Pumped storage power station cost optimization analysis system
Through the cost optimization analysis system of pumped storage power stations, the problem of insufficient consideration of construction costs in pumped storage power station projects has been solved, scientific and reasonable investment decisions have been achieved, investment risks and blindly following the trend of investment, and the construction of power stations has been improved Reliability and efficiency.
Patent Information
- Application Number
- CN202411185254.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Some pumped storage power station projects do not fully consider and control the construction costs of power stations, resulting in blindly following the trend of investment and construction.
A pumped storage power station cost optimization analysis system was designed, including the power station operation and maintenance rate industry threshold calculation module, the proposed power station capacity electricity price prediction module and the proposed power station cost optimization analysis module. By collecting the capacity and electricity price of the pumped storage power station Verify the results and technical parameters, generate the industry threshold and capacity electricity price cost prediction structure chart, conduct cost optimization and evaluation, and analyze abnormal situations and causes in cost operations.
Effectively help make scientific and reasonable investment decisions, reduce investment risks, optimize power station construction costs, avoid blindly following trends, and improve the reliability and efficiency of investment and construction.
Smart Images

Figure CN119067260A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of cost analysis, and in particular relates to a cost optimization analysis system for a pumped storage power station. Background Art
[0002] At present, the planning and construction of pumped-storage power stations in my country has entered the fast lane. As of the end of 2021, the total resources of pumped-storage sites included in the plan in my country are about 814 million kilowatts, and the installed capacity that has been built and approved under construction has reached 170 million kilowatts, with huge potential for future development.
[0003] Policies related to the formation of pumped-storage prices and cost channeling are also being formulated and issued one after another. The relevant policies have approved the capacity electricity prices of some pumped-storage power stations in operation and to be put into operation, injecting strong impetus into the construction and development of pumped-storage power stations. The volume electricity prices stipulated in the relevant policies compensate for other costs and reasonable profits besides the pumping and operating costs, which can greatly reduce their investment risks and stimulate the investment and construction of pumped-storage power stations. However, it may also lead to some pumped-storage power station projects failing to fully consider and control the construction costs of the power stations, resulting in blind investment and construction. Summary of the invention
[0004] The purpose of the present invention is to provide a pumped storage power station cost optimization analysis system, aiming to solve the problem that some pumped storage power station projects do not fully consider and control the power station construction cost, resulting in blindly following the trend of investment and construction.
[0005] The present invention is implemented as follows: a pumped-storage power station cost optimization analysis system, the system includes a power station operation and maintenance rate industry threshold calculation module, a proposed power station capacity electricity price cost prediction module and a proposed power station cost optimization analysis module. When performing cost optimization analysis, the capacity of the pumped-storage power station, the electricity price verification results and technical parameters are collected, and the pumped-storage power station capacity, the electricity price verification results and technical parameters are imported into the power station operation and maintenance rate industry threshold calculation module to generate the power station operation and maintenance rate industry threshold. The proposed power station capacity electricity price cost prediction module generates a power station capacity electricity price cost prediction structure diagram through the pumped-storage power station capacity electricity price cost calculation formula, and the proposed power station cost optimization analysis module optimizes and evaluates the cost, and analyzes abnormal conditions and causes in cost operation.
[0006] Preferably, the technical parameters include at least the installed capacity of each power station, the total project investment, the loan interest rate and the repayment method.
[0007] Preferably, the calculation formula for the capacity electricity price cost of the pumped storage power station is:
[0008]
[0009] Where:
[0010] C 本 The capital investment is 20% of the total project investment C. 本 +C 贷 =C 投 ;
[0011] i and j are the loan repayment period and profit period respectively. The sum of the two is the power plant operation period, which is determined as 40 years. The loan repayment period is calculated as 25 years, and the profit period is calculated as 15 years.
