Through a planning system based on comprehensive land remediation data, and using data processing and analysis modules to build an algorithm model, the problems of unreasonable planning results and untimely response in the existing technology are solved, and scientific decision-making and efficient planning of industrial development are achieved.

CN119067328AInactive Publication Date: 2024-12-03GUANGDONG PULAN GEOGRAPHIC INFORMATION SERVICE CO LTD

Patent Information

Application Number
CN202411570237.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing township industrial development plans rely on human operations, resulting in unreasonable planning results, difficulty in responding to market changes in a timely manner, and the plan effect is not good.

Method used

Design a planning system based on comprehensive land remediation data, including data processing, data analysis, algorithm model construction, evaluation verification and result generation modules, and generate visual industrial development through data cleaning, potential relationship mining, algorithm model deduction and verification Render the results.

Benefits of technology

It improves the accuracy and efficiency of the planning, reduces human intervention errors, realizes intelligent and automated processing from data to results, and supports scientific decision-making.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067328A_ABST
    Figure CN119067328A_ABST
Patent Text Reader

Abstract

The invention discloses a rural and town industry development planning system based on land comprehensive improvement data, which is characterized in that a data processing module processes, cleans and extracts massive land comprehensive improvement data to effectively remove redundant and abnormal data and ensure the quality and accuracy of the data; the data analysis module can deeply mine a potential association relationship between data sets and is helpful to discover new industrial development opportunities and potential risks, the algorithm model module can accurately carry out industrial development deduction, and an algorithm model can predict the future trend of industrial development and possible problems by simulating different scenes and conditions, so that the development efficiency of the industrial development is improved. The evaluation and verification module strictly verifies the algorithm model deduction result to ensure the accuracy and reliability of the deduction result, the result generation module facilitates understanding and analysis of a planning decision maker according to the verification result, and the system realizes whole-process intelligent and automatic processing from data to the result, so that the working efficiency is improved, and the working efficiency is improved. And errors and risks of human intervention are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of township industrial development planning, and in particular to a township industrial development planning system based on comprehensive land improvement data. Background Art

[0002] In the existing process of industrial development planning in towns and cities, it mainly relies on manual operation, and analyzes local industry, project and land space planning related data based on relevant technical standards and regulations. These data include but are not limited to remediation planning, cultivated land, ecological red lines, agricultural production status, river systems, ecological environment, natural resource distribution, existing underground pipelines, historical and cultural heritage and other factors. Planners need to comprehensively consider the relationship between these factors, and on the premise of meeting relevant requirements such as industrial development, commercial revitalization, and resource development, finally determine the planning implementation plan through comprehensive comparison.

[0003] However, this traditional method has many shortcomings. First, it requires manual comparison and analysis of various types of data, which is a large and cumbersome workload. It is easy to cause unreasonable planning results due to human misjudgment or incomplete data consideration. Secondly, the process of manual data analysis takes a long time, the work efficiency is low, and it is difficult to respond to rapidly changing market demands in a timely manner. In addition, due to the limitations of human experience, the formulated planning schemes may not meet the requirements of the long-term development of towns and villages, resulting in difficulties in the implementation of subsequent projects or poor results. Summary of the invention

[0004] In view of this, the present invention proposes a township industrial development planning system based on comprehensive land improvement data, which can solve the defects of the prior art such as unreasonable planning results, difficulty in timely responding to rapidly changing market demands and poor planning scheme effects.

[0005] The technical solution of the present invention is achieved in this way: A township industrial development planning system based on comprehensive land management data, including: The data processing module is used to process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis module, used to mine potential correlations between data based on data sets; An algorithm model module, which is used to construct an algorithm model based on the potential correlation between data, and the algorithm model is used to perform industrial development deduction; Evaluation and verification module, used to set evaluation indicators for industrial development planning and verify the results of algorithm model deduction; The result generation module is used to generate industrial development rendering results based on the verification results.

