Scientific and technological achievement transfer and transformation evaluation method and system

By obtaining and quantifying the scientific and technological innovation log information and combining the scientific and technological transformation evaluation system indicators for evaluation, the problem of lack of quantitative evaluation in traditional evaluation has been solved, and more objective and accurate evaluation of transfer and transformation of scientific and technological achievements has been achieved, and the utilization rate of scientific and technological achievements has been improved.

CN119067323APending Publication Date: 2024-12-03JIANGXI SHUOBO TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411548126.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-01
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

There is a lack of quantitative evaluation in the evaluation process of transfer and transformation of traditional scientific and technological achievements, resulting in deviations in evaluation results.

Method used

By obtaining science and technology innovation log information, performing quantitative processing, evaluating work information based on science and technology transfer evaluation system indicators, generating scoring information, and recommending scientific and technological achievements transformation resources based on scoring information.

Benefits of technology

It improves the objectivity and accuracy of the evaluation, avoids the influence of subjective factors in qualitative analysis, ensures the comprehensiveness and accuracy of the evaluation results, improves the utilization rate of scientific and technological achievements, and reduces idle resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067323A_ABST
    Figure CN119067323A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of scientific and technological achievement evaluation, and particularly relates to a scientific and technological achievement transfer and transformation evaluation method and system. Quantifying the medical and invasive log information to obtain work information; evaluating the work information according to the indexes of the medical transfer evaluation system to obtain score information corresponding to the work information; and based on the scoring information, recommending the scientific and technological achievement conversion resources to a user terminal corresponding to the scoring information. The scientific and technological achievement transfer and transformation evaluation method can solve the problem that in the traditional scientific and technological achievement transfer and transformation evaluation process, qualitative analysis is often emphasized, quantitative evaluation on the actual application effect is lacked, and consequently the evaluation result deviates.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of scientific and technological achievement evaluation, and in particular, relates to a method and system for evaluating the transfer and transformation of scientific and technological achievements. Background Art

[0002] With the continuous advancement of scientific and technological innovation, the transformation of scientific and technological achievements has become an important engine to promote economic growth and social development. The transfer and transformation of scientific and technological achievements refers to the transfer of scientific research results, technological inventions and innovative ideas from source units such as research institutions or universities to enterprises or markets, so that they can be put into practical use and generate economic and social benefits.

[0003] In the evaluation process of traditional technology transfer and transformation, people often focus on qualitative analysis and lack quantitative evaluation of actual application effects, which leads to deviations in the evaluation results. Summary of the invention

[0004] The embodiment of the present application provides a method and system for evaluating the transfer and transformation of scientific and technological achievements, which can solve the problem that in the evaluation process of traditional transfer and transformation of scientific and technological achievements, the focus is often on qualitative analysis and there is a lack of quantitative evaluation of actual application effects, which leads to deviations in evaluation results.

[0005] In a first aspect, the embodiment of the present application provides a method for evaluating the transfer and transformation of scientific and technological achievements, which is applied to a background terminal and includes: Obtaining scientific and technological innovation log information; wherein the scientific and technological innovation log information is used to reflect the actual working situation of the scientific and technological achievements of the university; Quantifying the scientific and technological innovation log information to obtain work information; wherein the work information is the scientific and technological innovation log information that meets the quantification standard; Evaluate the work information according to the scientific transfer evaluation system indicators to obtain scoring information corresponding to the work information; wherein the scoring information is used to reflect whether the actual working conditions of the scientific and technological achievements of the university corresponding to the work information are qualified; Based on the scoring information, scientific and technological achievement transformation resources are recommended to the user terminal corresponding to the scoring information.

[0006] The above technical solutions in the embodiments of the present application have at least the following technical effects: The evaluation method for the transfer and transformation of scientific and technological achievements provided in this application first obtains the scientific and technological innovation log information used to reflect the actual working situation of the scientific and technological achievements of universities, which is helpful for a better understanding of the actual situation of the transfer and transformation of scientific and technological achievements in the future, and can provide an important data basis for subsequent data analysis and trend research, which is conducive to avoiding the problem of deviation in subsequent evaluation results. Secondly, the scientific and technological innovation log information is quantified to obtain work information, which can avoid the influence of subjective factors in qualitative analysis, so that the evaluation process is standardized, and it is convenient for subsequent horizontal and vertical comparisons to help identify advantages and disadvantages, so as to ensure the objectivity and accuracy of subsequent evaluation results. Secondly, the work information is evaluated according to the indicators of the science and technology transfer evaluation system to obtain the scoring information corresponding to the work information, and the scientific and technological achievements can be systematically analyzed from multiple dimensions to ensure the comprehensiveness of the evaluation, reduce the interference of subjective factors, and thus ensure the objectivity and accuracy of the evaluation results. Then, based on the scoring information, the scientific and technological achievement transformation resources are recommended to the user terminal corresponding to the scoring information, which can help to improve the utilization rate of scientific and technological achievements in universities and avoid idle resources, so that the objectivity and accuracy of the evaluation results in the previous evaluation process can play a role in practical application.

[0007] In a second aspect, an embodiment of the present application provides a technology achievement transfer and transformation evaluation system, which is applied to a backend terminal and is used to implement the technology achievement transfer and transformation evaluation method described in any one of the first aspects above, and the technology achievement transfer and transformation evaluation system includes: An acquisition unit, used to acquire scientific and technological innovation log information; wherein the scientific and technological innovation log information is used to reflect the actual working conditions of scientific and technological achievements of universities; A quantification unit, used to quantify the scientific and technological innovation log information to obtain working information; wherein the working information is the scientific and technological innovation log information that meets the quantification standard; An evaluation unit, used to evaluate the work information according to the scientific transfer evaluation system indicators to obtain scoring information corresponding to the work information; wherein the scoring information is used to reflect whether the actual working conditions of the scientific and technological achievements of the university corresponding to the work information are qualified; A generating unit is used to recommend scientific and technological achievement transformation resources to the user terminal corresponding to the scoring information based on the scoring information.

[0008] In a third aspect, an embodiment of the present application provides a background terminal, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the technology achievement transfer and transformation evaluation method described in any one of the first aspects above is implemented.

[0009] It can be understood that the beneficial effects of the second to third aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0011] Figure 1 It is a flow chart of a method for evaluating the transfer and transformation of scientific and technological achievements provided in one embodiment of the present application; Figure 2 It is a schematic diagram of the implementation process of the evaluation process in the evaluation method for the transfer and transformation of scientific and technological achievements provided in one embodiment of the present application; Figure 3 It is a schematic diagram of the implementation process of adjusting the indicators of the technology transfer evaluation system of the technology transfer and transformation evaluation method provided in one embodiment of the present application; Figure 4 It is a schematic diagram of the implementation process of the technology achievement transfer and transformation evaluation method provided by another embodiment of the present application; Figure 5 It is a structural diagram of the scientific and technological achievement transfer and transformation evaluation system provided in the embodiment of the present application; Figure 6 It is a structural diagram of the background terminal provided in the embodiment of the present application. DETAILED DESCRIPTION

[0012] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0013] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0014] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0015] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting" depending on the context. Similarly, the phrase "if it is determined" or "if the described condition or event is detected" can be interpreted as meaning "uponce determined" or "in response to determining" or "uponce the described condition or event is detected" or "in response to detecting the described condition or event" depending on the context.

[0016] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0017] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0018] In related technologies, with the continuous advancement of scientific and technological innovation, the transformation of scientific and technological achievements has become an important engine to promote economic growth and social development. The transfer and transformation of scientific and technological achievements refers to the transfer of scientific research results, technological inventions and innovative ideas from source units such as research institutions or universities to enterprises or markets, so that they can be put into practical use and generate economic and social benefits.

