Method and device for adjusting building structure chart based on evacuation line

By determining the safe exit on the building structure drawing, dividing the area, generating evacuation lines and adjusting the structural drawing, the problem of not being closely related to the design of the building structure drawing is solved, the efficiency and scientificity of the design are improved, and the evacuation passage is ensured. Rationality and safety.

CN119066739APending Publication Date: 2024-12-03CHENGDU XUMI YUNTU ARCHITECTURAL DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411030121.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The design of evacuation lines and building structural drawings has not been closely linked in the prior art, resulting in the unreasonable building structural drawings.

Method used

By obtaining the safe exits on the building structure diagram, dividing the area, determining the furthest evacuation point, generating an evacuation line, and adjusting the structural diagram according to the length of the evacuation line and the preset length to ensure the rationality of the evacuation passage.

Benefits of technology

The design efficiency and scientificity of the building structure drawings have been optimized to ensure the rationality and safety of evacuation passages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119066739A_ABST
    Figure CN119066739A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of buildings, and provides a method and device for adjusting a building structure chart based on an evacuation line. The method comprises the following steps: determining all emergency exits of a target building on a structure chart; dividing the target building into a plurality of areas on the structure chart according to the emergency exits; according to the emergency exits corresponding to all the areas, the farthest evacuation points in all the areas are determined on the structure chart according to evacuation channel design rules; based on the emergency exit corresponding to each area and the farthest evacuation point in the area, generating an evacuation line of each area on the structure chart, and calculating the length of the evacuation line of each area; determining a preset length corresponding to an evacuation channel in the target building according to the building category of the target building; and adjusting the structure chart based on the length of the evacuation line of each region and a preset length. By means of the technical means, the problem that in the prior art, the design of the evacuation line and the design of the building structure chart are not closely connected together, and consequently the designed building structure chart is unreasonable is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building technology, and in particular to a method and device for adjusting a building structure drawing based on an evacuation line. Background Art

[0002] An evacuation passage refers to a path for people to evacuate safely to a safe area. In architectural design, the design and planning of evacuation passages are crucial because they are directly related to the safety of people's lives in emergency situations. Designing an evacuation passage corresponds to drawing an evacuation line on the building structure drawing, and the evacuation line represents the evacuation passage. At present, the evacuation line is drawn after the building structure drawing is designed, and the design of the evacuation line and the building structure drawing are not closely linked together. In traditional technology, if the evacuation line is found to be unqualified after drawing, the evacuation line is redrawn by opening more safety exits. In fact, this method is not reasonable. The design of the evacuation line and the building structure drawing should be linked together, and the building structure drawing should be adjusted in time based on the evacuation line, but there is no corresponding method at present. Summary of the invention

[0003] In view of this, the embodiments of the present application provide a method, device, electronic device and computer-readable storage medium for adjusting a building structure drawing based on an evacuation line, so as to solve the problem in the prior art that the design of the evacuation line and the building structure drawing is not closely linked together, resulting in an unreasonable designed building structure drawing.

[0004] In a first aspect of an embodiment of the present application, a method for adjusting a building structural diagram based on an evacuation line is provided, comprising: obtaining a structural diagram of a designed target building, and determining all safety exits of the target building on the structural diagram; dividing the target building into multiple areas on the structural diagram according to each safety exit, wherein one safety exit corresponds to one area; determining the farthest evacuation point in each area on the structural diagram according to the safety exits corresponding to each area and the evacuation passage design rules; generating evacuation lines for each area on the structural diagram based on the safety exits corresponding to each area and the farthest evacuation point in the area, and calculating the length of the evacuation line for each area, wherein each evacuation line corresponds to an evacuation passage; determining a preset length corresponding to the evacuation passage in the target building according to the building category of the target building; and adjusting the structural diagram based on the length of the evacuation line of each area and the preset length.