[0006] As a further optional solution of the township industrial development planning system based on land comprehensive improvement data, the data processing module processes, cleans and extracts the land comprehensive improvement data to form a data set that can be used for analysis, specifically including: Collect spatiotemporal element data and historical planning data of towns and villages; Based on ETL and spatial software tools, redundant data cleaning and abnormal data repair are performed on the spatiotemporal element data and historical planning data of towns and villages; Integrate the cleaned and repaired spatiotemporal element data and historical planning data to form a unified data set; Using geographic information system technology, the integrated data can be visualized on the map; On the GIS platform, build a basic analysis base map based on the spatial distribution and attribute characteristics of the data; On the basic analysis base map, rasterization technology is used to divide the spatial units into regular grids; According to the data characteristics in each grid, a corresponding weight value is assigned to each grid to generate a basic weighted grid base map.

[0007] As a further optional solution of the township industrial development planning system based on land comprehensive improvement data, the data analysis module mines the potential correlation between data according to the data set, specifically including: On the constructed basic weighted grid base map, the township industry data layer, township natural resource data layer, township production data layer and township project data layer are superimposed; According to the spatial analysis method, the spatial relationship of the data layer is identified to obtain the spatial relationship between different data elements; Based on the regression analysis method, the data is statistically analyzed to obtain the time relationship and causal relationship between different data elements.

[0008] As a further optional solution for the township industrial development planning system based on land comprehensive improvement data, the algorithm model is constructed based on the potential correlation between the data, specifically including: Design and construct an initial algorithm model based on the mined data association relationship, wherein the initial algorithm model is used to reflect the complex relationship between the data; A trend analysis algorithm is applied to the initial algorithm model to obtain a final algorithm model, wherein the trend analysis algorithm is used to analyze the historical trends, current conditions and possible future changes of industrial development.

[0009] As a further optional solution of the township industrial development planning system based on land comprehensive improvement data, the evaluation and verification module sets the industrial development planning evaluation indicators and verifies the results of the algorithm model deduction, specifically including: Set evaluation indicators based on the needs and goals of township industrial development planning; Collect and organize actual data related to evaluation indicators; Compare the results obtained by the algorithm model with the actual data to evaluate the accuracy of the model prediction; Conduct sensitivity analysis on key parameters, variables or assumptions in the evaluation results to analyze the impact of key parameters, variables or assumptions on the planning scheme; Adjust the algorithm model based on the analysis results.

[0010] As a further optional solution of the township industrial development planning system based on land comprehensive improvement data, the result generation module generates industrial development rendering results according to the verification results, specifically including: Set the parameters of rendering results according to the requirements of township industrial development planning; Using the GIS platform, the verified result data is converted into visual graphics or charts according to the set rendering result parameters, and the initial generated industrial development rendering results are obtained; The initially generated industrial development rendering results are adjusted and optimized to obtain the final industrial development rendering results.

[0011] As a further optional solution of the township industrial development planning system based on comprehensive land management data, the system also includes: The user interaction module is used to flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

[0012] A township industrial development planning method based on comprehensive land management data, specifically including: Data processing steps: Process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis steps: mining potential correlations between data based on the processed data set; Algorithm model building step: Based on the potential correlation between the data obtained in the data analysis step, an algorithm model is built, and the algorithm model is used for industrial development deduction; Evaluation and verification steps: Set the evaluation indicators for the industrial development plan, use the constructed algorithm model to perform deductions, and verify the deduction results; Result generation step: Generate industrial development rendering results based on the results of the evaluation and verification step. The industrial development rendering results convert the verified result data into visual graphics or charts based on the set rendering result parameters through the GIS platform; User interaction and adjustment steps: Through the user interaction module, users can flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

[0013] A computing device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the township industrial development planning method based on comprehensive land improvement data are implemented.

[0014] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the township industrial development planning method based on comprehensive land improvement data.

