Precise adding control method, system and equipment of phosphorus removal agent and storage medium

By real-time monitoring and adjustment of the drug administration strategy, using water quality and flow data to calculate the initial dose and standard dose, the problem of inaccurate dose of phosphorus removal agents in the existing technology is solved, and the automation of sewage treatment is improved. Chemical phosphorus removal effect.

CN119065407AInactive Publication Date: 2024-12-03SHENZHEN SHENGLONG INFORMATION TECH CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411470095.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing phosphorus removal agent dosage device cannot dynamically adjust the dosage of the agent, resulting in waste of the agent or inefficient treatment.

Method used

By obtaining water quality parameters and flow data, calculating the initial injection unit consumption and standard injection volume, monitoring the orthophosphate concentration in real time, adjusting the injection strategy, generating the drug injection instructions, and generating the best injection based on real-time data and historical data. Strategy to achieve accurate drug administration.

Benefits of technology

It improves the accuracy and efficiency of drug administration, reduces drug waste, optimizes the automation and intelligence level of sewage treatment, and achieves a more efficient and stable chemical phosphorus removal effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119065407A_ABST
    Figure CN119065407A_ABST
Patent Text Reader

Abstract

The invention relates to a phosphorus removal agent accurate adding control method, system and device and a storage medium, and the method comprises the steps: obtaining water quality parameters, and calculating agent initial adding unit consumption according to the water quality parameters and a preset initial adding unit consumption calculation formula; acquiring water inlet flow data and reflux flow data, and calculating the standard dosage of the medicament according to the initial dosage unit consumption, the water inlet flow data and the reflux flow data; generating an agent adding instruction according to the agent standard adding amount and the initial adding unit consumption, obtaining the orthophosphate concentration at the adding point in real time, and analyzing and adjusting the initial adding unit consumption according to the change of the orthophosphate concentration to obtain the agent standard adding unit consumption at different adding points; inputting the standard dosing amount and the standard dosing unit consumption of the medicament into a preset dosing control model to generate a dosing control strategy, and controlling the dosing device to perform dosing according to the dosing control strategy. The device and the method have the effect of accurate medicament adding amount.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of agent dosing control, and in particular to a method, system, equipment and storage medium for precise dosing control of a dephosphorization agent. Background Art

[0002] At present, chemical phosphorus removal is a commonly used treatment method in the sewage treatment process. The existing phosphorus removal agent dosing devices mostly rely on manual operation, and the control of the dosage is not precise enough, resulting in agent waste or poor treatment effect. Although some systems try to add agents through simple automatic control, they lack the ability to make dynamic adjustments based on real-time water quality data and cannot achieve precise control.

[0003] The above-mentioned prior art solutions have the following defects: the existing phosphorus removal agent dosing device cannot dynamically adjust the agent dosage, resulting in agent waste or low treatment efficiency, so there is room for improvement. Summary of the invention

[0004] In order to improve the accuracy of the dosage of the agent, the present application provides a method, system, equipment and storage medium for accurately controlling the dosage of the phosphorus removal agent.

[0005] The above-mentioned invention objective of the present application is achieved through the following technical solutions: A method for accurately dosing and controlling a phosphorus removal agent, comprising: Obtaining water quality parameters, and calculating the initial dosage unit consumption of the reagent according to the water quality parameters and a preset initial dosage unit consumption calculation formula; Acquire water inlet flow data and return flow data, and calculate the standard dosage of the reagent according to the initial dosage unit consumption, the water inlet flow data and the return flow data; Generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time, analyze and adjust the initial dosage unit consumption according to the change of the orthophosphate concentration, and obtain the standard dosage unit consumption of the reagent at different dosing points; The standard dosage of the reagent and the standard dosage unit consumption of the reagent are input into a preset dosage control model to generate a dosage control strategy, and the dosage device is controlled to perform dosage according to the dosage control strategy.

[0006] By adopting the above technical solution, by obtaining water quality parameters and calculating the initial dosage unit consumption of the reagent according to the preset initial dosage unit consumption calculation formula, the scientificity and accuracy of the initial dosage can be obtained, providing reliable basic data for subsequent dosage of the reagent; by obtaining the water inlet flow data and the return flow data, and calculating the standard dosage of the reagent according to the initial dosage unit consumption, the water inlet flow data and the return flow data, the dosage of the reagent can be matched with the actual water treatment demand, thereby reducing the occurrence of excessive or insufficient dosage when the reagent is added, and optimizing the use efficiency of the reagent; the reagent addition instruction is generated according to the standard dosage of the reagent and the initial dosage unit consumption, and the addition point is obtained in real time. The orthophosphate concentration at the site can be used to monitor and adjust the effect of chemical addition in real time to ensure that the actual phosphorus removal effect meets expectations. Through the real-time data-driven feedback mechanism, the initial dosage unit consumption can be analyzed and adjusted in time to obtain a more accurate standard dosage unit consumption of the chemical, and further optimize the dosage strategy. By inputting the standard dosage of the chemical and the standard dosage unit consumption of the chemical into the preset dosage control model, a dosage control strategy is generated, and the dosage device is controlled to perform dosage according to the dosage control strategy. According to the comprehensive analysis of real-time data and historical data, the optimal dosage strategy can be automatically generated, thereby improving the automation and intelligence level of sewage treatment and achieving a more efficient and stable chemical phosphorus removal effect.