[0005] According to a second aspect of an embodiment of the present application, there is provided a device for adjusting a building structural diagram based on an evacuation line, comprising: an acquisition module configured to acquire a structural diagram of a designed target building, and determine all safety exits of the target building on the structural diagram; a division module configured to divide the target building into a plurality of areas on the structural diagram according to each safety exit, wherein one safety exit corresponds to one area; a first determination module configured to determine the farthest evacuation point in each area on the structural diagram according to the safety exit corresponding to each area and the evacuation passage design rule; a generation module configured to generate evacuation lines for each area on the structural diagram based on the safety exit corresponding to each area and the farthest evacuation point in the area, and calculate the length of the evacuation line for each area, wherein each evacuation line corresponds to an evacuation passage; a second determination module configured to determine a preset length corresponding to the evacuation passage in the target building according to the building category of the target building; and an adjustment module configured to adjust the structural diagram based on the length of the evacuation line of each area and the preset length.

[0006] According to a third aspect of an embodiment of the present application, an electronic device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the computer program.

[0007] According to a fourth aspect of an embodiment of the present application, a computer-readable storage medium is provided, which stores a computer program, and when the computer program is executed by a processor, the steps of the above method are implemented.

[0008] Compared with the prior art, the embodiments of the present application have the following beneficial effects: obtaining the structural diagram of the designed target building, and determining all the safety exits of the target building on the structural diagram; dividing the target building into multiple areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area; determining the farthest evacuation point in each area on the structural diagram according to the safety exit corresponding to each area and the evacuation passage design rules; generating evacuation lines for each area on the structural diagram based on the safety exit corresponding to each area and the farthest evacuation point in the area, and calculating the length of the evacuation line for each area, wherein each evacuation line corresponds to an evacuation passage; determining the preset length corresponding to the evacuation passage in the target building according to the building category of the target building; adjusting the structural diagram based on the length of the evacuation line of each area and the preset length. The above technical means can solve the problem in the prior art that the design of the evacuation line and the building structural diagram is not closely linked together, resulting in an unreasonable designed building structural diagram, and then optimize the building structural diagram based on the evacuation line, thereby improving the efficiency and scientificity of the design of the building structural diagram. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0010] Figure 1 It is a flow chart of a method for adjusting a building structure diagram based on an evacuation line provided in an embodiment of the present application;

[0011] Figure 2 It is a flowchart of a method for generating evacuation lines for various areas provided in an embodiment of the present application;

[0012] Figure 3 It is a structural schematic diagram of a device for adjusting a building structure diagram based on an evacuation line provided in an embodiment of the present application;

[0013] Figure 4 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0014] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0015] A method and device for adjusting a building structure diagram based on an evacuation line according to an embodiment of the present application will be described in detail below with reference to the accompanying drawings.

[0016] Figure 1 It is a flow chart of a method for adjusting a building structure diagram based on evacuation lines provided in an embodiment of the present application. Figure 1 The method for adjusting the building structure drawing based on the evacuation line can be executed by a computer or a server, or software on the computer or the server. Figure 1 As shown, the method for adjusting the building structure diagram based on the evacuation line includes:

[0017] S101, obtaining a structural diagram of a designed target building, and determining all safety exits of the target building on the structural diagram;

[0018] S102, dividing the target building into a plurality of areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area;

[0019] S103, according to the safety exits corresponding to each area, determine the farthest evacuation point in each area on the structural diagram according to the evacuation channel design rules;

[0020] S104, generating evacuation lines for each area on the structural diagram based on the safety exits corresponding to each area and the farthest evacuation point in the area, and calculating the length of the evacuation lines for each area, wherein each evacuation line corresponds to an evacuation passage;

[0021] S105, determining a preset length corresponding to an evacuation passage in the target building according to the building type of the target building;

[0022] S106, adjusting the structure diagram based on the length of the evacuation line of each area and the preset length.

