temperature and humidity cycle control unit can set complex temperature and humidity change curves, such as rapid cooling, slow heating and periodic humidity changes, to test the performance degradation of components in temperature and humidity changes.

[0109] The mechanical stress loading system uses hydraulic servo control technology to accurately apply cyclic stresses such as tension, compression and bending to evaluate the structural integrity of components through multi-axis stress coupling.

[0110] Step 4.2 Coupling test and hot spot monitoring

[0111] The testing process combines an environmental simulation system with a stress loading system, allowing components to undergo durability tests while being exposed to ultraviolet rays, acid rain and mechanical stress, simulating multiple destructive factors in actual operation.

[0112] Thermal imagers monitor the temperature distribution on the component surface in real time, identifying hot spots caused by material aging, package damage or current concentration. The system automatically records and analyzes hot spots and generates thermal maps to assist in determining the fault location.

[0113] Step 4.3 Long-term aging evaluation and performance testing

[0114] After the aging test, the components are tested for a number of physical properties, such as tensile strength, surface hardness, and light transmittance. Optical microscopes and scanning electron microscopes are used to observe changes in the surface microstructure of the components and detect whether there are microcracks or peeling.

[0115] Compare the aged performance data with the initial data, analyze the performance decay curve, and calculate the life prediction value of the component under actual operating conditions.

[0116] Step 5: Photovoltaic curtain wall component integration performance test

[0117] Step 5.1 Photovoltaic curtain wall integrated test environment

[0118] In the integrated environment, photovoltaic modules are installed in the curtain wall position of the simulated building structure. The structure consists of a steel frame and a glass curtain wall, which completely simulates the installation method in an actual building.

[0119] The simulated structure is adjustable, and the azimuth and inclination angle of the building structure are adjusted through a hydraulic drive system to test the performance changes of the photovoltaic curtain wall in different orientations and angles.

[0120] The system is equipped with an all-weather solar simulation system, which consists of a high-precision tracking light source to simulate the sun's path and intensity changes, including lighting conditions in different time periods such as morning, noon, and dusk.

[0121] Step 5.2 Multi-point data acquisition and synchronization system

[0122] Multi-point sensors, including light intensity sensors, temperature sensors, voltage and current sensors, are arranged in different areas of the photovoltaic curtain wall to ensure real-time data collection on the entire curtain wall surface.

[0123] The data acquisition system uses the Precision Time Protocol (PTP) to ensure data synchronization of all sensors, with an acquisition accuracy of nanoseconds. This high-precision synchronization can accurately analyze the response differences of various parts of the photovoltaic curtain wall under different lighting conditions.

[0124] Through the distributed data processing platform, these data are monitored and analyzed in real time to generate reports on the curtain wall's power generation performance, temperature distribution, structural deformation, etc. at different time periods and azimuths.

[0125] Step 5.3 Load and stress testing

[0126] A stress testing system is configured in the integrated environment to monitor the stress of the photovoltaic curtain wall in real time through pressure sensors and strain gauges. The system simulates the stress of the building under conditions such as wind load, earthquake, thermal expansion and contraction to ensure the stability and safety of the curtain wall structure.

[0127] The stress testing system is combined with finite element analysis software (such as ANSYS) to simulate and calculate the entire curtain wall structure, output stress distribution diagrams and deformation diagrams, identify possible weak points and optimize the design.

[0128] Step 5.4 Full-year performance simulation and testing

[0129] Through long-term continuous testing, the power generation data of photovoltaic curtain walls in different seasons and weather conditions are collected. The data includes the changes in light from sunrise to sunset, the shadow effect on rainy days, the impact of snow cover, etc.

[0130] Combined with meteorological data, photovoltaic power generation prediction models (such as PVSyst) are used to simulate the annual power generation and evaluate the energy output capacity and economic benefits of the curtain wall in actual application.

[0131] The simulation results are compared and analyzed with the actual test data to identify model deviations and adjust parameters to improve the prediction accuracy of the model.

[0132] Step 6: Performance prediction and optimization based on digital twin technology

[0133] Step 6.1 Digital twin model construction

[0134] The digital twin model of the photovoltaic curtain wall component consists of a three-dimensional geometric model, material property data, electrical performance parameters and environmental conditions. The geometric model is generated by BIM (Building Information Modeling) software, and the material properties are imported through experimental data and parameters provided by suppliers.

[0135] The model integrates the IV characteristic curve, current density distribution, thermal resistance and other physical properties of photovoltaic modules. The data fusion algorithm is used to calibrate these physical properties with the actual test data to ensure the accuracy of the twin model.

[0136] Step 6.2 Performance prediction based on machine learning

[0137] Historical test data and real-time monitoring data are introduced into the digital twin model, and regression analysis, neural network and random forest algorithms are used for training to predict the long-term performance of photovoltaic modules under different environmental conditions.