[0007] In one example, the present application may be further configured as follows: the water quality parameters are obtained, and the initial dosage unit consumption of the agent is calculated according to the water quality parameters and a preset initial dosage unit consumption calculation formula, specifically including: Obtaining inlet total phosphorus concentration data, outlet total phosphorus concentration data and biological pool phosphorus removal effect data as the water quality parameters; According to the preset initial dosage unit consumption calculation formula Calculate the initial dosage unit consumption of the agent, where D is the initial dosage unit consumption of the agent, C in is the total phosphorus concentration data of the influent, C out is the effluent total phosphorus concentration data, C bio is the phosphorus removal effect data of the biological pool, and A is the preset dosage parameter.

[0008] By adopting the above technical solution, by obtaining key water quality parameters such as inlet total phosphorus concentration data, effluent total phosphorus concentration data and biological pool phosphorus removal effect data, and using a preset calculation formula to determine the initial dosage unit consumption, the scientificity and accuracy of the initial chemical dosage can be ensured, making the basic data of chemical dosage more reliable, and reasonable adjustments can be made according to different water quality conditions, thereby improving the overall efficiency of sewage treatment.

[0009] In one example, the present application may be further configured as follows: the acquisition of the inlet flow data and the return flow data, and the calculation of the standard dosage of the agent according to the initial dosage unit consumption, the inlet flow data and the return flow data, specifically includes: The initial dosage unit consumption, the water inlet flow data and the return flow data are input into the preset dosage calculation formula. , get the standard dosage of the agent, where D total is the standard dosage of the agent, Q in is the water inlet flow rate, Q rec is the reflux flow rate.

[0010] By adopting the above technical solution, by obtaining the actual water inlet and return flow data and calculating the standard dosage of the agent in combination with the initial dosage unit consumption, it is possible to ensure that the dosage of the agent is consistent with the actual treatment requirements, reduce the occurrence of excessive or insufficient agent, thereby further improving the efficiency of agent use and reducing operating costs.

[0011] In one example, the present application may be further configured as follows: analyzing and adjusting the initial dosage unit consumption according to the change in the orthophosphate concentration to obtain the standard dosage unit consumption of the agent at different dosage points specifically includes: Calculating the phosphorus removal effect data of the agent within a preset time according to the change of the orthophosphate concentration; The phosphorus removal effect data of the agent is compared with the preset phosphorus removal effect curve of the agent, and the initial dosage unit consumption is adjusted step by step according to the comparison result; Calculate the adjusted data of the agent phosphorus removal effect. When the adjusted data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, obtain the adjusted initial dosage unit consumption corresponding to the adjusted data of the agent phosphorus removal effect, and obtain the standard dosage unit consumption of the agent at different dosage points.

[0012] By adopting the above technical solution and monitoring the orthophosphate concentration, real-time monitoring and dynamic adjustment of the agent dosage effect can be achieved; based on the comparison of real-time data with the preset effect curve, the initial dosage unit consumption is adjusted step by step to ensure the accuracy and effectiveness of agent dosage, and deviations are discovered and corrected in time during the dosage process, the dosage strategy is optimized, the efficiency and effect of chemical phosphorus removal are further improved, and agent consumption is reduced.

[0013] In one example, the present application can be further configured as follows: comparing the agent phosphorus removal effect data with a preset agent phosphorus removal effect curve, and adjusting the initial dosage unit consumption step by step according to the comparison result, specifically including: When the agent phosphorus removal effect data does not reach the peak point of the preset agent phosphorus removal effect curve, gradually increasing the initial dosage unit consumption; When the agent phosphorus removal effect data reaches the peak point of the preset agent phosphorus removal effect curve, the initial dosage unit consumption is gradually reduced.

[0014] By adopting the above technical scheme, by comparing the actual agent phosphorus removal effect with the preset effect curve, the rationality and effectiveness of the current dosage can be accurately judged. If the preset effect is not achieved, the dosage unit consumption is gradually increased. If the preset effect is achieved or exceeded, the dosage unit consumption is gradually reduced. The agent dosage efficiency can be dynamically optimized, the efficiency and effect of chemical phosphorus removal can be improved, the agent waste can be reduced, and the stability and response speed of the system can be improved.

[0015] In one example, the present application may be further configured as follows: the calculation of the adjusted agent phosphorus removal effect adjustment data, when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve, obtaining the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data, and obtaining the agent standard dosage unit consumption at different dosage points, specifically includes: According to the step-by-step increased initial dosage unit consumption, when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve, the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data is obtained; According to the initial dosage unit consumption after step-by-step reduction, when the adjustment data of the agent phosphorus removal effect is lower than the peak point of the preset agent phosphorus removal effect curve, the adjustment data of the agent phosphorus removal effect of the previous level after the reduction is obtained, and the adjusted initial dosage unit consumption corresponding to the adjustment data of the agent phosphorus removal effect of the previous level after the reduction is obtained.

[0016] By adopting the above technical scheme, the optimal dosage unit consumption can be accurately determined by calculating and comparing the adjustment data of the agent phosphorus removal effect. When the adjustment data of the agent phosphorus removal effect has not reached the peak point of the preset effect curve, the dosage unit consumption is continued to be increased until the adjustment data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, and this is used as the new standard dosage unit consumption, so as to obtain accurate dosage efficiency when the initial dosage unit consumption is low; when the adjustment data of the agent phosphorus removal effect is still at the peak point of the preset effect curve, the dosage unit consumption is continuously reduced until the adjustment data of the agent phosphorus removal effect is lower than the peak point of the preset agent phosphorus removal effect curve, and the dosage unit consumption corresponding to the previous level of the reduced adjustment data of the agent phosphorus removal effect is obtained, so as to timely discover and deal with the situation of high initial dosage unit consumption, so as to improve the use efficiency of the phosphorus removal agent.