[0023] Generally, in order to ensure the safety of personnel, a building needs to be equipped with multiple safety exits. The target building can be divided into multiple areas on the structural diagram according to one safety exit corresponding to an area. Because it is necessary to ensure that personnel at any position in each area can reach the evacuation channel in time when danger occurs, the farthest evacuation point and safety exit of each area cover the maximum distance in the area as much as possible (a rectangular area, whose diagonal is the maximum distance within it) while meeting the evacuation channel design rules. The farthest evacuation point and safety exit are used as the two endpoints of the evacuation line to obtain the evacuation line of each area. After obtaining the evacuation line of each area, the length of the evacuation line of each area can be calculated. Each building category corresponds to a preset length, and the preset length corresponding to the evacuation channel in the target building is determined according to the building category of the target building. The structural diagram is optimized according to the length of the evacuation line of each area and the preset length.

[0024] According to the technical solution provided in the embodiment of the present application, the structural diagram of the designed target building is obtained, and all the safety exits of the target building are determined on the structural diagram; the target building is divided into multiple areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area; according to the safety exit corresponding to each area, the farthest evacuation point in each area is determined on the structural diagram according to the evacuation passage design rules; based on the safety exit corresponding to each area and the farthest evacuation point in the area, the evacuation line of each area is generated on the structural diagram, and the length of the evacuation line of each area is calculated, wherein each evacuation line corresponds to an evacuation passage; according to the building category of the target building, the preset length corresponding to the evacuation passage in the target building is determined; the structural diagram is adjusted based on the length of the evacuation line of each area and the preset length. The above-mentioned technical means can solve the problem in the prior art that the design of the evacuation line and the building structure diagram is not closely linked together, resulting in an unreasonable designed building structure diagram, and then optimize the building structure diagram based on the evacuation line, and improve the efficiency and scientificity of the design of the building structure diagram.

[0025] Furthermore, the structure diagram is adjusted based on the length of the evacuation lines of each area and the preset length, including: determining whether the length of the evacuation lines of each area is less than the preset length; when the length of the evacuation lines of each area is less than the preset length, determining that the structure diagram is qualified, and generating labels for each evacuation line; when there are areas where the length of the evacuation lines is greater than or equal to the preset length, determining that the structure diagram is unqualified; when the number of areas where the length of the evacuation lines is greater than or equal to the preset length is less than a preset number, adjusting the areas where the length of the evacuation lines is greater than or equal to the preset length in the structure diagram, so that the length of the evacuation lines in the area after adjustment is less than the preset length; when the number of areas where the length of the evacuation lines is greater than or equal to the preset length is greater than or equal to a preset number, redesigning the structure diagram.

[0026] If the length of the evacuation passage is too long (the length of the evacuation passage is the length of the evacuation line), personnel will not be able to reach the safe area through the evacuation passage in time when danger occurs, so the length of the evacuation line in each area needs to be less than the preset length. If the length of the evacuation line in each area is less than the preset length, the structure diagram is qualified, and labels for each evacuation line are generated. The labels include the length of the evacuation line and the number of the evacuation passage. If there are areas where the length of the evacuation line is greater than or equal to the preset length, the structure diagram is determined to be unqualified. Assume that the number of areas where the length of the evacuation line is greater than or equal to the preset length is 5, and the preset number is 3, which means that there are too many unqualified areas and the structure diagram needs to be redesigned. If the number of areas where the length of the evacuation line is greater than or equal to the preset length is 2, the areas where the length of the evacuation line is greater than or equal to the preset length can be adjusted, and there is no need to redesign the structure diagram.

[0027] Furthermore, in the structural diagram, an area where the length of the evacuation line is greater than or equal to a preset length is adjusted so that the length of the evacuation line in the area after adjustment is less than the preset length, comprising: adjusting the area where the length of the evacuation line is greater than or equal to the preset length in one or more of the following ways: reducing the number of building structures that hinder the flow of people in the area; reducing the number of corners that require turning in the area; reducing the turning radius of the corners in the area; reducing the depth of the area.

[0028] The evacuation line is the line between the emergency exit and the farthest evacuation point. If the number of building structures that hinder the flow of people in the area is reduced, the length of the evacuation line can be reduced. If the number of corners that need to be turned in the area is reduced, the length of the evacuation line can also be reduced. If the turning radius of the corners in the area is reduced, the length of the evacuation line can also be reduced. If the depth of the area is reduced, the length of the evacuation line can also be reduced.