[0019] In the evaluation process of traditional technology transfer and transformation, people often focus on qualitative analysis and lack quantitative evaluation of actual application effects, which leads to deviations in the evaluation results.

[0020] To solve the above problems, the embodiments of the present application provide a method and system for evaluating the transfer and transformation of scientific and technological achievements.

[0021] In this method, the scientific and technological innovation log information used to reflect the actual working situation of the scientific and technological achievements of universities is first obtained, which is helpful for a better understanding of the actual situation of the transfer and transformation of scientific and technological achievements in the future, and can provide an important data basis for subsequent data analysis and trend research, which is conducive to avoiding the problem of deviation in subsequent evaluation results. Secondly, the scientific and technological innovation log information is quantified to obtain work information, which can avoid the influence of subjective factors in qualitative analysis, so as to standardize the evaluation process, facilitate subsequent horizontal and vertical comparisons, help identify advantages and disadvantages, and thus ensure the objectivity and accuracy of subsequent evaluation results. Secondly, the work information is evaluated according to the indicators of the scientific and technological transfer evaluation system to obtain the scoring information corresponding to the work information, which can systematically analyze the scientific and technological achievements from multiple dimensions, ensure the comprehensiveness of the evaluation, reduce the interference of subjective factors, and thus ensure the objectivity and accuracy of the evaluation results. Then, based on the scoring information, the scientific and technological achievement transformation resources are recommended to the user terminal corresponding to the scoring information, which can help improve the utilization rate of scientific and technological achievements of universities and avoid idle resources, so that the objectivity and accuracy of the evaluation results in the previous evaluation process can play a role in practical application.

[0022] The technology transfer and transformation evaluation method provided in the embodiment of the present application can be applied to the background terminal. At this time, the background terminal is the executor of the technology transfer and transformation evaluation method provided in the embodiment of the present application. The embodiment of the present application does not impose any restrictions on the specific type of the background terminal.

[0023] For example, the backend terminal may be a server, a mobile phone, a tablet computer, a laptop computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc., which is used to evaluate the scientific and technological innovation log information input by the user terminal, and to recommend scientific and technological achievement transformation resources when the actual work of the university's scientific and technological achievements corresponding to the work information is unqualified.

[0024] In order to better understand the technology transfer and transformation evaluation method provided in the embodiment of the present application, the specific implementation process of the technology transfer and transformation evaluation method provided in the embodiment of the present application is exemplarily introduced below.

[0025] Figure 1 A schematic flow chart of a method for evaluating the transfer and transformation of scientific and technological achievements provided in an embodiment of the present application is shown. The method for evaluating the transfer and transformation of scientific and technological achievements includes: S100, obtaining scientific and technological innovation log information, wherein the scientific and technological innovation log information is used to reflect the actual working conditions of the scientific and technological achievements of the university.

[0026] It can be understood that the scientific and technological innovation log information can be daily, scattered information that has not been quantified, such as user name information, user department information, time information of technology transfer and transformation, completion information of technology transfer and transformation, number of participants in technology transfer and transformation projects, and information on employment driven by technology transfer of universities.

[0027] For example, HTML can be used to create text boxes, drop-down menus, etc. The user can directly enter the scientific innovation log information in the text box or drop-down menu of the user terminal by touch, keyboard, mouse, etc., and the background terminal can obtain the scientific innovation log information by sending an acquisition signal to the user terminal. The user can also upload a scientific innovation log file to the user terminal (such as a database built into an electronic device, etc.), and then the background terminal can obtain the scientific innovation log information in the file uploaded by the user to the user terminal through an API request.

[0028] Such a setting, by obtaining scientific and technological innovation log information, will help to better understand the actual situation of the transfer and transformation of scientific and technological achievements, and thus provide an important data basis for subsequent data analysis and trend research, which is conducive to avoiding deviations in subsequent evaluation results.

[0029] S200, quantify the scientific and technological innovation log information to obtain work information, wherein the work information is the scientific and technological innovation log information that meets the quantification standard.

[0030] It is understandable that work information can be information that can provide reference for subsequent evaluation. For example, information on the completion of university scientific and technological achievements in special actions, information on the over-fulfillment of university scientific and technological achievements in special actions, information on the employment driven by the transfer of university scientific and technological achievements, etc. can provide reference for subsequent evaluation.

[0031] For example, the scientific and technological innovation log information may include information on the completion of university scientific and technological achievements in special actions, information on the number of participants in scientific and technological achievements transfer and transformation projects, and information on employment driven by the transfer of scientific and technological achievements of universities. Set a screening condition, and the scientific and technological innovation log information that meets the screening condition will be retained, while the scientific and technological innovation log information that does not meet the screening condition will be discarded. For example, the screening condition can be to evaluate only the information on the completion of university scientific and technological achievements in special actions and the information on the employment driven by the transfer of scientific and technological achievements of universities. In this case, the information on the number of participants in the transfer and transformation projects of scientific and technological achievements will be discarded, and only the information on the completion of university scientific and technological achievements in special actions and the information on employment driven by the transfer of scientific and technological achievements of universities, that is, work information, will be retained. For another example, the screening condition can be to evaluate only the information on the completion of university scientific and technological achievements in special actions. In this case, the information on the number of participants in the transfer and transformation projects of scientific and technological achievements and the information on employment driven by the transfer of scientific and technological achievements of universities will be discarded, and only the information on the completion of university scientific and technological achievements in special actions, that is, work information, will be retained.

[0032] With this setup, by quantifying the information in the scientific and technological innovation log and obtaining work information, the evaluation process can be standardized, facilitating subsequent horizontal and vertical comparisons to help identify strengths and weaknesses, thereby ensuring the objectivity and accuracy of subsequent evaluation results.

[0033] In one possible implementation, see Figure 2 and Figure 3 , S200, quantify the scientific and technological innovation log information to obtain work information, including: S210, matching the scientific and technological innovation log information with preset quantitative information to determine whether the scientific and technological innovation log information meets the quantitative standard. The preset quantitative information is pre-set information that can be used as a reference for the evaluation process.

[0034] It is understandable that a matching condition can be set. When the scientific and technological innovation log information is the same as the preset quantitative information, it is judged that the scientific and technological innovation log information meets the quantitative standard; when the scientific and technological innovation log information is different from the preset quantitative information, it is judged that the scientific and technological innovation log information does not meet the quantitative standard. For example, the scientific and technological innovation log information may include information on the completion of university scientific and technological achievements in special actions, information on the number of participants in scientific and technological achievement transfer and transformation projects, and information on the employment driven by the transfer of university scientific and technological achievements. The preset quantitative information is information on the completion of university scientific and technological achievements in special actions. Then, it can be judged that the information on the completion of university scientific and technological achievements in special actions in the scientific and technological innovation log information meets the quantitative standard, while the information on the number of participants in scientific and technological achievement transfer and transformation projects and the information on the employment driven by the transfer of university scientific and technological achievements do not meet the quantitative standard. For another example, the science and technology innovation log information may include information on the completion of university scientific and technological achievements in special actions, information on the number of participants in scientific and technological achievement transfer and transformation projects, information on the employment driven by the transfer of university scientific and technological achievements, information on the promotion of energy conservation and environmental protection by university scientific and technological achievements, information on the over-completion of university scientific and technological achievements in special actions, and information on the promotion of energy conservation and environmental protection by university scientific and technological achievements. If the preset quantitative information is information on the completion of university scientific and technological achievements in special actions, information on the employment driven by the transfer of university scientific and technological achievements, information on the promotion of energy conservation and environmental protection by university scientific and technological achievements, and information on the over-completion of university scientific and technological achievements in special actions, then it can be judged that the information on the completion of university scientific and technological achievements in special actions, information on the employment driven by the transfer of university scientific and technological achievements, information on the promotion of energy conservation and environmental protection by university scientific and technological achievements, and information on the over-completion of university scientific and technological achievements in special actions in the science and technology innovation log information meets the quantitative standards.