[0012] is the loan principal and interest repaid in year i,
[0013] and The operating and maintenance costs in year i and year j are respectively. The annual operating and maintenance cost is calculated by the original value of fixed assets C 固 Multiplying the operation and maintenance rate rop, the original value of fixed assets is calculated based on the total project investment C 投 93% discount,
[0014] X i and X j is the average annual income between the i-th year and the j-th year. The average annual income is equal to the tax-free capacity price V multiplied by the installed capacity of the power station C, X = V × C;
[0015] Re is the residual value of fixed assets, depreciation cost C 折旧 It is included in the form of fixed asset residual value income, and the fixed asset residual value is included at 5% of the original value of the fixed asset. 折旧 =R e =C 固 ×5%=C 投 ×93%×5%;
[0016] and are the taxes and surcharges in year i and year j, including value-added tax, income tax, urban maintenance and construction tax, and education surcharge.
[0017] 6.5% is the internal rate of return of capital during the operating period.
[0018] Preferably, the power station operation and maintenance rate industry threshold value includes at least the industry operation and maintenance rate maximum value, minimum value and average value.
[0019] Preferably, the capacity electricity price cost prediction module of the proposed power station collects the technical parameters of the proposed pumped storage power station and the maximum and minimum values of the industry operation and maintenance rates, determines the constraints, solves the capacity electricity price cost calculation formula of the pumped storage power station, obtains the minimum and maximum values of the capacity electricity price cost prediction of the power station, and generates the capacity electricity price cost prediction structure diagram corresponding to the power station.
[0020] According to the formula,
[0021] C total =C capec (C,E)+C opex (O,R,S)
[0022] Calculate the capacity electricity price cost and generate the capacity electricity price cost forecast structure diagram, where C total is the total cost forecast of the power station, C capex (C, E) is the capital expenditure calculated based on the capacity C and the environmental impact consideration E. E is the environmental impact consideration of the power plant construction, including the carbon footprint and the cost of other environmental protection measures. C opex (O, R, S) is the operating expenditure calculated based on the operation and maintenance rate R, the operating parameter O and the safety factor S. S represents the additional cost related to safety, including the purchase of safety equipment and the cost of emergency preparedness.
[0023] Preferably, the percentage change of the total project investment or the change value of the operation and maintenance fee rate is imported into the proposed power station cost optimization analysis module, various constraints are determined, the capacity electricity price cost calculation formula of the pumped storage power station is solved, the optimized power station capacity electricity value and power station capacity electricity price cost value are obtained, and the electricity price difference is calculated.
[0024] Calculate the price difference according to the formula:
[0025]
[0026] Among them, ΔP is the difference in electricity price, C old is the original cost, ΔI cap is the percentage change of total investment, ΔI tech is the percentage increase in investment due to technological improvement, C om is the original operation and maintenance cost, C depr is the depreciation expense, reflecting the economic impact of equipment aging and replacement, ΔR om is the change in operation and maintenance fee rate, and Q is the annual electricity consumption.
[0027] Preferably, the cost optimization analysis is performed according to the formula:
[0028]
[0029] Calculate the optimized cost, where C initialis the initial construction cost of the power station, ΔP cap is the capacity adjustment percentage, reflecting the capacity adjustment caused by changes in market demand or technological progress. reg is the original electricity price verification result, ΔP reg is the electricity price adjustment value, reflecting the impact of policy changes or market price fluctuations, T eff and T reliab Represent the efficiency and reliability technical parameters of the power station, K eff and K reliab is the weight factor of the parameter, K total is the total weight.
[0030] Preferably, the power station operation and maintenance fee rate industry threshold is calculated according to the formula:
[0031] R threshold =
[0032] β0+β1′C+β2′P reg +β3·T eff +β4·T safe +β5·T env +β6·L
[0033] Calculate the industry threshold of operation and maintenance fee rate, where R threshold is the industry threshold of operation and maintenance fee rate, β0 is the constant term of regression model, β1, β2, β3, β4, β5, β6 are model coefficients, C is the capacity of pumped storage power station, P reg is the electricity price determination result, T eff is the technical parameter related to power station efficiency, T safe is the technical parameter related to power station safety, T env is the environmental impact parameter, which considers the impact of power plant operation on the surrounding environment, and L is the regulatory compliance level.
[0034] Preferably, the technical parameters are entered manually or imported through a source spreadsheet file.
[0035] Preferably, the source spreadsheet file can be excel, wps and matlab.
[0036] Preferably, the power station capacity electricity price cost forecast structure diagram is displayed via a bar chart or a pie chart.