[0029] Furthermore, the target building is divided into multiple areas according to each safety exit on the structural diagram, including: estimating the population density distribution of the target building; dividing the target building into multiple areas according to each safety exit and population density distribution on the structural diagram; wherein, the greater the population density of an area, the smaller the area of ​​the area.

[0030] The population density distribution of the target building can be estimated based on the building type of the target building and the number of people around it. For example, if a shopping mall is built in a city, the population density distribution of different areas of the mall can be estimated before the mall is built. Because in dangerous moments, the number of people that can pass through a safety exit is limited, and a safety exit corresponds to a safety passage. If too many people retreat from the same safety passage, it may cause congestion and be unfavorable for everyone to evacuate. The ideal situation is that the number of people retreating from each safety passage is the same, so that each safety passage can be maximized, so the product of the population density and area of ​​an area should be as close as possible.

[0031] Furthermore, based on the safety exits corresponding to each area, the farthest evacuation point in each area is determined on the structural diagram according to the evacuation channel design rules, including: for each area: the number of obstacles between the safety exit and the farthest evacuation point is less than a first number; the number of corners between the safety exit and the farthest evacuation point is less than a second number; the distance between the safety exit and the farthest evacuation point is less than or equal to the maximum distance but greater than a preset ratio of the maximum distance.

[0032] Because in order to ensure that everyone can evacuate safely, the evacuation line formed by the safety exit and the farthest evacuation point should cover the maximum distance of the area as much as possible. In addition, factors such as the number of obstacles between the safety exit and the farthest evacuation point (the number of obstacles on the evacuation line) and the number of corners between the safety exit and the farthest evacuation point (the number of corners on the evacuation line) must be considered. Therefore, the distance between the safety exit and the farthest evacuation point (the length of the evacuation line) should be between the preset ratio of the maximum distance and the maximum distance. The maximum distance of the area is the maximum distance between the safety exit and all positions in the area. The fewer the number of obstacles and corners on the evacuation line, the better, and the longer the evacuation line, the better. An evacuation line can be obtained from any position of the safety exit and the area, and the optimal evacuation line is selected according to the evacuation channel design.

[0033] Figure 2 FIG. 1 is a flow chart of a method for generating evacuation lines for each area provided in an embodiment of the present application. Figure 2 As shown, the method includes:

[0034] Execute the following loop:

[0035] S201, determining whether i is greater than N, where i is the serial number of the region, the initial value of i is 1, and N is the number of regions;

[0036] S202, when i is greater than N, it is determined that evacuation lines of all areas have been generated, and the loop ends;

[0037] S203, when i is less than or equal to N, generating an evacuation line for the i-th area on the structure diagram based on the safety exit corresponding to the i-th area and the farthest evacuation point in the i-th area;

[0038] S204, obtaining the coordinates of the safety exit corresponding to the i-th area and the farthest evacuation point in the i-th area;

[0039] S205, calculating the length of the evacuation line of the i-th area based on the coordinates of the safety exit corresponding to the i-th area and the farthest evacuation point in the i-th area;

[0040] S206, update i with the value of i plus 1.

[0041] According to the sequence number of the area, the evacuation line of each area is generated in turn, and the length of the evacuation line of each area is calculated.

[0042] Furthermore, the preset length corresponding to the evacuation passage in the target building is determined according to the building category of the target building, including: when the building category of the target building is a commercial building, the preset length corresponding to the evacuation passage in the target building is determined to be a first length; when the building category of the target building is an ordinary residence, the preset length corresponding to the evacuation passage in the target building is determined to be a second length; when the building category of the target building is an educational building, the preset length corresponding to the evacuation passage in the target building is determined to be a third length; when the building category of the target building is an office building, the preset length corresponding to the evacuation passage in the target building is determined to be a fourth length; when the building category of the target building is a medical building, the preset length corresponding to the evacuation passage in the target building is determined to be a fifth length; when the building category of the target building is an entertainment building, the preset length corresponding to the evacuation passage in the target building is determined to be a sixth length.