[0035] With this setting, the scientific and technological innovation log information is matched with the preset quantitative information to determine whether the scientific and technological innovation log information meets the quantitative standards. This can reduce the time and cost of manual review and provide data support for subsequent rapid matching, thereby reducing the complexity of the evaluation.

[0036] S220, when the scientific and technological innovation log information does not meet the quantification standard, the scientific and technological innovation log information that does not meet the quantification standard is discarded.

[0037] It can be understood that when the scientific and technological innovation log information does not meet the quantitative standards, it means that the current scientific and technological innovation log information cannot provide reference value for the evaluation process, that is, invalid information. Therefore, the scientific and technological innovation log information that does not meet the quantitative standards can be discarded, that is, deleted or ignored.

[0038] With this setting, when the scientific and technological innovation log information does not meet the quantitative standards, it will be discarded, which will help the subsequent evaluation process to focus more on information with actual reference value and ensure the effectiveness and accuracy of the evaluation.

[0039] S230, when the scientific and technological innovation log information meets the quantitative standard, the scientific and technological innovation log information meeting the quantitative standard is stored in the background terminal to obtain work information.

[0040] It can be understood that when the scientific and technological innovation log information meets the quantitative standards, it means that the current scientific and technological innovation log information can provide reference value for the evaluation process, that is, valid information. Therefore, the scientific and technological innovation log information that meets the quantitative standards can be retained, that is, stored in the background terminal. When preparing for the evaluation process, the scientific and technological innovation log information stored in the background terminal can be called to obtain work information.

[0041] With such a setting, when the scientific and technological innovation log information meets the quantitative standards, the scientific and technological innovation log information that meets the quantitative standards will be stored in the background terminal to obtain work information, and scientific judgments can be made based on valid data, thereby improving the effectiveness and accuracy of the evaluation.

[0042] S300, evaluating the work information according to the scientific transfer evaluation system indicators to obtain scoring information corresponding to the work information. The scoring information is used to reflect whether the actual working conditions of the scientific and technological achievements of the university corresponding to the work information are qualified.

[0043] It can be understood that the indicators of the scientific and technological transfer evaluation system can be indicators used to evaluate the effects and effectiveness of scientific and technological achievements from research and development to practical application. For example, the indicators of the scientific and technological transfer evaluation system can be results output indicators, patent quantity indicators, completion efficiency indicators, etc.

[0044] For example, the weighted scoring method or the analytic hierarchy process (AHP) can be used to set the weights of indicators, and the work information that passes the quantified standards (such as the information on the completion of scientific and technological achievements of universities in special actions is reflected as the scientific and technological achievement conversion rate is 80%, the unit investment result is 50,000 yuan / result, the work efficiency is 0.00267 results / hour, the information on the over-completion of scientific and technological achievements of universities in special actions is reflected as the scientific and technological achievement over-completion rate is 30%, the information on the promotion of energy conservation and environmental protection by scientific and technological achievements of universities is reflected as having a promoting effect, and the information on the transfer of scientific and technological achievements of universities to drive employment is reflected as having a positive effect), compared with the indicators of the science and technology transfer evaluation system, calculate the weights and scores, and finally obtain the evaluation results. For example, the weights are set such that the weight of the information on the completion of scientific and technological achievements of universities in special actions is 0.45, the weight of the information on the over-completion of scientific and technological achievements of universities in special actions is 0.45, the weight of the information on the promotion of energy conservation and environmental protection by scientific and technological achievements of universities is 0.05, and the weight of the information on the employment driven by the transfer of scientific and technological achievements of universities is 0.05. The scoring standards are formulated, and the scoring standards for the conversion rate of scientific and technological achievements are 0%-50%: 10 points, 51%-70%: 20 points, 71%-85%: 30 points, 86%-100%: 40 points; the scoring standards for unit investment results are less than 75,000 yuan: 40 points, 75,000-100,000 yuan: 30 points, 100 000-150000 yuan: 20 points; work efficiency scoring standard is less than 0.002: 50 points, 0.002-0.003: 30 points, 0.003-0.004: 10 points; the scoring standard for the over-completion rate of scientific and technological achievements is score = over-completion rate × 20 points; the information on the promotion of energy conservation and environmental protection by the scientific and technological achievements of universities is reflected as having a promoting effect, and the score is 10 points; the information on the promotion of energy conservation and environmental protection by the scientific and technological achievements of universities is reflected as not having a promoting effect, and the score is 0 points; the information on the employment driven by the transfer of scientific and technological achievements of universities is reflected as having a positive effect, and the information on the employment driven by the transfer of scientific and technological achievements of universities is reflected as not having a positive effect, and the score is 10 points. Calculate the score of each indicator: the score of technology conversion rate is 30 points, the score of unit investment results is 40 points, the score of work efficiency is 50 points, the score of over-completion rate of scientific and technological achievements is 6 points, the score of information on the promotion of energy conservation and environmental protection by scientific and technological achievements of universities is 10 points, and the score of information on the employment driven by the transfer of scientific and technological achievements of universities is 10 points. The comprehensive score is (0.45×30)+(0.45×40)+(0.45×50)+6+10+10=32+40+16=80 points, and the passing score is 69 points. Therefore, the actual work situation of scientific and technological achievements of universities corresponding to the current work information is qualified.

[0045] With this setting, work information is evaluated according to the indicators of the scientific and technological transfer evaluation system to obtain the scoring information corresponding to the work information. This can systematically analyze scientific and technological achievements from multiple dimensions, ensure the comprehensiveness of the evaluation, reduce the interference of subjective factors, and thus ensure the objectivity and accuracy of the evaluation results.

[0046] S400, based on the scoring information, recommending scientific and technological achievement transformation resources to a user terminal corresponding to the scoring information.

[0047] It can be understood that recommending scientific and technological achievement transformation resources to the user terminal corresponding to the scoring information can be a method of recommending resources corresponding to the preset scientific and technological achievement transformation resource library to the user terminal corresponding to the scoring information (such as failing the score), so as to realize a one-to-one single-point supply and demand exchange, so as to realize a closed loop of supply and demand. The preset scientific and technological achievement transformation resource library can be the scientific and technological achievement transformation resources that the operator has input in advance in the background terminal. The scientific and technological achievement transformation resources in the preset scientific and technological achievement transformation resource library can be resources with qualified actual working conditions of university scientific and technological achievements, or can be resources of university scientific and technological achievements that the university can provide to other users.

[0048] For example, when the scoring information reflects that the actual working situation of the university's scientific and technological achievements corresponding to the current work information is unqualified (i.e., the weak link itself), the scientific and technological achievement transformation resources whose actual working situation of the corresponding university's scientific and technological achievements in the preset scientific and technological achievement transformation resource library is qualified can be recommended to the user terminal corresponding to the work information reflected by the current scoring information; when the scoring information reflects that the actual working situation of the university's scientific and technological achievements corresponding to the current work information is unqualified (i.e., the weak link itself), and there are no resources whose actual working situation of the corresponding university's scientific and technological achievements in the preset scientific and technological achievement transformation resource library is qualified, the resource demand information of the user terminal can be obtained to understand what kind of scientific and technological achievement transformation resources the user terminal needs, so that the user terminal can conduct supply and demand exchanges in the background terminal, thereby realizing a closed loop of supply and demand.

[0049] Such a setting, based on the scoring information, recommends scientific and technological achievement transformation resources to the user terminal corresponding to the scoring information, which helps to improve the utilization rate of scientific and technological achievements of universities and avoid idle resources, so that the objectivity and accuracy of the evaluation results in the previous evaluation process can play a role in practical application.