[0037] Preferably, the technical parameters allow manual modification, and the modified technical parameters are saved back to the source table file or stored as a new source table file.
[0038] The pumped storage power station cost optimization analysis system provided by the present invention has the advantages of simple operation, clear principle, traceable parameter data, and diversified and intuitive display of result data. The data statistics cost is low, the data is reliable and easy to modify, and can be displayed continuously and gradually based on the latest data, which can effectively display the changing trend of the cost capacity curve. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 A flow chart of a power station operation and maintenance rate industry threshold value calculation module provided by an embodiment of the present invention;
[0040] Figure 2 A flow chart of a capacity electricity price cost prediction module for a proposed power station provided in an embodiment of the present invention;
[0041] Figure 3 A flow chart of a proposed power station cost optimization analysis module provided by an embodiment of the present invention;
[0042] Figure 4 A diagram of the architecture of a cost optimization analysis system for a proposed pumped storage power station provided in an embodiment of the present invention;
[0043] Figure 5 The cost prediction and optimization system architecture diagram of the proposed pumped storage power station provided by the embodiment of the present invention
[0044] Figure 6 A pie chart of capacity cost prediction results of a proposed pumped-storage power station provided in an embodiment of the present invention;
[0045] Figure 7 A bar chart of capacity cost prediction results of a proposed pumped-storage power station provided in an embodiment of the present invention;
[0046] Figure 8 A schematic diagram of capacity cost optimization analysis of a proposed pumped storage power station provided in an embodiment of the present invention;
[0047] Fig. 9 A schematic diagram of capacity cost optimization analysis of a proposed pumped-storage power station provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0049] It is understood that the terms "first", "second", etc. used in this application may be used herein to describe various elements, but unless otherwise specified, these elements are not limited by these terms. These terms are only used to distinguish a first element from another element. For example, without departing from the scope of this application, a first xx script may be referred to as a second xx script, and similarly, a second xx script may be referred to as a first xx script.
[0050] like Figure 1 , Figure 2 and Figure 3 As shown, a pumped-storage power station cost optimization analysis system provided by an embodiment of the present invention, the system includes a power station operation and maintenance rate industry threshold calculation module, a planned power station capacity electricity price cost prediction module and a planned power station cost optimization analysis module. When performing cost optimization analysis, the capacity of the pumped-storage power station, the electricity price verification results and technical parameters are collected, and the capacity of the pumped-storage power station, the electricity price verification results and technical parameters are imported into the power station operation and maintenance rate industry threshold calculation module to generate the power station operation and maintenance rate industry threshold. The planned power station capacity electricity price cost prediction module generates a power station capacity electricity price cost prediction structure diagram through the pumped-storage power station capacity electricity price cost calculation formula, and the cost is optimized and evaluated through the planned power station cost optimization analysis module, and the abnormal situation and causes in the cost operation are analyzed.
[0051] The cost optimization analysis, according to the formula,
[0052]
[0053] Calculate the optimized cost, where C initial is the initial construction cost of the power station, ΔP cap is the capacity adjustment percentage, reflecting the capacity adjustment caused by changes in market demand or technological progress. reg is the original electricity price verification result, ΔP reg is the electricity price adjustment value, reflecting the impact of policy changes or market price fluctuations, T eff and T reliab Represent the efficiency and reliability technical parameters of the power station, K eff and K reliab is the weight factor of the parameter, K total is the total weight.
[0054] The execution process is as follows:
[0055] First, adjust the power station capacity parameter C initial Multiply by an adjustment percentage ΔP related to market demand or technological progress cap , and then add the electricity price adjustment ΔP reg To reflect policy or market changes, the power plant efficiency T effand reliability T reliab The parameters are added to the calculation, considering their importance in the operation of the power station, and the corresponding weight factor K eff and K reliab Weighted,Finally, all costs and adjusted parameters are summed and divided by the total weight K total To obtain the optimized cost C opt ,In this way, we can examine in more detail how different factors jointly affect the ,total cost of a power station, and make more accurate cost ,optimization decisions accordingly.