[0138] Through time series analysis, the performance changes of photovoltaic curtain walls in the future are predicted, such as power attenuation rate, efficiency change trend, etc. Time series models include ARIMA (AutoRegressive Integrated Moving Average) model and LSTM (Long Short-Term Memory) model, which are suitable for prediction needs of different time spans.

[0139] The prediction results are displayed through visualization tools such as performance curves, thermal maps and life prediction charts to help technicians determine the future maintenance needs of the photovoltaic curtain wall.

[0140] Step 6.3 Environmental factor simulation and optimization suggestions

[0141] Environmental factors are introduced into the twin model, such as sunlight angle, temperature, humidity, dust coverage, etc. The model simulates these environmental factors in combination to identify the conditions that are most likely to cause component degradation.

[0142] The optimization algorithm is based on Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) technology to automatically generate the best operation strategy. For example, it is recommended to adjust the cleaning frequency of the curtain wall, optimize the angle setting or improve the surface coating, thereby improving the overall power generation efficiency and extending the service life.

[0143] As a specific implementation case, the application of digital twin technology in photovoltaic curtain wall component testing

[0144] 1. Model construction

[0145] Geometry Modeling:

[0146] Using BIM (Building Information Modeling) technology, first create a three-dimensional geometric model of the photovoltaic curtain wall, including the physical properties of the curtain wall such as size, angle, material, etc. This model is used to simulate the installation method and layout in the actual building structure. The geometric model can be described by the following formula:

[0147] M={G,P,S}

[0148] in:

[0149] G represents the geometric structure of the curtain wall, including the shape, installation angle, area, etc. of the components;

[0150] P represents the physical properties of the curtain wall components, such as the material’s refractive index, light transmittance, thermal conductivity, etc.;

[0151] S represents the connection relationship between the component and the building structure and the installation method.

[0152] Physical Property Modeling:

[0153] The digital twin model needs to include the electrical performance parameters of the photovoltaic module, such as open circuit voltage (Voc), short circuit current (Isc), maximum power point (P mp), etc. The electrical performance in the model can be described by the IV characteristic curve, and the formula is:

[0154]

[0155] in:

[0156] I is the component output current;

[0157] Io is the reverse saturation current;

[0158] q is the electron charge constant;

[0159] V is the output voltage;

[0160] n is the diode ideality factor;

[0161] K is the Boltzmann constant;

[0162] T is temperature.

[0163] This formula can be used to simulate the electrical performance of components under different lighting and temperature conditions.

[0164] Real-time data integration:

[0165] The digital twin model needs to be integrated with sensor data. Using the real-time data such as light, temperature, humidity, current, voltage, etc. collected by sensors, data fusion and noise suppression are performed through Kalman filters to obtain reliable real-time data for model updates:

[0166] x k =Ax k-1 +Bu k-1 +w k

[0167] in:

[0168] x kis the current state vector (such as voltage, current, temperature)

[0169] A is the state transfer matrix;

[0170] B is the control input matrix;

[0171] u k-1 are control inputs (e.g., changes in lighting);

[0172] w k is the process noise.

[0173] 2. Application scenarios of the model

[0174] Performance prediction:

[0175] Based on the digital twin model, time series analysis and deep learning methods (such as LSTM) are used to predict future performance. LSTM controls the impact of historical data on current predictions through memory and forget gates. The formula is:

[0176] h t =o t tanh(C t )

[0177] in:

[0178] h t is the output of the current time step;

[0179] o t is the output gate;

[0180] C t It is the state of memory cells.

[0181] By training the LSTM model, the output power change trend of photovoltaic modules in the future can be predicted, thereby optimizing the energy management strategy.

[0182] Fault diagnosis and maintenance planning:

[0183] Using rule-based and machine learning fault diagnosis algorithms, real-time data in the digital twin model is monitored. When an abnormal power drop or hot spot generation is detected, the system automatically triggers an alarm and recommends maintenance operations. Common anomaly detection algorithms include Isolation Forest:

[0184] Isolation Forest constructs a decision tree by randomly selecting samples and features, and determines whether it is an outlier based on the depth of the sample in the tree. The formula is:

[0185]

[0186] in:

[0187] h(x) is the depth of sample x in the tree;

[0188] E(h(x)) is the average depth of all samples in the tree.

[0189] Samples with shallow depth are more likely to be outliers

[0190] 3. Performance prediction algorithm based on machine learning

[0191] Regression analysis model

[0192] In the prediction of photovoltaic curtain wall component performance, common regression analysis models include multivariate linear regression and support vector regression (SVR). The regression model predicts future component output by fitting the relationship between test data and environmental variables. The formula for the multivariate linear regression model is:

[0193] Y=β0+β1X1+β2X2+…+β n X n +∈

[0194] in:

[0195] Y is the output power to be predicted;

[0196] X1, X2, ..., X n are input variables, such as light intensity, temperature, humidity, etc.;

[0197] β0 intercept, which represents the basic output value when there is no input feature.