[0050] In one possible implementation, see Figure 2 and Figure 4 S400, based on the scoring information, recommending scientific and technological achievement transformation resources to a user terminal corresponding to the scoring information, including: S410, when the scoring information reflects that the actual work of the university scientific and technological achievements corresponding to the work information is unqualified, obtain keywords of the work information.

[0051] It can be understood that when the scoring information reflects that the actual work of the university's scientific and technological achievements corresponding to the work information is unqualified, it means that there are weak links in the university's scientific and technological achievements corresponding to the current work information. Therefore, text analysis tools or natural language processing (NLP) technology can be used to extract keywords from the work information. For example, the keywords can be project resource names, universities, scientific and technological resources, etc.

[0052] With this setting, when the scoring information reflects that the actual work of the university's scientific and technological achievements corresponding to the work information is unsatisfactory, obtaining the keywords of the work information can help identify the core problems and weak links in the work information, thereby providing data support for the subsequent targeted recommendation of scientific and technological achievement transformation resources.

[0053] S420, matching the keywords of the work information in a preset scientific and technological achievement transformation resource library to obtain a matching result, wherein the matching result is used to reflect whether there is a scientific and technological achievement transformation resource matching the keywords of the work information.

[0054] It can be understood that the preset scientific and technological achievement transformation resource library includes multiple keywords and multiple scientific and technological achievement transformation resources, and there is a mapping relationship between the keywords and the scientific and technological achievement transformation resources. For example, the keywords are scientific and technological achievement transformation resource 1 and project name A, then the scientific and technological achievement transformation resources with the keyword of scientific and technological resource 1 are queried in the preset scientific and technological achievement transformation resource library; if not found, then the scientific and technological achievement transformation resources with the keyword of project name A can be queried in the preset scientific and technological achievement transformation resource library; if not found yet, then the matching result is the scientific and technological achievement transformation resources that do not match the keywords of the work information; otherwise, the matching result is the scientific and technological achievement transformation resources that match the keywords of the work information.

[0055] With this setting, the keywords of the work information are matched in the preset scientific and technological achievement transformation resource library to obtain matching results. This can reduce the time for manual search and comparison when the resource library is large, improve the efficiency of information acquisition, and avoid invalid searches.

[0056] S430, when the matching result reflects that there are scientific and technological achievement transformation resources matching the keywords of the work information, the scientific and technological achievement transformation resources in the preset scientific and technological achievement transformation resource library are recommended to the corresponding user terminal.

[0057] It can be understood that when the matching result reflects that there are scientific and technological achievement transformation resources that match the keywords of the work information, it means that there are qualified resources in the preset scientific and technological achievement transformation resource library corresponding to the actual work situation of the scientific and technological achievements of universities. Therefore, the scientific and technological achievement transformation resources in the preset scientific and technological achievement transformation resource library can be recommended to the corresponding user terminal.

[0058] Such a setting can accurately capture users' specific needs for scientific and technological achievement transformation resources, and provide a basis for subsequently finding the scientific and technological achievement transformation resources that best meet their needs.

[0059] S440, when the matching result reflects that there are no scientific and technological achievement transformation resources matching the keywords of the work information, the resource demand information of the user terminal is obtained, and the resource demand information is published to the background terminal, so that other user terminals can provide corresponding scientific and technological achievement transformation resources through the published resource demand information.

[0060] It can be understood that when the matching result reflects that there are no scientific and technological achievement transformation resources that match the keywords of the work information, it means that there are no corresponding qualified resources for the actual working conditions of the scientific and technological achievements of universities in the preset scientific and technological achievement transformation resource library. Therefore, a demand form can be set and sent to the user terminal. The user can enter the required scientific and technological achievement transformation resource keywords, descriptions or project background information, that is, resource demand information. After the user submits the demand form, the background terminal can automatically convert the resource demand information in the demand form into an announcement form and publish it to the background terminal. Set up push notifications to inform other users that there is new resource demand information to be responded to, provide a response channel for user terminals, and allow them to submit matching scientific and technological achievement transformation resource links or related information to meet the needs corresponding to the resource demand information.

[0061] Such a setting can accurately capture users' specific needs for resources and provide a basis for subsequently finding the scientific and technological achievement transformation resources that best meet their needs.

[0062] In a possible implementation, the backend terminal is connected to the user terminal in communication. In step S300, the work information is evaluated according to the scientific and technological transfer evaluation system indicators to obtain the evaluation results. The scientific and technological achievement transfer and transformation evaluation method further includes: S310, evaluating the work information continuously acquired by the user terminal one by one based on the scientific transfer evaluation system indicators, wherein the work information is used to evaluate the actual application effect of the scientific and technological achievements, and the scientific transfer evaluation system indicators are evaluation indicators used for the evaluation business between the front-end and back-end terminals and the user terminals.

[0063] It can be understood that quantified standard work data can be obtained, and for each work information, the indicators in the science and technology transfer evaluation system can be used to evaluate it, so that each work information can be compared with the indicators of the science and technology transfer evaluation system one by one.

[0064] With such a setting, the work information continuously obtained by the user terminal can be evaluated one by one based on the indicators of the scientific and technological transfer evaluation system, which can comprehensively evaluate the scientific and technological achievements, avoid one-sidedness, and help ensure the objectivity and accuracy of the evaluation results.

[0065] S320, in the case of evaluating work information, whenever it is determined that the evaluation progress or evaluation result of the evaluated work information meets the adjustment requirements, the evaluation system indicator of the department transfer is adjusted according to the evaluation time of the evaluated work information. The evaluation time of a work information is the time between the start time of the evaluation of a work information and the completion time of the evaluation of a work information.

[0066] For example, during the evaluation process, the evaluation may fail because the indicators of the science transfer evaluation system cannot meet all the important factors of the work information. Therefore, in order to avoid the evaluation failure scenario, the science transfer evaluation system indicators set in the background terminal can be adjusted in advance within a reasonable range. However, since the work information may change at any time during the actual process of the background terminal and the user terminal evaluating the work information, the science transfer evaluation system indicators adjusted in advance may not be able to adapt to the current state of the work information, which may also lead to evaluation failure.

[0067] It is understandable that a real-time monitoring system is established to record the evaluation progress and duration of each work information. For example, use project management tools or data analysis software to track the evaluation process of each work information. Define what kind of evaluation progress or evaluation results will trigger the adjustment of indicators (i.e., judge whether it meets the adjustment requirements). That is, in the case of evaluating work information, if the evaluation progress or evaluation results of the evaluated work information are judged to meet the adjustment requirements, it means that the previously adjusted indicators of the science transfer evaluation system cannot adapt to the current state of the work information. For example, if the evaluation progress exceeds a certain threshold of the expected time (such as 90% of the expected time), or the evaluation results fail to meet a certain standard, adjustments are required. For example, if the evaluation progress of a certain work information is long, it may be necessary to adjust the relevant science transfer evaluation indicators to optimize the evaluation system. For example, if the indicators of the science transfer evaluation system lead to an excessively long evaluation progress, the evaluation standards can be adjusted. For another example, when the indicators of the science transfer evaluation system are too strict, the evaluation results obtained do not meet the expected indicators, and the definition of the existing science transfer evaluation system indicators can be modified. According to the evaluation duration of the evaluation work information, determine which indicators can be adjusted, and then adjust the indicators of the science transfer evaluation system. For example, work information A: the evaluation time is 1 hour, the score is 80, which is in line with expectations. Work information B: the evaluation time is 5 hours, the score is 50, which exceeds the benchmark time and the score is low. Identify the evaluation indicators corresponding to work information with too long evaluation time or low score. For example: the evaluation time of work information B exceeds the benchmark. Analyze that the "unit investment results" evaluation indicator of work information B is too complex, resulting in too long evaluation time. The requirements of this indicator can be simplified, that is, the indicators of the science and technology transfer evaluation system can be adjusted.