[0017] In one example, the present application may be further configured as follows: the construction of the dosing control model specifically includes: Obtaining historical standard dosage of reagents, historical standard dosage unit consumption of reagents and their corresponding historical water quality data, historical purified water quality data and historical dosing pump data, and when the historical purified water quality data reaches a preset water quality standard, classifying water pollution according to the historical water quality data to obtain different pollution classification groups; According to different pollution classification groups, a model positive training set is generated for the historical standard dosage of the reagent, the historical standard dosage unit consumption of the reagent, and the historical dosage pump data corresponding to the historical water quality data, and the historical standard dosage of the reagent, the historical standard dosage unit consumption of the reagent, and the historical dosage pump data corresponding to the historical water quality data that meets the preset water quality standard are packaged as a model negative training set; The preset machine learning algorithm is iteratively trained positively and negatively according to the model positive training set and the model negative training set to obtain the dosage control model.

[0018] By adopting the above technical solution, various water quality conditions are classified and predicted by obtaining historical data, and different data sets can be used for classification training of the model, thereby improving the model's processing efficiency for different situations; by using positive and negative training sets for iterative training of machine learning algorithms, the model can be continuously optimized to make it more accurate and adaptable.

[0019] The second object of the invention is achieved by the following technical solutions: A precise dosing control system for a dephosphorization agent, the precise dosing control system for a dephosphorization agent comprising: An initial unit consumption calculation module is used to obtain water quality parameters and calculate the initial dosage unit consumption of the agent according to the water quality parameters and a preset initial dosage unit consumption calculation formula; A standard dosage calculation module is used to obtain the inlet flow data and the return flow data, and calculate the standard dosage of the agent according to the initial dosage unit consumption, the inlet flow data and the return flow data; A standard unit consumption calculation module is used to generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and to obtain the orthophosphate concentration at the dosing point in real time, and to analyze and adjust the initial dosage unit consumption according to the change of the orthophosphate concentration, so as to obtain the standard dosage unit consumption of the reagent at different dosing points; The dosing strategy generation module is used to input the standard dosage of the agent and the standard dosage unit consumption of the agent into a preset dosing control model, generate a dosing control strategy, and control the dosing device to perform dosing according to the dosing control strategy.

[0020] By adopting the above technical solution, by obtaining water quality parameters and calculating the initial dosage unit consumption of the reagent according to the preset initial dosage unit consumption calculation formula, the scientificity and accuracy of the initial dosage can be obtained, providing reliable basic data for subsequent dosage of the reagent; by obtaining the water inlet flow data and the return flow data, and calculating the standard dosage of the reagent according to the initial dosage unit consumption, the water inlet flow data and the return flow data, the dosage of the reagent can be matched with the actual water treatment demand, thereby reducing the occurrence of excessive or insufficient dosage when the reagent is added, and optimizing the use efficiency of the reagent; the reagent addition instruction is generated according to the standard dosage of the reagent and the initial dosage unit consumption, and the addition point is obtained in real time. The orthophosphate concentration at the site can be used to monitor and adjust the effect of chemical addition in real time to ensure that the actual phosphorus removal effect meets expectations. Through the real-time data-driven feedback mechanism, the initial dosage unit consumption can be analyzed and adjusted in time to obtain a more accurate standard dosage unit consumption of the chemical, and further optimize the dosage strategy. By inputting the standard dosage of the chemical and the standard dosage unit consumption of the chemical into the preset dosage control model, a dosage control strategy is generated, and the dosage device is controlled to perform dosage according to the dosage control strategy. According to the comprehensive analysis of real-time data and historical data, the optimal dosage strategy can be automatically generated, thereby improving the automation and intelligence level of sewage treatment and achieving a more efficient and stable chemical phosphorus removal effect.

[0021] The third objective of the present application is achieved through the following technical solutions: A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned method for controlling the precise addition of a dephosphorization agent are implemented.

[0022] The fourth objective of the present application is achieved through the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned method for controlling the precise addition of a phosphorus removal agent.

