Battery test system
By designing a battery test system, the problem that the existing BMS performance test system cannot effectively test BMS performance is solved, and multiple testing functions for different BMSs are realized, with strong versatility and mobility, simplifying the test procedures and improving the testing Efficiency and speed reduce costs.
Patent Information
- Application Number
- CN202310629464.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-03
AI Technical Summary
The existing BMS performance testing system cannot effectively test the relay voltage difference, load and voltage resistance of the battery management system, and there are problems such as complex controllers, high cost, and lack of versatility and mobility.
A battery testing system was designed, including a test interface module, a low-voltage test module, a load module, a high-voltage safety quick-cut module and a voltage tester. By simulating the battery load status and high-voltage testing, a variety of testing functions for different BMSs are realized. With mobility and low cost, simplifies testing procedures and improves testing efficiency and speed.
The system can complete the measurement of different BMSs through on-site overlap, which has strong versatility and mobility, simplifies the testing procedures, improves test efficiency and speed, reduces costs, and can realize a variety of BMS testing functions, including relay suction and closure. Disconnection, hardware load voltage, coil drive current and withstand voltage test.
Smart Images

Figure CN119064781A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of battery performance testing devices, and in particular to a battery testing system. Background Art
[0002] The following issues need to be addressed in terms of BMS performance, including: during the battery trial production stage, the battery BMS relay sintered after being energized, causing power-on failure of the entire package and assembly rework; bubble problems occurred in the BMS parts after the battery was disassembled, requiring BMS hardware testing and analysis; there was no hardware testing system for BMS parts problems (DC relay power-on failure) in the batch and after-sales stages; the BMS hardware development of the forward development project lacked a performance testing system, including relay voltage difference, load, and withstand voltage.
[0003] At present, there are also some technical solutions for testing BMS, for example, a test system and method of BMS based on DA, the system includes a voltage simulation module, BMS and a voltage control comparison module. The voltage simulation module is used to simulate the voltage of multiple single cells; the BMS is connected to the voltage simulation module in communication, and is used to obtain the voltage of multiple simulated single cells; the voltage control comparison module is connected to the voltage simulation module in communication, and is used to control the voltage simulation module to simulate the voltage of multiple single cells according to the simulated voltage setting value, and is connected to the BMS in communication, and compares the voltage acquisition value with the simulated voltage setting value to obtain the performance of the BMS. It is impossible to achieve other measurements and is not very versatile; and it involves a complex controller, which is expensive, not versatile, and not portable. A test method and test system for a battery management system BMS, the method comprising: obtaining a target test item of the battery management system BMS, and at the same time, determining the test serial number corresponding to the target test item; determining the test standard and test level corresponding to the test serial number in a preset test table; and testing the target test item of the battery management system BMS based on the test standard and test level. The test sequence number is determined by the target test items of the battery management system BMS, which is conducive to determining the test standards and test levels corresponding to the battery management system BMS, and then completing the test of the target test items, which greatly improves the comprehensiveness and accuracy of the test of the battery management system BMS. The method of dividing multiple test items into levels and completing the test step by step does not explain how to divide the levels, nor does it specify the test system and test process. Summary of the invention
[0004] To solve at least one aspect of the above problems, the present invention provides a battery testing system, comprising: a test interface module, the test interface is used to connect a battery to be tested; a low voltage test module, the low voltage test module is electrically connected to the test interface module, and the low voltage test module is used to collect test current; a low voltage control module, the low voltage control module is electrically connected to the low voltage test module, and the low voltage control module is used to provide a wake-up voltage for the battery to be tested; a load module, the load module is electrically connected to the low voltage test module and the low voltage control module, and the load module is used to simulate the load of the battery to be tested; a first data acquisition module, the first data acquisition module Electrically connected to the first test module; a second data acquisition module, the second data acquisition module is electrically connected to the first test module; a high-voltage safety quick-cut module, the high-voltage safety quick-cut module is electrically connected to the second data acquisition module, and the high-voltage safety quick-cut module is connected to the battery to be tested through the test interface module; a withstand voltage tester, the withstand voltage tester is electrically connected to the high-voltage safety quick-cut module; a withstand voltage test control module, the withstand voltage test control module is electrically connected to the withstand voltage tester; a controller, the controller is electrically connected to the first data acquisition module, the controller is electrically connected to the second data acquisition module, and the controller is electrically connected to the withstand voltage tester.