[0068] With such a setting, when evaluating work information, if the evaluation progress or evaluation results of the evaluated work information are judged to meet the adjustment requirements, the indicators of the science and technology transfer evaluation system will be adjusted according to the evaluation duration of the evaluated work information. This can continuously iterate and optimize the evaluation system, form a virtuous circle, and improve the accuracy of the evaluation.

[0069] In a possible implementation, S320, when evaluating work information, whenever it is determined that the evaluation progress or evaluation result of the evaluated work information meets the adjustment requirements, the indicators of the science transfer evaluation system are adjusted according to the evaluation time of the evaluated work information, including: S321, in the case of evaluating work information, if each piece of work information is evaluated, a first evaluation time corresponding to the currently evaluated work information is obtained, wherein the first evaluation time includes a start evaluation time and an end evaluation time.

[0070] It is understandable that a timing component can be set to record the start time when the evaluation of each work information starts; and the end time when it ends, so as to obtain the first evaluation time corresponding to the currently evaluated work information.

[0071] With this setting, when evaluating work information, if each work information is evaluated, the first evaluation time corresponding to the work information currently being evaluated is obtained, it will help track the progress of the evaluation process. It can be clearly seen how much time the evaluation took, providing data support for the subsequent adjustment of the scientific and technological transfer evaluation system indicators.

[0072] S322, when the evaluation progress of the evaluated work information is the preset progress, or when the evaluation result of the evaluated work information is the preset result, determine the evaluation duration corresponding to each work information according to the start evaluation time and the end evaluation time corresponding to the currently evaluated work information.

[0073] It can be understood that the evaluation progress of the work information can be compared with the preset progress to determine whether it meets expectations, and the evaluation results of the work information can be compared with the preset results to determine whether it meets expectations. When the evaluation progress of the evaluated work information is the preset progress, or, when the evaluation result of the evaluated work information is the preset result, it means that the pre-adjusted scientific and technological transfer evaluation system indicators cannot adapt to the current state of the work information. Therefore, it can be determined that when the pre-adjusted scientific and technological transfer evaluation system indicators cannot adapt to the current state of the work information, the evaluation time required for each work information can be determined (such as the end evaluation time can be subtracted from the start evaluation time) to analyze which work information's evaluation time causes the excessively long evaluation progress or the evaluation result does not meet the expected indicators.

[0074] With such a setting, when the evaluation progress of the evaluated work information is the preset progress, or, when the evaluation result of the evaluated work information is the preset result, the evaluation duration corresponding to each work information is determined according to the start evaluation time and end evaluation time corresponding to the currently evaluated work information. The evaluation process of each work information can be clearly displayed. For example, if the evaluation time of a certain work information is too long, it may indicate that there is a problem in the process, which provides data support for the subsequent optimization of the evaluation process.

[0075] S323, based on the evaluation duration of each work information, adjust the indicators of the science and technology transfer evaluation system.

[0076] For example, work information (simple project) A: evaluation time is 30 minutes, work information (medium complexity project) B: evaluation time is 25 minutes, set the benchmarks and standards for each type of work information. For example, you can set the expected evaluation time for each type of work information, category 1 (simple project): expected evaluation time is 15 minutes, category 2 (medium complexity project): expected evaluation time is 30 minutes. It is found that the evaluation time of work information (simple project) A is too long, indicating that the evaluation complexity of the science and technology transfer evaluation system indicators for simple projects is high, resulting in a cumbersome and time-consuming evaluation process. Then, the science and technology transfer evaluation system indicators can be adjusted so that the science and technology transfer evaluation system indicators evaluate the most important 2-3 information of simple projects.

[0077] With this setting, the indicators of the science and technology transfer evaluation system are adjusted based on the evaluation duration of each work information. In the actual evaluation process, overly complex or unreasonable evaluation indicators can be identified, and their requirements can be adjusted to make the evaluation results more real and accurate.

[0078] In one possible implementation, see Figure 3 , S323, based on the evaluation time of each work information, adjust the indicators of the science transfer evaluation system, including: S3231, based on the evaluation duration of each work information, determine a first evaluation period, wherein the first evaluation period is the maximum time period for the background terminal to evaluate the work information obtained by the user terminal after the adjustment of the scientific transfer evaluation system indicators.

[0079] It can be understood that after adjusting the indicators of the science transfer evaluation system in advance, the evaluation time of each work information is analyzed to find the maximum value of the evaluation time period to determine the first evaluation period. For example, the evaluation time of work information A, work information B, and work information C is analyzed. The evaluation time of work information A is analyzed to find that the start time of work information A is 7:00. The evaluation time of work information B is analyzed to find that the start time of work information B is 7:30. The evaluation time of work information C is analyzed to find that the start time of work information C is 8:10. Therefore, after the adjustment of the indicators of the science transfer evaluation system, the maximum time period for the background terminal to evaluate the work information obtained by the user terminal is from the start time of work information A to the start time of work information B, that is, 30 minutes.

[0080] Such a setting, in which the first evaluation period is determined based on the evaluation duration of each work information, can provide a clear time frame, which helps to optimize the processing order and rhythm of various types of work information.

[0081] S3232, according to the start evaluation time of each piece of work information, determine the time period for the background terminal to evaluate every two most recent work information acquired by the user terminal, so as to obtain multiple start evaluation time periods.

[0082] For example, the start evaluation time of all work information is sorted into a list, arranged from early to late, and the time period of two adjacent work information is calculated, that is, time period = start time of current work information - start time of previous work information, and each calculated time period is recorded to obtain multiple start evaluation time periods.

[0083] With this arrangement, based on the start evaluation time of each work information, the time period for the background terminal to evaluate each two most recent work information acquired by the user terminal is determined to obtain multiple start evaluation time periods, which can provide a clear time frame for subsequent management and analysis.

[0084] S3233, average the multiple start evaluation periods to obtain a second evaluation period.

[0085] It can be understood that multiple start evaluation time periods can be accumulated, and the total time period can be divided by the number of time periods to obtain an average value, that is, to obtain the second evaluation time period.

[0086] With such a configuration, multiple start evaluation periods are averaged to obtain the second evaluation period, so that it can be understood how often the work information should be evaluated under normal circumstances to better reflect the actual processing capacity of the background terminal.

[0087] S3234: When the first evaluation period is greater than or equal to the second evaluation period, the indicators of the scientific transfer evaluation system are adjusted according to the first evaluation period and the second evaluation period.

[0088] It can be understood that when the first evaluation period is greater than or equal to the second evaluation period, it means that the backend terminal may not be able to use the current science and technology transfer evaluation system indicators to evaluate the processing work information. Therefore, the adjustment ratio can be determined according to the ratio between the first evaluation period and the second evaluation period. For example, the following formula can be used: Adjustment ratio = For example, if T1=60 minutes and T2=50 minutes, the adjustment ratio is 1.2. According to the calculated adjustment ratio, the evaluation system indicators are adjusted accordingly, for example, linear adjustment: directly multiply by the adjustment ratio, such as: new indicator value = original indicator value × adjustment ratio. In the case where the first evaluation period is less than the second evaluation period, it means that the backend terminal has sufficient ability to use the current science transfer evaluation system indicators to evaluate the processing of work information, so there is no need to adjust the science transfer evaluation system indicators.

[0089] With such a setting, when the first evaluation period is greater than or equal to the second evaluation period, the scientific and technological transfer evaluation system indicators are adjusted according to the first evaluation period and the second evaluation period. The adjustments can be made based on the data of the current operating conditions, which can make the evaluation indicators more in line with the actual situation and avoid inefficient evaluation results caused by indicator lags.