[0056] The industry threshold of the power station operation and maintenance fee rate is as follows:
[0057] R threshold =
[0058] β0+β1·C+β2·P reg +β3·T eff +β4·T safe +β5·T env +β6·L
[0059] Calculate the industry threshold of operation and maintenance fee rate, where R threshold is the industry threshold of operation and maintenance fee rate, β0 is the constant term of regression model, β1, β2, β3, β4, β5, β6 are model coefficients, C is the capacity of pumped storage power station, P reg is the electricity price determination result, T eff is the technical parameter related to power station efficiency, T safe is the technical parameter related to power station safety, T env is the environmental impact parameter, which considers the impact of power plant operation on the surrounding environment, and L is the regulatory compliance level.
[0060] The execution process is as follows:
[0061] First, determine the specific values of each parameter, including power plant capacity C, electricity price verification result P, and efficiency T eff and safety safe Technical parameters, then add environmental impact parameters T env The two new parameters are used to enhance the predictive power and adaptability of the model, and then data collection and preprocessing are performed to fit the regression model. The model coefficients β0, β1, β2, β3, β4, β5, and β6 are fitted using historical data. Finally, the R threshold , in order to evaluate the industry threshold of the operation and maintenance rate of the power station. In this way, the model can more comprehensively consider the various factors affecting the operation and maintenance rate, and provide a scientific basis for formulating or adjusting the rate.
[0062] In this embodiment, the power station operation and maintenance fee rate industry threshold calculation module adopts the capacity electricity price verification results of N pumped storage power stations that have been put into operation, and establishes the pumped storage power station capacity electricity price cost calculation formula according to the operating period pricing method, and reversely deduces the power station operation and maintenance fee rate value range. The cost structure of the pumped storage capacity electricity price includes: capital investment, loan principal and interest, operation and maintenance fees, depreciation fees, taxes and surcharges, a total of 5 parts, respectively represented by symbols C 本 , C 贷 , C 运维 , C 折旧 , C 税 The calculation formula of capacity electricity price cost of pumped storage power station is as follows:
[0063]
[0064] Where:
[0065] C 本 As capital investment, according to the total project investment C 投 20% approved, C 本 +C 贷 =C 投 ;
[0066] i and j are the loan repayment period and profit period respectively. The sum of the two is the power plant operation period, which is determined as 40 years. The loan repayment period is calculated as 25 years, and the profit period is calculated as 15 years.
[0067] is the loan principal and interest repaid in year i,
[0068] and The operating and maintenance costs in year i and year j are respectively. The annual operating and maintenance cost is calculated by the original value of fixed assets C 固 Multiplying the operation and maintenance fee rate, the original value of fixed assets is calculated based on the total project investment C 投 93% discount,
[0069] X i and X j is the average annual income between the i-th year and the j-th year. The average annual income is equal to the capacity price V excluding tax multiplied by the installed capacity of the power station C, X = V × C;
[0070] Re is the residual value of fixed assets, depreciation cost C 折旧 It is recorded as fixed asset residual value income, and the fixed asset residual value is recorded at 5% of the original value of the fixed asset. 折旧 =R e =C 固 ×5%=C 投 ×93%×5%;
[0071] and are the taxes and surcharges in year i and year j, including value-added tax, income tax, urban maintenance and construction tax, and education surcharge.
[0072] 6.5% is the internal rate of return of capital during the operating period.
[0073] The specific implementation process of the above principle is as follows:
[0074] First, the capacity electricity price verification results of N pumped-storage power stations that are about to be put into operation are collected, as well as technical parameters such as installed capacity of each power station, total project investment, loan interest rate and repayment method.
[0075] Based on the published capacity electricity price verification results and the collected technical parameters, various constraints are determined and the capacity electricity price cost calculation formula of the pumped-storage power station is solved.
[0076] Get the operation and maintenance rate r of each power station op value, establish the industry threshold range of operation and maintenance fee rate [r op1 , r op2 ,…r opN ]
[0077] Get the maximum value of the industry operation and maintenance rate max rop 、Minimum value min rop and mean rop .
[0078] The capacity electricity price cost prediction module for the proposed power station adopts the capacity electricity price cost calculation formula for pumped-storage power stations, inputs technical parameters such as the installed capacity of the proposed power station, total project investment, loan term, loan interest rate, repayment method, depreciation rate, and the maximum and minimum values of the industry's operation and maintenance rates, obtains the capacity electricity price cost prediction value of the proposed power station, and forms a capacity electricity price cost prediction structure diagram for the power station.
