Intelligent control method and system for machine tool production line

By obtaining and analyzing the status of the machine tool production line equipment, calculating abnormal operation volume and equipment load at the same level, adjusting the operation parameters and equipment load, the problem of reduced production efficiency caused by equipment damage is solved, and equipment load balancing and product output stability is achieved.

CN119065319AInactive Publication Date: 2024-12-03GLIDE (HENAN) INTELLIGENT EQUIP CO LTD

Patent Information

Application Number
CN202411297028.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the machine tool production line is damaged, the remaining equipment in the previous process cannot meet the product needs of the subsequent process, resulting in a reduction in overall processing efficiency.

Method used

By obtaining the status of each device, defining abnormal equipment and equipment of the same level, calculating the total amount of abnormal jobs and the amount of the same level, determining the task allocation plan, adjusting the operation parameters, ensuring the allocation of abnormal jobs and equipment load balancing, and avoiding equipment overload. Optimize the equipment rest time to ensure that the product output meets the needs of subsequent processes.

Benefits of technology

Effectively share the tasks of damaged equipment, reduce the situation where product production efficiency is reduced due to equipment damage, ensure efficient and stable operation of each processing equipment, and meet the product needs of subsequent processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119065319A_ABST
    Figure CN119065319A_ABST
Patent Text Reader

Abstract

The invention relates to an intelligent control method and system for a machine tool production line, and relates to the field of intelligent manufacturing technologies. Defining abnormal equipment and same-level equipment according to the operation state of the equipment; obtaining an abnormal working amount corresponding to the abnormal equipment, a same-level working amount corresponding to the same-level equipment and working parameters of the same-level equipment; determining the total amount of abnormal work according to the abnormal work amount, and determining the same-level number according to the same-level equipment; determining a task allocation scheme according to the total amount of the abnormal jobs, the same-level number and the same-level job amount, and determining an adjustment job amount according to the task allocation scheme; and according to the coefficient matching relationship, determining an adjustment parameter corresponding to the adjustment workload under each operation parameter, and according to the adjustment parameter, performing parameter adjustment on each operation parameter of the same-level equipment. The method has the effect that the situation that the overall machining efficiency is affected due to the fact that machining equipment in the previous procedure is damaged is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of intelligent manufacturing technology, and in particular to an intelligent control method and system for a machine tool production line. Background Art

[0002] A machine tool production line is a production system that rationally arranges the various processing steps of a workpiece on several machine tools and connects them into a whole through conveying devices and auxiliary devices, so as to complete all the processing tasks of the workpiece in accordance with the process sequence. A machine tool production line usually includes five basic parts: processing equipment, process equipment, conveying system, auxiliary system and control system.

[0003] In the related art, when products are processed using a machine tool production line, since the processing time of each process is different, in order to improve the overall processing efficiency of the product, different numbers of processing equipment are set according to the processing time of the process, thereby reducing the situation where subsequent processes need to wait for the products processed and output by the previous process.

[0004] In the above-mentioned related technologies, when part of the processing equipment of the previous process is damaged and cannot operate, the remaining processing equipment of the previous process will still operate according to the set parameters. At this time, it is unable to supply enough products required for the subsequent processes, which will affect the overall processing efficiency and there is still room for improvement. Summary of the invention

[0005] In order to reduce the occurrence of damage to processing equipment in the previous process that affects the overall processing efficiency, the present application provides an intelligent control method and system for a machine tool production line.

[0006] In the first aspect, the present application provides an intelligent control method for a machine tool production line, which adopts the following technical solution: An intelligent control method for a machine tool production line, comprising: Obtain the process and operation status of each device; The equipment whose operation status is consistent with the preset abnormal operation status is defined as abnormal equipment, and the equipment in the same process as the abnormal equipment is defined as the same-level equipment; According to the abnormal device and the same-level device, the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device and the operation parameters of the same-level device are obtained; The total amount of abnormal operations is determined by summing up the abnormal operations, and the number of equipment at the same level is determined by counting the equipment at the same level; Determine the task allocation plan based on the total amount of abnormal operations, the number of the same level and the workload of the same level, and determine the simulated workload of each device of the same level based on the task allocation plan; Determine the adjusted workload based on the simulated workload and the corresponding workload at the same level; The adjustment parameters corresponding to the adjusted operation amount under each operation parameter are determined according to the preset coefficient matching relationship, and the operation parameters of the same-level equipment are adjusted according to the adjustment parameters.

[0007] Optionally, the step of determining the task allocation plan according to the total amount of abnormal operations, the number of the same level, and the amount of operations at the same level includes: Get the total upper limit of operations for each device of the same level; Calculate the difference between the upper limit and the same level of work to determine the permitted allocation of work; The load ratio is determined by calculating the same-level workload of each device of the same level, and the theoretical allocated workload of each device of the same level is determined by calculating the load ratio and the total amount of abnormal workload; Determine whether all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads; If all theoretical allocation workloads are not greater than the corresponding permitted allocation workloads, an allocation abnormality signal is output; If all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads, the task allocation plan is determined based on each theoretically allocated workload.