[0043] Commercial buildings: such as shops, shopping malls, vegetable markets, restaurants, canteens, hotels, etc. Ordinary residential buildings and dormitory buildings, etc. Educational buildings: such as nurseries, kindergartens, schools, etc. Office buildings: such as office buildings of government agencies and enterprises, etc. Medical buildings: such as hospitals, clinics, sanatoriums, etc. Entertainment buildings: such as cinemas, theaters, concert halls, cinemas, convention centers, exhibition halls, museums, etc. Different building types have different preset lengths for evacuation passages due to different personnel and population density.

[0044] All the above optional technical solutions can be arbitrarily combined to form optional embodiments of the present application, which will not be described one by one here.

[0045] The following is an embodiment of the device of the present application, which can be used to execute the embodiment of the method of the present application. For details not disclosed in the embodiment of the device of the present application, please refer to the embodiment of the method of the present application.

[0046] Figure 3 Schematic diagram of a device for adjusting a building structure diagram based on an evacuation line provided in an embodiment of the present application. Figure 3 As shown, the device for adjusting the building structure diagram based on the evacuation line includes:

[0047] The acquisition module 301 is configured to acquire a structural diagram of a designed target building and determine all the safety exits of the target building on the structural diagram;

[0048] The division module 302 is configured to divide the target building into a plurality of areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area;

[0049] The first determination module 303 is configured to determine the farthest evacuation point in each area on the structural diagram according to the safety exit corresponding to each area and the evacuation channel design rules;

[0050] The generating module 304 is configured to generate evacuation lines of each area on the structural diagram based on the safety exits corresponding to each area and the farthest evacuation point in the area, and calculate the length of the evacuation line of each area, wherein each evacuation line corresponds to an evacuation passage;

[0051] The second determination module 305 is configured to determine a preset length corresponding to an evacuation passage in a target building according to a building type of the target building;

[0052] The adjustment module 306 is configured to adjust the structure diagram based on the length of the evacuation line of each area and the preset length.

[0053] According to the technical solution provided in the embodiment of the present application, the structural diagram of the designed target building is obtained, and all the safety exits of the target building are determined on the structural diagram; the target building is divided into multiple areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area; according to the safety exit corresponding to each area, the farthest evacuation point in each area is determined on the structural diagram according to the evacuation passage design rules; based on the safety exit corresponding to each area and the farthest evacuation point in the area, the evacuation line of each area is generated on the structural diagram, and the length of the evacuation line of each area is calculated, wherein each evacuation line corresponds to an evacuation passage; according to the building category of the target building, the preset length corresponding to the evacuation passage in the target building is determined; the structural diagram is adjusted based on the length of the evacuation line of each area and the preset length. The above-mentioned technical means can solve the problem in the prior art that the design of the evacuation line and the building structure diagram is not closely linked together, resulting in an unreasonable designed building structure diagram, and then optimize the building structure diagram based on the evacuation line, and improve the efficiency and scientificity of the design of the building structure diagram.

[0054] In some embodiments, the adjustment module 306 is also configured to determine whether the length of the evacuation line of each area is less than a preset length; when the length of the evacuation line of each area is less than the preset length, the structural diagram is determined to be qualified and labels for each evacuation line are generated; when there are areas where the length of the evacuation line is greater than or equal to the preset length, the structural diagram is determined to be unqualified; when the number of areas where the length of the evacuation line is greater than or equal to the preset length is less than a preset number, the areas where the length of the evacuation line is greater than or equal to the preset length in the structural diagram are adjusted so that the length of the evacuation line of the area after adjustment is less than the preset length; when the number of areas where the length of the evacuation line is greater than or equal to the preset length is greater than or equal to the preset number, the structural diagram is redesigned.