[0005] Preferably, the load module comprises a high voltage power supply and a power load, the power load is connected to the high voltage power supply and the low voltage test module, and the low voltage control module is connected between the power load and the power load.
[0006] Preferably, it further comprises a temperature testing module, wherein the temperature testing module is used to measure the temperature of the battery to be tested, and the temperature testing module is electrically connected to the first data acquisition module.
[0007] Preferably, the high-voltage safety quick-cut module includes a first high-voltage relay group and a second high-voltage relay group, the second high-voltage relay group is connected to the second data acquisition module and the second high-voltage relay group, and the first high-voltage relay group is connected to the battery to be tested through the test interface module.
[0008] Preferably, the low voltage test module comprises a low voltage relay group and a first current sensor group, the low voltage relay group is connected to the first current sensor group and the low voltage control module, and the first current sensor group is connected to the battery to be tested through the test interface module.
[0009] Preferably, the low voltage test module comprises a second current sensor group and a high voltage circuit breaker group, the high voltage circuit breaker group connects the second current sensor group and the load module, and the second current sensor group is connected to the battery to be tested through the test interface module.
[0010] Preferably, the low-voltage control module comprises a low-voltage power supply, and the low-voltage power supply is used to connect to a power supply of the battery to be tested.
[0011] The battery testing system of the embodiment of the present invention has the following beneficial effects: it has different types of BMS testing functions and an open interface; the system completes the measurement of different BMSs by on-site bridging (i.e., on-site wiring), and reserves interfaces matching different BMSs, and has strong versatility; the system is mobile and can be tested in different areas; a simulated battery pack load state is built using a charge and discharge test system and a load, which is simple and low-cost; in the dielectric strength test, a quick-cut function is designed for 9 high-voltage test points and 4 relay control points, 9X4, a total of 36 tests, which can greatly improve the test efficiency; at the same time, according to the circuit characteristics of the BMS, the 9 high-voltage test points are reduced to 5 high-voltage test points, saving the test program, but the data of the 9 high-voltage test points can still be obtained; and since the system designs a loop for each group of high-voltage + low-voltage test points, the loops do not affect each other, and can be quickly switched manually through the panel without waiting for the static time within the high-voltage safety range, thereby ensuring the test speed; according to the test principle, the 12 test items are divided into three categories. The testing principles of each major category are the same and are completed through the same operation method, which improves the testing speed of the entire sequence. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to better understand the above and other purposes, features, advantages and functions of the present invention, reference may be made to the embodiments shown in the accompanying drawings. The same reference numerals in the accompanying drawings refer to the same components. It should be understood by those skilled in the art that the accompanying drawings are intended to schematically illustrate the preferred embodiments of the present invention and have no limiting effect on the scope of the present invention, and the components in the drawings are not drawn to scale.
[0013] Figure 1 is a structural block diagram of a battery testing system according to an embodiment of the present invention;
[0014] Figure 2 It is a structural schematic diagram of a battery testing system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0015] The following is a description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, including various details of the embodiments of the present disclosure to facilitate understanding, which should be considered as merely exemplary. Therefore, it should be recognized by those of ordinary skill in the art that various changes and modifications may be made to the embodiments described herein without departing from the scope and spirit of the present disclosure. Similarly, for the sake of clarity and conciseness, descriptions of well-known functions and structures are omitted in the following description.