[0008] Optionally, after allocating the abnormal signal output, the machine tool production line intelligent control method further includes: The same-level equipment whose theoretical allocated workload is greater than the corresponding permitted allocated workload is defined as an overloaded equipment, and the other same-level equipment except the overloaded equipment is defined as a normal equipment; The overload workload is determined by performing a difference calculation based on the theoretical allocated workload of the overload equipment and the corresponding permitted allocated workload; The total amount of overload operations is determined by summing up all the overload operations, and the compensation operation amount of each normal equipment is determined by calculating the load ratio between the normal equipment and the total amount of overload operations; The theoretical allocated workload is updated based on the compensation workload of normal equipment and the theoretical allocated workload, and the overload equipment and normal equipment are defined again until there is no new overload equipment, and the task allocation plan is determined based on the permitted allocated workload of the overload equipment and the theoretical allocated workload of the normal equipment.

[0009] Optionally, after the simulated workload is determined, the machine tool production line intelligent control method further includes: Obtain the pressure operating range according to each equipment of the same level; Determine whether there is equipment of the same level whose simulated operating volume is within the corresponding pressure operating range; If there is no equipment of the same level whose simulated operation volume is within the corresponding pressure operation range, the parameters of the equipment of the same level are adjusted according to each simulated operation volume; If there is a device of the same level whose simulated operating volume is within the corresponding pressure operating range, the device of the same level is defined as a pressure device, and the excess pressure is determined by calculating the difference between the simulated operating volume of the pressure device and the minimum value of the pressure operating range; Determine the permissible pressure duration corresponding to the excess pressure amount according to the preset pressure matching relationship; The pressure control device adjusts parameters according to the simulated workload, and after the parameters are adjusted, the control allowable pressure duration is counted down. When the timer returns to zero, the pressure control device enters a preset rest state and readjusts the parameters of other devices of the same level.

[0010] Optionally, after the permissible pressure duration is determined, the intelligent control method for the machine tool production line further includes: Establishing a detection interval with the current time point as the front end point and a width of the preset detection duration on the preset time axis, and obtaining the theoretical processing workload at each time point in the detection interval; The actual required workload is determined by summing up all abnormal workloads and all workloads at the same level; Determine whether the theoretical processing workload at all time points is not less than the actual required workload; If the theoretical processing workload at all time points is not less than the actual required workload, a qualified signal is output, and the pressure equipment is controlled to adjust parameters according to the simulated workload; If the theoretical processing workload at all time points is not less than the actual required workload, a processing exception signal is output.

[0011] Optionally, after processing the abnormal signal output, the machine tool production line intelligent control method further includes: A virtual rest point is randomly determined within the permitted pressure time of each pressure equipment, and the rest time interval is defined according to the preset overall rest time and the virtual rest point; A rest time interval is randomly selected from the rest time intervals of all pressure equipment to form a rest combination; A rest combination that can output a qualified signal is defined as a valid combination, and a corresponding virtual rest point in the valid combination is defined as a qualified rest point; Determine the monomer advance time according to the qualified rest point and the corresponding permitted pressure time, and calculate the overall advance time by summing up all monomer advance times; The overall advance time with the smallest value is determined according to the preset sorting rules, and the pressure equipment is controlled to operate according to the effective combination corresponding to the overall advance time.

[0012] Optionally, after the overall advance time is determined, the intelligent control method for the machine tool production line further includes: Determine whether there are at least two valid combinations with the same and minimum overall advance time; If there are not at least two valid combinations with the same and minimum overall advance time, the pressure equipment is controlled to operate according to the only valid combination with the minimum overall advance time; If there are at least two valid combinations with the same and minimum overall advance time, the corresponding valid combinations are defined as alternative combinations, and the required adjustment equipment is determined according to the alternative combinations; The demand adjustment device is counted to determine the demand adjustment quantity, and the demand adjustment quantity with the smallest value is determined according to the sorting rules, and the pressure device is controlled to operate according to the alternative combination corresponding to the demand adjustment quantity.