[0023] In summary, this application includes the following beneficial technical effects: 1. By obtaining water quality parameters and calculating the initial dosage unit consumption of the reagent according to the preset initial dosage unit consumption calculation formula, the scientificity and accuracy of the initial dosage can be obtained, providing reliable basic data for subsequent reagent dosage; by obtaining the inlet flow data and the return flow data, and calculating the standard dosage of the reagent according to the initial dosage unit consumption, the inlet flow data and the return flow data, the dosage of the reagent can be matched with the actual water treatment needs, thereby reducing the occurrence of over-dosage or under-dosage during reagent addition and optimizing the use efficiency of the reagent; the reagent addition instruction is generated according to the standard dosage of the reagent and the initial dosage unit consumption, and the orthophosphoric acid at the dosing point is obtained in real time. Salt concentration can monitor and adjust the effect of agent addition in real time to ensure that the actual phosphorus removal effect meets expectations. Through the real-time data-driven feedback mechanism, the initial dosage unit consumption can be analyzed and adjusted in time to obtain a more accurate standard dosage unit consumption of the agent, and the dosage strategy can be further optimized. By inputting the standard dosage of the agent and the standard dosage unit consumption of the agent into the preset dosage control model, a dosage control strategy is generated, and the dosage device is controlled to perform dosage according to the dosage control strategy. According to the comprehensive analysis of real-time data and historical data, the optimal dosage strategy can be automatically generated, thereby improving the automation and intelligence level of sewage treatment and achieving a more efficient and stable chemical phosphorus removal effect. 2. By comparing the actual agent phosphorus removal effect with the preset effect curve, the rationality and effectiveness of the current dosage can be accurately judged. If the preset effect is not achieved, the dosage unit consumption will be increased step by step. If the preset effect is achieved or exceeded, the dosage unit consumption will be reduced step by step. It can dynamically optimize the agent dosage efficiency, improve the efficiency and effect of chemical phosphorus removal, reduce agent waste, and improve the stability and response speed of the system; 3. By calculating and comparing the adjustment data of the phosphorus removal effect of the agent, the optimal dosage unit consumption can be accurately determined. When the adjustment data of the phosphorus removal effect of the agent does not reach the peak point of the preset effect curve, the dosage unit consumption will continue to be increased until the adjustment data of the phosphorus removal effect of the agent reaches the peak point of the preset phosphorus removal effect curve, and this will be used as the new standard dosage unit consumption, so as to obtain accurate dosage efficiency when the initial dosage unit consumption is low; when the adjustment data of the phosphorus removal effect of the agent is still at the peak point of the preset effect curve, the dosage unit consumption will continue to be reduced until the adjustment data of the phosphorus removal effect of the agent is lower than the peak point of the preset phosphorus removal effect curve, and the dosage unit consumption corresponding to the previous level of the phosphorus removal effect adjustment data after the reduction is obtained, so as to timely discover and deal with the situation of high initial dosage unit consumption, so as to improve the use efficiency of the phosphorus removal agent. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a flow chart of a method for accurately controlling the addition of a phosphorus removal agent in an embodiment of the present application; Figure 2 This is a flowchart for implementing step S10 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 3 This is a flowchart for implementing step S20 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 4 This is a flowchart for implementing step S30 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 5 This is a flowchart for implementing step S32 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 6 This is a flowchart for implementing step S33 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 7 This is a flowchart for implementing step S40 in the method for accurately dosing a phosphorus removal agent in one embodiment of the present application; Figure 8 This is a principle block diagram of a precise dosing control system for phosphorus removal agents in one embodiment of the present application; Fig. 9 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION

[0025] The present application is further described in detail below in conjunction with the accompanying drawings.

[0026] In one embodiment, if Figure 1 As shown, the present application discloses a method for accurately controlling the addition of a phosphorus removal agent, which specifically includes the following steps: S10: Obtain water quality parameters, and calculate the initial dosage unit consumption of the reagent according to the water quality parameters and a preset initial dosage unit consumption calculation formula.

[0027] In this embodiment, the water quality parameter refers to the water quality parameter of the sewage. The initial unit consumption of the reagent refers to the initial unit consumption when the reagent is added.

[0028] Specifically, the inlet total phosphorus concentration sensor, effluent total phosphorus concentration sensor and biological pool biological phosphorus removal effect monitoring system installed in the sewage treatment system are used to measure the total phosphorus concentration in the inlet water, the total phosphorus concentration in the effluent water and the phosphorus removal effect of the biological pool respectively. These data are input into the control system as water quality parameters. The control system uses a preset initial dosage unit consumption calculation formula to calculate the initial dosage unit consumption of the agent.

[0029] S20: Obtaining water inlet flow data and return flow data, and calculating the standard dosage of the reagent according to the initial dosage unit consumption, the water inlet flow data and the return flow data.

[0030] In this embodiment, the inflow flow data refers to the flow data of the sewage entering the biological pool. The backflow flow data refers to the flow data corresponding to the backflow state of the purified water. The standard dosage of the reagent refers to the accurate amount of the reagent that needs to be added corresponding to the actual sewage situation.

[0031] Specifically, flow meters are installed in the water inlet pipe and the water return pipe to measure and record the water inlet flow and the return flow in real time, and transmit these flow data to the control system. The control system calculates the standard dosage of the agent based on the measured initial dosage unit consumption, water inlet flow and return flow.

[0032] S30: Generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time. According to the change of the orthophosphate concentration, analyze and adjust the initial dosage unit consumption to obtain the standard dosage unit consumption of the reagent at different dosing points.

[0033] In this embodiment, the reagent dosing instruction refers to an instruction to control the dosing pump to dosing the reagent. The standard dosing unit consumption of the reagent refers to the accurate unit consumption of the reagent corresponding to the actual sewage situation when it is added.

[0034] Specifically, based on the calculated standard dosage of the reagent and the initial dosage unit consumption, the control system generates a specific reagent dosage instruction and controls the reagent dosage device to perform dosage. During the dosage process, an orthophosphate analyzer installed behind the dosage point is used to monitor the orthophosphate concentration at the dosage point in real time. Based on the real-time monitoring data, the control system analyzes changes in the orthophosphate concentration and adjusts the initial dosage unit consumption according to the degree of change to obtain a new standard reagent dosage unit consumption.

[0035] S40: inputting the standard dosage of the reagent and the standard dosage unit consumption of the reagent into a preset dosage control model, generating a dosage control strategy, and controlling the dosage device to perform dosage according to the dosage control strategy.

[0036] In this embodiment, the dosing control strategy refers to a strategy for controlling the dosing device to dosing the agent.

[0037] Specifically, the updated standard dosage of the agent and the standard dosage unit consumption of the agent are input into the preset dosage control model, and the control model generates a specific dosage control strategy, including the number of dosing devices opened and the dosage frequency and other states. According to the generated control strategy, the control system adjusts the operating parameters of the dosing device in real time to ensure the accurate dosage of the agent to achieve the best phosphorus removal effect.