[0055] If the length of the evacuation passage is too long (the length of the evacuation passage is the length of the evacuation line), personnel will not be able to reach the safe area through the evacuation passage in time when danger occurs, so the length of the evacuation line in each area needs to be less than the preset length. If the length of the evacuation line in each area is less than the preset length, the structure diagram is qualified, and labels for each evacuation line are generated. The labels include the length of the evacuation line and the number of the evacuation passage. If there are areas where the length of the evacuation line is greater than or equal to the preset length, the structure diagram is determined to be unqualified. Assume that the number of areas where the length of the evacuation line is greater than or equal to the preset length is 5, and the preset number is 3, which means that there are too many unqualified areas and the structure diagram needs to be redesigned. If the number of areas where the length of the evacuation line is greater than or equal to the preset length is 2, the areas where the length of the evacuation line is greater than or equal to the preset length can be adjusted, and there is no need to redesign the structure diagram.

[0056] In some embodiments, the adjustment module 306 is also configured to adjust the area where the length of the evacuation line is greater than or equal to a preset length in one or more of the following ways: reducing the number of building structures that hinder the flow of people in the area; reducing the number of corners that require turning in the area; reducing the turning radius of the corners in the area; reducing the depth of the area.

[0057] The evacuation line is the line between the emergency exit and the farthest evacuation point. If the number of building structures that hinder the flow of people in the area is reduced, the length of the evacuation line can be reduced. If the number of corners that need to be turned in the area is reduced, the length of the evacuation line can also be reduced. If the turning radius of the corners in the area is reduced, the length of the evacuation line can also be reduced. If the depth of the area is reduced, the length of the evacuation line can also be reduced.

[0058] In some embodiments, the division module 302 is further configured to estimate the population density distribution of the target building; divide the target building into multiple areas on the structural diagram according to each safety exit and population density distribution; wherein, the greater the population density of an area, the smaller the area of ​​the area.

[0059] The population density distribution of the target building can be estimated based on the building type of the target building and the number of people around it. For example, if a shopping mall is built in a city, the population density distribution of different areas of the mall can be estimated before the mall is built. Because in dangerous moments, the number of people that can pass through a safety exit is limited, and a safety exit corresponds to a safety passage. If too many people retreat from the same safety passage, it may cause congestion and be unfavorable for everyone to evacuate. The ideal situation is that the number of people retreating from each safety passage is the same, so that each safety passage can be maximized, so the product of the population density and area of ​​an area should be as close as possible.

[0060] In some embodiments, the first determination module 303 is also configured to, for each area: the number of obstacles between the safety exit and the farthest evacuation point is less than a first number; the number of corners between the safety exit and the farthest evacuation point is less than a second number; the distance between the safety exit and the farthest evacuation point is less than or equal to the maximum distance but greater than a preset ratio of the maximum distance.

[0061] Because in order to ensure that everyone can evacuate safely, the evacuation line formed by the safety exit and the farthest evacuation point should cover the maximum distance of the area as much as possible. In addition, factors such as the number of obstacles between the safety exit and the farthest evacuation point (the number of obstacles on the evacuation line) and the number of corners between the safety exit and the farthest evacuation point (the number of corners on the evacuation line) must be considered. Therefore, the distance between the safety exit and the farthest evacuation point (the length of the evacuation line) should be between the preset ratio of the maximum distance and the maximum distance. The maximum distance of the area is the maximum distance between the safety exit and all positions in the area. The fewer the number of obstacles and corners on the evacuation line, the better, and the longer the evacuation line, the better. An evacuation line can be obtained from any position of the safety exit and the area, and the optimal evacuation line is selected according to the evacuation channel design.

[0062] In some embodiments, the generation module 304 is also configured to execute the following loop: determine whether i is greater than N, where i is the serial number of the area, the initial value of i is 1, and N is the number of areas; when i is greater than N, determine that the evacuation lines of all areas have been generated, and end the loop; when i is less than or equal to N, generate the evacuation line of the i-th area on the structural diagram based on the safe exit corresponding to the i-th area and the farthest evacuation point in the i-th area; obtain the coordinates of the safe exit corresponding to the i-th area and the farthest evacuation point in the i-th area; calculate the length of the evacuation line of the i-th area based on the coordinates of the safe exit corresponding to the i-th area and the farthest evacuation point in the i-th area; update i with the value of i plus 1.