[0013] In the second aspect, the present application provides an intelligent control system for a machine tool production line, which adopts the following technical solutions: An intelligent control system for a machine tool production line, comprising: An acquisition module is used to obtain the process and operation status of each device; A processing module, connected to the acquisition module and the judgment module, for storing and processing information; A judgment module, connected with the acquisition module and the processing module, for judging the information; The processing module defines the equipment whose equipment operation state determined by the determination module is consistent with the preset abnormal operation state as an abnormal equipment, and defines the equipment in the same equipment process as the abnormal equipment as the same level equipment; The processing module obtains the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device, and the operation parameters of the same-level device according to the abnormal device and the same-level device; The processing module performs summation calculation based on the abnormal operation volume to determine the total amount of abnormal operations, and counts the same-level equipment to determine the same-level quantity; The processing module determines the task allocation plan according to the total amount of abnormal operations, the number of the same level and the workload of the same level, and determines the simulated workload of each device of the same level according to the task allocation plan; The processing module determines the adjusted workload according to the simulated workload and the corresponding workload at the same level; The processing module determines the adjustment parameters corresponding to the adjustment operation amount under each operation parameter according to the preset coefficient matching relationship, and adjusts the parameters of each operation parameter of the same level equipment according to the adjustment parameters.

[0014] In summary, the present application includes at least one of the following beneficial technical effects: When processing equipment is damaged, the remaining processing equipment in the same process can be controlled to share the processing tasks required by the damaged equipment, so that the output volume of the process will not be reduced due to the damage of the equipment, thereby reducing the situation where the overall processing efficiency of product production is reduced due to the damage of processing equipment; The tasks can be allocated more accurately according to the specific processing tasks of other processing equipment in the same process, so that each processing equipment can process the product efficiently and stably; The rest period of each processing equipment can be effectively adjusted to ensure that the output product volume of the process in each period meets the processing requirements of subsequent processes. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a flow chart of the intelligent control method of the machine tool production line.

[0016] Figure 2 It is a flow chart of the method for determining the task allocation plan.

[0017] Figure 3 is a flow chart of an abnormal allocation determination method.

[0018] Figure 4 It is a flow chart of the processing equipment rest control method.

[0019] Figure 5 It is a flow chart of the overall processing prediction method of the equipment.

[0020] Figure 6 It is a flow chart of the rest adjustment method of processing equipment.

[0021] Figure 7 is a flow chart of an effective combinatorial screening method.

[0022] Figure 8 It is a module flow chart of the intelligent control method of machine tool production line. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solutions and advantages of this application more clear, the following Figure 1-Figure 8 It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0024] The embodiments of the present application are further described in detail below in conjunction with the drawings in the specification.

[0025] An embodiment of the present application discloses an intelligent control method for a machine tool production line. When a product is processed on the machine tool production line, the status of each processing equipment is identified and analyzed. When an abnormality occurs in the processing equipment, the processing workload required by the processing equipment can be distributed to the remaining processing equipment of the same process, so that subsequent processes will not need to wait for processing of the product due to equipment damage in the previous process, thereby reducing the possibility of affecting the overall processing efficiency of the product.

[0026] Reference Figure 1 The method flow of the intelligent control method for a machine tool production line includes the following steps: Step S100: Acquire the process and operation status of each device.

[0027] The process in which the equipment is located is the process in which the currently analyzed equipment processes the product on the machine tool production line. The equipment operating status is the operating status of the processing equipment, including normal operating status and abnormal operating status. The normal operating status is the state in which the processing equipment can effectively perform the processing task, and the abnormal operating status is the state in which the processing equipment cannot perform the processing task, such as damaged parts, abnormal heating, etc.

[0028] Step S101: define a device whose device operation status is consistent with a preset abnormal operation status as an abnormal device, and define a device in the same device process as the abnormal device as a same-level device.

[0029] Define abnormal devices and devices of the same level to distinguish different processing equipment, so as to facilitate the subsequent control and processing of different equipment.

[0030] Step S102: Acquire the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device, and the operation parameters of the same-level device according to the abnormal device and the same-level device.

[0031] Abnormal workload refers to the amount of products that abnormal equipment needs to process per unit time when it is processing products normally. Equipment of the same level refers to the amount of products that equipment of the same level needs to process per unit time when it is processing products normally. Operation parameters refer to the parameters that need to be set when equipment of the same level processes the same level of workload.

[0032] Step S103: performing a sum calculation based on the abnormal operation amount to determine the total amount of abnormal operations, and performing a count based on the same-level devices to determine the same-level quantity.

[0033] The total amount of abnormal operations is the sum of the abnormal operations of abnormal equipment determined under the same process, and the same-level quantity is the total number of the same-level equipment determined under the same process.

[0034] Step S104: Determine a task allocation plan based on the total amount of abnormal operations, the number of devices at the same level, and the workload of devices at the same level, and determine the simulated workload of each device at the same level based on the task allocation plan.

[0035] The task allocation plan is a plan for allocating the tasks of the total amount of abnormal operations to each device of the same level. One task allocation plan can be to evenly distribute the total amount of abnormal operations to each device of the same level. Another task allocation plan can be to distribute the total amount of abnormal operations in equal proportion according to the size of the same level operation volume. The specific task allocation plan determination method is determined in advance by the staff. In this embodiment, the determination of the task allocation plan can be determined through steps S200-S2032; the simulated workload is the sum of the workload allocated to the same level device in the total amount of abnormal operations plus its own same level workload.