[0015] The beneficial effects of the present invention are as follows: the data processing module processes, cleans and extracts massive amounts of land comprehensive improvement data through professional methods, effectively removes redundant and abnormal data, and ensures the quality and accuracy of the data, which lays a solid foundation for subsequent data analysis and algorithm model construction. The data analysis module can deeply explore the potential correlations between data sets and reveal the laws and trends hidden behind the data. This deep mining helps to discover new industrial development opportunities and potential risks, and provide strong support for industrial development planning. The algorithm model module constructs an algorithm model based on the data mining results. The model can accurately deduce industrial development. By simulating different scenarios and conditions, the algorithm model can predict future trends in industrial development and possible problems, and provide a scientific basis for planning decision makers. and reference, the evaluation and verification module strictly verifies the deduction results of the algorithm model by setting evaluation indicators for industrial development planning. This process ensures the accuracy and reliability of the deduction results and avoids decision-making errors caused by model errors or data problems. The result generation module generates industrial development rendering results based on the verification results. These results are displayed in intuitive forms such as graphics and charts to facilitate the understanding and analysis of planning decision makers. At the same time, the rendering results are highly operational and can be adjusted and modified according to actual needs to meet different planning needs. The system integrates multiple modules such as data processing, data analysis, algorithm model construction, evaluation and verification, and result generation, realizing the full intelligent and automated processing from data to results, which not only improves work efficiency, but also reduces the errors and risks of human intervention. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 A schematic diagram of the composition of a township industrial development planning system based on comprehensive land management data according to the present invention; Figure 2 It is a flow chart of a township industrial development planning method based on comprehensive land improvement data of the present invention. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] refer to Figure 1 to Figure 2 , a township industrial development planning system based on comprehensive land management data, including: The data processing module is used to process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis module, used to mine potential correlations between data based on data sets; An algorithm model module, which is used to construct an algorithm model based on the potential correlation between data, and the algorithm model is used to perform industrial development deduction; Evaluation and verification module, used to set evaluation indicators for industrial development planning and verify the results of algorithm model deduction; The result generation module is used to generate industrial development rendering results based on the verification results.

[0020] In this embodiment, the data processing module processes, cleans and extracts massive amounts of land comprehensive improvement data through professional methods, effectively removes redundant and abnormal data, and ensures the quality and accuracy of the data, which lays a solid foundation for subsequent data analysis and algorithm model construction. The data analysis module can deeply explore the potential correlations between data sets and reveal the laws and trends hidden behind the data. This deep mining helps to discover new industrial development opportunities and potential risks, and provide strong support for industrial development planning. The algorithm model module constructs an algorithm model based on the data mining results. The model can accurately deduce industrial development. By simulating different scenarios and conditions, the algorithm model can predict future trends in industrial development and possible problems, and provide scientific basis and guidance for planning decision makers. For reference, the evaluation and verification module strictly verifies the deduction results of the algorithm model by setting evaluation indicators for industrial development planning. This process ensures the accuracy and reliability of the deduction results and avoids decision-making errors caused by model errors or data problems. The result generation module generates industrial development rendering results based on the verification results. These results are displayed in intuitive forms such as graphics and charts to facilitate the understanding and analysis of planning decision makers. At the same time, the rendering results are highly operational and can be adjusted and modified according to actual needs to meet different planning needs. The system integrates multiple modules such as data processing, data analysis, algorithm model construction, evaluation and verification, and result generation, realizing the full intelligent and automated processing from data to results, which not only improves work efficiency, but also reduces the errors and risks of human intervention.

[0021] Preferably, the data processing module processes, cleans and extracts the land comprehensive improvement data to form a data set that can be used for analysis, specifically including: Collect spatiotemporal element data and historical planning data of towns and villages; Based on ETL and spatial software tools, redundant data cleaning and abnormal data repair are performed on the spatiotemporal element data and historical planning data of towns and villages; Integrate the cleaned and repaired spatiotemporal element data and historical planning data to form a unified data set; Using geographic information system technology, the integrated data can be visualized on the map; On the GIS platform, build a basic analysis base map based on the spatial distribution and attribute characteristics of the data; On the basic analysis base map, rasterization technology is used to divide the spatial units into regular grids; According to the data characteristics in each grid, a corresponding weight value is assigned to each grid to generate a basic weighted grid base map.