[0038] In one embodiment, if Figure 2 As shown, in step S10, water quality parameters are obtained, and the initial dosage unit consumption of the reagent is calculated according to the water quality parameters and a preset initial dosage unit consumption calculation formula, specifically including: S11: Obtain inlet total phosphorus concentration data, effluent total phosphorus concentration data and biological pool phosphorus removal effect data as water quality parameters.

[0039] Specifically, by installing an inlet total phosphorus concentration sensor, an effluent total phosphorus concentration sensor and a biological pool biological phosphorus removal effect monitoring system in the sewage treatment system, the total phosphorus concentration in the inlet water, the total phosphorus concentration in the effluent water and the phosphorus removal effect of the biological pool are obtained as water quality parameters.

[0040] S12: According to the preset initial dosage unit consumption calculation formula Calculate the initial dosage unit consumption of the reagent, where D0 is the initial dosage unit consumption of the reagent, C in is the total phosphorus concentration in the influent, C out is the effluent total phosphorus concentration data, C bio is the phosphorus removal effect data of the biological pool, and A is the preset dosing parameter.

[0041] Specifically, after biological treatment, the phosphorus concentration that still needs to be removed by chemical agents is C in −C bio −C out , divide the net phosphorus removal by the preset dosage parameter A to obtain the initial dosage unit consumption D0, which is used to preliminarily set the dosage of the agent.

[0042] In one embodiment, if Figure 3 As shown, in step S20, the inlet flow data and the return flow data are obtained, and the standard dosage of the agent is calculated according to the initial dosage unit consumption, the inlet flow data and the return flow data, which specifically includes: S21: Input the initial dosage unit consumption, water inlet flow data and return flow data into the preset dosage calculation formula , get the standard dosage of the agent, where D total is the standard dosage of the agent, Q in is the water inlet flow rate, Q rec is the return flow.

[0043] Specifically, flow meters installed in the water inlet and return pipes measure and record the water inlet flow and return flow in real time. These flow data are input into the control system, which calculates the standard dosage of the agent based on the initial dosage unit consumption, water inlet flow and return flow using the preset dosage calculation formula. The sum of the water inlet flow and return flow Q is in +Q rec Represents the total amount of water that needs to be treated. Multiply the total amount of treated water by the initial dosage unit consumption D0 to get the standard dosage of the agent D total , indicating the total amount of reagent that needs to be added within a specific time.

[0044] In one embodiment, if Figure 4As shown, in step S30, the initial dosage unit consumption is analyzed and adjusted according to the change of orthophosphate concentration to obtain the standard dosage unit consumption of the agent at different dosage points, which specifically includes: S31: Calculate the phosphorus removal effect data of the agent within a preset time according to the change of orthophosphate concentration.

[0045] Specifically, during the agent addition process, an orthophosphate analyzer installed behind the addition point is used to monitor the orthophosphate concentration at the addition point in real time. According to the change in the orthophosphate concentration, the control system calculates the agent's phosphorus removal effect data within a preset time.

[0046] S32: Compare the agent phosphorus removal effect data with the preset agent phosphorus removal effect curve, and adjust the initial dosage unit consumption step by step according to the comparison result.

[0047] Specifically, the data on the phosphorus removal effect of the agent is compared with the preset phosphorus removal effect curve of the agent. If the actual phosphorus removal effect does not meet expectations, the initial dosage unit consumption is adjusted step by step. If the dosage is too little, resulting in poor phosphorus removal effect, the dosage unit consumption will be increased. If the dosage is too fast, resulting in saturation of the phosphorus removal effect, the dosage unit consumption will be reduced until the optimal value between the phosphorus removal effect of the phosphorus removal agent and the dosage of the phosphorus removal agent is reached.

[0048] S33: Calculate the adjusted data of the agent phosphorus removal effect. When the adjusted data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, obtain the adjusted initial dosage unit consumption corresponding to the adjusted data of the agent phosphorus removal effect, and obtain the standard dosage unit consumption of the agent at different dosage points.

[0049] Specifically, the adjusted agent phosphorus removal effect data is calculated and compared with the preset curve. Under the condition of meeting the optimal value between the phosphorus removal effect of the phosphorus removal agent and the dosage of the phosphorus removal agent, the corresponding adjusted initial dosage unit consumption is determined to obtain the new agent standard dosage unit consumption.

[0050] In one embodiment, if Figure 5 As shown, in step S32, the agent phosphorus removal effect data is compared with the preset agent phosphorus removal effect curve, and the initial dosage unit consumption is adjusted step by step according to the comparison result, specifically including: S321: When the data of the agent phosphorus removal effect does not reach the peak point of the preset agent phosphorus removal effect curve, the initial dosage unit consumption is increased step by step.

[0051] Specifically, when the data on the phosphorus removal effect of the agent does not reach the peak point of the preset curve, the initial dosage unit consumption is increased step by step to improve the purification efficiency of the phosphorus removal agent and determine the optimal dosage unit consumption.

[0052] S322: When the data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, the initial dosage unit consumption is gradually reduced.

[0053] Specifically, when the adjustment data reaches the peak point of the preset curve, there may be a state where the phosphorus removal effect is saturated due to excessive dosage unit consumption. The optimal dosage unit consumption can be determined by gradually reducing the initial dosage unit consumption.

[0054] In one embodiment, if Figure 6 As shown, in step S33, the adjusted agent phosphorus removal effect adjustment data is calculated, and when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve, the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data is obtained, and the agent standard dosage unit consumption at different dosage points is obtained, which specifically includes: S331: According to the step-by-step increase in the initial dosage unit consumption, when the adjustment data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, the adjusted initial dosage unit consumption corresponding to the adjustment data of the agent phosphorus removal effect is obtained.