[0090] In a possible implementation, in step S323, after adjusting the scientific transfer evaluation system indicators based on the evaluation duration of each work information, the scientific and technological achievement transfer and transformation evaluation method further includes: When the adjustment of the scientific and technological transfer evaluation system indicators is completed, the work information obtained by the user terminal will continue to be evaluated based on the adjusted scientific and technological transfer evaluation system indicators.

[0091] It can be understood that the weighted scoring method or the analytic hierarchy process (AHP) can be used to set the weights of the adjusted indicators, compare the work data that has passed the quantified standards with the adjusted scientific and technological transfer evaluation system indicators, calculate the weights and scores, and finally obtain the evaluation results.

[0092] With such a setting, when the adjustment of the scientific and technological transfer evaluation system indicators is completed, the work information obtained by the user terminal will continue to be evaluated according to the adjusted scientific and technological transfer evaluation system indicators, which can ensure the comprehensiveness of the evaluation, avoid inefficient evaluation results caused by indicator lags, and thus ensure the objectivity and accuracy of the evaluation results.

[0093] S330, in the case of evaluating work information, if it is determined that the evaluation progress or evaluation result of the evaluated work information does not meet the adjustment requirements, the scientific transfer evaluation system indicators will not be adjusted.

[0094] It can be understood that when evaluating work information, if the evaluation progress or evaluation results of the evaluated work information are judged to be inconsistent with the adjustment requirements, it means that the previously adjusted scientific and technological transfer evaluation system indicators can adapt to the current status of the work information. Therefore, the current scientific and technological transfer evaluation system indicators can continue to be used for evaluation.

[0095] With such a setting, when evaluating work information, if the evaluation progress or evaluation results of the evaluated work information are judged to not meet the adjustment requirements, the science and technology transfer evaluation system indicators will not be adjusted. This can avoid repeated adjustments, ensure that the evaluation system maintains a certain stability, and reduce the troubles caused by constantly changing indicators.

[0096] In one possible implementation, see Figure 4 The evaluation method currently used by the backend terminal is the first evaluation method, and the current second evaluation method is in an inactive state. The evaluation method for the transfer and transformation of scientific and technological achievements also includes: S400, after monitoring that the second evaluation path is switched from an inactive state to an active state, the evaluation timing is started.

[0097] It is understood that the first evaluation approach may be an automatic evaluation approach, for example, evaluation is performed through a system algorithm and pre-set indicators. The second evaluation approach may be a manual evaluation approach, for example, manual evaluation of the transfer and transformation of scientific and technological achievements. A timing component may be provided to start the evaluation timing after monitoring that the second evaluation approach switches from an inactive state to an active state, and the evaluation timing may be 10 seconds, 30 seconds, etc.

[0098] With this arrangement, by monitoring the switching of the second evaluation path from an inactive state to an active state, the evaluation timing is started, which introduces clear time nodes and sequences for the entire evaluation process, making the transition from the first evaluation path to the second evaluation path more orderly and avoiding confusion and uncertainty in the evaluation process.

[0099] S500, before the evaluation timing reaches a preset duration, obtaining data currently collected by the background terminal.

[0100] For example, in a scenario where a manual evaluation pathway is currently being used instead of an automatic evaluation pathway, there may be some scientific and technological achievements being processed by the automatic evaluation pathway. If it is stopped immediately, the evaluation process of these scientific and technological achievements will be interrupted and may need to be restarted, wasting time and resources. A timer with a preset duration (such as 10 seconds, 30 seconds, etc.) can be set. During this process, the evaluation pathway of the current scientific and technological achievements will be adjusted, that is, gradually transitioning from the automatic evaluation pathway to the manual evaluation pathway, ensuring that after the automatic evaluation pathway is actually stopped, the scientific and technological achievements are all evaluated by the manual evaluation pathway. For example, if it is found that there are insufficient human resources, the automatic evaluation pathway can continue to be used to evaluate some achievements during this period.

[0101] For example, if after the preset timer ends, there are still some scientific and technological achievements that have not completed the adjustment of the evaluation path, it means that there may be some problems, such as difficulties in allocating manual resources or obstacles in the evaluation process. Since the probability of this situation is low, in order to avoid resource consumption caused by the continued operation of the automatic evaluation path, the automatic evaluation path can be notified to stop running, and while maintaining manual evaluation, the scientific and technological achievements that have not completed the adjustment of the evaluation path will not be evaluated for the time being, waiting for subsequent processing.

[0102] For example, if manual resources are suddenly reduced or an emergency occurs, the manual evaluation pathway needs to be suspended. At this time, the automatic evaluation pathway needs to be started immediately. In this transitional stage, the evaluation of scientific and technological achievements does not have comprehensive and accurate evaluation capabilities for the time being, because the automatic evaluation pathway has not yet fully functioned. In order to reduce the probability of evaluation errors, this time window without comprehensive evaluation capabilities can be shortened. When the automatic evaluation pathway resumes normal operation, the data of the current manual evaluation pathway (if there are unfinished manual evaluation results) will be immediately adjusted to the automatic evaluation pathway for subsequent evaluation.

[0103] It is understandable that the data currently collected by the backend terminal may be the current evaluation data. Before the evaluation timing reaches the preset duration, the data currently collected by the backend terminal may be regularly checked and recorded by the data acquisition module.

[0104] With this setting, before the evaluation timing reaches the preset duration, the data currently collected by the background terminal can be obtained, which can provide accurate and timely data support for the subsequent evaluation of the transfer and transformation of scientific and technological achievements.

[0105] S600: When there is first unevaluated data in the currently collected data, obtain state information of the first unevaluated data.

[0106] It can be understood that the status information of the first unevaluated data can be information on whether the first unevaluated data is valid. In the case where the first unevaluated data is included in the currently collected data, it means that there is unevaluated data in the process of the first evaluation path switching from the activated state to the inactivated state and the second evaluation path switching from the inactivated state to the activated state. Therefore, it takes a certain amount of time for the second evaluation path to switch from the inactivated state to the activated state. At this time, it is equivalent to that both the first evaluation path and the second evaluation path are in the inactivated state. During this period of time, there may be unevaluated data, namely, the first unevaluated data, so the status information of the first unevaluated data can be obtained.

[0107] With such configuration, when the currently collected data includes the first unevaluated data, the state information of the first unevaluated data is obtained, which can avoid missing data and thus ensure the objectivity and accuracy of subsequent evaluation results.

[0108] In a possible implementation, in step S600, when the currently collected data includes the first unevaluated data, after obtaining the status information of the first unevaluated data, the scientific and technological achievement transfer and transformation evaluation method further includes: S610: When the status information of the first unevaluated data reflects invalid information, the first unevaluated data is added to the pending conversion evaluation list.

[0109] It can be understood that when the status information of the first unevaluated data reflects invalid information, it means that the first unevaluated data may still be in the transmission process, that is, it is not complete data. Therefore, the first unevaluated data can be added to the pending conversion evaluation list for subsequent evaluation.

[0110] With such a configuration, when the status information of the first unevaluated data reflects invalid information, the first unevaluated data is added to the pending conversion evaluation list, ensuring that the data will not be ignored or lost, thereby providing an opportunity for subsequent evaluation and processing.

[0111] In a possible implementation, in step S610, when the status information of the first unevaluated data reflects invalid information, after adding the first unevaluated data to the pending transformation evaluation list, the scientific and technological achievement transfer and transformation evaluation method further includes: S611, monitoring a feedback signal corresponding to the first unevaluated data, wherein the feedback signal is a signal of an evaluation request sent for the first unevaluated data.

[0112] It is understandable that long polling, WebSocket, or a message queue may be used to monitor the feedback signal in real time.

[0113] With such configuration, by monitoring the feedback signal corresponding to the first unevaluated data, it is possible to avoid the first unevaluated data from being forgotten, ensure that the data will not be ignored or lost, and further ensure the integrity of subsequent evaluations.