[0022] In this embodiment, through the application of ETL (Extract, Transform, Load) and spatial software tools, redundant data is effectively removed and abnormal data is repaired, ensuring the accuracy and consistency of the data. This data cleaning process is crucial for subsequent analysis because it can reduce analysis errors caused by data quality problems; the cleaned and repaired spatiotemporal element data and historical planning data are integrated to form a unified data set, which simplifies the complexity of data management and improves the convenience of data use. At the same time, this integration also promotes interoperability and sharing between data, and provides the possibility for cross-departmental and cross-domain data analysis; using geographic information system (GIS) technology, the integrated data is visualized on the map, making the spatial distribution and attribute characteristics of the data clear at a glance. This visualization not only enhances the readability and comprehensibility of the data, but also helps Decision makers can quickly gain insights into the patterns and trends behind the data. On the GIS platform, a basic analysis base map is constructed based on the spatial distribution and attribute characteristics of the data, providing an accurate spatial reference for subsequent analysis. This base map not only reflects the actual distribution of the data, but also provides the necessary spatial constraints and boundary conditions for the construction and deduction of algorithm models. The rasterization technology is used to divide the spatial units into regular grids, providing a unified spatial scale for data analysis. This division makes data analysis more refined and accurate, and also facilitates operations such as spatial statistics and spatial analysis. A corresponding weight value is assigned to each grid based on the data characteristics within each grid to generate a basic weighted raster base map. This weight assignment takes into account factors such as the importance, influence and spatial distribution of the data, making the analysis results more scientific, reasonable and close to reality.

[0023] It should be noted that the spatial and temporal element data of towns and villages, including but not limited to geographical location, topography, climate conditions, etc., and historical planning data, such as past industrial development plans, land use plans, urban construction plans, etc., are collected, and the collected data are cleaned to remove redundant, erroneous and abnormal data, and the data are formatted and standardized to ensure consistency and comparability.

[0024] Preferably, the data analysis module mines potential correlations between data based on the data set, specifically including: On the constructed basic weighted grid base map, the township industry data layer, township natural resource data layer, township production data layer and township project data layer are superimposed; According to the spatial analysis method, the spatial relationship of the data layer is identified to obtain the spatial relationship between different data elements; Based on the regression analysis method, the data is statistically analyzed to obtain the time relationship and causal relationship between different data elements.

[0025] In this embodiment, by superimposing multiple data layers such as industry, natural resources, production and projects, and identifying their spatial relationships, the data analysis module can fully and multi-dimensionally display the current status and potential of township industrial development, which helps to discover the interactions and influences between different factors and provide a more comprehensive information basis for planning; combined with the regression analysis method, the data analysis module can quantitatively analyze the temporal relationship and causal relationship between data elements, so as to achieve accurate prediction of future development trends, which is of great guiding significance for formulating scientific industrial development plans and optimizing resource allocation; by mining the potential correlation between data, the data analysis module can provide decision makers with more intuitive and accurate information support, which helps to reduce the bias of human judgment and improve the scientificity and rationality of decision-making, thereby ensuring that the industrial development plan meets the requirements of the long-term development of townships.

[0026] It should be noted that on the constructed basic weighted grid base map, various data layers such as industry status data, natural resource data, production data, project data, etc. are superimposed. This step is to display and analyze the spatial distribution and mutual relationship of different data elements under the same spatial framework; spatial analysis methods such as spatial autocorrelation analysis and spatial clustering analysis are used to identify the spatial relationship of data layers. These analysis methods can help us discover the similarities or differences in the spatial distribution of different data elements, as well as the spatial agglomeration or exclusion between them; in addition to spatial analysis, statistical analysis of the data is also required to identify the temporal relationship and causal relationship between different data elements. This can be achieved through regression analysis methods to understand the dynamic changes and mutual influence mechanisms between data.

[0027] Preferably, the algorithm model is constructed based on the potential correlation between the data, specifically including: Design and construct an initial algorithm model based on the mined data association relationship, wherein the initial algorithm model is used to reflect the complex relationship between the data; A trend analysis algorithm is applied to the initial algorithm model to obtain a final algorithm model, wherein the trend analysis algorithm is used to analyze the historical trends, current conditions and possible future changes of industrial development.