[0016] As used herein, the term "including" and its variations mean open inclusion, i.e., "including but not limited to". Unless otherwise stated, the term "or" means "and / or". The term "based on" means "based at least in part on". The terms "an example embodiment" and "an embodiment" mean "at least one example embodiment". The term "another embodiment" means "at least one additional embodiment". The terms "first", "second", etc. may refer to different or the same objects. Other explicit and implicit definitions may also be included below.
[0017] In order to at least partially solve the above problems and one or more of other potential problems, an embodiment of the present disclosure proposes a battery testing system, including: a test interface module, the test interface is used to connect the battery to be tested; a low voltage test module, the low voltage test module is electrically connected to the test interface module, and the low voltage test module is used to collect test current; a low voltage control module, the low voltage control module is electrically connected to the low voltage test module, and the low voltage control module is used to provide a wake-up voltage for the battery to be tested; a load module, the load module is electrically connected to the low voltage test module and the low voltage control module, and the load module is used to simulate the battery to be tested. A load; a first data acquisition module, the first data acquisition module is electrically connected to the first test module; a second data acquisition module, the second data acquisition module is electrically connected to the first test module; a high-voltage safety quick-cut module, the high-voltage safety quick-cut module is electrically connected to the second data acquisition module, and the high-voltage safety quick-cut module is connected to the battery to be tested through the test interface module; a withstand voltage tester, the withstand voltage tester is electrically connected to the high-voltage safety quick-cut module; a withstand voltage test control module, the withstand voltage test control module is electrically connected to the withstand voltage tester; a controller, the controller is electrically connected to the first data acquisition module, the controller is electrically connected to the second data acquisition module, and the controller is electrically connected to the withstand voltage tester.
[0018] Specifically, Figure 1As shown, the test interface module is used to connect the battery to be tested and the battery testing system. The test interface module includes multiple groups of interfaces, and the multiple groups of interfaces are connected to the battery to be tested according to the test requirements. The low-voltage test module includes multiple dynamic and static current sensors, and the multiple dynamic and static current sensors obtain the current in the circuit during the test of the battery to be tested. The low-voltage control module includes a low-voltage power supply, and the low-voltage power supply adopts a 12V DC power supply, which is used to provide a low-voltage power supply to the power supply of the battery to be tested to wake up the battery to be tested and complete the test under low-voltage conditions. The load module includes a high-power resistor for simulating the power load of the battery to be tested. The first data acquisition module and the second data acquisition module use integrated circuits to collect the current signal of the dynamic and static current sensor by connecting the power supply test module. The high-voltage safety switching module is connected between the withstand voltage test control module and the battery to be tested, and is used to ensure the safety of the battery to be tested in the dielectric strength and insulation test. The module includes high-voltage isolation and other devices. The withstand voltage test control module is connected to the withstand voltage tester to provide high voltage in the dielectric strength and insulation test of the battery to be tested. The controller is connected to the withstand voltage tester, the first data acquisition module and the second data acquisition module to receive signals such as the tested voltage and current. In some embodiments, the controller is also connected to a display to output the test results.
[0019] In some embodiments, the load module includes a high voltage power supply and a power load, the power load is connected to the high voltage power supply and the low voltage test module, and the low voltage control module is connected between the power load and the power load.
[0020] Specifically, Figure 2 As shown, the high voltage power supply uses a Chroma charger and discharger, and the power load uses a BRU high power load brake resistor box. The power load is connected between the high voltage power supply and the low voltage test module.
[0021] In some embodiments, a temperature testing module is further included. The temperature testing module is used to measure the temperature of the battery to be tested. The temperature testing module is electrically connected to the first data acquisition module.
[0022] Specifically, Figure 2 As shown, the temperature test module includes infrared temperature probe 1, infrared temperature probe 2, infrared temperature probe 3 and infrared temperature probe 4, which are used to detect NTC-shuntA temperature, NTC-RshuntA temperature, NTC-shuntB temperature and NTC-RshuntB temperature respectively. The temperature test module is used to detect the thermistor of the battery to be tested and convert the relevant detection quantity into temperature.