[0079] The specific implementation process of the above principle is as follows:
[0080] First, we collect technical parameters such as installed capacity of the proposed pumped-storage power station, total project investment, loan term, loan interest rate, repayment method, depreciation rate, and the maximum and minimum industry operation and maintenance rates.
[0081] Determine various constraints and solve the cost calculation formula for the capacity electricity price of a pumped storage power station.
[0082] Get the predicted minimum value min X and maximum value max X of the capacity electricity price cost of the power station.
[0083] A capacity electricity price cost forecast structure diagram for the power station is formed.
[0084] According to the formula,
[0085] C total =C capex (C,E)+C opex (O,R,S)
[0086] Calculate the capacity electricity price cost and generate the capacity electricity price cost forecast structure diagram, where C total is the total cost forecast of the power station, C capex (C, E) is the capital expenditure calculated based on the capacity C and the environmental impact consideration E. E is the environmental impact consideration of the power plant construction, including the carbon footprint and the cost of other environmental protection measures. C opex (O, R, S) is the operating expenditure calculated based on the operation and maintenance rate R, the operating parameter O and the safety factor S. S represents the additional cost related to safety, including the purchase of safety equipment and the cost of emergency preparedness.
[0087] The execution process is as follows:
[0088] First, calculate the capital expenditure C capex This not only takes into account the cost of infrastructure and equipment C, but also the cost of environmental impact E, which can be based on the cost of environmental protection measures recommended in the project's environmental assessment report. Next, calculate the operating expenses C opex This includes standard operation and maintenance costs O and operation and maintenance rates R, and additionally considers safety measures costs S, which are assessed based on safety regulations and historical safety records in the area where the power station is located. Finally, random values of these costs are repeatedly generated through Monte Carlo simulation to create a probability distribution map of the costs. This kind of chart helps decision makers visualize the uncertainty and possible fluctuation range of cost forecasts, thereby more accurately conducting cost management and risk assessment.
[0089] The electricity price difference is calculated according to the formula:
[0090]
[0091] Calculate the price difference, where ΔP is the price difference, C old is the original cost, ΔI cap is the percentage change of total investment, ΔI tech is the percentage increase in investment due to technological improvement, C om is the original operation and maintenance cost, C depr is the depreciation expense, reflecting the economic impact of equipment aging and replacement, ΔR om is the change in operation and maintenance fee rate, and Q is the annual electricity consumption.
[0092] The execution process is as follows:
[0093] First, calculate the original electricity price P old for Then calculate the new cost C new , the original cost C old Adjusted to include changes in investment ΔI cap and technology improvement investment increase ΔI tech , then the operating maintenance cost C om Increase depreciation expense C depr To take into account the depreciation and renewal costs of the equipment, multiply it by the change in the operation and maintenance rate ΔR om Finally, these costs are allocated by the annual electricity quantity Q to obtain the new electricity price P new , and finally calculate the electricity price difference ΔP. This process takes into account all relevant changing factors in detail in order to more accurately predict the actual impact of cost changes on electricity prices.
[0094] In the cost optimization analysis module of the proposed power station, the power station can optimize and evaluate the cost by combining the sensitivity analysis of the two factors affecting the capacity electricity price cost, namely the total project investment and the operation and maintenance fee rate, analyze the abnormal situations and causes in the cost operation, grasp the law of cost changes, and fully tap the potential for reducing the capacity electricity price cost.
[0095] The specific implementation process of the above principle is as follows:
[0096] Enter the percentage change of total project investment I % or operation and maintenance fee rate change value r op %.
[0097] Determine various constraints and solve the cost calculation formula for the capacity electricity price of a pumped storage power station.
[0098] Get the power value of the power station capacity after optimization or
[0099] Get the optimized power plant capacity electricity price cost value or
[0100] Obtain the capacity electricity price and capacity electricity price cost difference of the power station before and after optimization or
[0101] According to the principles described in the content of the invention, the corresponding system development is carried out. The overall architecture of this system includes three parts: parameter input, capacity electricity price cost prediction and optimization calculation. Its architecture principle is as follows Figure 4 shown.