[0028] In this embodiment, through the application of trend analysis algorithms, the algorithm model can not only reflect the complex relationship between current data, but also predict the historical trends, current conditions and possible future changes of industrial development, and provide more accurate data support and decision-making basis for township industrial planning; the design of the algorithm model takes into account the potential correlation between data, and can be adjusted and optimized according to actual data changes, thereby improving the flexibility and adaptability of the model in dealing with different townships and different industrial backgrounds; through the automated processing of the algorithm model, the errors of human judgment and data processing are reduced, the efficiency and accuracy of planning work are improved, and at the same time, it also provides strong support for the optimization of planning schemes.

[0029] It should be noted that the trend analysis algorithm specifically includes: Historical trend analysis: Extract historical data of industrial development from the processed data, use statistical analysis methods (such as time series analysis, regression analysis, etc.) to process the historical data, identify historical trends of industrial development, such as growth rate, fluctuation cycle, etc., visualize historical trends, and use charts (such as line charts, bar charts, etc.) to intuitively show the changing patterns of industrial development over time.

[0030] Current situation analysis: Based on the latest data, analyze the current status of industrial development, identify the main characteristics, advantages and disadvantages of current industrial development, as well as the opportunities and challenges it faces. Use cluster analysis, principal component analysis and other methods to conduct a multi-dimensional and in-depth analysis of the current status of the industry.

[0031] Future trend forecast: Based on the results of historical trend analysis and current situation analysis, the time series forecasting model is used to forecast future industrial development trends. The impact of external factors (such as policy environment, market environment, technological innovation, etc.) on industrial development is considered, and the forecast results are revised and adjusted. Different scenario assumptions are set and multi-scenario analysis is conducted to cope with possible uncertainties in the future.

[0032] Preferably, the evaluation and verification module sets the industrial development planning evaluation indicators and verifies the algorithm model deduction results, specifically including: Set evaluation indicators based on the needs and goals of township industrial development planning; Collect and organize actual data related to evaluation indicators; Compare the results obtained by the algorithm model with the actual data to evaluate the accuracy of the model prediction; Conduct sensitivity analysis on key parameters, variables or assumptions in the evaluation results to analyze the impact of key parameters, variables or assumptions on the planning scheme; Adjust the algorithm model based on the analysis results.

[0033] In this embodiment, by setting clear evaluation indicators and comparing the results of the algorithm model deduction with the actual data, the accuracy of the model prediction can be objectively evaluated, thereby improving the scientificity and rationality of the industrial development planning scheme; collecting and organizing actual data related to the evaluation indicators makes the verification process more comprehensive and specific, which helps to discover potential problems and risks, thereby improving the feasibility and operability of the planning scheme; by conducting sensitivity analysis on key parameters, variables or assumptions, the degree of influence of these factors on the planning scheme can be understood, and then the algorithm model can be adjusted to enhance its flexibility and adaptability to better respond to changes in actual conditions; the use of the evaluation and verification module can help decision makers more accurately grasp the trends and changes in industrial development, optimize resource allocation, avoid waste of resources and unnecessary investment, and improve the efficiency and benefits of industrial development; the entire evaluation and verification process is carried out through systematic methods and processes, which can greatly improve the efficiency of planning decisions, shorten the planning cycle, and provide more timely and effective support for township industrial development planning and business planning.

[0034] Preferably, the result generation module generates industrial development rendering results according to the verification results, specifically including: Set the parameters of rendering results according to the requirements of township industrial development planning; Using the GIS platform, the verified result data is converted into visual graphics or charts according to the set rendering result parameters, and the initial generated industrial development rendering results are obtained; The initially generated industrial development rendering results are adjusted and optimized to obtain the final industrial development rendering results.