[0055] Specifically, in the process of gradually increasing the initial dosage unit consumption, the control system monitors the adjustment data of the agent phosphorus removal effect in real time, and compares it with the preset agent phosphorus removal effect curve. When the adjustment data reaches the peak point of the preset curve, the corresponding adjusted initial dosage unit consumption is recorded as the new standard dosage unit consumption.

[0056] S332: According to the initial dosage unit consumption after step-by-step reduction, when the adjustment data of the agent phosphorus removal effect is lower than the peak point of the preset agent phosphorus removal effect curve, obtain the adjustment data of the agent phosphorus removal effect of the previous level after the reduction, and obtain the adjusted initial dosage unit consumption corresponding to the adjustment data of the agent phosphorus removal effect of the previous level after the reduction.

[0057] Specifically, in the process of gradually reducing the initial unit consumption of addition, if the adjusted data is lower than the peak point, the adjusted data of the previous level is recorded and used as the adjusted initial unit consumption of addition.

[0058] In one embodiment, if Figure 7 As shown, in step S40, i.e., the construction of the dosing control model, specifically includes: S401: Obtain historical standard dosage of reagents, historical standard dosage unit consumption of reagents and their corresponding historical water quality data, historical purified water quality data and historical dosing pump data. When the historical purified water quality data reaches the preset water quality standard, classify water pollution according to the historical water quality data to obtain different pollution classification groups.

[0059] Specifically, historical data is collected, including historical standard dosage of reagents, historical standard dosage unit consumption of reagents, historical water quality data, historical purified water quality data, and historical dosage pump data. When the historical purified water quality data meets the preset water quality standards, it can be used as positive data for model training, and different pollution classification groups are obtained according to the degree of water pollution. Group training is used to improve the learning efficiency of the model for water with different pollution degrees and its reagent dosing strategies.

[0060] S402: According to different pollution classification groups, a model positive training set is generated for the historical standard dosage of reagents, the historical standard dosage unit consumption of reagents and the historical dosage pump data corresponding to the historical water quality data, and the historical purified water quality data that meets the preset water quality standards is encapsulated as a model negative training set.

[0061] Specifically, according to different pollution classification groups, the corresponding historical water quality data, historical standard dosage of chemicals, historical standard dosage unit consumption of chemicals and historical dosage pump data are used to generate a model positive training set. For historical water quality data that does not meet the preset water quality standards, the corresponding historical standard dosage of chemicals, historical standard dosage unit consumption of chemicals and historical dosage pump data are encapsulated as a model negative training set to improve the model's learning and understanding of different training data.

[0062] S403: Perform iterative positive and negative training on the preset machine learning algorithm according to the model positive training set and the model negative training set to obtain a dosing control model.

[0063] Specifically, the preset machine learning algorithm is iteratively trained using positive and negative training sets to optimize and improve the dosage control model, and the accuracy of the model is tested based on the test training set. When the error value between the result obtained from the input data and the test training set does not exceed 5%, the dosage control model is obtained.

[0064] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0065] In one embodiment, a precise dosing control system for phosphorus removal agent is provided, and the precise dosing control system for phosphorus removal agent corresponds to the precise dosing control method for phosphorus removal agent in the above embodiment. Figure 8 As shown, the precise dosing control system for phosphorus removal agents includes an initial unit consumption calculation module, a standard dosage calculation module, a standard unit consumption calculation module, and a dosing strategy generation module. The detailed description of each functional module is as follows: The initial unit consumption calculation module is used to obtain water quality parameters and calculate the initial dosage unit consumption of the reagent according to the water quality parameters and the preset initial dosage unit consumption calculation formula; The standard dosage calculation module is used to obtain the inlet flow data and the return flow data, and calculate the standard dosage of the reagent according to the initial dosage unit consumption, the inlet flow data and the return flow data; The standard unit consumption calculation module is used to generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time. According to the change of the orthophosphate concentration, the initial dosage unit consumption is analyzed and adjusted to obtain the standard dosage unit consumption of the reagent at different dosing points; The dosing strategy generation module is used to input the standard dosage of the agent and the standard unit consumption of the agent into a preset dosing control model, generate a dosing control strategy, and control the dosing device to perform dosing according to the dosing control strategy.

[0066] Optionally, the initial unit consumption calculation module specifically includes: The data acquisition submodule is used to obtain the inlet total phosphorus concentration data, the outlet total phosphorus concentration data and the phosphorus removal effect data of the biological pool as water quality parameters; The data calculation submodule is used to calculate the unit consumption according to the preset initial dosage formula. Calculate the initial dosage unit consumption of the reagent, where D0 is the initial dosage unit consumption of the reagent, C in is the total phosphorus concentration in the influent, C out is the effluent total phosphorus concentration data, C bio is the phosphorus removal effect data of the biological pool, and A is the preset dosing parameter.

[0067] Optionally, the standard dosage calculation module specifically includes: The dosage calculation submodule is used to input the initial dosage unit consumption, inlet flow data and return flow data into the preset dosage calculation formula , get the standard dosage of the agent, where D total is the standard dosage of the agent, Q in is the water inlet flow rate, Q rec is the return flow.