[0198] β1, β2, ..., β n Regression coefficient, which indicates the weight of each feature on the output power

[0199] ∈ 误差项 , represents the unexplained random error in the regression model.

[0200] The optimization goal of the regression model is to minimize the mean square error (MSE):

[0201]

[0202] in:

[0203] n: number of samples

[0204] Y i The actual output value of the th sample,

[0205] The predicted output value of the i-th sample;

[0206] The optimization objective of the support vector regression (SVR) model is:

[0207]

[0208] in:

[0209] w model weight vector

[0210] C: Regularization parameter, used to balance model complexity and prediction error.

[0211] y i The actual output value of the i-th sample,

[0212] x i The input feature vector of the i-th sample.

[0213] b: bias term;

[0214] ∈Tolerance error range, the SVR model allows some errors to be within € without affecting the optimization objective.

[0215] The deep learning model (LSTM, long short-term memory network) is a commonly used model for time series prediction, especially for the prediction of photovoltaic module output. LSTM is mainly composed of input gate, forget gate and output gate.

[0216] The Forget Gate controls which information is forgotten, and its formula is:

[0217] f t =σ(W f ·[h t-1 ,x t ]+b f )

[0218] in:

[0219] f t The output value of the forget gate at the current time step t (between 0 and 1) indicates the proportion of information to be forgotten.

[0220] W f Weight matrix of forget gate

[0221] h t-1 The hidden state at the previous time step

[0222] x t Input features at the current time step (such as light intensity, temperature, etc.).

[0223] b f Bias term for the forget gate.

[0224] σSigmoid activation function limits the output value to between 0 and 1.

[0225] The input gate controls what new information needs to be stored. Its formula is:

[0226] i t =σ(W i ·[h t-1 ,x t ]+b i )

[0227]

[0228] in:

[0229] i t The input gate output value (between 0 and 1) at the current time step t, indicating the proportion of information to be updated.

[0230] W i Weight matrix for the input gate.

[0231] W C Weight matrix of candidate memory cells

[0232] Candidate memory cell states for the current time step

[0233] b i , b C Bias terms for input gates and candidate memory cells.

[0234] Tanh hyperbolic tangent activation function limits the output value to between -1 and 1.

[0235] The output gate determines what information to output, and its formula is:

[0236] o t =σ(W o ·[h t-1 ,x t ]+b o )

[0237] h t =o t tanh(C t )

[0238] in:

[0239] O t The output gate output value at the current time step t (between 0 and 1)

[0240] W o The weight matrix of the output gate

[0241] C t The memory cell state at the current time step

[0242] ht The hidden state at the current time step (the final output value).

[0243] b o Bias term for the output gate.

[0244] Step 6.4 Long-term operation simulation and maintenance plan

[0245] Simulate the operating conditions of photovoltaic curtain wall components in the next few years, including power output, efficiency attenuation, changes in hot spot locations, etc. Generate an optimized maintenance plan based on the simulation results, including regular cleaning, repair recommendations, component replacement cycles, etc.

[0246] The system also has a self-learning function. As time goes by and data accumulates, the prediction accuracy of the digital twin model continues to improve, and it can better adapt to application scenarios in complex environments.

[0247] Step 7: Intelligent analysis and report generation of comprehensive test data

[0248] Step 7.1 Multi-source data fusion and processing

[0249] The data processing platform adopts a big data architecture and uses Apache Hadoop and Spark for large-scale data processing, including data cleaning, deduplication, outlier detection, etc. The platform has the ability to perform time series processing, spatial processing and multi-dimensional analysis on multi-source data.

[0250] Various test data are processed uniformly through data fusion algorithms, including Kalman filtering, Bayesian reasoning, and adaptive weighted average algorithms, to ensure that data collected by different test equipment at different times can be processed consistently.

[0251] Step 7.2 Intelligent analysis and decision support

[0252] The data analysis system uses deep learning technologies, such as convolutional neural networks (CNN) and long short-term memory networks (LSTM), to perform pattern recognition and trend analysis on large-scale historical data and real-time data.

[0253] The system also has an intelligent alarm function, which uses anomaly detection algorithms (such as Isolation Forest and DBSCAN) to automatically identify potential risks in the operation of PV modules, such as power attenuation, abnormal hot spots, structural deformation, etc., and issue early warnings.

[0254] Step 7.3 Automated test report generation

[0255] Based on the test data, the system automatically generates a structured report, which includes test overview, data analysis results, performance evaluation, optimization suggestions, etc. Natural language generation technology (NLG) is used in the report generation process to convert data analysis results into easy-to-understand text descriptions.

[0256] Test reports are output in multiple formats, such as PDF, HTML, and interactive data dashboards (such as Power BI or Tableau) to meet the needs of different application scenarios.