[0036] Step S105: determining the adjusted workload according to the simulated workload and the corresponding workload at the same level.

[0037] The adjusted workload is the additional workload required for the equipment of the same level, that is, the simulated workload minus the workload of the same level.

[0038] Step S106: determining adjustment parameters corresponding to the adjusted operation amount under each operation parameter according to the preset coefficient matching relationship, and adjusting the operation parameters of the same-level equipment according to the adjustment parameters.

[0039] Adjustment parameters are parameters that need to be adjusted on the basis of original operating parameters so that the same-level equipment can increase the adjustment workload. Different operating parameters have different corresponding adjustment parameters under different adjustment workloads. The coefficient matching relationship between the three is determined by the staff through multiple tests in advance. Each operating parameter is adjusted through adjustment parameters so that the same-level equipment can increase the appropriate amount of products. At this time, the total amount of products processed and output by the process remains unchanged, and the processing efficiency of subsequent processes will not be affected by equipment abnormalities.

[0040] Reference Figure 2 The steps of determining the task allocation scheme according to the total amount of abnormal operations, the number of the same level and the amount of operations at the same level include: Step S200: Obtain the upper limit of the total number of operations of each device at the same level.

[0041] The upper limit of total operation volume is the maximum production volume that can be achieved per unit time by the same level of equipment after parameter adjustment.

[0042] Step S201: Calculate the difference between the upper limit of the total amount of work and the amount of work at the same level to determine the permitted allocation amount of work.

[0043] The permitted allocation of workload is the maximum workload that can be allocated to the equipment of the same level on the current basis, and is determined by deducting the corresponding workload of the same level from the total workload of the upper limit.

[0044] Step S202: Calculate the load ratio according to the same-level workload of each device at the same level, and calculate the theoretical allocated workload of each device at the same level according to the load ratio and the total amount of abnormal workload.

[0045] The load ratio is the ratio of the same-level workloads of devices of the same level. For example, if there are three devices of the same level, and the corresponding same-level workloads are 9, 6, and 3 respectively, then the corresponding load ratio is 3:2:1; the theoretically allocated workload is the workload allocated to each device of the same level in proportion under theoretical circumstances. Taking the above load ratio of 3:2:1 as an example, the same-level device with a same-level workload of 9 needs to share 1 / 2 of the workload, the same-level device with a same-level workload of 6 needs to share 1 / 3 of the workload, and the same-level device with a same-level workload of 3 needs to share 1 / 6 of the workload.

[0046] Step S203: Determine whether all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads.

[0047] The purpose of the judgment is to find out whether the equipment at the same level can distribute the total amount of abnormal operations according to the load ratio.

[0048] Step S2031: If all theoretical allocated workloads are not greater than the corresponding permitted allocated workloads, an allocation abnormality signal is output.

[0049] When all theoretical allocation workloads are not greater than the corresponding permitted allocation workloads, it means that allocation cannot be performed according to the load ratio at this time, and an allocation abnormality signal is output to identify the situation for subsequent analysis.

[0050] Step S2032: If all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads, a task allocation plan is determined according to each theoretically allocated workload.

[0051] When all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads, it means that the total amount of abnormal workload can be allocated according to the load ratio. At this time, the task allocation plan can be determined based on the theoretically allocated workload determined by each device at the same level.

[0052] Reference Figure 3 After allocating the abnormal signal output, the intelligent control method of the machine tool production line also includes: Step S300: defining a device of the same level whose theoretical allocated workload is greater than the corresponding permitted allocated workload as an overloaded device, and defining the remaining devices of the same level except the overloaded device as normal devices.

[0053] Define overload devices and normal devices to distinguish different devices of the same level for subsequent analysis.

[0054] Step S301: Calculate the difference between the theoretical allocated workload of the overloaded equipment and the corresponding permitted allocated workload to determine the overloaded workload.

[0055] The overload workload is the value of the theoretical allocated workload minus the permitted allocated workload.

[0056] Step S302: performing a sum calculation based on all overload operation amounts to determine the total overload operation amount, and performing a calculation based on the load ratio between normal equipment and the total overload operation amount to determine the compensation operation amount of each normal equipment.

[0057] The total amount of overload operations is the sum of all overload operations; the compensation operation volume is the operation volume after calculating the total amount of overload operations based on the load ratio between normal equipment. For example, among the three same-level equipment mentioned above, the same-level equipment with a same-level operation volume of 6 and the same-level equipment with a same-level operation volume of 3 are both normal equipment, then the corresponding load ratio is 2:1. At this time, the compensation operation volume of the same-level equipment with a same-level operation volume of 6 is 2 / 3 of the total amount of overload operations, and the compensation operation volume of the same-level equipment with a same-level operation volume of 3 is 1 / 3 of the total amount of overload operations.