[0068] Optionally, the standard unit consumption calculation module specifically includes: The phosphorus removal effect calculation submodule is used to calculate the phosphorus removal effect data of the agent within a preset time according to the change of orthophosphate concentration; The initial unit consumption adjustment submodule is used to compare the agent phosphorus removal effect data with the preset agent phosphorus removal effect curve, and adjust the initial dosage unit consumption step by step according to the comparison results; The standard unit consumption calculation module is used to calculate the adjusted data of the agent phosphorus removal effect. When the adjusted data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, the adjusted initial dosage unit consumption corresponding to the adjusted data of the agent phosphorus removal effect is obtained to obtain the standard dosage unit consumption of the agent at different dosage points.

[0069] Optionally, the initial unit consumption adjustment submodule specifically includes: The unit consumption increasing unit is used to gradually increase the initial dosage unit consumption when the agent phosphorus removal effect data does not reach the peak point of the preset agent phosphorus removal effect curve; The unit consumption reduction unit is used to gradually reduce the initial unit consumption when the agent phosphorus removal effect data reaches the peak point of the preset agent phosphorus removal effect curve.

[0070] Optionally, the standard unit consumption calculation module specifically includes: An improvement determination unit is used to obtain the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data according to the initial dosage unit consumption after step-by-step increase, when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve; The reduction situation determination unit is used to obtain the adjusted data of the previous level of agent phosphorus removal effect after the reduction based on the initial unit dosage after step-by-step reduction, and obtain the adjusted initial unit dosage corresponding to the adjusted data of the previous level of agent phosphorus removal effect after the reduction, when the adjusted data of the agent phosphorus removal effect is lower than the peak point of the preset agent phosphorus removal effect curve.

[0071] Optionally, the construction of the dosing control model specifically includes: The training data acquisition submodule is used to obtain the historical standard dosage of reagents, the historical standard dosage unit consumption of reagents and their corresponding historical water quality data, historical purified water quality data and historical dosing pump data. When the historical purified water quality data reaches the preset water quality standard, water pollution classification is performed according to the historical water quality data to obtain different pollution classification groups; The training set generation submodule is used to generate a model positive training set for the historical standard dosage of reagents, the historical standard dosage unit consumption of reagents and the historical dosage pump data corresponding to the historical water quality data according to different pollution classification groups, and encapsulate the historical standard dosage of reagents, the historical standard dosage unit consumption of reagents and the historical dosage pump data corresponding to the historical water quality data that meets the preset water quality standards as a model negative training set; The model training submodule is used to iteratively perform positive and negative training on the preset machine learning algorithm according to the model positive training set and the model negative training set to obtain the dosage control model.

[0072] For the specific definition of the precise dosing control system for phosphorus removal agents, please refer to the definition of the precise dosing control method for phosphorus removal agents mentioned above, which will not be repeated here. Each module in the precise dosing control system for phosphorus removal agents can be implemented in whole or in part by software, hardware and a combination thereof. Each of the above modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.

[0073] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig. 9 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for accurately controlling the addition of a dephosphorization agent is implemented.

[0074] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: Obtain water quality parameters, and calculate the initial dosage unit consumption of the reagent based on the water quality parameters and the preset initial dosage unit consumption calculation formula; Obtain the inlet flow data and the return flow data, and calculate the standard dosage of the reagent based on the initial dosage unit consumption, the inlet flow data and the return flow data; Generate a reagent dosing instruction based on the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time. According to the change of orthophosphate concentration, analyze and adjust the initial dosage unit consumption to obtain the standard dosage unit consumption of the reagent at different dosing points; The standard dosage of the reagent and the standard unit consumption of the reagent are input into a preset dosage control model to generate a dosage control strategy, and the dosage device is controlled to perform dosage according to the dosage control strategy.

[0075] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: Obtain water quality parameters, and calculate the initial dosage unit consumption of the reagent based on the water quality parameters and the preset initial dosage unit consumption calculation formula; Obtain the inlet flow data and the return flow data, and calculate the standard dosage of the reagent based on the initial dosage unit consumption, the inlet flow data and the return flow data; Generate a reagent dosing instruction based on the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time. According to the change of orthophosphate concentration, analyze and adjust the initial dosage unit consumption to obtain the standard dosage unit consumption of the reagent at different dosing points; The standard dosage of the reagent and the standard unit consumption of the reagent are input into a preset dosage control model to generate a dosage control strategy, and the dosage device is controlled to perform dosage according to the dosage control strategy.

[0076] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0077] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.

[0078] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for accurately controlling the addition of a phosphorus removal agent, characterized in that: The precise dosing control method of the phosphorus removal agent comprises: Obtaining water quality parameters, and calculating the initial dosage unit consumption of the reagent according to the water quality parameters and a preset initial dosage unit consumption calculation formula; Acquire water inlet flow data and return flow data, and calculate the standard dosage of the reagent according to the initial dosage unit consumption, the water inlet flow data and the return flow data; Generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and obtain the orthophosphate concentration at the dosing point in real time, analyze and adjust the initial dosage unit consumption according to the change of the orthophosphate concentration, and obtain the standard dosage unit consumption of the reagent at different dosing points; The standard dosage of the reagent and the standard dosage unit consumption of the reagent are input into a preset dosage control model to generate a dosage control strategy, and the dosage device is controlled to perform dosage according to the dosage control strategy.

2. The method for controlling the precise addition of phosphorus removal agents according to claim 1, characterized in that: The obtaining of water quality parameters and calculating the initial dosage unit consumption of the reagent according to the water quality parameters and a preset initial dosage unit consumption calculation formula specifically includes: Obtaining inlet total phosphorus concentration data, outlet total phosphorus concentration data and biological pool phosphorus removal effect data as the water quality parameters; According to the preset initial dosage unit consumption calculation formula Calculate the initial dosage unit consumption of the agent, where D0 is the initial dosage unit consumption of the agent, C in is the total phosphorus concentration data of the influent, C out is the effluent total phosphorus concentration data, C bio is the phosphorus removal effect data of the biological pool, and A is the preset dosage parameter.