[0257] Step 7.4 Data Visualization and User Interaction

[0258] The report uses visualization tools to present test data, including line graphs, bar graphs, heat maps, scatter plots, etc. Users can dynamically adjust the analysis dimensions through interactive charts to gain a deeper understanding of the impact of different parameters on the performance of photovoltaic curtain walls.

[0259] The system also supports personalized customization of reports. Users can adjust the presentation of report content as needed, such as highlighting changes in power output, and analyzing in detail the performance of components under certain environmental conditions.

[0260] This method not only covers the comprehensive evaluation of photovoltaic curtain wall components in complex environments, but also provides a scientific basis for future application optimization and maintenance management with the help of digital twin technology and intelligent data analysis. It can help photovoltaic curtain wall designers, manufacturers and users improve product performance throughout the entire life cycle.

[0261] As a specific implementation method, a photovoltaic curtain wall component test system module relationship and workflow are as follows:

[0262] The entire photovoltaic curtain wall component testing system can be divided into the following main modules:

[0263] Test platform module: used to fix and adjust the installation angle and position of photovoltaic curtain wall components.

[0264] Light source simulation module: used to simulate various lighting conditions.

[0265] Environmental simulation module: used to simulate various environmental factors (such as temperature, humidity, wind speed, particulate matter, etc.).

[0266] Data acquisition and analysis module: used to collect and analyze the output data of photovoltaic modules in real time and generate analysis reports.

[0267] Durability test module: used to evaluate the performance changes and aging of photovoltaic modules during long-term use.

[0268] Remote monitoring and management module: used for remote monitoring, sharing and multi-user collaborative operation of data.

[0269] The relationship between the test platform module and other modules:

[0270] The test platform module is the core foundation of the entire system, and other modules rely on it to fix and adjust the angle of the photovoltaic modules.

[0271] The light source simulation module and the environment simulation module adjust the output according to the angle and position of the test platform to ensure that the light conditions and environmental conditions can correctly act on the surface of the photovoltaic module.

[0272] The data acquisition and analysis module is integrated on the test platform through sensors to collect the electrical performance data of components in different angles and environments in real time.

[0273] The durability test module applies external factors such as stress, temperature and humidity changes to photovoltaic modules fixed on the test platform to evaluate the aging of the modules in real scenarios.

[0274] Relationship between light source simulation module and environment simulation module

[0275] The light source simulation module simulates the lighting conditions of photovoltaic curtain wall components under different time periods and weather conditions by controlling the intensity, angle and spectrum of light.

[0276] The environmental simulation module adjusts factors such as temperature, humidity, wind speed, and particle concentration, and cooperates with the light source simulation module to simulate various environmental conditions in actual applications.

[0277] These two modules need to work in coordination to ensure synchronous simulation under specific lighting and environmental conditions. For example, when simulating a high temperature and high humidity environment under strong sunlight at noon, the light source simulation module and the environmental simulation module need to be highly consistent to accurately test the performance of photovoltaic modules.

[0278] Integration of data acquisition and analysis modules

[0279] The data acquisition and analysis module is deeply integrated with other modules and is mainly responsible for collecting, processing and analyzing the data generated during the test process.

[0280] The sensors are distributed in the test platform, light source simulation module and environment simulation module to collect the electrical performance data (such as voltage, current, power, etc.), spectral data, temperature and humidity data and environmental data of the photovoltaic modules in real time.

[0281] The collected data is analyzed by the data processing center, and combined with AI algorithms and digital twin models to generate the component's IV characteristic curve, power output curve, and spectral response curve.

[0282] The data processing center will also feed back the analysis results to the light source simulation module and the environment simulation module to help optimize the lighting and environmental conditions for the next round of testing.

[0283] Embedding of durability test module

[0284] The durability test module performs aging tests on photovoltaic modules through ultraviolet radiation, mechanical stress, and temperature and humidity cycles, and monitors the performance changes of the modules in real time.

[0285] The data from the durability test module will be transmitted to the data acquisition and analysis module for processing and compared with the previous data to generate an aging curve, life prediction model and hot spot distribution map.

[0286] The data analysis results can be further fed back to the test platform module to adjust the installation angle or position of the components for more accurate durability evaluation.

[0287] Synergy of remote monitoring and management modules

[0288] The remote monitoring and management module serves as the command and data management center of the entire system, maintaining information synchronization with all modules.

[0289] The data collected by each module will be uploaded through the cloud platform, and the remote monitoring system will display the test progress, environmental parameters and performance indicators of the photovoltaic modules in real time.

[0290] The user can adjust the parameters of the light source simulation module and the environment simulation module, or change the angle setting of the test platform module through the remote interface.

[0291] The remote management module also supports multi-user collaborative analysis. Different users can share test data and analysis reports to jointly optimize the design and maintenance plans of PV modules.