[0058] Step S303: Calculate the theoretical allocated workload based on the compensatory workload of the normal equipment and the theoretical allocated workload, and redefine the overloaded equipment and normal equipment until there is no new overloaded equipment, and determine the task allocation plan based on the permitted allocated workload of the overloaded equipment and the theoretical allocated workload of the normal equipment.

[0059] The theoretical allocated workload of normal equipment under actual allocation can be obtained by adding the compensation workload to the theoretical allocated workload. At this time, the workload required to be allocated to the overloaded equipment is the permitted allocated workload. By repeating the analysis until there is no new overloaded equipment, it means that all equipment at the same level can effectively handle the current workload. At this time, the task allocation plan can be determined based on the determined theoretical allocated workload.

[0060] Reference Figure 4 After the simulated workload is determined, the intelligent control method for the machine tool production line also includes: Step S400: Obtain the pressure operating range according to each device at the same level.

[0061] The pressure operating range refers to the range within which each equipment of the same level is considered to have a certain processing pressure when operating, so that it needs to rest after a period of processing. The pressure operating range of each equipment of the same level is determined in advance by the staff.

[0062] Step S401: Determine whether there is a device of the same level whose simulated operation volume is within the corresponding pressure operation range.

[0063] The purpose of the judgment is to find out whether there is equipment of the same level with greater processing pressure.

[0064] Step S4011: If there is no equipment of the same level whose simulated operation volume is within the corresponding pressure operation range, parameters of the equipment of the same level are adjusted according to each simulated operation volume.

[0065] When there is no equipment of the same level whose simulated operating volume is within the corresponding pressure operating range, it means that all equipment of the same level can process the product relatively stably. At this time, the parameters can be adjusted normally according to the corresponding adjustment parameters.

[0066] Step S4012: If there is a device of the same level whose simulated operating volume is within the corresponding pressure operating range, the device of the same level is defined as a pressure device, and the difference between the simulated operating volume of the pressure device and the minimum value of the pressure operating range is calculated to determine the excess pressure.

[0067] When there is equipment of the same level whose simulated workload is within the corresponding pressure operating range, it means that there is equipment with relatively high pressure during the processing. At this time, it is defined as pressure equipment for identification, so as to distinguish different equipment of the same level and facilitate subsequent analysis; excess pressure is the excess workload that will cause the equipment to produce relatively high pressure, which is determined by subtracting the minimum value of the pressure operating range from the simulated workload.

[0068] Step S402: Determine the permissible pressure duration corresponding to the excess pressure amount according to a preset pressure matching relationship.

[0069] The allowable pressure time is the length of time that the equipment can continuously process under the action of excess pressure in theoretical circumstances. Different excess pressure amounts cause the equipment to withstand different pressures during processing, and the corresponding allowable pressure time is also different. The pressure matching relationship between the two is determined in advance by the staff through multiple tests.

[0070] Step S403: the pressure device is controlled to adjust parameters according to the simulated workload, and after the parameters are adjusted, the permitted pressure duration is controlled to count down, and when the timer returns to zero, the pressure device is controlled to enter a preset rest state, and the parameters of other devices of the same level are readjusted.

[0071] Control the operation of pressure equipment. When the timer returns to zero, it means that the equipment needs to rest. At this time, it is controlled to enter the rest state so that the equipment can rest. At this time, since the equipment cannot process in the rest state, it is necessary to readjust the parameters of other equipment of the same level so that the overall processing volume of the process does not change; the rest state is the state when the processing equipment is not processing, and the duration of the rest state is determined in advance by the staff.

[0072] Reference Figure 5 After the permissible pressure duration is determined, the intelligent control method of the machine tool production line also includes: Step S500: establishing a detection interval with the current time point as the front end point and a width of the preset detection duration on the preset time axis, and obtaining the theoretical processing workload at each time point in the detection interval.

[0073] The time axis is a coordinate axis formed by the combination of various time points, pointing from the time point that has been reached to the time point that has not yet been reached; the detection time is a fixed time set by the staff, and the fixed time needs to include the entire time range of the machine tool production line in this production stage. A detection interval is established to facilitate the analysis of the data within the detection time; the theoretical processing workload is the workload that can be processed and produced by the process at a single time point in the detection interval, that is, the sum of the workload of all equipment of the same level that can produce at that single time point.

[0074] Step S501: performing a sum calculation based on all abnormal workloads and all workloads at the same level to determine the actual required workload.

[0075] The actual required workload is the workload that needs to be processed in the production plan for this process, which is obtained by adding all abnormal workloads and all workloads at the same level.

[0076] Step S502: Determine whether the theoretical processing workload at all time points is not less than the actual required workload.

[0077] The purpose of the judgment is to find out whether there is a possibility that the processing production volume cannot meet the requirements due to the downtime of the processing equipment.