3. The method for controlling the precise addition of phosphorus removal agents according to claim 1, characterized in that: The obtaining of the inlet flow data and the return flow data, and calculating the standard dosage of the reagent according to the initial dosage unit consumption, the inlet flow data and the return flow data, specifically includes: The initial dosage unit consumption, the water inlet flow data and the return flow data are input into the preset dosage calculation formula. , get the standard dosage of the agent, where D total is the standard dosage of the agent, Q in is the water inlet flow rate, Q rec is the reflux flow rate.

4. The method for controlling the precise addition of phosphorus removal agents according to claim 1, characterized in that: The analyzing and adjusting the initial dosage unit consumption according to the change of the orthophosphate concentration to obtain the standard dosage unit consumption of the agent at different dosage points specifically includes: Calculating the phosphorus removal effect data of the agent within a preset time according to the change of the orthophosphate concentration; The phosphorus removal effect data of the agent is compared with the preset phosphorus removal effect curve of the agent, and the initial dosage unit consumption is adjusted step by step according to the comparison result; Calculate the adjusted data of the agent phosphorus removal effect. When the adjusted data of the agent phosphorus removal effect reaches the peak point of the preset agent phosphorus removal effect curve, obtain the adjusted initial dosage unit consumption corresponding to the adjusted data of the agent phosphorus removal effect, and obtain the standard dosage unit consumption of the agent at different dosage points.

5. The method for controlling the precise addition of phosphorus removal agents according to claim 4, characterized in that: The step of comparing the phosphorus removal effect data of the agent with a preset phosphorus removal effect curve of the agent, and adjusting the initial dosage unit consumption step by step according to the comparison result, specifically includes: When the agent phosphorus removal effect data does not reach the peak point of the preset agent phosphorus removal effect curve, gradually increasing the initial dosage unit consumption; When the agent phosphorus removal effect data reaches the peak point of the preset agent phosphorus removal effect curve, the initial dosage unit consumption is gradually reduced.

6. The method for controlling the precise addition of phosphorus removal agents according to claim 5, characterized in that: The calculated adjusted agent phosphorus removal effect adjustment data, when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve, obtains the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data, and obtains the agent standard dosage unit consumption at different dosage points, specifically including: According to the step-by-step increased initial dosage unit consumption, when the agent phosphorus removal effect adjustment data reaches the peak point of the preset agent phosphorus removal effect curve, the adjusted initial dosage unit consumption corresponding to the agent phosphorus removal effect adjustment data is obtained; According to the initial dosage unit consumption after step-by-step reduction, when the adjustment data of the agent phosphorus removal effect is lower than the peak point of the preset agent phosphorus removal effect curve, the adjustment data of the agent phosphorus removal effect of the previous level after the reduction is obtained, and the adjusted initial dosage unit consumption corresponding to the adjustment data of the agent phosphorus removal effect of the previous level after the reduction is obtained.

7. The method for controlling the precise addition of phosphorus removal agents according to claim 1, characterized in that: The construction of the dosing control model specifically includes: Obtaining historical standard dosage of reagents, historical standard dosage unit consumption of reagents and their corresponding historical water quality data, historical purified water quality data and historical dosing pump data, and when the historical purified water quality data reaches a preset water quality standard, classifying water pollution according to the historical water quality data to obtain different pollution classification groups; According to different pollution classification groups, a model positive training set is generated for the historical standard dosage of the reagent, the historical standard dosage unit consumption of the reagent, and the historical dosage pump data corresponding to the historical water quality data, and the historical standard dosage of the reagent, the historical standard dosage unit consumption of the reagent, and the historical dosage pump data corresponding to the historical water quality data that meets the preset water quality standard are packaged as a model negative training set; The preset machine learning algorithm is iteratively trained positively and negatively according to the model positive training set and the model negative training set to obtain the dosage control model.

8. A precise dosing control system for phosphorus removal agents, characterized in that: The precise dosing control system for phosphorus removal agent comprises: An initial unit consumption calculation module is used to obtain water quality parameters and calculate the initial dosage unit consumption of the agent according to the water quality parameters and a preset initial dosage unit consumption calculation formula; A standard dosage calculation module is used to obtain the inlet flow data and the return flow data, and calculate the standard dosage of the agent according to the initial dosage unit consumption, the inlet flow data and the return flow data; A standard unit consumption calculation module is used to generate a reagent dosing instruction according to the standard dosage of the reagent and the initial dosage unit consumption, and to obtain the orthophosphate concentration at the dosing point in real time, and to analyze and adjust the initial dosage unit consumption according to the change of the orthophosphate concentration, so as to obtain the standard dosage unit consumption of the reagent at different dosing points; The dosing strategy generation module is used to input the standard dosage of the agent and the standard dosage unit consumption of the agent into a preset dosing control model, generate a dosing control strategy, and control the dosing device to perform dosing according to the dosing control strategy.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method for accurately controlling the addition of phosphorus removal agents as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for accurately controlling the addition of phosphorus removal agents as described in any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Precise phosphorus removal control method for efficient sedimentation tank based on magnetizing medium

    CN120172525A

  • A precise phosphorus removal control method based on an efficient sedimentation tank with a magnetic medium

    CN120172525B

  • Water treatment agent adding method and system

    CN121063620A