[0292] The workflow is as follows:

[0293] Initialization and Setup

[0294] The user sets the installation angle, lighting conditions and environmental conditions of the photovoltaic modules through the remote monitoring system and fixes the modules on the test platform. The light source simulation module and the environmental simulation module adjust the output according to the preset parameters.

[0295] Testing and data collection

[0296] The test platform module starts, and the light source simulation module and the environment simulation module start working. The data acquisition and analysis module collects the electrical performance data, light data and environmental data of the photovoltaic module in real time and transmits them to the data processing center.

[0297] Durability testing and aging assessment

[0298] During long-term durability tests, the durability test module applies mechanical stress, UV radiation, and temperature and humidity cycles, and the data analysis module monitors the performance changes of the components in real time.

[0299] Data analysis and feedback optimization

[0300] The data processing center generates analysis reports through AI algorithms and digital twin models, and adjusts the parameters of light source simulation and environmental simulation based on the test results to optimize subsequent tests.

[0301] Remote monitoring and collaborative analysis

[0302] All test data is uploaded to the cloud platform in real time. Users can view test progress, adjust test parameters or generate reports through the remote monitoring system, supporting multi-user collaborative analysis and optimized decision-making.

[0303] The test platform module provides basic support, the light source simulation and environment simulation modules provide multi-dimensional test conditions, the data acquisition and analysis module performs real-time data processing and feedback optimization, the durability test module evaluates the long-term reliability of components, and the remote monitoring and management module realizes the intelligence and operability of the system.

[0304] like Figure 2 As shown, the connection and inclusion relationship between the various modules of the photovoltaic curtain wall component test system is as follows:

[0305] Test platform module (core module):

[0306] Connection relationship: The test platform module is directly connected to the light source simulation module and the environment simulation module, serving as the physical support and installation position regulator of these modules.

[0307] Inclusion relationship: The test platform module includes sub-modules such as angle adjustment unit, fixing unit, position sensor, etc., which are used to adjust and monitor the installation status of photovoltaic modules.

[0308] Light source simulation module:

[0309] Connection relationship: The light source simulation module is connected to the test platform module to provide lighting conditions that meet the angle and position of the component. It is also connected to the data acquisition and analysis module to transmit the lighting conditions and spectral data to the data acquisition unit.

[0310] Inclusion relationship: The light source simulation module includes a spectrum control unit, a light angle control unit, etc., which are used to adjust the light source intensity, wavelength and incident angle.

[0311] Environmental simulation module:

[0312] Connection relationship: The environmental simulation module is connected to the test platform module and the light source simulation module to simulate complex environmental conditions (such as temperature, humidity, wind speed, etc.) and transmit environmental data to the data acquisition and analysis module.

[0313] Inclusion relationship: The environmental simulation module includes sub-modules such as temperature and humidity control unit, wind speed adjustment unit, and particle injection system, which are used to reproduce complex natural environments.

[0314] Data acquisition and analysis module (central control module):

[0315] Connection relationship: The data acquisition and analysis module connects all modules and is the data processing and analysis core of the entire system. It receives real-time data from the light source simulation module, environment simulation module and test platform module for processing and feedback.

[0316] Inclusion relationship: This module includes sub-modules such as data acquisition unit, AI analysis engine, digital twin model, etc., which are used for data processing, performance analysis and report generation.

[0317] Durability test module:

[0318] Connection relationship: The durability test module is directly connected to the test platform module and the data acquisition and analysis module to simulate aging conditions and feed back the results to the data acquisition and analysis module.

[0319] Inclusions: The durability test module includes a UV radiation source, a stress loading unit, and a thermal imaging monitoring system to test the durability of components in extreme environments.

[0320] Remote monitoring and management module (global control module):

[0321] Connection relationship: The remote monitoring and management module connects all modules, controls and monitors the test process, and supports remote access and parameter adjustment.

[0322] Inclusion relationship: This module includes a cloud platform, data visualization tools, and a remote operation interface for monitoring, control, and data sharing.

[0323] Connections and data flow between modules

[0324] The test platform module is the basis for the operation of all other modules and is directly physically connected to the light source simulation module and the environment simulation module.

[0325] The light source simulation module and the environment simulation module adjust the output parameters according to the component positions on the test platform, and transmit the data to the data acquisition and analysis module.

[0326] The data collection and analysis module serves as the core data processing node, connecting all modules and responsible for data aggregation, processing and feedback.

[0327] The durability test module interacts with the data acquisition and analysis module in real time during long-term testing to provide aging data.

[0328] The remote monitoring and management module connects the entire system, collects the status and data of each module in real time, and supports users' remote operation and decision-making.