[0063] According to the sequence number of the area, the evacuation line of each area is generated in turn, and the length of the evacuation line of each area is calculated.

[0064] In some embodiments, the second determination module 305 is further configured to, when the building category of the target building is a commercial building, determine the preset length corresponding to the evacuation passage in the target building as a first length; when the building category of the target building is an ordinary residence, determine the preset length corresponding to the evacuation passage in the target building as a second length; when the building category of the target building is an educational building, determine the preset length corresponding to the evacuation passage in the target building as a third length; when the building category of the target building is an office building, determine the preset length corresponding to the evacuation passage in the target building as a fourth length; when the building category of the target building is a medical building, determine the preset length corresponding to the evacuation passage in the target building as a fifth length; when the building category of the target building is an entertainment building, determine the preset length corresponding to the evacuation passage in the target building as a sixth length.

[0065] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0066] Figure 4 Schematic diagram of an electronic device 4 provided in an embodiment of the present application. Figure 4 As shown, the electronic device 4 of this embodiment includes: a processor 401, a memory 402, and a computer program 403 stored in the memory 402 and executable on the processor 401. When the processor 401 executes the computer program 403, the steps in the above-mentioned method embodiments are implemented. Alternatively, when the processor 401 executes the computer program 403, the functions of the modules / units in the above-mentioned device embodiments are implemented.

[0067] The electronic device 4 may be a desktop computer, a notebook, a PDA, a cloud server, or other electronic device. The electronic device 4 may include, but is not limited to, a processor 401 and a memory 402. Those skilled in the art will appreciate that Figure 4 The electronic device 4 is merely an example and does not limit the electronic device 4 , and may include more or less components than those shown in the figure, or different components.

[0068] The processor 401 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0069] The memory 402 may be an internal storage unit of the electronic device 4, for example, a hard disk or memory of the electronic device 4. The memory 402 may also be an external storage device of the electronic device 4, for example, a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the electronic device 4. The memory 402 may also include both an internal storage unit and an external storage device of the electronic device 4. The memory 402 is used to store computer programs and other programs and data required by the electronic device.

[0070] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units.

[0071] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. The computer program may include computer program code, and the computer program code may be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable medium does not include electric carrier signals and telecommunication signals.

[0072] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for adjusting building structure drawings based on evacuation lines, It is characterized in that include: Obtaining a structural diagram of a designed target building, and determining all emergency exits of the target building on the structural diagram; Dividing the target building into a plurality of areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area; According to the safety exits corresponding to each area, the farthest evacuation point in each area is determined on the structural diagram according to the evacuation channel design rules; Based on the safety exits corresponding to each area and the farthest evacuation point in the area, an evacuation line of each area is generated on the structural diagram, and the length of the evacuation line of each area is calculated, wherein each evacuation line corresponds to an evacuation passage; Determining a preset length corresponding to an evacuation passage in the target building according to the building type of the target building; The structural diagram is adjusted based on the length of the evacuation lines of each area and the preset length.

2. The method according to claim 1, It is characterized in that Adjusting the structural diagram based on the length of the evacuation line of each area and the preset length includes: Determine whether the lengths of the evacuation lines of each area are less than the preset length; When the lengths of the evacuation lines of each area are less than the preset length, the structural diagram is determined to be qualified, and labels of each evacuation line are generated; When there is an area where the length of the evacuation line is greater than or equal to the preset length, it is determined that the structural diagram is unqualified; When the number of regions where the length of the evacuation line is greater than or equal to the preset length is less than the preset number, adjusting the region where the length of the evacuation line is greater than or equal to the preset length in the structural diagram so that the length of the evacuation line of the region after adjustment is less than the preset length; When the number of regions where the length of the evacuation lines is greater than or equal to the preset length is greater than or equal to the preset number, the structural diagram is redesigned.