[0102] Among them, by clicking "Parameters of pumped-storage power stations that have been put into operation", you can enter and modify the parameters of the pumped-storage power stations that have been put into operation. The parameter entry is a way for the system to enter data manually or read data from source table files. The source table files can be excel, wps, matlab, etc. The parameter table of N pumped-storage power stations that have been put into operation is shown in Table 1. This system reads data as system variables.
[0103] The system can determine the table type and read the data, and display the data in the parameter input area. The data in the parameter input area can be modified manually. You can click "Add Row" to add a pumped storage power station, or "Reduce Row" to reduce a pumped storage power station. You can click "Save" to save the modified data back to the source table file, or save it as a new table file. Its system structure is as follows Figure 5 shown.
[0104] Table 1 Parameters of N pumped storage power stations that have been put into operation
[0105]
[0106] Click "Capacity Electricity Price Cost Forecast", and the system will calculate the capacity electricity price cost forecast result of the proposed pumped storage power station through the method described in the invention content. The display result can be displayed in a pie chart or a bar chart, which can be achieved by clicking different buttons. Figure 6 and Figure 7 shown.
[0107] Click the "Capacity Price Optimization Calculation" button to perform capacity price optimization analysis and calculation of the proposed pumped storage power station. After clicking the "Capacity Price Optimization Calculation" button, two scenario analysis factor buttons "Total Project Investment" and "Operation and Maintenance Rate" appear. Click "Add Scenario" or "Reduce Scenario" to add or delete scenarios.
[0108] For example, in this example, you can first click the "Total Project Investment" button, set up three scenarios respectively, and enter the following in the scenario name: Low scenario, the total project investment decreases by 5%, enter -5% in the change amount, click "Add scenario", and click the "Calculate" button to generate the calculation and analysis results of the first scenario; enter "Medium scenario, the total project investment decreases by 10%", enter -10% in the change amount, click "Add scenario", and click the "Calculate" button to generate the calculation and analysis results of the second scenario; you can also enter the amount of change in the total project investment as needed, and add scenarios and calculation results. The results are displayed in the display area, such as Figure 8 As shown, we can explore the impact of total project investment on capacity electricity price.
[0109] Similarly, the same operation can be performed on the operation and maintenance fee rate to explore the impact of the operation and maintenance fee rate on the capacity electricity price. Fig. 9 shown.
[0110] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.
[0111] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0112] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0113] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
[0114] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pumped storage power station cost optimization analysis system, characterized in that: The system includes a power station operation and maintenance rate industry threshold calculation module, a planned power station capacity electricity price cost prediction module and a planned power station cost optimization analysis module. When performing cost optimization analysis, the capacity, electricity price verification results and technical parameters of the pumped-storage power station are collected, and the capacity, electricity price verification results and technical parameters of the pumped-storage power station are imported into the power station operation and maintenance rate industry threshold calculation module to generate the power station operation and maintenance rate industry threshold. The planned power station capacity electricity price cost prediction module generates a power station capacity electricity price cost prediction structure diagram through the pumped-storage power station capacity electricity price cost calculation formula, and the planned power station cost optimization analysis module optimizes and evaluates the cost, and analyzes abnormal situations and causes in cost operation.
2. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The technical parameters include at least the installed capacity of each power station, the total project investment, the loan interest rate and the repayment method.
3. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The calculation formula for the capacity electricity price cost of the pumped storage power station is: Where: C 本 As capital investment, according to the total project investment C 投 20% approved, C 本 +C 贷 =C 投 ; i and j are the loan repayment period and profit period respectively. The sum of the two is the power plant operation period, which is determined as 40 years. The loan repayment period is calculated as 25 years, and the profit period is calculated as 15 years. is the loan principal and interest repaid in year i, and The operating and maintenance costs in year i and year j are respectively. The annual operating and maintenance cost is calculated by the original value of fixed assets C 固 Multiplying the operation and maintenance fee rate, the original value of fixed assets is calculated based on the total project investment C 投 93% discount, X i and X j is the average annual income between the i-th year and the j-th year. The average annual income is equal to the tax-free capacity price V multiplied by the installed capacity of the power station C, X = V × C; Re is the residual value of fixed assets, depreciation cost C 折旧 It is included in the form of fixed asset residual value income, and the fixed asset residual value is included at 5% of the original value of the fixed asset. 折旧 =R e =C 固 ×5%=C 投 ×93%×5%; and are the taxes and surcharges in year i and year j, including value-added tax, income tax, urban maintenance and construction tax, and education surcharge. 6.5% is the internal rate of return of capital during the operating period.
4. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The power station operation and maintenance fee industry threshold value includes at least the industry operation and maintenance fee maximum value, minimum value and average value.
5. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The capacity electricity price cost prediction module of the proposed power station collects the technical parameters of the proposed pumped storage power station and the maximum and minimum values of the industry operation and maintenance rates, determines the constraints, solves the capacity electricity price cost calculation formula of the pumped storage power station, obtains the minimum and maximum values of the capacity electricity price cost prediction of the power station, and generates the capacity electricity price cost prediction structure diagram corresponding to the power station. According to the formula, C total =C capex (C,E)+C opex (O,R,S) Calculate the capacity electricity price cost and generate the capacity electricity price cost forecast structure diagram, where C total is the total cost forecast of the power station, C capex (C, E) is the capital expenditure calculated based on the capacity C and the environmental impact consideration E. E is the environmental impact consideration of the power plant construction, including the carbon footprint and the cost of other environmental protection measures. C opex (O, R, S) is the operating expenditure calculated based on the operation and maintenance rate R, the operating parameter O and the safety factor S. S represents the additional cost related to safety, including the purchase of safety equipment and the cost of emergency preparedness.
6. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: Import the percentage change of total project investment or the change value of operation and maintenance rate into the proposed power station cost optimization analysis module, determine various constraints, solve the capacity electricity price cost calculation formula of pumped storage power station, obtain the optimized power station capacity electricity value and power station capacity electricity price cost value, and calculate the price difference. The electricity price difference is calculated according to the formula: Among them, ΔP is the difference in electricity price, C old is the original cost, ΔI cap is the percentage change of total investment, ΔI tech is the percentage increase in investment due to technological improvement, C om is the original operation and maintenance cost, C depr is the depreciation expense, reflecting the economic impact of equipment aging and replacement, ΔR om is the change in operation and maintenance fee rate, and Q is the annual electricity consumption.
7. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: Technical parameters are entered manually or imported through source spreadsheet files. The source spreadsheet files can be Excel, WPS and Matlab.
8. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The power station capacity electricity price cost forecast structure diagram is displayed through a bar chart or a pie chart, and the technical parameters allow manual modification. The modified technical parameters are saved back to the source table file or stored as a new source table file.
9. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The cost optimization analysis, according to the formula, Calculate the optimized cost, where C initial is the initial construction cost of the power station, ΔP cap is the capacity adjustment percentage, reflecting the capacity adjustment caused by changes in market demand or technological progress. reg is the original electricity price verification result, ΔP reg is the electricity price adjustment value, reflecting the impact of policy changes or market price fluctuations, T eff and T reliab Represent the efficiency and reliability technical parameters of the power station, K eff and K reliab is the weight factor of the parameter, K total is the total weight.
10. The pumped storage power station cost optimization analysis system according to claim 1, characterized in that: The industry threshold of the power station operation and maintenance fee rate is as follows: R threshold = β0+β1·C+β2·P reg +β3·T eff +β4·T safe +β5·T env +β6·L Calculate the industry threshold of operation and maintenance fee rate, where R threshold is the industry threshold of operation and maintenance fee rate, β0 is the constant term of regression model, β1, β2, β3, β4, β5, β6 are model coefficients, C is the capacity of pumped storage power station, P reg is the electricity price determination result, T eff is the technical parameter related to power station efficiency, T safe is the technical parameter related to power station safety, T env is the environmental impact parameter, which considers the impact of power plant operation on the surrounding environment, and L is the regulatory compliance level.
Citation Information
Patent Citations
Electricity price pricing method of pumped storage power station
CN112308606A
Pumped storage power station unit proportion division method and device and medium
CN117574188A
Project economic analysis system and method based on net present value method
WO2023273207A1