[0329] As a specific embodiment:

[0330] This embodiment provides a comprehensive testing system and method for photovoltaic curtain wall components, which is used to simulate various working conditions of photovoltaic curtain wall components in real environments and conduct comprehensive testing and analysis of their performance. The system combines modules such as light source simulation, environmental simulation, data collection and analysis, durability testing, remote monitoring and optimization management.

[0331] Test platform module

[0332] The photovoltaic curtain wall components are fixed and angle-adjusted through the test platform. The test platform includes an angle adjustment unit and a fixing unit. The angle adjustment unit is driven by a servo motor with an angle range of 0° to 90°. The installation angle of the component is set by the control software to ensure that its performance at different tilt angles can be tested. During the test, the angle sensor and position sensor on the platform monitor the installation status of the component in real time and feed the data back to the control system to ensure the accuracy of the component position.

[0333] Light source simulation module

[0334] The light source simulation module uses a full-spectrum LED light source array to simulate visible light, ultraviolet light and infrared light in natural light. The light source adjusts the light intensity, spectral distribution and incident angle through a programmable controller to reproduce the lighting environment in different time periods (such as early morning, noon, and evening) and different climatic conditions (such as sunny days, cloudy days, and shadows). The light source system has a built-in light angle control unit, which accurately adjusts the light direction through a reflector system to ensure that the lighting conditions of the photovoltaic modules in actual applications can be reproduced.

[0335] Environmental simulation module

[0336] The environmental simulation module is used to reproduce the working state of photovoltaic curtain wall components in extreme environments. The temperature and humidity control unit can accurately adjust the temperature and humidity in the test environment, with a temperature range of -20℃ to +80℃ and a humidity range of 10% to 95% RH. The wind speed adjustment unit generates a wind speed range of 0 to 15m / s, and the particle injection unit uses a multi-directional adjustable nozzle system to evenly spray simulated sand and pollutants to ensure that the surface of the photovoltaic module is fully covered to test its anti-corrosion and anti-pollution performance in harsh environments.

[0337] Data acquisition and analysis module

[0338] The module collects the electrical performance data of photovoltaic curtain wall components in real time through multi-channel current and voltage sensors, including key parameters such as open circuit voltage, short circuit current, and maximum power point. At the same time, the spectrum analysis unit monitors the spectrum distribution in real time and records the energy conversion efficiency of the components under different lighting conditions. The collected data is transmitted to the data processing center, which combines AI algorithms and digital twin technology to analyze and model the test data to generate the IV characteristic curve, PV power curve, spectral response curve, etc. of the component.

[0339] Durability test module

[0340] This module is used to evaluate the durability of photovoltaic curtain wall components in long-term operation. The ultraviolet radiation source simulates the long-term exposure of the components to strong sunlight, and combines the temperature and humidity cycle control unit and the stress loading unit to simulate the aging process of the components in extreme environments. The stress loading unit adopts hydraulic servo control technology to evaluate the structural stability of the components under multi-axial stress by applying periodic tensile, compressive and bending stresses. The thermal imager monitors the temperature distribution on the surface of the component in real time, identifies hot spots caused by material aging or current concentration, and generates detailed thermal maps for fault diagnosis.

[0341] Remote monitoring and management module

[0342] The test system supports remote monitoring and data management, and realizes multi-user collaborative operation through the cloud platform. During the test, all data is uploaded to the cloud platform in real time. Users can monitor the test progress, view analysis results and generate test reports through the visual dashboard. The test report includes component performance evaluation, fault diagnosis and optimization suggestions, and supports customization of report content to meet the needs of different scenarios.

[0343] Specific testing process:

[0344] Installation and Initialization

[0345] Install the photovoltaic curtain wall components on the test platform and set the tilt angle, position and installation direction of the components according to the test requirements. Adjust the lighting parameters of the light source simulation module, such as light intensity, spectral distribution, incident angle, etc., to ensure that the simulation conditions meet the test plan. The temperature, humidity, wind speed and particle injection systems in the environmental simulation module are started according to the preset program to start simulating the target environment.

[0346] Electrical performance testing and data acquisition

[0347] Under different lighting and environmental conditions, the electrical parameters of photovoltaic modules are collected through multi-channel sensors to generate IV characteristic curves and PV power curves. At the same time, the spectrum analysis unit records the conversion efficiency at different wavelengths and generates a spectrum response curve. All data is transmitted to the data processing center, where it is analyzed in real time by AI algorithms and digital twin models to output a comprehensive performance evaluation report of the module.

[0348] Durability testing and troubleshooting

[0349] In the long-term cycle test, the aging process of the components is simulated, and the durability of the components is evaluated by combining ultraviolet radiation, temperature and humidity changes, and stress loading. The thermal imager monitors and identifies abnormal changes in the surface temperature of the components, generates a hot spot distribution map, and compares and analyzes it with the predicted results in the digital twin model to determine the potential failure location and cause of the components.