[0114] S612: When a feedback signal is monitored and the first unevaluated data is in the pending conversion evaluation list, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path.

[0115] It can be understood that when the feedback signal is monitored and the first unevaluated data is on the pending conversion evaluation list, it means that the transmission of the first unevaluated data is completed and the evaluation activity can be carried out. Therefore, the first unevaluated data can be processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path.

[0116] With such a setting, when a feedback signal is monitored and the first unevaluated data is on the pending conversion evaluation list, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path. This allows comprehensive evaluation activities to improve the accuracy of the overall evaluation.

[0117] S700: When the status information of the first unevaluated data reflects valid information, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path.

[0118] It can be understood that when the status information of the first unevaluated data is reflected as valid information, it means that the first unevaluated data can be evaluated, and at this time the second evaluation pathway is activated, so the first unevaluated data can be processed on the second evaluation pathway, and the evaluation pathway currently used for the first unevaluated data is recorded as the second evaluation pathway.

[0119] With such a setting, when the status information of the first unevaluated data is reflected as valid information, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path. The evaluation path can be switched dynamically to ensure seamless connection of the evaluation process and improve overall evaluation efficiency.

[0120] In a possible implementation method, the evaluation method for the transfer and transformation of scientific and technological achievements also includes: S810, after monitoring that the second evaluation path is switched from an activated state to an inactivated state and the background terminal is in a running state, obtaining data currently collected by the background terminal.

[0121] For example, a listener can be set to listen for the second evaluation path to switch from an activated state to an inactivated state. When manual resources are suddenly reduced or an emergency occurs and the manual evaluation path needs to be suspended, the second evaluation path switches from an activated state to an inactivated state. After monitoring that the second evaluation path switches from an activated state to an inactivated state and the background terminal is in operation, it means that in this transitional stage, the evaluation of scientific and technological achievements temporarily does not have a comprehensive and accurate evaluation capability, because the automatic evaluation path has not yet fully and normally operated, and the second evaluation path has also switched from an activated state to an inactivated state, so the data currently collected by the background terminal can be obtained.

[0122] With this setting, after monitoring that the second evaluation path switches from an activated state to an inactivated state and the background terminal is in a running state, the data currently collected by the background terminal is obtained, which can avoid subsequent data loss caused by the evaluation path not operating completely normally, and help ensure the accuracy of subsequent evaluations.

[0123] S820: When there is second unevaluated data in the currently collected data, determine whether the evaluation method used for the second unevaluated data is the first evaluation method.

[0124] It can be understood that when the currently collected data contains second unevaluated data, it means that the second unevaluated data appears in the process of the first evaluation path switching from an unactivated state to an activated state, and in the process of the second evaluation path switching from an activated state to an unactivated state. Therefore, it can be determined whether the evaluation path used by the second unevaluated data is the first evaluation path.

[0125] With such a configuration, when there is second unevaluated data in the currently collected data, determining whether the evaluation approach used for the second unevaluated data is the first evaluation approach can avoid inaccurate or incomplete evaluation and ensure the quality of the final evaluation result.

[0126] S830: When the evaluation path used by the second unevaluated data is not the first evaluation path, the second unevaluated data is processed on the first evaluation path, and the evaluation path currently used by the second unevaluated data is recorded as the first evaluation path.

[0127] It can be understood that when the evaluation path used by the second unevaluated data is not the first evaluation path, it means that the evaluation path currently used by the second unevaluated data is not the path in the state where the automatic evaluation path has not been fully and normally operated, because the second unevaluated data will fail to evaluate when using the automatic evaluation path that has not been fully and normally operated, that is, the second unevaluated data is reflected as unevaluated data. Therefore, when the evaluation path used by the second unevaluated data is not the first evaluation path, the second unevaluated data can be processed on the activated first evaluation path, and the evaluation path currently used by the second unevaluated data is recorded as the first evaluation path.

[0128] With such a setting, when the evaluation pathway used for the second unevaluated data is not the first evaluation pathway, the second unevaluated data is processed on the first evaluation pathway, and the evaluation pathway currently used for the second unevaluated data is recorded as the first evaluation pathway. This allows comprehensive evaluation activities to improve the accuracy of the overall evaluation.

[0129] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0130] Corresponding to the technology transfer and transformation evaluation method described in the above embodiment, the embodiment of the present application also provides a technology transfer and transformation evaluation system, and each unit of the system can implement each step of the technology transfer and transformation evaluation method. Figure 5 A structural block diagram of a technology achievement transfer and transformation evaluation system provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.

[0131] Reference Figure 5 , the evaluation system for the transfer and transformation of scientific and technological achievements includes: The acquisition unit is used to acquire scientific and technological innovation log information, wherein the scientific and technological innovation log information is used to reflect the actual working conditions of the scientific and technological achievements of the university.

[0132] The quantification unit is used to quantify the scientific and technological innovation log information to obtain working information, wherein the working information is the scientific and technological innovation log information that meets the quantification standard.

[0133] The evaluation unit is used to evaluate the work information according to the indicators of the scientific transfer evaluation system to obtain the scoring information corresponding to the work information. Among them, the scoring information is used to reflect whether the actual working situation of the scientific and technological achievements of the university corresponding to the work information is qualified.

[0134] The generating unit is used to recommend scientific and technological achievement transformation resources to a user terminal corresponding to the scoring information based on the scoring information.

[0135] It should be noted that the information interaction, execution process, etc. between the above-mentioned systems / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0136] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units is used as an example for illustration. In practical applications, the above-mentioned functions can be assigned to different functional units as needed, that is, the internal structure of the system can be divided into different functional units to complete all or part of the functions described above. The functional units in the embodiment can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0137] The embodiment of the present application also provides a background terminal, Figure 6 This is a schematic diagram of the structure of a backend terminal provided in an embodiment of the present application. Figure 6 As shown, the background terminal 6 of this embodiment includes: at least one processor 60 ( Figure 6 Only one is shown), at least one memory 61 ( Figure 6 Only one is shown) and a computer program 62 stored in the at least one memory 61 and executable on the at least one processor 60. When the processor 60 executes the computer program 62, the backend terminal 6 implements the steps in any of the above-mentioned embodiments of the technology transfer and transformation evaluation method, or implements the functions of the units in the above-mentioned system embodiments.

[0138] Exemplarily, the computer program 62 may be divided into one or more units, which are stored in the memory 61 and executed by the processor 60 to complete the present application. The one or more units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program 62 in the background terminal 6.

[0139] The backend terminal 6 may be a mobile phone, a tablet computer, a laptop computer, an ultra-mobile personal computer (UMPC), a netbook, a desktop computer, a computing device or a computer connected to a wireless modem, a laptop computer, a handheld communication device, a handheld computing device, etc. The backend terminal 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will appreciate that Figure 6 It is only an example of the backend terminal 6 and does not constitute a limitation on the backend terminal 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components, for example, it may also include input and output devices, network access devices, buses, etc.

[0140] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0141] In some embodiments, the memory 61 may be an internal storage unit of the backend terminal 6, such as a hard disk or memory of the backend terminal 6. In other embodiments, the memory 61 may also be an external storage device of the backend terminal 6, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the backend terminal 6. Further, the memory 61 may also include both an internal storage unit and an external storage device of the backend terminal 6. The memory 61 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 61 may also be used to temporarily store data that has been output or is to be output.

[0142] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0143] An embodiment of the present application provides a computer program product. When the computer program product runs on a background terminal, the background terminal implements the steps in any of the above method embodiments.

[0144] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the background terminal, a recording medium, a computer memory, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), an electric carrier signal, a telecommunication signal, and a software distribution medium. For example, a USB flash drive, a mobile hard disk, a disk or an optical disk.