[0078] Step S5021: If the theoretical processing workload at all time points is not less than the actual required workload, a qualified signal is output, and the pressure equipment is controlled to adjust parameters according to the simulated workload.

[0079] When the theoretical processing workload at all time points is not less than the actual required workload, it means that in the subsequent processing process, the output of the product of this process will not be unable to meet the requirements due to the rest of some processing equipment. At this time, a qualified signal is output to mark the situation, so that each pressure equipment can operate and rest normally.

[0080] Step S5022: If the theoretical processing workload at all time points is not less than the actual required workload, a processing abnormality signal is output.

[0081] When the theoretical processing workload at all time points is not less than the actual required workload, it means that the output of the product of this process may not meet the requirements due to equipment rest. At this time, an abnormal processing signal is output to identify the situation for subsequent analysis.

[0082] Reference Figure 6 After processing the abnormal signal output, the intelligent control method of the machine tool production line also includes: Step S600: randomly determining a virtual rest point within the permitted pressure duration of each pressure device, and defining a rest time interval according to a preset overall rest duration and the virtual rest point.

[0083] The virtual rest point is a random time point in the allowable pressure time. The overall rest time is the interval from when the processing equipment enters the rest state to when it can start working next time. The rest time interval is a time interval with the starting point of the virtual rest point and the width of the overall rest time.

[0084] Step S601: randomly selecting a rest time interval from the rest time intervals of all pressure devices to form a rest combination.

[0085] A rest combination is a combination of rest time intervals of each pressure device when it is resting. For example, there are two pressure devices, one of which has m rest time intervals and the other has n rest time intervals, then there are a total of m*n rest combinations.

[0086] Step S602: defining a rest combination that can output a qualified signal as a valid combination, and defining a corresponding virtual rest point in the valid combination as a qualified rest point.

[0087] When a qualified signal can be output, it means that the determined rest combination can ensure the effective rest of each pressure equipment without affecting the overall processing of the process. At this time, it is defined as a valid combination to distinguish different rest combinations for subsequent analysis; at the same time, a qualified rest point is defined to facilitate subsequent analysis and control.

[0088] Step S603: determining the monomer advance time according to the qualified rest point and the corresponding permitted pressure time, and summing up all monomer advance times to determine the overall advance time.

[0089] The single advance time refers to the time that a single pressure equipment needs to rest in advance, that is, the time interval between the qualified rest point and the corresponding time point after the permitted pressure time; the overall advance time is the time that all pressure equipment needs to rest in advance, that is, the sum of all single advance times.

[0090] Step S604: Determine the overall advance time with the smallest value according to a preset sorting rule, and control the pressure equipment to operate according to the effective combination corresponding to the overall advance time.

[0091] The sorting rule is a method set by the staff to sort the size of values, such as the bubble method. The sorting rule can be used to determine the overall advance time with the smallest value, that is, all pressure equipment can perform production operations well under the effective combination corresponding to the overall advance time. At this time, the operation of each pressure equipment can be controlled according to the effective combination corresponding to the overall advance time.

[0092] Reference Figure 7 After the overall lead time is determined, the intelligent control method of the machine tool production line also includes: Step S700: Determine whether there are at least two valid combinations with the same and minimum overall advance time.

[0093] The purpose of the judgment is to find out whether there are multiple valid combinations that meet the requirements.

[0094] Step S7001: If there are not at least two valid combinations with the same and minimum overall advance time, the pressure equipment is controlled to operate according to the only valid combination with the minimum overall advance time.

[0095] When there are not at least two valid combinations with the same and minimum overall advance time, it means that there is only one valid combination that meets the requirements. At this time, the pressure equipment can be controlled according to the only valid combination with the smallest overall advance time.

[0096] Step S7002: If there are at least two valid combinations with the same and minimum overall advance time, the corresponding valid combinations are defined as alternative combinations, and the required adjustment equipment is determined according to the alternative combinations.

[0097] When there are at least two valid combinations with the same and minimum overall advance time, it means that there are multiple valid combinations that meet the requirements. At this time, they are defined as alternative combinations for subsequent analysis; the demand adjustment equipment is the pressure equipment that needs to advance the rest time.

[0098] Step S701: Counting is performed according to the demand adjustment device to determine the demand adjustment quantity, and the demand adjustment quantity with the smallest value is determined according to the sorting rule, and the pressure device is controlled to operate according to the alternative combination corresponding to the demand adjustment quantity.

[0099] The demand adjustment quantity is the total number of demand adjustment devices in the valid combination. The minimum demand adjustment quantity can be determined through the sorting rules, that is, the pressure equipment that needs to be adjusted is the least, so that the overall calculation and analysis data volume is the lowest. At this time, the pressure equipment can be controlled according to the alternative combination corresponding to the demand adjustment quantity; when there are still multiple alternative combinations with the same and minimum demand adjustment quantity, randomly select an alternative combination for use.