[0023] In some embodiments, the high-voltage safety quick-cut module includes a first high-voltage relay group and a second high-voltage relay group, the second high-voltage relay group is connected to the second data acquisition module and the second high-voltage relay group, and the first high-voltage relay group is connected to the battery to be tested through the test interface module.
[0024] Specifically, Figure 1 and Figure 2 As shown, the first high-voltage relay group includes high-voltage relay k1, high-voltage relay k2, high-voltage relay k3 and high-voltage relay k4, and the second high-voltage relay group includes high-voltage relay k5, high-voltage relay k6 and high-voltage relay k7. The test interface module includes a first group of interfaces, and the first group of interfaces includes CH3 (DC-) / CH1 terminals, CH5 (TN-) / CH2 (DC+) terminals, CH6 / CH4 (TN+) terminals and CH7 / CH8 & BAT + / - terminals. High-voltage relay k1 connects CH3 (DC-) / CH1 terminals, high-voltage relay k5 and high-voltage relay k7; high-voltage relay k2 connects CH5 (TN-) / CH2 (DC+) terminals, high-voltage relay k5 and high-voltage relay k7; high-voltage relay k3 connects CH6 / CH4 (TN+) terminals, high-voltage relay k5 and high-voltage relay k6; high-voltage relay k4 connects CH7 / CH8 & BAT + / - terminals, high-voltage relay k5 and high-voltage relay k6. High-voltage relays k5, k6 and k7 are connected to the second data acquisition module respectively, and high-voltage relay k5 is connected to a withstand voltage tester. The withstand voltage tester adopts a 19032-P model.
[0025] In some embodiments, the low voltage test module includes a low voltage relay group and a first current sensor group, the low voltage relay group is connected to the first current sensor group and the low voltage control module, and the first current sensor group is connected to the battery to be tested through the test interface module.
[0026] Specifically, Figure 1 and Figure 2 As shown, the low-voltage relay group includes a low-voltage relay k9 and a low-voltage relay k10, the first current sensor group includes a current sensor L1 and a current sensor L2, and the test interface module includes a second group of interfaces, and the second group of interfaces includes an HVM / P control interface and a DCM / P control interface. The low-voltage control module includes a low-voltage power supply and a high-voltage relay K8. The current sensor L1 and the current sensor L2 are respectively connected to the second data acquisition module. The current sensor L1 is connected in series between the HVM / P control interface and the low-voltage relay k9, and the low-voltage relay k9 is connected to the low-voltage power supply and the high-voltage relay k8; the current sensor L2 is connected in series between the DCM / P control interface and the low-voltage relay k10, and the low-voltage relay k10 is connected to the low-voltage power supply and the high-voltage relay k8, and one end of the high-voltage relay k8 is connected between the power load and the high-voltage power supply (Chroma charger and discharger).
[0027] In some embodiments, the low voltage test module includes a second current sensor group and a high voltage circuit breaker group, the high voltage circuit breaker group connects the second current sensor group and the load module, and the second current sensor group is connected to the battery to be tested through the test interface module.
[0028] Specifically, Figure 1 and Figure 2 As shown, the high-voltage circuit breaker group includes a high-voltage circuit breaker F1 and a high-voltage circuit breaker F2, the second current sensor group includes a current sensor L3 and a current sensor L4, and the test interface module includes a third group of interfaces, and the third group of interfaces includes a TN+ / - port and a DC+ / - port. The current sensor L3 and the current sensor L4 are respectively connected to the first data acquisition module. The current sensor L3, the high-voltage circuit breaker F1 and the power load are connected in series in sequence, and the current generator L3 is connected to the TN+ / - port; the current sensor L4, the high-voltage circuit breaker F2 and the power load are connected in series in sequence, and the current generator L4 is connected to the DC+ / - port.