[0350] Optimization and maintenance suggestions

[0351] Based on the test data and the simulation results of the digital twin model, the system automatically generates optimization suggestions for photovoltaic modules, including installation angle adjustment, cleaning cycle optimization, surface coating improvement, etc. Users can view and adjust test parameters through the remote monitoring platform, or plan subsequent maintenance plans based on the generated reports.

[0352] The photovoltaic curtain wall component test system can comprehensively evaluate the performance of photovoltaic curtain wall components under complex working conditions by accurately simulating a variety of environmental conditions and lighting conditions, combined with data analysis and intelligent prediction technology. At the same time, the system's integrated remote monitoring and management functions improve test efficiency, support multi-user collaborative analysis and decision-making, and provide reliable data support and optimization solutions for the design, manufacture and application of photovoltaic curtain walls.

[0353] The specific testing system and method of this embodiment effectively improves the testing accuracy and efficiency of photovoltaic curtain wall components, and provides reliable technical support for the practical application of the components.

[0354] The above specific implementations are only descriptions of the preferred implementations of the present invention, and do not limit the protection scope of the present invention. Without departing from the design concept and spirit of the present invention, various modifications, substitutions and improvements made by ordinary technicians in this field to the technical solution of the present invention based on the text description and drawings provided by the present invention should all fall within the protection scope of the present invention. The protection scope of the present invention is determined by the claims.

Claims

1. A photovoltaic curtain wall component testing method, characterized in that: include: Step 1: Establish a test environment for photovoltaic curtain wall components; Step 2: Electrical performance evaluation of photovoltaic curtain wall components; Step 3: Conduct efficiency test based on adaptive spectrum analysis; Step 4: Conduct durability test of multi-factor coupling; Step 5: Conduct photovoltaic curtain wall component integration performance test; Step 6: Performance prediction and optimization based on digital twin technology; Step 7: Intelligent analysis and report generation of comprehensive test data.

2. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 1 is as follows: Step 1.1: Design an adjustable angle simulation test platform according to the installation position of the photovoltaic curtain wall to ensure that the lighting conditions of the components at different tilt angles can reproduce the actual application scenarios; Step 1.2: Configure a high-precision light source simulator on the test platform. The light source simulator should be able to adjust the spectral distribution to simulate the light intensity in different time periods and weather conditions; Step 1.3: The environmental simulation part includes a temperature control system and a humidity control device, which are used to adjust the temperature and humidity in the test environment to simulate the working state of components in extreme environments from extremely cold to high temperature, and from dry to humid; Step 1.4: Set up the wind speed controller and particle injection system in the test environment to simulate the actual operating environment under harsh conditions.

3. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 2 is as follows: Step 2.1: Connect a multi-channel data acquisition system, including a high-precision current sensor and a voltage sensor, to collect the open-circuit voltage, short-circuit current, maximum power point voltage, and current of the PV module in real time; Step 2.2: The data acquisition system is linked with the test control software to record the output curve of the component in real time by setting different light intensity, angle and frequency of the light source; Step 2.3: By comparing the actual test data with the standard photovoltaic test curve, evaluate whether the module has obvious electrical performance defects.

4. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 3 is as follows: Step 3.1: Use an adaptive spectrum analyzer to monitor the spectrum distribution on the component surface in real time to ensure the accuracy of test data under different time periods and lighting conditions; Step 3.2: The adaptive spectrum analyzer has a dynamic adjustment function, which automatically adjusts its band range according to the changes of different test light sources and environments to ensure maximum spectrum coverage; Step 3.3: During the test, the conversion efficiency of the photovoltaic module under a specific spectrum is calculated in real time, and the spectrum intensity, incident angle and temperature parameters are recorded; Step 3.4: The data analysis part normalizes the energy conversion efficiency under different spectra to obtain the comprehensive efficiency performance of the photovoltaic module under the full spectrum.

5. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 4 is as follows: Step 4.1: In a closed test environment, introduce ultraviolet radiation, temperature and humidity cycle changes, acid rain simulation and particle injection to simulate various destructive factors of photovoltaic curtain walls in long-term operation; Step 4.2: The test equipment uses a multi-dimensional stress loading system to periodically apply mechanical stress and conduct a coupled test in combination with temperature stress to observe the attenuation of the components under the combined effects of stress and environmental factors; Step 4.3: Introduce a thermal imager to monitor the temperature distribution on the component surface and identify potential hot spots; Step 4.4: After the long-term aging test is completed, the components are tested for physical properties to check the changes in their mechanical strength, sealing and light transmittance indicators, and compared with the initial state for analysis.

6. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 5 is as follows: Step 5.1: Integrate the individually tested photovoltaic modules into the simulated building structure to form a practical application environment. Through the lighting system simulating the sun's trajectory, observe the shading, light transmission and power generation performance of the photovoltaic curtain wall in the building; Step 5.2: In an integrated environment, configure a multi-point data acquisition device to collect real-time electrical parameters, light intensity and temperature data in different areas of the photovoltaic curtain wall to evaluate the performance consistency of the components in different areas; Step 5.3: During the test, record the load distribution and stress changes of the photovoltaic curtain wall in the building structure to ensure its structural safety under extreme conditions; Step 5.4: Simulate the performance of the curtain wall under different seasons and climate conditions, and calculate the annual power generation and shading effect.

7. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 6 is as follows: Step 6.1: Establish a three-dimensional digital twin model of the photovoltaic curtain wall component, which contains the component's geometric information, material properties, and electrical performance parameter data; Step 6.2: Train the digital twin model through historical test data and field monitoring data to improve its performance prediction accuracy under different working conditions; Step 6.3: Introduce environmental factors into the model and simulate the operation of PV panels in the coming years to predict their power generation efficiency, aging rate and maintenance needs; Step 6.4: Based on the simulation results of the digital twin model, propose targeted optimization solutions to extend component life and improve overall system performance.

8. A photovoltaic curtain wall assembly testing method according to claim 1, characterized in that: Step 7 is as follows: Step 7.1: The multidimensional data collected during the test is transmitted to the central data processing platform through the Internet of Things, and the AI ​​algorithm performs preliminary cleaning and analysis on the data; Step 7.2: Use big data analysis technology to detect correlation, trend and anomaly of multi-source test data to form a multi-dimensional analysis model of component performance; Step 7.3: Automatically generate a structured test report, including electrical performance analysis, durability evaluation, spectral efficiency and integrated performance, and provide data visualization charts to help decision makers better understand the test results; Step 7.4: The test report also contains predictive data from the digital twin simulation results, further supplementing the long-term performance information that cannot be covered in the actual test, forming a complete technical evaluation and improvement suggestions.

9. A photovoltaic curtain wall component testing system, applicable to a photovoltaic curtain wall component testing method according to any one of claims 1 to 8, characterized in that: include: A test platform module, used to fix and adjust the installation angle and position of the photovoltaic curtain wall assembly to be tested, the test platform module includes an angle adjustment unit and a fixing unit, the angle adjustment unit is controlled by a servo motor to adjust the tilt angle of the photovoltaic assembly within a range of 0° to 90°, and the fixing unit is used to stabilize the photovoltaic curtain wall assembly to ensure that it is not disturbed by external factors during the test; A light source simulation module is used to simulate natural lighting conditions, including a full-spectrum LED light source array and a lighting angle control unit. The full-spectrum LED light source array can simulate sunlight with different spectral distributions and automatically adjust the band and intensity of the spectral output according to preset lighting conditions. The lighting angle control unit adjusts the lighting angle through a programmable reflector system to simulate the sunlight path in different time periods; The environmental simulation module is used to simulate the impact of different environmental conditions on photovoltaic curtain wall components. It includes a temperature and humidity control unit, a wind speed adjustment unit and a particle injection unit. The temperature and humidity control unit is used to adjust the temperature and humidity in the test environment. The wind speed adjustment unit is used to generate different wind speed conditions. The particle injection unit sprays simulated dust and pollutants through a multi-directional adjustable nozzle system to test the performance of photovoltaic components in harsh environments.

10. A photovoltaic curtain wall component testing system according to claim 9, characterized in that: Also includes: The data acquisition and analysis module is used to collect and process the output data of photovoltaic curtain wall components in real time, including multi-channel current and voltage sensors, spectral analysis units and data processing centers. The spectral analysis unit dynamically adjusts the sampling frequency and spectral resolution to ensure the accuracy of test data under different light source conditions. The data processing center combines AI algorithms and digital twin technology to perform real-time modeling of test data, and combines machine learning algorithms to predict the long-term performance changes of photovoltaic curtain wall components. The data acquisition and analysis module also includes angle sensors and position sensors for real-time monitoring and feedback of the installation angle and position of photovoltaic components. The durability test module is used to simulate the long-term use environment of photovoltaic curtain wall components. It includes an ultraviolet radiation source, a stress loading unit and a thermal imager. The stress loading unit adopts hydraulic servo control technology, realizes complex stress field simulation through multi-axis stress coupling, and combines temperature and humidity cycles for coupling testing. The thermal imager identifies potential thermal defects through multi-band scanning and generates a hotspot distribution map in conjunction with the data processing center.

Citation Information

Cited By

  • Multi-parameter testing system for PETG environment-friendly decorative film

    CN119845878A

  • Curtain wall lighting performance simulation method and system based on deep learning

    CN120974945B

  • Multi-factor cooperative control photovoltaic module packaging material pretreatment method and system

    CN121632919A

  • Dynamic environment adaptability evaluation system for power generation efficiency of photoelectric curtain wall

    CN122001296A

  • Production detection system of full-color composite glass substrate display screen

    CN122259606A