[0100] Reference Figure 8 Based on the same inventive concept, an embodiment of the present invention provides an intelligent control system for a machine tool production line, including: An acquisition module is used to obtain the process and operation status of each device; A processing module, connected to the acquisition module and the judgment module, for storing and processing information; A judgment module, connected with the acquisition module and the processing module, for judging the information; The processing module defines the equipment whose equipment operation state determined by the determination module is consistent with the preset abnormal operation state as an abnormal equipment, and defines the equipment in the same equipment process as the abnormal equipment as the same level equipment; The processing module obtains the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device, and the operation parameters of the same-level device according to the abnormal device and the same-level device; The processing module performs summation calculation based on the abnormal operation volume to determine the total amount of abnormal operations, and counts the same-level equipment to determine the same-level quantity; The processing module determines the task allocation plan according to the total amount of abnormal operations, the number of the same level and the workload of the same level, and determines the simulated workload of each device of the same level according to the task allocation plan; The processing module determines the adjusted workload according to the simulated workload and the corresponding workload at the same level; The processing module determines the adjustment parameters corresponding to the adjustment operation amount under each operation parameter according to the preset coefficient matching relationship, and adjusts the parameters of each operation parameter of the same-level equipment according to the adjustment parameters; The task allocation scheme determination module is used to determine the task allocation scheme more accurately; The abnormal allocation determination module is used to determine the task allocation plan in the case of abnormal allocation signal output; Equipment rest control module, used to control the rest of processing equipment with high pressure to reduce damage to processing equipment; The overall processing prediction module is used to predict the processing task volume of the process at each subsequent time point; Equipment rest adjustment module, used to adjust the rest time period of each processing equipment; The effective combination screening module is used to screen multiple effective combinations that meet the requirements.

[0101] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. The specific working process of the system, device and unit described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

Claims

1. A machine tool production line intelligent control method, characterized in that: include: Obtain the process and operation status of each device; The equipment whose operation status is consistent with the preset abnormal operation status is defined as abnormal equipment, and the equipment in the same process as the abnormal equipment is defined as the same-level equipment; According to the abnormal device and the same-level device, the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device and the operation parameters of the same-level device are obtained; The total amount of abnormal operations is determined by summing up the abnormal operations, and the number of equipment at the same level is determined by counting the equipment at the same level; Determine the task allocation plan based on the total amount of abnormal operations, the number of the same level and the workload of the same level, and determine the simulated workload of each device of the same level based on the task allocation plan; Determine the adjusted workload based on the simulated workload and the corresponding workload at the same level; The adjustment parameters corresponding to the adjusted operation amount under each operation parameter are determined according to the preset coefficient matching relationship, and the operation parameters of the same-level equipment are adjusted according to the adjustment parameters.

2. The intelligent control method for a machine tool production line according to claim 1, characterized in that: The steps of determining the task allocation plan based on the total amount of abnormal operations, the number of same-level operations, and the amount of operations at the same level include: Get the total upper limit of operations for each device of the same level; Calculate the difference between the upper limit and the same level of work to determine the permitted allocation of work; The load ratio is determined by calculating the same-level workload of each device of the same level, and the theoretical allocated workload of each device of the same level is determined by calculating the load ratio and the total amount of abnormal workload; Determine whether all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads; If all theoretical allocation workloads are not greater than the corresponding permitted allocation workloads, an allocation abnormality signal is output; If all theoretically allocated workloads are not greater than the corresponding permitted allocated workloads, the task allocation plan is determined based on each theoretically allocated workload.

3. The intelligent control method for a machine tool production line according to claim 2, characterized in that: After allocating the abnormal signal output, the machine tool production line intelligent control method also includes: The same-level equipment whose theoretical allocated workload is greater than the corresponding permitted allocated workload is defined as an overloaded equipment, and the other same-level equipment except the overloaded equipment is defined as a normal equipment; The overload workload is determined by performing a difference calculation based on the theoretical allocated workload of the overload equipment and the corresponding permitted allocated workload; The total amount of overload operations is determined by summing up all the overload operations, and the compensation operation amount of each normal equipment is determined by calculating the load ratio between the normal equipment and the total amount of overload operations; The theoretical allocated workload is updated based on the compensation workload of normal equipment and the theoretical allocated workload, and the overload equipment and normal equipment are defined again until there is no new overload equipment, and the task allocation plan is determined based on the permitted allocated workload of the overload equipment and the theoretical allocated workload of the normal equipment.