[0029] In another embodiment, Figure 1 and Figure 2 As shown, the test interface module also includes a fourth group of interfaces, including an RshuntA / B differential pressure detection interface and a ShuntA / B differential pressure detection interface. The fourth group of interfaces connects the battery to be tested and the first data acquisition module.
[0030] In some embodiments, Figure 2 As shown, the battery testing system also includes a test execution module, multiple high-voltage relays of the high-voltage quick-cut module are respectively connected to the control interface 1, and the relays of the low-voltage test module and the low-voltage control module are respectively connected to the control interface 2. The control interface 1 and the control interface 2 are respectively electrically connected to the test execution module, and the test execution module is electrically connected to the controller, so that the controller controls and adjusts the high-voltage quick-cut module, the low-voltage test module and the low-voltage control module connected to the control interface 1 and the control interface 2 through the test execution module according to the test requirements.
[0031] Example 1
[0032] The power load is used in conjunction with the high-voltage power supply in the circuit, and is built into a simulation system that can simulate the working state of the entire package. The circuit can have technical parameters of 400V / 20A. The relay is controlled to be attracted through the low-voltage control module, and the high and low voltage signals are collected through the second data acquisition module. The current signal is collected through the cooperation of the first data acquisition module of the data acquisition system and the low-voltage test module. The high-voltage power supply is connected to the negative end originally connected to the BAT module, the low-voltage control module is connected to the relay of the battery to be tested, the test interface module is connected to the voltage test point (CH1-CH8) of the battery to be tested, and the power load is connected in series with the high-voltage power supply in the test circuit. After the connection is completed, the switching of the relay is controlled according to the test requirements.
[0033] The implemented test functions include:
[0034] Relay on / off function test: The voltage difference between the two ends of the Shunt under load state needs to be within a certain range, indicating that the processing quality of the Shunt is qualified.
[0035] Hardware load pressure test, whether the voltage value is accurate and stable under the load state (400V, 20A) of the test points at both ends of the relay. The main method is to measure the voltage value of the test points at both ends when both HV and DC relays are energized.
[0036] Hardware current test is to check whether the current value is accurate and stable under the load state (400V, 20A) of the test points at both ends of the relay. The main method is to measure the current value of each circuit when the HV and DC relays are respectively in the energized state.
[0037] Relay coil drive current test, when the relay is in the energized state, measures its drive current, thereby calculating the resistance value of the relay coil. The resistance value is an important parameter to characterize the performance of the coil. Generally, the standard resistance value of a relay coil is 20.6Ω.
[0038] Coil voltage difference impedance test: When the load relay is in the energized state, measure the voltage difference between the two ends of the relay. The smaller the voltage difference, the higher the processing quality of the relay. The MEB standard is ≤6mV at 20A.
[0039] Example 2
[0040] Connect the high-voltage power supply to the negative pole on one side of the battery to be tested, connect the temperature test interface connected to the temperature test module to the three voltage drop test points of the battery to be tested, and connect the power load in series in the test loop on the high-voltage power supply side. After the connection is completed, the relay controller controls the relay to open and close, and measures the current, voltage, and temperature to complete the test. Among them, the resistance is calculated by the current and voltage.
[0041] The implemented test functions include:
[0042] Shunt voltage test: Shunt resistance test, the measured value needs to be within a certain range, indicating that the Shunt processing quality is qualified.
[0043] Shunt resistance accuracy test: When the load relay is in the energized state, measure the voltage difference between the two ends of the relay. The smaller the voltage difference, the higher the processing quality of the relay. The MEB standard is ≤12mV at 20A.
[0044] NTC temperature test: NTC is a thermistor, which acts as a temperature measurement device for BMS hardware. First, the surface temperature of NTC is measured, and then the actual resistance of NTC is measured. Each resistance value will correspond to the actual temperature of NTC, and then they will be compared.
[0045] Pyrofuse resistance test: Measure the voltage of the Shunt and RShunt pins to see if it is consistent with the voltage of the circuit after the relay is energized, because the Shunt pins are consumable parts and are easily bent and deformed, causing damage and failure.