3. The method according to claim 1, It is characterized in that Adjusting the length of the evacuation line in the structural diagram to a region greater than or equal to the preset length so that the length of the evacuation line in the region after adjustment is less than the preset length includes: The area where the length of the evacuation line is greater than or equal to the preset length is adjusted by one or more of the following methods: Reducing the number of structures that create obstacles to pedestrian movement in the area; Reduce the number of corners that require turning in the area; Reduce the turning radius of corners in this area; Reduce the depth of the area.

4. The method according to claim 1, It is characterized in that The target building is divided into multiple areas according to various safety exits on the structural diagram, including: estimating the population density distribution of the target building; Dividing the target building into a plurality of areas on the structural diagram according to each safety exit and the personnel density distribution; Among them, the greater the population density in an area, the smaller the area of ​​the area.

5. The method according to claim 1, It is characterized in that According to the safety exits corresponding to each area, the farthest evacuation point in each area is determined on the structural diagram according to the evacuation channel design rules, including: For each region: The number of obstacles between the emergency exit and the farthest evacuation point is less than the first number; The number of corners between the emergency exit and the farthest evacuation point is less than the second number; The distance between the safe exit and the farthest evacuation point is less than or equal to the maximum distance but greater than the preset ratio of the maximum distance.

6. The method according to claim 1, It is characterized in that Based on the safety exits corresponding to each area and the farthest evacuation point in the area, an evacuation line of each area is generated on the structural diagram, and the length of the evacuation line of each area is calculated, including: Execute the following loop: Determine whether i is greater than N, where i is the serial number of the region, the initial value of i is 1, and N is the number of regions; When i is greater than N, it is determined that the evacuation lines of all areas have been generated, and the loop ends; When i is less than or equal to N, an evacuation line of the i-th area is generated on the structural diagram based on the safety exit corresponding to the i-th area and the farthest evacuation point in the i-th area; Get the coordinates of the safe exit corresponding to the i-th area and the farthest evacuation point in the i-th area; Calculate the length of the evacuation line of the i-th area based on the coordinates of the safe exit corresponding to the i-th area and the farthest evacuation point in the i-th area; Update i with the value of i plus 1.

7. The method according to claim 1, It is characterized in that Determining a preset length corresponding to an evacuation passage in the target building according to the building type of the target building includes: When the building type of the target building is a commercial building, determining that the preset length corresponding to the evacuation passage in the target building is a first length; When the building type of the target building is an ordinary residence, determining that the preset length corresponding to the evacuation passage in the target building is a second length; When the building category of the target building is an educational building, determining that the preset length corresponding to the evacuation passage in the target building is a third length; When the building type of the target building is an office building, determining that the preset length corresponding to the evacuation passage in the target building is a fourth length; When the building category of the target building is a medical building, determining that the preset length corresponding to the evacuation passage in the target building is a fifth length; When the building type of the target building is an entertainment building, the preset length corresponding to the evacuation passage in the target building is determined to be the sixth length.

8. A device for adjusting a building structure diagram based on an evacuation line, It is characterized in that include: An acquisition module is configured to acquire a structural diagram of a designed target building and determine all safety exits of the target building on the structural diagram; a division module, configured to divide the target building into a plurality of areas according to each safety exit on the structural diagram, wherein one safety exit corresponds to one area; The first determination module is configured to determine the farthest evacuation point in each area on the structural diagram according to the safety exit corresponding to each area and the evacuation channel design rules; A generating module is configured to generate evacuation lines of each area on the structural diagram based on the safety exits corresponding to each area and the farthest evacuation point in the area, and calculate the length of the evacuation line of each area, wherein each evacuation line corresponds to an evacuation passage; A second determination module is configured to determine a preset length corresponding to an evacuation passage in the target building according to a building type of the target building; The adjustment module is configured to adjust the structural diagram based on the length of the evacuation line of each area and the preset length.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.