4. The intelligent control method for a machine tool production line according to claim 1, characterized in that: After the simulated workload is determined, the intelligent control method for the machine tool production line also includes: Obtain the pressure operating range according to each equipment of the same level; Determine whether there is equipment of the same level whose simulated operating volume is within the corresponding pressure operating range; If there is no equipment of the same level whose simulated operation volume is within the corresponding pressure operation range, the parameters of the equipment of the same level are adjusted according to each simulated operation volume; If there is a device of the same level whose simulated operating volume is within the corresponding pressure operating range, the device of the same level is defined as a pressure device, and the excess pressure is determined by calculating the difference between the simulated operating volume of the pressure device and the minimum value of the pressure operating range; Determine the permissible pressure duration corresponding to the excess pressure amount according to the preset pressure matching relationship; The pressure control device adjusts parameters according to the simulated workload, and after the parameters are adjusted, the control allowable pressure duration is counted down. When the timer returns to zero, the pressure control device enters a preset rest state and readjusts the parameters of other devices of the same level.

5. The intelligent control method for a machine tool production line according to claim 4, characterized in that: After the permissible pressure duration is determined, the intelligent control method of the machine tool production line also includes: Establishing a detection interval with the current time point as the front end point and a width of the preset detection duration on the preset time axis, and obtaining the theoretical processing workload at each time point in the detection interval; The actual required workload is determined by summing up all abnormal workloads and all workloads at the same level; Determine whether the theoretical processing workload at all time points is not less than the actual required workload; If the theoretical processing workload at all time points is not less than the actual required workload, a qualified signal is output, and the pressure equipment is controlled to adjust parameters according to the simulated workload; If the theoretical processing workload at all time points is not less than the actual required workload, a processing exception signal is output.

6. The intelligent control method for a machine tool production line according to claim 5, characterized in that: After processing the abnormal signal output, the intelligent control method of the machine tool production line also includes: A virtual rest point is randomly determined within the permitted pressure time of each pressure equipment, and the rest time interval is defined according to the preset overall rest time and the virtual rest point; A rest time interval is randomly selected from the rest time intervals of all pressure equipment to form a rest combination; A rest combination that can output a qualified signal is defined as a valid combination, and a corresponding virtual rest point in the valid combination is defined as a qualified rest point; Determine the monomer advance time according to the qualified rest point and the corresponding permitted pressure time, and calculate the overall advance time by summing up all monomer advance times; The overall advance time with the smallest value is determined according to the preset sorting rules, and the pressure equipment is controlled to operate according to the effective combination corresponding to the overall advance time.

7. The intelligent control method for a machine tool production line according to claim 6, characterized in that: At After the overall lead time is determined, the intelligent control method of the machine tool production line also includes: Determine whether there are at least two valid combinations with the same and minimum overall advance time; If there are not at least two valid combinations with the same and minimum overall advance time, the pressure equipment is controlled to operate according to the only valid combination with the minimum overall advance time; If there are at least two valid combinations with the same and minimum overall advance time, the corresponding valid combinations are defined as alternative combinations, and the required adjustment equipment is determined according to the alternative combinations; The demand adjustment device is counted to determine the demand adjustment quantity, and the demand adjustment quantity with the smallest value is determined according to the sorting rules, and the pressure device is controlled to operate according to the alternative combination corresponding to the demand adjustment quantity.

8. An intelligent control system for a machine tool production line, characterized in that: include: An acquisition module is used to obtain the process and operation status of each device; A processing module, connected to the acquisition module and the judgment module, for storing and processing information; A judgment module, connected with the acquisition module and the processing module, for judging the information; The processing module defines the equipment whose equipment operation state determined by the determination module is consistent with the preset abnormal operation state as an abnormal equipment, and defines the equipment in the same equipment process as the abnormal equipment as the same level equipment; The processing module obtains the abnormal operation amount corresponding to the abnormal device, the same-level operation amount corresponding to the same-level device, and the operation parameters of the same-level device according to the abnormal device and the same-level device; The processing module performs summation calculation based on the abnormal operation volume to determine the total amount of abnormal operations, and counts the same-level equipment to determine the same-level quantity; The processing module determines the task allocation plan according to the total amount of abnormal operations, the number of the same level and the workload of the same level, and determines the simulated workload of each device of the same level according to the task allocation plan; The processing module determines the adjusted workload according to the simulated workload and the corresponding workload at the same level; The processing module determines the adjustment parameters corresponding to the adjustment operation amount under each operation parameter according to the preset coefficient matching relationship, and adjusts the parameters of each operation parameter of the same level equipment according to the adjustment parameters.

Citation Information

Patent Citations

  • Job scheduling system of automatic industrial apparatuses

    CN105159240A

  • Preventive maintenance and production scheduling joint decision-making method for hybrid flow shop

    CN115438815A

  • Production scheduling method and terminal equipment

    CN115860690A

  • Enterprise production safety risk assessment method, system and device and storage medium

    CN118313667A

  • Intelligent production management method and system

    CN118536768A

Cited By

  • Intelligent production method and system for air conditioner shell stamping part

    CN120024072A