[0046] Example 3
[0047] During the test, the high-voltage safety quick-cut module is connected to the test port corresponding to the shunt pin of the battery to be tested through the first group of interfaces, and the low-voltage test module is connected to the low-voltage test point of the battery to be tested through the first group of interfaces. The withstand voltage tester provides high voltage to the battery to be tested through the withstand voltage test control module and the high-voltage safety quick-cut module.
[0048] The implemented test functions include:
[0049] Hardware potential voltage test: Test the relay's closing and disconnecting functions to avoid functional failure. The main method is to measure the voltage changes at the test points at both ends of the relay under various states of closing and disconnecting.
[0050] Hardware insulation resistance test: Measure the insulation between the hardware points such as CH1, CH2, CH4, CH7, BAT+, TN+, DCL+ in the high-voltage hardware circuit and the relay control terminal points to see if the insulation is good when the relay is disconnected.
[0051] Hardware withstand voltage test: Measure the withstand voltage between the hardware points such as CH1, CH2, CH4, CH7, BAT+, TN+, DCL+ in the high-voltage hardware circuit and the relay control terminal points, and check whether the withstand voltage is good when the relay is disconnected.
[0052] The embodiments of the present disclosure have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the present invention.
Claims
1. A battery testing system, characterized in that: include: A test interface module, wherein the test interface is used to connect a battery to be tested; A low voltage test module, the low voltage test module is electrically connected to the test interface module, and the low voltage test module is used to collect a test current; A low voltage control module, the low voltage control module is electrically connected to the low voltage test module, and the low voltage control module is used to provide a wake-up voltage for the battery to be tested; A load module, the load module is electrically connected to the low voltage test module and the low voltage control module respectively, and the load module is used to simulate the load of the battery to be tested; A first data acquisition module, wherein the first data acquisition module is electrically connected to the first test module; A second data acquisition module, the second data acquisition module is electrically connected to the first test module; A high-voltage safety quick-cut module, the high-voltage safety quick-cut module is electrically connected to the second data acquisition module, and the high-voltage safety quick-cut module is connected to the battery to be tested through the test interface module; A withstand voltage tester, the withstand voltage tester is electrically connected to the high voltage safety quick cut module; A withstand voltage test control module, the withstand voltage test control module is electrically connected to the withstand voltage tester; A controller is electrically connected to the first data acquisition module, the controller is electrically connected to the second data acquisition module, and the controller is electrically connected to the withstand voltage tester.
2. The system according to claim 1, characterized in that The load module includes a high voltage power supply and a power load, the power load is connected to the high voltage power supply and the low voltage test module, and the low voltage control module is connected between the power load and the power load.
3. The system according to claim 2, characterized in that It also includes a temperature testing module, which is used to measure the temperature of the battery to be tested, and the temperature testing module is electrically connected to the first data acquisition module.
4. The system according to claim 3, characterized in that The high-voltage safety quick-cut module includes a first high-voltage relay group and a second high-voltage relay group, the second high-voltage relay group is connected to the second data acquisition module and the second high-voltage relay group, and the first high-voltage relay group is connected to the battery to be tested through the test interface module.
5. The system according to claim 4, characterized in that The low voltage test module includes a low voltage relay group and a first current sensor group. The low voltage relay group is connected to the first current sensor group and the low voltage control module. The first current sensor group is connected to the battery to be tested through the test interface module.
6. The system according to claim 5, characterized in that The low voltage test module comprises a second current sensor group and a high voltage circuit breaker group, the high voltage circuit breaker group connects the second current sensor group and the load module, and the second current sensor group is connected to the battery to be tested through the test interface module.
7. The system according to claim 6, characterized in that The low voltage control module comprises a low voltage power supply, and the low voltage power supply is used to connect to a power supply of the battery to be tested.
Citation Information
Cited By
Battery pack reliability test method and system
CN120779276A