[0035] In this embodiment, complex data is converted into graphics or charts through the GIS platform, so that the results of the township industrial development plan are more intuitive and easy to understand, and managers and decision makers can clearly see the industrial development of different regions and the expected results after the implementation of the plan; the visual display of the rendering results greatly simplifies the decision-making process, and decision makers can quickly identify key problem areas and potential development opportunities from the graphics, so as to make faster and more accurate decisions; the result generation module allows the initial generated rendering results to be adjusted and optimized, which means that the planning scheme can be flexibly adjusted according to actual conditions to meet the changing needs of township industrial development; through algorithm model deduction and verification, combined with the visual display of the GIS platform, the planning analysis system of the present invention ensures the scientificity and rationality of the industrial development plan, avoids the subjectivity and one-sidedness of human judgment, and improves the accuracy and reliability of the planning scheme; the industrial development rendering results generated based on the verification results can provide township managers with accurate policy basis, and they can formulate corresponding policy measures and action plans according to the problem areas and advantage areas displayed in the rendering results to promote the sustainable development of township industries.

[0036] Preferably, the system further comprises: The user interaction module is used to flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

[0037] In this embodiment, the user interaction module allows the user to flexibly modify the area to be analyzed through the drawing function. This high degree of customization greatly improves the user experience. Users can quickly locate a specific area for analysis according to their needs and concerns without being limited to the preset analysis range. Users can not only modify the analysis area, but also customize the visualization effect of the generated results. This means that users can adjust visual elements such as color, size, and transparency according to their preferences and display needs, making the analysis results more intuitive and easy to understand. Batch rendering and visualization functions are supported, and users can handle multiple analysis tasks at the same time, which greatly saves time. This is an important efficiency improvement point for users who need to frequently analyze and display industrial development plans. The addition of the user interaction module makes the system no longer a static display tool, but a dynamic platform that can interact with users. Users can use the functions provided by the system to adjust analysis parameters and visualization effects in real time, observe changes in analysis results under different parameters, and thus have a deeper understanding of the meaning behind the data.

[0038] A township industrial development planning method based on comprehensive land management data, specifically including: Data processing steps: Process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis steps: mining potential correlations between data based on the processed data set; Algorithm model building step: Based on the potential correlation between the data obtained in the data analysis step, an algorithm model is built, and the algorithm model is used for industrial development deduction; Evaluation and verification steps: Set the evaluation indicators for the industrial development plan, use the constructed algorithm model to perform deductions, and verify the deduction results; Result generation step: Generate industrial development rendering results based on the results of the evaluation and verification step. The industrial development rendering results convert the verified result data into visual graphics or charts based on the set rendering result parameters through the GIS platform; User interaction and adjustment steps: Through the user interaction module, users can flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

[0039] A computing device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the township industrial development planning method based on comprehensive land improvement data are implemented.

[0040] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the township industrial development planning method based on comprehensive land improvement data.

[0041] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A township industrial development planning system based on comprehensive land management data, It is characterized in that include: The data processing module is used to process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis module, used to mine potential correlations between data based on data sets; An algorithm model module, which is used to construct an algorithm model based on the potential correlation between data, and the algorithm model is used to perform industrial development deduction; Evaluation and verification module, used to set evaluation indicators for industrial development planning and verify the results of algorithm model deduction; The result generation module is used to generate industrial development rendering results based on the verification results.

2. A township industrial development planning system based on comprehensive land management data according to claim 1, It is characterized in that The data processing module processes, cleans and extracts the land comprehensive improvement data to form a data set that can be used for analysis, specifically including: Collect spatiotemporal element data and historical planning data of towns and villages; Based on ETL and spatial software tools, redundant data cleaning and abnormal data repair are performed on the spatiotemporal element data and historical planning data of towns and villages; Integrate the cleaned and repaired spatiotemporal element data and historical planning data to form a unified data set; Using geographic information system technology, the integrated data can be visualized on the map; On the GIS platform, build a basic analysis base map based on the spatial distribution and attribute characteristics of the data; On the basic analysis base map, rasterization technology is used to divide the spatial units into regular grids; According to the data characteristics in each grid, a corresponding weight value is assigned to each grid to generate a basic weighted grid base map.