[0145] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0146] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0147] In the embodiments provided in the present application, it should be understood that the disclosed technology transfer and transformation evaluation system / backstage terminal and technology transfer and transformation evaluation method can be implemented in other ways. For example, the background terminal / technology transfer and transformation evaluation system embodiment described above is only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0148] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0149] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for evaluating the transfer and transformation of scientific and technological achievements, characterized in that: Applied to a backend terminal, the method includes: Obtaining scientific and technological innovation log information; wherein the scientific and technological innovation log information is used to reflect the actual working situation of the scientific and technological achievements of the university; Quantifying the scientific and technological innovation log information to obtain work information; wherein the work information is the scientific and technological innovation log information that meets the quantification standard; Evaluate the work information according to the scientific transfer evaluation system indicators to obtain scoring information corresponding to the work information; wherein the scoring information is used to reflect whether the actual working conditions of the scientific and technological achievements of the university corresponding to the work information are qualified; Based on the scoring information, scientific and technological achievement transformation resources are recommended to the user terminal corresponding to the scoring information.

2. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 1, characterized in that: The quantification of the scientific and technological innovation log information to obtain work information includes: Matching the scientific and technological innovation log information with preset quantitative information to determine whether the scientific and technological innovation log information meets the quantitative standard; wherein the preset quantitative information is pre-set information that can be used as a reference for the evaluation process; If the scientific and technological innovation log information does not meet the quantitative standards, the scientific and technological innovation log information that does not meet the quantitative standards will be discarded; In the case where the scientific and technological innovation log information meets the quantitative standards, the scientific and technological innovation log information that meets the quantitative standards is stored in the background terminal to obtain the work information.

3. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 1, characterized in that: The recommending, based on the scoring information, scientific and technological achievement transformation resources to the user terminal corresponding to the scoring information includes: When the scoring information reflects that the actual work of the university scientific and technological achievements corresponding to the work information is unqualified, obtaining keywords of the work information; Matching the keywords of the work information in a preset scientific and technological achievement transformation resource library to obtain a matching result; wherein the matching result is used to reflect whether there is a scientific and technological achievement transformation resource matching the keywords of the work information; In the case where the matching result reflects that there are scientific and technological achievement transformation resources matching the keywords of the work information, recommending the scientific and technological achievement transformation resources in the preset scientific and technological achievement transformation resource library to the corresponding user terminal; When the matching result reflects that there are no scientific and technological achievement transformation resources matching the keywords of the work information, the resource demand information of the user terminal is obtained, and the resource demand information is published to the background terminal so that other user terminals can provide corresponding scientific and technological achievement transformation resources through the published resource demand information.

4. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 1, characterized in that: The backend terminal is in communication connection with the user terminal. Before evaluating the work information according to the indicators of the science and technology transfer evaluation system to obtain the evaluation result, the method further includes: Based on the scientific transfer evaluation system indicators, the work information continuously acquired by the user terminal is evaluated one by one; wherein the work information is used to evaluate the actual application effect of scientific and technological achievements, and the scientific transfer evaluation system indicators are evaluation indicators used for the evaluation business between the background terminal and the user terminal before the evaluation; In the case of evaluating the work information, whenever it is judged that the adjustment requirements are met according to the evaluation progress or evaluation results of the evaluated work information, the indicators of the science transfer evaluation system are adjusted according to the evaluation time of the evaluated work information; wherein the evaluation time of one work information is the time between the time when the evaluation of one work information starts and the time when the evaluation of one work information is completed; In the case of evaluating the work information, if it is determined that the evaluation progress or evaluation result of the work information does not meet the adjustment requirements, the science and technology transfer evaluation system indicators will not be adjusted.

5. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 4, characterized in that: In the case of evaluating the work information, whenever it is determined that the work information meets the adjustment requirements based on the evaluation progress or evaluation results of the work information being evaluated, the indicators of the science transfer evaluation system are adjusted according to the evaluation time of the work information, including: In the case of evaluating the work information, if each piece of work information is evaluated, a first evaluation time corresponding to the work information currently being evaluated is obtained; wherein the first evaluation time includes a start evaluation time and an end evaluation time; When the evaluation progress of the evaluated work information is a preset progress, or when the evaluation result of the evaluated work information is a preset result, the evaluation duration corresponding to each work information is determined according to the evaluation start time and the evaluation end time corresponding to the work information currently being evaluated; Based on the evaluation duration of each piece of work information, the indicators of the science and technology transfer evaluation system are adjusted.

6. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 4, characterized in that: The step of adjusting the indicators of the science transfer evaluation system based on the evaluation duration of each piece of work information includes: Based on the evaluation duration of each piece of work information, a first evaluation period is determined; wherein the first evaluation period is the maximum time period for the background terminal to evaluate the work information acquired by the user terminal after the scientific transfer evaluation system indicator is adjusted; According to the start evaluation time of each piece of work information, determining a time period for the background terminal to evaluate each of the two most recent pieces of work information acquired by the user terminal, so as to obtain a plurality of start evaluation time periods; Calculating an average of the plurality of starting evaluation time periods to obtain a second evaluation time period; When the first evaluation period is greater than or equal to the second evaluation period, the scientific transfer evaluation system indicators are adjusted according to the first evaluation period and the second evaluation period.

7. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 1, characterized in that: The evaluation path currently used by the background terminal is the first evaluation path, and the current second evaluation path is in an inactive state. The method further includes: After monitoring that the second evaluation path switches from an inactive state to an active state, starting the evaluation timer; Before the evaluation timing reaches a preset time, obtaining the data currently collected by the background terminal; In the case that the currently collected data includes first unevaluated data, obtaining state information of the first unevaluated data; In a case where the status information of the first unevaluated data reflects valid information, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path.

8. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 7, characterized in that: In the case that the currently collected data includes the first unevaluated data, after obtaining the state information of the first unevaluated data, the method further includes: In the case where the status information of the first unevaluated data reflects invalid information, the first unevaluated data is added to the pending conversion evaluation list.

9. The evaluation method for the transfer and transformation of scientific and technological achievements according to claim 8, characterized in that: In the case that the state information of the first unevaluated data reflects invalid information, after adding the first unevaluated data into the pending conversion evaluation list, the method further includes: monitoring a feedback signal corresponding to the first unevaluated data; wherein the feedback signal is a signal of an evaluation request sent for the first unevaluated data; When the feedback signal is monitored and the first unevaluated data is in the pending conversion evaluation list, the first unevaluated data is processed on the second evaluation path, and the evaluation path currently used by the first unevaluated data is recorded as the second evaluation path.

10. A technology achievement transfer and transformation evaluation system, characterized in that: Applied to a backend terminal, used to implement the scientific and technological achievement transfer and transformation evaluation method according to any one of claims 1 to 9, the scientific and technological achievement transfer and transformation evaluation system comprises: An acquisition unit, used to acquire scientific and technological innovation log information; wherein the scientific and technological innovation log information is used to reflect the actual working conditions of scientific and technological achievements of universities; A quantification unit, used to quantify the scientific and technological innovation log information to obtain working information; wherein the working information is the scientific and technological innovation log information that meets the quantification standard; An evaluation unit, used to evaluate the work information according to the scientific transfer evaluation system indicators to obtain scoring information corresponding to the work information; wherein the scoring information is used to reflect whether the actual working conditions of the scientific and technological achievements of the university corresponding to the work information are qualified; A generating unit is used to recommend scientific and technological achievement transformation resources to the user terminal corresponding to the scoring information based on the scoring information.

Citation Information

Patent Citations

  • Scientific and technological enterprise evaluation method and device, equipment and medium

    CN114662926A

  • Water conservancy scientific and technological achievement multi-source information fusion evaluation system

    CN118657418A

  • Method and apparatus for preference and avoidance of test experts in scientific and technological achievement test

    WO2024164698A1