3. A township industrial development planning system based on land comprehensive management data according to claim 2, It is characterized in that The data analysis module mines the potential correlation between data according to the data set, specifically including: On the constructed basic weighted grid base map, the township industry data layer, township natural resource data layer, township production data layer and township project data layer are superimposed; According to the spatial analysis method, the spatial relationship of the data layer is identified to obtain the spatial relationship between different data elements; Based on the regression analysis method, the data is statistically analyzed to obtain the time relationship and causal relationship between different data elements.

4. A township industrial development planning system based on comprehensive land management data according to claim 3, It is characterized in that The algorithm model is constructed based on the potential correlation between the data, specifically including: Design and construct an initial algorithm model based on the mined data association relationship, wherein the initial algorithm model is used to reflect the complex relationship between the data; A trend analysis algorithm is applied to the initial algorithm model to obtain a final algorithm model, wherein the trend analysis algorithm is used to analyze the historical trends, current conditions and possible future changes of industrial development.

5. A township industrial development planning system based on comprehensive land management data according to claim 4, It is characterized in that The evaluation and verification module sets the industrial development planning evaluation indicators and verifies the algorithm model deduction results, including: Set evaluation indicators based on the needs and goals of township industrial development planning; Collect and organize actual data related to evaluation indicators; Compare the results obtained by the algorithm model with the actual data to evaluate the accuracy of the model prediction; Conduct sensitivity analysis on key parameters, variables or assumptions in the evaluation results to analyze the impact of key parameters, variables or assumptions on the planning scheme; Adjust the algorithm model based on the analysis results.

6. A township industrial development planning system based on comprehensive land management data according to claim 5, It is characterized in that The result generation module generates industrial development rendering results according to the verification results, specifically including: Set the parameters of rendering results according to the requirements of township industrial development planning; Using the GIS platform, the verified result data is converted into visual graphics or charts according to the set rendering result parameters, and the initial generated industrial development rendering results are obtained; The initially generated industrial development rendering results are adjusted and optimized to obtain the final industrial development rendering results.

7. A township industrial development planning system based on comprehensive land management data according to claim 6, It is characterized in that The system further comprises: The user interaction module is used to flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

8. A township industrial development planning method based on comprehensive land management data, It is characterized in that Specifically include: Data processing steps: Process, clean and extract the land comprehensive improvement data to form a data set that can be used for analysis; Data analysis steps: mining potential correlations between data based on the processed data set; Algorithm model building step: Based on the potential correlation between the data obtained in the data analysis step, an algorithm model is built, and the algorithm model is used for industrial development deduction; Evaluation and verification steps: Set the evaluation indicators for the industrial development plan, use the constructed algorithm model to perform deductions, and verify the deduction results; Result generation step: Generate industrial development rendering results based on the results of the evaluation and verification step. The industrial development rendering results convert the verified result data into visual graphics or charts based on the set rendering result parameters through the GIS platform; User interaction and adjustment steps: Through the user interaction module, users can flexibly modify the area to be analyzed through the drawing function, customize the visualization effect of the generated results, and support batch rendering and visualization functions.

9. A computing device, It is characterized in that It includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the township industrial development planning method based on comprehensive land improvement data as described in claim 8 are implemented.

10. A computer-readable storage medium, It is characterized in that The storage medium stores a computer program, which, when executed by a processor, implements the steps of the method for township industrial development planning based on comprehensive land improvement data as described in claim 8.

Citation Information

Patent Citations

  • Grid land hot area display method

    CN110648039A

  • Power grid path planning method and system

    CN115480577A

  • Intelligent city planning system and method based on big data analysis

    CN116823578A

Cited By

  • Town land reclamation type division and path matching method based on industrial characteristics

    CN120450240A

  • Classification and path matching method of town land consolidation types based on industrial characteristics

    CN120450240B

  • Land reclamation collaborative planning system based on GIS and BIM fusion

    CN120833040A

  • Industrial cluster analysis method and system

    TWI944849B